National Institute of Urban Affairs Pre-Submission Queries for Selection of Agencies as HRIDAY City Anchors for 12 Cities Under Scheme “HRIDAY” of Ministry of Urban Development, Government of India The following queries shall be read along with the EOI document and Corrigendum-01. # Section No. 1.1 Section 2.1 Page 12 Scope of Work 1.2 Section 2.4, Engagement Fee, (iii) Page 14 Fees for Evaluation of Detailed Project Reports 1.3 Section 2.4 Payment Schedule, Point 3 Page 15 Payment for Preparation of City HRIDAY Plan Query Description 1. IPE Global Private Limited Kindly elaborate on the skill set requirements (i.e. education qualification and work experience) for the person(s) to be deployed by city anchors for continuous support & delivery? This will enable us to streamline our approach for the proposal preparation. Kindly share the city-wise allocated budget under the “Project Implementation head”? NPMU Response The following shall be the skill set required from one person deployed by the HRIDAY City Anchor at the City for continuous support & delivery: Educational Qualification: Minimum Bachelors in Engineering or Architecture Work Experience: Minimum 5 years of experience The city wise allocation budget under the Project Implementation head is as follow: Ajmer 35 Crores Amaravati 20 Crores Amritsar 60 Crores Badami 20 Crores Dwarka 20 Crores Gaya 35 Crores Kanchipuram 20 Crores Mathura 35 Crores Puri 20 Crores Varanasi 80 Crores Velankanni 20 Crores Warangal 35 Crores "…5 Civic infrastructure development plan Only one CIDP shall be prepared for each heritage (CIDP)...”for areas around tangible heritage assets. asset. In cases where more than one How many CIDPs will be developed for one heritage structures/assets are listed as one heritage asset, asset? Will at least 5 heritage zones be identified for they will be included in the same CIDP. each city? Kindly provide the city wise list of heritage areas for which CIDPs will be developed. # Section No. Query Description 1.4 Section 2.4, Page 15-16 Payment Schedule 1.5 Section 3.2, Page 18 Pre-Qualification Criteria NPMU Response Kindly refer to Annexure 1, Point 1 in the EOI document for further clarification regarding Heritage Area. In the The Anchors shall be provided with the list of heritage assets in each City for which the CIDPs need to be developed. In the event that a City does not have a total of 5 identified heritage assets, the City Anchor shall prepare Civic Infrastructure Development Plans for those many identified heritage assets. Nonetheless, the City Anchor will be paid the entire fees for the preparation of the City HRIDAY Plan as specified under Section 2.4 of the EOI document. The approval from these multiple stake-holders The National Mission Directorate will make all committee for each payment is very tough and it efforts to expedite the process of approval and might virtually lead to a stage of non-payment to the payments. agency working as city anchor. Kindly re-consider In this regard, the terms of the EOI will remain this and facilitate linking payments to acceptance by unchanged. City Mission Director. Kindly clarify if a consulting firm registered under Consulting firms registered under the Companies Act Companies Act is eligible under this criterion? fulfilling the Pre-Qualification Criteria-2 as mentioned in the Corrigendum-01 are eligible to apply. Only those agencies fulfilling either the PreQualification Criteria-1 or Pre-Qualification Criteria-2 as mentioned in Corrigendum-01 are eligible to participate in the EOI as a standalone agency or as a JV or consortium. (Please refer to Corrigendum-01 for further clarifications) # 1.6 Section No. Section 3.2, Page 18 Pre-Qualification Criteria Query Description Kindly clarify what is meant by “Specialized agency” as mentioned under this clause? 1.7 Section 2.1 Page 12 Scope of Work There is no mention of team composition for carrying out the tasks under HRIDAY. Kindly state if this is it not required at this stage? NPMU Response The term ‘Specialized Agency’ refers to “autonomous organizations working with the United Nations and each other through the coordinating machinery of the United Nations Economic and Social Council at the intergovernmental level, and through the Chief Executives Board for coordination (CEB) at the intersecretariat level.” The following shall be the skill set required from one person deployed by the HRIDAY City Anchor at the City for continuous support & delivery: Educational Qualification: Minimum Bachelors in Engineering or Architecture Work Experience: Minimum 5 years of experience 1.8 2.1 Section 2.3, Page 13 Engagement Duration Section 3.2, Page 18 Pre-Qualification Criteria Kindly state the exact duration of the Project 2. Dronah and IHCN Please clarify whether the Non-Government Organizations involved in the National Advisory Committee are eligible to apply. The remaining team size and composition shall be determined by the HRIDAY City Anchor, based on the Anchor’s understanding of the scope of work and the timeline for completion of deliverables. The Project shall end either on 31st March, 2017 or on the date of the completion of execution of Projects identified for the particular City, whichever is earlier. Nonetheless, the retainership fee for the Anchors shall be paid for the entire period ending 31st March, 2017 even in instances of early completion. An agency that is formally associated with a member of the National Advisory Committee shall not be eligible to apply. # 2.2 Section No. EOI: HRIDAY-01-2015 Query Description Is it possible to replace the terms ‘EOI’ and ‘Bid’ with Empanelment or Selection as this then Invites larger spectrum and recognized NGO’s to participate. 2.3 EOI: HRIDAY-01-2015 Can the City Anchor be also empanelled with NIUA later for preparation of City level DPR? And will they be eligible to bid for DPR’s in other cities where they are not city anchors. 2.4 Section 2.3, Page 12-13 Key Milestones Under section 2.2 on milestones; there is a contradiction between 1 B and 1 D – is the Final City HRIDAY Plan for 5 priority areas or for all heritage areas? 2.5 Section 3.2, Page 18 Pre-Qualification Criteria Clarify the term ‘specialized agency’ under section 3.2 on pre-qualification criteria. Does it cover consultancy firm or ‘for profit’ organization. NPMU Response The word ‘Pre-Bid Query’ can be read as ‘PreSubmission Query’ The word ‘Bid Document’ can be read as ‘Proposal Document’ The word ‘Bid Opening’ can be read as ‘Proposal Opening’ The word ‘Bidding for’ can be read as ‘Participating in’ The HRIDAY City Anchors shall not be eligible for empanelment for preparation of DPRs in the City where they are Anchors. However, for other Cities, the HRIDAY City Anchor is eligible to apply for empanelment for preparation of DPRs. The Final City HRIDAY Plan shall include City Infrastructure Development Plans (CIDPs) for all heritage assets that are identified by the State Departments, ASI, ULBs etc. Milestone 1B shall be completed upon preparation of CIDPs for 5 heritage assets, while Milestone 1D shall be completed upon preparation of CIDPs for all identified heritage assets. The term ‘Specialized Agency’ refers to “autonomous organizations working with the United Nations and each other through the coordinating machinery of the United Nations Economic and Social Council at the intergovernmental level, and through the Chief Executives Board for coordination (CEB) at the intersecretariat level.” # 2.6 Section No. Section 4, Page 21 Evaluation Process 2.7 Section 4, Page 21 Evaluation Process 2.8 Section 4, Page 21 Evaluation Process 2.9 Section 3.1, Page 17 General Instructions Query Description NPMU Response Under Section 4 on Evaluation Process – the More weightage has been given on specific City eligibility criteria in point 1 mention requirement of related projects to ensure that City level knowledge 3 master plan/tourism plan/heritage plan level and experience is captured. works in the same city which does not seem In this regard, the terms of the EOI will remain feasible. Project Planning for State Level Heritage unchanged. works should also be considered for point 1. In fact all requirements under eligibility criteria 1-5 should include city/state rather than be restricted to the specific city in order to allow a wider range of applicants. Under Section 4 on all points is it possible to extend The terms of the EOI will remain unchanged for the term of qualifying projects to the requirement of 5 years for qualifying projects. 7/10 years instead of recent 5 years? Would there Projects older than 5 years can be included in the be any points for projects older than 5 years or do application, however only those projects meeting we completely remove these from the application? the requirements shall be considered. In case the applicant has more projects for last 5 The number of projects should be limited to only years (than the number asked for; can these be the number asked for. There are no additional added in the list or does one limit to the number marks for more projects. asked for only. Any extra points for these? Under Section 4, point 4 Detailed Project Report for In this regard, the terms of the EOI will remain ‘Urban Infrastructure Projects’ unchanged. should be replaced by ‘Heritage Infrastructure’ or ‘Urban Infrastructure Projects in Heritage areas’ as per HRIDAY guidelines. It is to be noted that organization working on infrastructure in Heritage areas should only qualify considering the nature of intervention in heritage areas. In a JV/Consortia are there any mandatory There are no other mandatory requirements for the requirements for the lead agency in terms of lead agency, besides the Pre-Qualification Criteria Projects/ Team leader or any other? enlisted in Corrigendum-01 for the EOI document. 3. Sincere Architects Engineers Private Limited # 3.1 Section No. Section 3.2, Page 18 Pre-Qualification Criteria 3.2 EOI: HRIDAY-01-2015 4.1 Section 2.1, Page 11 Scope of work 4.2 Section 2.1, Page 11 Scope of work 4.3 Section 2.1, Page 11-12 Scope of work 4.4 Section 2.1, Page 11-12 Scope of work Query Description Does an Architectural Firm qualify for applying under Specialized Agency? NPMU Response The term ‘Specialized Agency’ refers to “autonomous organizations working with the United Nations and each other through the coordinating machinery of the United Nations Economic and Social Council at the intergovernmental level, and through the Chief Executives Board for coordination (CEB) at the intersecretariat level.” If the agency is selected as the City Anchor for a The meaning of ‘design contracts’ in the query is particular city, can it undertake design contracts in understood as preparation of DPRs. the city or not? The HRIDAY City Anchors shall not be eligible for empanelment for preparation of DPRs in the City where they are Anchors. However, for other Cities, the HRIDAY City Anchor is eligible to apply for empanelment for preparation of DPRs. 4. School of Planning & Architecture, Vijaywada “Prepare a sustainable Civic Infrastructure Any proposed infrastructure development in the Development…. as per locally applicable standards”. Heritage Area shall be as per ALL locally applicable Please clarify as per locally applicable standards, is it standards including the Master Plan, Building as per Master Plan or ASI regulations Byelaws, guidelines issued by Agencies such as CPHEEO etc. What role City Anchor will play in DPR preparation The HRIDAY City Anchor is not expected to play a role process in the preparation of DPRs. However, they may be expected to provide inputs on heritage components to be considered by the DPR preparing Agency. What would be the roles and responsibility of The scope of work and roles and responsibility of the appointed City specific professional by City Anchor, HRIDAY City Anchor apply to all individuals throughout the engagement period? representing the HRIDAY City Anchor. Team composition is not mentioned anywhere in The following shall be the skill set required from the document. Please clarify. one person deployed by the HRIDAY City Anchor at the City for continuous support & delivery: Educational Qualification: Minimum Bachelors in # Section No. 5.1 Section 3.2, Page 18 Pre-Qualification Criteria 5.2 Section 2.1, Page 11-12 Scope of Work Query Description NPMU Response Engineering or Architecture Work Experience: Minimum 5 years of experience The remaining team size and composition shall be determined by the HRIDAY City Anchor, based on the Anchor’s understanding of the scope of work and the timeline for completion of deliverables. 5. Darashaw & Company Private Limited It is requested that registered companies/ Consulting firms registered under the Companies consultancy firms with similar experience in the Act fulfilling the Pre-Qualification Criteria-2 as sector, should be allowed to participate in the mentioned in the Corrigendum-01 are eligible to tender apply. Only those agencies fulfilling either the PreQualification Criteria-1 or Pre-Qualification Criteria2 as mentioned in Corrigendum-01 are eligible to participate in the EOI as a standalone agency or as a JV or consortium. (Please refer to Corrigendum-01 for further clarifications) Please clarify the experience and qualification of the The following shall be the skill set required from person to be deployed at the city. one person deployed by the HRIDAY City Anchor at the City for continuous support & delivery: Educational Qualification: Minimum Bachelors in Engineering or Architecture Work Experience: Minimum 5 years of experience The remaining team size and composition shall be determined by the HRIDAY City Anchor, based on the Anchor’s understanding of the scope of work and the timeline for completion of deliverables. # 5.3 Section No. Section 2.3, Page 12-13 Key Milestones Query Description Please clarify that in case the City Authorities do not have any “Existing DPR” then what will be the course of action. 5.4 Section 2.3, Page 12-13 Key Milestones Please clarify on what basis the appointed City Anchor will claim payments from client, for the taskHRIDAY linked evaluation of project execution, when his engagement contract lapses as per clause 2.3 i.e. on March 31, 2017. It is not necessary that project execution/construction will get completed within consultant’s engagement duration. In such a case, is there a provision wherein NIUA may extend the consultants contract formally as per same conditions after March 31, 2017. 5.5 Section 2.4, Page 13-14 Engagement fee Kindly clarify whether the budget under the “Project Implementation” head of each HRIDAY City has already been finalized or will be finalized as part of the City HRIDAY Plan. In case it is already final, we will request you to share the same. NPMU Response In the case that City Authorities do not have an existing DPR, the HRIDAY City Anchor shall identify one heritage linked urban infrastructure project identified in consultation with the City Mission Directorate and prepare a DPR Proposal, within 15 days of being appointed, for which a Detailed Project Report can be prepared. There shall be no difference in the compensation to the HRIDAY City Anchor. It shall be ensured that only those projects will be undertaken that can be completed within the Scheme duration ending 31st March, 2017. If due to unforeseen circumstances, the Project execution continues beyond the Scheme duration, the contract of HRIDAY City Anchor shall be extended only for the monitoring and evaluation component of heritage linked execution of that Project. However, the retainership fees shall not be extended for the period extending beyond 31st March, 2017. The city wise allocation budget under the Project Implementation head is as follow: Ajmer 35 Crores Amaravati 20 Crores Amritsar 60 Crores Badami 20 Crores Dwarka 20 Crores Gaya 35 Crores Kanchipuram 20 Crores Mathura 35 Crores Puri 20 Crores Varanasi 80 Crores Velankanni 20 Crores # Section No. Query Description Warangal 5.6 Section 2.4, page 13-15 Engagement fee and payment schedule 5.7 Section 3.1, Page 17 General instructions The clause mentions submission and approval of 5 Civic Infrastructure Development Plans. • Scope of Work (Point I) mentions that the Civic Infrastructure Development Plans have to be made for areas around tangible heritage assets identified/ approved by the client, upon suitable assessment of the existing infrastructure availability and the requirements. • The tangible heritage assets for each of the HRIDAY Cities have also been listed in the document. • However, our concern is largely based on the proximity of these tangible heritage assets, and that whether one will be able to identify 5 distinct Civic Infrastructure projects around these Tangible Heritage Assets. • Since the scope for any civic infrastructure provisions cannot be limited to one specific point in the city, hence this might not be specifically possible. • In such case, where it is not possible to identify and develop 5 distinct City Infrastructure Development Plans, how would the performance of the City Anchor be assessed • In case number of such projects is less than 05 then how would be payments for first milestone be made, please clarify. This criterion will limit the expert and experienced consultants from working for the HRIDAY Cities. NPMU Response 35 Crores Only one CIDP shall be prepared for each heritage asset. In cases where more than one structures/assets are listed as one heritage asset, they will be included in the same CIDP. Kindly refer to Annexure 1, Point 1 in the EOI document for further clarification regarding Heritage Area The Anchors shall be provided with the list of heritage assets in each City for which the CIDPs need to be developed In the event that a City does not have a total of 5 identified heritage assets, the City Anchor shall prepare Civic Infrastructure Development Plans for those many identified heritage assets. Nonetheless, the City Anchor will be paid the entire fees for the preparation of the City HRIDAY Plan as specified under Section 2.4 of the EOI document. In this regard, the terms of the EOI will remain unchanged. # 5.8 Section No. Section 3.1, Page 17 General instructions ; Point (iv) Query Description Hence, in the best of the envisioned development in the HRIDAY Cities, we kindly request to remove this clause. Appointment of a single agency for too many cities may lead to compromise on the quality of work and deliverables. It is thus suggested that an upper limit for the number of cities that can be awarded to an agency be restricted to 2 or 3 cities. NPMU Response Agencies are required to submit their priority of order for the Cities applied for, which shall facilitate the selection process for each City. Regarding submission of the Proposal, the terms of the EOI will stand unchanged. Please refer to Section 3.4 of the EOI document for further instructions regarding submission of the Proposal. Further, submission of separate proposals for each city is not necessary as it is QCBS and no financial quote is invited. Moreover the format F-5 specifies the willingness of the agency to participate for each of the HRIDAY City, and their relative preference for each of the cities. 5.9 Section 3.1, Page 17 General instructions ; Point (viii) It is suggested that the Single Proposal Clause may be utilized, however, city wise separate approach and methodology and schedule can be requested from the interested agencies. This would reduce costs and the overall documentation volume, thereby facilitating faster evaluation of the proposals submitted. Please clarify whether NIUA will also go for RFP based detailed proposal invitation tender stage for selection of consultants/ agencies or based on this expression of interest (EoI) only the selection of agencies/ consultants as City Anchors, will be finalised. Final selection of HRIDAY City Anchors shall be made based on the proposals received for the EOI for selection of HRIDAY City Anchors. # Section No. 5.10 Section 3.2, Page 18 Pre-Qualification Criteria 5.11 Section 3.4 Page 19 Submission, Receipt and Opening of Proposals 5.12 Section 4, Page 21 Evaluation Process , Point 1 5.13 Section 5, Page – 25 Proposal formats, F-2: Agency’s organization & prequalification criteria 5.14 Section 5, Page – 27 Proposal formats, F-3 Proposed approach and methodology Query Description The criteria can be more specific and elaborate to facilitate consultants to assess their eligibility. For example eligibility details like: annual turnover, number of related projects done & their total costs, experience in PMU/ anchor type services etc. can be kept in prequalification criteria so that more competent and experienced firms can be encouraged to bid for the project Hard Copy refers to Printed Proposals or Hard Bound Proposals. Please clarify. NPMU Response In this regard, the terms of the EOI will remain unchanged. It is requested that special emphasis may not be laid on awarded extra points for local experience. This will limit the involvement of established and more experience consultants who have worked on similar lines in other parts of the country. Special emphasis to local consultants and agencies those who have specially worked on the HRIDAY Cities may please be omitted/ relaxed. The column heading “Focus area of engagement “should be modified as “Title of project/ engagement” to facilitate clarity in pre-qualification. In this regard, the terms of the EOI will remain unchanged. By the terminology ‘high level recommendations’ is it meant that these are ‘major or vital recommendations’ Please clarify In this section, the HRIDAY City Anchor is required to showcase its understanding of the City heritage and broad nature of projects that it envisions to be taken up under HRIDAY. Such broad recommendations on innovate ideas and suggestions shall be vital in ensuring the heritage linked urban rejuvenation of the Heritage Areas. Hard Copy refers to Printed Proposals. Please refer to Section 3.4 in the EOI document for further instructions regarding submission of the Proposal. The word “Focus area of engagement” can be read as “Title of Engagement and Focus Area”. # Section No. 6.1 Section 2.1, Page 11-12 Scope of work 6.2 Section 2.1, Page 11-12 Scope of work 6.3 Section 2.1, Page 11-12 Scope of work 6.4 Section 2.4, Page 13-16 Engagement Fee and Payment schedule Section 2.4, Page 13-16 Engagement Fee and Payment schedule 6.5 Query Description 6. INTACH NPMU Response In terms of reference should not the City Anchor also first develop an overall heritage vision for the city using heritage as the engine for urban development so as to be able to fully augment its full potential? The scope does not include any works related to heritage conservation or restoration of even city level landmarks or historic street scapes which are intrinsic to the identity of the city as also spelt out in indicative components of HRIDAY guidelines. The HRIDAY City Anchor shall be required to develop the overall heritage vision as part of the City HRIDAY Plan. Could the city anchors suggest other projects like creating cultural attractions, cultural centers, craft centers, heritage walks etc, besides cultural museum or park as these projects should ideally determined from the vision and may also be left to city anchors based on real requirement of the specific city, other projects . If the city anchors wish to propose multiple concept plans will the fee be multiplies accordingly @ Rs. 1 lac per concept plan. The principal amount over which the fee will be calculated may also be communicated. Such suggestions can be explicitly stated in the Proposal under the Approach and Methodology Section. Only heritage linked urban infrastructure development projects shall be considered in scope of this engagement. The HRIDAY City Anchors are required to prepare one Concept Plan per City, the fee for which is fixed at Rs. 1 Lakh. The principal amount over which the fee will be calculated is as follows: Ajmer 35 Crores Amaravati 20 Crores Amritsar 60 Crores Badami 20 Crores Dwarka 20 Crores Gaya 35 Crores Kanchipuram 20 Crores Mathura 35 Crores Puri 20 Crores # Section No. 6.6 Annexure 6, Page – 30 Detailed scope of work 6.7 Section 2.4, Page 13-16 Engagement Fee and Payment schedule 6.8 Section 2.4, Page 13-16 Engagement Fee and Payment schedule 6.9 Section 3.1, Page 17 General instructions ; Point (xi) 6.10 Section 3.2, Page 18 Pre-Qualification Criteria Query Description NPMU Response Varanasi 80 Crores Velankanni 20 Crores Warangal 35 Crores Five heritage areas are suggested to be identified The scale of each heritage area shall be determined however their scales are not specified, this number by the HRIDAY City Anchor. may also be difficult to achieve in smaller towns, in In the event that a City does not have a total of 5 which case what will be the implication of the same identified heritage assets, the City Anchor shall on the fee. prepare Civic Infrastructure Development Plans for those many identified heritage assets. Nonetheless, the City Anchor will be paid the entire fees for the preparation of the City HRIDAY Plan as specified under Section 2.4 of the EOI document. What is the provision of mobilization advance as The payment terms are mentioned in Section 2.4 in substantial work is required to be taken up before the EOI document and should be considered. first consolidated fee is released. In this regard, the terms of the EOI remain unchanged Is the reimbursement for domestic travel & out of All expenses relating to manpower, travel, meetings pocket expense allowed within set consolidated fee? and other out of pocket expenses are considered in the proposed Consultation Fee mentioned under Section 2.4 of the EOI document. In case of JV will the eligibility & evaluation criteria Only those agencies fulfilling either the Prebe applicable to all partners or lead agency. Qualification Criteria-1 or Pre-Qualification Criteria-2 as mentioned in Corrigendum-01 are eligible to participate in the EOI as a standalone agency or as a JV or consortium. (Please refer to Corrigendum-01 for further clarifications) The experience of the Consortium or JV shall be considered under the Evaluation Criteria. What is meant by specialized agency? The term ‘Specialized Agency’ refers to “autonomous organizations working with the United Nations and each other through the coordinating machinery of the United Nations Economic and Social Council at # Section No. 6.11 Section 4, Page 21 Evaluation Process 6.12 Section 4, Page 21 Evaluation Process 6.13 Section 4, Page 21 Evaluation Process Query Description Evaluation process, and submission process seems to be based on one used for selecting a consultancy firm rather than a NGO etc the basic eligibility criteria as the assumption that all ngos are engaged in taking up consultancies and preparation of heritage dev plan etc. should the evaluation process be more conducive towards the working and functioning of a NGO rather than infrastructure consulting firms. Also since the selection is for CITY anchors , only 60% of the overall marks are provided for city specific experience should this not be considered to be at 80% as experience in other national or international area may be desirable but not mandatory? Moreover since there are not many projects that are required to be evaluated #4 may be considered to be relaxed. NPMU Response the intergovernmental level, and through the Chief Executives Board for coordination (CEB) at the intersecretariat level.” In this regard, the terms of the EOI will remain unchanged. In this regard, the terms of the EOI will remain unchanged. In this regard, the terms of the EOI will remain unchanged. 6.14 Section 4, Page 21 Evaluation Process Please also consider a 80% : 20% allocation to agency experience and approach & methodology respectively. In this regard, the terms of the EOI will remain unchanged. 6.15 Section 6, Annexure 1, Page 30-34 Detailed scope of work In case listing of heritage assets is not available or updated for the city can the city anchor make it afresh? In case listing of heritage assets is not available or updated for the city, the City Mission Directorate shall ensure that the HRIDAY City Anchor shall be provided a list of minimum 5 heritage assets through joint consultation of stakeholders. # Section No. 6.16 Section 6, Annexure 1, Page 30-34 Detailed scope of work 6.17 Section 5, Page – 27 Proposal formats, F-3 Proposed approach and methodology 6.18 Section 6, Annexure 1, Page 30-34 Detailed scope of work 6.19 Section 6, Annexure 1, Page 30-34 Detailed scope of work 6.20 Section 6, Annexure 1, Page 30-34 Detailed scope of work Query Description NPMU Response Besides taking up infrastructure development in Any urban development which enhances the heritage identified heritage area, the link of heritage in urban component and supports heritage rejuvenation in the development may please be clarified especially in City shall be included in the Scope of Work for the light of the mission’s objectives & guidelines. HRIDAY City Anchors Are the city anchors free to identify other aspects of Such suggestions can be captured under High Level urban & tourist infrastructure beside enumerated Recommendations in the Approach & Methodology under 1.1 iii? Should potential reuse of heritage Section. structure for such activity be encouraged? Scale& level of stakeholder consultation may please All costs associated with consultative meetings be defined including its cost implications. Is the city conducted by the HRIDAY City Anchor as part of the anchor expected to fund such consultative meeting Scope of Work are considered in the fees of the from their fee? HRIDAY City Anchor as specified in Section 2.4 of the EOI document. However, if such meetings take a form of a workshop with requirements to mobilize large number of stakeholders, then costs associated with such workshops shall be considered separately in consultation with the National Mission Directorate. Since city anchors are anyways expected to review Recommendations on the institutional framework existing policies etc should they not also suggest shall not be included in the scope of work of HRIDAY required institutional framework for long term City Anchors. Inputs if any shall be shared with the benefits of the scheme in the city? National Mission Directorate and City Mission Directorate for consideration. Annex 6 1.5 is not clear and not defined since in light Only one CIDP shall be prepared for each heritage of point 6 above , can this be reconsidered ? will asset. In cases where more than one additional fee be payable for this additional work ? structures/assets are listed as one heritage asset, they will be included in the same CIDP. Kindly refer to Annexure 1, Point 1 in the EOI document for further clarification regarding Heritage Area # Section No. 6.21 Section 6, Annexure 1, Page 30-34 Detailed scope of work 6.22 Section 6, Annexure 1, Page 30-34 Detailed scope of work 6.23 Section 6, Annexure 1, Page 30-34 Detailed scope of work, Monitoring & Evaluation 7.1 Section 3.2, Page 18 Pre-Qualification Criteria Query Description NPMU Response The Anchors shall be provided with the list of heritage assets in each City for which the CIDPs need to be developed The fees for the aforementioned work is specified under Section 2.4 (i) page 13 of the EOI document. No additional fees shall be paid. In the event that a City does not have a total of 5 identified heritage assets, the City Anchor shall prepare Civic Infrastructure Development Plans for those many identified heritage assets. Nonetheless, the City Anchor will be paid the entire fees for the preparation of the City HRIDAY Plan as specified under Section 2.4 of the EOI document. Should potential reuse of heritage structure for such Such suggestions can be captured under High Level activity be encouraged? Recommendations in the Approach & Methodology Section. Should compliance with heritage norms, All of the components mentioned in the query shall conservation policy and understanding heritage constitute part of the review and evaluation of DPRs. impact assessment be essential part of this? Since most of materials and design will already be The primary focus of heritage linked monitoring and determined in DPR and subsequently made part of evaluation of project execution shall be quality tendered item should the scope of city anchor not assessment, guidance and design / DPR compliance. limited to quality assessment, guidance and design / For detailed scope of work, please refer to Section 6, DPR compliance? Annexure 1, Point 4 of the EOI document. 7. Indian Heritage Cities Network Foundation What is the definition of specialized agency? The term ‘Specialized Agency’ refers to “autonomous Whether an individual expert can be a part of a organizations working with the United Nations and Collaboration/JV as a specialized agency? each other through the coordinating machinery of the United Nations Economic and Social Council at the intergovernmental level, and through the Chief # 7.2 7.3 7.4 8.1 8.2 8.3 Section No. Query Description NPMU Response Executives Board for coordination (CEB) at the intersecretariat level.” Section 3.1, Page 17 In small towns there are hardly any consultants who Agencies can hire individual consultants as part of the General Instructions, point has handled infrastructure projects in the last 5 years. Engagement Team to ensure quality of work executed. (11) Is it permissible to use the services of an individual contractor in the collaboration? EOI: HRIDAY-01-2015 As the EOI is predominantly for Infrastructure Capacity Building shall be looked at as a separate development, capacity building of the Urban activity undertaken by the City Mission Directorate Managers and Engineers on heritage infrastructure and National Mission Directorate development ought to have been part of this EOI. Section 2.4, Page 13-16 Retainership fees for Overall Coordination and In this regard, the terms of the EOI will stand Engagement Fee and Advisory is required to be enhanced. Otherwise is it unchanged. Payment schedule possible to handle the Anchor Agencies establishment cost from out of PIU funds? 8. IL&FS Infrastructure Development Corporation Ltd. Section 3.2, Page 18 The tender is restricted to participation of NGOs/Not Consulting firms registered under the Companies Pre-Qualification Criteria for profit companies. This does not give a chance for Act fulfilling the Pre-Qualification Criteria-2 as the Companies (as per the Company’s act) that have mentioned in the Corrigendum-01 are eligible to suitable credentials to participate in the bid process. apply. The authority is requested to allow the participation Only those agencies fulfilling either the Preof the Companies in the Bidding process. Qualification Criteria-1 or Pre-Qualification Criteria2 as mentioned in Corrigendum-01 are eligible to participate in the EOI as a standalone agency or as a JV or consortium. (Please refer to Corrigendum-01 for further clarifications) Section 3.2, Page 18 The authority is also requested to consider the In this regard, the terms of the EOI will stand Pre-Qualification Criteria experience of Tourism sector development as they unchanged. have been considered as evaluation criteria under clause 4 (Evaluation process) Section 2.4, Page 13-16 The scope of work given for preparation of city Hriday Please refer to Annexure 1 of the EOI document for the Plan is exhaustive and includes 1) delineation of the detailed scope of work # 8.4 Section No. Engagement Fee Payment schedule Query Description NPMU Response and Heritage Area 2) Mapping of Heritage Assets 3) In this regard, the terms of the EOI will stand Infrastructure Assessment Development of City unchanged. based tool kits 3) preparation of DPRs for Infrastructure projects etc. The fee allocated for the task is substantially low and it is requested to revise the Fee for preparation of City Hriday Plan, as per the following; City Recommended Fee for preparation of City Hriday Plan Ajmer 40 Amravati 20 Amritsar 40 Badami 25 Dwarka 40 Gaya 30 Kanchipuram 30 Mathura 35 Puri 25 Varanasi 60 Velankanni 20 Warangal 40 The payment schedule for City Hriday Plan is backloaded. The authority is requested to consider the change in payment schedule. Section 2.4, Page 13-16 The fee for evaluation of DPR and Evaluation of Engagement Fee and Execution of Works is not as per the market standards Payment schedule and needs to be revised to 4% to 5%. Consortium: Request the authority to allow the consortiums to participate in the bid process. The Anchors shall only evaluate the DPR in heritage related aspects such as design, material, intent of City HRIDAY Plan etc. In this regard, the terms of the EOI shall prevail. # 8.5 8.6 Section No. Query Description Section 2.4, Page 13-16 How many personals are required to be deputed for Engagement Fee and Overall Coordination and Advisory? What is the Payment schedule experience level sought by the authority for personnel to be deputed. NPMU Response A minimum of one person should be deployed by the HRIDAY City Anchor at the City throughout the engagement period for continuous support and delivery The following shall be the skill set required from one person deployed by the HRIDAY City Anchor at the City for continuous support & delivery: Educational Qualification: Minimum Bachelors in Engineering or Architecture Work Experience: Minimum 5 years of experience The remaining team size and composition is left to the Anchor, based on the Anchor’s understanding of the scope of work and the timeline for completion of deliverables. Section 2.4, Page 13-16 The retainership fee prescribed by the authority is In this regard, the terms of the EOI will remain. Engagement Fee and significantly low considering the inputs envisaged for Payment schedule the project throughout the project life cycle. The authority is requested to revise the retainership fee accordingly.
© Copyright 2024