DESIGN GUIDELINES HORRY COUNTY SCHOOLS P.O. Box 260005

HORRY COUNTY SCHOOLS
P.O. Box 260005
Conway, SC 29528-6005
DESIGN GUIDELINES
SCOPE
BUDGET
QUALITY
June 21, 2010
TABLE OF CONTENTS
Disclaimer Statement for Design Guidelines and Specifications ....................................................................... 4
Educational Specifications for Elementary/Middle/High Schools ...................................................................... 5
Minimum Standards for Athletic Facilities/Playgrounds ................................................................................... 11
Service and Warranties...................................................................................................................................... 17
Required Training Sessions .............................................................................................................................. 18
District Points of Concern and Requirements................................................................................................... 19
Required District Inspections ............................................................................................................................. 27
Recommendations for New Schools and Renovated Spaces
Roofs ........................................................................................................................................................ 28
Walls ......................................................................................................................................................... 30
Kitchens .................................................................................................................................................... 31
Paint Recommendations ......................................................................................................................... 33
HVAC........................................................................................................................................................ 35
Plumbing .................................................................................................................................................. 38
Electrical ................................................................................................................................................... 42
Security..................................................................................................................................................... 50
Fire Alarms and Sprinkler Riser Rooms ................................................................................................. 51
Door Specifications .................................................................................................................................. 52
Door Hardware Specification Guidelines ................................................................................................ 53
Padlocks and Keyless Entry Locks ......................................................................................................... 66
Electronic Strike and Wireless Entry ....................................................................................................... 66
Fiberglass Reinforced Polyester Doors .................................................................................................. 67
June 21, 2010
2
Aluminum Stile and Rail Doors and Framing.......................................................................................... 71
Toilet Partitions ........................................................................................................................................ 75
Lockers - Student Corridor and Athletic .................................................................................................. 79
Operable Wall Specifications .................................................................................................................. 80
Accordion Wall Specifications ................................................................................................................. 81
Fence........................................................................................................................................................ 82
Floor Finishes........................................................................................................................................... 85
Ceiling Tile................................................................................................................................................ 86
Cabinetry .................................................................................................................................................. 87
Windows ................................................................................................................................................... 88
Multipurpose Wall Specifications ............................................................................................................ 89
Media Center............................................................................................................................................ 90
Stormwater Drainage Maintenance ........................................................................................................ 91
Landscaping ………………………………………….. .............................................................................. 92
Civil ........................................................................................................................................................... 93
Construction Project Sinage Requirements............................................................................................ 94
Technology Specifications ................................................................................................................................. 95
June 21, 2010
3
DISCLAIMER STATEMENT FOR
DESIGN GUIDELINES AND SPECIFICATIONS
All specifications shall be drafted so as to assure cost effective procurement of the school district’s actual needs and
shall not be unduly restrictive. The requirements regarding the non-restrictiveness of specifications shall apply to,
among others, all specifications prepared by architects, engineers, designers, draftsmen, and land surveyors for
school district contracts.
Brand Name Specification means a specification limited to one or more items by the manufacturer's name or catalog
number.
Brand Name or Equal Specification means a specification which uses one or more manufacturer's name or catalog
numbers to describe the standard of quality, performance, and other characteristics needed to meet school district
requirements, and which provide for the submission of equivalent products.
Specification means any description of the physical, functional, or performance characteristics, or of the nature of a
supply, service, equipment, or construction item. A specification includes, as appropriate, requirements for
inspecting, testing, or preparing a supply, service, equipment, or construction item for delivery. Unless the context
requires otherwise, the terms "specification" and "purchase description" are used interchangeably.
The purpose of a specification is to serve as a basis for obtaining a supply, service, equipment, or construction item
adequate and suitable for the school district's needs in a cost effective manner, taking into account, to the extent
practicable, the cost of ownership and operation as well as initial acquisition costs. IT IS THE POLICY OF THE
SCHOOL DISTRICT THAT SPECIFICATIONS PERMIT MAXIMUM PRACTICABLE COMPETITION CONSISTENT
WITH THIS PURPOSE. SPECIFICATIONS SHALL BE DRAFTED WITH THE OBJECTIVE OF CLEARLY
DESCRIBING THE SCHOOL DISTRICT'S REQUIREMENTS. ALL SPECIFICATIONS SHALL BE WRITTEN IN A
NONRESTRICTIVE MANNER SO AS TO DESCRIBE THE REQUIREMENTS TO BE MET.
All design work performed for Horry County Schools by Architects and their Consultants must meet current OSF, current Local,
State, and National Codes, and Horry County Schools Design Guidelines. Please be advised that should an individual, or any
business/design entity choose to substitute or change a guideline specification, without prior written approval from the Horry
County Schools Construction Department, that individual or business entity shall be responsible for removing, replacing, and
incur any related costs for the required changes. It is understood by Horry County Schools certain materials and applications
may not always be appropriate for every application but in these cases, a written request for a specific change to these
guidelines must be submitted to the Construction Management Department for consideration and approval. In the event that an
application or product in the guideline causes a conflict with current OSF or Code requirements, the OSF and/or current Code
requirements shall override the guideline; however, a written notice and explanation must be submitted to the Construction
Management Department for the change.
Horry County Schools maintains an Architects Checklist on the website to be used as a tool during the Design Phase to ensure
that desired products and applications are obtained. All Permits and Agency Reviews along with any additional information
required for a specific project must be obtained prior to bidding the project. A copy of the permits and agency review letters must
be attached to the checklist when plans are delivered for review by the Construction Management Department. Project delays
and costs for these delays caused by not obtaining required permits, agency reviews, and approvals prior to bidding the project
will be the responsibility of the Architect and their Consultants.
June 21, 2010
4
BASIC COMPONENTS OF EDUCATIONAL SPECIFICATIONS
FOR ELEMENTARY SCHOOLS OF 900 DESIGN CAPACITY***
(w/ Core designed for 1,200)
#
TYPE
CAPACITY
MIN. SQ FEET
3
6
18
11
4
4
1
1
1
CD classrooms @ 20 to 1
Kindergarten classrooms @ 25 to 1
Primary classrooms @ 21 to 1
Elementary classrooms @ 24 to 1
*Self-contained @ 12 to 1
Resource
Music
Art
Computer lab
**Design Capacity
60
150
378
264
48
1,150
1,150
800
800
800
800
1,200
1,200
1,000
900
TOTAL SQ
FEET
3,450
6,900
14,400
8,800
3,200
3,200
1,200
1,200
1,000
43,350
* Time out rooms may be provided depending upon need.
** Design Capacity and Maximum Capacity are the same in the elementary schools because teachers have the same
class of students throughout the entire school day and therefore do not get a typical “planning period”.
***The number and type of classrooms needed to achieve a desired capacity will vary based on the current district
approved pupil/teacher ratio for each grade.
Physical Education
•
•
•
•
PE Facility
Multipurpose Room w/ stage
Coaches’/Teachers’ offices
Storage
Administration
•
•
•
•
•
•
•
•
Principal
Bookkeeper
Receptionist
Secretary
2 Assistant Principals
ISS
Conference Room
Curriculum Coach
Guidance – 4 Counselors
•
•
•
•
Office Space
Conference rooms (2)
Testing room
Storage
June 21, 2010
5
Clinic
Media
• Isolation room
• Conference room
•
•
•
•
•
•
•
•
Reading area
Studio
Computer lab
Workroom
Library Office
Adult restroom
Book storage
MDF Room
Food Service
•
•
•
•
•
•
Kitchen
Serving
Cafeteria
Coolers/Freezers
Dry storage
Receiving
Teacher Work Spaces x 3
Itinerate Teacher Spaces x3
Speech
Parent Resource Center
General Storage
TOTAL SQ.FEET, INCLUDING CIRCULATION, NOT TO EXCEED: 110,000
June 21, 2010
6
BASIC COMPONENTS OF EDUCATIONAL SPECIFICATIONS
FOR MIDDLE SCHOOLS
#
10
3
10
3
10
3
5
4
1
4
1
1
1
1
1
1
•
TYPE
6th grade regular classrooms @ 22 to 1
6th grade science labs @ 22 to 1
7th grade regular classrooms @ 22 to 1
7th grade science labs @ 22 to 1
8th grade regular classrooms @ 22 to 1
8th grade science labs @ 22 to 1
Resource @ 12 to 1
Self-contained @12 to 1
Art @ 22 to 1
Computer labs @ 22 to 1
Band @ 25 to 1
Home Arts @ 22 to 1
Chorus @ 25 to 1
Industrial Technology @ 22 to 1
Physical Education @ 50 to 1
Business @ 22 to 1
*Maximum capacity
Capacity modifier
**Design Capacity
CAPACITY
220
66
220
66
220
66
60
48
22
88
25
22
25
22
50
22
1242
x .90
1,118
Maximum Capacity is the total student capacity of all classroom space, based on current pupil/teacher ratios that would be
available if teachers did not have a planning period and were “floated” from room to room. It is extremely important to note
that this is NOT an ideal capacity. A facility this crowded would cause a loss of instructional quality as well as create serious
deficiencies in the quality of the students’ experience. Filling a school to this level also taxes the school’s core facilities.
** Design Capacity in both middle and high schools is equal to 90% of the Maximum Capacity at that facility. This
calculation is based on giving every teacher a planning period and making efficient use of all instructional space.
Physical Education
• Gym (SF adjusted by project to reflect adequate seating)
• P.E. Lockers
• Team lockers
• Training room
• Coaches’/Teachers’ offices
• Laundry
• Storage
• Health Classroom
Auditorium
• 320 seat lecture hall
• Storage
June 21, 2010
7
Administration
• Principal
• Bookkeeper
• Receptionist
• Secretary
• 3 Assistant Principals
• ISS
• OSIRIS/Attendance
• Mail Room
• Conference Room
Guidance – 3 Counselors
• Office Space
• Conference rooms
• Testing room
• Storage
• Waccamaw Mental Health
• Records Vault
Clinic
Media
• Examining room
• Conference room
• Office Space
•
•
•
•
•
•
•
•
Reading area
Studio
Computer lab
Workroom
Library Office
Book storage
Adult restrooms
MDF Room
Food Service
• Kitchen
• Serving
• Cafeteria
• Coolers/Freezers
• Dry storage
• Receiving
• Office Space
Teacher Work Spaces x 3
Itinerate Teacher Spaces x 2
Speech
Resource Officer
General Storage
TOTAL SQ. FEET, INCLUDING CIRCULATION, NOT TO EXCEED: 140,000
June 21, 2010
8
BASIC COMPONENTS OF EDUCATIONAL SPECIFICATIONS
FOR SECONDARY SCHOOLS
#
35
8
8
3
1
1
2
1
1
7
1
1
4
2
TYPE
Regular classrooms @ 23 to 1
Science labs @ 23 to 1
Special education @ 12 to 1
Physical education @ 30 to 1
ROTC @ 23 to 1
Fine Arts/Drama @ 23 to 1
Art @ 23 to 1
Instrumental Music @ 40 to 1
Choral Music @ 40 to 1
Vocational Labs @ 23 to 1
Driver Education @ 12 to 1
Distance Learning @ 23 to 1
Computer Labs @ 25 to 1
Journalism @ 23 to 1
*Maximum capacity
Capacity modifier
**Design Capacity
CAPACITY
805
184
96
90
23
23
46
40
40
161
12
23
100
46
1689
x .90
1,520
* Maximum Capacity is the total student capacity of all classroom space, based on current pupil/teacher ratios that would be
available if teachers did not have a planning period and were “floated” from room to room. It is extremely important to note
that this is NOT an ideal capacity. A facility this crowded would cause a loss of instructional quality as well as create serious
deficiencies in the quality of the students’ experience. Filling a school to this level also taxes the school’s core facilities.
** Design Capacity in both middle and high schools is equal to 90% of the Maximum Capacity at that facility. This calculation is
based on giving every teacher a planning period and making efficient use of all instructional space.
Physical Education
• Gym (SF adjusted by project to reflect adequate seating)
• Multipurpose Room/Auxiliary Gym
• Weight Room
• P.E. Lockers
• Team lockers
• Training room
• Coaches’/Teachers’ offices
• Laundry
• Storage
•
Auditorium
• 700 seat capacity
• Storage
June 21, 2010
9
Administration
• Principal
• Bookkeeper
• Receptionist
• Secretary
• 4 Assistant Principals
• ISS
• Conference Space
• OSIRIS/Attendance
• Mail Room
Guidance – 4 Counselors
• Office Space
• Conference rooms
• Testing room
• Storage
• Waccamaw Mental Health
• Records Vault
Clinic
Media
• 2 Examining rooms
• 2 Conference rooms
• Office Space
•
•
•
•
•
•
•
•
Reading area
Studio
Computer lab
Workroom
Library Office
Book storage
Adult restrooms
MDF Room
Food Service
• Kitchen
• Serving
• Cafeteria
• Coolers/Freezers
• Dry storage
• Receiving
• Office Space
Teacher Work Spaces/Lounge x 4
Itinerate Teacher Spaces x 2
Speech
Community/Large Meeting Room
Bus Office
Resource Officer
General Storage
TOTAL SQ. FEET, INCLUDING CIRCULATION, NOT TO EXCEED: 230,000
June 21, 2010
10
HORRY COUNTY MINIMUM STANDARDS
FOR ATHLETIC FACILITIES/PLAYGROUNDS
ELEMENTARY SCHOOL REQUIREMENTS
MULTIPURPOSE PLAYFIELD
•
•
•
90’ x 120’
Properly graded with irrigation and well
Grass covering entire playing area
MULTIPURPOSE ROOM
•
•
•
•
Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during
assemblies
5,500 sq. ft.
Athletic flooring
Wall padding must be installed on ends
CHILD DEVELOPMENT/KINDERGARTEN PLAYGROUND EQUIPMENT
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Four Individual Spring Riders
Tunnel Slide
Loop Climber
Crawl Tunnel
Elbow Slide
Double Wide Fiberglass Slide
Arched Chain Climber
Tic-Tac-Toe Panel below deck
Village Seat Panel
Ladder Panel
Village Counter Panel
Safety Panel w/ Wheel Above; Mirror Panel Below
Transfer Station
Wheelchair Turning Area
Landing area consists of hardwood chips that meet ASTM standards to a minimum depth of 12 inches
ADA approved access entry ramp
Border timbers of molded plastic around play area
3’ x 3’ x 2” wear mats at ends of all slides
40’ x 70’ covered concrete play area
PRIMARY PLAYGROUND EQUIPMENT
•
•
•
•
•
•
•
Swings – 3 leg heavy duty swings – 8 ft. height – 6 swings
Beam Run
Stretch Pole
Vertical Ladder
Balance Beam
Challenge Ladder
Spring-up Bars
June 21, 2010
11
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Parallel Bars
Jump Touch Beam
Pull-up Bars
Sit-up Bench
Spiral Slide
Arch Climber
Bubble Panel
Snake Pole
Faces Panel
Transfer Station
Wheelchair Turning Area
Double Wide Plastic Slide
Landing area consists of hardwood chips that meet ASTM standards to a minimum depth of 12 inches
ADA approved access entry ramp
Molded plastic border timbers around play area
3’ x 3’ x 2” wear mats at ends of all slides and below all swings
ELEMENTARY PLAYGROUND EQUIPMENT
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Swings – 3 leg heavy duty swings – 8 ft. height – 6 units/swings
Beam Run
Stretch Pole
Vertical Ladder
Balance Beam
Sit-up Bench
Challenge Ladder
Spring-up Bars
Parallel Bars
Jump Touch Beam
Pull-up Bars
See Saw Snake
Track Ride
Double Ring Trek
Turning Bar
Log Roll
Chinning Bar
Trapeze Ladder
Landing area consists of hardwood chips that meet ASTM standards to a minimum depth of 12 inches
One ADA approved access ramp
3’ x 3’ x 2” wear mats at ends of all slides and beneath all swings
Molded plastic border timbers to surround all playground equipment
June 21, 2010
12
HORRY COUNTY MINIMUM STANDARDS
FOR ATHLETIC FACILITIES/PLAYGROUNDS
MIDDLE SCHOOL REQUIREMENTS
SPORTS:
Fall
Football
Cheerleading
Winter
Basketball
Cheerleading
Spring
Soccer
PRACTICE FIELD
GYM
•
•
•
One 100 yard long/50 yard wide area
Properly graded with irrigation
Grass covering entire playing area
•
•
•
•
•
•
•
•
•
•
Includes volleyball, basketball
Regulation basketball court with markings
One regulation volleyball court with markings
Seating
Restroom facilities for spectators, other than locker area
Concession area
Ticket booth
Scoreboards with controller required in gym
Wall padding must be installed on ends of gym
Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during
assemblies
June 21, 2010
13
HORRY COUNTY MINIMUM STANDARDS
FOR ATHLETIC FACILITIES/PLAYGROUNDS
HIGH SCHOOL REQUIREMENTS
SPORTS:
Fall
Football
Cross Country
Girls Tennis
Volleyball
Cheerleading
Winter
Basketball
Wrestling
Cheerleading
Spring
Baseball
Softball
Soccer
Track
Boys Tennis
Golf
FOOTBALL
Seating Requirements
• All seats should be constructed of aluminum or concrete
• Seating capacities adequate for first round of playoffs
AAAA
4,000
AAA
3,500
AA
2,300
A
1,000
Grading
Drainage
Irrigation
Sod
•
1 percent grade (minimal)
•
Water must run to designated drainage areas off the playing surface and away from stadium
•
•
•
All heads must be even or below playing surface.
Each head coverage shall overlap another zone.
Entire playing surface must have coverage.
•
•
Fields must have grass, which covers the entire playing surface
If grass is going on a new field or grass is being replaced, Bermuda or Tifton 419 should be used
Press Box
•
Adequate space to accommodate the following: Home and Away crews (two per team), clock judge,
announcer, and spotter. A fence or rail must surround the top of the press box.
Concession Stand(s)
• Shall include a home side concession stand with restrooms
• Shall include a visitor side concession stand with restrooms
Field House
• A multi-sport field house shall be included
Ticket Booth
• One booth with two ticket windows
June 21, 2010
14
Lighting
Fencing
•
•
•
Four poles – 70’ high
Foot-candle = 50 maintained
Metal or concrete poles
•
•
4’ barrier separating spectators from playing field
6’ fence surrounding entire stadium complex to include two separate double gate sections for entrance
and emergency exits. (Must be an easy access for emergency vehicles to enter and leave playing
area.)
CROSS COUNTRY
•
TENNIS
GYM
Course must be complete with start and finish line (3.1 miles)
•
•
•
Four regulation courts with proper markings
6’ fence surrounding tennis complex
Lighting
•
•
•
•
•
•
•
•
•
•
•
•
Includes volleyball, basketball, wrestling
Regulation basketball court with markings
One regulation volleyball court
Two cross court volleyball courts for practice
Seating
Restroom facilities for spectators, other than locker area
Concession area
Ticket booth
Playing surface wood of competition grade
Wall padding must be installed on ends of gym
Scoreboards with controller are required
Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during
assemblies
AUXILIARY GYM
•
•
•
•
•
•
4,000 sq. ft.
Seating for 150
Basketball goals – 2 on ends – 4 solid fiberglass practice goals on sides
Sufficient for P.E. activities, volleyball, wrestling
Playing surface wood of practice grade
Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during
assemblies
BASEBALL/SOFTBALL
•
Fields must be properly graded so that water runs off playing surface
Dimensions
• Baseball – 290’ Left/Right Field
305’ Centerfield
• Softball – 185’ Home to Outfield
June 21, 2010
15
Fence
Irrigation
Seating
Lighting
•
•
•
6’ outfield fence
4’ down baselines
Backstop - softball 15’
baseball 20’
•
•
•
All heads must be even or below playing surface.
Each head coverage shall overlap another zone.
Entire playing surface must have coverage.
•
•
100 per field
Portable aluminum
•
•
•
•
Baseball foot-candles infield = 45 maintained
Baseball foot-candles outfield = 20 maintained
Softball foot-candles infield = 45 maintained
Softball foot-candles outfield = 20 maintained
Dug-outs
•
40’ x 10’ long to include a 10’ x 10’ storage area or 30’ x 10’ long with one 20’ x 20’ storage area
Restrooms/Concessions
• There must be a place where restrooms may be used by spectators
• Two toilets – women; one toilet, one urinal – men
• Concession/scoreboard operator space
SOCCER
TRACK
•
•
Will practice on practice field area
Games will be played on football game field
•
•
•
•
•
•
•
•
Completely marked eight-lane track
Type 4 asphalt
Straightaway for sprints (start and finish lines)
Runway complete with landing area
Shot and discus circle
Safety net for discus area
High jump approach and landing area
Long jump approach and landing area opposite end for triple jump entire length not to be less than 100 ft.
PRACTICE FIELD
•
•
•
One 100 yard long/50 yard wide area
Properly graded with irrigation
Grass without nylon backing covering entire playing area
June 21, 2010
16
SERVICE AND WARRANTIES
Since service intensive systems require local support, constraints are imposed on maximum distances allowed to the nearest
contractors/subcontractors/suppliers maintained office:
Roofing
Door Hardware Supplier
Door Hardware Installer
Fire Alarm
HVAC Subcontractor
HVAC Equipment Supplier
100 miles
100 miles
100 miles
100 miles
100 miles
100 miles
The school district contracts for construction require a one-year labor and materials warranty on all work. In addition, the
following warranties should be specified:
Door Hardware (parts only)
Roof System (materials and labor)
Roof System (materials, NDL)
HVAC Compressors (parts only)
HVAC
June 21, 2010
3 years
5 years (watertight)
20 years with watertight warranty
5 years
1 year – all maintenance for HVAC systems is included in service.
Changing filters is the only service not included. HCS will change
filters during the service period.
17
REQUIRED TRAINING SESSIONS
Training sessions must be performed prior to and on a separate day from final required district inspections. Training sessions
will take place at each new or renovation project. The contractor, appropriate subcontractor, staff members, and the appropriate
representative from maintenance must be present for training sessions. A minimum of one week’s notice must be given for all
training sessions. Training must be scheduled when the principal and school facilities manager can be present. The following
training sessions are required and must be noted in specifications:
1.
Fire alarm training. This training must be videotaped by the contractor.
2.
Electrical training. This training must be videotaped by the contractor.
3.
Mechanical training for units. This training must be videotaped by the contractor.
4.
Plumbing training. This training must be videotaped by the contractor.
5.
Irrigation system training (minimum two staff members and plumber from HCS Maintenance department). This training
must be videotaped by the contractor.
6.
Kitchen Equipment training. This training must be videotaped and include full demonstration of actual cooking on all
equipment with food.
7.
Audiovisual equipment, such as, but not limited to, auditorium/multipurpose sound, lighting, stage curtains, projection
operations, etc.
8.
Cleaning products and practices.
June 21, 2010
18
DISTRICT POINTS OF CONCERN AND REQUIREMENTS
The following items of concern to the School District have been noted on previous projects and must be addressed in future
projects on the drawings and specifications as generalized standards.
GENERAL
1.
From observation by the School District of buildings now near completion, it is noted that projects have moved forward more
quickly when the contractor has installed the service road around the building pad at the very beginning of construction.
This allows all weather access and the owner highly recommends it.
2.
Water/sewer, DHEC, and lift station approvals have usually taken more time than anticipated; therefore, the owner expects
these items to be addressed early on. Permits required by the state and local level such as, but not limited to, land
disturbance permits, wetland permits, etc., must be obtained as the guidelines require before the project goes out for bid.
Architect needs to schedule meeting with water utility company prior to bidding project. The District would like to
have backflow preventers and as many utility items as possible installed by site contractor.
3.
Mortar joints in concrete block should be uniform, not irregular. Block work shall be faced to corridor side. Many times we
approve a sample wall and continued work does not have the same quality of the sample approved. We expect a job
consistent with the sample wall that is approved.
4.
Through wall flashing must be installed in all areas directed on plans as work progresses and not after the fact.
5.
Through wall flashing needs to be protected. Any torn flashing must be repaired or replaced at the time it is
damaged.
6.
Make sure there is adequate waterproofing on cavity side of wall.
7.
Structural rebar must be placed in wall before wall is pumped.
8.
Refrigerant tubing must be placed into PVC pipes after placing pipe in wall. This can help prevent damage to insulation.
9.
Painted corridors and classrooms must have semi gloss paint. Flat paint is not allowed. No exceptions.
10. Room numbers for operational and signage purposes will be approved by the District and may be different from
architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms
unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If
there is a question, call your representative from the school district. The actual school room numbers that are
used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing,
and mechanical units. The architect must meet with the building principal during design phase and architect shall
verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect
correct signage and room number schedule.
11. Teacher storage cabinets are required in all classrooms. Corner cabinets are requested when possible.
12. Contractors’ builders risk insurance cannot be transferred to the owner until substantial completion has been achieved. The
fire alarm must be operational and keys turned over to owner. The contractor should notify owner in order to have phone
lines for fire alarm activated. The security personnel from the district will be responsible for installing the security panel and
making the connection from the panel to the dial out. Our security personnel must be notified well in advance of OSF
inspections.
13. All temporary utilities will be provided by the Contractor and in the Contractor’s name. The Contactor is responsible for the
bill until the District has a Certificate of Occupancy and has accepted the building.
14. Lay down areas for all materials must be identified and indicated on plans and in specs on all renovation projects and all
areas must be shown on plans. Chain link fencing is required. Orange fencing is not allowed for safety or lay down areas.
June 21, 2010
19
15. The school district requires a clean jobsite, both interior and exterior. We have noted on past projects that those kept clean
and free from debris were much safer, more organized, and had smoother completions.
16. Safety is the most important factor on school renovation projects when school is in session. Construction barriers and
warning signage must be installed before construction begins and must be maintained at all times. Students must not have
access to the construction site. Any safety fencing that is damaged or down must be replaced immediately. Emergency
exits must be maintained with appropriate signage. Emergency exits must never be blocked. A clear exit pathway must be
maintained at all times from every exit door during construction. If it is absolutely necessary to block these areas in order to
do specific work, this work must be performed before or after working hours. Any work that will cause excessive noise,
vibration to the building, or distraction must be done before or after hours as well. Safety fencing must be chain link fencing.
Orange plastic fence is not allowed for safety or lay down.
17. OCRM monitors our projects on a regular basis. It is essential that the silt fence be in place and in good shape at all times.
SCDOT also monitors roadways. Site Contractors must maintain compliance for OCRM and SCDOT at all times.
18. Use of tobacco products are not allowed in school buildings or on any school property to include inside vehicles.
19. In renovation projects, the CONTRACTOR is responsible for removing and protecting all furniture and boxed items from
rooms being renovated. The CONTRACTOR is also responsible for replacing these items in an orderly fashion after
renovations are complete. Items must be stored and protected in a manner that avoids all damage. When doing partial
work in an occupied classroom, the contractor is responsible for covering any and all items that are subject to dust or
damage. This must be noted on drawings and in specifications.
20. As-built drawings for the lift station must be done by a certified engineer and must include the engineer’s stamp. Fees for
this service must be included in the base bid.
21. Any sheetrock that becomes wet due to lack of protection during construction must be replaced. The entire area from floor
to ceiling must be replaced and the insulation behind it must be replaced also. There are no exceptions to this.
22. Slip resistant VCT must be used in all ramp areas.
23. Type of floor covering used must be approved by owner during design phase.
24. Expansion joint covers must be specified for block walls. These need to be metal not rubber caulk.
25. Pencil blocks and electric sharpeners are to be installed in all classrooms.
26. Kiln areas must be equipped with exhaust hoods. See note about this in electrical section. Kilns are to be specified by the
architect and provided and installed by the contractor in the base bid. Exhaust fans and all components must be specified
with the kiln and included in the base bid.
27. Storefront doors are not allowed in any areas.
28. Sanitary napkin disposals must be provided in all female group toilets in elementary, middle, and high schools. Napkin
disposals must also be provided in each stall at the elementary, middle and high schools. Napkin disposals must be
provided in all female or unisex toilets.
29. Recessed soap dispensers are not permitted in any location. The District will provide these dispensers for wall areas.
30. Covered walks should consist of a single walk to the parent drop off area and a covered walk from the school to the bus
drop off. The termination point of the bus drop off should be in a T-shape and approximately 30’ long adjacent to the bus
drive. Light fixtures shall be installed under all canopy areas. (The T-shape canopy shall be used depending on site layout.
In renovations, an L-shape may have to be used.)
31. Curbing and gutter must be specified for all parking lot drives and drop off areas. Heavy duty RCP pipe must be used under
all drive areas. Storm drain must be tied in in all areas. The engineer must provide drainage for all areas including all play
areas.
June 21, 2010
20
32. Elementary schools shall have two assistant principals’ offices. Middle schools shall have three assistant principals’ offices.
High schools shall have four assistant principals’ offices. When possible, for monitoring purposes, these offices shall have
glass looking out to hallways. There are no private toilets in these offices.
33. Standard signage is required for both renovations and new schools. Signage shall include interior and exterior signage.
Exterior signage should consist of brick or block base per plan. School name lettering shall be of contrasting color and of
size to be clearly visible. A marquis with transparent lockable door should be included. The marquis should be large
enough to accommodate a short message such as “PTA meeting tonight at 7:00 p.m.” (4 lines of 8” tall changeable letters in
locking case). Ground lighting must be included for all signage. All interior signage must be mechanically fastened.
Numbering the signage schedule must be approved by the District. The contractor is to provide letters and symbols for the
marquis.
34. Fire extinguisher cabinets must be metal with Lexan door. Plastic bubble type cabinets are not permitted.
35. Sky lights are not permitted in any ceilings.
36. Through wall flashing must be SANDELL COATED COPPER consisting of a full sheet of copper weighing 3 oz. per square
foot coated on both sides with a special rubberized asphalt compound weighing not less than 6 oz. per square foot or
approved equal. Manufacturer’s specifications for application and installation must be followed. Please note: through wall
flashing must be as stated above except in locations where a roof terminates at a masonry wall. In these locations the wall
shall have a 16 oz. copper through wall flashing. The flashing shall turn up a minimum height of 8 inches inside the wall,
come through the exterior brick or block and turn down a minimum of 1½ inches on the face of the masonry wall.
37. The contractor is responsible for line locations for all utilities on private school property prior to beginning construction and
this must be noted clearly on the plans and specifications. A private locator will be required as PUPS will not locate on
private property. This must be clearly indicated on specifications and plans.
38. Hardware specifications must be strictly followed. Please note that the architect or contractor shall be held responsible for
corrections to any variance from hardware specifications.
39. Accommodations for book theft detection shall be made in all Horry County Schools’ media centers. District will provide
equipment specifications.
40. It is mandatory that all construction workers on school property have a visible picture ID Tag at all times. Workers who do
not have a tag are considered unregistered and will be asked to leave the property.
41. Products included in this document are intended to establish minimum requirements for quality. THE OWNER MUST BE
NOTIFIED PRIOR TO APPROVAL OF A SUBSTITUTE PRODUCT.
42. All colors must be submitted to the School District prior to approval.
43. Playground equipment will be provided by the Owner but will be coordinated by the Contractor in order to avoid damage to
landscaping and underground piping. The architect is to provide playground area for equipment installation and is to ensure
with engineers that water, electrical, mechanical, irrigation and storm drain covers are not in conflict with designated play
area. Storm drain covers located in the play area must be pedestrian type designed specifically for small children.
LANDSCAPE
44. Sod, trees, and bushes should not be installed until irrigation system is installed and operational. Mesh backing on sod is
not allowed on any Horry County Schools’ projects.
45. Landscaping must consist of trees and shrubs that are native to the area and approved. Centipede sod is required for
sodded areas. Straw must be used for mulching. Pine bark is not acceptable. Irrigation systems must be insulated and
also have some type of weather protection, such as a house, rock, etc.
46. Parking lot islands must be grassed. Minimize straw beds as much as possible for future upkeep.
June 21, 2010
21
47. Weed protection must be used in bed areas.
ELECTRICAL
48. All under slab electrical turn-ups shall have rigid elbows and be asphalt coated.
49. Security keypad boxes must be located on the inside of the building. Exterior boxes are not acceptable. Boxes with blank
plates must be installed at front entrance, loading dock, and all corridors at the end door.
50. Room numbers for operational and signage purposes will be approved by the District and may be different from
architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms
unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If
there is a question, call your representative from the school district. The actual school room numbers that are
used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing,
and mechanical units. The architect must meet with the building principal during design phase and architect shall
verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect
correct signage and room number schedule.
51. Switchgear must be kept dry at all times both before and after roof has been installed.
52. Electrical boxes and conduits in rough-in stages must be covered with tape at all times to prevent debris from getting inside.
53. In the media center, two sets of four power and four data must be located on the half wall between studio and production
areas under the glass that divides the two rooms. A 5” PVC conduit must be provided in the bottom block closest to the
floor level under the window to allow for the transfer of wiring from one room to another. Wiring must be on the studio side
of the glass that looks into production.
54. There must be provisions for interior and exterior security lights at the end of each corridor and main entrances to the school
that is designed to burn at night so it can be used to identify objects picked up on security cameras.
55. The numbers for rooms on the plans must be the true room signage numbers. To avoid confusion, the architect’s
room numbers and the school door signage numbers must be one in the same. Numbers and the signage schedule must
be approved by the District. Electrical panels must be numbered to the true school signage numbers and all phone and
data must be labeled with true school’s room signage numbers. The fire alarm program and all smoke detectors must be
labeled with the true school signage numbers. It will be less confusing for everyone to have only one set of numbers.
56. Lights in all spaces must be controlled with motion sensors as specified in attached.
CEILING TILE AND FLOOR FINISHES
57. It is recommended that curing compound be used in all areas where directed by architect.
58. Carpet should not be installed until finishes have been completed. The Owner will not accept carpet that has been steam
cleaned, dry cleaned, or cleaned in any other method than vacuuming. Any carpet that has been wet due to leaks,
cleaning, etc., must be replaced. Due to problems with mold and mildew, carpet that has been wet is considered damaged
and cannot be accepted by the Owner. Architect must specify a carpet tile that is owner approved during design.
59. Ceiling tiles must be standard tiles and must be white in color. Decorative tiles are not permitted. Ceiling tiles must be
fire rated and be standard Armstrong 2’ x 2’ #824 white tiles, standard Armstrong 2’ x 4’ #823 white tiles, standard
Armstrong 2’ x 2’ #770 white tiles, standard 2’ x 4’ #769A white tiles, USG 2’ x 2’ #2110 white tiles, USG 2’ x 4’ #2310 white
tiles, or approved equal.
60. Epoxy floors in kitchens, gang toilets, and any miscellaneous areas must have a minimum of two sealer coats. The District
only allows darker shades of epoxy such as dark blue, charcoal, black and red terracotta. Light colors are not permitted.
June 21, 2010
22
HARDWARE
61. Key cores for exterior metal doors must be on right hand side.
62. All door magnet hold opens shall be provided under specification Section 08710. The General Contractor must closely
coordinate rough-ins for these magnets. Lockable interior corridor doors shall be used in areas of the school so that
evening activities can take place in public areas and still maintain the ability to secure other areas of the school. Heavy duty
magnets are required.
63. Exit devices must be through bolted. Wide style doors must be installed in order to accommodate the type exit devices we
use.
64. Science case work in science labs must be keyed the same for all cabinet or drawer locks in a given room. Each science
lab must be keyed different on a per lab basis to all other labs.
65. The contractor must provide Medeco padlocks keyed to Horry County Schools’ keying system for all lockable items such as
gates, roof hatches, etc. The architect is responsible for the count.
66. All keyless entry locks must be wireless. Locations for these keyless entry locks will be specified during the design
phase.
67. An electronic strike with a wireless transmitter button must be specified at the front entry.
DOORS
68. STOREFRONT DOORS, FRAMING AND/OR HARDWARE ARE NOT ALLOWED ON SCHOOL PROPERTY.
69. Doorframes must be sanded, re-primed, and repainted in any damaged or rusted areas.
70. Doors must be wood doors only. Laminate doors are not permitted. Mohawk doors are not allowed. Please refer to interior
wood door specifications.
HVAC
71. Room numbers for operational and signage purposes will be approved by the District and may be different from
architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms
unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If
there is a question, call your representative from the school district. The actual school room numbers that are
used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing,
and mechanical units. The architect must meet with the building principal during design phase and architect shall
verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect
correct signage and room number schedule.
72. Coils and filters in mechanical units must be protected at all times during finish installation. Construction filters must be
changed and dated weekly. Filter protection must be placed over all return grills and diffusers during construction. Should
proper filters not be in place, units should not be turned on. If these conditions are not met, the school district will require
cleaning of the units, ductwork, and the coils before accepting the building. All HVAC filters must be changed and dated
the week prior to building turnover.
73. Heat pumps must be labeled in a clockwise fashion starting at the admin area at the front entrance beginning with HP01,
HP02, HP03, etc. All ventilation equipment must be labeled MAU01, MAU02, MAU03, etc. Labeling for heat pumps must
be HCS signage numbers.
74. The District will change HVAC filters during the warranty period. The District does not want the mechanical contractor to
change filters.
June 21, 2010
23
75. ALL DUCT BRANCH CIRCUITS MUST BE R-6 ACOUSTICAL FLEX AND MUST BE FLEXMASTER ACOUSTICAL TYPE 8
OR APPROVED EQUAL. TO AVOID NOISE LEVELS IN CLASSROOMS, IT IS IMPERATIVE TO USE THIS
ACOUSTICAL FLEX.
PLUMBING
76. Fiberglass fuel tanks are not permitted.
77. Any drains under parking lots, asphalt drive areas, or concrete areas must be concrete or RCP pipe. (Civil)
78. Grease traps must be heavy duty pressure type round manhole frame with C/S bolted lids and must be water, gas, and
steam tight.
79. All urinals are to be waterless. There must be one urinal at handicap height in all male restrooms.
80. Kitchen hoses are required to be installed with kitchen serving line equipment. Kitchen reels are to be provided by the
plumber in the base bid.
81. Eyewash stations are required in all science labs and janitor closets that are chemical storage areas. .
ARCHITECT AND ENGINEERS
82. Eyewash stations are required in all science labs, janitor closets, and any other chemical storage areas.
83. Room numbers for operational and signage purposes will be approved by the District and may be different from
architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms
unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If
there is a question, call your representative from the school district. The actual school room numbers that are
used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing,
and mechanical units. The architect must meet with the building principal during design phase and architect shall
verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect
correct signage and room number schedule.
84. The discovery period is extremely important for renovation projects. It is very important to take note of illegal penetrations
above ceiling, code issues that include missing or broken exit lights, missing egress signs, and other items that may be
missing or not functioning. IDF and MDF rooms may be too full for additional equipment or locations of these closets may
have moved from their original locations. There may not be adequate power and data for the amount of computers that are
currently being used in classrooms. Provisions should be made to restore power, phone and data to walls that are being
demolished. Drawings should show items to be removed and where these items should be restored. In renovation projects
where the administration area is being renovated, strong consideration needs to be given to the effect renovations will have
on the fire alarm system, the security system, phones, bells, and speakers. Some older classrooms do not currently have
overhead speakers but will need them after renovations. Wiring for these speakers must be provided on plans. All existing
mechanical, electrical, and plumbing issues must be looked at closely during the discovery period. Verbal interviews with
staff and managers will be very important to gather information. These are merely examples of items that contractors have
overlooked in the bid process previously. In these instances both the owner and the contractor had added costs. It is
important to get as much input as possible up front. It is important to relay all discovery items in writing to the owner. The
owner’s representative will accompany architects and engineers during discovery.
85. It is also important in renovations to gain important information from the principal with regard to testing dates and activities
held at the school so that these items can be addressed in planning and in specifications. Note on specs and plans that the
contractor is responsible for planning his work schedule around the school instructional day. It is essential that work be
done after school hours, weekends, holidays, and breaks. Interruption of the instructional day will not be permitted. All
contractors and subcontractors must wear identification tags. Workers without tags will not be permitted in the building or
on school grounds.
June 21, 2010
24
86. Contractors need to be informed that the district will have Clemson Extension perform random inspections on termite
treatment.
87. The district requires a detailed cleaning spec for all areas of the building in the specifications. The contactor will be
responsible for additional coats of wax over and above what was used in the past. Classrooms and hallways will require
eight coats of wax. The floors must be burnished after all coats of wax are applied. Cleaning in all areas must be very
detailed and performed by a professional cleaning crew and also must be coordinated with furniture deliveries and
installations.
88. Architect is to have utilities located and verified during design phase and must be shown on construction documents.
89. Architect must complete and submit the Architect’s Checklist with the construction review documents provided to the
District. Architect must complete Ready for Construction form and deliver to the Construction Management staff prior to
bidding the project.
90. Architect must provide a color board for District approval. No colors are to be approved without District approval.
91. The civil engineer must coordinate drain covers in playground areas so the District does not have large drain covers located
in play areas. If these drains are absolutely necessary, they must be pedestrian type designed specifically for small
children.
92. Location of mechanical, electrical, and plumbing lines must be coordinated by the contractor with playground installers and
Horry County Schools to avoid conflict.
93. The Contractor must provide Medeco padlocks keyed to the Horry County School District Keymark Keying System. For all
lockable items in and outside the building, including but not limited to gates, around ponds, HVAC units, lift stations, wells
and irrigation system, gas disconnects, riser pits, entry roll gates, roof hatches, etc. The Contractor is responsible for the
total number of lockable items per project as specified by the architect. The Contractor will purchase padlocks from the
hardware supplier.
94. Keyless entry locks must be specified by the Architect, provided by the Contractor in the base bid, and must be wireless.
The District will specify approved brands and location of keyless entry during design review.
95. All IDF/MDF rooms require keyless entry locks.
96. Required District Inspections:
A final walk through with maintenance will be required prior to the district acceptance of the new or renovated facility. All
items listed below must be commissioned and approved by appropriate district personnel. This walk through will take place
after all training sessions are complete. THE CONTRACTOR SHALL PROVIDE and turn over a set of as-built plans to the
maintenance department staff at the walk through. As-built drawings on C.D. Rom can be provided at a later date with
close out documents. Maintenance staff will sign for the as-built drawings they received at the inspection. This document
shall be turned in with close out documents. At the time of the inspection, confirmation will be given that items in the
building are as as-built drawings indicate. The general contractor and subcontractor representing each area for the walk
through must be present. An appropriate representative from the maintenance department will also be present. The
following areas will be addressed on the final inspection:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Roofing
HVAC and Test & Balance Reports
Plumbing
Electrical
Fire Alarm
Kitchen Equipment
Paint
Technology
Doors, Toilet Partitions, Lockers
Hardware
Floor Finishes
Fencing
June 21, 2010
25
13. Irrigation
Final inspections must be done separately and on a different day from training sessions. Architects must specify
these inspections on plans and specifications.
FIRE ALARM
97. All costs for U.L. monitoring, testing and certification required for fire alarm systems must be included in the base bid
contract and provided by the contractor for one year. All fire pits must have signage chains and locks. Locks must be
provided by the contractor.
98. Sprinkler riser rooms must be supervised and labeled for each section. A diagram of the school must be provided on the
wall and must indicate all labeling.
99. All PIV valves FDCs must have signage.
100. All PIV valves are required to have tamper switches.
101. Back flow preventers must have tamper switches tied into the fire alarm system as required by the State Fire Marshal. Back
flow preventer fills must be locked and valves must be signed, chained and locked. Above ground pits must have heater.
Riser rooms must have heaters also.
ROOF
102. In renovation work, when asphalt is used, an additive to reduce odor is required. The architect is required to use an Horry
County Schools’ approved roof consultant.
June 21, 2010
26
REQUIRED DISTRICT INSPECTIONS
A final walk through with maintenance will be required prior to the district acceptance of the new or renovated facility. All items
listed below must be commissioned and approved by appropriate district personnel. This walk through will take place after all
training sessions are complete. THE CONTRACTOR SHALL PROVIDE and turn over a set of as-built plans to the maintenance
department staff at the walk through. As-built drawings on C.D. Rom can be provided at a later date with close out documents.
Maintenance staff will sign for the as-built drawings they received at the inspection. This document shall be turned in with close
out documents. At the time of the inspection, confirmation will be given that items in the building are as as-built drawings
indicate. The general contractor and subcontractor representing each area for the walk through must be present. An
appropriate representative from the maintenance department will also be present. The following areas will be addressed on the
final inspection:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Roofing
HVAC and Test & Balance Reports
Plumbing
Electrical
Fire Alarm
Kitchen Equipment
Paint
Technology
Doors, Toilet Partitions, Lockers
Hardware
Floor Finishes
Fencing
Irrigation
Final inspections must be done separately and on a different day from training sessions. Architects must specify these
inspections on plans or in specifications as well as the requirement for as-builts.
June 21, 2010
27
RECOMMENDATIONS FOR NEW SCHOOLS AND RENOVATED SPACES
ROOFS
1.
Low slope applications; Cold or hot – Modified Bituminous Membrane roofs shall be installed over the specified insulation,
with a minimum of 2 plies of prefabricated, reinforced, homogeneous Styrene-Butadiene-Styrene (SBS) block copolymer
modified asphalt membrane secured to a prepared substrate. Both reinforcement mats shall be impregnated and coated
each side with a high quality SBS modified bitumen blend. The roof system shall pass ASTM D 5849, Resistance to Cyclic
Joint Displacement at 14ºF. Passing results shall show no signs of membrane cracking or interply delamination after 500
cycles as manufactured and 200 cycles after heat conditioning according to ASTM D 5147. The modified base ply
membrane shall be glass fiber or polyester-reinforced ply sheet manufactured for torch application, cold-adhesive
application, or mopped application meeting or exceeding requirements of ASTM D 6163 (glass fiber reinforced) or ASTM D
6164 (polyester reinforced), Type I or II, Grade S. The interplay adhesive material for the modified bitumen membrane base
sheet shall be ambient temperature asphalt that is VOC compliant, cold adhesive, or adhered using torch grade membrane;
the interplay adhesive material for the modified bitumen surface ply shall be cold adhesive or adhered using torch grade
membrane. The modified cap sheet membrane shall be glass fiber or polyester-reinforced ply sheet manufactured for torch
application or cold-adhesive application meeting or exceeding requirements of ASTM D 6163 (glass fiber reinforced) or
ASTM D 6164 (polyester reinforced), Type I or II, Grade S. The modified cap sheet shall have factory embedded white
ceramic granules. Design shall meet NRCA standards including 12” minimum flashing heights, equipment flashing, and
through-wall flashing, etc. As a minimum, the roof systems must be installed to comply with FMG 4470/4450 and meet the
FMG wind uplift requirements for each school location, FMG Data Sheet 1-29 for above roof deck components and FMG
Data Sheet 1-49 for perimeter flashing and meet UL 790 Class A Fire Rating.
When hot asphalt is being used, a low fume asphalt or alternate substance to reduce asphalt/tar odor shall be used. Utilize
low or no fuming asphalt kettle whenever roofing bitumen is being heated. Kettle to be an incineration type apparatus as
manufactured by Reeves Roofing Equipment Co. (Afterburner Kettle) or Garlock Equipment Co. (Fume Guard) or a filtration
type apparatus as manufactured by National Tool and Equipment Co. (Fume Recovery System).
Minimum acceptable slope for such systems will be ¼” per foot and should be incorporated into the building design as to
avoid the expense of tapered insulation. Roof insulation boards shall be installed in two (2) layers when the insulation
exceeds 2 inches in thickness. A moisture resistant gypsum overlayment board shall be installed over all layers equal to
DensDeck or Securock.
2.
Steep slope applications (4/12 or steeper) – Standing seam Kynar finished structural metal roofing system or architectural
system over deck, utilizing seams that are a minimum of 2 inches above the plane of the roof panel secured by means of
concealed cleats. Kynar finished aluminum is preferred if the budget allows. In general, a minimum slope of 3 inches per
foot should be maintained. Exposed fasteners are not permitted.
3.
Low slope applications (3/12 or flatter) – When a standing seam metal roof is used, must have a minimum rib height of 2 ½”.
* A double lock rib is required in both low slope (3/12 or flatter) and steep slope (4/12 or steeper) standing seam
applications.
4.
Through-wall flashing – In all locations where a roof terminates at masonry wall, the wall shall have a 16 oz. Copper
through-wall flashing. The flashing shall turn up a minimum height of eight inches inside the wall, come through the exterior
brick or block and turn down a minimum of one and one half inches on the face of the masonry wall. Joints shall be
soldered to make a watertight connection and be inspected by the architect or his representative before being covered.
Provide end dams at flashing termination at walls for control of drainage to exterior of building. Remove all excess mortar
from joints on the interior side of the new brick wall and ensure excess mortar does not fall into wall cavity on to new
through-wall flashings. Contractor shall utilize procedures necessary to ensure cavity walls, through-wall flashings, and
weeps are clear of mortar and/or debris. The flashing shall be installed in the masonry wall so that it will be located a
minimum height of eight to ten inches above the finished roof.
5.
2-Piece Receiver and Counter Flashing – ASTM A167, 26 gauge. Fabricate receiver and counterflashing in 8- or 10-foot
lengths. Refer to SMACNA Manual Figure 4-4A. The receiver flashing is set as the wall is built and placed a minimum of
10 inches above the finished roof and 1 inch above the cant.
June 21, 2010
28
The interior wall vertical leg shall extend up a minimum of 2 inches. Secure top edge of receiver with expansion anchors
with EPDM washers spaced 12 inches on center. The through-wall flashing shall extend over the vertical and horizontal
legs to within 1 inch of the exterior wall surface. Dissimilar metals shall be separated with a coating of asphaltic paint.
Notch and lap receiver 4 inches at joints with 2 rows of stainless steel pop rivets staggered and placed 2 inches on center
and completely solder.
Notch and lap inside corners. Notch and seam outside corners. Do not rivet or otherwise secure joints at corners.
Provide end dams at flashing termination at walls for control of drainage to exterior of building.
Install counterflashing into receiver flashing and secure.
Install wind clips 24 inches on center.
Notch and lap ends of adjoining sections not less than 6 inches. Apply sealant between sections.
6.
Roof Drains and Downspouts – All roof drains shall be cast iron and flashed with 4 lb. lead or soft copper. All roof drains
shall have a minimum 48” sump with 24” copper gravel guards installed with granule surfacing. The downspouts from the
gutters shall be piped into the storm drain system. Cast iron roof drains and rims are required. PVC rims are not allowed.
7.
Parapet walls and wall caps – All parapet walls shall be covered with a high temperature ice and water shield for use under
metal, have continuous wind clips, and tapered cants installed before caps are installed on the wall. All wall caps shall have
standing seam connections fabricated and installed in accordance with SMACNA and ANSI SPRI ES-1.
8.
Expansion joints – All expansion joints, whether roof to roof or roof to wall, whenever and wherever possible, shall be
curbed and covered with vinyl water barrier and standing seam metal joints fabricated and installed in accordance with
SMACNA.
9.
Roof Scuttles – All roof scuttles are to be Bilco Aluminum or stainless steel constructed roof scuttles with ladder up the post.
10. Warranties – All roofing systems, whether modified bituminous membrane, standing seam metal, or single ply, etc., shall be
installed according to manufacturer’s specification and meet state and local building codes. All manufacturers’ warranties
shall include the full system and include all materials specified from the deck up with a twenty year no dollar limit weathertightness warranty. The warranty shall include inspections during the second year with preventative maintenance
performed by the contractor and manufacturer. After the inspection, a report shall be delivered to the Building Owner
identifying all corrective actions by the contractor and manufacturer and any future action required by the Owner to maintain
the roof.
June 21, 2010
29
WALLS
Masonry type: Concrete block interior with brick exterior. The District prefers to use utility brick at 1/3 bond. Split face block
should not be used unless it is needed to match an existing building or renovation. Interior walls to be finished to acceptable
tolerances and painted except in areas such as restrooms and kitchens. FRP must be used in kitchens and staff restrooms from
floor to ceiling level. Waterborne epoxy must be used in the remainder of kitchen and restroom areas, such as storage and
miscellaneous areas. Administrative walls may be metal stud cavity with gypsum wallboard. Classroom wall finishes shall be
concrete block.
*See Paint Recommendation section for specifics on paint pertaining to new schools versus renovations.
June 21, 2010
30
KITCHENS
All kitchens are required to have an exterior doorbell at loading dock door. Doorbell specified must be a heavy duty commercial
and must be located to buzz adjacent to kitchen manager’s office. A peep hole must be installed in the same loading dock door
with the exterior doorbell.
EXHAUST HOODS
Variable Volume Specifications
The variable shall automatically control the speed of the exhaust (and make-up if applicable) fan to ensure optimal hood
performance. The system includes the following components: I/O Processor, Keypad, Temperature Sensors, Optic Sensors,
Electric Motor Starters (VFB’s which replace magnetic starters for 3 phase motors), and Cables.
The hood manufacturer shall integrate this pre-engineered system into new construction kitchen hoods. The I/O Processor,
Keypad, and Electronic Motor Starters (VFB’s) shall be mounted in the exhaust collar, and the Optic Sensors shall be mounted
inside the ends of the hood with air purge units (APU) mounted on the top of the hood.
Standard System Components
• I/O Processor
• Keypad
• Temperature Sensor
• Optic Sensor with air purge unit
• Electronic motor starters (VFB’s)
• Plug and Play Cables
Responsibilities
The hood manufacturer is to pre-mount all variable volume system components at the factory. All variable volume system
components shall be factory pre-wired. The variable volume system shall be pre-programmed at the factory.
The electrical contractor shall field wire the I/O processor inside the utility cabinet with an input of 115/1 or 230/1 VAC from a
dedicated circuit. The output wiring shall be connected to the hood lights. The electrical contractor shall field wire the electric
motor starters inside the utility cabinet by connecting 3-phase input power from the circuit breakers. The output wiring shall be
connected to the respective fan motor. The input and output wiring shall be run in separate conduit for each starter. (Note: If
there is a heated MUA unit, separator circuit must feed the controls. Do not use the motor circuit. Also, a control cable with at
least 4 conductors shall be run from the MUA to the I/O Processor.) The electrical contractor shall connect Plug-n-Play cables
from I/O Processor to each hood. Electrical contractor shall start up the system by pressing the light and fan switch on the
keypad to verify hood lights function and fans proceed to minimum speed. Correct fan rotation as necessary.
Test and balance contractor shall air balance the system by pressing the 100% switch on the keypad. Speed adjustments on the
direct drive fans to be made at the electronic motor starts (VFB).
1.
2.
3.
4.
5.
Exhaust hood duct over equipment from the top of hood to the roof curb must be stainless steel.
Exhaust hood heights 6’8” AFF.
Exhaust hood preferred brand name is Green Hec or Captive-Aire (U.L. Listed).
Use variable volume drive on hood.
Do not use bottom discharge make-up air.
WALK-IN COOLER AND FREEZER
1.
2.
3.
4.
5.
Walk-in cooler and freezer preferred brand name is Bally Engineered Systems, Bally Boxes, Bally conditioned units, Bally
evap., or approved substitute.
Walk-in cooler and freezer stainless steel floors with nonskid strips (no painted or concrete floor).
Lighting to comply with DHEC specifications. DHEC may require additional lighting. Verify with DHEC.
Condenser units located on ground should be fenced in.
Freezer and cooler must be on the emergency generator at all times when available.
June 21, 2010
31
MANAGER’S OFFICE
1.
2.
Manager’s Office must have view of entire facility (serving line, deliveries, and preparation area).
HVAC for manager’s office shall be a separate unit from preparation area.
WALLS, FLOORS, DOORS (NEW SCHOOLS ONLY)
1.
2.
3.
4.
5.
FRP shall be used floor to ceiling in kitchen, preparation area, serving area, and dishwasher area.
Epoxy poured floors such as a Dex-O-Tex type product. When epoxy floors are used only dark colors such as dark blue,
charcoal, black and red terracotta may be used.
Door at the back of kitchen shall have fly fan.
Use only Pants/EQ duct over dishwasher and must be stainless steel to roof curb, and be insulated.
All roll-up doors to be electrical, not manual. The only exception would be the dish return unless it is in a fire rated wall.
OSF guidelines should be followed.
WATER BOILERS
1.
Preferred brand is A.O. Smith or approved substitute.
*Factory built rack systems are not allowed.
2.
Brass fittings to be used on boilers, water heaters and storage tanks. (No galvanized pipe fittings to be used).
3.
Water heaters must have two-temp booster recovery systems for HW 420 HW520 - HW670.
GAS EQUIPMENT
1.
2.
3.
4.
Use of Gas Equipment is preferred. Natural gas is preferred where available.
Valves - Jenkins - Conbraco - Ball valves to be full port on hot water lines.
Electric water heaters to be used is A.O. Smith with brass pipe nipples used in place of galvanized.
Kitchen/Gas Appliances: Vulcan-Hart or Hobart, or approved equal
Automatic Slicers - Hobart
Convection Ovens - Blodgett - Hobart
Braising Pans - Groen
Hot Plate - Southbend - Hobart - Franklin Chef
Fat Fryer - Pitco with standing pilot only with dump station filter system - no electronic ignition systems
Convection Steamer - VS X 10 Vulcan Hart with water filtering system
Dishwashers – Hobart
Buffalo Chopper - Hobart
* Items listed above are preferred brands. Substitutions will be considered but must be approved. Energy Star
appliances preferred.
5.
Water Boilers (No PVI, they will not last with the high temperature we use). We use only A.O. Smith with two-temp boosterrecovery systems, used with kitchen dishwashers. Use brass pipe nipples in place of any galvanized fittings on
storage tanks.
GAS PIPING - UNDERGROUND
1.
Use polyethylene pipe only.
SERVING LINE EQUIPMENT
Serving line equipment must meet all DHEC, OSF and Building Code requirements. Hoses for serving equipment must be
provided by the contractor. All drain areas must be covered with grids.
June 21, 2010
32
PAINT RECOMMENDATIONS
FLAT PAINT SHALL NOT BE USED IN HORRY COUNTY SCHOOLS BUILDING CORRIDORS, CLASSROOMS, AND HIGH
TRAFFIC AREAS.
1.
2.
3.
4.
5.
6.
All interior walls of new schools should be painted with semi-gloss interior/exterior waterborne acrylic Devflex 4208 or
approved equal. Walls shall have a minimum of three coats of paint.
Interior doors and openings should be painted with interior/exterior waterborne acrylic gloss Devflex or approved equal.
Door frames and interior window frames shall have a minimum of three coats of paint.
Exterior hollow metal doors and frames should be painted with interior/exterior waterborne acrylic gloss Devflex or approved
equal. Exterior doors and frames must have a minimum of three coats of paint.
Prior to painting, all surfaces must be prepared with appropriate primers.
All recommended products are Sherwin Williams, ICI Devoe, Rose Talbert, DTM acrylic coating, or approved equal.
Architects shall specify surface preparation and finish.
*THE SAME PRODUCTS AS LISTED ABOVE MAY BE USED IN RENOVATION PROJECTS; HOWEVER, PROPER
PRIMERS MUST BE USED IN CASES OF OLD WALLS THAT HAVE BEEN PAINTED AND REPAINTED MANY TIMES WITH
OIL OR OIL EPOXY PAINT.
Painting Requirements for Renovations
Previously Coated Surfaces
Maintenance painting will frequently not permit or require complete removal of all old coatings prior to repainting. However, all
surface contamination such as oil, grease, loose paint, mill scale dirt, foreign matter, rust, mold, mildew, mortar, efflorescence,
and sealers must be removed to assure sound bonding to the tightly adhering old paint. Glossy surfaces of old paint films must
be clean and dull before repainting. Thorough washing with an abrasive cleanser will clean and dull in one operation, or wash
thoroughly and dull by sanding. Spot prime any bare areas with an appropriate primer. Recognize that any surface preparation
short of total removal of the old coating may compromise the service length of the system. Check for compatibility by applying a
test patch of the recommended coating system, covering at least 2 to 3 square feet. Allow to dry one week before testing
adhesion per ASTM D3359. If the coating system is incompatible, complete removal is required.
Painting Requirements for New Schools
Block (Cinder and Concrete)
Remove all loose mortar and foreign material. Surface must be free of laitance, concrete dust, dirt, form release agents,
moisture curing membranes, loose cement, and hardeners. Concrete and mortar must be cured at least 30 days at 75°F. The
pH of the surface should be between 6 and 9, unless the products to be used are designed to be used in high or low pH
environments, such as Loxon. On tilt-up and poured-in place concrete, commercial detergents and abrasive blasting may be
necessary to prepare the surface. Fill bug holes, air pockets, and other voids with a patching compound such as ConSeal.
*ALL HAND RAILING MUST BE HEAVILY SANDED WITH ROUGH SAND PAPER IN ORDER TO PROVIDE THE PRODUCT
WITH SOMETHING TO STICK TO.
New Construction Painting Schedule
Interior Painting Schedule
A. CEMENT BLOCK WALLS - Concrete Masonry Unit
Surface Prep: Block (Cinder and Concrete) S-W 3
Pre-Primer: Loxon Block Surfacer
Prime Coat: Loxon Block Surfacer
Intermediate: DTM Acrylic Coating Semi-Gloss
Finish Coat: DTM Acrylic Coating Semi-Gloss
B. SHEETROCK WALLS - Gypsum Board
Surface Prep: Drywall - Interior & Exterior S-W 3
Pre-Primer: Builders Solution Interior Primer/Surfacer
Prime Coat: Builders Solution Interior Primer/Surfacer
Intermediate: DTM Acrylic Coating Semi-Gloss
June 21, 2010
33
Finish Coat: DTM Acrylic Coating Semi-Gloss
C. METAL DOOR CASINGS/DOORS - Steel
Surface Prep: Power Tool Cleaning S-W 15
Pre-Primer: Pro-Cryl Universal Primer
Prime Coat: Pro-Cryl Universal Primer
Intermediate: Waterbased Industrial Enamel
Finish Coat: Waterbased Industrial Enamel
Exterior Painting Schedule
A. BRICK LINALS - Steel
Surface Prep: Hand Tool Cleaning S-W 14
Pre-Primer: Pro-Cryl Universal Primer
Prime Coat: Pro-Cryl Universal Primer
Intermediate: DTM Acrylic Coating Semi-Gloss
Finish Coat: DTM Acrylic Coating Semi-Gloss
B.
METAL DOORS (Pre-primed)
Surface Prep: Hand Tool Cleaning S-W 14
Intermediate: Waterbased Industrial Enamel
Finish Coat: Waterbased Industrial Enamel
C. EXTERIOR STUCCO (DRYVIT) - Stucco
Surface Prep: Not Selected
Prime Coat: Loxon Exterior Acrylic Masonry Primer
Intermediate: A-100 Exterior Latex Gloss
Finish Coat: A-100 Exterior Latex Gloss
D. EXTERIOR SHEETROCK – Exterior Drywall
Surface Prep: Drywall – Interior & Exterior S-W 8
Prime Coat: Loxon Exterior Acrylic Masonry Primer
Intermediate: A-100 Exterior Latex Satin
Finish Coat: A-100 Exterior Latex Satin
E.
EXTERIOR METAL CANOPY DECKING - Galvanized
Surface Prep: Galvanized Metal S-W 10
Prime Coat: Pro-Cryl Universal Primer
Intermediate: Waterborne Acrylic Gloss Devflex or DTM Acrylic
Finish Coat: Waterborne Acrylic Gloss Devflex or DTM Acrylic
F.
METAL CANOPY POSTS - Steel
Surface Prep: Hand Tool Cleaning S-W 14
Prime Coat: Pro-Cryl Universal Primer
Intermediate: Waterbased Industrial Enamel
Finish Coat: Waterbased Industrial Enamel
G. KITCHEN/BATH/WASHROOMS (OPTIONAL) - Concrete Masonry Unit
Surface Prep: Block (Cinder and Concrete) S-W 3
Prime Coat: Loxon Block Surfacer
Intermediate: Waterbased Tile-Clad Epoxy
Finish Coat: Waterbased Tile-Clad Epoxy
June 21, 2010
34
HVAC
CONTRACTOR DOES NOT CHANGE FILTERS DURING WARRANTY PERIOD, HOWEVER, FILTERS MUST BE CHANGED
AND DATED ONE WEEK PRIOR TO SCHOOL DISTRICT OCCUPANCY.
Plumbing vents must be located far enough from make-up air units so odor will not be pulled back into the building.
HVAC access doors must be totally and easily accessible. HVAC access must not be blocked by overhead plumbing or
electrical conduits, lines and ductwork.
Auditorium – Do not put air handlers over seating area.
Auditorium – Size one heat pump for square footage of the area and the other heat pump for the “people load”. This is
to help with humidity control when space is unoccupied.
Provide humidity control for entire building (not just classrooms).
Heat pumps are to be 13 Seer or better.
Do not tie condensate drains into roof drains.
Provide heaters at all corridor entrances in all buildings.
HVAC Duct Work
ALL DUCT BRANCH CIRCUITS MUST BE R-6 ACOUSTICAL FLEX AND MUST BE FLEXMASTER ACOUSTICAL TYPE 8 OR
APPROVED EQUAL. THIS TYPE FLEX MUST BE USED TO REDUCE NOISE LEVELS IN CLASSROOMS.
1.
2.
3.
4.
5.
6.
All ductwork is to meet S.M.N.C.A. Guidelines.
All ductwork is to be metal duct (No Ductboard).
All duct is to be sealed before duct wrap goes on with sealant. Any duct wrap that gets wet must be removed and replaced
at no charge to the owner.
Flex duct can be used on supply grills and return grills.
Do not exceed 8’ on all flex lines.
On flex duct, support with hangers every six feet.
Duct Insulation
1.
All duct is to be externally wrapped (No Duct Lining).
2.
Use 2” or larger duct wrap.
3.
Use fiber cloth and staples on wrap with 1½ seam.
4.
Mastic all duct seams, even take off and grills.
a) Insulation blankets on supply
b) Use grill 3 way registers to prevent air blowing on walls or on thermostat
5.
On return side duct from unit to return grill, no open plenum.
Diffusers & Grills
1.
2.
Use 2’ x 2’ drop in louvered grills in support ceilings, open size 22” x 22”, 20” x 20”, or 20” x 30” as needed for particular
application. Large standard size grills and filters only.
Each classroom is to have its own return filtered grill.
June 21, 2010
35
3.
4.
ALL RETURNS ARE TO BE FILTERED AT THE GRILL (STANDARD FILTER SIZES ONLY). ALL GRILLS AND ALL
FILTERS MUST BE STANDARD COMMERCIAL SIZE. NO SPECIAL ORDER OR ODD SIZED GRILLS AND FILTERS.
MOST COMMONLY USED SIZES BY THE SCHOOL DISTRICT ARE 20” X 20” AND 20” X 30”.
Try to use the same size filters throughout the job, minimize size differences.
Equipment
1.
Equipment shall be UL approved and minimums 13 EE R.
2.
ALL EQUIPMENT MUST BE SERVICEABLE. MAINTAIN AT LEAST A MINIMUM OF 24” SERVICEABILITY AROUND
THE UNIT. A MINIMUM OF 36” SERVICEABILITY IS REQUIRED FOR EXTERIOR MAKE UP AIR UNITS ON THE
GROUND AND ROOF. ROOF PADDING IS REQUIRED AROUND ALL ROOF TOP UNITS. Engineer is to add this as
an additional note on plans.
3.
All air handlers to have overflow pan with float switch. Pan should be a minimum of 2” larger than unit on all sides. Depth
should be a minimum of 2 ½”. Units and pans must have a minimum of four supports for additional weight when full.
4.
All p-traps are to be copper with clean out or blow out.
5.
Drain lines are to be insulated from unit out to end, with proper slope. A minimum of 1/8” per foot is required and must be
directed into the storm drain. DO NOT TIE DRAIN LINES INTO ROOF DRAINS.
6.
All outside equipment shall have chain link fences around outside with clearance for maintenance. Large and small units
shall have a minimum of 3’ clearance around the unit. Access to panels that open must not be blocked. Service gates
must be a minimum of 3’.
7.
All systems in mechanical rooms must be elevated on concrete slabs or house cleaning pads.
8.
Design drop ceiling grid made in a 4’x4’ area to take out, in areas under mechanical units for services and
maintenance of unit.
9.
All equipment to have coil guard for protection.
10.
Provide for easy access to above ceiling mechanical units: use of wall mounted ladders is suggested. Above ceiling units
must have 2’ perimeters access.
11.
As needed per design, provide lighted attic space with receptacles at light fixtures where equipment is located in attic
space.
12.
A/C drain lines to be run by A/C contractor with no dry wells.
13.
Air handler disconnects to be accessible from electrical service panel of unit.
14.
Acceptable Equipment Choices are:
a) Trane
b) Lennox
c) McQuay
*Substitutions will be considered but must be approved by the District.
15.
Coils and filters in mechanical units must be protected at all times during finish installation. Construction filters must be
changed and dated weekly. Filter protection must be placed over all return grills and diffusers during construction. Should
proper filters not be in place, units should not be turned on. If these conditions are not met, the school district will require
cleaning of the units, ductwork, and the coils before accepting the building. All HVAC filters must be changed and dated
the week prior to building turnover.
16.
Choices for Air Recovery System must be a heat pipe or plate heat exchange.
*Substitutions will be considered but must be approved.
June 21, 2010
36
Note: 1st Wringer plus with heat pipe outside of building, 2nd Hot water coil in air handler if installed in attic with hot water
heater in another area.
17.
Interior HVAC equipment must not be exposed to weather in lay down areas for long periods of time before installation.
18.
A cover must be provided for all exterior refrigeration units. Covers must provide proper ventilation.
19.
No direct fire gas heaters are to be used in any duct or dehumidification units.
20.
Testing and Balance Reports must be complete before OSF inspection and must be hired by the GC. The testing and
balancing contractor must be independent of the mechanical contractor.
Filters
1.
Filters must be changed by the general contractor immediately prior to occupancy. District responsible for providing and
changing filters during the warranty one year period.
2.
This District will not accept dirty coils. Coils must be cleaned and photographed prior to District occupancy.
Energy Management Systems
1.
2.
3.
4.
Stay with our present systems (Landis & Staefa.)
Put the E.P. in mechanical room, not an office or work area.
Label all equipment, etc.
System needs to be able to shed loads, duty cycle, optimum start/stop, and have demand limit.
Hanger Support
1.
2.
All metal used should be painted or galvanized.
Stamps on ductwork should be at least 22 Ga. or better.
Cooling Tower (if used)
1.
2.
3.
4.
5.
6.
7.
Tower should be closed circuit cooler type.
Tower should be all stainless steel with induced draft (type 304). Chain length fencing is required around chillers with
minimum of 5’ clearance. Chillers drainage must be routed to storm drains.
Basin heaters to prevent freezing.
Tower to sit on concrete rail pad. Size of pad must be adequate.
Tower needs to have bottom drain 2”.
Any metal used must be all stainless.
Provide variable speed drive on tower fans.
HVAC Refrigerant Lines
1.
2.
3.
4.
All lines that penetrate any wall must be in a sleeve and must be insulated. Lines that do not penetrate a wall must have
continuous insulation and must be totally sealed.
All lines to be soldiered must contain nitrogen and must be kept clean and free of moisture by means of caps or otherwise.
Final test requires 250-lbs. pressure for 24 hours.
Must not exceed manufacturer’s recommended length.
June 21, 2010
37
PLUMBING
See Specifications attached for faucet to be used in all single and gang toilets.
Plumbing vents must be located far enough from make-up air units so odor will not be pulled back into the building.
Overhead plumb lines, mechanical duct and electrical conduits must not block access to any other overhead equipment
or access doors.
1.
2.
3.
4.
5.
The plumber is to supply hoses for kitchen serving line equipment.
Potable hot and cold water pipe shall be copper.
Small water heaters may be used in isolated application. The kitchen and athletic locker room's hot water system should be
re-circulating. All water heaters shall be controlled by Energy Management System. Water heaters shall not be controlled
by heat run TEC’s.
Central hot water heaters for locker room showers, etc. shall be gas fired. The kitchen dishwashing system shall be either
A. O. Smith, RayPak, or approved substitute (No PVI).
Automatic trap primers shall only be used for floor drains. The primer shall be the passive type fed off of local sink traps.
No mechanical trap primers shall be used. Traps shall be filled with vegetable oil after construction.
Grease Trap Requirements
R-6460 Series
Pressure Type Round Manhole Frames with C/S Bolted Lids
Water-, Gas-, and Steam-tight
Heavy Duty – Round for Slab Construction.
Drainage
All soil, waste, drain, and vent PVC piping shall be at least schedule 40 or better below the slab and to the point of connection of
the sanitary sewer system. All laboratories to be chemical resistant acid waste piping.
Domestic Cold Water and Hot Water
All domestic cold and hot water piping shall be hard drawn copper. Type K copper must be used below the slab and Type L
above finished floor, with soldered wrought copper fittings. All domestic water lines shall be run overhead. Hot and cold water
should be provided in each gang toilet and all miscellaneous restrooms. Please provide a mixing valve so that hot water can be
predetermined.
Valves
All ball valves shall be Hammond, Jenkins, Apollo by Conbraco, or approved substitute. No gate valves are permitted.
Cut off valves shall be placed throughout the building to allow for isolation of small areas for easier repair and maintenance.
Isolation valves shall be installed at all toilet locations and in hot water lines leaving main going to classrooms and restrooms.
Valves must be easily accessible.
Where valve access boxes are used, they shall be key lockable and keys shall be provided to the school.
All lavatory and sink stop valves shall be polished chrome-plated heavy cast construction. Sweat valves are accepted or if
threaded valves are used, they shall be used with chrome plated brass nipples.
Valves must be labeled on ceiling grid or walls for maintenance.
Wall Hydrants
Provide Woodford chrome plated, self-draining and anti-freeze exterior wall hydrants. Wall Hydrants shall have internal vacuum
breaker. Hydrant keys shall be provided to the school when construction is completed. Approved equals are Josam or J.R.
Smith.
Electric Water Heater
Provide energy efficient glass-lined water heater as manufactured by A.O. Smith, Ruud, Bradford White, or approved substitute.
June 21, 2010
38
All hot and cold connections to water heaters shall have a dielectric union.
Valve and Line Identification
Provide 1 ¼” standard hexagonal bronze identification tags as manufactured by Seton Nameplate Company. This must be done
on each to identify the type of service at an area easily accessible.
Lines are to be identified Hot or Cold with directional arrows.
A valve chart shall be provided and attached to wall in the mechanical room where the main water supply enters the building.
Valves must be labeled clearly on ceiling grid.
Isolation valves shall be installed at all toilet locations.
Plumbing Fixtures
All plumbing fixtures are as manufactured by American Standard or approved substitute if they can provide exact replacements
for a period of 10 years. Replacement parts must be available in the United States.
Brass flange provided by the manufacturer for drain connection between urinal and drain-piping system shall be used.
PVC or plastic flanges shall in no case be permitted on urinal drains
Drain traps on sinks, lavatories, etc., shall be 17-gauge brass with chrome or satin finish.
When used, flush valves shall be Sloan, Delaney, Zurn, or approved substitute.
Electric water coolers are to be of quality same as or equal to Halsey Taylor, Elkay, or Oasis brands.
In boys and girls restrooms, all lavatories shall have a grid strainer type drain. Metering faucets are not acceptable. Wrist
handles should only be used where required by code. All urinals must be waterless. There must be one urinal at handicapped
height in each male restroom.
Parts for all eye wash stations must be available in the United States.
Hot Water
Hot or tepid water must be installed as required by OSF and DHEC in all areas. The District prefers to have hot water in janitor
closets, special education classrooms, art rooms and adult restrooms.
Hot water shall be installed in administrative areas, teacher workrooms, health room, and media center.
Washer/Dryer Hookups
Hookups shall be provided in kitchen and P.E. storage areas and other areas as may be required for specialty programs such as:
Special Ed, Home Economics, Culinary, Cosmetology, Nursing, etc.
Backflow Preventer
Provide a backflow preventer as manufactured by Watts #709, Febco, Conbraco, or approved substitute.
Backflow preventer shall be installed on main water supply with ample space for testing and servicing the unit.
Any kitchen reels, can wash areas, dish wash areas, or any other areas that have mixing valves must have check valves on cold
water in the ceiling.
Piping Outside of Building
A locator wire shall be run with all outside PVC or any non-metallic piping.
Clean outs to grade shall have concrete clean out rings or collars for protection to clean outs.
June 21, 2010
39
Any and all irrigation sprinkler systems shall be run with no less than schedule 40 PVC pipe, and a locator wire run
along with piping.
An as-built drawing shall be submitted to the Horry County Schools Maintenance Department on all irrigation systems.
Training for the irrigation system is required. A minimum of two staff members and one of the plumbers from
Maintenance must be present. All irrigation system must have a lock with keys on the time clock box. Three keys are
required and must be turned over to the District lock and key supervisor.
All irrigation wells should have well houses with electricity. All wells must be fenced in.
Blueprints and Submittals
All plumbing shall be run according to the blue prints. Any approved changes needed shall be marked on drawings and a
complete set of as-builts must be provided to Horry County Schools with close-out documents.
A complete set of job submittals must be provided to the architect and district project representative.
Future Connections
For future expansion, provide 1” cold water and 4” sewer stub outs at the end of each wing. Cap ends of connection and stub
out shall be a minimum of 10’ from building avoiding walkways, etc., for the purpose of the hookup of future portable classrooms.
Smoke Test
At the time of final inspection, a smoke test shall be conducted on the entire sanitary sewer system to check for sewer
gas leaks. Maintenance should be present.
All lab faucets and faucets in classrooms and restrooms must be vandal resistant.
All drain lines under slab need to be checked by camera and recorded on DVD as part of the closeout documents. The
DVD of all lines must be turned in with closeout documents.
THE NURSES SINK MUST ALSO HAVE A SPRAY NOZZLE.
Eyewash Station
Eyewash stations are required in all science labs and janitor chemical storage closets. The District prefers a Bradley Eyewash
Station or owner approved equal. Parts must be available in the U.S.
June 21, 2010
40
THIS FAUCET MUST BE SPECIFIED WITH ALL GANG TOILET SINKS AND INDIVIDUAL SINKS.
RECESSED SOAP DISPENSERS ARE NOT ALLOWED.
June 21, 2010
41
ELECTRICAL
Sensors in all rooms including storage, office, halls, restrooms, common areas, and media.
Type of sensor preferred – Leviton Dual Technology.
Sensors must be located in center of rooms and if possible six foot from air duct and 2 foot from lights, overhead
plumb lines, and mechanical duct.
Electrical conduits must not block access to any other overhead equipment.
1.
Standard fixtures must be used in all areas.
2.
Fluorescent light fixture should be 2’ x 4’ lay-in type, with electronic ballast, and 4100, T8 lamps, 28 watt.
3.
Classroom and office fluorescent fixtures should be three tube type, two outside tubes on one switch and two inside tubes
on one switch.
4.
Hall fluorescent fixtures should be three tube 2’ x 4’ lay-in type; they shall be controlled by occupancy sensor.
5.
Restroom light fixture should be 2’ x 4’ flush mounted, three tubes, and controlled by occupancy sensor. Each restroom
should also include one night light fixture, perhaps located in the hard ceiling.
6.
All schools shall have emergency generators, either LP or natural gas or diesel. Generators shall be large enough to run
emergency lights, phone system, intercom system, freezer, cooler, night lights in toilets, and power outlet that may be
needed by emergency personnel of Red Cross. Red Cross requires a 120 volt 20-amp circuit.
7.
Ceiling height above 15’ should have T5 or T8 florescent ceiling fixtures with cover shade. All interior lighting shall be
controlled by occupancy sensors.
8.
Exterior wall mounted lighting should be metal halide with Polycarbonate lenses, they should be photo controlled with a
contractor carrying the fixture load, and located in the electrical equipment room. Photocells shall carry the contractor coil
loads only.
9.
Parking lot lights should be on Energy Management System with photo control and override input to building automation
system. No box lighting is permitted. Pole heights must be a maximum of 30’ in height.
10. All classrooms and all student gathering places (media center, lecture halls, auditoriums, multipurpose rooms, etc.) must
have a minimum of two duplex receptacles on each wall that is not an orange receptacle for computers. These are for other
type equipment such as lamps and vacuum cleaners so as not to trip off computer circuits. All plugs must have neutral
pigtails.
11. All hallways shall have a 120-volt receptacle in them with an absolute maximum of 50’ apart.
12. All receptacles shall be rated not less than 20 amps (Federal Spec Grade).
13. No back to back electrical outlets should be allowed, 2’ minimum spacing. (See Technology Specs for specifics on
computer, power, and data layout.)
14. All HVAC units shall have 120-volt GFI outlet located within 50’ or within eyesight for servicing.
15. Art kilns must have an exhaust hood, must be specified by the architect, and must be installed by the contractor. Kiln fan
shall be interlocked with kiln controls and shall operate when the kiln is on. Provide fresh air make-up for kiln room.
16. Teacher’s lounge and all workrooms should have six circuits from panel room. Receptacles should be 42” A.F.F. and
located not to exceed 6’ apart all around the room with a minimum of six circuits.
June 21, 2010
42
17. All receptacles, switch, etc., plate should be stainless steel jumbo over-sized type.
18. All switches should be rated not less than 20 amps and 277 volts.
19. All gang and public toilets shall have electronic hand dryers in eyesight of hallway (Pinnacle hand dryers or approved
equal).
20. All vocational shop areas shall have a central location Red “OFF” button for emergency shut down of shop equipment.
21. All timed overrides shall be 2 hours, no hold.
22. All electrical panels shall have bolt in type branch breakers, with a minimum of ten branch spaces, and sized so the demand
load does not exceed 70% of the panel board rating. Also panels to have spare conduit stubbed out for future use for
branch circuits. Power factor correction must be provided for.
23. All 120/208-volt panels shall have lighting surge protection on all phases.
24. All gang toilet and corridor light switches shall be located in the main administrative office area. This allows an administrator
to conveniently control all main lighting from one location.
25. All disconnects shall be heavy duty, non-fused, and located within 6’ of equipment.
26. Interior raceways shall be EMT.
27. All nonmetallic conduit under slabs shall have ridged galvanized 90 degree bends and rigid riser nipples and
coated with asphalt.
28. The main electrical service shall be underground to a riser pole or pad mounted transformer, as required by the power
company.
29. All panels shall be accessible from the halls and they shall be mounted in shallow electrical rooms to avoid storage room
type situations. Electrical rooms shall open outward into the hall to give the panels their clearance. One overhead exhaust
fan shall also be installed with a set 90-degree thermostat to avoid heat build up. C FM must be sized to room with louvered
doors.
30. Add phone outlets and electrical outlets in all areas indicated in Technology Specs in each file server room.
31. Mark all future raceways on an on site framed future raceway drawing located in the main mechanical room.
32. Size each computer power panel with spare spaces to allow each receptacle located on the back wall of each classroom to
add two future additional 110V computer circuits “for future computer lab additions”. Each classroom must have a
telephone outlet as required in Technology Specs. Data jacks must be located away from thermostats.
33. Multipurpose rooms should have (4 each side) incandescent up-down wall mount lights with two wall dimmers located back
stage by the stage light dimmer control.
34. The multipurpose room stage should have an electric projection screen, 10' x 10' to be operated at a remote location on
adjacent wall. Multipurpose room shall have a separate sound system.
35. The cafeteria cashier’s stand (Point of Sale terminal) should have a computer outlet with a raceway back to the kitchen
manager. The kitchen manager’s office also needs a network raceway back to the hall cable tray system. (See Technology
Specs)
36. Teachers’ workroom needs to be provided with adequate power for refrigerator, microwave, coffeepot, Coke machine,
snack machine, and computer, as well as TV and phone. A 120V and a 240V outlet shall be located at copier locations.
Teachers’ workroom should have a minimum of two computer outlets. A canteen area must be designated with dedicated
outlets for several Coke, cracker, and ice cream machines.
June 21, 2010
43
37. Panels are to be G.E., Square-D, Cutterhamer/Westinghouse, Siemans, or approved equal.
38. Add two 2” conduits from the file server room to the nearest cable tray. Cable tray shall be provided in all corridors sized to
contain all low voltage wires. The basket type cable tray is preferred.
39. All branch circuits to be copper wire only.
40. All feeders shall be copper from transformer to panels and sub-feeders shall be copper also. Aluminum wiring is not
permitted.
41. All steel in building shall be grounded.
42. All dry type transformers shall be grounded and XO shall be grounded.
43. On as-built drawings, all changes shall be shown on drawings. All inside circuits and all outside circuit wiring shall be
shown also.
44. Exit signs shall be LED low voltage.
45. Provide conduits for ETV, CATV, and telephone to locations coordinated with utility or agency.
46. Contractor will not block access to any other equipment with overhead electrical conduits, plumbing lines, or
HVAC duct.
Lighting/Surge Protection
•
AC Lighting/Surge Protectors shall be installed at the AC power input terminals for the fire alarm control power extenders
and any other peripheral equipment associated with the fire alarm panel. Recommended manufacturer: Ditek.
•
Low Voltage Lighting/Surge Protectors (clamping voltage within +15 volts of circuit operating voltage) shall be installed at
the following locations:
1.
2.
3.
•
At addressable loop input terminals of the control panel.
At notification appliance circuit input terminals of the control panel and power extenders.
At any point where addressable loop or notification appliance circuits exit/enter from one building to another.
An Earth Ground connection shall be provided at any point where Lighting/Surge Protection is installed.
Documentation and Training
Videotaping of electrical training is required to be provided by the contractor. The contractor must submit three copies of the
training tape to Owner with closeout documents.
The contractor shall compile and provide to the owners three complete manuals on the completed system to include operation,
maintenance, and programming instructions, point programming and I/O correlation records, and as-built wiring diagrams. In
addition to the above manuals, the contractor shall provide the services of the manufacturer’s trained representative for a period
of eight hours per school to instruct the owner’s designated personnel on the operation and maintenance of the entire system.
Testing equipment and setting breaks must be done prior to the training.
June 21, 2010
44
MOTION SENSOR AND
POWER BASE CUT SHEET
Motion sensors are to be located in all corridors and spaces
and must be located in the center of the ceiling in classrooms.
June 21, 2010
45
OPB15-DW
Description
The Power Base™ Adapter converts any Leviton low voltage ceiling
occupancy sensor to a self-contained, line voltage unit, with 15Amp,
120/277V load capacity.
June 21, 2010
46
OSC20-M0W
Classrooms under 2000 Sq. Ft.
Description
Multi-Technology, 360 Degree, 2000 Sq. Ft. Coverage, Self-Adjusting, Ceiling Mount
Occupancy Sensor, Commercial Grade - White
Product Features
Color: White
Sensor Type:
Adjustment:
Sensor Technology:
Pattern Degrees:
Coverage Range Sq. Ft.:
Manual Time Adjustment:
Load Rating:
Input Voltage:
Current Consumption:
Photo Cell:
Color:
Standards and Certifications:
Warranty:
Housing Material:
Code Compliance:
Multi-Technology
Self-Adjusting
PIR/Ultrasonic 32kHz
360
2000
30s-30m, 6s Test Mode
Uses Power Pack
24VDC
32mA
Ambient Override ON
White
CUL/US Cert
5-Year Limited
High-Impact, Injection Moulded Plastic
California Title 24
Features and Benefits
• Small Size: Installed sensor appears almost invisible.
• Fast Simple Installation: Easy ceiling mount, three wire connection (low voltage) and twist-lock sensor attachment.
• Accurate, Consistent Switching: Occupant complaints are eliminated; lights are on when room is occupied, off when
empty. Annoying false-offs are minimized and lights on at night is eliminated.
• Self-Adapting: An internal microprocessor continually analyzes, evaluates and adjusts settings. Performance is kept
at a maximum and user complaints are eliminated.
• Maximum Reliability, Low Cost: All digital circuitry uses a minimum of components.
• Non-Volatile Memory: Learned and adjusted settings saved in protected memory. Power outages will not cause status
loss.
• Ambient Light Recognition: The photocell prevents lights from turning on when room is adequately lit by natural light.
• Excellent Warranty: 5-Year Limited Warranty
• Typical Applications: Cafeteria, Computer Room, Office w/Cubicles, Office Open, File Room, Classroom, Lounge, All
Restroom types, Open Area, or Gymnasium
Halls use OSWLR-IOW
Tall rooms (Band) use OSW Series mounted 10’ from floor in room corner
June 21, 2010
47
Control Specifications
Adjustment Self-Adjusting
Manual Time 30s-30m, 6s Test
Adjustment Mode
Timer Factory Preset 10 Minutes
Sensitivity
Adjustment 0 to 100 Pct
Sensitivity Factory Ultrasonic 50 Pct
Preset Infrared 75 Pct
Photo Cell
Adjustment 20 to 3000 Lux
Photocell Factory 3000 Lux (disable
Preset photocell)
Single/Multi-Tech Switchable ON/OFF
Mode PIR/ULTRA
LED Disable LEDS Enable/LEDS
Disable
Environmental Specifications
Operating 32F to 104F 0C to
Temperature 40C
Operating Humidity 0 Pct to 95 Pct
Relative, NonCondensing
Mechanical Specifications
PIR/Ultrasonic
Sensor Technology 32kHz
Pattern Degrees 360
Coverage Range Sq. 2000
Ft.
Major Motion Area 64X32 Feet
Minor Motion Area 45X23 Feet
Ambient Override
Photo Cell ON
June 21, 2010
Electrical Specifications
Input Voltage 24VDC
Current
Consumption 32mA
Output Voltage 24VDC w/Short
Circuit Protection
Load Rating Uses Power Pack
Material Specifications
Color White
Housing Material High-Impact,
Injection Moulded
Plastic
LED Indicator Red Infrared Motion
& Green Ultrasonic
Motion
PIR Lens Type Extended Range
Qty of Transducer 2
Pairs
Transducer Size 16 mm Diameter
Wire Leads Color Coded 6 Inch
Sensor Weight 5oz/142g
Standards and Certifications
CUL/US Listed 9034
ANCE Compliant
NOM 057
Code Compliance California Title 24
ASHRAE Standard 90.1
Compliant
FCC Compliant
48
SCHEMATIC OF
SENSOR WIRING
June 21, 2010
49
SECURITY
Security
• Boxes for security are to be located on documents and installed by contractor. The electrical engineer shall allow for
an empty box for security at the front entrance, the loading dock, and at the end of all classroom wings. Plates must
be provided for all boxes until definite keypad locations are determined.
• Security shall be provided by the Owner through existing contract. Supervision of Security and security locations shall
be coordinated through the Maintenance Department.
June 21, 2010
50
FIRE ALARMS AND SPRINKLER RISER ROOMS
•
•
•
•
•
•
All costs for U.L. monitoring, testing and certification required for fire alarm systems must be included in the
base bid contract and provided by the contractor for one year. All fire pits must have signage chains and
locks. In renovations where work extends into two consecutive summers, the monitoring contract will be
included in the base bid for two years.
The engineer must determine in a renovation if the number of devices being added requires an upgrade of the
entire existing building as well as U.L. monitoring. If it does, this must be included in the base bid contract.
Sprinkler riser rooms must be supervised and labeled for each section. A diagram of the school must be provided on
the wall and must indicate all labeling.
All PIV valves FDCs must have signage.
All PIV valves are required to have tamper switches.
Back flow preventers must have tamper switches tied into the fire alarm system as required by the State Fire Marshal.
Back flow preventer fills must be locked and valves must be signed, chained and locked. Above ground pits must have
heater. Riser rooms must have heaters also.
June 21, 2010
51
DOOR SPECIFICATIONS
Doors
Interior doors are wood only, except where metal is required by OSF. All exterior doors are to be 18 gauge galvanized. All
interior doors are to be 5 ply solid core wood doors with bonded and sanded core glued using type one adhesive. Core will be
laminated strand lumber. Wood door stiles to have 7/16” matching hardwood edge. Birch veneer with factory UV finish. All
frames, both interior and exterior, are to be 16 gauge welding type. All exterior frames are to be galvanized. All doors are to be
pre-machined and pre-fitted to jamb. All frames, both interior and exterior, are to be sealed on all surfaces before installation. All
Door Hardware preparations must be factory machined. Approved manufacturers for wood doors are Lambton, Eggers, Algoma.
Mohawk doors are not approved.
For new construction, exterior doors shall be 1-3/4” thick FRP flush insulated panel doors equal to Commercial Door Systems
F300. FRP face sheets to have finish color throughout. Factory installed hardware except for closers. Glazing, louvers, etc., to
be factory installed and field-replaceable. FRP clad doors are to be hung in box-type tubular aluminum framing (no open back
frame stock). Minimum aluminum frame thickness shall be .125”. Aluminum frames to be manufactured by the door
manufacturer.
Any metal doors used should be 16 gauge. Solid wood core doors may be preferred in retrofits since they can be planed to
better fit existing openings. Interior doors should be stain grade solid wood core. All classroom doors should have a small vision
panel per ADA. Mineral core doors and knockdown frames should be avoided. Laminate doors are not permitted.
Door closers, pulls, hold-opens, etc. should be through bolted. Exterior doors should be properly weather-stripped. Rain shields
should be used on all doors that are not protected by building overhangs.
Do not use doors at main entrance to gang toilets except where the toilets may need to be secure for use only by the public.
Storefronts
Aluminum storefront doors, frames and hardware are not allowed.
Rolling Fire Doors
Features that will be required:
1. Visible means of egress.
2. Must have Auto-Set Type closure. Walls can be opened and closed without being reset by contractor or manufacturer.
3. All panels can be tested at the same time with one switch.
The School District will not accept warped doors. Doors stored both on and offsite must be stored per door manufacturers spec.
District Rep will verify storage method.
June 21, 2010
52
DOOR HARDWARE SPECIFICATION GUIDELINES
USE THIS DOCUMENT: Please be advised, this document has been prepared under the direction of the
Horry County Schools Construction Project Management Department and shall be part of the project’s
Design Checklist. This document shall be included in the project manual and reviewed with the
Construction Project Management Department for project specific applications, along with the submittal of
the Construction Documents for review. Architects shall also include a “Lock Function” column in the
Door & Frame Schedule page. The lock function shall be included in this schedule when the Hardware
Sets are prepared and included with the Construction Documents.
Please be advised, should an individual or any business/design entity choose to substitute or change this
guideline specification without the prior written approval from the Horry County Schools Construction
Project Management Department, that individual or business entity shall be responsible for removing,
replacing, and incur any related cost for the required changes with the guideline specific hardware. It is
understood by Horry County Schools certain applications may not always be appropriate for every
application, but a written request for a specific change to this document shall be submitted to the
Construction Project Management Department for consideration of approval.
PART 1 - GENERAL
1.1 DESCRIPTION OF WORK
Work under this section comprises the furnishing and installation of finish and security hardware specified herein and noted on
drawings for a complete and operational system, including any electrified door hardware components including finish and
security hardware and auto operators for entrance doors.
Items include, but are not limited to the following:
1. Hinges/Continuous Hinges
2. Flush Bolts
3. Exit Devices
4. Locksets and Cylinders
5. Push Plates - Pulls
6. Coordinators
7. Closers/ADA Operators
8. Kick, Mop and Protection Plates
9. Stops, Wall Bumpers, Overhead Controls
10. Thresholds, Gasketing and Door Bottoms
11. Silencers
12. Miscellaneous Trim and Accessories
13. Electrified Hardware Items, Controls and Power Supplies
14. Computer Managed Locksets
1.2 RELATED DOCUMENTS
Drawings and general provisions of contract, including General and Supplementary conditions and Division 1 specifications
sections apply to this section.
1.3 RELATED WORK
Work specified elsewhere that should be examined for its effect upon this section.
1. Division 1 Alternates
2. Section 08410, Aluminum Entrances and Storefront
3. Section 08110, Hollow Metal Doors and Frames
4. Section 08210, Wood Doors
5. Section 08800, Glazing
6. Section 09900, Paints and Coatings as applicable.
7. Division 16 Electrical
June 21, 2010
53
1.4 REFERENCES SPECIFIED in this section subject to compliance by:
NFPA-80-1995 - Standard for Fire Doors and Windows
NFPA-101-1994 - Life Safety Code
NFPA-70 - National Electrical Code
ADA - The Americans with Disabilities Act - Title III - Public Accommodations
ANSI-A117.1-1992 American National Standards Institute - Accessible and Usable Buildings and Facilities
ANSI-A156.5-American National Standards Institute - Auxiliary Locks and Associated Products
UFAS - Uniform Federal Accessibility Standards
UL 10 C – UBC 7.2 – Positive Pressure Testing
ANSI-A250.6-1997/SDI -107 "Hardware on Steel Doors" (reinforcement- application)
Architectural Woodwork Institute (AWI)
International Building Code as Adopted
U.L. - Underwriter's Laboratories
WHI - Warnock Hersey International, Division of Intertek Testing Services
Current State and Local Codes including Authority Having Jurisdiction
1.5 SUBMITTALS
A.
Shop Drawings: Indicate door and frame elevations and sections, materials, gauges, finishes, door thickness, door
swing, stile and rail dimensions, veneers, undercuts, fabrication and erection details, locations of finish hardware by
dimension and locations/details of all openings and louvers. Do not proceed with any fabrication until all details are
approved.
B.
Hardware Schedule: Submit copies of schedule in accordance with Division 1 – “Submittals”, General Requirements.
Schedule to be in vertical format, listing each door opening, including: Keying Information, handing of opening, all
hardware scheduled for opening or otherwise required to allow for proper function of door opening as intended, and
finish of hardware. At doors with door closers or door controls include degree of door opening. All submittals
(schedules, cut sheets, wiring diagrams, operational descriptions and elevation drawing) shall be reviewed by Horry
County Schools Construction Representative and the Horry County Maintenance Department Hardware
Representative, prior to ordering of material. The Hardware Supplier shall submit the schedules and all templates
within two (2) weeks from date purchase order is received by the door openings supplier – installer.
C. Manufacturer’s Catalog Cuts: Submit manufacturer's cut/catalog sheets on all hardware items and any required special
mounting instructions with the hardware schedule.
D. Certification of Compliance: Submit any information necessary to indicate compliance to these specifications.
E.
Wiring Diagrams: Provide complete wiring diagrams: Riser diagrams, Point-to-point diagrams, for each opening
requiring electrified hardware. Provide a copy with each hardware schedule submitted for approval. Supply a copy
with delivery of hardware to job site and another copy to the Owner at time of job completion. All electrical components
shall be listed by opening in the hardware submittals.
June 21, 2010
54
F.
Operational Descriptions: Provide complete operational descriptions of electronic components listed by opening in the
hardware submittals. Operational descriptions shall detail how each electrical component functions within the opening,
and incorporating all conditions of ingress and egress. Provide a copy with each hardware schedule submitted for
approval. Supply another copy with delivery of hardware to job site and another copy to owner at time of job
completion.
G. Elevation Drawings: Provide elevation drawings of electronic hardware and systems identifying locations of the system
components with respect to their placement in the door opening. Provide a copy with each hardware schedule
submitted for approval. Supply another copy with delivery of hardware to job site and another copy to the Owner at
time of job completion.
1.6 QUALITY ASSURANCE
A.
Door Openings Supplier shall be a qualified direct distributor of products to be furnished. In addition, the distributor
shall have in their regular employment a certified Architectural Hardware Consultant (A.H.C) who will be available at
reasonable times to consult with the Architect, Contractor, and/or Owner regarding any matters affecting the door
opening assembly. The Hardware Supplier shall make periodical visits to the job site while the finish hardware is being
installed, and on completion of the project, the Supplier shall inspect the installed hardware for correct operation and
installation. Supplier’s office/warehouse location shall be within 200 miles of Horry County Schools.
B.
All hardware used on labeled fire or smoke rated openings shall be listed for those types of openings and bear the
identifying label or mark indicating UL (Underwriter's Laboratories) or Warnock Hersey (WHI) approved for fire. Nonlabeled openings to be listed for panic application. All hardware applications used on labeled fire or smoke rated
openings shall be in compliance with the Positive Pressure Fire Test: UL10C and with UBC7-2 1997.
C. Pre-Installation Meetings: The Contractor shall initiate and conduct a jobsite meeting with the supplier and
installer, and all related trades for mechanical hardware, and a meeting for electronic hardware. The Hardware
Supplier shall schedule the Manufacturer’s representatives of the following products to provide training for
product installation: Closers, Exit Devices, and Locksets. These meetings shall convene at least one month
prior to commencement of the related work. All approved shop drawings and schedules shall be made
available to all related trades as required for work to be performed. Prior to installation of wiring and
installation of power supplies for electronic hardware, arrange a conference between the supplier, the
installers, and all related trades to review materials, procedures, review door opening functions, and
coordinating related work. The Owner’s Construction Project Manager and the Maintenance Department
Hardware Representative shall attend all pre-install meetings. The Owner’s Construction Project Manager and
the Maintenance Department Hardware Representative shall attend all electrical pre-installation meetings.
D. All hardware products furnished to the project shall be furnished by an authorized distributor of each product to insure
quality compliance, service, and Warranty of products. Product representatives of the following products: Locksets,
Closers, Exit Devices, Electrified Hardware, shall conduct a certified training session at the pre-install meeting for
product hardware installation training.
E.
All wood and composite doors shall be furnished with solid blocking at mortise lockset location, and at exit device
location (hinge and center case). All metal doors shall be furnished with hardware reinforcements integral with the
door for mortise locksets, door closers, and exit devices. All aluminum doors and frames shall be furnished with
hardware reinforcements integral with the door for locksets, door closers, and exit devices.
F.
Keying Conference: A Keying Conference shall be conducted within 14 days after approval of all hardware submittals,
and before ordering the locks and cylinders, on each Building Project. Attendance to this conference shall be: The
Project Architect, the General Contractor, Hardware Supplier, the Horry County Schools Construction Representative,
the Horry County Schools Maintenance Department Hardware Representative. Exact quantities for GGMK, GMK, MK
and change keys shall be discussed, as well as determining the level of the key system, and verifying door openings
with keyed function. The Hardware Supplier shall prepare and submit the Keying Schedule with one week following
the Keying Conference. The Hardware Supplier shall review quantity of Proximity Cards required for each project at
this meeting. This conference shall be separate from the meeting described in 2.2 Lock Cylinders & Keying, paragraph
C.
1.7 DELIVERY, STORAGE AND HANDLING
June 21, 2010
55
A.
Finish Hardware
1. Furnish all hardware with each unit clearly marked and numbered in accordance with the hardware
schedule. Include door and item number for each.
2.
3.
4.
5.
6.
7.
Pack each item complete with all necessary parts and fasteners.
Properly wrap and cushion each item to prevent scratches and dents during delivery and storage.
Inventory hardware jointly with the General Contractor, Hardware Distributor, and Installer until each is satisfied
that all products and counts are correct. Any shortages shall be replaced immediately.
The General Contractor shall provide secure lock up in a clean, dry, well-lit space for finish and security hardware
storage as delivered to the Project. Control handling and installation of hardware and security items to insure the
installation will not be delayed due to hardware losses, both before and after installation.
Hardware shipped to the jobsite is to be packaged in biodegradable packs such as paper or cardboard boxes and
wrapping. If non-biodegradable packing such as plastic, plastic bags or large amounts of styrofoam is utilized, the
Contractor shall be responsible for the disposal of the non-biodegradable packing to a licensed or authorized
collector for recycling of the non-biodegradable packing. The Contractor shall provide a copy of the recycling
receipt to the Horry County Schools Construction Representative.
The Manufacturers Representative and Owners Representative shall make several inspections of the
installation of Finish and Security Hardware during that phase of construction. Any deficiencies in
installation of all products in this Section shall be corrected before installation continues.
1.8 SEQUENCING AND SCHEDULING
A.
Deliver all openings components to the job site in a timely manner so not to delay progress of other trades.
1.9 WARRANTY
A.
Hardware Warranty:
Part of respective manufacturers’ regular terms of sale. Provide manufacturers’ warranties:
1. Hinges: Life of Building
2. Mortise locksets shall carry manufacturer’s 3-year warranty against manufacturing defects and workmanship.
3. Door closers shall carry manufacturer’s 10-year warranty against manufacturing defects. Exit devices shall carry
manufacturer’s 3-year warranty against manufacturing defects and workmanship.
4. Continuous gear hinges shall carry manufacturer’s Lifetime warranty to be free from defects in material and
workmanship.
5. ADA operators shall carry manufacturer’s 2-year warranty against manufacturing defects and workmanship.
6. Balance of items shall carry a manufacturer’s 1-year warranty against manufacturing defects and workmanship.
B. During the warranty period, replace defective work, including labor, materials and other costs incidental to the work.
Inspect the work within 24 hours after receipt of notice from the Horry County Schools Construction Representative.
PART 2 - PRODUCTS
A.
Furnish finish hardware with all necessary screws, bolts and other fasteners of suitable size and type to anchor the
hardware in position for a long life under hard use.
B.
Furnish fastenings where necessary with expansion shields, toggle bolts and other anchors, and according to the
material to which the hardware is to be applied and the recommendations of the hardware manufacturer. Generally,
furnish fasteners for machine screw installation. Do not provide hardware which has been prepared for self-tapping
sheet metal screws, except as specifically indicated. All closers and exit devices on labeled wood doors shall be
thru-bolted. All thresholds shall be fastened with provided screws and anchors. Where specified in the hardware
sets, security type fasteners of the type called for are to be supplied. Where brackets are specified in the hardware
sets, furnish brackets only as manufactured by the product manufacturer specified.
C. Design of all fastenings shall harmonize with the hardware as to material and finish.
D. Provide products as hereafter specified. Substitutions other than those manufacturers listed as Approved Equals must
be approved, in writing, via addenda, prior to bid. Procedure for substitutions shall be as outlined in Division 1. No
substitutions will be considered after award of contract.
June 21, 2010
56
2.1 HINGES
A.
Provide full mortise type, five knuckle exposed tip design ball bearing hinges as specified. Continuous Geared Hinges
shall be furnished as half surface type for all Exit doors, and any high-use interior doors such as stairwells,
auditoriums, gymnasium, or cross corridors as specified. Unless otherwise scheduled, the required weight, size and
butt hinge type shall be as follows:
1.
Butt hinges required per door leaf:
a.
b.
c.
Doors up to 5'0" in height 2 hinges
Doors over 5'0" to 7'6" in height 3 hinges
Doors over 7'6" to 9'0" in height 4 hinges
2. Size and weight requirements:
a.
b.
B.
Doors over 36" in width shall have extra-heavy weight hinges, 5 inches in width.
At Exterior openings, hinge pins shall be stainless steel.
Finish: Except as otherwise indicated, provide all hinges with the following finish:
a.
b.
Exterior US32D (630) Satin Stainless Steel
Interior US26D (652) Satin Chrome
Approved Manufacturers:
Butt Hinges:
Ives 5BB1/5BB1HW
Hager BB1279/BB1168/BB1191/BB1199
Bommer BB5000/BB5004/BB5002/BB5006
McKinney TB2714/T4B3786/TB2314 /T4B3386
Stanley FBB179/FBB168/FBB199
Continuous Hinges:
Select SL54HD
Ives 054HD
ABH A540HD
2.2 LOCK CYLINDERS AND KEYING
A.
General: All locks and cylinders shall be furnished with temporary keyed construction cores for the
contractor’s use during the construction period of the project. Construction control and operating keys and cores
shall not be part of the Owner’s permanent keying system, or furnished on the same keyway as the Owner’s
permanent keying system. Permanent cores and keys shall be keyed to the approved keying schedule. All cylinder
housings and cores shall be KeyMark by Medeco, 6-pin in an A4 System. Cores shall be furnished as small or large
format depending on the Owner’s choice, or the pre-existing conditions of the project.
1.
2.
3.
4.
All cylinders shall be rim or mortise type with interchangeable cores. All cylinder components shall be constructed
of extruded brass. All cylinders, cores, and housings shall match the lock finish.
All cylinders shall use a .150” space dimension between tumbler pin chambers shall be capable of using industry
standard tumbler pins. Cylinder shall contain standard pins, a portion of which (both bottom and top pins) shall be
spooled to resist pick attacks.
All Cut keys, key blanks and cylinders shall be so constructed to be capable of being keyed in the same system,
allowing the convenience of one master key to operate all types of listed cylinders. All cut keys and key blanks
shall be utility patented and controlled by a contract between the end user and the manufacturer. Key blanks for
this project shall be delivered directly from the factory to the Owner.
All interchangeable core type cylinders shall have a keyway with lower angled portion, such that the keyway exits
the plug at an angle preventing access to the core’s pin ejector holes (located in the bottom of the core) by
insertion of a lock picking tool or tools through the keyway.
B. Permanent keys and cores shall be stamped with applicable key mark for identification. These visual key control
June 21, 2010
57
codes shall not include the actual key cuts. All permanent keyed cores, cylinders, keys and key blanks shall be
delivered directly to the Horry County Schools Hardware Maintenance Representative from the Manufacturer via
Registered Delivery, Return Receipt Required.
C. The Horry County Schools Hardware Maintenance Representative shall determine the specific keyway prior to the
submittal of the Keying Schedule. Within seven (7) days of receipt of the contract, the Hardware Supplier shall request
the specific keyway information from the Horry County Schools Hardware Maintenance Representative for the purpose
of establishing the parameters of the complete system. This information shall be included in the Key Schedule
prepared after the Keying Conference described in Section 1.6, paragraph F. Furnish keys in the following quantities:
15 each Masterkeys per set
20 each Grand Master Keys for each system/school
5 each Change Keys per change key set
6 each Construction Master keys
200 each key blanks
D. At project completion, the Hardware Supplier shall install the permanent keyed cores. Permanent cores shall
be installed prior to final OSF inspection. Permanent core installation shall be coordinated and scheduled, in
writing, with the General Contractor. All construction cores and keys shall be returned to the Hardware
Supplier.
2.3 KEY CONTROL SYSTEM
A.
Provide a key control system including envelopes, labels, tags with self-locking key clips, receipt forms, three-way
visible card index, temporary markers, permanent markers, and standard metal cabinet, all as recommended by
system manufacturer, with capacity for 150 percent of the number of locks required for the Project.
B.
Provide complete cross-index system. The Key Control system shall be set up by the Hardware Supplier, using
Horry County Schools assigned room numbers. The completed cross index, along with the cabinet shall be
furnished to the General Contractor following the installation of the permanent cores.
C. Provide hinged-panel type cabinet for wall mounting.
D. All miscellaneous keys must be properly tagged and turned in to the Horry County Schools Maintenance Department
Hardware Representative.
2.4 LOCKS, LATCHES AND BOLTS
A.
Mortise Lock and Latches shall be mortise type, ANSI A156.13, series 1000. Mortise Sets shall be Grade 1
operational and security, UL Listed for 3-hour fire door. Trim Design shall be tubular lever with return to within ½” of
door face. Finish shall be 626 (US26D) unless otherwise noted. Furnish latch bolts with ¾" minimum throw.
Deadbolts shall have 1” throw. All strikes shall be curved lip, furnished with dust box as standard. Locksets furnished
on additions to existing schools shall match the existing locks and trim, unless otherwise specified in the hardware
sets. The Owner approval required to match existing.
B.
Provide knurled levers or abrasive strips to all rooms that are considered hazardous, and are not specified with
storeroom keyed function. This includes but is not limited to all electrical, mechanical and telecommunications rooms.
C. Auxiliary Locks shall be Grade 1 Classroom E06091 Deadlock.
D. Staff Toilets located in Corridors shall be furnished as follows:
Elementary School Projects: Series 1000, Grade 1, Hotel F15 x Indicator with standard cylinder plug.
Middle and High School Projects: Series 1000, Grade 1 Hotel F15 x Indicator with standard cylinder plug.
Toilet rooms within Early Childhood Areas shall have passage function, F01, only.
June 21, 2010
58
Toilet rooms within Special Education Areas shall have Series 1000, Grade 1 Classroom Security function F32.
E. Acceptable Keyed Lockset functions shall be:
Storeroom (F07) Schlage L9080; Best 40H D; COR ML2057.
Classroom (F05) Schlage L9070; Best 40H R; COR ML 2055.
Classroom Security Schlage L9071; Best 40H INL; COR ML2042.
Computer Managed Lockset at all IDF and MDF rooms: Product and Quantity to be determined by Horry
County Schools prior to bid.
Specifier Note:
The following functions will not be acceptable: Office or classroom
Lockset functions: All locking functions shall be furnished with free egress at all times. All classroom doors shall be
furnished with security classroom function: “Latchbolt retracted by lever from either side unless outside lever is locked
by key from either side”. All exterior doors from classrooms shall be furnished with a function that allows for the
following: “Latchbolt retracted by lever from either side. Deadbolt thrown or retracted by key from either side. Outside
Lever shall remain locked at all times. Turning inside lever simultaneously retracts deadbolt and latchbolt. Inside lever
is always free for immediate egress.” Use of thumbturns on locksets for classroom doors and egress doors
located within classrooms are unacceptable. Thumbturns shall not be utilized in any other applications, unless the
thumbturn is a classroom type function, where it will only function to retract a bolt, such as on a restroom door. If a
thumbturn is specified in this circumstance, or for any special application, the thumb-turn function must be approved, in
writing, by the Horry County Schools Construction Representative and the Horry County Maintenance Department
Hardware Representative, prior to the specification being published in the project manual by the Architect.
F. Padlocks: Provide a hardware set for each project to include the following padlock as manufactured by:
Medeco. The Owner will not accept an “Add” change order for padlocks not included with the Hardware
Submittal. The HCS representative will direct keying for these locks with all other hardware keying. The
contractor is responsible for providing padlocks for all lockable items (roof hatches, gates, disconnects, etc.)
in the base bid. The architect is responsible for specifying an accurate count on plans and specs.
G. Acceptable Manufacturers:
Schlage L9000 series x 93N.
Best 40H series x 03J.
Corbin Russwin ML2000 series x LWM.
2.5 CLOSERS
A.
General: One manufacturer for all closer units throughout the Project Work, including surface closers and
electromagnetic hold-open closers. (Use of this product type must be approved by Horry County Schools in writing
prior to bid.
B.
Size of Units: Except as otherwise specifically indicated, comply with the manufacturer’s recommendations for size of
door control unit, depending upon size of door, exposure to weather and anticipated frequency of use.
C. Surface Closers:
1.
Door Closers shall be heavy-duty type, Grade 1.
2.
Cylinder piston diameter shall be 1 ½” diameter steel.
3.
Closer main arm shall be forged on all closers. Parallel arms shall be rigid forearms.
4.
Shaft/Pinion shall be minimum 5/8” diameter.
5.
All closers shall have “all-weather” hydraulics to operate in temperatures from – 30 degrees to 120 degrees F
without valve adjustments and conforms to positive pressure fire test standards UL10C & UBC 7-2.
June 21, 2010
59
6.
Where spring stop arm is specified, arm shall provide an additional five-degree cushion.
7.
Pressure Relief Valves shall not be acceptable.
8.
Spring power shall be continuously adjustable over the full range of closer sizes, and allow for reduced
opening force for the physically handicapped, where applicable. Closing speed shall meet 3 seconds
minimum from open position of 70 degree to a point 3 inches from the latch. Interior doors, other than
fire-rated label doors, shall be furnished sized for 5 lb. maximum opening force. Fire-rated label doors
shall be sized for self-closing and self-latching. Size 3 closer recommended for 3’ wide interior fire doors
per NFPA80. At exterior doors, closers shall be adjusted for ADA, but shall also be required to reliably
allow the door to close and latch. The Contractor shall notify the Horry County Schools Construction
Project Supervisor if both ADA compliance, and reliable closing and latching of exterior doors cannot be
achieved from the manufacturer’s available spring power adjustment.
9.
Units shall be stamped with date-of-manufacture code.
10. Closers mounted on wood doors shall be thru-bolt mounted.
11. Provide plates, brackets, and special templating as specified and per the manufacturer’s recommendation.
12. Acceptable manufacturers: LCN 4041series x EDA; Ryobi D4550 x EDA.
13. All exterior surface mount door closers shall be located on the interior side of the door, and shall include a heavy
duty forged parallel arm, mounted for maximum possible swing. Parallel arm mounting is preferred.
D. ADA Operators: Where low kinetic energy, as defined by ANSI/BHMA Standard A156.19, power operators are
specified for doors required to be accessible to the disabled. ADA operators shall be specified and furnished as
electric powered type, complying with the ADA for opening force and time to close standards. Full closing force shall
be provided when the power or assist cycle ends. All power operator systems shall include the following features and
functions:
1.
Provisions for separate conduits to carry high and low voltage wiring in compliance with the National Electrical
Code, section 725-31.
2.
The operator shall be designed to prevent damage to the mechanism if the system is actuated while the door is
latched or if the door is forced closed during the opening cycle.
3.
All covers, mounting plates and arm systems shall be powder coated and successfully pass a minimum of 100
hours testing as outlined in ANSI/BHMA Standard A156.18.
4.
UL listed for use on labeled doors.
5.
All operators shall be non-handed with spring power over a range of at least four sizes; either 1 through 4 or 2
through 5.
6.
Provisions in the control box or module shall provide control (inputs and outputs) for electric strike delay, auxiliary
contacts, sequential operation, fire alarms systems, actuators, swing side sensors, and stop side sensors.
7.
The electrical contractor shall provide a power shut-off switch to the operator control box. The ADA operator
supplier shall indicate this switch on the wiring diagrams submittal as reference only.
8.
All electrically powered operators shall include the following features or functions:
a. “second chance feature”: when an obstruction or resistance to the opening swing is encountered, the
operator will pause at that point, then attempt to continue opening the door. If the obstruction or resistance
remains, the operator will again pause the door.
b. Easily accessible main power and maintain hold-open switches will be provided on the operator.
c. An electronically controlled clutch to provide adjustable opening force.
June 21, 2010
60
d.
e.
f.
9.
A microprocessor to control all motor and clutch functions.
An on-board power supply capable of delivering both 12V and 24V outputs up to a maximum of 1.0 ampere
combined load.
All input and output power wiring shall be protected by slow blow fuses. These fuses shall be easily
replaceable without special tools or component replacement.
Electrical control functions shall be provided by a control module in lieu of a separate control box. Only two
Actuators shall be required to create the complete, stand alone, powered door system(s). ADA operators shall be
UL and NEC compliant, include soft-start motor control and meet the following Standards: ANSI A156.19, Section
2.1/ANSI A117.1, Section 4.13.13/UL 325/UL Listed for Fire Rated Door Operators with Automatic Closers, File
(GUJY).
10. All door closers, closer controls and ADA Operators shall be the products of one manufacturer.
11. ADA Operators shall be surface mounted as specified in the Hardware Sets. Acceptable manufactures shall meet
all of the above specified features and descriptions. Acceptable manufacturers for electrically powered operators:
LCN 4640/4630 series; Precision 4990 series, and Norton.
2.6 EXIT DEVICES
A.
General: All devices shall be the products of one manufacturer to provide for proper installation and servicing. Devices
shall be furnished non-handed and capable of direct field conversion of all available trim functions. All devices shall
carry a three-year warranty against manufacturing defects and workmanship.
1.
2.
3.
Furnish all devices with stainless steel touch bars.
Furnish all exit devices with deadlocking latch bolts or guarded latch (GL) feature.
Furnish all non-label devices with “less dogging” or as keyed cylinder dogging. The exit device dogging feature
shall be determined by Horry County Schools on a project by project basis.
4. Furnish all exit devices with cast metal end caps.
5. Furnish roller strikes with all exit devices.
6. Mullions: furnish mullion stabilizers and mullion keyed locking feature with all removable mullions.
7. All Exit Devices and Mullions shall be from one manufacturer.
8. Lever trim shall be solid cast material with a break-away feature to limit damage to the unit from vandalism.
9. Acceptable Manufacturers: Von Duprin 99/98 series devices; Precision 2100 series mullions shall be by the same
manufacturer as the exit devices.
10. Exit Device Application and Functions:
a. Exterior Pairs: Rim “DT” x Keyed Removable Mullion x Rim “NL”
b. Exterior Single: Rim “NL”/Rim “EO”/Rim “DT”
c. Interior Non-Label Locking Pair: Surface Vertical Rod x Less Bottom Rod
d. Interior Non-Label Pair:
e. Interior Single Label/Non-Label: Rim “L”/“NL”
f. Interior Corridor Label Pairs Shall be Hollow Metal. Devices shall be Surface Vertical Rod, Less Bottom Rod:
“L”/“EO”
2.7 DOOR TRIM UNITS
A.
Fasteners: provide manufacturers’ standard exposed fasteners for door trim units (kick plates, edge trim, viewers,
knockers, mail drops and similar units), either machine screws or self-tapping screws. Thru-bolt mount all pulls, unless
otherwise specified in hardware sets.
B.
Fabricate edge trim of stainless steel, not more than ½” or less than 1/16” smaller in length than door dimension.
C. Fabricate protection plates (armor, kick or mop) not more than 2” less door width on stop side and not more than 1”
less door width on pull side x the height indicated.
D. Metal Plates: Stainless Steel .050” (U.S. 18ga.), 304SS
E. Approved Manufacturers: Ives/ Rockwood/Trimco/Burns
June 21, 2010
61
2.8 MISCELLANEOUS
A.
Provide manual or automatic flush bolts, including coordinators and mounting brackets at pairs of doors as specified.
Flushbolt heads shall have a minimum of ½” diameter rod and shall be a minimum of 12” length rod. Size rod length
according to door height. Approved Manufactures: Ives/ Trimco/ Rockwood/Burns.
B.
Generally provide door stops or controls at each door leaf. Provide wall, floor, or stops and holders as specified.
Approved Manufacturers: Ives/Trimco/Rockwood/Burns
C. Provide overhead controls, stops or holders as specified. Overhead stop shall be made of stainless steel and shall be
surface mounted at existing frames, and as specified for new construction. Approved Manufacturers: Glynn Johnson/
Rixson/ABH.
D. Wall mounted Magnetic Door Holders/Release: Verify voltage requirements and furnish as specified in Hardware Sets.
Approved Manufacturers: Glynn Johnson/Rixson/ABH.
2.9 THRESHOLDS/WEATHERSTRIP
A.
General: Except as otherwise indicated, provide continuous weatherstripping at each edge of every exterior door leaf.
Provide type, size and profiles shown or specified. Provide non-corrosive fasteners as recommended by manufacturer
for application intended. Except as otherwise indicated provide ADA standard aluminum thresholds of type, size and
profile specified.
B.
Replaceable Seal Strips: Provide only those units where resilient or flexible seal strip is easily replaceable and readily
available from manufacturers stock.
C. Acceptable Manufactures: National Guard/Pemko/Zero /Reese.
D. Provide thresholds that are 1” wider than frame depth. Unless return closed ends are specified, furnish thresholds 2”
longer than the opening width for notching around the frame. Hardware installer shall be responsible for notching
thresholds to the frame by field measuring after the door opening assembly is installed.
2.10 DOOR SILENCERS
A.
At all hollow metal frames furnish gray resilient rubber silencers. Quantity: three each at single door openings; two
each at double door openings.
2.11 OWNERS SERVICE AND STOCK ITEMS
A.
Provide four (4) Final Field use Finish and Security Hardware Schedules with Cut Sheets, Service Instructions and any
materials pertinent to the service and maintenance of the Hardware and Systems.
B.
Provide four (4) sets of all Electrical Drawings illustrating Riser and Point-to-Point Diagrams.
C. Furnish the Owner with all specialized tools supplied with the hardware products.
D. Furnish 12 each un-combinated cores for Owner’s stock.
2.12 COMPUTER MANAGED LOCKSETS
Product and Quantity to be determined by Horry County Schools prior to bid.
2.13 KEY LOCK BOX
A.
Furnish one each secure storage box for two each building keys for emergency personnel use. This box shall be located
per the architect at the exterior of the building. Manufacturer: Knox Box Co.
PART 3 - EXECUTION
June 21, 2010
62
3.1 INSTALLATION
A.
Mount hardware units at heights indicated in the following applicable publications, except as specifically indicated or
required to comply with governing regulations and except as otherwise directed by the Architect. Mounting Height of
exit devices, with the exception of full glass aluminum doors, shall not interfere with light kits shown on elevations.
“Recommended Locations for Builders Hardware for Standard Steel Doors and Frames” by the Door and Hardware
Institute
B.
Install each hardware item in compliance with the manufacturer’s instructions and recommendations. Install
only with fasteners and/or brackets furnished with each hardware item or exact match if additional fasteners
are required. Any substitute fastener shall be approved by Horry County Schools Maintenance Department
Hardware Representative prior to installation. Where cutting and fitting is required to install hardware onto or into
surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation or
application of surface protection with finishing work specified in the Division 9 Section. Do not install surface mounted
items until finishes have been completed on the substrates involved.
1.
Gaskets: install jamb-applied gaskets before door closers, overhead stops, rim strikes, etc. Install sweeps across
bottoms of doors before astragals. Trim astragals to tops of sweeps.
2.
Locate floor stops not more than 4 inches from the wall.
3.
Drill pilot holes for fasteners in wood doors and/or frames.
C. Set units level, plumb, and true to line and location. Adjust and reinforce the attachment substrate as necessary for
proper installation and operation.
D. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors in
accordance with industry standards and manufacturer’s installation instructions.
E.
Set thresholds for exterior doors in full bed of butyl rubber or polyisobutylene mastic sealant complying with
requirements specified in Division 7 Section “Joint Sealers”.
F.
Weatherstripping and Seals: Comply with manufacturer’s instructions and recommendations to the extent installation
requirements are not otherwise indicated.
G
Instruct Owner’s personnel in the proper adjustment and maintenance of door hardware and hardware finishes.
H. Certified installers: Contractor’s personnel and Section 8710 supplier/installer shall be certified prior to installation of
exit devices, computer-managed exit device trim, locksets, closers, and electrified hardware, including ADA operators,
and electric door releases. Certification shall be obtained by attendance of manufacturer’s training at the pre-install
meeting. The manufacturer’s representative shall provide written certification to the installers and a copy of the
certification shall be provided to the Contractor, Horry County Schools Construction Representative and the Horry
County Schools Maintenance Department Hardware Representative. Hardware Installers working on the project site
not certified by attending the above specified training shall be removed from the project site.
I.
All conduit, outlet and backboxes, provisions for 120 VAC power, wiring types required for access control system,
pulling of correct wiring to appropriate locations, fire alarm system installation and interface, coordination of electrical
applications shall be furnished by the Electrical Contractor (Division 16).
3.2 ADJUST AND CLEAN
A.
Adjust and check each operating item of hardware and system of each door to ensure proper operation or function of
every unit. Replace units which cannot be adjusted to operate freely and smoothly as intended for the application
made.
B.
Clean adjacent surfaces soiled by Hardware Installation. Avoid the use of caustic cleaners which may mar the finish of
the Hardware.
June 21, 2010
63
C. Final Adjustment: Wherever hardware installation is made more than one month prior to acceptance or occupancy of a
space or area, return to work one week before final acceptance and make final check and adjustment of all hardware in
such space or area. Clean operating items as necessary. Adjust door closers after HVAC Test and Balance to insure
proper door control.
D. Instruct Owners Personnel in the proper adjustment and maintenance of Hardware and Systems during the final
adjustment period.
E.
Continued Maintenance Service: Approximately six (6) months after acceptance of the Project, the Installer,
accompanied by the Owners representative and the Finish and Security Hardware Representative(s) shall return to the
project and survey the project, readjusting any items as required to restore the hardware to its original function.
Replace any failed products due to faulty design, materials or installation. Prepare and deliver to the Owners
representative a written report of any potential problems in the performance of the hardware with recommended
service procedures to insure continued correct function of the products.
3.3 INSPECTION
A.
Door Hardware Supplier’s Field Service
1.
The Hardware Supplier/AHC shall inspect door hardware items for correct installation and adjustment prior to
Owner’s permanent core installation. The Hardware Installer shall be present for this inspection. The Owner shall
give written notice to the Contractor five (5) days prior to inspection. The Hardware Supplier/AHC shall submit a
written report of the inspection, including any exceptions noted during the inspection, and shall include the
certified AHC stamp or seal, to the Contractor, Architect, the Horry County Schools Construction Representative,
and the Horry County Schools Maintenance Department Hardware Representative. The inspection shall include:
a.
b.
c.
d.
2.
Fasteners
Templating for correct latch/strike engagement, degree of opening/holding
Function: locks/exits
Operation: closers, exits, locks, cylinders, hinges
The Hardware Installer shall reply to the inspection report within three (3) working days after the inspection report.
The Installer’s response shall include a list of the required repairs or alterations, and the date repair work shall be
performed. All repairs and/or alterations shall be performed within one week after the Installers response report.
3. The written inspection report and the Installers repair report shall become part of the Contractor’s punch list
report. All reports shall be submitted to the project Architect and the Horry County Schools Construction
Representative.
4.0 HARDWARE SETS
Final drawings must include hardware sets prepared by an architectural hardware consultant.
END FINISH HARDWARE SECTION 08710
June 21, 2010
64
This is an example of a typed key schedule that the Contractor must turn in at key turnover time.
All keys must be accounted for and labeled on schedule and be tagged.
KEY SCHEDULE FOR BURGESS ELEMENTARY SCHOOL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
What
Interior Hose Bib & Can Wash
Exterior Wall Hydrants
Roll-up Door @ Service Area
Generator
Irrigation Control Box
School Marquee
Flag Pole
Light Control Cabinet
McGee Electrical Panels
Fire Alarm Cabinet
Fire Boxes
TV Brackets
Teachers’ Cabinets / 39 extra
Chemistry Cabinet in Science Lab
Science Room Cabinet
Science Room Cabinet
Restroom Door/Privacy
Double Lav. Soap Dispenser
Key for Cut Off Under Sink
Key Wrenches for Faucet Aereator
Aereator/Gang Lav.
Torks / Access Panels / Gang Lav.
Soap Dispensers
Towel / Toilet Disp & Tampons
Hand Dryer Security Key
Cashier Stand
Walk-in Coolers
Milk Cooler #1
Milk Cooler #2
Ice Cream Box
Reach In Refrigerator
Pass thru Heated Cabinets
Pass thru Coolers
FRP Kitchen Door
June 21, 2010
Number
N/A
N/A
31315
Olympian
CH751
5.5 MM
C415A
B135A
B135A
“B”
BH005
2383
100T
331CK
D1563A
D1560A
N/A
Willoughby
N/A
N/A
N/A
N/A
N/A
2055
N/A
C057A
BH010
1454
H2298
HL312
HL312
HL312
HLHL312
N/A
Description
Silver Oval Head / 8 keys
Silver Mouse Ears / 20 keys
Silver Pyramid Key / 1 pair
Black Oval Key / 1 key
Silver Round Key / 1 pair
Allan Wrenches / 2 keys
Silver Square Head / 1 pair
Gold Square Key / 2 keys
Gold Square Key / 3 keys
Gold Round Key / 5 keys
Gold Round Key / 25 pairs
Gold Round Key / 14 pairs
Gold Round Key / 132 keys
Gold Round Key / 1 key
Square Head Gold Key / 1 pair
Square Head Gold Key / 1 pair
Silver Round Head / 22 keys
Silver Flat Dbl. Prong / 11 keys
Silver T Square / 62 keys
Silver Flat I Key / 39 keys
Silver Flat I Key / 7 keys
Star Tip / 10 keys
Flat Gray Strip / 92 keys
Gold Crown / 204 keys
Star Tip / 4 keys
Gold Square Key / 2 pairs
Gold Round Key / 3 keys
Gold Round Key / 1 pair
Gold Crown Key / 1 pair
Silver Round Key / 1 pair
Gold Round Key / 2 pairs
Gold Round Key / 2 pairs
Gold Round Key / 2 pairs
Silver Round Key / 1 key
65
PADLOCKS AND KEYLESS ENTRY LOCKS
Contract Provided Padlocks
The Contractor must provide Medeco padlocks keyed to the Horry County School District Keymark Keying System. All lockable
items in and outside the building, including but not limited to gates, around ponds, HVAC units, lift stations, wells and irrigation
system, gas disconnects, riser pits, entry roll gates, roof hatches, etc. The architect is responsible for specifying the correct
number of padlocks in plans and specifications. The contractor will provide all padlocks in the base bid. The Contractor will
purchase padlocks from the hardware supplier.
Keyless entry locks must be specified by the Architect and provided by the Contractor in the base bid.
All keyless entry locks for IDF, MDF rooms and exterior doors must be wireless.
All IDF/MDF rooms require keyless entry locks.
Three (3) keyless entry locks are to be provided on renovations.
Six (6) keyless entry locks are to be provided for new schools.
The Owner will verify location and brand name of keyless entry to be used in plan reviews during Design Development.
ELECTRONIC STRIKE AND WIRELESS ENTRY BUTTON AT THE FRONT ENTRY OF
SCHOOL IN THE WINDLOCK AREA
Provide one entry location selected by Horry County Schools to have the following remote unlock hardware for access security.
1
1
1
1
2
D-67
D-21A
9600-630
AL175ULX
NP7A12V
June 21, 2010
Digital Receiver
Transmitter
Surface Electric Strike
Power Supply
Battery
66
FIBERGLASS REINFORCED POLYESTER DOORS
Front entry and corridor FRP doors must have top and bottom glass panels. All other FRP doors such as storage and
electrical must be a solid panel with installation of louvers as required for ventilation.
PART 1 – GENERAL
1.01
RELATED DOCUMENTS
A.
1.02
Drawings and General provisions of Contract, including General and Supplementary Conditions and Division 1
Specification sections, apply to work specified in this section.
DESCRIPTION OF WORK
A.
The fiberglass doors and aluminum frames required for this work are indicated on the drawings and include, but is
not necessarily limited to:
1.
2.
3.
4.
5.
1.03
Aluminum frames
FRP Flush Doors
FRP Panel
The installation of new opening systems that include aluminum frames, fiberglass doors, fiberglass panels,
and door hardware.
(OPTIONAL FOR RENOVATIONS) The removal of existing doors, frames, glass, etc. as noted.
RELATED WORK SPECIFIED ELSEWHERE
A. For Finish Hardware, See Section 08700.
B. For Caulking, See Section 08810.
C. For Glazing, See Section 08800.
1.04
QUALITY ASSURANCE
A.
Standards: Comply with the requirements and recommendations in applicable specification and standards by
AAMA, except to the extent where more stringent requirements are indicated herein.
B. Performance: A minimum ten-year record of production manufacturing of frames, doors and panels, and
completion of similar type and size projects is required.
C. Instruction: The manufacturer or his representative will be available for consultation to all parties engaged in the
project including instruction to installation personnel.
D. Field Measurement: The supplier shall field verify all information prior to fabrication and furnishing of materials.
Omitted details due to lack of verification shall be furnished at no additional cost to Owner.
E. Regulations and Codes: Comply with the current edition in force at the project location of all local, state, and
federal codes and regulations, including the Americans with Disabilities Act of 1992.
1.05
SUBMITTALS
A.
Product Data: Submit manufacturer’s product data, specifications and instructions for each type of door and
frame required in accordance with Section 01340 and the following:
1.
2.
3.
4.
B.
Include details of core stile and rail construction, trim for lights and all other components.
Include details of finish hardware mounting.
Include samples of each aluminum alloy to be used on this project. Where normal finish color and texture
variations are expected, include two or more samples to show the range of such variations.
Include one sample of typical fabricated section, showing joints, fastenings, quality of workmanship,
hardware and accessory items before fabrication of the work proceeds.
Submit shop drawings for the fabrication and installation of the doors and frames, and associated components.
Details to be shown full scale. Include glazing details and finish hardware schedule.
June 21, 2010
67
1.06
PRODUCT DELIVERY, STORAGE AND HANDLING
A.
Deliver materials to job site in their original, unopened packages with labels intact. Each door and frame will be
tagged with a mark or number, which correlates with designation system used for shop drawings. Inspect
materials for damage and advise manufacturer immediately of any unsatisfactory materials.
B. Package door assemblies in individual corrugated cartons so no portion of the door has contact with the outer
shell of the container. Package and ship frames pre-assembled to the greatest possible extent.
C. Store material in a secure, weatherproof space.
D. Handle doors and frames with care. Do not walk or place other materials on top of stacked doors. Contractor
shall use all means necessary to protect doors from damage prior to, during, and after installation. All damaged
doors shall be repaired or replaced by the Contractor at no cost to the Owner.
1.07
PROJECT WARRANTY
A.
Provide a written warranty signed by manufacturer agreeing to replace, at no cost to the Owner, any doors,
frames, hardware, or factory hardware installation, which fail in materials or workmanship, within the warranty
period. Failure of materials or workmanship includes: excessive deflection; faulty operation of entrances;
deterioration of finish, or construction, in excess of normal weathering; and defects in hardware installation.
1.
2.
FRP doors will carry a 25 year limited warranty on doors structural integrity, mainframe, and the lamination
between face sheets and core.
System manufacturer will guarantee THE ENTIRE SYSTEM for a period of 10 years.
PART 2 – PRODUCTS
2.01
ACCEPTABLE MANUFACTURERS
A.
2.02
Manufacturer: Subject to compliance with requirements, provide products manufactured by:
1. Commercial Door Systems (CDS) – Philadelphia, PA – 215-244-9080 – www.commercialdoorsystems.com
2. Insolrae Bldg. Products – Southampton, PA – 215-673-6050
3. Or other manufacturers meeting these specifications and approved in writing by Owner prior to bid date.
MATERIALS AND ACCESSORIES
A.
Aluminum Members: Alloy and temper as recommended by manufacturer for strength, corrosion resistance,
and application of required finish and control of color; ASTM B 221 for extrusions, ASTM B209 for sheet/plate
with a minimum wall thickness of 0.125”.
B. Components: Furnish door and frame components from the same manufacturer. The use of a different
manufacturer of door and frame components is not permitted.
C. Fasteners: Provide Aluminum, non-magnetic stainless steel or other non-corrosive metal fasteners, guaranteed
by the manufacturer to be compatible with the doors, frames, stops, panels, hardware, anchors, and other items
being fastened. For exposed fasteners (if any), provide Oval Phillips Head screws with finish matching the item
to be fastened. The use of sex bolts or thru bolts will not be accepted.
D. Glazing Gaskets: For glazing factory-installed glass, and for gaskets which are factory-installed in “captive”
assembly of glazing stops, manufacturer’s standard stripping of molded neoprene, complying with ASTM D
2000 (designation 2BC415 to 3BC620), or molded PVC complying with ASTM C 509 Grade 4.
2.03
FABRICATION
A.
Sizes and Profiles: The required sizes for door and frame units, and profiles requirements are shown on the
drawings.
B. Coordination of Fabrication: Field measure before fabrication, and show recorded measurements on final shop
drawings.
C. Complete the cutting, fitting, forming, drilling, and grinding of all metal work prior to assembly. Remove burrs from
cut edges, and ease edges and corners to a radius of approximately 1/64”.
D. No welding or joinery of doors or frames will be provided except with owner request.
June 21, 2010
68
E.
2.04
Maintain continuity of line and accurate relation of planes and angles. Secure attachments and support at
mechanical joints, with hairline fit at contacting members.
FIBERGLASS REINFORCED POLYESTER FRP FLUSH DOORS – F500HD
A.
Materials and Construction
1.
2.
3.
4.
5.
2.05
ARCHITECTURAL PANELS
A.
FRP Panels
1.
2.
3.
4.
2.06
Construct 1-3/4 thick doors of 6063-T6 aluminum alloy with minimum stiles of 5-1/2” tube, top rails minimum
of 6” and bottom rails minimum of 10”. Provide joinery 3/8” diameter full width tie rods through extruded
splines top and bottom as standard .125” tubular shaped stiles and rails reinforced to accept hardware as
specified. Provide hex type aircraft nuts for joiner without welds, glues, or other methods for securing
internal door extrusions. Furnish reglets to accept face sheet to permit a flush appearance.
Door face sheeting .120” thickness fiberglass reinforced polyester. Provide Model F500HD doors with an
abuse resistance engineered surface of the standard colors: white, light gray, red, blue, green, beige, dark
gray, dark bronze, or black as selected.
Core of door assembly will be minimum 25-pound PSI density polystyrene with a flame spread rating of no
more than 25. Meeting stiles on pairs of doors top and bottom weather bar with FIN-SEAL wool pile brush
weather stripping.
Manufacture doors with cutouts for vision lights, louvers, or panels, as scheduled. Factory to furnish and
install all glass, louvers, and panels prior to shipment.
Pre-machine doors in accordance with templates from the specified hardware manufacturers and approved
hardware schedule. Factory installs hardware except door closers.
Model: P25 one quarter inch, P75 one inch or thickness as shown.
FRP face sheets with finish color throughout.
FRP option: Construct insulated panels of two .120” minimum thickness sheets with core of minimum 2½
pound PSI density polystyrene.
Class A option for flame spread and smoke developed rating on interior faces of exterior panels and both
faces of interior panels as shown. Flame spread no greater than 25, smoke developed no greater than 450
per ASTM E-84.
ALUMINUM FRAMING SYSTEMS
All aluminum framing must be heavy duty and reinforced
A.
Tubular Framing
1.
2.
3.
4.
5.
6.
June 21, 2010
Framing system shall be by the door manufacturer and of the size and type shown. Framing shall be type
6063-T6 aluminum alloy with minimum wall thickness of .125” and .625” high applied door stops with screws
and weather stripping. Frame members are to be box type with four (4) enclosed sides. Open back
framing will not be acceptable.
Caulk joints before assembling from members. Secure joint with fasteners and provide a hairline butt joint
appearance. Pre-fit doors using “stick” materials are not acceptable.
Applied stops for side, transom and borrowed lights and panels, with fasteners exposed on interior or
unsecured portion only. Pre-machine and reinforced frame members for hardware in accordance with
manufacturer’s standards and the approved hardware schedule. Factory installs hardware except closers.
Anchors appropriate for wall conditions to anchor framing to wall materials. A minimum of five anchors up to
7’4” on jamb members and one additional anchor for each foot over 7’4”. Secure head and still members of
transom, side lights, and similar conditions.
Factory pre-assembles side light to the greatest extent possible, and mark frame assemblies according to
location.
Provide framing in a knock-down condition and attach to door assembly. Mark frames members according to
location.
69
7.
2.07
GLAZING
A.
2.08
Hardware installations for aluminum doors must beet all installation requirements called for in the hardware
specs.
Design system for replacement of glass
1. Manufacturer’s standard flush glazing system of recessed channels and captive glazing gaskets or applied
stops as shown.
2. Allow for thermal expansion on exterior units.
3. Glass as shown and factory glazed into doors.
ALUMINUM FINISHES
A.
Anodized surfaces; AAM12C22A41 Clear 215-R1; AAM12C22A42 Light Bronze 311, Medium Bronze 312, Dark
Bronze 313, and Black 315. Special painted finishes as specified.
PART 3 – EXECUTION
3.01
INSTALLATION
A.
Comply with manufacturer’s recommendations and specifications for the installation of the doors and frames.
Factory installs hardware, glass, and louvers in doors. Factory assembled side-lights and transoms to the
greatest extent possible.
B. Set units plumb, level and true to line, without harp or rack of doors or frames. Anchor securely in place.
Separate aluminum and other metal surfaces with bituminous coatings or other means as approved by architect.
C. Set thresholds in a bed of mastic and back seal.
D. Clean surfaces promptly after installation of doors and frames, exercising care to avoid damage to the protective
coating.
E. Ensure that the doors and frames will be without damage or deterioration (other than normal weathering) at the
time of acceptance.
F. Provide Owner with all adjustment tools and instruction sheets. Arrange an in-service session for Owner at
Owner’s convenience. Provide a minimum one year written warranty on all labor related to this section. Any
workmanship which is defective or deficient shall be corrected to the Owner’s satisfaction and at no additional cost
to the Owner.
June 21, 2010
70
ALUMINUM STILE AND RAIL DOORS AND FRAMING
ANY OPENINGS REQUIRING HURRICANE IMPACT SYSTEMS MUST BE COORDINATED WITH AND APPROVED BY
HORRY COUNTY SCHOOLS BEFORE FINAL APPROVAL OF A GIVEN SYSTEM.
PART 1 – GENERAL
1.01
RELATED DOCUMENTS
A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and Division 1
Specification sections, apply to work specified in this section.
1.02
DESCRIPTION OF WORK
A.
B.
1.03
RELATED WORK SPECIFIED ELSEWHERE
A.
B.
C.
1.04
The elevation of each type of door and frame is shown on the drawings and in the schedules.
The following types of doors and frames are required:
1. Aluminum stile and rail doors
2. Aluminum frames
For Finish Hardware, See Section 08700.
For Caulking, See Section 08810.
For Glazing, See Section 08810.
QUALITY ASSURANCE
A.
Standards: Comply with the requirements and recommendations in applicable specification and standards by
AAMA, except to the extent where more stringent requirements are indicated herein.
B. Performance: A minimum ten-year record of production manufacturing of frames, doors and panels, and
completion of similar type and size projects is required.
C. Instruction: The manufacturer or his representative will be available for consultation to all parties engaged in the
project including instruction to installation personnel.
D. Field Measurement: The supplier shall field verify all information prior to fabrication and furnishing of materials.
Omitted details due to lack of verification shall be furnished at no additional cost to Owner.
E. Regulations and Codes: Comply with the current edition in force at the project location of all local, state, and
federal codes and regulations, including the Americans with Disabilities Act of 1992.
1.05
SUBMITTALS
A.
Product Data: Submit manufacturer’s product data, specifications and instructions for each type of door and
frame required in accordance with Section 01340 and the following:
1.
2.
3.
4.
B.
1.06
Include details of core stile and rail construction, trim for lights and all other components.
Include details of finish hardware mounting.
Include samples of each aluminum alloy to be used on this project. Where normal finish color and texture
variations are expected, include two or more samples to show the range of such variations.
Include one sample of typical fabricated section, showing joints, fastenings, quality of workmanship,
hardware and accessory items before fabrication of the work proceeds.
Submit shop drawings for the fabrication and installation of the doors and frames, and associated components.
Details to be shown full scale. Include glazing details and finish hardware schedule.
PRODUCT DELIVERY, STORAGE AND HANDLING
A.
Deliver materials to job site in their original, unopened packages with labels intact. Inspect materials for damage
and advise manufacturer immediately of any unsatisfactory materials.
June 21, 2010
71
B.
1.07
Package door assemblies in individual corrugated cartons so no portion of the door has contact with the outer
shell of the container. Package and ship frames pre-assembled to the greatest possible extent.
PROJECT WARRANTY
A.
Provide a written warranty signed by manufacturer, installer and contractor, agreeing to replace, at no cost to the
Owner, any doors, frames, hardware, or factory hardware installation, which fail in materials or workmanship,
within the warranty period. Failure of materials or workmanship includes: excessive deflection; faulty operation of
entrances; deterioration of finish, or construction, in excess of normal weathering; and defects in hardware
installation. The minimum time period of limited warranty is 25 years for doors manufactured with polystyrene
core and only 10 years for doors manufactured with urethane core from project acceptance.
PART 2 – PRODUCTS
2.01
ACCEPTABLE MANUFACTURERS
A.
2.02
Manufacturer: Subject to compliance with requirements, provide products manufactured by Commercial Door
Systems (CDS).
MATERIALS AND ACCESSORIES
A.
Aluminum Members: Alloy and temper as recommended by manufacturer for strength, corrosion resistance, and
application of required finish and control of color; ASTM B 221 for extrusions, ASTM B209 for sheet/plate with a
minimum wall thickness of 0.125”.
B. Components: Furnish door and frame components from the same manufacturer. The use of a different
manufacturer of door and frame components is not permitted.
C. Fasteners: Provide Aluminum, non-magnetic stainless steel or other non-corrosive metal fasteners, guaranteed
by the manufacturer to be compatible with the doors, frames, stops, panels, hardware, anchors, and other items
being fastened. For exposed fasteners (if any), provide Oval Phillips Head screws with finish matching the item to
be fastened.
D. Glazing Gaskets: For glazing factory-installed glass, and for gaskets which are factory-installed in “captive”
assembly of glazing stops, manufacturer’s standard stripping of molded neoprene, complying with ASTM D 2000
(designation 2BC415 to 3BC620), or molded PVC complying with ASTM C 509 Grade 4.
2.03
FABRICATION
A.
Sizes and Profiles: The required sizes for door and frame units, and profiles requirements are shown on the
drawings.
B. Coordination of fabrication: Field measure before fabrication, and show recorded measurements on final shop
drawings.
C. Complete the cutting, fitting, forming, drilling, and grinding of all metal work prior to assembly. Remove burrs from
cut edges and ease edges and corners to a radius of approximately 1/64”.
D. No welding or joinery of doors or frames will be provided except with owner request.
E. Maintain continuity of line and accurate relation of planes and angles. Secure attachments and support at
mechanical joints, with hairline fit at contacting members.
2.04
STILE AND RAIL DOORS
A.
Materials and Construction
1.
2.
3.
June 21, 2010
Stile and rails of type 6063-T5 aluminum alloy 1-3/4” minimum thickness and with tubular extrusions with a
minimum .125” wall thickness. Overall stiles and rail requirements for MID-PANEL RAIL DOORS type
R500MP are: 6-1/2” wide top rail, 4 ½” wide stiles and a 10” minimum bottom rail.
True mortise and tenon joinery at corners with full width 3/8” diameter tie rods secured with locking washers
and hex nuts.
No welding of joinery is used, except by owner request.
72
4.
5.
6.
7.
2.05
Exterior glazing stops are permanent and integral to stile and rail extrusions. Provide interior glazing stops
with counter punched holes and flat head screws. No applied snap-on stops are permitted. Factory to
furnish and install glass, panels, and louvers.
Mid-Rail Option: 12” mid-rail as shown. Fasten with mortise/tenon joinery and 3/8” tie rod/locking hex nuts.
Mid-Panel Option: Mid-Panels constructed of aluminum tubes with extruded spline and interlocking edges to
secure face sheets. Poured-in-place urethane core of minimum five pounds per cubic foot density. Urethane
core to be free of CFC. Fasten with mortise/tenon joinery and 3/8” tie rod/locking hex nuts. Aluminum, FRP
or other face sheet as shown.
Pre-machine doors in accordance with templates from the specified hardware manufacturers and approved
hardware schedule. Factory installed hardware.
ALUMINUM FRAMING SYSTEMS
A.
Tubular Framing
1. Framing system from the door manufacturer of the size and type shown: .125” minimum wall thickness and
type 6063-T5 aluminum alloy. .625” high applied door stops with screws and weather stripping. Frame
members are to be box type with four (4) enclosed sides. Open back framing will not be acceptable.
2. Caulk joints before assembling from members. Secure joint with fasteners and provide a hairline butt joint
appearance. Pre-fit doors using “stick” materials are not acceptable.
3. Applied stops for side, transom and borrowed lights and panels, with fasteners exposed on interior or
unsecured portion only. Pre-machine and reinforced frame members for hardware in accordance with
manufacturer’s standards and the approved hardware schedule. Factory installed hardware.
4. Anchors appropriate for wall conditions to anchor framing to wall materials. A minimum of five anchors up to
7’4” on jamb members and one additional anchor for each foot over 7’4”. Secure head and still members of
transom, side lights, and similar conditions.
5. Factory pre-assembled side light to the greatest extent possible, and mark frame assemblies according to
location.
6. Provide framing in a knock-down condition and attach to door assembly. Mark frames members according to
location.
B.
Insert Framing Systems
1. Model: CDS 225 and CDS 226.
2. Insert frame as shown, using an integral stop fitted with weather stripping.
3. Corner joints of miter design, secure with furnished aluminum clips, and screw into place.
4. Reinforce and pre-machine insert frame members for hardware in accordance with manufacturer’s standards
and the approved hardware schedule.
5. Anchors of a suitable type to fasten insert framing to existing frame materials, using a minimum of five
anchors on jambs up to 7’4” height, three on headers. One additional anchor for each additional lineal foot of
frame.
C. Frame Capping
1. Model: C2 and C4.
2. 0.90 wall thickness capping as indicated on drawings with insert frame as shown. Finish of capping to match
framing.
2.06
GLAZING
A.
2.07
Design system for replacement of glass
1. Manufacturer’s standard flush glazing system of recessed channels and captive glazing gaskets or applied
stops as shown.
2. Allow for thermal expansion on exterior units.
3. Glass as shown and factory glazed into doors.
ALUMINUM FINISHES
A.
Anodized surfaces; AAM12C22A41 Clear 215-R1; AAM12C22A42 Light Bronze 311, Medium Bronze 312, Dark
Bronze 313, and Black 315. Special painted finishes as specified.
June 21, 2010
73
PART 3 – EXECUTION
3.01
INSTALLATION
A.
Comply with manufacturer’s recommendations and specifications for the installation of the doors and frames.
Factory installed hardware, glass, and louvers in doors. Factory assembled side-lights and transoms to the
greatest extent possible.
B. Set units plumb, level and true to line, without harp or rack of doors or frames. Anchor securely in place.
Separate aluminum and other metal surfaces with bituminous coatings or other means as approved by architect.
C. Set thresholds in a bed of mastic and backseal.
D. Clean surfaces promptly after installation doors and frames, exercising care to avoid damage to the protective
coating.
E. Ensure that the doors and frames will be without damage or deterioration (other than normal weathering) at the
time of acceptance.
F. Provide Owner with all adjustment tools and instruction sheets. Arrange an in-service session for Owner at
Owner’s convenience. Provide a minimum one year written warranty on all labor related to this section. Any
workmanship which is defective or deficient shall be corrected to the Owner’s satisfaction and at no additional cost
to the Owner.
June 21, 2010
74
TOILET PARTITIONS
PART 1 – GENERAL
1.1
RELATED DOCUMENTS
A.
1.2
1.3
SUMMARY
A.
Provide Overhead-Braced and Floor-Anchored, Solid Phenolic Toilet Partitions and Privacy Screens as indicated
on Drawings and as specified herein. Grab Bars provided under Toilet and Bath Accessories.
B.
Related Sections include the following:
1. Division 5 Section "Metal Fabrications" for supports that attach units to overhead structural system.
2. Division 10 "Toilet and Bath Accessories" for toilet paper holders, grab bars, purse shelves, and similar
accessories.
REFERENCES
A.
1.4
Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1
Specification Sections, apply to this Section.
American Society for Testing and Materials (ASTM).
SUBMITTALS
A.
Product Data: Submit manufacturer's detailed technical data for materials, fabrication, and installation, including
catalog cuts of anchors, hardware, fasteners, and accessories.
B.
Shop Drawings: For fabrication and installation of Toilet Partition and Screen assemblies. Include plans,
elevations, sections, details, and attachments to other work.
C. Samples for Initial Selection:
1. Submit manufacturer's color chart with manufacturer's full range of Standard Colors. Color shall be selected
on a basis of four (4) stalls or more per color.
2. Submit certification that materials furnished comply with requirements specified.
D. Samples for Verification:
1. Submit 6" square samples of each color and finish on same substrate used in work, for color verification after
selections have been made.
2. Submit one (1) sample of the following:
a. Hardware (Complete)
b. Pilaster (12" x 12")
c. Divider Panel (12" x 12")
d. Full High Aluminum Mounting Bracket (57.5")
e. Continuous Full High 14 Gauge Stainless Steel Hinge (57.5")
1.5
E.
Maintenance Instructions: Provide manufacturer's printed Instructions for Maintenance of Installed Work.
F.
Written Warranty
PROJECT CONDITIONS
A.
Field Measurements: Verify dimensions in areas of installation by field measurements before fabrication and
indicate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid
delaying the work.
June 21, 2010
75
1.
1.6
DELIVERY, STORAGE AND HANDLING
A.
1.7
Established Dimensions: Where field measurements cannot be made without delaying the Work, establish
dimensions and proceed with fabricating units without field measurements. Coordinate supports, adjacent
construction, and fixture locations to ensure actual dimensions correspond to establish Dimensions.
Delivery, store, and handle compartments as recommended by manufacturer to protect from damage.
MANUFACTURER'S WARRANTY
A.
Provide manufacturer's written two part warranty: The entire Toilet Partition shall be warranted for fifteen (15)
years, against breakage, corrosion and delamination, to include Hardware; replaced without charge, excluding
labor. Panels, Pilasters and Doors shall be warranted for twenty-five (25) years against breakage, corrosion and
delamination, replaced without charge, excluding labor.
PART 2 – PRODUCTS
2.1
MANUFACTURERS
COLUMBIA PARTITIONS SUPER HD - 8433, by Partition Systems, Inc., or equal. Capitol Toilet Partitions, Scranton
Products, and Columbia Partitions.
2.2
MATERIALS
A.
General: Provide material which has been selected for surface flatness and smoothness. Exposed surfaces
which exhibit pitting, seam marks, roller marks, stains, discolorations, telegraphing of core material, or other
imperfections on finished units are not acceptable. Solid Phenolic shall meet or exceed all requirements for Class
"A" Flame Spread Rating calculated according to ASTM E-84-91A, and shall carry a UL Class "A" Fire Rating
Certification.
B.
Material shall be Solid Phenolic with a High Pressure Melamine matte finish surface made as an integral part of
the core material. Laminated surfaces are not acceptable.
1. Doors - Minimum .75" (19 mm) Finished Thickness
2. Divider Panels - Minimum .50" (13mm) Finished Thickness
3. Pilasters - Minimum .75" (19 mm) Finished Thickness
C. Colors: To be selected by Project Architect from Manufacturer's Standard Colors. Must also be approved by
District representative.
D. Pilaster Shoes: ASTM 167, Type 302/304 Stainless Steel, minimum 4" high, 18 gauge, finished with #3
Directional Polish, attached with Stainless Steel through bolts.
E.
Continuous Brackets must be used: Full High (57.5") Extruded 6063-T5 Aluminum with a satin anodized
finish. The minimum weight shall be 1.685 pounds per lineal foot. Inside of opening of Bracket shall be
.50" for panels, .75" for pilasters. All holes for mounting to wall and panel/pilaster shall be pre-drilled.
Holes are to be spaced at 9" O.C. along the full length of the bracket for a total of fourteen (14) holes for
mounting to the wall and seven (7) holes for mounting to the panel/pilaster. Each bracket is to have
minimum wall thickness of .125". Each bracket is to be packaged in a separate poly tube, and is to be
labeled by stock number and manufacturer.
F.
Heavy Duty Continuous Hinges must be used: Continuous 14 gauge stainless steel hinge (57.5"). Hinge
shall be 3" wide and shall have five (5) stainless steel wire springs for self-closing action. Pivot pin shall
be .250" in diameter, and shall be made of Type 302/304 stainless steel. Hinges shall provide emergency
access by lifting the door. Hinges shall be pre-drilled for mounting to door and pilaster. Mounting holes
shall be at 9" O.C. for through bolting with stainless steel fasteners. Each hinge is to be packaged in a
separate poly tube, and is to be labeled by stock number, manufacturer, and left or right hand.
June 21, 2010
76
G. Strike and Keeper: Heavy duty cast stainless steel with a satin finish. The Strike and Keeper shall be
2.50" high, with the mounting holes at 1.50" O.C., and the wall thickness shall be a minimum of .125". The
Strike and Keeper shall have an integral rubber bumper door stop. The stock number shall be molded
into the back of the Strike and Keeper for ease in identification. Each Strike and Keeper shall be
packaged in a separate poly bag, and is to be labeled by stock number and manufacturer. Furnish one
per door.
H. Panel and doors must have heat sync strip.
I.
Solid phenolic products are not allowed.
J.
Slide Latch: Heavy Duty Cast Stainless Steel with a Satin finish. The Slide Latch shall be surface mounted. The
slide bar shall be .150" thick, 1.020" wide and 3.720" long. Latch shall have an internal Stainless Steel buffering
spring to prevent damage when door is inadvertently slammed against the Latch. Mounting holes are to be
spaced at 3.50" O.C. Latch knob is to be riveted to the slide bar and then welded to insure that the knob will not
come off. The stock number is to be molded into the back of the Slide Latch for ease in identification. Each Slide
Latch shall be packaged in a separate poly bag, and is to be labeled by stock number and manufacturer. Furnish
one per door.
K.
Coat Hook: Heavy duty cast stainless steel with a satin finish. Coat hook and bumper shall be 2.340" high, 1.230"
wide and shall protrude out from the door 3.05". The hook portion shall have a finished diameter of .250" The
stock number shall be molded into the back of the coat hook and bumper for ease in identification. Each coat
hook and bumper shall be packaged in a separate poly bag and is to be labeled by stock number and
manufacturer. Furnish one per door.
L.
Door Stop: Heavy duty cast stainless steel with a satin finish. Plated Zamac Door Stops are unacceptable. Door
Stop shall have a 2.125" base diameter and shall protrude 1.80" from the wall. The bumper at the end of the Door
Stop shall be .20" thick. The diameter of the shaft shall be .6875". The stock number shall be molded into the
back of the Door Stop for ease in identification. Each doorstop shall be packaged in a separate poly bag and is to
be labeled by stock number and manufacturer. Furnish one for each Disabled Accessible door.
M. Pull Handle: Heavy duty cast stainless steel with a satin finish. Plated Zamac Door Pulls are unacceptable. Pull
Handle shall protrude from the face of the door .940" and shall be 4.735" long. The pull handle shall have
mounting holes drilled and tapped for 10/24 threads at 3.50" O.C. The pull handle shall be .655" wide and shall be
mounted back to back with the Slide Latch. The stock number shall be molded into the back of the Pull Handle for
ease in identification. Each pull handle shall be packaged in a separate poly bag and is to be labeled by stock
number and manufacturer. Furnish one for each Disabled Accessible door.
N. Overhead Bracing (Headrail): Continuous Heavy Duty Extruded 6063-T5 Aluminum Headrail with Anti-Grip
profile. Headrail shall have integral reinforcing channel and curtain track. Headrail shall have a satin anodized
finish. Provide Headrail Corner Brackets, Wall Brackets, and Headrail End Caps as required. The Headrail and
Headrail Brackets shall have a minimum wall height of 2". The minimum wall thickness of the Headrail and
Headrail Brackets shall be .125". Each Headrail Bracket is to be packaged in a separate poly bag and is to be
labeled by stock number and manufacturer.
O. Anchorages and Fasteners: All fasteners shall be chrome plated brass with theft proof heads, through-bolted
unless noted otherwise. No chrome-plated steel will be acceptable.
2.3
FABRICATION
A.
General: Provide standard doors, panels, screens, and pilasters fabricated for partition system, complete with all
accessories and hardware listed above and as required for installation of fully functional system, unless otherwise
noted. Provide units with cutouts and drilled holes to receive partition-mounted hardware, accessories, and grab
bars as indicated.
B.
Overhead-Braced and Floor-Anchored Partitions:
June 21, 2010
77
1.
2.
3.
Furnish Heavy Duty Cast Stainless Steel "Z" Bars, complete with Stainless Steel threaded rods, lock washers
and leveling-adjusting nuts at pilaster, to permit structural connection at floor.
Make provision for setting and securing continuous Extruded Aluminum Anti-Grip Headrail at top of each
pilaster.
Furnish Stainless Steel Shoe at each pilaster to conceal supports and leveling mechanism.
C. Doors: Unless otherwise indicated, provide 24" (610 mm) wide in-swinging doors for standard Toilet Partitions
and 36" (914 mm) wide out-swinging doors with a minimum 32" (813 mm) wide clear opening for Partitions
indicated to be Handicapped Accessible.
D. Floor Anchored Privacy Screens: Furnish Privacy Screens consisting of a pilaster and a panel of the same
construction and finish as the Toilet Partitions. Furnish in accordance with the drawings.
PART 3 – EXECUTION
3.1
INSTALLATION
A.
General: Comply with manufacturer's written installation instruction. Install Partitions rigid, straight, plumb, and
level. Provide clearances of not more than .50" (13 mm) between pilasters and panels, and not more than 1.0"
(25 mm) between panels and walls. No evidence of drilling, cutting, and patching shall be visible in finished work.
B.
Attach Continuous Wall Brackets to the wall with the following:
1.
2.
At solid masonry: #14 x 1.50" long Stainless Steel Phillips Pan head Screws and Plastic #14/16 Anchors at
9" O.C. vertical spacing.
At cavity masonry: .25" diameter x required length Stainless Steel toggle bolts at 9" O.C. vertical spacing.
C. Overhead-Braced and Floor-Anchored Partitions: Secure pilasters to floor and level, plumb, and tighten. Secure
continuous headrail to each pilaster with not less than two (2) Through-Bolted Stainless Steel fasteners. Hang
doors and adjust so tops of doors are parallel with overhead brace when doors are in closed position.
D. Screens: Attach with anchoring devices according to manufacturer's written instructions and to suit supporting
structure. Set units level and plumb and to resist lateral impact.
3.2
ACCESSORIES
A.
3.3
Mount accessories to Partition units in accordance with manufacturer's instruction.
ADJUSTING AND CLEANING
A.
B.
Hardware Adjustment: Adjust and lubricate hardware according to manufacturer's written instructions for proper
operation.
Provide final protection and maintain conditions that ensure Toilet Partitions and Screens are without damage or
deterioration at the time of Substantial Completion.
June 21, 2010
78
LOCKERS - STUDENT CORRIDOR AND ATHLETIC
All lockers in the building shall be of all steel that meets or exceeds Debourgh specifications including lifetime warranty. Lock
system must be master built-in combination locks installed according to manufacturer’s specifications. Upper lockers must be
sloped. Top of locks and lockers must be located at an acceptable height for students.
June 21, 2010
79
OPERABLE WALL SPECIFICATIONS
Modernfold:
Acousti-Seal 931 or 932
Use #17 Track
STC 47 Minimum
Hufcor:
Classic 7500 or 7600
Use #38 Track
STC 47 Minimum
Panelfold:
610 or 620 Series
Use #5 Track
STC 47 Minimum
* Substitutions will be considered but must be approved.
* The District prefers not to have operable walls unless absolutely necessary.
June 21, 2010
80
ACCORDION WALL SPECIFICATIONS
Modernfold:
SM8
STC 39 Minimum
Hufcor:
Model 3900
STC 39 Minimum
Panelfold:
Fabricwal
STC 39 Minimum
* Substitutions will be considered but must be approved.
* The District prefers not to have accordion walls unless absolutely necessary.
June 21, 2010
81
FENCE
CHAIN LINK FENCE REQUIREMENTS
GENERAL SPECIFICATIONS
***Any deviation in these specifications shall be indicated in each solicitation.***
General Note:
1. When using regular galvanized chain link fencing, 9 gauge steel wire is required.
2.
When using vinyl coated chain link fencing, 9 gauge core is required.
DESCRIPTION
Contractor shall provide chain link fencing. The work shall include chain link fencing systems, gates, related hardware, and
installation.
QUALITY ASSURANCE
Contractor shall have been in business a minimum of five years and provide chain link fences as complete units produced by the
manufacturer, including necessary erection accessories, fittings, and fastenings.
Contractor shall use experienced chain link fence installers with a minimum of one year of experience.
The Contractor shall have and maintain an office within Horry County.
MATERIAL
Chain link fabric shall be one piece with full height up to 12’ 0”, 2” mesh, 9 gauge steel wire (plastic coating excluded).
The finish shall be galvanized steel chain link fabric.
The top and bottom selvages shall be knuckled for fabric 72” high and under.
The framework shall be round steel pipe. The pipe shall be galvanized steel pipe, schedule 40. All Fittings and Hardware shall
be matching galvanized steel.
COMPONENTS (HEAVY INDUSTRIAL FENCE) All pipe shall be Schedule 40 material.
End, corner, and pull posts up to 6’ 0” fabric height shall be 3” OD.
Line posts up to 6’ 0” fabric height shall be 2” OD.
Gate posts with gate leaves 7’ 0” wide or less shall be 3” OD.
Gate posts with gate leaves over 7’ 0” wide shall be 4” OD.
Top and brace rails shall be 1 5/8” OD – Schedule 40 pipe.
Gate frames up to 6’ 0” high and leaf width 8’ 0’ or less shall be 1 5/8” OD.
Bottom tension wire shall be 7 gauge (.177”) coil spring wire with a finish matching the fabric.
June 21, 2010
82
GATES
Fabricate gate perimeter frames of tubular steel members assembled by welding or with special fittings at corners. Provide
additional horizontal and vertical members to ensure proper operation and attachment of fabric, hardware, and accessories.
Gate fabric shall match metal and fence fabric.
Provide manufacturer’s standard gate hardware complete with matching latches, stops, keepers, and hinges. Provide hardware
of sufficient design and strength for satisfactory and proper gate operation.
Main gate openings need to be 28’ minimum, 30’ maximum for future portable access. Playground area/retention pond gates
would be a standard one to two man gate size.
All roll gates must be commercial heavy duty type.
INSPECTION
Examine final grades and installation conditions. The Contractor is responsible for all grading and installation conditions and
work shall not proceed until the Contractor remedies all unsatisfactory conditions. The Contractor shall be responsible for the
safeguarding of all underground infrastructure (including electrical, water, sewer, computer cabling, telephone, gas piping, and
etc.). If the Contractor cuts, breaks or damages the underground infrastructure, it must be repaired and repairs approved by the
Horry County Schools Maintenance staff. Infrastructure damage shall be reported to the HCS Maintenance department
immediately at 843-488-6963 or 843-241-6100.
PREPARATION
Contractor shall lay out each complete fence line.
Contractor shall locate and mark post positions. Contractor shall space line posts equally and at maximum of 10’ 0” on center.
Contractor shall provide corner posts at positions where fence changes direction more than 10 degrees.
INSTALLATION
Install the chain link fence in accordance with manufacturer’s installation instructions and specifications.
Provide a rigid and plum finish fence structure with fabric tight and in proper tension.
Drill post holes into firm, undisturbed, or compacted earth.
Install gate, end, corner, pull, and line posts in concrete foundations (minimum 3000 psi. concrete).
Hole diameter shall be a minimum of 3 times the post diameter.
Posts and gate posts depth shall be a minimum of 36”. All posts shall be aligned both vertically and laterally.
Concrete depth shall be a minimum of 30” and a minimum of 2” below grade.
Extra post hole soil and any extra debris shall be removed from the site daily.
Set keeps, stops, sleeves, and other accessories into concrete as required.
Top rails shall be installed continuously through post caps or extension arms.
Center rails and brace assemblies are optional and used only if specified by the District as an additional requirement.
June 21, 2010
83
Install tension wires on security side of post before stretching fabric and tie wire to each post with wire or clips.
Stretch fabric tight between terminal posts. Install on security side and anchor securely to framework so that tension remains
after the pulling force is released.
Position bottom of fabric a maximum of 2” above ground level at each post unless otherwise instructed.
Bend wire binding to minimize hazards to persons.
Install gates plum, level, and secure for full opening without interference. Hardware shall be adjusted for smooth operation and
lubricate where necessary.
Site cleaning shall be performed during and after completion of fencing project. All debris and excess soil shall be removed from
the site. Any site damage (tire ruts, heavy indentions in ground surface, and etc.) shall be repaired to the District’s satisfaction at
no expense to the District.
ALTERNATE FINISH
PVC (Poly vinyl chloride) coated over 9 gauge galvanized steel wire, not less than Class 2a 15 mil thick fabric coated before
fabric fabrication.
Color to be determined by the District from the Contractor’s available color chart.
WARRANTY
The Contractor shall warranty all materials, installation, and workmanship for two years.
June 21, 2010
84
FLOOR FINISHES
The decision to specify VCT, carpet squares, epoxy floors, wood floors, sports flooring or no-wax tile will be made during the
design phase and approved by the owner.
Any time standard VCT tile is specified, a minimum of eight coats of wax shall be applied by the contractor. This must be clearly
stated on the plans.
When epoxy flooring is used only dark colors are permitted such as black, navy or terracotta.
Rubber base is required when sports flooring, VCT, or carpet squares are used.
Environmental backing on carpet is not allowed.
The color of carpet/carpet squares must be approved by owner.
Woven carpet cannot be used.
It’s important that the architect specify carpet that seams well.
June 21, 2010
85
CEILING TILE
Acoustical Ceiling Specifications
All acoustical tiles used must be standard 2’ x 2’ or 2’ x 4’ only. Decorative tiles are not permitted. 2’ x 4’ tiles must be Armstrong
#823A, #769A, USG #2310, or approved equal. 2’ x 2’ tiles must be Armstrong #824, #770, USG #2110, or approved equal.
Media Center and Classrooms:
Provide 2' x 4' acoustical tiles. Architect shall specify grid and detail wall molding. Panels must have Bio Block paint on front and
back of panels to inhibit or retard surface growth of mold or mildew.
Corridors:
Provide 2' x 4' acoustical tiles. Architect shall specify grid detail and 2' x 4' wall molding. Bio Block paint finish on front and back
#1773.
Administrative Area:
Provide 2' x 2' acoustical tiles. Architect shall specify grid detail and wall molding.
Locker Rooms, Wet Areas, and Kitchen Area:
Provide Armstrong Fine Fissured Ceramaguard 2' x 2' Panels. Architect shall specify grid and wall molding. Bio Block paint
finish on front and back of panels.
All grid around kitchen dry storage and bathrooms must be caulked to the wall.
Substitutions will be considered but must be approved.
June 21, 2010
86
CABINETRY
All cabinetry shall have laminate tops and laminate faces. All hardware shall be standard hardware that can be purchased locally
from local distributors. All OSF guidelines for millwork heights should be followed. The Owner would prefer that all K-3
classrooms have elevated cubbies with coat hooks below, kindergarten classrooms to have 30 cubbies, grades 1-3 classrooms
to have 30 cubbies. All 4-5 classrooms shall have 30 wall cubbies with 26 hooks underneath.
All 4th and 5th grades shall have equal storage space. Fourth and fifth grade classes with no storage closets will have wall
cabinets 8' long and 12" deep with shelving. Shelving inside storage closets will be equal to wall cabinets. All classrooms shall
have a teacher cabinet. Teacher cabinets and all admin cabinets, including the nurse’s office, must have locks. All classroom
cabinet locks must be keyed the same.
Teacher cabinets are required for all new schools and renovations. Corner cabinets are preferred whenever possible.
All base cabinetry and counter tops must be constructed of AWI custom grade except in wet areas where it must be marine
grade or exterior grade plywood.
June 21, 2010
87
WINDOWS
Heavy-duty aluminum frame, double insulated. Glass and tint specified should be such that it is easily obtained through local
suppliers. Degree of tint must be strong enough to prevent glare on marker boards and to avoid damage to books and materials
due to direct sunlight. Windows with internal blinds are not permitted. Glass tint shall be limited to three tints (solar grey,
bronze, or light green).
Window tint must be approved by the Owner during the design phase. A UV light and heat blocker tint must be used
and the degree of tint must be capable of eliminating the need for blinds.
* Skylights are not permitted.
June 21, 2010
88
MULTIPURPOSE WALL SPECIFICATIONS
Wall between multipurpose room and cafeteria shall be a solid block wall.
Doors in multipurpose must be double doors with removable mullion.
Accordion and operable walls are not allowed in this area.
June 21, 2010
89
MEDIA CENTER
All media centers shall have a studio/production area with a large window for viewing between media and production.
Shelving/casework shall be located under large viewing glass area to allow for computer and equipment. At floor level under
viewing area and shelving shall be a 5” conduit opening to allow pass through wiring from production and studio. Power and data
for this cabinet must be specified in electrical drawings. Production area must have a counter area with sink and wall cabinets.
Media center shall have a staff toilet.
Circulation Desk
Circulation desk must have front exterior privacy panel to hide equipment wiring and work area. Counter must also contain
handicap accessible check out station.
1.
2.
3.
4.
Elementary - 32" height
Middle - 40" height
High - 40" height
Grommets must be provided in all casework in the media center for cords to accommodate computer, keyboard, monitor,
and print drawer.
5. Drawers, adjustable shelves
6. Shelves behind desk
7. Area for legs and feet
8. Four computer drops
9. Outlets must include electrical outlets for computer and printer and additional electrical outlets for miscellaneous equipment.
10. Shelf depth should be 12"
11. Counter height shelves for free standing storage
12. Book drop with box with wheels underneath to catch books
AV Equipment Storage Room
1.
2.
3.
4.
5.
Door to both hallway and Library Media Center
Counters and cabinets above on one wall with strip of outlets between counter and cabinet
Two computer drops
Large open shelves for equipment storage on other three walls. Shelves should be ceiling height.
Outlets in the baseboard of wall shelves every 10 feet.
In some media centers, it may be necessary to specify flooded data cable in a small area but Owner must approve this
during Design Phase.
June 21, 2010
90
STORMWATER DRAINAGE MAINTENANCE DURING CONSTRUCTION
In reference to retention ponds, ongoing maintenance for storm water compliance shall include:
1.
Vegetation around the pond bank shall be maintained so as not to become a nuisance but shall be thick enough and
maintained to prevent erosion of the ponds' banks.
2.
Outlet control structures shall be kept free of debris and trash and shall be inspected at least once per week.
3.
Periodically during construction, the contractor shall be responsible for measuring the bottom of the ponds for silt and
sediment buildup. When the sediment has built up to approximately 1.0 ft. above the pond bottom elevation as shown on
the design plans, the silt shall be dredged out of the pond to return the pond to original grade and disposed of offsite in an
upland spoils pit.
4.
All catch basins shall be inspected monthly for sediment build-up and assure no foreign objects are restricting positive flow
through the system. This must be conducted on new schools and renovations.
5.
Piping to storm drains must be totally sealed on top, sides, and bottom.
June 21, 2010
91
LANDSCAPING
All vegetation specified by the architect must be native to the area and hardy. No small flowers or flower beds are permitted.
Landscaping vegetation and watering plans are to be specified by the architect and approved by Horry County Schools.
Weed protection must be used in bed areas.
Myrtle bushes and holly bushes are not allowed.
Irrigation Pipe: Refer to Plumbing section and specify as indicated. Emphasis must be made on specifications and
plans regarding depth of irrigation pipe installation.
Mesh backed sod is not allowed on any Horry County Schools’ property.
June 21, 2010
92
CIVIL
Provide sufficient downspouts to ensure there is not water overflow on all roof drains.
The engineer shall coordinate drainage in play areas so that, if possible, large storm drain covers are not located in playground
areas and if storm drains are required they are pedestrian type designed specifically for small children.
Curb and gutter is required in all parking, drive, and drop off areas.
Make sure design drains water away from all playground areas.
The Civil Engineer must provide adequate drainage in all foot traffic, driving, and playground areas.
Sod must be specified for all immediate areas adjacent to the building.
June 21, 2010
93
CONSTRUCTION PROJECT SINAGE REQUIREMENTS
All verbiage listed on the sample sign below must be included on the construction project sign. The architect shall include the
logo or signage identification for Horry County Schools and the contractor on the top of the project sign.
June 21, 2010
94
TECHNOLOGY CABLING STANDARDS AND SPECIFICATIONS
As of 06.17.10
I m portant I nform ation
We require that each party involved, Architect, Engineers, Contractor, Subcontractors, etc review these
specifications in full. Any deviation to these specifications without written consent of HORRY COUNTY
SCHOOL personnel will not be allowed.
In the event that any work has been incorrectly installed as defined within these specifications, HORRY
COUNTY SCHOOL will not be held liable for any Change Order that may need to occur in order to bring
the workmanship in line with these specifications. Any cost, labor, or time will be the responsibility of the
Architect or others as the Architect designates as being at fault. Again, Horry County Schools will not pay
for any change order that is needed in order to bring the work up to our specifications.
June 21, 2010
95
TECHNOLOGY CABLING STANDARDS AND SPECIFICATIONS
Introduction and Special Notes
The District goal is to have certified cable installations at all sites. Cabling Contractors are required to be certified
by the appropriate manufacturer(s) for the cabling plant that exists at the campus the work is requested. Installation
must include a minimum 15-year manufacturer’s warranty (Section 2.1). PANDUIT brand connectivity products
and PANDUIT partner cables will be used unless the District specifies different manufacturers. No equivalents
other than what the District specifies will be accepted.
Areas of Special Note:
Test Results
Each port must pass the appropriate tests for the type of cable installed. Test results for each port will be delivered
to the District in electronic EXCEL formats. (Section 3.2-all sub-sections)
Labeling
Each port (fiber or Cat 6/6a) must be labeled according to the standards listed in Sections 6.0, 6.1, 6.1.1, and 6.1.2.
As-built Drawings
As-built drawings are to be included for any cabling installed (Section 1.4.2.1). District requires a laminated copy
of the final as-built, plus an electronic copy of the CAD file. Electronic drawings for the site will be provided to the
contractor if they exist. If there are no electronic as-builts, the contractor will be expected to create an original CAD
drawing. Work added to an existing as-built is to be “clouded” on the drawing and appropriate notes are to be added
to the legend indicating the scope, contractor, and date of completion. See Diagram F for sample as-built drawing.
Inspection of Work
All inspections of work done in the scope of these specs shall be the responsibility of the General Contractor and/or
Architect.
Changes in Building Codes
At any time during construction that there is a change in building codes not reflected within these documents, the
District shall not be charged for a change order for work required to comply with current building codes.
STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM
PART 1 – GENERAL
1.1
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are
referred to within the text by the basic designation only.
June 21, 2010
96
SOUTH CAROLINA BUILDING STANDARDS
South Carolina Electrical Code
ELECTRONIC INDUSTRIES ASSOCIATION (EIA)
EIA/TIA TSB-75
(1996) Additional Horizontal Cabling Practices for Open Offices
EIA/TIA-455-21
(1988) FOTP-21 Mating Durability of Fiber Optic Interconnecting Devices
EIA-492AAAA
(1989) 62.5 uM Core Diameter/125 uM Cladding Diameter Class Ia Multimode,
Graded-Index Optical Waveguide Fibers
EIA/TIA-526-7
(1994) Optical Power Loss Measurements of Installed Single-Mode Fiber Cable
Plant
EIA/TIA-526-14
(1990) OFSTP-14 Optical Power Loss Measurements of Installed Multimode Fiber
Cable Plant
TIA/EIA-568-B.1, B.2
(Fall 2001) Commercial Building Telecommunications Wiring Standard
TIA/EIA-568-B.2-1
(2002) Transmission Performance Specifications for 4-Pair 100 Ohm Category 6
Cabling
TIA/EIA-568-B.2-2
(2001) Commercial Building Telecommunications Cabling Standard - Part 2:
Balanced Twisted-Pair Cabling Components - Addendum 2 (ANSI/TIA/EIA-568B.2-2-2001)
TIA/EIA-568-B.2-3
(2002) Commercial Building Telecommunications Cabling Standard - Part 2:
Balanced Twisted-Pair Cabling – Addendum 3 - Additional Considerations for
Insertion Loss and Return Loss Pass/Fail Determination (ANSI/TIA/EIA-568-B.2-32002)
TIA/EIA-568-B.2-5
(2003) Commercial Building Telecommunications Cabling Standard - Part 2:
Balanced Twisted-Pair Cabling Components - Addendum 5 - Corrections to
TIA/EIA-568-B.2-5
TIA/EIA-568-B.3
2000)
(2000) Optical Fiber Cabling Components Standard (ANSI/TIA/EIA-568-B.3-
TIA/EIA-569-A
(1998) Commercial Building Standard for Telecommunications Pathways and
Spaces (ANSI/TIA/EIA-569-A-98)
TIA/EIA-569-A-1
(2000) Commercial Building Standard for Telecommunications Pathways and
Spaces, Addendum 1 (ANSI/TIA/EIA-569-A-1-2000) This addendum defines the
surface raceways contained in the work area outlets.
TIA/EIA-569-A-2
(2000) Commercial Building Standard for Telecommunications Pathways and
Spaces, Addendum 2 (ANSI/TIA/EIA-569-A-2-2000) This addendum defines the
furniture pathways and spaces contained in work areas.
TIA/EIA-570-A
(1999) Residential and Light Commercial Telecommunications Wiring Standard
TIA/EIA-606-A
(2002) Administration Standard for the Telecommunications Infrastructure of
Commercial Buildings
June 21, 2010
97
TIA/EIA-607-A
(2002) Commercial Building Grounding (Earthing) and Bonding Requirements for
Telecommunications (ANSI/JSTD--607-A-2002)
TIA-568-B.1-4
Commercial Building Telecommunications Cabling Standard - Part 1: General
Requirements - Addendum 4 - Recognition of Category 6 and 850 nm LaserOptimized 50/125 µm Multimode Optical Fiber Cabling (ANSI/TIA-568-B.1-4-2003)
TIA/EIA-568-B2-1
Commercial Building Telecommunications Cabling Standard - Part 2: Balanced
Twisted Pair Components - Addendum 1 - Transmission Performance
Specifications for 4-Pair 100 Ohm Category 6 Cabling (ANSI/TIA/EIA-568-B.2-12002)
TIA/EIA-854
A Full Duplex Ethernet Specification for 1000 Mbis/s (1000BASE-TX) Operating
Over Category 6 Balanced Twisted-Pair Cabling (ANSI/TIA/EIA-854-2001)
FEDERAL COMMUNICATIONS COMMISSION (FCC)
FCC Part 68.5
Establishment of Telephone Premises Wiring Attestation List
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
ANSI/ICEA S-80-576
(1994) Communication Wire and Cable for Wiring of Premises
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA WC 63
(1994) Telecommunications Cables
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70
(2002) National Electrical Code
RURAL ELECTRIFICATION ADMINISTRATION (REA)
REA 345-165
(1989) Digital Stored Program Controlled Central Office Equipment (Form 522)
REA TECM 823
(1980) Electrical Protection by Use of Gas Tube Arrestors
UNDERWRITERS LABORATORIES INC. (UL)
UL 444
(1994; R 1995, Bul. 1995 and 1996) Communications Cables
UL 467
(1993; Bul. 1994 and 1996, R 1996) Grounding and Bonding Equipment
UL 497
(1995) Safety Protector for Paired Conductor Communication Circuit
UL 514C
(1988; R 1989, Bul. 1993 and 1994) Nonmetallic Outlet Boxes, Flush-Device
Boxes and Covers
UL 910
(1995; R 1995, Bul. 1995 and 1996) Flame-Propagation and Smoke-Density
Values for Electrical and Optical-Fiber Cables Used in Spaces Transporting
Environmental Air
UL 969
(1995) Marking and Labeling Systems
June 21, 2010
98
UL 1286
(1993) Office Furnishings
UL 1581
(1991; Bul. 1993, 1994, 1995, and 1996, R 1996) Electrical Wires, Cables, and
Flexible Cords
UL 1666
(1991; Bul. 1995 and 1996) Flame Propagation Height of Electrical and OpticalFiber Cables Installed in Vertical Shafts
UL 1863
(1995) Communication Circuit Accessories
1.2
DEFINITIONS
1.2.1
Main Distribution Frame (MDF)
A. A physical concentration or central location for terminating backbone cables to interconnect
with local exchange carrier (LEC) equipment at the activity minimum point of presence. The
MDF generally includes vendor specific components to support voice and data circuits, building
surge protector assemblies, main cross connect blocks, equipment support frames, and plywood
backboard equipment. Depending upon local site conditions, the MDF and IDF may be
identical.
1.2.2
Intermediate Distribution Frame (IDF)
A. An intermediate termination point for horizontal wiring and cross connections normally within
another structure separate from the MDF.
1.3
SYSTEM DESCRIPTION
A. The structured telecommunications cable and pathway distribution and wiring system shall include
permanently installed backbone and horizontal cabling, horizontal and backbone pathways, workstation
pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for terminating, and
interconnecting.
B. The horizontal system includes the cabling and pathway between the IDF and the work area
telecommunications outlet.
C. The backbone cabling and pathway system includes the interconnecting cabling, pathway, and terminal
hardware to provide connectivity between the MDF's and IDF's.
D. The backbone system shall be wired in a star topology with the MDF at the center or hub of the star.
E. Hardware and terminating equipment shall consist of UL approved, Cat 6/6a patch panels, jacks, and
fiber optic terminating equipment.
F. Backbone cable shall consist of Multimode fiber optic cable (OFN) 50/125µm will be used for all
multimode backbone cable. (2.3.1).
G. Inter-building backbone pathways will consist of 2” conduits, except where noted per the drawings.
H. Horizontal pathways will consist of 1.25” conduits, existing conduit, cable trays and raceways, Wire
mold 5500 raceway or combination of both, as per the drawings. Wire basket cable trays are preferred.
I.
Structured Telecommunications Cabling and Pathways Systems shall be installed in a “neat and
workmanlike manner” as specified or recommended by ANSI/NECA/BICSI 568-2001 and National
Electrical Code, Sections 110-12 and 800-6.
June 21, 2010
99
1.4
SUBMITTALS
A. If there is an installed base in an existing building other than PANDUIT brand connectivity, the
Contractor is to submit the following information to the Horry County Schools Building Technology
Coordinator for approval prior to purchasing and installation:
1.4.1
Manufacturer's Catalog Data
A. Telecommunications cabling, specifications make and model (backbone and horizontal)
1.
2.
3.
4.
5.
6.
7.
8.
9.
Fiber optic type SC connectors
Telecommunications outlet/connector assemblies RJ45 jack
Equipment support rack
Patch Panels (Copper and Fiber optic)
Power Strips
Cable Hangers
Fire stop material
External mounted raceway
Cable tray (Wired baskets type is preferred)
B. All Telecommunications equipment is subject to Horry County Schools’ approval.
1.4.2
Drawings
A. Telecommunications Drawings
B. Distribution Frame Elevations
1.4.2.1
Telecommunications Drawings
A. Show the layout of cabling and pathway runs, MDF, IDF, and ground system.
B. Drawings shall depict final telecommunications cabling configuration, including
location, gauge, pair assignment, and patch panels after telecommunications cable
installation.
C. Provide one set of plastic laminated diagrams of the overall telecommunications
cable system showing cabling, IDF's, MDF's, and equipment rooms keyed to floor
plans by room number attached to the rack in the MDF. Provide rack drawings
showing the cabling equipment layout in each rack. (See diagram B for example) In
IDFs, supply a rack drawing layout of the IDF and the IDF area as-builts which are
laminated and attached to the rack.
D. Provide two (2) electronic copies of as-builts to HCS. AutoCAD drawing with
mark-up of data placement and labeling or approved equivalent. Drawings shall be
provided within one week of project completion and prior to final payment for
project.
1.4.2.2
Distribution Frames
A. Provide shop drawing showing layout of applicable equipment including incoming
IDF racks, patch panels, and LAN equipment.
June 21, 2010
100
1.4.3
Statements
A. Installer qualifications
B. Testing plan and Documentation Samples
C. Professional References
D. Labeling Scheme Samples (refer to Section 6.1)
1.4.3.1
Installer Qualifications
1. Provide information on company background including number of years in
business, size of firm, and experience.
2.
Provide the location of your company’s main office. Provide the name, location, and
experience/background of representative(s) who will be providing service and
assistance to the district staff in developing, installing, and maintaining the system.
3.
Provide the name, location, and experience/background of the primary trainer(s) who
will be providing training to district and school staff in learning to use the
components of the system.
4.
Provide, as reference, the names of at least three organizations, preferably K-12
school districts that are currently using the company’s product.
5.
Provide name, location, and experience/background of supervisor of installation
personnel on project site.
6.
Provide a copy of the Vendor’s current Panduit PCI Certified Installer certification
documenting approval/training as an installer of the specified products for new
schools and select renovation projects.
7.
The Vendor shall be required to establish, to the satisfaction of the Owner, the
reliability and responsibility of the persons or entities proposed to furnish and
perform the Work described in the Proposal Document.
8.
The Vendor shall demonstrate the Vendor’s experience by providing a list of three
(3) successful installations of similar size and scope as the Work described in these
documents. Vendor shall also provide documentation showing a minimum of five
(5) years experience in Structural Low Voltage wiring, and any certifications
documenting that the Vendor is an approved, trained installer of the equipment.
9.
Vendor shall employ, full-time, an RCDD/NTS/LAN Specialist or RCDD.
Subcontracting this individual for District projects is unacceptable. Provide copy of
current RCDD registration certificate with bid response.
10. Vendor shall employ a competent Project Manager with five (5) years minimum
experience in networked multimedia systems that shall be in attendance at the
Project premises during performance of the Work. The Project Manager must attend
all meetings pertaining to the Project. The Project Manager will attend weekly
meetings with the Owner to provide project status and updates. The Project Manager
shall not be changed except with written consent of the Owner.
11. The Vendor will have a SPIN (Service Provider Identification Number) and FCC
Number and will be knowledgeable about E-Rate and eligibility of services and
June 21, 2010
101
products/equipment. The awarded bidder will not depend on the District to provide
guidance about E-Rate, but rather will be a resource for the District in regard to ERate. Proposals and invoices will be broken down by eligible and ineligible items.
12. The Vendor must be specialized in performing the work of this section and approved
by the manufacturer.
13. The Vendor must be able to service and install all aspects of this network with
internal personnel. Any applicants that do not employ personnel that can service and
install all data, voice, audio, and video components may be disqualified.
14. The Vendor must maintain a service department located within fifty (50) miles of the
District Office and stock sufficient replacement parts and equipment to provide the
specified warranty service.
15. The Vendor must be an authorized distributor of the equipment supplied.
16. The Vendor must demonstrate proof of after-hours service arrangements and provide
the telephone number being used for such service. Contractor shall provide warranty
service during normal business hours, but shall also demonstrate full capability of
providing 24-hour local service for emergency calls after hours. After hours
emergency service shall be charged at the Contractor’s standard published service
rate.
17. This system is to be installed only by contractors and/or personnel authorized to do
so by the manufacturer of the equipment being provided. The Vendor must have a
minimum of five (5) years experience in Structural Low Voltage Wiring. Upon
request, the Owner, or the Owner’s agent, may request the contractor supply project
references which substantiate the above experience. All system equipment
installations and tests are to be made by workers skilled in the specific trade and task
assigned to them.
18. The Vendor’s RCDD/NTS/LAN Specialist or RCDD will be responsible for
reviewing architectural drawings for accuracy and reporting to District IT
department.
19. Vendor will have a representative on-site to assist in troubleshooting wiring
problems for the first three (3) days of “turning up” of system.
1.4.3.2
Test Plan
A. Provide a complete and detailed test plan for the telecommunications cabling system
including a complete list of test equipment for the UTP and OFN components and
accessories. Include procedures for certification, validation, and testing.
B. Furnish documentation samples for the testing results.
1.4.3.3
Professional References
A. Provide a list of at least five professional references for similar projects. Include
company names, contacts, phone numbers, and a description of project.
1.4.3.4
Factory Test Reports
A. Factory reel tests
1.
June 21, 2010
Furnish factory reel tests for fiber optic cables.
102
1.4.3.5
Field Test Reports
A. Telecommunications cabling testing
1.4.3.6
Operation and Maintenance Manuals
A. Telecommunications cabling and pathway system
1.4.3.7
Schedules
A. Construction Schedules are required for each project and should be coordinated with
the General Contractor and Architect. A weekly report shall be furnished in writing
to the District detailing project schedule to include start date, project completion
date, and a summary of completed work detailing project milestones. This report
shall be furnished to Facilities and Technology contacts defined after project award
date and prior to project start date.
1.5
DELIVERY AND STORAGE
A. Provide protection from weather, moisture, dirt, dust, and other contaminants for telecommunications
cabling and pathway equipment placed in storage.
PART 2 – PRODUCTS
2.1
COMPONENTS
A. UL or third party certified. Provide a complete system of telecommunications cabling and pathway
components using star topology and support structures, pathways, and spaces complete with conduits,
pull wires, raceways, pull boxes, outlets, cables, and ground boxes, as per the drawings. Fixed cables
and pathway systems for telecommunications systems shall be UL listed or third party independent
testing laboratory certified, and shall comply with NFPA 70. Horizontal cable and termination
equipment shall be of a manufacturer, installed and certified so as to provide a 15-year warranty.
B. For installations in ‘new’ buildings and for select renovation/addition projects, the District has
standardized on PANDUIT brand connectivity hardware and wire management products. Part numbers
for District approved products are defined in this document. NO DEVIATION FROM PANDUIT
PRODUCTS OR FROM THE SUPPLIED PART NUMBERS WILL BE TOLERATED WITHOUT
WRITTEN CONSENT FROM THE DISTRICT. A list of approved products is included in Section 2.11 of
this document.
2.2
PATHWAYS (BACKBONE AND HORIZONTAL)
A. TIA/EIA-569-A. Pathway shall be basket-style cable tray, conduit and raceway installations. Provide
grounding and bonding as required by TIA/EIA-607-A.
B. Pathways shall be installed in accordance with NEC Article 314 and Article 800.51 (J), (K), or (L), as
applicable, and installed in accordance with Articles 362.24 through 362.56, where the requirements
applicable to electrical nonmetallic tubing apply.
June 21, 2010
103
2.3
TELECOMMUNICATIONS CABLING
A. Cabling shall be UL listed for the application and shall comply with EIA TSB-67, TIA/EIA-568-B.1,
B.2, and NFPA 70. Cabling shall consist of Cat 6 or Cat6a UTP (TBD project-by-project by the District)
and OFNP/FT6. Plenum cables shall comply with UL 910. Provide a labeling system for as stated in
Supplemental 1 at the end of this document. Cabling manufactured more than 12 months prior to date of
installation shall not be used. OFN shall comply with UL 1581 vertical tray flame test. OFNP may be
substituted for OFNR. OFNG and OFN may be substituted for OFNP and OFNR.
B. Provide and install plenum-rated Cat 6/6a and optical fiber cabling manufactured by companies that are
included in the PANDUIT extended warranty program.
2.3.1
Backbone Cabling
A. Data backbone cabling shall be indoor/outdoor rated, tight-buffered 12 strand 50/125
multimode fiber optic cable placed in innerduct within the cable tray or armored
cable may be used in the cable tray. Terminate with SC connectors.
B. 1 – Cat 6/6a cable shall be installed and terminated, RJ45, between the Demark and
the MDF in places where the Demark and the MDF are NOT co-located.
C. ETV cabling backbones shall be RG-11. In addition to cabling from the MDF to all
IDFs, backbones shall be installed from the MDF to the ITFS Tower and to the
Satellite Dish. Three (3) RG-11 cables shall be installed to the ITFS tower. Two (2)
RG-11 cables shall be installed to the Satellite Dish. Leave a 10’ service loop at both
ends of each cable. Terminate with RG-11 connectors.
D. Paging applications shall use 12-conductor 18 gauge non-shielded twisted pair
backbone cable. Terminate on Krone blocks in the IDF and MDF.
E. A minimum of one 25-pair, Category 3 or Category 5e, 14 gauge, copper backbone
cable shall be installed from the MDF to each IDF unless otherwise specified by the
District. The pair count to support voice / IR / Video applications may vary based on
the converged system selected. Provide 20% additional pairs for future growth
beyond immediate project requirements. Terminate cable(s) on patchpanels in ‘new’
installations and in ‘new’ additions to existing facilities. In existing MDF or IDF,
terminate cable on wall-mounted blocks matching existing system (66 or 110 type)
in use.
2.3.2
Horizontal Cabling
A. Comply with NFPA 70, NEMA WC 63, ANSI/ICEA S-80-576 and performance characteristics
in TIA/EIA-568-B.1 and B.2 UTP, four-pair 100 ohm.
B. Ultimate breaking strength shall be minimum 90 pounds.
C. Four pair cable shall withstand a bend radius of one-inch minimum at a temperature of minus
20° C maximum without jacket or insulation cracking.
D. Conductors shall be color coded and polarized in accordance with TIA/EIA-568-B.1 and B.2.
June 21, 2010
104
E. Enhanced performance Cat 6a UTP plenum cable for local area networks shall meet or exceed
TIA/EIA-568-B.1 and B.2 standards.
F. Conductor shall be 24 awg solid annealed copper unless otherwise specified.
G. Primary insulation shall be FEP fluoropolymer resin for each pair.
H. Cable shall be plenum rated and shall comply with NFPA 70, UL 444, and UL 910.
2.3.2.1
Fiber Optic Cabling
A. 12 – strands of multimode amour fiber optic cable (50/125µm) shall be pulled from the MDF to
each IDFs and terminated with SC connectors on both ends. Cables shall be placed in a
proper SC bulkhead.
B.
All fiber optic cable shall be properly labeled and tested bi-directionally at 850 nm and 1300
nm.
2.3.2.2 Fiber Optic Patch Cables.
A. Fiber Optic Patch Cables shall be multimode patch cords pre-made to connect fiber optic
equipment with fiber optic cross connects, interconnects, and outlets.
B. The patch cords (jumpers) shall be impact-resistant multi fiber cables, SC connectors, of the
same performance characteristics as the multimode fiber backbone being connected
(50/125µm).
C. These fiber optic patch panel connections shall provide 0.4 dB or less insertion loss and provide
connection between the Active LAN devices and the Fiber Optic patch panel. Quantities for
100% population plus 10% Spares.
2.4
DISTRIBUTION FRAMES
A. Provide 19” x 7’ equipment racks in each MDF and IDF. See Section 5.2.
2.4.1
Copper Patch Panels
A
UTP patch panels shall be rack mounted, rated to exceed EIA/TIA Cat 6/6a modular (8 position)
patch panels each wired to terminate modular jacks per the EIA/TIA T568A standard.
B. Quantities of jacks are based on the number of UTP cables originating at wall outlets and
terminating at the patch panel.
C. All patch panels shall be grounded.
D. 10% growth on Patch Panels shall be provided.
2.4.2
Fiber Optic Patch Panel
A. Provide panel for maintenance and cross connecting of fiber optic cables.
B. Panel shall be constructed of 0.125-inch minimum aluminum and shall have connectors which
interface the inside plant fiber optic jumper cable with the outside plant fiber optic cable.
C. Panels shall be equipped with engraved laminated plastic nameplates above each connector.
June 21, 2010
105
D. Rack-mounted fiber patch panels shall be equipped to terminate or splice the incoming interbuilding fiber and any required backbone or interconnect cables.
E. Each cable must be properly dressed.
F. These units will terminate the fiber optic cables, provide a place for jumper cables, and will
provide room to terminate additional optics.
G. All connectors will be type SC.
H. The fiber optic patch panel connections shall provide 0.4 dB or less insertion loss.
I.
2.5
All patch panels shall be grounded.
TELECOMMUNICATIONS OUTLET/CONNECTOR ASSEMBLIES
A. Jacks shall comply with FCC Part 68.5, and TIA/EIA-568-B.1 and B.2.
B. Jacks shall accommodate UTP or OFN and work in concert with Wire mold 5500 raceway.
C. UTP jacks shall be RJ45 designation T568A type, UL 1863 listed, eight-position constructed of high
impact rated thermoplastic housing rated for Cat 6a service.
D. UTP jacks for data shall be Cat 6a hardware and shall comply with the attenuation requirements
contained in TIA/EIA-568-B.1 and B.2.
E. Telecommunications cover plates shall comply with UL 514C and TIA/EIA-568-B.1 and B.2; flush
design constructed of high impact metal material.
F. Stenciled lettering for voice and data circuits shall be provided using thermal ink transfer process.
2.6
RACEWAY (EXPOSED)
A. Conceal cable pathways within walls whenever possible.
B. Raceway shall be ivory in color or a color approved by HCS personnel.
C. Notching or modifications of raceway will not be permitted.
D. All Raceway and conduit will be provided by the electrical contractor.
2.7
BACKBOARDS
A. Provide fire rated plywood 3/4 inch thick 4’ x 8’ lining at least 2 adjoining walls in the MDF and each
IDF for mounting of PA, Video, Security, and other termination equipment. This will be the
responsibility of the General Contractor.
B. Plywood backboards shall be painted with a light color, nonconductive fire-resistant overcoat. Do not
paint over the fire retardant marking/stamp of the plywood.
2.8
GROUNDING AND BONDING PRODUCTS
June 21, 2010
106
A. Comply with UL 467, TIA/EIA-607-A, and NFPA 70. Components shall be identified as required by
TIA/EIA-606-A.
2.9
FIRE STOPPING MATERIAL
A. Contractor shall provide all necessary fire stopping of openings through which cable is installed under
this specification, in accordance with NFPA 70 and all local codes. This includes installation in conduits,
raceways, or bare penetrations. Provide and install UL 1479 approved (Fire Barrier Caulk) fire stop
material.
2.10 TV Mounting Brackets (If Required)
A. TV mounting and brackets shall be determined by the type of flat panel TV purchased. General
Contractor shall be responsible for mounting, purchasing and installing TVs. Contact Horry County
Schools for the type and model of TVs being purchased for approval.
June 21, 2010
107
2.11 District Approved Products
Description
Manufacturer
Part Number
Horizontal plenum-rated UTP Cable
Panduit Warranty Partner
Panduit Warranty
Partner
50/125 µm Optical fiber Backbone Cable
Panduit Warranty Partner
Panduit Warranty
Partner
BLUE Jack for Data – Category 6a
PANDUIT
CJ6X88TGBU
BLUE Jack for Data – Category 6
PANDUIT
CJ688TGBU
BLUE Jack for Data – Category 5e
RETROFITS / RENOVATIONS ONLY
PANDUIT
CJ5E88TGBU
RED Jack for Voice & Wireless – Category 6a
PANDUIT
CJ6X88TGRD
RED Jack for Voice & Wireless – Category 6
PANDUIT
CJ688TGRD
RED Jack for Voice & Wireless – Category 5e
RETROFITS / RENOVATIONS ONLY
PANDUIT
CJ5E88TGRD
YELLOW Jack for Video / IR – Category 6a
PANDUIT
CJ6X88TGYL
YELLOW Jack for Video / IR – Category 6
PANDUIT
CJ688TGYL
YELLOW Jack for Video / IR – Category 5e
RETROFITS / RENOVATIONS ONLY
PANDUIT
CJ5E88TGYL
Hanging Wallphone Kit – Category 6
PANDUIT
KWP6PY
PANDUIT
2 Port : CFPL2SY
4 Port : CFPL4SY
6 Port : CFPL6SY
Stainless Steel Faceplate
Single Gang
Equipped with label windows & lens covers
June 21, 2010
108
Vertical Cable Manager 80.4”H x 6.7” W x 13.8” D
PANDUIT
WMPVHC45E
Horizontal Cable Manager 3.5”H x 19” W x 9.8” D
PANDUIT
NCMH2
48 Port Patch Panel – Category 6a
PANDUIT
DP486X88TGY
48 Port Patch Panel – Category 6
PANDUIT
DP48688TGY
48 Port Patch Panel – Category 5e
RETROFITS / RENOVATIONS ONLY
PANDUIT
DP485E88TGY
24 Port Patch Panel – Category 6a
PANDUIT
DP246X88TGY
24 Port Patch Panel – Category 6
PANDUIT
DP24688TGY
24 Port Patch Panel – Category 5e
RETROFITS / RENOVATIONS ONLY
PANDUIT
DP245E88TGY
Siecor UV or 3M Hotmelt
Siecor UV or 3M
Hotmelt
RTC18B (18 port)
RTC36B (36 port)
RTC72B (72 port)
SC Connectors
Rack Mount Fiber Cabinets – Black, regular density
SMP
Fiber Optic Adapter Plate – 6 Port Multimode
SC
SMP
616MMSC
Fiber Optic Adapter Plate – Blank
SMP
600
Copper Patch Cords – Category 5e, 6, 6a
Provided by District
Provided by District
Optical Fiber Patch Cords
Provided by District
Provided by District
June 21, 2010
109
PART 3 – EXECUTION
3.1
INSTALLATION
A. Telecommunications cabling and pathway systems, including the horizontal and backbone cable, pathway
systems, telecommunications outlet/connector assemblies, and associated hardware shall be installed in
accordance with TIA/EIA-568-B.1, B.2, B.3, TIA/EIA-569-A, NFPA 70, and UL standards as applicable.
B. Cabling shall be connected in a star topology network.
C. Contractor shall provide all necessary tools and materials not specified (tie wraps, “D” rings, screws,
consumables, hardware, etc.) and equipment (ladders, hydraulic lifts, storage containers, etc.) necessary to
provide a complete and operating system.
D. Installation methodologies shall adhere to manufacturer installation procedures so as to not violate
certifications (i.e. UL).
E. All work shall be performed in a good workmanship-like manner leaving each location in the same or better
condition as at the start of each project. Daily housekeeping of cabling site is required.
F. The designated District representative shall be provided weekly written progress reports.
G. Periodic on-site inspections will be done during the course of installation.
H. The District reserves the right of “local jurisdiction” for final approval.
I. All cabling shall be routed from the bottom of the connecting blocks, dressed, and secured in a professional
manner.
J. Spools/mushrooms shall be installed for efficient routing of cross-connect wires. Cross-connect wires shall
be routed in acceptable telecommunications industry practices and shall be routed above the punch down
blocks.
K. Cat 6/6a cables (Video, Voice, Data) shall have all 4 pair punched down. Termination will be on patch panels
in MDFs or IDFs. In existing communication closets, termination will be blocks or similar to existing
termination in existing closet.
L. Size and quantity of feeder cables plus quantities of Cat 6/6aa voice and IR cables installed determine the
number of termination blocks required. Termination will be on patch panels in new MDFs or IDFs. In
existing communication closets, termination will be blocks or similar to existing termination in existing
closet.
M. All 66-type and Krone punch down blocks plus coax cables at the MDF/IDF shall be uniquely labeled and
identified. Cat 6/6a, PA, and RG11 feeder cables shall be uniquely labeled and identified. Cat 6/6a UTP
cables for voice and IRs shall be uniquely labeled and identified as per Supplemental 1 at the end of this
document. Termination will be on patch panels in new MDFs or IDFs. In existing communication closets,
termination will be blocks or similar to existing termination in existing closet.
N. Cat 6/6a cables for telephones (If IP based phone system will be installed, check with HCS Technology
before installing.), video rebroadcast, and IR control will be required to each IDF and to the telephone
demarcation point.
O. All cabling, IR, Voice, Data and CATV shall be installed in separated areas on backboard or data rack as
determined by HCS or its consultants. Installation of such cabling shall be in sequential order as related to an
appropriate numbering scheme and clearly marked. All racks shall have 3 foot of open/unused rack space
available from base of rack. Data shall be placed on one rack. An empty rack shall be place next to the data
rack. Phone and WAPs shall be placed onto one rack. Video, video rebroadcast and IR shall be place onto
June 21, 2010
110
one rack. Combining racks maybe permitted, ONLY if pre-approved by HCS-Technology. (i.e., All drops in
Room XXX shall occupy sequential ports on patch panels.)
P.
Speaker wiring shall be terminated on backboard on Krone. 18 gauge stranded pair shall be used for all
speakers wiring.
Q. “Loop wiring” IS NOT acceptable with any cabling.
R. No data connection shall be greater that 250 ft. from a MDF/IDF.
S. All faceplates shall be metal and shall have windows and lenses to accommodate labels.
T. Data Jacks (RJ45) shall be BLUE in color.
U. Phone/IP Phone & Wireless Jacks (RJ45) shall be RED in color.
V. Video Jacks (RJ45) shall be yellow in color. This includes TV, IR, Video, Cameras.
W. Installation of speaker cabling, termination of closet end of cables, and labeling of both ends of cables shall
be performed by the Cabling Contractor. Installation of speakers shall be the responsibility of other District
Vendor. Purchase of speaker will be by other District Contractor. General Contractor will be responsible for
coordinating and procuring speaker installation with District Vendor.
X. Installation of camera cabling, termination in surface mounted box with Yellow Jacks in ceiling and
termination on patch panels in closets by the Cabling Contractor. Installation of cameras and camera mounts
by Other District Vendor. Connection to Network and alignment/adjustment of cameras to be performed by
Other District Vendor.
Y. Installation of Data Cable, terminations & labeling on both ends will be done by the cabling contractor.
Z. All projector cabling by Other District Vendor.
3.1.1 Cabling
A. Install Cat 6/6a UTP and OFN telecommunications cabling and pathway system in accordance
with TIA/EIA-568-B.1, B.2, 569-A and the drawings.
B. Cabling installation shall comply with EIA TSB40-A and EIA TSB-36.
C. Screw terminals shall not be used except where specifically indicated on plans.
D. Do not untwist Cat 6/6a UTP cables more than 1/4 inch from the point of termination to
maintain cable geometry.
E. Do not exceed manufacturers' cable pull tensions for copper and fiber optic cables. Provide a
device to monitor cable pull tensions. Do not exceed 25 pounds pull tension for four pair
copper cables.
F. Do not chafe or damage outer jacket materials.
G. Use only lubricants approved by cable manufacturer.
H. Do not over cinch cables or crush cables with staples.
June 21, 2010
I.
For UTP cable bend, radii shall not be less than four times the cable diameter.
I.
Plenum cable shall be used.
111
3.1.1.1
Open Cable
A. Use only where specifically indicated on plans or determined during site surveys.
B. When not run in surface mounted raceway or conduit, utilize Cable Trays above
suspended ceilings and in all ceiling spaces. Cable Trays is the preferred method.
C. Comply with TIA/EIA-568-B.1 and B.2.
D. Install cabling above suspended ceilings 6 to 12 inches above ceiling in cable trays
and securely attach to structural ceiling.
E. Do not exceed cable pull tensions recommended by the manufacturer.
3.1.1.2
1.
Plenum cable shall be used in all appropriate areas. Plenum cables shall comply
with flammability plenum requirements of NFPA 70 and shall comply with UL
910.
2.
Avoid routing copper cable in areas where there may be high levels of
electromagnetic interference (EMI). EMI is caused by AC power lines,
broadcast signals, X-ray equipment, motors, generators, and fluorescent lights.
UTP cables shall be routed at least 5 inches away from fluorescent lighting
fixtures.
3.
Cables shall be placed in the support device, Cable Tray, and wrapped using
Velcro ties or other ties as approved by HCS.
4.
Cabling shall be organized and identified so as to facilitate locating and handling
individual sheaths for maintenance functions.
5.
Each bundle shall be neatly tied without over cinching or stressing cable.
6.
Bundles shall be clearly marked identifying the IDF and room to which routed,
the station numbers served by the bundle, and any other information that may
assist in administration.
7.
Great care shall be taken to protect all cabling from physical damage.
8.
A minimum 5’ or a maximum 10’ service loop shall be installed on each cable
installation where possible. Installation shall be above the ceiling on J-Hooks in
3 foot diameter loop.
Backbone Cable
A. Fiber Optic Backbone Cable. Install backbone OFN in pathways.
B. Do not exceed manufacturer's recommended bending radii and pull tension.
C. Prepare cable for pulling by cutting outer jacket 10 inches leaving strength members
exposed for approximately 10 inches. Twist strength members together and attach to
pulling eye.
D. Terminate individual strands into fiber optic type SC connectors.
E. All fiber shall be placed in innerduct or be armored jacket construction.
June 21, 2010
112
3.1.1.3
Horizontal Cabling
A. Install horizontal cabling and pathway as shown on drawings or as determined at site
survey between IDF and telecommunications outlet assemblies at workstations, in
accordance with TIA/EIA-568-B.1, B.2, and 569-A.
3.1.1.4
Feeder Cables
A. TV Cabling (where TV are installed)
Two Cat 6/6a cables terminated with RJ45 connector from each TV location to the
MDF/IDF. One Cat 6/6a will be for TV signal and one for IR. These two Cat 6/6a
cables may be in place into a single box. RG11 cable will be run from each IDF to
the MDF where needed.
B. Feeder Cable
1 - RG11 for TV
1 - 12 conductor 18 gauge (non-shielded) stranded wire for paging
1 - 12 strand 50 µm multimode optical fiber.
Provide enough 24 gauge copper feeder (25 pr, 50 pr, 100 pr, etc.) to provide feeder
pairs to all required telephones (if not IP phones), speakers, paging, IR, and TV
controls (if required). A minimum of one 25 pair to each closet shall be installed.
These counts may vary based on the converged system selected. Also there will be
20% additional feeder cable for future growth.
Termination will be on patch panels in new MDFs or IDFs and on matching wallmounted blocks for retrofits/renovations. Coordinate this with HCS-Technology.
3.1.1.5
ETV Cabling
One 3 inch conduit shall be provided from the ITFS tower location to the MDF. Three RG11
cables shall be pulled in this conduit. Leave a service loop of 10 ft at each end.
One 3 inch conduit shall be provided from the Satellite Dish location to the MDF. Two RG11
cables shall be pulled in this conduit. Leave a service loop of 10 ft at each end.
3.1.2
Work Area Outlets
A. Terminate UTP cable in accordance with TIA/EIA-568-B.1, B.2, and wiring configuration
T568A.
3.2
TESTING
3.2.1
Cabling Testing
A. Perform cabling inspection, verification, and performance on all cabling.
B. All testing personnel shall be trained on testing equipment tools to assure that complete and
accurate testing results are obtained/provided.
June 21, 2010
113
3.2.1.1
Inspection
A. Visually inspect cabling jacket materials for UL or third party certification markings.
B. Visually inspect UTP and OFN jacket materials for UL or third party certification
markings.
C. Inspect cabling terminations in telecommunications rooms and at workstations to
confirm color code for tip and ring pin assignments, and inspect cabling connections
to confirm compliance with TIA/EIA-568-B.1 and B.2.
D. Visually confirm Cat 6/6a marking of outlets, cover plates, jacks, and patch panels.
3.2.1.2
Verification Tests
A. Perform copper cabling certification testing to appropriate ANSI/TIA/EIA Standard
for category rating of system installed (5e / 6 / 6a).
B. Perform optical fiber backbone end-to-end attenuation tests using a power meter and
source. Perform tests bi-directionally and at both 850nm & 1300 nm wavelengths.
3.2.1.3
Performance Tests
A. Cat 6/6a Links. Perform UTP Permanent Link tests in accordance with TIA/EIA568 B.2-1 and manufacturer’s guidelines.
B. Tests shall include wire map, length, attenuation, NEXT, FEXT, and propagation
delay.
C. OFN Links. Perform OFN end-to-end attenuation tests and reel tests at job site.
D. RG6 (Coax), RG11 (Coax Backbone) and speaker cabling will be tested for
continuity.
3.2.1.4
Final Verification Tests
A. Perform verification tests for UTP and OFN systems after the complete
telecommunications cabling and workstation jacks are installed.
B. Provide District representative with written final tests verification within 1 week of
completion of installation.
C. Final test results shall include summary pages for each IDF/MDF as required.
D. Test results shall be provided in both hard and soft copy. Acceptable format shall be
Access database, Excel spreadsheet, or CSV.
(Section 4.0 - Pathway Installations will be provided by separate vendor)
PART 4 – PATHWAY INSTALLATIONS
A. Comply with TIA/EIA-569-A, NEC, and CEC.
June 21, 2010
114
B. Shall be installed in accordance with NEC Article 314 and Article 800.51 (J), (K), or (L), as applicable, and
installed in accordance with Articles 362.24 through 362.56, where the requirements applicable to electrical
nonmetallic tubing apply.
C. Conceal interior conduit within finished walls, ceilings, and floors ( conduit in floors or under slab will need
approval from HCS Personnel) where possible.
D. Keep conduit minimum 6 inches away from parallel runs of electrical power equipment, flues, steam, and hot
water pipes.
E. Install conduit parallel with or at right angles to ceilings, walls, and structural members where located above
accessible ceilings and where conduit is visible after completion of project.
F. No communication conduits are to be installed in crawl spaces or under floor slabs. All data cabling is to be
done above ceiling unless written permission is given by Horry County Schools.
G. Install no more than two 90-degree bends for a single horizontal cable run. If run requires more than two 90
degree bends, then a 4 inch x 4 inch “pull box” must be installed.
H. Run raceway as determined by site survey.
I.
Provide Pull boxes with “Sealtight” flex conduit only where flexible connections are required. HCS approval
required prior to all “Sealtight” flex conduit installations.
J.
Provide all coring, patching, and painting as needed for Intra-Building and Inter-Building pathways. Caulking
is not an acceptable patching method for conduit penetrations into exterior walls. Coordinate with HCS for
acceptable patching methods.
4.1
Ground Boxes and Pull Boxes
A. Ground boxes shall be made of concrete and the minimum size shall be 35½” x 17½” x 12”.
B. Ground box covers shall be rated for traffic (type T.05) and shall be marked communications.
C. Metal covers shall be used in all locations subject to vehicle traffic.
D. Gravel shall be installed below all ground boxes for drainage.
E. Ground boxes and pull boxes shall not be placed in areas subject to flooding.
F. Unless otherwise noted, exterior pull boxes shall have minimum dimensions of 20” x 20” x 6”.
1.
Interior pull boxes shall consist of 16 gauge steel minimum, unless otherwise noted on plans.
2.
Indoor enclosures shall conform to NEMA Type 4, unless otherwise noted.
3.
Size pull boxes to not less than minimum Code requirements. Increase size above Code
requirements where necessary to provide space for pulling, racking, or splicing enclosed conductors,
or where specified or indicated dimensions exceed Code requirements.
4.
Exterior metal pull boxes exposed to weather (and not installed in or below grade) shall be equipped
with rain tight or weatherproof-hinged doors.
5.
Exterior pull boxes shall have 16 gauge steel bodies and 14 gauge steel doors.
6.
Exterior pull boxes shall be equipped with external mounting feet.
June 21, 2010
115
7.
Exterior pull boxes shall be equipped with stainless steel door clamps on three sides and a removable
stainless steel continuous hinge pin.
8.
Exterior pull boxes shall be equipped with a hasp and staple for padlocking.
9.
Enclosures installed on vertical exterior walls shall conform to NEMA Type 3R.
10. Enclosures installed on exterior horizontal surfaces such as rooftops or breezeways shall conform to
NEMA Type 4 unless otherwise noted.
11. Rain tight or weatherproof boxes shall use threaded watertight hubs for top or side entry and may
use knockout for bottom entry only.
12. Exterior pull boxes shall conform to these industry standards:
a.
b.
c.
d.
e.
UL 508 Type 4
NEMA/EEMAC Type 3, Type 4, Type 12, Type 13
JIC standard EGP-1-1967
CSA Type 4
IEC 529, IP66
13. Tamper resistant screws shall be used on all exterior, aboveground junction/pull boxes that are
exposed to public/student areas.
14. Exterior pull boxes shall be manufactured by Hoffman or HCS approved equal.
4.2
Communication Duct-Banks and Conduits
4.2.1
Trenches
A. All underground trenches shall be 24” wide by 30” deep.
B. Trenches shall be back-filled at 95% compaction.
C. Contractor shall restore surface to same or better condition.
D. Contractor shall contact appropriate Utilities a minimum of 72 hours prior to excavation to
verify the location of existing underground utilities.
E. Modifications to pathway design may be dictated by field conditions subject to approval by
HCS.
F. Compaction testing notification must be provided to the District 72 hours prior to testing so that
a District inspector may be present.
G. Slurry fill trenches to within three inches (3”) of finished grade whenever crossing paved areas.
“Two Sack” slurry shall be used with an overlay of 10 feet on either side.
4.2.2
Conduit
A. Underground conduit shall consist of Schedule 40 PVC – 2 inch inside diameter or type C
telephone conduit - 2 inch inside diameter (if concrete encased).
1.
June 21, 2010
Inner duct, where specified, corrugated, or splined (inside and outside) flexible orange inner
duct, 1 inch in diameter, riser rated, will be placed for fiber optic cable protection.
116
2.
One (1) inner duct shall be placed in a 2-inch conduit. Inner ducts are to be equipped with
1/8" pull ropes.
3.
Conduit shall have a factory formed bell on one end for interconnecting segments.
4.
Conduit located under heavy use highways or railroad rights-of-ways shall be encased in
steel casing consistent with the AASHTO or AREA specifications. The thickness of the
steel casing shall be engineered for each specific application. This may vary based on
campus codes.
5.
Spacers: High impact spacers shall be used in all multi-duct systems, for both solely owned
or joint telecommunications/power construction. They shall conform with NEMA TC-2,
TC-6, TC-8, and ASTM F 512 dimensions.
6.
All fittings shall be designed specifically for use with the type of conduit placed.
7.
All conduits shall be equipped with seal plugs in all ground boxes and expansion rubber
seal plugs within all buildings.
8.
A horizontal and vertical separation of 1 inch shall, between the ducts, be maintained by
installing high impact spacers with horizontal and vertical locking intervals of ten feet.
B. All communications conduits shall be placed in a uniform manner between ground boxes and
pull boxes. Conduit in position #1 at one ground box or pull box shall maintain its position
within the duct run and terminate in the #1 position at the next box. The position of all conduits
between ground boxes and pull boxes shall be maintained.
C. Long radius bends (over 30 feet) shall be used whenever possible to make changes in direction.
If it is found to be necessary to place a 90-degree bend in the conduit run, a factory-made sweep
of no less than 60-inch radius shall be used.
D. No conduit run shall exceed a total of 180 degrees of bend between any two points (such as
manholes or buildings) considering both vertical and horizontal sweeps.
E. Cold-formed trench bends shall have a radius of not less than 60 inches and shall pass mandrel
integrity. Bend radius criterion is 2" or less 6 times the diameter of the conduit and any conduit
larger than 2" is 10 times the diameter of the conduit.
F. The length and destination of all conduits shall be identified in each ground box, pull box, and
building. Embossed metal or heavy plastic tags strapped to each conduit shall be used.
G. After installation of communications conduits, the contractor shall prove all conduits by pulling
a mandrel with a diameter ¼ inch smaller than the conduit and 6 inches long through each
conduit end-to-end. An inspector designated by the contractor and HCS shall be notified 24
hours before this procedure. Each conduit shall be cleaned with a bristle brush to remove any
debris.
H. Utility marking tape (see 4.2.2.3) shall be buried 12 inches below the surface directly above the
conduit.
June 21, 2010
I.
Where communications and power conduits occupy the same trench, all conduit structures shall
be built with the telecommunications conduits placed above the power conduits and separated
by a minimum of 12” of compact earth or 3” of concrete encasement, unless otherwise called
out on the construction drawings and approved by HCS. If this type of construction is required,
it shall receive the prior approval of the contractor and HCS.
J.
Electrical Contractor will install new ¼” pull rope in all conduits placed.
117
K. All conduit and raceway installations shall be the responsibility of the electrical contractor.
4.2.2.1
Overhead Conduit
A. Where overhead conduit is required between or within buildings, Contractor shall
utilize EMT conduit with an inside diameter of 3”, unless otherwise specified.
B. All fittings shall be compression type connectors and couplers designed specifically
for use with the type of conduit placed.
C. All fittings shall be watertight. Fitting types shall be pre-approved by the designated
District representative.
Unless pre-approved by the designated District
representative, all conduits shall be installed by a qualified electrical contractor who
has at least five years experience in similar installations.
D. Contractor shall install conduit at roof locations utilizing the current District
approved methodology and process. All conduit pathways and locations must be
approved by HCS prior to installation.
E. All roof penetrations must be approved by HCS prior to installation.
F. Electrical Contractor will install new ¼” pull rope in all conduits placed.
G. All conduit and raceway installations shall be the responsibility of the electrical
contractor.
4.2.2.2
Communications Entrance Conduit
A. To prevent shear, all inter-building conduit (either underground or aerial) shall
transition from PVC or metal to Sealtight flex conduit when attaching to a permanent
structure. The contractor and HCS shall determine the placement of all entrance
conduit. All applicable standards shall be adhered to, i.e., HCS, NEC, BICSI, or
G.O. 128.
B. Sealtight flex conduit lengths shall not exceed 24”, unless approved by HCS.
C. Sealtight flex conduit may be used between adjacent bungalows within 24” of one
another using District approved connectors and methods. Use of Sealtight flex
conduit between bungalow locations beyond the 24” distance shall require written
authorization (email) from HCS.
D. Contractor shall install new ¼” pull rope in all conduits placed.
E. All conduit installation shall be the responsibility of the electrical contractor.
4.2.2.3
Duct-bank locating cable (electronically detectable warning tape)
A. Warning tape shall be a minimum of 3" wide, orange in color, and shall have a
nondegradable imprint as follows:
June 21, 2010
1.
“Caution Fiber Optic Cable Buried Below”
2.
The tape shall be electronically detectable.
118
4.2.2.4
Pull Rope
A. Pull rope shall be new ¼" polypropylene over polyester rope with a minimum 1700
lb. Tensile strength.
B. Pull rope shall be new material that is free of knots, kinks, and abrasions and shall be
placed as a single continuous length in every new conduit.
C. All pull rope shall be the responsibility of the conduit installer.
D. Pull rope shall be secured at each end.
PART 5 – COMMUNICATION ROOMS
5.1
MDF
A. Minimum MDF room size shall be 12’ x 10’
B. Two quad 20 amp power outlets shall be provided on a minimum of 3 walls and on a minimum of two
separate circuits and placed on emergency power.
C. One 208v, NEMA L6-30R, outlet shall be provided.
D. Room shall be provided with conditioned air on its own thermostat. Room must maintain a temperature
between 68 F and 72 F.
E. 7’ x 19” open bay equipment racks shall be used and securely mounted to the floor. One rack shall be for
Data and one empty rack shall be place beside data rack. One rack for POE (power over Ethernet)
devices. Separate Patch Panels for the POE devices shall be provided. Current POE devices are Wireless
Access Points and IP phones. . Video can coexist on rack with POE devices with prior approval from
HCS-Technology and where it would be cost effective. Ladder rack shall be used as a transition from
wall to open bay rack. Must have 3 ft of unused/open space measure from the bottom of each rack. (See
Supplemental 1 at end of Document)
F. Panduit wire management shall be used and shall be mounted on each side of rack (8 inch minimum on
sides, front and rear) and in between each patch panel front and rear. (See Section 2.11 and Diagram B
at end of Document)
G. An additional 7’x19” open bay enclosed and lockable equipment shall be installed and securely mounted
to the floor for the mounting of servers.
H. A 2-inch conduit shall be provided from the MDF to the school’s Marquee sign if a marquee sign is
provided in the contract.
I.
16 – Cat6/6a cables shall be provided from the Media Headend (Teknet) to the MDF. Cables shall be
properly terminated, tested and labeled.
J.
Pathway from the MDF to the outside for accepting Public phone, CATV, etc will be provided.
Coordination with District phone/CATV provider may be necessary.
June 21, 2010
119
The Following shall be provided by Electrical contractor…
A. All MDF Racks shall be installed with a Telecommunications Grounding Busbar (TGB) and the TGB
shall be installed in accordance with TIA/EIA-607-A. Grounding source shall be provided by another
contractor. (Electrical Contractor).
B. The TGB shall be grounded to a grounding system as provided by electrical contractor and described
below…
“Building ground is identified as cold water pipe, building structural steel, or ground rod. Gas pipes
and electrical conduits are not acceptable ground attachment points.
Ground conductors are not to exceed 40’. If building ground connection is beyond 40’, contractor is to
install a new ground round at the nearest outside location. Ground rod location shall be approved by
HCS prior to installation.
Provide ohms testing for ground. Ground connections shall not exceed 5 ohms.
Fargo clamp shall be cast from copper, silver-plated, and furnished with copper bolt. Ground rod shall
be manufactured of high strength high carbon steel, with electrolytically bonded jacket of copper on
surface, and meet UL spec. 467 and ANSI C-33.8-1072.
Two quad 20 amp power outlets shall be provided on a minimum of 3 walls and on a minimum of two
separate circuits and placed on emergency power.”
All wiring penetrations, including low voltage wiring, shall be the responsibility of the Electrical
Contractor.
5.1.1 Essential Communication Connections / DEMAC
It will be the responsibility of the architect and/or contractor to assure that essential communication lines
remain operational during construction. This may include communications between MDF and IDFs and
Demarcation from service providers. It will be the responsibility of the architect and/or contractor to do any
line locations necessary. It will also be the responsibility of the architect and/or contractor to coordinate with
appropriate vendors or service providers in securing and relocating these communication lines. Any damaged
lines will be repaired by the contractor or subcontractor at no cost to Horry County Schools.
5.2
IDF Rooms & Racks
A. Minimum IDF room size shall be 8’ x 10’.
B. Room shall be provided with conditioned air on its own thermostat. Room will maintain a temperature
between 68 F and 72 F.
C. 7’ x 19” open bay equipment racks shall be used and securely mounted to the floor. One rack shall be for
Data and non-POE devices and one empty rack shall be place beside the data rack. One rack for POE
(power over Ethernet) devices. Separate Patch Panels for the POE devices shall be provided. Current
POE devices are Wireless Access Points and IP phones. Video can coexist on rack with POE devices
with prior approval from HCS-Technology and where it would be cost effective. Ladder rack shall be
used as a transition from wall to open bay rack. (See Supplemental 1 at end of Document) Allow three
feet of unused/open space as measured from the bottom of each rack.
D. Panduit wire management or an HCS approved equivalent shall be used and shall be mounted on each
side of rack and in between each patch panel front and rear. (See Section 2.11 & Diagram B at end of
Document) Oversized width Panduit 7’ wire vertical management is to be used. Panduit horizontal wire
June 21, 2010
120
management shall be double-sided to accommodate patch cords on the front and horizontal/backbone
cabling on the rear.
E. 12 strands 50/125 µm Multimode Optical Fiber Cabling shall be run between each IDF to the MDF.
Fiber will be terminated with SC connectors.
The Following shall be provided by Electrical Contractor…
“IDF racks shall be installed with a telecommunications grounding busbar (TGB). The TGB shall be
installed in accordance with TIA/EIA-607-A. The TGB shall be grounded to the nearest building ground
with a #6 AWG insulated conductor.
Building ground is identified as cold water pipe, building structural steel, or ground rod. Gas pipes and
electrical conduits are not acceptable ground attachment points.
Ground conductors are not to exceed 40’. If building ground connection is beyond 40’, contractor is to
install a new ground round at the nearest outside location. Ground rod location shall be approved by
HCS prior to installation.
Provide ohms testing for ground. Ground connections shall not exceed 5 ohms.
Fargo clamp shall be cast from copper, silver-plated, and furnished with copper bolt. Ground rod shall
be manufactured of high strength high carbon steel, with electrolytically bonded jacket of copper on
surface, and meet UL spec. 467 and ANSI C-33.8-1072.
One dual - 20 amp power outlet shall be provided on a minimum of 3 walls on a minimum of two
separate circuits and placed on emergency power.”
All wiring penetrations, including low voltage wiring, shall be the responsibility of the Electrical
Contractor.
PART 6 – DATA SYSTEMS LABELING PROCEDURES
A. The labeling shall be in accordance with the TIA/EIA-606-A standards for data.
B. The labeling shall be computer software generated and printed with readable fonts and black ink.
C. The ink and label shall be water and smear-proof for both indoor and outdoor use.
D. Samples of each type of media showing label type, labeling format, font size, and ink shall be submitted for
HCS approval prior to application.
E. Hand written labels are unacceptable.
F. Room numbers will be assigned by the District’s Energy Management Department. The room numbers on the
architectural plans are not to be used. Translation between architectural drawing and formal room numbers will
be done by District’s Energy Management Department.
6.1
Cabling Systems Labeling (See Supplemental 1 at the end of this document.)
A. See Section 2.11 for Approved Products List
June 21, 2010
121
PART 7 – CABLING REQUIREMENTS (See Supplemental 1 at the end of this document)
7.1
Instructional Area (Classrooms)
A. Teacher Area.
a. Two Cat 6/6a cables shall be installed at the teacher location. One Cat 6/6a will be located at 48
inches (red jack) for phone with appropriate metal face plate to accommodate a wall mounted
phone. Location shall be unobstructed by marker boards or any other objects (an 8x11 sheet of
paper, horizontally should fit in this area). One Cat 6/6a cable shall be installed at 18 inches AFF
(blue jack). Cables may be installed in the same conduit. Cables shall be properly terminated and
tested.
B. Student Area.
a. Five Cat 6/6a data jacks shall be provided in the student computer area. Data drops shall be
divided into 2 single gang boxes. One will have 3 data and one will have 2 data. Separate conduit
will be used for each single gang boxes. Install height shall be 18 inches AFF unless approved
change by HCS. Cables shall be properly terminated and tested.
C. LCD Projector Area.
a. Projector wall mount shall be 3 inches left of center line of the Smart Board. Bottom of Wall
mount shall be placed 2 inches above the top of the Smart Board. (See Diagram F)
b.
Wall mount has cut outs for placement of power and data/SVGA cables. Single gang boxes shall
be installed in line with the cutouts. As you face the cutouts, the left side shall be used for power
and the right side shall be used for Data/SVGA cables. Data cable shall have 1.25 inch conduit to
the cable tray. SVGA shall have 1.25 inch conduit to the teacher location. Cabling will be done
by other vendor. (See Diagram F)
D. One 2 conductor 18 gauge (shielded) stranded wire for a ceiling mount speaker.
E.
A Cat 6/6a data jack shall be provided above ceiling as per drawings for future camera installation.
F. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box and
then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than 2
inches.
7.2 Offices
A. Two Cat 6/6a data/voice cables shall be installed in each office area.
B. One 2-conductor 18 gauge stranded wire for a ceiling mount speaker as indicated on the electrical
drawing.
C. Principal Office shall also have a Cat 6/6a cable, located as per drawings, installed for Emergency
Phone.
7.3
Multipurpose Room
A. One Cat 6/6a cable housed in a recessed box and terminated on an RJ45 wall jack for an IP Telephone as
indicated on the electrical drawings. The height of this outlet will be at 48 inches.
B. Two Cat 6/6a data cables. The exact location will be determined from the electrical drawings and
through discussions with the Horry County School District’s Technology department. The height of this
outlet will be at 18 inches. Termination shall be at the nearest MDF/IDF.
C. ( IF REQUIRED) Two Cat 6/6a video cable and electrical power shall be installed for each location as
per drawings for accommodating flat screen TV. Height shall be at 66 inches. Contact HCS-Technology
for space requirements for flat panel TV.
June 21, 2010
122
D. One 2-conductor 18 gauge stranded cable will be run to each speaker.
E. An auxiliary sound system will be required as indicated on the electrical drawings.
F. General Contractor shall be responsible for the installation of any and all auxiliary sound systems with
HCS approval..
G. One Cat 6/6a shall be installed above ceiling for access point as shown on drawings.
H. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box
and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than
2 inches.
7.3.1 Commons Area
A. Cat 6/6a data cables shall be installed at each POS location in the cafeteria. Each POS outlet will receive
two cables: one data run to the Cafeteria Office and terminated on a 110 block, and one data run to the
nearest MDF/IDF. Modify the RJ-45 patch cord in the Cafeteria Office to comply with the POS system.
If POS conduit is under slab, use flooded type underground rated cable.
B. Two Cat 6/6a video cable and electrical power shall be installed for each location as per drawings for
accommodating flat screen TV. Height shall be reflected on the drawings. Contact HCS-Technology for
space requirements for flat panel TV.
C. Cat 6/6a data cables shall be installed for Access Points as determined by HCS Personnel and as defined
on drawings.
D. Camera outlets, Cat 6/6a, will be determined on each project and will be reflected in the drawings for
locations and heights.
7.4
Media Center
A. One Cat 6/6a cable terminated on a RJ45 jack for each IP Phone as indicated on the electrical drawings.
B. A minimum of twelve Cat 6/6a data cables will be required for student use. Four Cat 6/6a data cables
will also be required at all administration jacks indicated on the electrical drawings. The height of these
outlets will be at 18 inches.
C. Two Cat 6/6a Video cable and electrical outlet shall be installed at 66 inches AFF where indicated on
drawings for TV connections.
D. One 2-conductor 18 gauge stranded cable will be run to each speaker.
E. A minimum of two Cat 6/6a cables shall be terminated on RJ45 jack above ceiling and terminated at the
nearest MDF/IDF. One jack per single gang box. ( wireless )
F. Cat 6/6a Data Cables ( camera) shall be installed in Media Center as noted on drawings. The data drops
shall be 10 ft. AFF or above ceiling if ceiling is less than 10 ft. Termination shall be at the nearest
MDF/IDF. One cable per single gang box.
G. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box
and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than
2 inches.
June 21, 2010
123
7.5
High School and Middle School Gymnasiums
A. One Cat 6/6a cable terminated in a recessed box on a RJ45 jack at 48 inches above floor level for wallmounted IP phone. May need to install a separate wall box to mount IP phones, but phone must cover
both boxes. Phone area must also be recessed into the wall.
B. Two Cat 6/6a data cables at 18 inches above floor level at each end of Gymnasium. One for data and one
for video.
C. One 2 conductor 18 gauge stranded cable will be run to each speaker indicated on the prints.
D. One Cat 6/6a cable shall be installed for each wireless access points at a location and height as
determined by HCS-Technology. Minimum of 2 APs drops are required.
E. General Contractor shall be responsible for the installation of any and all auxiliary sound systems.
F. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box
and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than
2 inches.
7.5.1 Auditorium
Projection room.
A. One Cat 6/6a cable terminated on a RJ45 jack for phone. The height of this outlet will be 18
inches above floor level.
B. Two Cat 6/6a data cables at 18 inches above floor level.
In Auditorium
A. One Cat 6/6a Video cable and electrical power shall be installed at each TV locations as noted
on drawings. The height will be 72 inches AFF. Contact HCS-Technology for space and
bracket requirements for flat panel TV.
B. One Cat 6/6a data drop shall be installed on the front and at each end of the stage area.
C. One Cat 6/6a cable is to be installed at a location designated on drawing for each wireless access
point.
D. LCD Projector and sound system shall be provided under the General Contractor contract by a
vendor that specializes in audio/visual systems.
E. General Contractor shall be responsible for the installation of any and all auxiliary sound
systems.
F. All communication drops shall be placed in conduit to the cable tray. If drops are run to a
central box and then a single conduit is ran from this central box to the cable tray, that conduit
shall be no less than 2 inches.
June 21, 2010
124
7.5.2 Computer Labs
A. Each computer lab will have a total of 33 data drops at 18 inches AFF. One wall will have 3
sets of 6 data drops spaced 5 feet intervals. On the opposite wall will be 3 sets of 4 data drops
spaced at 5 feet intervals. First set of Drops will be 10 ft from marker board wall. Two data
drops will be installed at the teacher area. One data (blue jack - data) will be at 18 inches AFF
and one at 48 inches (red jack - Phone) with phone faceplate. One Cat 6/6a shall be installed for
a printer as located on the drawings. (See Diagram E) All other typical classroom wiring
applies.
B.
7.6
All communication drops shall be placed in conduit to the cable tray. If drops are run to a
central box and then a single conduit is ran from this central box to the cable tray, that conduit
shall be no less than 4 inches.
Server Farm
A. Twelve Cat 6/6a data cables to MDF if Server Farm IS NOT located in MDF.
B. Twelve strand multi-mode fiber optic cable with SC connectors to MDF terminated (at the server farm).
C. Server Farm location shall have conditioned air.
7.7
Video Surveillance Cabling & Camera Installation
Each camera location indicated on the electrical drawing will require one Cat 6/6a cables. the Cat 6/6a will
be terminated at the nearest MDF/IDF All Cat 6/6a cables will be properly terminated and tested from each
camera location. One inch conduit shall be provided to each outdoor camera location from cable tray.
7.8
Wireless Access Point
One Cat 6/6a data cable shall be provided to all Wireless Access Points as indicated on the electrical
drawings. All Cat 6/6a cables will be properly terminated and tested from each Access Point location to the
nearest MDF/IDF. The location of these outlets will be above ceiling in corridors and/or common walls in
classrooms as determined by HCS Technology. Access Point locations shall be clearly marked on ceiling
grid. Color of jacks shall be RED and termination shall be on appropriate patch panel.
7.9
Climate Control
A. One Cat 6/6ae data cable shall be provided in the climate control location. Cable shall be properly
terminated and tested to the nearest MDF/IDF. Contact HCS Energy Management for location. Also
there shall be an analog phone line provided in this same location.
7.10 Computer Labs
A. See Classroom configuration for LCD projectors.
June 21, 2010
125
PART 8 – REMOVAL OF OLD CABLING
A. Contractor shall be responsible for the removal of all cabling not in use. This shall include, but not be limited
to, phone cables, data cables, and CATV cables.
B. Contractor shall identify cables using a method which will assure that current working cabling remains intact.
C. Working cabling which is removed purposely or accidentally shall be replaced by the contractor at no additional
cost to Horry County Schools.
Please Reference Supplemental 1 at end of document for Diagram A
Diagram A
Data Rack
Wire
Management
Wireless (POE)
Wire
Management
Video
Phones (POE)
Phones (POE)
VRB
3.00
3.00
3.00
Typical MDF/IDF Layout
June 21, 2010
126
Diagram B
June 21, 2010
127
Diagram E
4 Data
4 Data
4 Data
Teacher Area
6 Data
6 Data
6 Data
2 Data
1 Phone
Diagram E - Computer
Lab Data Wiring
June 21, 2010
128
Diagram F (consist of this page and the next two pages.)
Data
To Cable Tray
1.25 in conduit
SVGA
Data
Electrical
Outlet
SVGA to
Teacher
Location
1.25 in conduit
White Marker Board
SMART BOARD
(Board measurements are
Below)
White Marker Board
Due to cable length restrictions, SVGA must have
a direct conduit to the teacher location.
Installation of conduit will need to be horizontal
through the wall to cut down on distance.
SMART Board™ 660 Interactive Whiteboard
Size 54 3/4" W ᅲ41 5/8" H ᅲ5 1/8" D
(139.1 cm ᅲ105.7 cm ᅲ13 cm)
Active Screen Area
(maximum interactive,
projected image)
51 1/4" W ᅲ38 1/4" H
(130.2 cm ᅲ97.2 cm)
64" (162.6 cm) diagonal
Weight 21 lb. 14 oz. (9.9 kg)
Shipping Size 46" W ᅲ64 1/2" H ᅲ5 1/2" D
(116.8 cm ᅲ163.8 cm ᅲ14 cm)
Shipping Weight 35 lb. (15.9 kg)
June 21, 2010
129
June 21, 2010
130
June 21, 2010
131
Diagram G – example of Panduit Warranty Certificates as required
June 21, 2010
132
June 21, 2010
133
Horry County Schools
TECHNOLOGY DEPARTMENT
Supplemental 1
CABLING STANDARDS
& SPECIFICATIONS
MDF and IDFs
Labeling and Room Layouts
June 21, 2010
134
MDF & IDF CABLING RACK LAYOUT DESIGN & INSTALLATION:
•
Install Rack-mounted Fiber cabinets at the top of a rack.
•
Leave 2RU (two rack units) of open space between a Rack-mounted Fiber Cabinet and the first horizontal
wire manager for copper cabling on patchpanels.
•
Horizontal wire managers are to be installed above the first copper patch panel in a rack.
Example:
Rack-mounted Fiber Enclosure
2 RU Open Space
Horizontal Manager
1
1
2
2
3
3
4
4
5
5
6
6
DP6 P LUS PatchPanel
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
7
Copper Patchpanel
7
8
8
9
9
10
10
DP6 P LUS PatchPanel
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
11
June 21, 2010
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
29
29
30
30
31
31
32
32
33
33
34
34
35
35
36
36
37
37
38
38
39
39
40
40
41
41
42
42
43
43
44
44
45
45
135
MDF CABLING RACK LAYOUT DESIGN & INSTALLATION:
•
Install the rack to be left open for the Technology Department to install IT equipment in between the data
rack(s) and the Voice/Wireless rack.
•
Leave three feet of unused rack space as measured from the floor up.
Example:
June 21, 2010
136
FACEPLATE PORT NUMBERING SCHEME:
Faceplates are to be numbered/counted from:
•
•
the leftmost port to the rightmost port on the first row of a faceplate,
continuing with the leftmost port to the rightmost port on the second row.
Example:
1
1
2
12 3
2
3
4
4 56
Faceplate Port Numbering Scheme
FIBER CABINET LABELING SCHEME:
All rack-mounted and wall-mounted optical fiber cabinets are to be labeled.
The label shall indicate:
•
•
the closet room number the other end of the cable goes to,
and the port numbers the connectors are installed in.
Example:
For a 6-strand fiber cable installed from MDF Room #222 to IDF Room # 333, the labeling on each end is
as follows:
In the MDF, the label reads: IDF Room 333 Ports 1-6
In the IDF, the label reads: MDF Room 222 Ports 1-6
June 21, 2010
137
HORIZONTAL CABLE LABELING SCHEME:
The following changes are made to Section 6.1 of the Technology Cabling Standards & Specifications Last Revised
09/30/08:
Device/Function Abbreviations:
V = Voice
S = Camera
D = Data
E = Video
W = Wireless
M = Mechanical (HVAC, etc.)
I = IR Control
For cameras and wireless outlets in hallways, use P-Touch or other label printer to make a label that can be fastened
to the ceiling grid at the location of the device. Attach this label to the metal ceiling grid, not the ceiling tile. This
label shall be in addition to the faceplate label located in the ceiling at the point of termination.
At the rack end, camera and wireless labeling for devices in hallways or outdoors shall be:
•
•
•
•
•
Wireless in a hallway gets the designation WH followed by the hallway/corridor number = 300.W.H
A camera in a hallway receives the designation SH followed by the hallway/corridor number = 200.C.H
Cameras located outdoors will have the letter B (for Breezeway Location) or O (for general outdoor
location not on a breezeway) and will have the number of the nearest room used to identify their location.
A camera in a breezeway near Lobby Room 100 = 100.C.B
A camera outside located near classroom #410 = 410.S.O
Labeling for cameras and wireless outlets located inside the building are to use the usual labeling scheme for all
horizontal cabling.
June 21, 2010
138
ROOM OUTLET CONFIGURATION
The first outlet to the left of the door is designated “A”.
The alphabetical naming then continues clockwise from “A” around the room back to the door.
Example:
C
CLASSROOM
610
B
A
When adding cabling to an existing room, the outlet is labeled using two letters. The first letter is that of the nearest
outlet to the door from the new add. The second letter is that of the next existing outlet in a clockwise motion from
the door.
Example:
C
CLASSROOM
610
This new outlet will be ‘BC’.
B
This new outlet will be ‘AA’.
A
June 21, 2010
AA
139
When a ‘Teacher Outlet’ has the voice in a wall-phone plate and the data 18” AFF, the Teacher voice outlet is
designated “A”, the teacher data outlet is designated “B”, and then C, D, etc follow as clockwise around the room.
Example:
D
CLASSROOM
610
C
Teacher Voice @ 48"
A
B
June 21, 2010
Teacher Data @ 18"
140
HORIZONTAL CABLE LABELING SCHEME
In the closet, each patch panel port is labeled to the corresponding room number the cable resides in, the faceplate
letter, faceplate port number, and device/function at the other end of the cable.
Room #, Faceplate Letter, Faceplate Port,
400.A.1.D (‘D’ for data, ‘V’ for Voice, etc.)
At the faceplate, each jack is labeled with the telecom closet room number, the rack number in the closet, the patch
panel number in the closet, and the port number on the patch panel.
Telecom Room #, Rack#, Patch Panel #, Port #
210.1.A.24
Example:
CLASSROOM
400
Telecom Closet
IDF 210
Example outlet with
1 Data & 1 Voice
At this end of the cable, the lable reads:
At this end of the cable,
the label reads:
210.Rack #.Patchpanel #,Port #.
400.A.1.D
400.A.2.V
June 21, 2010
141
JACK COLOR SCHEME:
Colored jacks to identify outlet function are to be installed in new projects as well as for MAC (move/add/change)
work.
Colors to be used are as follows:
•
•
•
Red – Telephone/IP Telephone & Wireless
Yellow – Video (TV, IR, Surveillance Cameras)
Blue - Data
AS-BUILT DRAWINGS:
•
Drawings for the entire project performed are to be laminated and located in the MDF.
If the MDF was not the source of the cabling work performed (such as MAC work), the drawings for any
and all closets are still to be located in the MDF. Both floor plan drawings and rack layout drawings are to
be included. The laminated drawings are to be hole-punched and chained to a rack so that they remain in
the MDF.
•
Each IDF closet is to have a laminated copy of its area/wing floor plan & rack layout drawing holepunched and chained to the rack so that they remain in the IDF.
•
Additional copies of the drawings are to be delivered to Mike Cherry along with test results. Payment will
not be rendered without as-built documentation and warranty.
•
Blue lettering/text is to be used for jack and port numbers on as-built drawings rather than black which is
difficult to distinguish from room numbering.
June 21, 2010
142
PORTABLE CLASSROOMS:
•
Do not cover or encroach on the electrical panel with the installation of the ‘Teacher Outlet’ containing 1
Data and 1 Voice.
•
Utilize the number painted on the exterior AC unit as the portable number. Do not use any school assigned
numbering schemes.
•
When adding a surveillance camera to a portable classroom, run the cabling to the closest closet in the main
building if it does not exceed 295’ from the outlet to the patch panel.
Teacher
1 Voice /1 Data
Student
4 Data
S
TV & IR
2 Video
Speaker
Closet
TYPICAL PORTABLE CLASSROOM
Cable used (Cat 6 or cat 5e) is to
Match the cabling in the school.
VIDEO BACKBONES:
•
Do not include RG-11 cabling for video backbone unless RG-6 cabling is being used to the classroom.
•
In new school installations and entire wing additions/renovations, optical fiber cabling will be used for the
video backbone when copper cabling is used to the TV/IR outlet.
OFFICE CABLING:
•
•
If a Storage Room is 6’ x 6’ in size or larger, it will receive an ‘Office Outlet’.
The configuration of an ‘Office Outlet’ is changed from 1 Data / 1 Voice / 1 Printer / 1 Video to 2 Data / 1
Voice.
June 21, 2010
143
GENERAL CABLING INFORMATION:
•
No cables are to be installed such that they lay on top of ceiling tiles without support of either cable tray or
J-hooks.
•
No cables are to be run through building joists. All cabling is to be supported by either cable tray or Jhooks.
End of requirement updates.
June 21, 2010