Introduction to Datacenters & the Cloud Datacenter Power Alex M. Hurd Clarkson Open Source Institute April 2, 2015 Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 1 / 19 Overview AISO Barcelona Supercomputing Center Citi eBay IBM Intel Yahoo! Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 2 / 19 AISO Affordable Internet Services Online (AISO) Location: Romoland, CA Online: April 2005 Time to Design and Build: 6 Months Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 3 / 19 AISO Continued Solar used as primary power source Solar tube lighting Rain water collection system for use in cooling system Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 4 / 19 AISO Continued Size: 2,000 sq. ft Total, 400 sq. ft of hosting space Overhead power, cooling, and cabling Tier III Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 5 / 19 AISO Continued Number of Server Racks: 15 IT power Capacity: 110kW All power is derived from an onsite solar array Three independant network hookups Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 6 / 19 Barcelona Supercomputing Center Location: Barcelona, Spain Online: April 2005 Time to Design and Build: 7 Months Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 7 / 19 Barcelona Supercomputing Center Continued Servers are located in a chapel built in 1920 Houses the MareNostrum Supercomputer Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 8 / 19 Barcelona Supercomputing Center Continued 1722 sq. ft of hosting space Power, Cooling, and Data all under raised floor Tier 0 Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 9 / 19 Barcelona Supercomputing Center Continued Number of Server Racks: 48 IT power Capacity: 850kW Power Density: up to 22kW Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 10 / 19 Barcelona Supercomputing Center Continued Upon opening the MareNostrum was a 63.8 TerraFLOP PowerPC based Super Computer Updated in 2012 the MareNostrum is now a 103.2 TerraFLOP Xeon Based Super Computer Operated by a consortium of Government and Academics Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 11 / 19 Citi Citi Location: Frankfurt, Germany Online: May 2008 Time to Design and Build: 20 Months Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 12 / 19 Citi Continued Green Roof and Walls Rainwater Harvested for irrigation Reverse osmosis water treatment for cooling Rotary UPS First Data Center certified LEED Platinum Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 13 / 19 Citi Continued Size: 228,000 sq. ft Total, 100,000 sq. ft of hosting space Overhead cabling, power and cooling delivered by raised floor Tier III Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 14 / 19 Cite Continued Two separate 14.4MW feeds Cabinet Location: Unknown Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 15 / 19 eBay eBay Location: Phoenix, Arizona Online: October 2011 Time to Design and Build: 22 Months Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 16 / 19 eBay Continued In Building Data Hall Containerized Datacenters on Roof Air and Liquid Cooling to Racks Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 17 / 19 eBay Continued Size: 42,000 sq. ft Total, 14,000 sq. ft of hosting space Overhead cabling, power and cooling Chilled water delivered by 6ft raised floor Tier II Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 18 / 19 eBay Continued 4MW for IT initially, expandable to 6MW for the Data Hall and 6MW for the containers Cabinet Location: 256 on the main floor Roof can house 10-12 containers and cabinets can vary by configuration Alex M. Hurd (COSI) Introduction to Datacenters & the Cloud April 2, 2015 19 / 19
© Copyright 2025