HORRY COUNTY SCHOOLS P.O. Box 260005 Conway, SC 29528-6005 DESIGN GUIDELINES SCOPE BUDGET QUALITY June 21, 2010 TABLE OF CONTENTS Disclaimer Statement for Design Guidelines and Specifications ....................................................................... 4 Educational Specifications for Elementary/Middle/High Schools ...................................................................... 5 Minimum Standards for Athletic Facilities/Playgrounds ................................................................................... 11 Service and Warranties...................................................................................................................................... 17 Required Training Sessions .............................................................................................................................. 18 District Points of Concern and Requirements................................................................................................... 19 Required District Inspections ............................................................................................................................. 27 Recommendations for New Schools and Renovated Spaces Roofs ........................................................................................................................................................ 28 Walls ......................................................................................................................................................... 30 Kitchens .................................................................................................................................................... 31 Paint Recommendations ......................................................................................................................... 33 HVAC........................................................................................................................................................ 35 Plumbing .................................................................................................................................................. 38 Electrical ................................................................................................................................................... 42 Security..................................................................................................................................................... 50 Fire Alarms and Sprinkler Riser Rooms ................................................................................................. 51 Door Specifications .................................................................................................................................. 52 Door Hardware Specification Guidelines ................................................................................................ 53 Padlocks and Keyless Entry Locks ......................................................................................................... 66 Electronic Strike and Wireless Entry ....................................................................................................... 66 Fiberglass Reinforced Polyester Doors .................................................................................................. 67 June 21, 2010 2 Aluminum Stile and Rail Doors and Framing.......................................................................................... 71 Toilet Partitions ........................................................................................................................................ 75 Lockers - Student Corridor and Athletic .................................................................................................. 79 Operable Wall Specifications .................................................................................................................. 80 Accordion Wall Specifications ................................................................................................................. 81 Fence........................................................................................................................................................ 82 Floor Finishes........................................................................................................................................... 85 Ceiling Tile................................................................................................................................................ 86 Cabinetry .................................................................................................................................................. 87 Windows ................................................................................................................................................... 88 Multipurpose Wall Specifications ............................................................................................................ 89 Media Center............................................................................................................................................ 90 Stormwater Drainage Maintenance ........................................................................................................ 91 Landscaping ………………………………………….. .............................................................................. 92 Civil ........................................................................................................................................................... 93 Construction Project Sinage Requirements............................................................................................ 94 Technology Specifications ................................................................................................................................. 95 June 21, 2010 3 DISCLAIMER STATEMENT FOR DESIGN GUIDELINES AND SPECIFICATIONS All specifications shall be drafted so as to assure cost effective procurement of the school district’s actual needs and shall not be unduly restrictive. The requirements regarding the non-restrictiveness of specifications shall apply to, among others, all specifications prepared by architects, engineers, designers, draftsmen, and land surveyors for school district contracts. Brand Name Specification means a specification limited to one or more items by the manufacturer's name or catalog number. Brand Name or Equal Specification means a specification which uses one or more manufacturer's name or catalog numbers to describe the standard of quality, performance, and other characteristics needed to meet school district requirements, and which provide for the submission of equivalent products. Specification means any description of the physical, functional, or performance characteristics, or of the nature of a supply, service, equipment, or construction item. A specification includes, as appropriate, requirements for inspecting, testing, or preparing a supply, service, equipment, or construction item for delivery. Unless the context requires otherwise, the terms "specification" and "purchase description" are used interchangeably. The purpose of a specification is to serve as a basis for obtaining a supply, service, equipment, or construction item adequate and suitable for the school district's needs in a cost effective manner, taking into account, to the extent practicable, the cost of ownership and operation as well as initial acquisition costs. IT IS THE POLICY OF THE SCHOOL DISTRICT THAT SPECIFICATIONS PERMIT MAXIMUM PRACTICABLE COMPETITION CONSISTENT WITH THIS PURPOSE. SPECIFICATIONS SHALL BE DRAFTED WITH THE OBJECTIVE OF CLEARLY DESCRIBING THE SCHOOL DISTRICT'S REQUIREMENTS. ALL SPECIFICATIONS SHALL BE WRITTEN IN A NONRESTRICTIVE MANNER SO AS TO DESCRIBE THE REQUIREMENTS TO BE MET. All design work performed for Horry County Schools by Architects and their Consultants must meet current OSF, current Local, State, and National Codes, and Horry County Schools Design Guidelines. Please be advised that should an individual, or any business/design entity choose to substitute or change a guideline specification, without prior written approval from the Horry County Schools Construction Department, that individual or business entity shall be responsible for removing, replacing, and incur any related costs for the required changes. It is understood by Horry County Schools certain materials and applications may not always be appropriate for every application but in these cases, a written request for a specific change to these guidelines must be submitted to the Construction Management Department for consideration and approval. In the event that an application or product in the guideline causes a conflict with current OSF or Code requirements, the OSF and/or current Code requirements shall override the guideline; however, a written notice and explanation must be submitted to the Construction Management Department for the change. Horry County Schools maintains an Architects Checklist on the website to be used as a tool during the Design Phase to ensure that desired products and applications are obtained. All Permits and Agency Reviews along with any additional information required for a specific project must be obtained prior to bidding the project. A copy of the permits and agency review letters must be attached to the checklist when plans are delivered for review by the Construction Management Department. Project delays and costs for these delays caused by not obtaining required permits, agency reviews, and approvals prior to bidding the project will be the responsibility of the Architect and their Consultants. June 21, 2010 4 BASIC COMPONENTS OF EDUCATIONAL SPECIFICATIONS FOR ELEMENTARY SCHOOLS OF 900 DESIGN CAPACITY*** (w/ Core designed for 1,200) # TYPE CAPACITY MIN. SQ FEET 3 6 18 11 4 4 1 1 1 CD classrooms @ 20 to 1 Kindergarten classrooms @ 25 to 1 Primary classrooms @ 21 to 1 Elementary classrooms @ 24 to 1 *Self-contained @ 12 to 1 Resource Music Art Computer lab **Design Capacity 60 150 378 264 48 1,150 1,150 800 800 800 800 1,200 1,200 1,000 900 TOTAL SQ FEET 3,450 6,900 14,400 8,800 3,200 3,200 1,200 1,200 1,000 43,350 * Time out rooms may be provided depending upon need. ** Design Capacity and Maximum Capacity are the same in the elementary schools because teachers have the same class of students throughout the entire school day and therefore do not get a typical “planning period”. ***The number and type of classrooms needed to achieve a desired capacity will vary based on the current district approved pupil/teacher ratio for each grade. Physical Education • • • • PE Facility Multipurpose Room w/ stage Coaches’/Teachers’ offices Storage Administration • • • • • • • • Principal Bookkeeper Receptionist Secretary 2 Assistant Principals ISS Conference Room Curriculum Coach Guidance – 4 Counselors • • • • Office Space Conference rooms (2) Testing room Storage June 21, 2010 5 Clinic Media • Isolation room • Conference room • • • • • • • • Reading area Studio Computer lab Workroom Library Office Adult restroom Book storage MDF Room Food Service • • • • • • Kitchen Serving Cafeteria Coolers/Freezers Dry storage Receiving Teacher Work Spaces x 3 Itinerate Teacher Spaces x3 Speech Parent Resource Center General Storage TOTAL SQ.FEET, INCLUDING CIRCULATION, NOT TO EXCEED: 110,000 June 21, 2010 6 BASIC COMPONENTS OF EDUCATIONAL SPECIFICATIONS FOR MIDDLE SCHOOLS # 10 3 10 3 10 3 5 4 1 4 1 1 1 1 1 1 • TYPE 6th grade regular classrooms @ 22 to 1 6th grade science labs @ 22 to 1 7th grade regular classrooms @ 22 to 1 7th grade science labs @ 22 to 1 8th grade regular classrooms @ 22 to 1 8th grade science labs @ 22 to 1 Resource @ 12 to 1 Self-contained @12 to 1 Art @ 22 to 1 Computer labs @ 22 to 1 Band @ 25 to 1 Home Arts @ 22 to 1 Chorus @ 25 to 1 Industrial Technology @ 22 to 1 Physical Education @ 50 to 1 Business @ 22 to 1 *Maximum capacity Capacity modifier **Design Capacity CAPACITY 220 66 220 66 220 66 60 48 22 88 25 22 25 22 50 22 1242 x .90 1,118 Maximum Capacity is the total student capacity of all classroom space, based on current pupil/teacher ratios that would be available if teachers did not have a planning period and were “floated” from room to room. It is extremely important to note that this is NOT an ideal capacity. A facility this crowded would cause a loss of instructional quality as well as create serious deficiencies in the quality of the students’ experience. Filling a school to this level also taxes the school’s core facilities. ** Design Capacity in both middle and high schools is equal to 90% of the Maximum Capacity at that facility. This calculation is based on giving every teacher a planning period and making efficient use of all instructional space. Physical Education • Gym (SF adjusted by project to reflect adequate seating) • P.E. Lockers • Team lockers • Training room • Coaches’/Teachers’ offices • Laundry • Storage • Health Classroom Auditorium • 320 seat lecture hall • Storage June 21, 2010 7 Administration • Principal • Bookkeeper • Receptionist • Secretary • 3 Assistant Principals • ISS • OSIRIS/Attendance • Mail Room • Conference Room Guidance – 3 Counselors • Office Space • Conference rooms • Testing room • Storage • Waccamaw Mental Health • Records Vault Clinic Media • Examining room • Conference room • Office Space • • • • • • • • Reading area Studio Computer lab Workroom Library Office Book storage Adult restrooms MDF Room Food Service • Kitchen • Serving • Cafeteria • Coolers/Freezers • Dry storage • Receiving • Office Space Teacher Work Spaces x 3 Itinerate Teacher Spaces x 2 Speech Resource Officer General Storage TOTAL SQ. FEET, INCLUDING CIRCULATION, NOT TO EXCEED: 140,000 June 21, 2010 8 BASIC COMPONENTS OF EDUCATIONAL SPECIFICATIONS FOR SECONDARY SCHOOLS # 35 8 8 3 1 1 2 1 1 7 1 1 4 2 TYPE Regular classrooms @ 23 to 1 Science labs @ 23 to 1 Special education @ 12 to 1 Physical education @ 30 to 1 ROTC @ 23 to 1 Fine Arts/Drama @ 23 to 1 Art @ 23 to 1 Instrumental Music @ 40 to 1 Choral Music @ 40 to 1 Vocational Labs @ 23 to 1 Driver Education @ 12 to 1 Distance Learning @ 23 to 1 Computer Labs @ 25 to 1 Journalism @ 23 to 1 *Maximum capacity Capacity modifier **Design Capacity CAPACITY 805 184 96 90 23 23 46 40 40 161 12 23 100 46 1689 x .90 1,520 * Maximum Capacity is the total student capacity of all classroom space, based on current pupil/teacher ratios that would be available if teachers did not have a planning period and were “floated” from room to room. It is extremely important to note that this is NOT an ideal capacity. A facility this crowded would cause a loss of instructional quality as well as create serious deficiencies in the quality of the students’ experience. Filling a school to this level also taxes the school’s core facilities. ** Design Capacity in both middle and high schools is equal to 90% of the Maximum Capacity at that facility. This calculation is based on giving every teacher a planning period and making efficient use of all instructional space. Physical Education • Gym (SF adjusted by project to reflect adequate seating) • Multipurpose Room/Auxiliary Gym • Weight Room • P.E. Lockers • Team lockers • Training room • Coaches’/Teachers’ offices • Laundry • Storage • Auditorium • 700 seat capacity • Storage June 21, 2010 9 Administration • Principal • Bookkeeper • Receptionist • Secretary • 4 Assistant Principals • ISS • Conference Space • OSIRIS/Attendance • Mail Room Guidance – 4 Counselors • Office Space • Conference rooms • Testing room • Storage • Waccamaw Mental Health • Records Vault Clinic Media • 2 Examining rooms • 2 Conference rooms • Office Space • • • • • • • • Reading area Studio Computer lab Workroom Library Office Book storage Adult restrooms MDF Room Food Service • Kitchen • Serving • Cafeteria • Coolers/Freezers • Dry storage • Receiving • Office Space Teacher Work Spaces/Lounge x 4 Itinerate Teacher Spaces x 2 Speech Community/Large Meeting Room Bus Office Resource Officer General Storage TOTAL SQ. FEET, INCLUDING CIRCULATION, NOT TO EXCEED: 230,000 June 21, 2010 10 HORRY COUNTY MINIMUM STANDARDS FOR ATHLETIC FACILITIES/PLAYGROUNDS ELEMENTARY SCHOOL REQUIREMENTS MULTIPURPOSE PLAYFIELD • • • 90’ x 120’ Properly graded with irrigation and well Grass covering entire playing area MULTIPURPOSE ROOM • • • • Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during assemblies 5,500 sq. ft. Athletic flooring Wall padding must be installed on ends CHILD DEVELOPMENT/KINDERGARTEN PLAYGROUND EQUIPMENT • • • • • • • • • • • • • • • • • • • Four Individual Spring Riders Tunnel Slide Loop Climber Crawl Tunnel Elbow Slide Double Wide Fiberglass Slide Arched Chain Climber Tic-Tac-Toe Panel below deck Village Seat Panel Ladder Panel Village Counter Panel Safety Panel w/ Wheel Above; Mirror Panel Below Transfer Station Wheelchair Turning Area Landing area consists of hardwood chips that meet ASTM standards to a minimum depth of 12 inches ADA approved access entry ramp Border timbers of molded plastic around play area 3’ x 3’ x 2” wear mats at ends of all slides 40’ x 70’ covered concrete play area PRIMARY PLAYGROUND EQUIPMENT • • • • • • • Swings – 3 leg heavy duty swings – 8 ft. height – 6 swings Beam Run Stretch Pole Vertical Ladder Balance Beam Challenge Ladder Spring-up Bars June 21, 2010 11 • • • • • • • • • • • • • • • • Parallel Bars Jump Touch Beam Pull-up Bars Sit-up Bench Spiral Slide Arch Climber Bubble Panel Snake Pole Faces Panel Transfer Station Wheelchair Turning Area Double Wide Plastic Slide Landing area consists of hardwood chips that meet ASTM standards to a minimum depth of 12 inches ADA approved access entry ramp Molded plastic border timbers around play area 3’ x 3’ x 2” wear mats at ends of all slides and below all swings ELEMENTARY PLAYGROUND EQUIPMENT • • • • • • • • • • • • • • • • • • • • • • Swings – 3 leg heavy duty swings – 8 ft. height – 6 units/swings Beam Run Stretch Pole Vertical Ladder Balance Beam Sit-up Bench Challenge Ladder Spring-up Bars Parallel Bars Jump Touch Beam Pull-up Bars See Saw Snake Track Ride Double Ring Trek Turning Bar Log Roll Chinning Bar Trapeze Ladder Landing area consists of hardwood chips that meet ASTM standards to a minimum depth of 12 inches One ADA approved access ramp 3’ x 3’ x 2” wear mats at ends of all slides and beneath all swings Molded plastic border timbers to surround all playground equipment June 21, 2010 12 HORRY COUNTY MINIMUM STANDARDS FOR ATHLETIC FACILITIES/PLAYGROUNDS MIDDLE SCHOOL REQUIREMENTS SPORTS: Fall Football Cheerleading Winter Basketball Cheerleading Spring Soccer PRACTICE FIELD GYM • • • One 100 yard long/50 yard wide area Properly graded with irrigation Grass covering entire playing area • • • • • • • • • • Includes volleyball, basketball Regulation basketball court with markings One regulation volleyball court with markings Seating Restroom facilities for spectators, other than locker area Concession area Ticket booth Scoreboards with controller required in gym Wall padding must be installed on ends of gym Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during assemblies June 21, 2010 13 HORRY COUNTY MINIMUM STANDARDS FOR ATHLETIC FACILITIES/PLAYGROUNDS HIGH SCHOOL REQUIREMENTS SPORTS: Fall Football Cross Country Girls Tennis Volleyball Cheerleading Winter Basketball Wrestling Cheerleading Spring Baseball Softball Soccer Track Boys Tennis Golf FOOTBALL Seating Requirements • All seats should be constructed of aluminum or concrete • Seating capacities adequate for first round of playoffs AAAA 4,000 AAA 3,500 AA 2,300 A 1,000 Grading Drainage Irrigation Sod • 1 percent grade (minimal) • Water must run to designated drainage areas off the playing surface and away from stadium • • • All heads must be even or below playing surface. Each head coverage shall overlap another zone. Entire playing surface must have coverage. • • Fields must have grass, which covers the entire playing surface If grass is going on a new field or grass is being replaced, Bermuda or Tifton 419 should be used Press Box • Adequate space to accommodate the following: Home and Away crews (two per team), clock judge, announcer, and spotter. A fence or rail must surround the top of the press box. Concession Stand(s) • Shall include a home side concession stand with restrooms • Shall include a visitor side concession stand with restrooms Field House • A multi-sport field house shall be included Ticket Booth • One booth with two ticket windows June 21, 2010 14 Lighting Fencing • • • Four poles – 70’ high Foot-candle = 50 maintained Metal or concrete poles • • 4’ barrier separating spectators from playing field 6’ fence surrounding entire stadium complex to include two separate double gate sections for entrance and emergency exits. (Must be an easy access for emergency vehicles to enter and leave playing area.) CROSS COUNTRY • TENNIS GYM Course must be complete with start and finish line (3.1 miles) • • • Four regulation courts with proper markings 6’ fence surrounding tennis complex Lighting • • • • • • • • • • • • Includes volleyball, basketball, wrestling Regulation basketball court with markings One regulation volleyball court Two cross court volleyball courts for practice Seating Restroom facilities for spectators, other than locker area Concession area Ticket booth Playing surface wood of competition grade Wall padding must be installed on ends of gym Scoreboards with controller are required Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during assemblies AUXILIARY GYM • • • • • • 4,000 sq. ft. Seating for 150 Basketball goals – 2 on ends – 4 solid fiberglass practice goals on sides Sufficient for P.E. activities, volleyball, wrestling Playing surface wood of practice grade Acoustics must be addressed by the architect and provisions must be made for adequate acoustical sound during assemblies BASEBALL/SOFTBALL • Fields must be properly graded so that water runs off playing surface Dimensions • Baseball – 290’ Left/Right Field 305’ Centerfield • Softball – 185’ Home to Outfield June 21, 2010 15 Fence Irrigation Seating Lighting • • • 6’ outfield fence 4’ down baselines Backstop - softball 15’ baseball 20’ • • • All heads must be even or below playing surface. Each head coverage shall overlap another zone. Entire playing surface must have coverage. • • 100 per field Portable aluminum • • • • Baseball foot-candles infield = 45 maintained Baseball foot-candles outfield = 20 maintained Softball foot-candles infield = 45 maintained Softball foot-candles outfield = 20 maintained Dug-outs • 40’ x 10’ long to include a 10’ x 10’ storage area or 30’ x 10’ long with one 20’ x 20’ storage area Restrooms/Concessions • There must be a place where restrooms may be used by spectators • Two toilets – women; one toilet, one urinal – men • Concession/scoreboard operator space SOCCER TRACK • • Will practice on practice field area Games will be played on football game field • • • • • • • • Completely marked eight-lane track Type 4 asphalt Straightaway for sprints (start and finish lines) Runway complete with landing area Shot and discus circle Safety net for discus area High jump approach and landing area Long jump approach and landing area opposite end for triple jump entire length not to be less than 100 ft. PRACTICE FIELD • • • One 100 yard long/50 yard wide area Properly graded with irrigation Grass without nylon backing covering entire playing area June 21, 2010 16 SERVICE AND WARRANTIES Since service intensive systems require local support, constraints are imposed on maximum distances allowed to the nearest contractors/subcontractors/suppliers maintained office: Roofing Door Hardware Supplier Door Hardware Installer Fire Alarm HVAC Subcontractor HVAC Equipment Supplier 100 miles 100 miles 100 miles 100 miles 100 miles 100 miles The school district contracts for construction require a one-year labor and materials warranty on all work. In addition, the following warranties should be specified: Door Hardware (parts only) Roof System (materials and labor) Roof System (materials, NDL) HVAC Compressors (parts only) HVAC June 21, 2010 3 years 5 years (watertight) 20 years with watertight warranty 5 years 1 year – all maintenance for HVAC systems is included in service. Changing filters is the only service not included. HCS will change filters during the service period. 17 REQUIRED TRAINING SESSIONS Training sessions must be performed prior to and on a separate day from final required district inspections. Training sessions will take place at each new or renovation project. The contractor, appropriate subcontractor, staff members, and the appropriate representative from maintenance must be present for training sessions. A minimum of one week’s notice must be given for all training sessions. Training must be scheduled when the principal and school facilities manager can be present. The following training sessions are required and must be noted in specifications: 1. Fire alarm training. This training must be videotaped by the contractor. 2. Electrical training. This training must be videotaped by the contractor. 3. Mechanical training for units. This training must be videotaped by the contractor. 4. Plumbing training. This training must be videotaped by the contractor. 5. Irrigation system training (minimum two staff members and plumber from HCS Maintenance department). This training must be videotaped by the contractor. 6. Kitchen Equipment training. This training must be videotaped and include full demonstration of actual cooking on all equipment with food. 7. Audiovisual equipment, such as, but not limited to, auditorium/multipurpose sound, lighting, stage curtains, projection operations, etc. 8. Cleaning products and practices. June 21, 2010 18 DISTRICT POINTS OF CONCERN AND REQUIREMENTS The following items of concern to the School District have been noted on previous projects and must be addressed in future projects on the drawings and specifications as generalized standards. GENERAL 1. From observation by the School District of buildings now near completion, it is noted that projects have moved forward more quickly when the contractor has installed the service road around the building pad at the very beginning of construction. This allows all weather access and the owner highly recommends it. 2. Water/sewer, DHEC, and lift station approvals have usually taken more time than anticipated; therefore, the owner expects these items to be addressed early on. Permits required by the state and local level such as, but not limited to, land disturbance permits, wetland permits, etc., must be obtained as the guidelines require before the project goes out for bid. Architect needs to schedule meeting with water utility company prior to bidding project. The District would like to have backflow preventers and as many utility items as possible installed by site contractor. 3. Mortar joints in concrete block should be uniform, not irregular. Block work shall be faced to corridor side. Many times we approve a sample wall and continued work does not have the same quality of the sample approved. We expect a job consistent with the sample wall that is approved. 4. Through wall flashing must be installed in all areas directed on plans as work progresses and not after the fact. 5. Through wall flashing needs to be protected. Any torn flashing must be repaired or replaced at the time it is damaged. 6. Make sure there is adequate waterproofing on cavity side of wall. 7. Structural rebar must be placed in wall before wall is pumped. 8. Refrigerant tubing must be placed into PVC pipes after placing pipe in wall. This can help prevent damage to insulation. 9. Painted corridors and classrooms must have semi gloss paint. Flat paint is not allowed. No exceptions. 10. Room numbers for operational and signage purposes will be approved by the District and may be different from architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If there is a question, call your representative from the school district. The actual school room numbers that are used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing, and mechanical units. The architect must meet with the building principal during design phase and architect shall verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect correct signage and room number schedule. 11. Teacher storage cabinets are required in all classrooms. Corner cabinets are requested when possible. 12. Contractors’ builders risk insurance cannot be transferred to the owner until substantial completion has been achieved. The fire alarm must be operational and keys turned over to owner. The contractor should notify owner in order to have phone lines for fire alarm activated. The security personnel from the district will be responsible for installing the security panel and making the connection from the panel to the dial out. Our security personnel must be notified well in advance of OSF inspections. 13. All temporary utilities will be provided by the Contractor and in the Contractor’s name. The Contactor is responsible for the bill until the District has a Certificate of Occupancy and has accepted the building. 14. Lay down areas for all materials must be identified and indicated on plans and in specs on all renovation projects and all areas must be shown on plans. Chain link fencing is required. Orange fencing is not allowed for safety or lay down areas. June 21, 2010 19 15. The school district requires a clean jobsite, both interior and exterior. We have noted on past projects that those kept clean and free from debris were much safer, more organized, and had smoother completions. 16. Safety is the most important factor on school renovation projects when school is in session. Construction barriers and warning signage must be installed before construction begins and must be maintained at all times. Students must not have access to the construction site. Any safety fencing that is damaged or down must be replaced immediately. Emergency exits must be maintained with appropriate signage. Emergency exits must never be blocked. A clear exit pathway must be maintained at all times from every exit door during construction. If it is absolutely necessary to block these areas in order to do specific work, this work must be performed before or after working hours. Any work that will cause excessive noise, vibration to the building, or distraction must be done before or after hours as well. Safety fencing must be chain link fencing. Orange plastic fence is not allowed for safety or lay down. 17. OCRM monitors our projects on a regular basis. It is essential that the silt fence be in place and in good shape at all times. SCDOT also monitors roadways. Site Contractors must maintain compliance for OCRM and SCDOT at all times. 18. Use of tobacco products are not allowed in school buildings or on any school property to include inside vehicles. 19. In renovation projects, the CONTRACTOR is responsible for removing and protecting all furniture and boxed items from rooms being renovated. The CONTRACTOR is also responsible for replacing these items in an orderly fashion after renovations are complete. Items must be stored and protected in a manner that avoids all damage. When doing partial work in an occupied classroom, the contractor is responsible for covering any and all items that are subject to dust or damage. This must be noted on drawings and in specifications. 20. As-built drawings for the lift station must be done by a certified engineer and must include the engineer’s stamp. Fees for this service must be included in the base bid. 21. Any sheetrock that becomes wet due to lack of protection during construction must be replaced. The entire area from floor to ceiling must be replaced and the insulation behind it must be replaced also. There are no exceptions to this. 22. Slip resistant VCT must be used in all ramp areas. 23. Type of floor covering used must be approved by owner during design phase. 24. Expansion joint covers must be specified for block walls. These need to be metal not rubber caulk. 25. Pencil blocks and electric sharpeners are to be installed in all classrooms. 26. Kiln areas must be equipped with exhaust hoods. See note about this in electrical section. Kilns are to be specified by the architect and provided and installed by the contractor in the base bid. Exhaust fans and all components must be specified with the kiln and included in the base bid. 27. Storefront doors are not allowed in any areas. 28. Sanitary napkin disposals must be provided in all female group toilets in elementary, middle, and high schools. Napkin disposals must also be provided in each stall at the elementary, middle and high schools. Napkin disposals must be provided in all female or unisex toilets. 29. Recessed soap dispensers are not permitted in any location. The District will provide these dispensers for wall areas. 30. Covered walks should consist of a single walk to the parent drop off area and a covered walk from the school to the bus drop off. The termination point of the bus drop off should be in a T-shape and approximately 30’ long adjacent to the bus drive. Light fixtures shall be installed under all canopy areas. (The T-shape canopy shall be used depending on site layout. In renovations, an L-shape may have to be used.) 31. Curbing and gutter must be specified for all parking lot drives and drop off areas. Heavy duty RCP pipe must be used under all drive areas. Storm drain must be tied in in all areas. The engineer must provide drainage for all areas including all play areas. June 21, 2010 20 32. Elementary schools shall have two assistant principals’ offices. Middle schools shall have three assistant principals’ offices. High schools shall have four assistant principals’ offices. When possible, for monitoring purposes, these offices shall have glass looking out to hallways. There are no private toilets in these offices. 33. Standard signage is required for both renovations and new schools. Signage shall include interior and exterior signage. Exterior signage should consist of brick or block base per plan. School name lettering shall be of contrasting color and of size to be clearly visible. A marquis with transparent lockable door should be included. The marquis should be large enough to accommodate a short message such as “PTA meeting tonight at 7:00 p.m.” (4 lines of 8” tall changeable letters in locking case). Ground lighting must be included for all signage. All interior signage must be mechanically fastened. Numbering the signage schedule must be approved by the District. The contractor is to provide letters and symbols for the marquis. 34. Fire extinguisher cabinets must be metal with Lexan door. Plastic bubble type cabinets are not permitted. 35. Sky lights are not permitted in any ceilings. 36. Through wall flashing must be SANDELL COATED COPPER consisting of a full sheet of copper weighing 3 oz. per square foot coated on both sides with a special rubberized asphalt compound weighing not less than 6 oz. per square foot or approved equal. Manufacturer’s specifications for application and installation must be followed. Please note: through wall flashing must be as stated above except in locations where a roof terminates at a masonry wall. In these locations the wall shall have a 16 oz. copper through wall flashing. The flashing shall turn up a minimum height of 8 inches inside the wall, come through the exterior brick or block and turn down a minimum of 1½ inches on the face of the masonry wall. 37. The contractor is responsible for line locations for all utilities on private school property prior to beginning construction and this must be noted clearly on the plans and specifications. A private locator will be required as PUPS will not locate on private property. This must be clearly indicated on specifications and plans. 38. Hardware specifications must be strictly followed. Please note that the architect or contractor shall be held responsible for corrections to any variance from hardware specifications. 39. Accommodations for book theft detection shall be made in all Horry County Schools’ media centers. District will provide equipment specifications. 40. It is mandatory that all construction workers on school property have a visible picture ID Tag at all times. Workers who do not have a tag are considered unregistered and will be asked to leave the property. 41. Products included in this document are intended to establish minimum requirements for quality. THE OWNER MUST BE NOTIFIED PRIOR TO APPROVAL OF A SUBSTITUTE PRODUCT. 42. All colors must be submitted to the School District prior to approval. 43. Playground equipment will be provided by the Owner but will be coordinated by the Contractor in order to avoid damage to landscaping and underground piping. The architect is to provide playground area for equipment installation and is to ensure with engineers that water, electrical, mechanical, irrigation and storm drain covers are not in conflict with designated play area. Storm drain covers located in the play area must be pedestrian type designed specifically for small children. LANDSCAPE 44. Sod, trees, and bushes should not be installed until irrigation system is installed and operational. Mesh backing on sod is not allowed on any Horry County Schools’ projects. 45. Landscaping must consist of trees and shrubs that are native to the area and approved. Centipede sod is required for sodded areas. Straw must be used for mulching. Pine bark is not acceptable. Irrigation systems must be insulated and also have some type of weather protection, such as a house, rock, etc. 46. Parking lot islands must be grassed. Minimize straw beds as much as possible for future upkeep. June 21, 2010 21 47. Weed protection must be used in bed areas. ELECTRICAL 48. All under slab electrical turn-ups shall have rigid elbows and be asphalt coated. 49. Security keypad boxes must be located on the inside of the building. Exterior boxes are not acceptable. Boxes with blank plates must be installed at front entrance, loading dock, and all corridors at the end door. 50. Room numbers for operational and signage purposes will be approved by the District and may be different from architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If there is a question, call your representative from the school district. The actual school room numbers that are used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing, and mechanical units. The architect must meet with the building principal during design phase and architect shall verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect correct signage and room number schedule. 51. Switchgear must be kept dry at all times both before and after roof has been installed. 52. Electrical boxes and conduits in rough-in stages must be covered with tape at all times to prevent debris from getting inside. 53. In the media center, two sets of four power and four data must be located on the half wall between studio and production areas under the glass that divides the two rooms. A 5” PVC conduit must be provided in the bottom block closest to the floor level under the window to allow for the transfer of wiring from one room to another. Wiring must be on the studio side of the glass that looks into production. 54. There must be provisions for interior and exterior security lights at the end of each corridor and main entrances to the school that is designed to burn at night so it can be used to identify objects picked up on security cameras. 55. The numbers for rooms on the plans must be the true room signage numbers. To avoid confusion, the architect’s room numbers and the school door signage numbers must be one in the same. Numbers and the signage schedule must be approved by the District. Electrical panels must be numbered to the true school signage numbers and all phone and data must be labeled with true school’s room signage numbers. The fire alarm program and all smoke detectors must be labeled with the true school signage numbers. It will be less confusing for everyone to have only one set of numbers. 56. Lights in all spaces must be controlled with motion sensors as specified in attached. CEILING TILE AND FLOOR FINISHES 57. It is recommended that curing compound be used in all areas where directed by architect. 58. Carpet should not be installed until finishes have been completed. The Owner will not accept carpet that has been steam cleaned, dry cleaned, or cleaned in any other method than vacuuming. Any carpet that has been wet due to leaks, cleaning, etc., must be replaced. Due to problems with mold and mildew, carpet that has been wet is considered damaged and cannot be accepted by the Owner. Architect must specify a carpet tile that is owner approved during design. 59. Ceiling tiles must be standard tiles and must be white in color. Decorative tiles are not permitted. Ceiling tiles must be fire rated and be standard Armstrong 2’ x 2’ #824 white tiles, standard Armstrong 2’ x 4’ #823 white tiles, standard Armstrong 2’ x 2’ #770 white tiles, standard 2’ x 4’ #769A white tiles, USG 2’ x 2’ #2110 white tiles, USG 2’ x 4’ #2310 white tiles, or approved equal. 60. Epoxy floors in kitchens, gang toilets, and any miscellaneous areas must have a minimum of two sealer coats. The District only allows darker shades of epoxy such as dark blue, charcoal, black and red terracotta. Light colors are not permitted. June 21, 2010 22 HARDWARE 61. Key cores for exterior metal doors must be on right hand side. 62. All door magnet hold opens shall be provided under specification Section 08710. The General Contractor must closely coordinate rough-ins for these magnets. Lockable interior corridor doors shall be used in areas of the school so that evening activities can take place in public areas and still maintain the ability to secure other areas of the school. Heavy duty magnets are required. 63. Exit devices must be through bolted. Wide style doors must be installed in order to accommodate the type exit devices we use. 64. Science case work in science labs must be keyed the same for all cabinet or drawer locks in a given room. Each science lab must be keyed different on a per lab basis to all other labs. 65. The contractor must provide Medeco padlocks keyed to Horry County Schools’ keying system for all lockable items such as gates, roof hatches, etc. The architect is responsible for the count. 66. All keyless entry locks must be wireless. Locations for these keyless entry locks will be specified during the design phase. 67. An electronic strike with a wireless transmitter button must be specified at the front entry. DOORS 68. STOREFRONT DOORS, FRAMING AND/OR HARDWARE ARE NOT ALLOWED ON SCHOOL PROPERTY. 69. Doorframes must be sanded, re-primed, and repainted in any damaged or rusted areas. 70. Doors must be wood doors only. Laminate doors are not permitted. Mohawk doors are not allowed. Please refer to interior wood door specifications. HVAC 71. Room numbers for operational and signage purposes will be approved by the District and may be different from architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If there is a question, call your representative from the school district. The actual school room numbers that are used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing, and mechanical units. The architect must meet with the building principal during design phase and architect shall verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect correct signage and room number schedule. 72. Coils and filters in mechanical units must be protected at all times during finish installation. Construction filters must be changed and dated weekly. Filter protection must be placed over all return grills and diffusers during construction. Should proper filters not be in place, units should not be turned on. If these conditions are not met, the school district will require cleaning of the units, ductwork, and the coils before accepting the building. All HVAC filters must be changed and dated the week prior to building turnover. 73. Heat pumps must be labeled in a clockwise fashion starting at the admin area at the front entrance beginning with HP01, HP02, HP03, etc. All ventilation equipment must be labeled MAU01, MAU02, MAU03, etc. Labeling for heat pumps must be HCS signage numbers. 74. The District will change HVAC filters during the warranty period. The District does not want the mechanical contractor to change filters. June 21, 2010 23 75. ALL DUCT BRANCH CIRCUITS MUST BE R-6 ACOUSTICAL FLEX AND MUST BE FLEXMASTER ACOUSTICAL TYPE 8 OR APPROVED EQUAL. TO AVOID NOISE LEVELS IN CLASSROOMS, IT IS IMPERATIVE TO USE THIS ACOUSTICAL FLEX. PLUMBING 76. Fiberglass fuel tanks are not permitted. 77. Any drains under parking lots, asphalt drive areas, or concrete areas must be concrete or RCP pipe. (Civil) 78. Grease traps must be heavy duty pressure type round manhole frame with C/S bolted lids and must be water, gas, and steam tight. 79. All urinals are to be waterless. There must be one urinal at handicap height in all male restrooms. 80. Kitchen hoses are required to be installed with kitchen serving line equipment. Kitchen reels are to be provided by the plumber in the base bid. 81. Eyewash stations are required in all science labs and janitor closets that are chemical storage areas. . ARCHITECT AND ENGINEERS 82. Eyewash stations are required in all science labs, janitor closets, and any other chemical storage areas. 83. Room numbers for operational and signage purposes will be approved by the District and may be different from architect’s numbering on plans. The district will approve a list of room numbers and names. Any rooms unaccounted for on the District approved list shall maintain the same number as used on the architect’s plans. If there is a question, call your representative from the school district. The actual school room numbers that are used for signage are to be used for labeling for data, phone, T.V. electrical, fire alarm, sprinkler riser, plumbing, and mechanical units. The architect must meet with the building principal during design phase and architect shall verify that room numbers on plans and actual signage numbers are the same. Contract documents must reflect correct signage and room number schedule. 84. The discovery period is extremely important for renovation projects. It is very important to take note of illegal penetrations above ceiling, code issues that include missing or broken exit lights, missing egress signs, and other items that may be missing or not functioning. IDF and MDF rooms may be too full for additional equipment or locations of these closets may have moved from their original locations. There may not be adequate power and data for the amount of computers that are currently being used in classrooms. Provisions should be made to restore power, phone and data to walls that are being demolished. Drawings should show items to be removed and where these items should be restored. In renovation projects where the administration area is being renovated, strong consideration needs to be given to the effect renovations will have on the fire alarm system, the security system, phones, bells, and speakers. Some older classrooms do not currently have overhead speakers but will need them after renovations. Wiring for these speakers must be provided on plans. All existing mechanical, electrical, and plumbing issues must be looked at closely during the discovery period. Verbal interviews with staff and managers will be very important to gather information. These are merely examples of items that contractors have overlooked in the bid process previously. In these instances both the owner and the contractor had added costs. It is important to get as much input as possible up front. It is important to relay all discovery items in writing to the owner. The owner’s representative will accompany architects and engineers during discovery. 85. It is also important in renovations to gain important information from the principal with regard to testing dates and activities held at the school so that these items can be addressed in planning and in specifications. Note on specs and plans that the contractor is responsible for planning his work schedule around the school instructional day. It is essential that work be done after school hours, weekends, holidays, and breaks. Interruption of the instructional day will not be permitted. All contractors and subcontractors must wear identification tags. Workers without tags will not be permitted in the building or on school grounds. June 21, 2010 24 86. Contractors need to be informed that the district will have Clemson Extension perform random inspections on termite treatment. 87. The district requires a detailed cleaning spec for all areas of the building in the specifications. The contactor will be responsible for additional coats of wax over and above what was used in the past. Classrooms and hallways will require eight coats of wax. The floors must be burnished after all coats of wax are applied. Cleaning in all areas must be very detailed and performed by a professional cleaning crew and also must be coordinated with furniture deliveries and installations. 88. Architect is to have utilities located and verified during design phase and must be shown on construction documents. 89. Architect must complete and submit the Architect’s Checklist with the construction review documents provided to the District. Architect must complete Ready for Construction form and deliver to the Construction Management staff prior to bidding the project. 90. Architect must provide a color board for District approval. No colors are to be approved without District approval. 91. The civil engineer must coordinate drain covers in playground areas so the District does not have large drain covers located in play areas. If these drains are absolutely necessary, they must be pedestrian type designed specifically for small children. 92. Location of mechanical, electrical, and plumbing lines must be coordinated by the contractor with playground installers and Horry County Schools to avoid conflict. 93. The Contractor must provide Medeco padlocks keyed to the Horry County School District Keymark Keying System. For all lockable items in and outside the building, including but not limited to gates, around ponds, HVAC units, lift stations, wells and irrigation system, gas disconnects, riser pits, entry roll gates, roof hatches, etc. The Contractor is responsible for the total number of lockable items per project as specified by the architect. The Contractor will purchase padlocks from the hardware supplier. 94. Keyless entry locks must be specified by the Architect, provided by the Contractor in the base bid, and must be wireless. The District will specify approved brands and location of keyless entry during design review. 95. All IDF/MDF rooms require keyless entry locks. 96. Required District Inspections: A final walk through with maintenance will be required prior to the district acceptance of the new or renovated facility. All items listed below must be commissioned and approved by appropriate district personnel. This walk through will take place after all training sessions are complete. THE CONTRACTOR SHALL PROVIDE and turn over a set of as-built plans to the maintenance department staff at the walk through. As-built drawings on C.D. Rom can be provided at a later date with close out documents. Maintenance staff will sign for the as-built drawings they received at the inspection. This document shall be turned in with close out documents. At the time of the inspection, confirmation will be given that items in the building are as as-built drawings indicate. The general contractor and subcontractor representing each area for the walk through must be present. An appropriate representative from the maintenance department will also be present. The following areas will be addressed on the final inspection: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Roofing HVAC and Test & Balance Reports Plumbing Electrical Fire Alarm Kitchen Equipment Paint Technology Doors, Toilet Partitions, Lockers Hardware Floor Finishes Fencing June 21, 2010 25 13. Irrigation Final inspections must be done separately and on a different day from training sessions. Architects must specify these inspections on plans and specifications. FIRE ALARM 97. All costs for U.L. monitoring, testing and certification required for fire alarm systems must be included in the base bid contract and provided by the contractor for one year. All fire pits must have signage chains and locks. Locks must be provided by the contractor. 98. Sprinkler riser rooms must be supervised and labeled for each section. A diagram of the school must be provided on the wall and must indicate all labeling. 99. All PIV valves FDCs must have signage. 100. All PIV valves are required to have tamper switches. 101. Back flow preventers must have tamper switches tied into the fire alarm system as required by the State Fire Marshal. Back flow preventer fills must be locked and valves must be signed, chained and locked. Above ground pits must have heater. Riser rooms must have heaters also. ROOF 102. In renovation work, when asphalt is used, an additive to reduce odor is required. The architect is required to use an Horry County Schools’ approved roof consultant. June 21, 2010 26 REQUIRED DISTRICT INSPECTIONS A final walk through with maintenance will be required prior to the district acceptance of the new or renovated facility. All items listed below must be commissioned and approved by appropriate district personnel. This walk through will take place after all training sessions are complete. THE CONTRACTOR SHALL PROVIDE and turn over a set of as-built plans to the maintenance department staff at the walk through. As-built drawings on C.D. Rom can be provided at a later date with close out documents. Maintenance staff will sign for the as-built drawings they received at the inspection. This document shall be turned in with close out documents. At the time of the inspection, confirmation will be given that items in the building are as as-built drawings indicate. The general contractor and subcontractor representing each area for the walk through must be present. An appropriate representative from the maintenance department will also be present. The following areas will be addressed on the final inspection: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Roofing HVAC and Test & Balance Reports Plumbing Electrical Fire Alarm Kitchen Equipment Paint Technology Doors, Toilet Partitions, Lockers Hardware Floor Finishes Fencing Irrigation Final inspections must be done separately and on a different day from training sessions. Architects must specify these inspections on plans or in specifications as well as the requirement for as-builts. June 21, 2010 27 RECOMMENDATIONS FOR NEW SCHOOLS AND RENOVATED SPACES ROOFS 1. Low slope applications; Cold or hot – Modified Bituminous Membrane roofs shall be installed over the specified insulation, with a minimum of 2 plies of prefabricated, reinforced, homogeneous Styrene-Butadiene-Styrene (SBS) block copolymer modified asphalt membrane secured to a prepared substrate. Both reinforcement mats shall be impregnated and coated each side with a high quality SBS modified bitumen blend. The roof system shall pass ASTM D 5849, Resistance to Cyclic Joint Displacement at 14ºF. Passing results shall show no signs of membrane cracking or interply delamination after 500 cycles as manufactured and 200 cycles after heat conditioning according to ASTM D 5147. The modified base ply membrane shall be glass fiber or polyester-reinforced ply sheet manufactured for torch application, cold-adhesive application, or mopped application meeting or exceeding requirements of ASTM D 6163 (glass fiber reinforced) or ASTM D 6164 (polyester reinforced), Type I or II, Grade S. The interplay adhesive material for the modified bitumen membrane base sheet shall be ambient temperature asphalt that is VOC compliant, cold adhesive, or adhered using torch grade membrane; the interplay adhesive material for the modified bitumen surface ply shall be cold adhesive or adhered using torch grade membrane. The modified cap sheet membrane shall be glass fiber or polyester-reinforced ply sheet manufactured for torch application or cold-adhesive application meeting or exceeding requirements of ASTM D 6163 (glass fiber reinforced) or ASTM D 6164 (polyester reinforced), Type I or II, Grade S. The modified cap sheet shall have factory embedded white ceramic granules. Design shall meet NRCA standards including 12” minimum flashing heights, equipment flashing, and through-wall flashing, etc. As a minimum, the roof systems must be installed to comply with FMG 4470/4450 and meet the FMG wind uplift requirements for each school location, FMG Data Sheet 1-29 for above roof deck components and FMG Data Sheet 1-49 for perimeter flashing and meet UL 790 Class A Fire Rating. When hot asphalt is being used, a low fume asphalt or alternate substance to reduce asphalt/tar odor shall be used. Utilize low or no fuming asphalt kettle whenever roofing bitumen is being heated. Kettle to be an incineration type apparatus as manufactured by Reeves Roofing Equipment Co. (Afterburner Kettle) or Garlock Equipment Co. (Fume Guard) or a filtration type apparatus as manufactured by National Tool and Equipment Co. (Fume Recovery System). Minimum acceptable slope for such systems will be ¼” per foot and should be incorporated into the building design as to avoid the expense of tapered insulation. Roof insulation boards shall be installed in two (2) layers when the insulation exceeds 2 inches in thickness. A moisture resistant gypsum overlayment board shall be installed over all layers equal to DensDeck or Securock. 2. Steep slope applications (4/12 or steeper) – Standing seam Kynar finished structural metal roofing system or architectural system over deck, utilizing seams that are a minimum of 2 inches above the plane of the roof panel secured by means of concealed cleats. Kynar finished aluminum is preferred if the budget allows. In general, a minimum slope of 3 inches per foot should be maintained. Exposed fasteners are not permitted. 3. Low slope applications (3/12 or flatter) – When a standing seam metal roof is used, must have a minimum rib height of 2 ½”. * A double lock rib is required in both low slope (3/12 or flatter) and steep slope (4/12 or steeper) standing seam applications. 4. Through-wall flashing – In all locations where a roof terminates at masonry wall, the wall shall have a 16 oz. Copper through-wall flashing. The flashing shall turn up a minimum height of eight inches inside the wall, come through the exterior brick or block and turn down a minimum of one and one half inches on the face of the masonry wall. Joints shall be soldered to make a watertight connection and be inspected by the architect or his representative before being covered. Provide end dams at flashing termination at walls for control of drainage to exterior of building. Remove all excess mortar from joints on the interior side of the new brick wall and ensure excess mortar does not fall into wall cavity on to new through-wall flashings. Contractor shall utilize procedures necessary to ensure cavity walls, through-wall flashings, and weeps are clear of mortar and/or debris. The flashing shall be installed in the masonry wall so that it will be located a minimum height of eight to ten inches above the finished roof. 5. 2-Piece Receiver and Counter Flashing – ASTM A167, 26 gauge. Fabricate receiver and counterflashing in 8- or 10-foot lengths. Refer to SMACNA Manual Figure 4-4A. The receiver flashing is set as the wall is built and placed a minimum of 10 inches above the finished roof and 1 inch above the cant. June 21, 2010 28 The interior wall vertical leg shall extend up a minimum of 2 inches. Secure top edge of receiver with expansion anchors with EPDM washers spaced 12 inches on center. The through-wall flashing shall extend over the vertical and horizontal legs to within 1 inch of the exterior wall surface. Dissimilar metals shall be separated with a coating of asphaltic paint. Notch and lap receiver 4 inches at joints with 2 rows of stainless steel pop rivets staggered and placed 2 inches on center and completely solder. Notch and lap inside corners. Notch and seam outside corners. Do not rivet or otherwise secure joints at corners. Provide end dams at flashing termination at walls for control of drainage to exterior of building. Install counterflashing into receiver flashing and secure. Install wind clips 24 inches on center. Notch and lap ends of adjoining sections not less than 6 inches. Apply sealant between sections. 6. Roof Drains and Downspouts – All roof drains shall be cast iron and flashed with 4 lb. lead or soft copper. All roof drains shall have a minimum 48” sump with 24” copper gravel guards installed with granule surfacing. The downspouts from the gutters shall be piped into the storm drain system. Cast iron roof drains and rims are required. PVC rims are not allowed. 7. Parapet walls and wall caps – All parapet walls shall be covered with a high temperature ice and water shield for use under metal, have continuous wind clips, and tapered cants installed before caps are installed on the wall. All wall caps shall have standing seam connections fabricated and installed in accordance with SMACNA and ANSI SPRI ES-1. 8. Expansion joints – All expansion joints, whether roof to roof or roof to wall, whenever and wherever possible, shall be curbed and covered with vinyl water barrier and standing seam metal joints fabricated and installed in accordance with SMACNA. 9. Roof Scuttles – All roof scuttles are to be Bilco Aluminum or stainless steel constructed roof scuttles with ladder up the post. 10. Warranties – All roofing systems, whether modified bituminous membrane, standing seam metal, or single ply, etc., shall be installed according to manufacturer’s specification and meet state and local building codes. All manufacturers’ warranties shall include the full system and include all materials specified from the deck up with a twenty year no dollar limit weathertightness warranty. The warranty shall include inspections during the second year with preventative maintenance performed by the contractor and manufacturer. After the inspection, a report shall be delivered to the Building Owner identifying all corrective actions by the contractor and manufacturer and any future action required by the Owner to maintain the roof. June 21, 2010 29 WALLS Masonry type: Concrete block interior with brick exterior. The District prefers to use utility brick at 1/3 bond. Split face block should not be used unless it is needed to match an existing building or renovation. Interior walls to be finished to acceptable tolerances and painted except in areas such as restrooms and kitchens. FRP must be used in kitchens and staff restrooms from floor to ceiling level. Waterborne epoxy must be used in the remainder of kitchen and restroom areas, such as storage and miscellaneous areas. Administrative walls may be metal stud cavity with gypsum wallboard. Classroom wall finishes shall be concrete block. *See Paint Recommendation section for specifics on paint pertaining to new schools versus renovations. June 21, 2010 30 KITCHENS All kitchens are required to have an exterior doorbell at loading dock door. Doorbell specified must be a heavy duty commercial and must be located to buzz adjacent to kitchen manager’s office. A peep hole must be installed in the same loading dock door with the exterior doorbell. EXHAUST HOODS Variable Volume Specifications The variable shall automatically control the speed of the exhaust (and make-up if applicable) fan to ensure optimal hood performance. The system includes the following components: I/O Processor, Keypad, Temperature Sensors, Optic Sensors, Electric Motor Starters (VFB’s which replace magnetic starters for 3 phase motors), and Cables. The hood manufacturer shall integrate this pre-engineered system into new construction kitchen hoods. The I/O Processor, Keypad, and Electronic Motor Starters (VFB’s) shall be mounted in the exhaust collar, and the Optic Sensors shall be mounted inside the ends of the hood with air purge units (APU) mounted on the top of the hood. Standard System Components • I/O Processor • Keypad • Temperature Sensor • Optic Sensor with air purge unit • Electronic motor starters (VFB’s) • Plug and Play Cables Responsibilities The hood manufacturer is to pre-mount all variable volume system components at the factory. All variable volume system components shall be factory pre-wired. The variable volume system shall be pre-programmed at the factory. The electrical contractor shall field wire the I/O processor inside the utility cabinet with an input of 115/1 or 230/1 VAC from a dedicated circuit. The output wiring shall be connected to the hood lights. The electrical contractor shall field wire the electric motor starters inside the utility cabinet by connecting 3-phase input power from the circuit breakers. The output wiring shall be connected to the respective fan motor. The input and output wiring shall be run in separate conduit for each starter. (Note: If there is a heated MUA unit, separator circuit must feed the controls. Do not use the motor circuit. Also, a control cable with at least 4 conductors shall be run from the MUA to the I/O Processor.) The electrical contractor shall connect Plug-n-Play cables from I/O Processor to each hood. Electrical contractor shall start up the system by pressing the light and fan switch on the keypad to verify hood lights function and fans proceed to minimum speed. Correct fan rotation as necessary. Test and balance contractor shall air balance the system by pressing the 100% switch on the keypad. Speed adjustments on the direct drive fans to be made at the electronic motor starts (VFB). 1. 2. 3. 4. 5. Exhaust hood duct over equipment from the top of hood to the roof curb must be stainless steel. Exhaust hood heights 6’8” AFF. Exhaust hood preferred brand name is Green Hec or Captive-Aire (U.L. Listed). Use variable volume drive on hood. Do not use bottom discharge make-up air. WALK-IN COOLER AND FREEZER 1. 2. 3. 4. 5. Walk-in cooler and freezer preferred brand name is Bally Engineered Systems, Bally Boxes, Bally conditioned units, Bally evap., or approved substitute. Walk-in cooler and freezer stainless steel floors with nonskid strips (no painted or concrete floor). Lighting to comply with DHEC specifications. DHEC may require additional lighting. Verify with DHEC. Condenser units located on ground should be fenced in. Freezer and cooler must be on the emergency generator at all times when available. June 21, 2010 31 MANAGER’S OFFICE 1. 2. Manager’s Office must have view of entire facility (serving line, deliveries, and preparation area). HVAC for manager’s office shall be a separate unit from preparation area. WALLS, FLOORS, DOORS (NEW SCHOOLS ONLY) 1. 2. 3. 4. 5. FRP shall be used floor to ceiling in kitchen, preparation area, serving area, and dishwasher area. Epoxy poured floors such as a Dex-O-Tex type product. When epoxy floors are used only dark colors such as dark blue, charcoal, black and red terracotta may be used. Door at the back of kitchen shall have fly fan. Use only Pants/EQ duct over dishwasher and must be stainless steel to roof curb, and be insulated. All roll-up doors to be electrical, not manual. The only exception would be the dish return unless it is in a fire rated wall. OSF guidelines should be followed. WATER BOILERS 1. Preferred brand is A.O. Smith or approved substitute. *Factory built rack systems are not allowed. 2. Brass fittings to be used on boilers, water heaters and storage tanks. (No galvanized pipe fittings to be used). 3. Water heaters must have two-temp booster recovery systems for HW 420 HW520 - HW670. GAS EQUIPMENT 1. 2. 3. 4. Use of Gas Equipment is preferred. Natural gas is preferred where available. Valves - Jenkins - Conbraco - Ball valves to be full port on hot water lines. Electric water heaters to be used is A.O. Smith with brass pipe nipples used in place of galvanized. Kitchen/Gas Appliances: Vulcan-Hart or Hobart, or approved equal Automatic Slicers - Hobart Convection Ovens - Blodgett - Hobart Braising Pans - Groen Hot Plate - Southbend - Hobart - Franklin Chef Fat Fryer - Pitco with standing pilot only with dump station filter system - no electronic ignition systems Convection Steamer - VS X 10 Vulcan Hart with water filtering system Dishwashers – Hobart Buffalo Chopper - Hobart * Items listed above are preferred brands. Substitutions will be considered but must be approved. Energy Star appliances preferred. 5. Water Boilers (No PVI, they will not last with the high temperature we use). We use only A.O. Smith with two-temp boosterrecovery systems, used with kitchen dishwashers. Use brass pipe nipples in place of any galvanized fittings on storage tanks. GAS PIPING - UNDERGROUND 1. Use polyethylene pipe only. SERVING LINE EQUIPMENT Serving line equipment must meet all DHEC, OSF and Building Code requirements. Hoses for serving equipment must be provided by the contractor. All drain areas must be covered with grids. June 21, 2010 32 PAINT RECOMMENDATIONS FLAT PAINT SHALL NOT BE USED IN HORRY COUNTY SCHOOLS BUILDING CORRIDORS, CLASSROOMS, AND HIGH TRAFFIC AREAS. 1. 2. 3. 4. 5. 6. All interior walls of new schools should be painted with semi-gloss interior/exterior waterborne acrylic Devflex 4208 or approved equal. Walls shall have a minimum of three coats of paint. Interior doors and openings should be painted with interior/exterior waterborne acrylic gloss Devflex or approved equal. Door frames and interior window frames shall have a minimum of three coats of paint. Exterior hollow metal doors and frames should be painted with interior/exterior waterborne acrylic gloss Devflex or approved equal. Exterior doors and frames must have a minimum of three coats of paint. Prior to painting, all surfaces must be prepared with appropriate primers. All recommended products are Sherwin Williams, ICI Devoe, Rose Talbert, DTM acrylic coating, or approved equal. Architects shall specify surface preparation and finish. *THE SAME PRODUCTS AS LISTED ABOVE MAY BE USED IN RENOVATION PROJECTS; HOWEVER, PROPER PRIMERS MUST BE USED IN CASES OF OLD WALLS THAT HAVE BEEN PAINTED AND REPAINTED MANY TIMES WITH OIL OR OIL EPOXY PAINT. Painting Requirements for Renovations Previously Coated Surfaces Maintenance painting will frequently not permit or require complete removal of all old coatings prior to repainting. However, all surface contamination such as oil, grease, loose paint, mill scale dirt, foreign matter, rust, mold, mildew, mortar, efflorescence, and sealers must be removed to assure sound bonding to the tightly adhering old paint. Glossy surfaces of old paint films must be clean and dull before repainting. Thorough washing with an abrasive cleanser will clean and dull in one operation, or wash thoroughly and dull by sanding. Spot prime any bare areas with an appropriate primer. Recognize that any surface preparation short of total removal of the old coating may compromise the service length of the system. Check for compatibility by applying a test patch of the recommended coating system, covering at least 2 to 3 square feet. Allow to dry one week before testing adhesion per ASTM D3359. If the coating system is incompatible, complete removal is required. Painting Requirements for New Schools Block (Cinder and Concrete) Remove all loose mortar and foreign material. Surface must be free of laitance, concrete dust, dirt, form release agents, moisture curing membranes, loose cement, and hardeners. Concrete and mortar must be cured at least 30 days at 75°F. The pH of the surface should be between 6 and 9, unless the products to be used are designed to be used in high or low pH environments, such as Loxon. On tilt-up and poured-in place concrete, commercial detergents and abrasive blasting may be necessary to prepare the surface. Fill bug holes, air pockets, and other voids with a patching compound such as ConSeal. *ALL HAND RAILING MUST BE HEAVILY SANDED WITH ROUGH SAND PAPER IN ORDER TO PROVIDE THE PRODUCT WITH SOMETHING TO STICK TO. New Construction Painting Schedule Interior Painting Schedule A. CEMENT BLOCK WALLS - Concrete Masonry Unit Surface Prep: Block (Cinder and Concrete) S-W 3 Pre-Primer: Loxon Block Surfacer Prime Coat: Loxon Block Surfacer Intermediate: DTM Acrylic Coating Semi-Gloss Finish Coat: DTM Acrylic Coating Semi-Gloss B. SHEETROCK WALLS - Gypsum Board Surface Prep: Drywall - Interior & Exterior S-W 3 Pre-Primer: Builders Solution Interior Primer/Surfacer Prime Coat: Builders Solution Interior Primer/Surfacer Intermediate: DTM Acrylic Coating Semi-Gloss June 21, 2010 33 Finish Coat: DTM Acrylic Coating Semi-Gloss C. METAL DOOR CASINGS/DOORS - Steel Surface Prep: Power Tool Cleaning S-W 15 Pre-Primer: Pro-Cryl Universal Primer Prime Coat: Pro-Cryl Universal Primer Intermediate: Waterbased Industrial Enamel Finish Coat: Waterbased Industrial Enamel Exterior Painting Schedule A. BRICK LINALS - Steel Surface Prep: Hand Tool Cleaning S-W 14 Pre-Primer: Pro-Cryl Universal Primer Prime Coat: Pro-Cryl Universal Primer Intermediate: DTM Acrylic Coating Semi-Gloss Finish Coat: DTM Acrylic Coating Semi-Gloss B. METAL DOORS (Pre-primed) Surface Prep: Hand Tool Cleaning S-W 14 Intermediate: Waterbased Industrial Enamel Finish Coat: Waterbased Industrial Enamel C. EXTERIOR STUCCO (DRYVIT) - Stucco Surface Prep: Not Selected Prime Coat: Loxon Exterior Acrylic Masonry Primer Intermediate: A-100 Exterior Latex Gloss Finish Coat: A-100 Exterior Latex Gloss D. EXTERIOR SHEETROCK – Exterior Drywall Surface Prep: Drywall – Interior & Exterior S-W 8 Prime Coat: Loxon Exterior Acrylic Masonry Primer Intermediate: A-100 Exterior Latex Satin Finish Coat: A-100 Exterior Latex Satin E. EXTERIOR METAL CANOPY DECKING - Galvanized Surface Prep: Galvanized Metal S-W 10 Prime Coat: Pro-Cryl Universal Primer Intermediate: Waterborne Acrylic Gloss Devflex or DTM Acrylic Finish Coat: Waterborne Acrylic Gloss Devflex or DTM Acrylic F. METAL CANOPY POSTS - Steel Surface Prep: Hand Tool Cleaning S-W 14 Prime Coat: Pro-Cryl Universal Primer Intermediate: Waterbased Industrial Enamel Finish Coat: Waterbased Industrial Enamel G. KITCHEN/BATH/WASHROOMS (OPTIONAL) - Concrete Masonry Unit Surface Prep: Block (Cinder and Concrete) S-W 3 Prime Coat: Loxon Block Surfacer Intermediate: Waterbased Tile-Clad Epoxy Finish Coat: Waterbased Tile-Clad Epoxy June 21, 2010 34 HVAC CONTRACTOR DOES NOT CHANGE FILTERS DURING WARRANTY PERIOD, HOWEVER, FILTERS MUST BE CHANGED AND DATED ONE WEEK PRIOR TO SCHOOL DISTRICT OCCUPANCY. Plumbing vents must be located far enough from make-up air units so odor will not be pulled back into the building. HVAC access doors must be totally and easily accessible. HVAC access must not be blocked by overhead plumbing or electrical conduits, lines and ductwork. Auditorium – Do not put air handlers over seating area. Auditorium – Size one heat pump for square footage of the area and the other heat pump for the “people load”. This is to help with humidity control when space is unoccupied. Provide humidity control for entire building (not just classrooms). Heat pumps are to be 13 Seer or better. Do not tie condensate drains into roof drains. Provide heaters at all corridor entrances in all buildings. HVAC Duct Work ALL DUCT BRANCH CIRCUITS MUST BE R-6 ACOUSTICAL FLEX AND MUST BE FLEXMASTER ACOUSTICAL TYPE 8 OR APPROVED EQUAL. THIS TYPE FLEX MUST BE USED TO REDUCE NOISE LEVELS IN CLASSROOMS. 1. 2. 3. 4. 5. 6. All ductwork is to meet S.M.N.C.A. Guidelines. All ductwork is to be metal duct (No Ductboard). All duct is to be sealed before duct wrap goes on with sealant. Any duct wrap that gets wet must be removed and replaced at no charge to the owner. Flex duct can be used on supply grills and return grills. Do not exceed 8’ on all flex lines. On flex duct, support with hangers every six feet. Duct Insulation 1. All duct is to be externally wrapped (No Duct Lining). 2. Use 2” or larger duct wrap. 3. Use fiber cloth and staples on wrap with 1½ seam. 4. Mastic all duct seams, even take off and grills. a) Insulation blankets on supply b) Use grill 3 way registers to prevent air blowing on walls or on thermostat 5. On return side duct from unit to return grill, no open plenum. Diffusers & Grills 1. 2. Use 2’ x 2’ drop in louvered grills in support ceilings, open size 22” x 22”, 20” x 20”, or 20” x 30” as needed for particular application. Large standard size grills and filters only. Each classroom is to have its own return filtered grill. June 21, 2010 35 3. 4. ALL RETURNS ARE TO BE FILTERED AT THE GRILL (STANDARD FILTER SIZES ONLY). ALL GRILLS AND ALL FILTERS MUST BE STANDARD COMMERCIAL SIZE. NO SPECIAL ORDER OR ODD SIZED GRILLS AND FILTERS. MOST COMMONLY USED SIZES BY THE SCHOOL DISTRICT ARE 20” X 20” AND 20” X 30”. Try to use the same size filters throughout the job, minimize size differences. Equipment 1. Equipment shall be UL approved and minimums 13 EE R. 2. ALL EQUIPMENT MUST BE SERVICEABLE. MAINTAIN AT LEAST A MINIMUM OF 24” SERVICEABILITY AROUND THE UNIT. A MINIMUM OF 36” SERVICEABILITY IS REQUIRED FOR EXTERIOR MAKE UP AIR UNITS ON THE GROUND AND ROOF. ROOF PADDING IS REQUIRED AROUND ALL ROOF TOP UNITS. Engineer is to add this as an additional note on plans. 3. All air handlers to have overflow pan with float switch. Pan should be a minimum of 2” larger than unit on all sides. Depth should be a minimum of 2 ½”. Units and pans must have a minimum of four supports for additional weight when full. 4. All p-traps are to be copper with clean out or blow out. 5. Drain lines are to be insulated from unit out to end, with proper slope. A minimum of 1/8” per foot is required and must be directed into the storm drain. DO NOT TIE DRAIN LINES INTO ROOF DRAINS. 6. All outside equipment shall have chain link fences around outside with clearance for maintenance. Large and small units shall have a minimum of 3’ clearance around the unit. Access to panels that open must not be blocked. Service gates must be a minimum of 3’. 7. All systems in mechanical rooms must be elevated on concrete slabs or house cleaning pads. 8. Design drop ceiling grid made in a 4’x4’ area to take out, in areas under mechanical units for services and maintenance of unit. 9. All equipment to have coil guard for protection. 10. Provide for easy access to above ceiling mechanical units: use of wall mounted ladders is suggested. Above ceiling units must have 2’ perimeters access. 11. As needed per design, provide lighted attic space with receptacles at light fixtures where equipment is located in attic space. 12. A/C drain lines to be run by A/C contractor with no dry wells. 13. Air handler disconnects to be accessible from electrical service panel of unit. 14. Acceptable Equipment Choices are: a) Trane b) Lennox c) McQuay *Substitutions will be considered but must be approved by the District. 15. Coils and filters in mechanical units must be protected at all times during finish installation. Construction filters must be changed and dated weekly. Filter protection must be placed over all return grills and diffusers during construction. Should proper filters not be in place, units should not be turned on. If these conditions are not met, the school district will require cleaning of the units, ductwork, and the coils before accepting the building. All HVAC filters must be changed and dated the week prior to building turnover. 16. Choices for Air Recovery System must be a heat pipe or plate heat exchange. *Substitutions will be considered but must be approved. June 21, 2010 36 Note: 1st Wringer plus with heat pipe outside of building, 2nd Hot water coil in air handler if installed in attic with hot water heater in another area. 17. Interior HVAC equipment must not be exposed to weather in lay down areas for long periods of time before installation. 18. A cover must be provided for all exterior refrigeration units. Covers must provide proper ventilation. 19. No direct fire gas heaters are to be used in any duct or dehumidification units. 20. Testing and Balance Reports must be complete before OSF inspection and must be hired by the GC. The testing and balancing contractor must be independent of the mechanical contractor. Filters 1. Filters must be changed by the general contractor immediately prior to occupancy. District responsible for providing and changing filters during the warranty one year period. 2. This District will not accept dirty coils. Coils must be cleaned and photographed prior to District occupancy. Energy Management Systems 1. 2. 3. 4. Stay with our present systems (Landis & Staefa.) Put the E.P. in mechanical room, not an office or work area. Label all equipment, etc. System needs to be able to shed loads, duty cycle, optimum start/stop, and have demand limit. Hanger Support 1. 2. All metal used should be painted or galvanized. Stamps on ductwork should be at least 22 Ga. or better. Cooling Tower (if used) 1. 2. 3. 4. 5. 6. 7. Tower should be closed circuit cooler type. Tower should be all stainless steel with induced draft (type 304). Chain length fencing is required around chillers with minimum of 5’ clearance. Chillers drainage must be routed to storm drains. Basin heaters to prevent freezing. Tower to sit on concrete rail pad. Size of pad must be adequate. Tower needs to have bottom drain 2”. Any metal used must be all stainless. Provide variable speed drive on tower fans. HVAC Refrigerant Lines 1. 2. 3. 4. All lines that penetrate any wall must be in a sleeve and must be insulated. Lines that do not penetrate a wall must have continuous insulation and must be totally sealed. All lines to be soldiered must contain nitrogen and must be kept clean and free of moisture by means of caps or otherwise. Final test requires 250-lbs. pressure for 24 hours. Must not exceed manufacturer’s recommended length. June 21, 2010 37 PLUMBING See Specifications attached for faucet to be used in all single and gang toilets. Plumbing vents must be located far enough from make-up air units so odor will not be pulled back into the building. Overhead plumb lines, mechanical duct and electrical conduits must not block access to any other overhead equipment or access doors. 1. 2. 3. 4. 5. The plumber is to supply hoses for kitchen serving line equipment. Potable hot and cold water pipe shall be copper. Small water heaters may be used in isolated application. The kitchen and athletic locker room's hot water system should be re-circulating. All water heaters shall be controlled by Energy Management System. Water heaters shall not be controlled by heat run TEC’s. Central hot water heaters for locker room showers, etc. shall be gas fired. The kitchen dishwashing system shall be either A. O. Smith, RayPak, or approved substitute (No PVI). Automatic trap primers shall only be used for floor drains. The primer shall be the passive type fed off of local sink traps. No mechanical trap primers shall be used. Traps shall be filled with vegetable oil after construction. Grease Trap Requirements R-6460 Series Pressure Type Round Manhole Frames with C/S Bolted Lids Water-, Gas-, and Steam-tight Heavy Duty – Round for Slab Construction. Drainage All soil, waste, drain, and vent PVC piping shall be at least schedule 40 or better below the slab and to the point of connection of the sanitary sewer system. All laboratories to be chemical resistant acid waste piping. Domestic Cold Water and Hot Water All domestic cold and hot water piping shall be hard drawn copper. Type K copper must be used below the slab and Type L above finished floor, with soldered wrought copper fittings. All domestic water lines shall be run overhead. Hot and cold water should be provided in each gang toilet and all miscellaneous restrooms. Please provide a mixing valve so that hot water can be predetermined. Valves All ball valves shall be Hammond, Jenkins, Apollo by Conbraco, or approved substitute. No gate valves are permitted. Cut off valves shall be placed throughout the building to allow for isolation of small areas for easier repair and maintenance. Isolation valves shall be installed at all toilet locations and in hot water lines leaving main going to classrooms and restrooms. Valves must be easily accessible. Where valve access boxes are used, they shall be key lockable and keys shall be provided to the school. All lavatory and sink stop valves shall be polished chrome-plated heavy cast construction. Sweat valves are accepted or if threaded valves are used, they shall be used with chrome plated brass nipples. Valves must be labeled on ceiling grid or walls for maintenance. Wall Hydrants Provide Woodford chrome plated, self-draining and anti-freeze exterior wall hydrants. Wall Hydrants shall have internal vacuum breaker. Hydrant keys shall be provided to the school when construction is completed. Approved equals are Josam or J.R. Smith. Electric Water Heater Provide energy efficient glass-lined water heater as manufactured by A.O. Smith, Ruud, Bradford White, or approved substitute. June 21, 2010 38 All hot and cold connections to water heaters shall have a dielectric union. Valve and Line Identification Provide 1 ¼” standard hexagonal bronze identification tags as manufactured by Seton Nameplate Company. This must be done on each to identify the type of service at an area easily accessible. Lines are to be identified Hot or Cold with directional arrows. A valve chart shall be provided and attached to wall in the mechanical room where the main water supply enters the building. Valves must be labeled clearly on ceiling grid. Isolation valves shall be installed at all toilet locations. Plumbing Fixtures All plumbing fixtures are as manufactured by American Standard or approved substitute if they can provide exact replacements for a period of 10 years. Replacement parts must be available in the United States. Brass flange provided by the manufacturer for drain connection between urinal and drain-piping system shall be used. PVC or plastic flanges shall in no case be permitted on urinal drains Drain traps on sinks, lavatories, etc., shall be 17-gauge brass with chrome or satin finish. When used, flush valves shall be Sloan, Delaney, Zurn, or approved substitute. Electric water coolers are to be of quality same as or equal to Halsey Taylor, Elkay, or Oasis brands. In boys and girls restrooms, all lavatories shall have a grid strainer type drain. Metering faucets are not acceptable. Wrist handles should only be used where required by code. All urinals must be waterless. There must be one urinal at handicapped height in each male restroom. Parts for all eye wash stations must be available in the United States. Hot Water Hot or tepid water must be installed as required by OSF and DHEC in all areas. The District prefers to have hot water in janitor closets, special education classrooms, art rooms and adult restrooms. Hot water shall be installed in administrative areas, teacher workrooms, health room, and media center. Washer/Dryer Hookups Hookups shall be provided in kitchen and P.E. storage areas and other areas as may be required for specialty programs such as: Special Ed, Home Economics, Culinary, Cosmetology, Nursing, etc. Backflow Preventer Provide a backflow preventer as manufactured by Watts #709, Febco, Conbraco, or approved substitute. Backflow preventer shall be installed on main water supply with ample space for testing and servicing the unit. Any kitchen reels, can wash areas, dish wash areas, or any other areas that have mixing valves must have check valves on cold water in the ceiling. Piping Outside of Building A locator wire shall be run with all outside PVC or any non-metallic piping. Clean outs to grade shall have concrete clean out rings or collars for protection to clean outs. June 21, 2010 39 Any and all irrigation sprinkler systems shall be run with no less than schedule 40 PVC pipe, and a locator wire run along with piping. An as-built drawing shall be submitted to the Horry County Schools Maintenance Department on all irrigation systems. Training for the irrigation system is required. A minimum of two staff members and one of the plumbers from Maintenance must be present. All irrigation system must have a lock with keys on the time clock box. Three keys are required and must be turned over to the District lock and key supervisor. All irrigation wells should have well houses with electricity. All wells must be fenced in. Blueprints and Submittals All plumbing shall be run according to the blue prints. Any approved changes needed shall be marked on drawings and a complete set of as-builts must be provided to Horry County Schools with close-out documents. A complete set of job submittals must be provided to the architect and district project representative. Future Connections For future expansion, provide 1” cold water and 4” sewer stub outs at the end of each wing. Cap ends of connection and stub out shall be a minimum of 10’ from building avoiding walkways, etc., for the purpose of the hookup of future portable classrooms. Smoke Test At the time of final inspection, a smoke test shall be conducted on the entire sanitary sewer system to check for sewer gas leaks. Maintenance should be present. All lab faucets and faucets in classrooms and restrooms must be vandal resistant. All drain lines under slab need to be checked by camera and recorded on DVD as part of the closeout documents. The DVD of all lines must be turned in with closeout documents. THE NURSES SINK MUST ALSO HAVE A SPRAY NOZZLE. Eyewash Station Eyewash stations are required in all science labs and janitor chemical storage closets. The District prefers a Bradley Eyewash Station or owner approved equal. Parts must be available in the U.S. June 21, 2010 40 THIS FAUCET MUST BE SPECIFIED WITH ALL GANG TOILET SINKS AND INDIVIDUAL SINKS. RECESSED SOAP DISPENSERS ARE NOT ALLOWED. June 21, 2010 41 ELECTRICAL Sensors in all rooms including storage, office, halls, restrooms, common areas, and media. Type of sensor preferred – Leviton Dual Technology. Sensors must be located in center of rooms and if possible six foot from air duct and 2 foot from lights, overhead plumb lines, and mechanical duct. Electrical conduits must not block access to any other overhead equipment. 1. Standard fixtures must be used in all areas. 2. Fluorescent light fixture should be 2’ x 4’ lay-in type, with electronic ballast, and 4100, T8 lamps, 28 watt. 3. Classroom and office fluorescent fixtures should be three tube type, two outside tubes on one switch and two inside tubes on one switch. 4. Hall fluorescent fixtures should be three tube 2’ x 4’ lay-in type; they shall be controlled by occupancy sensor. 5. Restroom light fixture should be 2’ x 4’ flush mounted, three tubes, and controlled by occupancy sensor. Each restroom should also include one night light fixture, perhaps located in the hard ceiling. 6. All schools shall have emergency generators, either LP or natural gas or diesel. Generators shall be large enough to run emergency lights, phone system, intercom system, freezer, cooler, night lights in toilets, and power outlet that may be needed by emergency personnel of Red Cross. Red Cross requires a 120 volt 20-amp circuit. 7. Ceiling height above 15’ should have T5 or T8 florescent ceiling fixtures with cover shade. All interior lighting shall be controlled by occupancy sensors. 8. Exterior wall mounted lighting should be metal halide with Polycarbonate lenses, they should be photo controlled with a contractor carrying the fixture load, and located in the electrical equipment room. Photocells shall carry the contractor coil loads only. 9. Parking lot lights should be on Energy Management System with photo control and override input to building automation system. No box lighting is permitted. Pole heights must be a maximum of 30’ in height. 10. All classrooms and all student gathering places (media center, lecture halls, auditoriums, multipurpose rooms, etc.) must have a minimum of two duplex receptacles on each wall that is not an orange receptacle for computers. These are for other type equipment such as lamps and vacuum cleaners so as not to trip off computer circuits. All plugs must have neutral pigtails. 11. All hallways shall have a 120-volt receptacle in them with an absolute maximum of 50’ apart. 12. All receptacles shall be rated not less than 20 amps (Federal Spec Grade). 13. No back to back electrical outlets should be allowed, 2’ minimum spacing. (See Technology Specs for specifics on computer, power, and data layout.) 14. All HVAC units shall have 120-volt GFI outlet located within 50’ or within eyesight for servicing. 15. Art kilns must have an exhaust hood, must be specified by the architect, and must be installed by the contractor. Kiln fan shall be interlocked with kiln controls and shall operate when the kiln is on. Provide fresh air make-up for kiln room. 16. Teacher’s lounge and all workrooms should have six circuits from panel room. Receptacles should be 42” A.F.F. and located not to exceed 6’ apart all around the room with a minimum of six circuits. June 21, 2010 42 17. All receptacles, switch, etc., plate should be stainless steel jumbo over-sized type. 18. All switches should be rated not less than 20 amps and 277 volts. 19. All gang and public toilets shall have electronic hand dryers in eyesight of hallway (Pinnacle hand dryers or approved equal). 20. All vocational shop areas shall have a central location Red “OFF” button for emergency shut down of shop equipment. 21. All timed overrides shall be 2 hours, no hold. 22. All electrical panels shall have bolt in type branch breakers, with a minimum of ten branch spaces, and sized so the demand load does not exceed 70% of the panel board rating. Also panels to have spare conduit stubbed out for future use for branch circuits. Power factor correction must be provided for. 23. All 120/208-volt panels shall have lighting surge protection on all phases. 24. All gang toilet and corridor light switches shall be located in the main administrative office area. This allows an administrator to conveniently control all main lighting from one location. 25. All disconnects shall be heavy duty, non-fused, and located within 6’ of equipment. 26. Interior raceways shall be EMT. 27. All nonmetallic conduit under slabs shall have ridged galvanized 90 degree bends and rigid riser nipples and coated with asphalt. 28. The main electrical service shall be underground to a riser pole or pad mounted transformer, as required by the power company. 29. All panels shall be accessible from the halls and they shall be mounted in shallow electrical rooms to avoid storage room type situations. Electrical rooms shall open outward into the hall to give the panels their clearance. One overhead exhaust fan shall also be installed with a set 90-degree thermostat to avoid heat build up. C FM must be sized to room with louvered doors. 30. Add phone outlets and electrical outlets in all areas indicated in Technology Specs in each file server room. 31. Mark all future raceways on an on site framed future raceway drawing located in the main mechanical room. 32. Size each computer power panel with spare spaces to allow each receptacle located on the back wall of each classroom to add two future additional 110V computer circuits “for future computer lab additions”. Each classroom must have a telephone outlet as required in Technology Specs. Data jacks must be located away from thermostats. 33. Multipurpose rooms should have (4 each side) incandescent up-down wall mount lights with two wall dimmers located back stage by the stage light dimmer control. 34. The multipurpose room stage should have an electric projection screen, 10' x 10' to be operated at a remote location on adjacent wall. Multipurpose room shall have a separate sound system. 35. The cafeteria cashier’s stand (Point of Sale terminal) should have a computer outlet with a raceway back to the kitchen manager. The kitchen manager’s office also needs a network raceway back to the hall cable tray system. (See Technology Specs) 36. Teachers’ workroom needs to be provided with adequate power for refrigerator, microwave, coffeepot, Coke machine, snack machine, and computer, as well as TV and phone. A 120V and a 240V outlet shall be located at copier locations. Teachers’ workroom should have a minimum of two computer outlets. A canteen area must be designated with dedicated outlets for several Coke, cracker, and ice cream machines. June 21, 2010 43 37. Panels are to be G.E., Square-D, Cutterhamer/Westinghouse, Siemans, or approved equal. 38. Add two 2” conduits from the file server room to the nearest cable tray. Cable tray shall be provided in all corridors sized to contain all low voltage wires. The basket type cable tray is preferred. 39. All branch circuits to be copper wire only. 40. All feeders shall be copper from transformer to panels and sub-feeders shall be copper also. Aluminum wiring is not permitted. 41. All steel in building shall be grounded. 42. All dry type transformers shall be grounded and XO shall be grounded. 43. On as-built drawings, all changes shall be shown on drawings. All inside circuits and all outside circuit wiring shall be shown also. 44. Exit signs shall be LED low voltage. 45. Provide conduits for ETV, CATV, and telephone to locations coordinated with utility or agency. 46. Contractor will not block access to any other equipment with overhead electrical conduits, plumbing lines, or HVAC duct. Lighting/Surge Protection • AC Lighting/Surge Protectors shall be installed at the AC power input terminals for the fire alarm control power extenders and any other peripheral equipment associated with the fire alarm panel. Recommended manufacturer: Ditek. • Low Voltage Lighting/Surge Protectors (clamping voltage within +15 volts of circuit operating voltage) shall be installed at the following locations: 1. 2. 3. • At addressable loop input terminals of the control panel. At notification appliance circuit input terminals of the control panel and power extenders. At any point where addressable loop or notification appliance circuits exit/enter from one building to another. An Earth Ground connection shall be provided at any point where Lighting/Surge Protection is installed. Documentation and Training Videotaping of electrical training is required to be provided by the contractor. The contractor must submit three copies of the training tape to Owner with closeout documents. The contractor shall compile and provide to the owners three complete manuals on the completed system to include operation, maintenance, and programming instructions, point programming and I/O correlation records, and as-built wiring diagrams. In addition to the above manuals, the contractor shall provide the services of the manufacturer’s trained representative for a period of eight hours per school to instruct the owner’s designated personnel on the operation and maintenance of the entire system. Testing equipment and setting breaks must be done prior to the training. June 21, 2010 44 MOTION SENSOR AND POWER BASE CUT SHEET Motion sensors are to be located in all corridors and spaces and must be located in the center of the ceiling in classrooms. June 21, 2010 45 OPB15-DW Description The Power Base™ Adapter converts any Leviton low voltage ceiling occupancy sensor to a self-contained, line voltage unit, with 15Amp, 120/277V load capacity. June 21, 2010 46 OSC20-M0W Classrooms under 2000 Sq. Ft. Description Multi-Technology, 360 Degree, 2000 Sq. Ft. Coverage, Self-Adjusting, Ceiling Mount Occupancy Sensor, Commercial Grade - White Product Features Color: White Sensor Type: Adjustment: Sensor Technology: Pattern Degrees: Coverage Range Sq. Ft.: Manual Time Adjustment: Load Rating: Input Voltage: Current Consumption: Photo Cell: Color: Standards and Certifications: Warranty: Housing Material: Code Compliance: Multi-Technology Self-Adjusting PIR/Ultrasonic 32kHz 360 2000 30s-30m, 6s Test Mode Uses Power Pack 24VDC 32mA Ambient Override ON White CUL/US Cert 5-Year Limited High-Impact, Injection Moulded Plastic California Title 24 Features and Benefits • Small Size: Installed sensor appears almost invisible. • Fast Simple Installation: Easy ceiling mount, three wire connection (low voltage) and twist-lock sensor attachment. • Accurate, Consistent Switching: Occupant complaints are eliminated; lights are on when room is occupied, off when empty. Annoying false-offs are minimized and lights on at night is eliminated. • Self-Adapting: An internal microprocessor continually analyzes, evaluates and adjusts settings. Performance is kept at a maximum and user complaints are eliminated. • Maximum Reliability, Low Cost: All digital circuitry uses a minimum of components. • Non-Volatile Memory: Learned and adjusted settings saved in protected memory. Power outages will not cause status loss. • Ambient Light Recognition: The photocell prevents lights from turning on when room is adequately lit by natural light. • Excellent Warranty: 5-Year Limited Warranty • Typical Applications: Cafeteria, Computer Room, Office w/Cubicles, Office Open, File Room, Classroom, Lounge, All Restroom types, Open Area, or Gymnasium Halls use OSWLR-IOW Tall rooms (Band) use OSW Series mounted 10’ from floor in room corner June 21, 2010 47 Control Specifications Adjustment Self-Adjusting Manual Time 30s-30m, 6s Test Adjustment Mode Timer Factory Preset 10 Minutes Sensitivity Adjustment 0 to 100 Pct Sensitivity Factory Ultrasonic 50 Pct Preset Infrared 75 Pct Photo Cell Adjustment 20 to 3000 Lux Photocell Factory 3000 Lux (disable Preset photocell) Single/Multi-Tech Switchable ON/OFF Mode PIR/ULTRA LED Disable LEDS Enable/LEDS Disable Environmental Specifications Operating 32F to 104F 0C to Temperature 40C Operating Humidity 0 Pct to 95 Pct Relative, NonCondensing Mechanical Specifications PIR/Ultrasonic Sensor Technology 32kHz Pattern Degrees 360 Coverage Range Sq. 2000 Ft. Major Motion Area 64X32 Feet Minor Motion Area 45X23 Feet Ambient Override Photo Cell ON June 21, 2010 Electrical Specifications Input Voltage 24VDC Current Consumption 32mA Output Voltage 24VDC w/Short Circuit Protection Load Rating Uses Power Pack Material Specifications Color White Housing Material High-Impact, Injection Moulded Plastic LED Indicator Red Infrared Motion & Green Ultrasonic Motion PIR Lens Type Extended Range Qty of Transducer 2 Pairs Transducer Size 16 mm Diameter Wire Leads Color Coded 6 Inch Sensor Weight 5oz/142g Standards and Certifications CUL/US Listed 9034 ANCE Compliant NOM 057 Code Compliance California Title 24 ASHRAE Standard 90.1 Compliant FCC Compliant 48 SCHEMATIC OF SENSOR WIRING June 21, 2010 49 SECURITY Security • Boxes for security are to be located on documents and installed by contractor. The electrical engineer shall allow for an empty box for security at the front entrance, the loading dock, and at the end of all classroom wings. Plates must be provided for all boxes until definite keypad locations are determined. • Security shall be provided by the Owner through existing contract. Supervision of Security and security locations shall be coordinated through the Maintenance Department. June 21, 2010 50 FIRE ALARMS AND SPRINKLER RISER ROOMS • • • • • • All costs for U.L. monitoring, testing and certification required for fire alarm systems must be included in the base bid contract and provided by the contractor for one year. All fire pits must have signage chains and locks. In renovations where work extends into two consecutive summers, the monitoring contract will be included in the base bid for two years. The engineer must determine in a renovation if the number of devices being added requires an upgrade of the entire existing building as well as U.L. monitoring. If it does, this must be included in the base bid contract. Sprinkler riser rooms must be supervised and labeled for each section. A diagram of the school must be provided on the wall and must indicate all labeling. All PIV valves FDCs must have signage. All PIV valves are required to have tamper switches. Back flow preventers must have tamper switches tied into the fire alarm system as required by the State Fire Marshal. Back flow preventer fills must be locked and valves must be signed, chained and locked. Above ground pits must have heater. Riser rooms must have heaters also. June 21, 2010 51 DOOR SPECIFICATIONS Doors Interior doors are wood only, except where metal is required by OSF. All exterior doors are to be 18 gauge galvanized. All interior doors are to be 5 ply solid core wood doors with bonded and sanded core glued using type one adhesive. Core will be laminated strand lumber. Wood door stiles to have 7/16” matching hardwood edge. Birch veneer with factory UV finish. All frames, both interior and exterior, are to be 16 gauge welding type. All exterior frames are to be galvanized. All doors are to be pre-machined and pre-fitted to jamb. All frames, both interior and exterior, are to be sealed on all surfaces before installation. All Door Hardware preparations must be factory machined. Approved manufacturers for wood doors are Lambton, Eggers, Algoma. Mohawk doors are not approved. For new construction, exterior doors shall be 1-3/4” thick FRP flush insulated panel doors equal to Commercial Door Systems F300. FRP face sheets to have finish color throughout. Factory installed hardware except for closers. Glazing, louvers, etc., to be factory installed and field-replaceable. FRP clad doors are to be hung in box-type tubular aluminum framing (no open back frame stock). Minimum aluminum frame thickness shall be .125”. Aluminum frames to be manufactured by the door manufacturer. Any metal doors used should be 16 gauge. Solid wood core doors may be preferred in retrofits since they can be planed to better fit existing openings. Interior doors should be stain grade solid wood core. All classroom doors should have a small vision panel per ADA. Mineral core doors and knockdown frames should be avoided. Laminate doors are not permitted. Door closers, pulls, hold-opens, etc. should be through bolted. Exterior doors should be properly weather-stripped. Rain shields should be used on all doors that are not protected by building overhangs. Do not use doors at main entrance to gang toilets except where the toilets may need to be secure for use only by the public. Storefronts Aluminum storefront doors, frames and hardware are not allowed. Rolling Fire Doors Features that will be required: 1. Visible means of egress. 2. Must have Auto-Set Type closure. Walls can be opened and closed without being reset by contractor or manufacturer. 3. All panels can be tested at the same time with one switch. The School District will not accept warped doors. Doors stored both on and offsite must be stored per door manufacturers spec. District Rep will verify storage method. June 21, 2010 52 DOOR HARDWARE SPECIFICATION GUIDELINES USE THIS DOCUMENT: Please be advised, this document has been prepared under the direction of the Horry County Schools Construction Project Management Department and shall be part of the project’s Design Checklist. This document shall be included in the project manual and reviewed with the Construction Project Management Department for project specific applications, along with the submittal of the Construction Documents for review. Architects shall also include a “Lock Function” column in the Door & Frame Schedule page. The lock function shall be included in this schedule when the Hardware Sets are prepared and included with the Construction Documents. Please be advised, should an individual or any business/design entity choose to substitute or change this guideline specification without the prior written approval from the Horry County Schools Construction Project Management Department, that individual or business entity shall be responsible for removing, replacing, and incur any related cost for the required changes with the guideline specific hardware. It is understood by Horry County Schools certain applications may not always be appropriate for every application, but a written request for a specific change to this document shall be submitted to the Construction Project Management Department for consideration of approval. PART 1 - GENERAL 1.1 DESCRIPTION OF WORK Work under this section comprises the furnishing and installation of finish and security hardware specified herein and noted on drawings for a complete and operational system, including any electrified door hardware components including finish and security hardware and auto operators for entrance doors. Items include, but are not limited to the following: 1. Hinges/Continuous Hinges 2. Flush Bolts 3. Exit Devices 4. Locksets and Cylinders 5. Push Plates - Pulls 6. Coordinators 7. Closers/ADA Operators 8. Kick, Mop and Protection Plates 9. Stops, Wall Bumpers, Overhead Controls 10. Thresholds, Gasketing and Door Bottoms 11. Silencers 12. Miscellaneous Trim and Accessories 13. Electrified Hardware Items, Controls and Power Supplies 14. Computer Managed Locksets 1.2 RELATED DOCUMENTS Drawings and general provisions of contract, including General and Supplementary conditions and Division 1 specifications sections apply to this section. 1.3 RELATED WORK Work specified elsewhere that should be examined for its effect upon this section. 1. Division 1 Alternates 2. Section 08410, Aluminum Entrances and Storefront 3. Section 08110, Hollow Metal Doors and Frames 4. Section 08210, Wood Doors 5. Section 08800, Glazing 6. Section 09900, Paints and Coatings as applicable. 7. Division 16 Electrical June 21, 2010 53 1.4 REFERENCES SPECIFIED in this section subject to compliance by: NFPA-80-1995 - Standard for Fire Doors and Windows NFPA-101-1994 - Life Safety Code NFPA-70 - National Electrical Code ADA - The Americans with Disabilities Act - Title III - Public Accommodations ANSI-A117.1-1992 American National Standards Institute - Accessible and Usable Buildings and Facilities ANSI-A156.5-American National Standards Institute - Auxiliary Locks and Associated Products UFAS - Uniform Federal Accessibility Standards UL 10 C – UBC 7.2 – Positive Pressure Testing ANSI-A250.6-1997/SDI -107 "Hardware on Steel Doors" (reinforcement- application) Architectural Woodwork Institute (AWI) International Building Code as Adopted U.L. - Underwriter's Laboratories WHI - Warnock Hersey International, Division of Intertek Testing Services Current State and Local Codes including Authority Having Jurisdiction 1.5 SUBMITTALS A. Shop Drawings: Indicate door and frame elevations and sections, materials, gauges, finishes, door thickness, door swing, stile and rail dimensions, veneers, undercuts, fabrication and erection details, locations of finish hardware by dimension and locations/details of all openings and louvers. Do not proceed with any fabrication until all details are approved. B. Hardware Schedule: Submit copies of schedule in accordance with Division 1 – “Submittals”, General Requirements. Schedule to be in vertical format, listing each door opening, including: Keying Information, handing of opening, all hardware scheduled for opening or otherwise required to allow for proper function of door opening as intended, and finish of hardware. At doors with door closers or door controls include degree of door opening. All submittals (schedules, cut sheets, wiring diagrams, operational descriptions and elevation drawing) shall be reviewed by Horry County Schools Construction Representative and the Horry County Maintenance Department Hardware Representative, prior to ordering of material. The Hardware Supplier shall submit the schedules and all templates within two (2) weeks from date purchase order is received by the door openings supplier – installer. C. Manufacturer’s Catalog Cuts: Submit manufacturer's cut/catalog sheets on all hardware items and any required special mounting instructions with the hardware schedule. D. Certification of Compliance: Submit any information necessary to indicate compliance to these specifications. E. Wiring Diagrams: Provide complete wiring diagrams: Riser diagrams, Point-to-point diagrams, for each opening requiring electrified hardware. Provide a copy with each hardware schedule submitted for approval. Supply a copy with delivery of hardware to job site and another copy to the Owner at time of job completion. All electrical components shall be listed by opening in the hardware submittals. June 21, 2010 54 F. Operational Descriptions: Provide complete operational descriptions of electronic components listed by opening in the hardware submittals. Operational descriptions shall detail how each electrical component functions within the opening, and incorporating all conditions of ingress and egress. Provide a copy with each hardware schedule submitted for approval. Supply another copy with delivery of hardware to job site and another copy to owner at time of job completion. G. Elevation Drawings: Provide elevation drawings of electronic hardware and systems identifying locations of the system components with respect to their placement in the door opening. Provide a copy with each hardware schedule submitted for approval. Supply another copy with delivery of hardware to job site and another copy to the Owner at time of job completion. 1.6 QUALITY ASSURANCE A. Door Openings Supplier shall be a qualified direct distributor of products to be furnished. In addition, the distributor shall have in their regular employment a certified Architectural Hardware Consultant (A.H.C) who will be available at reasonable times to consult with the Architect, Contractor, and/or Owner regarding any matters affecting the door opening assembly. The Hardware Supplier shall make periodical visits to the job site while the finish hardware is being installed, and on completion of the project, the Supplier shall inspect the installed hardware for correct operation and installation. Supplier’s office/warehouse location shall be within 200 miles of Horry County Schools. B. All hardware used on labeled fire or smoke rated openings shall be listed for those types of openings and bear the identifying label or mark indicating UL (Underwriter's Laboratories) or Warnock Hersey (WHI) approved for fire. Nonlabeled openings to be listed for panic application. All hardware applications used on labeled fire or smoke rated openings shall be in compliance with the Positive Pressure Fire Test: UL10C and with UBC7-2 1997. C. Pre-Installation Meetings: The Contractor shall initiate and conduct a jobsite meeting with the supplier and installer, and all related trades for mechanical hardware, and a meeting for electronic hardware. The Hardware Supplier shall schedule the Manufacturer’s representatives of the following products to provide training for product installation: Closers, Exit Devices, and Locksets. These meetings shall convene at least one month prior to commencement of the related work. All approved shop drawings and schedules shall be made available to all related trades as required for work to be performed. Prior to installation of wiring and installation of power supplies for electronic hardware, arrange a conference between the supplier, the installers, and all related trades to review materials, procedures, review door opening functions, and coordinating related work. The Owner’s Construction Project Manager and the Maintenance Department Hardware Representative shall attend all pre-install meetings. The Owner’s Construction Project Manager and the Maintenance Department Hardware Representative shall attend all electrical pre-installation meetings. D. All hardware products furnished to the project shall be furnished by an authorized distributor of each product to insure quality compliance, service, and Warranty of products. Product representatives of the following products: Locksets, Closers, Exit Devices, Electrified Hardware, shall conduct a certified training session at the pre-install meeting for product hardware installation training. E. All wood and composite doors shall be furnished with solid blocking at mortise lockset location, and at exit device location (hinge and center case). All metal doors shall be furnished with hardware reinforcements integral with the door for mortise locksets, door closers, and exit devices. All aluminum doors and frames shall be furnished with hardware reinforcements integral with the door for locksets, door closers, and exit devices. F. Keying Conference: A Keying Conference shall be conducted within 14 days after approval of all hardware submittals, and before ordering the locks and cylinders, on each Building Project. Attendance to this conference shall be: The Project Architect, the General Contractor, Hardware Supplier, the Horry County Schools Construction Representative, the Horry County Schools Maintenance Department Hardware Representative. Exact quantities for GGMK, GMK, MK and change keys shall be discussed, as well as determining the level of the key system, and verifying door openings with keyed function. The Hardware Supplier shall prepare and submit the Keying Schedule with one week following the Keying Conference. The Hardware Supplier shall review quantity of Proximity Cards required for each project at this meeting. This conference shall be separate from the meeting described in 2.2 Lock Cylinders & Keying, paragraph C. 1.7 DELIVERY, STORAGE AND HANDLING June 21, 2010 55 A. Finish Hardware 1. Furnish all hardware with each unit clearly marked and numbered in accordance with the hardware schedule. Include door and item number for each. 2. 3. 4. 5. 6. 7. Pack each item complete with all necessary parts and fasteners. Properly wrap and cushion each item to prevent scratches and dents during delivery and storage. Inventory hardware jointly with the General Contractor, Hardware Distributor, and Installer until each is satisfied that all products and counts are correct. Any shortages shall be replaced immediately. The General Contractor shall provide secure lock up in a clean, dry, well-lit space for finish and security hardware storage as delivered to the Project. Control handling and installation of hardware and security items to insure the installation will not be delayed due to hardware losses, both before and after installation. Hardware shipped to the jobsite is to be packaged in biodegradable packs such as paper or cardboard boxes and wrapping. If non-biodegradable packing such as plastic, plastic bags or large amounts of styrofoam is utilized, the Contractor shall be responsible for the disposal of the non-biodegradable packing to a licensed or authorized collector for recycling of the non-biodegradable packing. The Contractor shall provide a copy of the recycling receipt to the Horry County Schools Construction Representative. The Manufacturers Representative and Owners Representative shall make several inspections of the installation of Finish and Security Hardware during that phase of construction. Any deficiencies in installation of all products in this Section shall be corrected before installation continues. 1.8 SEQUENCING AND SCHEDULING A. Deliver all openings components to the job site in a timely manner so not to delay progress of other trades. 1.9 WARRANTY A. Hardware Warranty: Part of respective manufacturers’ regular terms of sale. Provide manufacturers’ warranties: 1. Hinges: Life of Building 2. Mortise locksets shall carry manufacturer’s 3-year warranty against manufacturing defects and workmanship. 3. Door closers shall carry manufacturer’s 10-year warranty against manufacturing defects. Exit devices shall carry manufacturer’s 3-year warranty against manufacturing defects and workmanship. 4. Continuous gear hinges shall carry manufacturer’s Lifetime warranty to be free from defects in material and workmanship. 5. ADA operators shall carry manufacturer’s 2-year warranty against manufacturing defects and workmanship. 6. Balance of items shall carry a manufacturer’s 1-year warranty against manufacturing defects and workmanship. B. During the warranty period, replace defective work, including labor, materials and other costs incidental to the work. Inspect the work within 24 hours after receipt of notice from the Horry County Schools Construction Representative. PART 2 - PRODUCTS A. Furnish finish hardware with all necessary screws, bolts and other fasteners of suitable size and type to anchor the hardware in position for a long life under hard use. B. Furnish fastenings where necessary with expansion shields, toggle bolts and other anchors, and according to the material to which the hardware is to be applied and the recommendations of the hardware manufacturer. Generally, furnish fasteners for machine screw installation. Do not provide hardware which has been prepared for self-tapping sheet metal screws, except as specifically indicated. All closers and exit devices on labeled wood doors shall be thru-bolted. All thresholds shall be fastened with provided screws and anchors. Where specified in the hardware sets, security type fasteners of the type called for are to be supplied. Where brackets are specified in the hardware sets, furnish brackets only as manufactured by the product manufacturer specified. C. Design of all fastenings shall harmonize with the hardware as to material and finish. D. Provide products as hereafter specified. Substitutions other than those manufacturers listed as Approved Equals must be approved, in writing, via addenda, prior to bid. Procedure for substitutions shall be as outlined in Division 1. No substitutions will be considered after award of contract. June 21, 2010 56 2.1 HINGES A. Provide full mortise type, five knuckle exposed tip design ball bearing hinges as specified. Continuous Geared Hinges shall be furnished as half surface type for all Exit doors, and any high-use interior doors such as stairwells, auditoriums, gymnasium, or cross corridors as specified. Unless otherwise scheduled, the required weight, size and butt hinge type shall be as follows: 1. Butt hinges required per door leaf: a. b. c. Doors up to 5'0" in height 2 hinges Doors over 5'0" to 7'6" in height 3 hinges Doors over 7'6" to 9'0" in height 4 hinges 2. Size and weight requirements: a. b. B. Doors over 36" in width shall have extra-heavy weight hinges, 5 inches in width. At Exterior openings, hinge pins shall be stainless steel. Finish: Except as otherwise indicated, provide all hinges with the following finish: a. b. Exterior US32D (630) Satin Stainless Steel Interior US26D (652) Satin Chrome Approved Manufacturers: Butt Hinges: Ives 5BB1/5BB1HW Hager BB1279/BB1168/BB1191/BB1199 Bommer BB5000/BB5004/BB5002/BB5006 McKinney TB2714/T4B3786/TB2314 /T4B3386 Stanley FBB179/FBB168/FBB199 Continuous Hinges: Select SL54HD Ives 054HD ABH A540HD 2.2 LOCK CYLINDERS AND KEYING A. General: All locks and cylinders shall be furnished with temporary keyed construction cores for the contractor’s use during the construction period of the project. Construction control and operating keys and cores shall not be part of the Owner’s permanent keying system, or furnished on the same keyway as the Owner’s permanent keying system. Permanent cores and keys shall be keyed to the approved keying schedule. All cylinder housings and cores shall be KeyMark by Medeco, 6-pin in an A4 System. Cores shall be furnished as small or large format depending on the Owner’s choice, or the pre-existing conditions of the project. 1. 2. 3. 4. All cylinders shall be rim or mortise type with interchangeable cores. All cylinder components shall be constructed of extruded brass. All cylinders, cores, and housings shall match the lock finish. All cylinders shall use a .150” space dimension between tumbler pin chambers shall be capable of using industry standard tumbler pins. Cylinder shall contain standard pins, a portion of which (both bottom and top pins) shall be spooled to resist pick attacks. All Cut keys, key blanks and cylinders shall be so constructed to be capable of being keyed in the same system, allowing the convenience of one master key to operate all types of listed cylinders. All cut keys and key blanks shall be utility patented and controlled by a contract between the end user and the manufacturer. Key blanks for this project shall be delivered directly from the factory to the Owner. All interchangeable core type cylinders shall have a keyway with lower angled portion, such that the keyway exits the plug at an angle preventing access to the core’s pin ejector holes (located in the bottom of the core) by insertion of a lock picking tool or tools through the keyway. B. Permanent keys and cores shall be stamped with applicable key mark for identification. These visual key control June 21, 2010 57 codes shall not include the actual key cuts. All permanent keyed cores, cylinders, keys and key blanks shall be delivered directly to the Horry County Schools Hardware Maintenance Representative from the Manufacturer via Registered Delivery, Return Receipt Required. C. The Horry County Schools Hardware Maintenance Representative shall determine the specific keyway prior to the submittal of the Keying Schedule. Within seven (7) days of receipt of the contract, the Hardware Supplier shall request the specific keyway information from the Horry County Schools Hardware Maintenance Representative for the purpose of establishing the parameters of the complete system. This information shall be included in the Key Schedule prepared after the Keying Conference described in Section 1.6, paragraph F. Furnish keys in the following quantities: 15 each Masterkeys per set 20 each Grand Master Keys for each system/school 5 each Change Keys per change key set 6 each Construction Master keys 200 each key blanks D. At project completion, the Hardware Supplier shall install the permanent keyed cores. Permanent cores shall be installed prior to final OSF inspection. Permanent core installation shall be coordinated and scheduled, in writing, with the General Contractor. All construction cores and keys shall be returned to the Hardware Supplier. 2.3 KEY CONTROL SYSTEM A. Provide a key control system including envelopes, labels, tags with self-locking key clips, receipt forms, three-way visible card index, temporary markers, permanent markers, and standard metal cabinet, all as recommended by system manufacturer, with capacity for 150 percent of the number of locks required for the Project. B. Provide complete cross-index system. The Key Control system shall be set up by the Hardware Supplier, using Horry County Schools assigned room numbers. The completed cross index, along with the cabinet shall be furnished to the General Contractor following the installation of the permanent cores. C. Provide hinged-panel type cabinet for wall mounting. D. All miscellaneous keys must be properly tagged and turned in to the Horry County Schools Maintenance Department Hardware Representative. 2.4 LOCKS, LATCHES AND BOLTS A. Mortise Lock and Latches shall be mortise type, ANSI A156.13, series 1000. Mortise Sets shall be Grade 1 operational and security, UL Listed for 3-hour fire door. Trim Design shall be tubular lever with return to within ½” of door face. Finish shall be 626 (US26D) unless otherwise noted. Furnish latch bolts with ¾" minimum throw. Deadbolts shall have 1” throw. All strikes shall be curved lip, furnished with dust box as standard. Locksets furnished on additions to existing schools shall match the existing locks and trim, unless otherwise specified in the hardware sets. The Owner approval required to match existing. B. Provide knurled levers or abrasive strips to all rooms that are considered hazardous, and are not specified with storeroom keyed function. This includes but is not limited to all electrical, mechanical and telecommunications rooms. C. Auxiliary Locks shall be Grade 1 Classroom E06091 Deadlock. D. Staff Toilets located in Corridors shall be furnished as follows: Elementary School Projects: Series 1000, Grade 1, Hotel F15 x Indicator with standard cylinder plug. Middle and High School Projects: Series 1000, Grade 1 Hotel F15 x Indicator with standard cylinder plug. Toilet rooms within Early Childhood Areas shall have passage function, F01, only. June 21, 2010 58 Toilet rooms within Special Education Areas shall have Series 1000, Grade 1 Classroom Security function F32. E. Acceptable Keyed Lockset functions shall be: Storeroom (F07) Schlage L9080; Best 40H D; COR ML2057. Classroom (F05) Schlage L9070; Best 40H R; COR ML 2055. Classroom Security Schlage L9071; Best 40H INL; COR ML2042. Computer Managed Lockset at all IDF and MDF rooms: Product and Quantity to be determined by Horry County Schools prior to bid. Specifier Note: The following functions will not be acceptable: Office or classroom Lockset functions: All locking functions shall be furnished with free egress at all times. All classroom doors shall be furnished with security classroom function: “Latchbolt retracted by lever from either side unless outside lever is locked by key from either side”. All exterior doors from classrooms shall be furnished with a function that allows for the following: “Latchbolt retracted by lever from either side. Deadbolt thrown or retracted by key from either side. Outside Lever shall remain locked at all times. Turning inside lever simultaneously retracts deadbolt and latchbolt. Inside lever is always free for immediate egress.” Use of thumbturns on locksets for classroom doors and egress doors located within classrooms are unacceptable. Thumbturns shall not be utilized in any other applications, unless the thumbturn is a classroom type function, where it will only function to retract a bolt, such as on a restroom door. If a thumbturn is specified in this circumstance, or for any special application, the thumb-turn function must be approved, in writing, by the Horry County Schools Construction Representative and the Horry County Maintenance Department Hardware Representative, prior to the specification being published in the project manual by the Architect. F. Padlocks: Provide a hardware set for each project to include the following padlock as manufactured by: Medeco. The Owner will not accept an “Add” change order for padlocks not included with the Hardware Submittal. The HCS representative will direct keying for these locks with all other hardware keying. The contractor is responsible for providing padlocks for all lockable items (roof hatches, gates, disconnects, etc.) in the base bid. The architect is responsible for specifying an accurate count on plans and specs. G. Acceptable Manufacturers: Schlage L9000 series x 93N. Best 40H series x 03J. Corbin Russwin ML2000 series x LWM. 2.5 CLOSERS A. General: One manufacturer for all closer units throughout the Project Work, including surface closers and electromagnetic hold-open closers. (Use of this product type must be approved by Horry County Schools in writing prior to bid. B. Size of Units: Except as otherwise specifically indicated, comply with the manufacturer’s recommendations for size of door control unit, depending upon size of door, exposure to weather and anticipated frequency of use. C. Surface Closers: 1. Door Closers shall be heavy-duty type, Grade 1. 2. Cylinder piston diameter shall be 1 ½” diameter steel. 3. Closer main arm shall be forged on all closers. Parallel arms shall be rigid forearms. 4. Shaft/Pinion shall be minimum 5/8” diameter. 5. All closers shall have “all-weather” hydraulics to operate in temperatures from – 30 degrees to 120 degrees F without valve adjustments and conforms to positive pressure fire test standards UL10C & UBC 7-2. June 21, 2010 59 6. Where spring stop arm is specified, arm shall provide an additional five-degree cushion. 7. Pressure Relief Valves shall not be acceptable. 8. Spring power shall be continuously adjustable over the full range of closer sizes, and allow for reduced opening force for the physically handicapped, where applicable. Closing speed shall meet 3 seconds minimum from open position of 70 degree to a point 3 inches from the latch. Interior doors, other than fire-rated label doors, shall be furnished sized for 5 lb. maximum opening force. Fire-rated label doors shall be sized for self-closing and self-latching. Size 3 closer recommended for 3’ wide interior fire doors per NFPA80. At exterior doors, closers shall be adjusted for ADA, but shall also be required to reliably allow the door to close and latch. The Contractor shall notify the Horry County Schools Construction Project Supervisor if both ADA compliance, and reliable closing and latching of exterior doors cannot be achieved from the manufacturer’s available spring power adjustment. 9. Units shall be stamped with date-of-manufacture code. 10. Closers mounted on wood doors shall be thru-bolt mounted. 11. Provide plates, brackets, and special templating as specified and per the manufacturer’s recommendation. 12. Acceptable manufacturers: LCN 4041series x EDA; Ryobi D4550 x EDA. 13. All exterior surface mount door closers shall be located on the interior side of the door, and shall include a heavy duty forged parallel arm, mounted for maximum possible swing. Parallel arm mounting is preferred. D. ADA Operators: Where low kinetic energy, as defined by ANSI/BHMA Standard A156.19, power operators are specified for doors required to be accessible to the disabled. ADA operators shall be specified and furnished as electric powered type, complying with the ADA for opening force and time to close standards. Full closing force shall be provided when the power or assist cycle ends. All power operator systems shall include the following features and functions: 1. Provisions for separate conduits to carry high and low voltage wiring in compliance with the National Electrical Code, section 725-31. 2. The operator shall be designed to prevent damage to the mechanism if the system is actuated while the door is latched or if the door is forced closed during the opening cycle. 3. All covers, mounting plates and arm systems shall be powder coated and successfully pass a minimum of 100 hours testing as outlined in ANSI/BHMA Standard A156.18. 4. UL listed for use on labeled doors. 5. All operators shall be non-handed with spring power over a range of at least four sizes; either 1 through 4 or 2 through 5. 6. Provisions in the control box or module shall provide control (inputs and outputs) for electric strike delay, auxiliary contacts, sequential operation, fire alarms systems, actuators, swing side sensors, and stop side sensors. 7. The electrical contractor shall provide a power shut-off switch to the operator control box. The ADA operator supplier shall indicate this switch on the wiring diagrams submittal as reference only. 8. All electrically powered operators shall include the following features or functions: a. “second chance feature”: when an obstruction or resistance to the opening swing is encountered, the operator will pause at that point, then attempt to continue opening the door. If the obstruction or resistance remains, the operator will again pause the door. b. Easily accessible main power and maintain hold-open switches will be provided on the operator. c. An electronically controlled clutch to provide adjustable opening force. June 21, 2010 60 d. e. f. 9. A microprocessor to control all motor and clutch functions. An on-board power supply capable of delivering both 12V and 24V outputs up to a maximum of 1.0 ampere combined load. All input and output power wiring shall be protected by slow blow fuses. These fuses shall be easily replaceable without special tools or component replacement. Electrical control functions shall be provided by a control module in lieu of a separate control box. Only two Actuators shall be required to create the complete, stand alone, powered door system(s). ADA operators shall be UL and NEC compliant, include soft-start motor control and meet the following Standards: ANSI A156.19, Section 2.1/ANSI A117.1, Section 4.13.13/UL 325/UL Listed for Fire Rated Door Operators with Automatic Closers, File (GUJY). 10. All door closers, closer controls and ADA Operators shall be the products of one manufacturer. 11. ADA Operators shall be surface mounted as specified in the Hardware Sets. Acceptable manufactures shall meet all of the above specified features and descriptions. Acceptable manufacturers for electrically powered operators: LCN 4640/4630 series; Precision 4990 series, and Norton. 2.6 EXIT DEVICES A. General: All devices shall be the products of one manufacturer to provide for proper installation and servicing. Devices shall be furnished non-handed and capable of direct field conversion of all available trim functions. All devices shall carry a three-year warranty against manufacturing defects and workmanship. 1. 2. 3. Furnish all devices with stainless steel touch bars. Furnish all exit devices with deadlocking latch bolts or guarded latch (GL) feature. Furnish all non-label devices with “less dogging” or as keyed cylinder dogging. The exit device dogging feature shall be determined by Horry County Schools on a project by project basis. 4. Furnish all exit devices with cast metal end caps. 5. Furnish roller strikes with all exit devices. 6. Mullions: furnish mullion stabilizers and mullion keyed locking feature with all removable mullions. 7. All Exit Devices and Mullions shall be from one manufacturer. 8. Lever trim shall be solid cast material with a break-away feature to limit damage to the unit from vandalism. 9. Acceptable Manufacturers: Von Duprin 99/98 series devices; Precision 2100 series mullions shall be by the same manufacturer as the exit devices. 10. Exit Device Application and Functions: a. Exterior Pairs: Rim “DT” x Keyed Removable Mullion x Rim “NL” b. Exterior Single: Rim “NL”/Rim “EO”/Rim “DT” c. Interior Non-Label Locking Pair: Surface Vertical Rod x Less Bottom Rod d. Interior Non-Label Pair: e. Interior Single Label/Non-Label: Rim “L”/“NL” f. Interior Corridor Label Pairs Shall be Hollow Metal. Devices shall be Surface Vertical Rod, Less Bottom Rod: “L”/“EO” 2.7 DOOR TRIM UNITS A. Fasteners: provide manufacturers’ standard exposed fasteners for door trim units (kick plates, edge trim, viewers, knockers, mail drops and similar units), either machine screws or self-tapping screws. Thru-bolt mount all pulls, unless otherwise specified in hardware sets. B. Fabricate edge trim of stainless steel, not more than ½” or less than 1/16” smaller in length than door dimension. C. Fabricate protection plates (armor, kick or mop) not more than 2” less door width on stop side and not more than 1” less door width on pull side x the height indicated. D. Metal Plates: Stainless Steel .050” (U.S. 18ga.), 304SS E. Approved Manufacturers: Ives/ Rockwood/Trimco/Burns June 21, 2010 61 2.8 MISCELLANEOUS A. Provide manual or automatic flush bolts, including coordinators and mounting brackets at pairs of doors as specified. Flushbolt heads shall have a minimum of ½” diameter rod and shall be a minimum of 12” length rod. Size rod length according to door height. Approved Manufactures: Ives/ Trimco/ Rockwood/Burns. B. Generally provide door stops or controls at each door leaf. Provide wall, floor, or stops and holders as specified. Approved Manufacturers: Ives/Trimco/Rockwood/Burns C. Provide overhead controls, stops or holders as specified. Overhead stop shall be made of stainless steel and shall be surface mounted at existing frames, and as specified for new construction. Approved Manufacturers: Glynn Johnson/ Rixson/ABH. D. Wall mounted Magnetic Door Holders/Release: Verify voltage requirements and furnish as specified in Hardware Sets. Approved Manufacturers: Glynn Johnson/Rixson/ABH. 2.9 THRESHOLDS/WEATHERSTRIP A. General: Except as otherwise indicated, provide continuous weatherstripping at each edge of every exterior door leaf. Provide type, size and profiles shown or specified. Provide non-corrosive fasteners as recommended by manufacturer for application intended. Except as otherwise indicated provide ADA standard aluminum thresholds of type, size and profile specified. B. Replaceable Seal Strips: Provide only those units where resilient or flexible seal strip is easily replaceable and readily available from manufacturers stock. C. Acceptable Manufactures: National Guard/Pemko/Zero /Reese. D. Provide thresholds that are 1” wider than frame depth. Unless return closed ends are specified, furnish thresholds 2” longer than the opening width for notching around the frame. Hardware installer shall be responsible for notching thresholds to the frame by field measuring after the door opening assembly is installed. 2.10 DOOR SILENCERS A. At all hollow metal frames furnish gray resilient rubber silencers. Quantity: three each at single door openings; two each at double door openings. 2.11 OWNERS SERVICE AND STOCK ITEMS A. Provide four (4) Final Field use Finish and Security Hardware Schedules with Cut Sheets, Service Instructions and any materials pertinent to the service and maintenance of the Hardware and Systems. B. Provide four (4) sets of all Electrical Drawings illustrating Riser and Point-to-Point Diagrams. C. Furnish the Owner with all specialized tools supplied with the hardware products. D. Furnish 12 each un-combinated cores for Owner’s stock. 2.12 COMPUTER MANAGED LOCKSETS Product and Quantity to be determined by Horry County Schools prior to bid. 2.13 KEY LOCK BOX A. Furnish one each secure storage box for two each building keys for emergency personnel use. This box shall be located per the architect at the exterior of the building. Manufacturer: Knox Box Co. PART 3 - EXECUTION June 21, 2010 62 3.1 INSTALLATION A. Mount hardware units at heights indicated in the following applicable publications, except as specifically indicated or required to comply with governing regulations and except as otherwise directed by the Architect. Mounting Height of exit devices, with the exception of full glass aluminum doors, shall not interfere with light kits shown on elevations. “Recommended Locations for Builders Hardware for Standard Steel Doors and Frames” by the Door and Hardware Institute B. Install each hardware item in compliance with the manufacturer’s instructions and recommendations. Install only with fasteners and/or brackets furnished with each hardware item or exact match if additional fasteners are required. Any substitute fastener shall be approved by Horry County Schools Maintenance Department Hardware Representative prior to installation. Where cutting and fitting is required to install hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation or application of surface protection with finishing work specified in the Division 9 Section. Do not install surface mounted items until finishes have been completed on the substrates involved. 1. Gaskets: install jamb-applied gaskets before door closers, overhead stops, rim strikes, etc. Install sweeps across bottoms of doors before astragals. Trim astragals to tops of sweeps. 2. Locate floor stops not more than 4 inches from the wall. 3. Drill pilot holes for fasteners in wood doors and/or frames. C. Set units level, plumb, and true to line and location. Adjust and reinforce the attachment substrate as necessary for proper installation and operation. D. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors in accordance with industry standards and manufacturer’s installation instructions. E. Set thresholds for exterior doors in full bed of butyl rubber or polyisobutylene mastic sealant complying with requirements specified in Division 7 Section “Joint Sealers”. F. Weatherstripping and Seals: Comply with manufacturer’s instructions and recommendations to the extent installation requirements are not otherwise indicated. G Instruct Owner’s personnel in the proper adjustment and maintenance of door hardware and hardware finishes. H. Certified installers: Contractor’s personnel and Section 8710 supplier/installer shall be certified prior to installation of exit devices, computer-managed exit device trim, locksets, closers, and electrified hardware, including ADA operators, and electric door releases. Certification shall be obtained by attendance of manufacturer’s training at the pre-install meeting. The manufacturer’s representative shall provide written certification to the installers and a copy of the certification shall be provided to the Contractor, Horry County Schools Construction Representative and the Horry County Schools Maintenance Department Hardware Representative. Hardware Installers working on the project site not certified by attending the above specified training shall be removed from the project site. I. All conduit, outlet and backboxes, provisions for 120 VAC power, wiring types required for access control system, pulling of correct wiring to appropriate locations, fire alarm system installation and interface, coordination of electrical applications shall be furnished by the Electrical Contractor (Division 16). 3.2 ADJUST AND CLEAN A. Adjust and check each operating item of hardware and system of each door to ensure proper operation or function of every unit. Replace units which cannot be adjusted to operate freely and smoothly as intended for the application made. B. Clean adjacent surfaces soiled by Hardware Installation. Avoid the use of caustic cleaners which may mar the finish of the Hardware. June 21, 2010 63 C. Final Adjustment: Wherever hardware installation is made more than one month prior to acceptance or occupancy of a space or area, return to work one week before final acceptance and make final check and adjustment of all hardware in such space or area. Clean operating items as necessary. Adjust door closers after HVAC Test and Balance to insure proper door control. D. Instruct Owners Personnel in the proper adjustment and maintenance of Hardware and Systems during the final adjustment period. E. Continued Maintenance Service: Approximately six (6) months after acceptance of the Project, the Installer, accompanied by the Owners representative and the Finish and Security Hardware Representative(s) shall return to the project and survey the project, readjusting any items as required to restore the hardware to its original function. Replace any failed products due to faulty design, materials or installation. Prepare and deliver to the Owners representative a written report of any potential problems in the performance of the hardware with recommended service procedures to insure continued correct function of the products. 3.3 INSPECTION A. Door Hardware Supplier’s Field Service 1. The Hardware Supplier/AHC shall inspect door hardware items for correct installation and adjustment prior to Owner’s permanent core installation. The Hardware Installer shall be present for this inspection. The Owner shall give written notice to the Contractor five (5) days prior to inspection. The Hardware Supplier/AHC shall submit a written report of the inspection, including any exceptions noted during the inspection, and shall include the certified AHC stamp or seal, to the Contractor, Architect, the Horry County Schools Construction Representative, and the Horry County Schools Maintenance Department Hardware Representative. The inspection shall include: a. b. c. d. 2. Fasteners Templating for correct latch/strike engagement, degree of opening/holding Function: locks/exits Operation: closers, exits, locks, cylinders, hinges The Hardware Installer shall reply to the inspection report within three (3) working days after the inspection report. The Installer’s response shall include a list of the required repairs or alterations, and the date repair work shall be performed. All repairs and/or alterations shall be performed within one week after the Installers response report. 3. The written inspection report and the Installers repair report shall become part of the Contractor’s punch list report. All reports shall be submitted to the project Architect and the Horry County Schools Construction Representative. 4.0 HARDWARE SETS Final drawings must include hardware sets prepared by an architectural hardware consultant. END FINISH HARDWARE SECTION 08710 June 21, 2010 64 This is an example of a typed key schedule that the Contractor must turn in at key turnover time. All keys must be accounted for and labeled on schedule and be tagged. KEY SCHEDULE FOR BURGESS ELEMENTARY SCHOOL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 What Interior Hose Bib & Can Wash Exterior Wall Hydrants Roll-up Door @ Service Area Generator Irrigation Control Box School Marquee Flag Pole Light Control Cabinet McGee Electrical Panels Fire Alarm Cabinet Fire Boxes TV Brackets Teachers’ Cabinets / 39 extra Chemistry Cabinet in Science Lab Science Room Cabinet Science Room Cabinet Restroom Door/Privacy Double Lav. Soap Dispenser Key for Cut Off Under Sink Key Wrenches for Faucet Aereator Aereator/Gang Lav. Torks / Access Panels / Gang Lav. Soap Dispensers Towel / Toilet Disp & Tampons Hand Dryer Security Key Cashier Stand Walk-in Coolers Milk Cooler #1 Milk Cooler #2 Ice Cream Box Reach In Refrigerator Pass thru Heated Cabinets Pass thru Coolers FRP Kitchen Door June 21, 2010 Number N/A N/A 31315 Olympian CH751 5.5 MM C415A B135A B135A “B” BH005 2383 100T 331CK D1563A D1560A N/A Willoughby N/A N/A N/A N/A N/A 2055 N/A C057A BH010 1454 H2298 HL312 HL312 HL312 HLHL312 N/A Description Silver Oval Head / 8 keys Silver Mouse Ears / 20 keys Silver Pyramid Key / 1 pair Black Oval Key / 1 key Silver Round Key / 1 pair Allan Wrenches / 2 keys Silver Square Head / 1 pair Gold Square Key / 2 keys Gold Square Key / 3 keys Gold Round Key / 5 keys Gold Round Key / 25 pairs Gold Round Key / 14 pairs Gold Round Key / 132 keys Gold Round Key / 1 key Square Head Gold Key / 1 pair Square Head Gold Key / 1 pair Silver Round Head / 22 keys Silver Flat Dbl. Prong / 11 keys Silver T Square / 62 keys Silver Flat I Key / 39 keys Silver Flat I Key / 7 keys Star Tip / 10 keys Flat Gray Strip / 92 keys Gold Crown / 204 keys Star Tip / 4 keys Gold Square Key / 2 pairs Gold Round Key / 3 keys Gold Round Key / 1 pair Gold Crown Key / 1 pair Silver Round Key / 1 pair Gold Round Key / 2 pairs Gold Round Key / 2 pairs Gold Round Key / 2 pairs Silver Round Key / 1 key 65 PADLOCKS AND KEYLESS ENTRY LOCKS Contract Provided Padlocks The Contractor must provide Medeco padlocks keyed to the Horry County School District Keymark Keying System. All lockable items in and outside the building, including but not limited to gates, around ponds, HVAC units, lift stations, wells and irrigation system, gas disconnects, riser pits, entry roll gates, roof hatches, etc. The architect is responsible for specifying the correct number of padlocks in plans and specifications. The contractor will provide all padlocks in the base bid. The Contractor will purchase padlocks from the hardware supplier. Keyless entry locks must be specified by the Architect and provided by the Contractor in the base bid. All keyless entry locks for IDF, MDF rooms and exterior doors must be wireless. All IDF/MDF rooms require keyless entry locks. Three (3) keyless entry locks are to be provided on renovations. Six (6) keyless entry locks are to be provided for new schools. The Owner will verify location and brand name of keyless entry to be used in plan reviews during Design Development. ELECTRONIC STRIKE AND WIRELESS ENTRY BUTTON AT THE FRONT ENTRY OF SCHOOL IN THE WINDLOCK AREA Provide one entry location selected by Horry County Schools to have the following remote unlock hardware for access security. 1 1 1 1 2 D-67 D-21A 9600-630 AL175ULX NP7A12V June 21, 2010 Digital Receiver Transmitter Surface Electric Strike Power Supply Battery 66 FIBERGLASS REINFORCED POLYESTER DOORS Front entry and corridor FRP doors must have top and bottom glass panels. All other FRP doors such as storage and electrical must be a solid panel with installation of louvers as required for ventilation. PART 1 – GENERAL 1.01 RELATED DOCUMENTS A. 1.02 Drawings and General provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified in this section. DESCRIPTION OF WORK A. The fiberglass doors and aluminum frames required for this work are indicated on the drawings and include, but is not necessarily limited to: 1. 2. 3. 4. 5. 1.03 Aluminum frames FRP Flush Doors FRP Panel The installation of new opening systems that include aluminum frames, fiberglass doors, fiberglass panels, and door hardware. (OPTIONAL FOR RENOVATIONS) The removal of existing doors, frames, glass, etc. as noted. RELATED WORK SPECIFIED ELSEWHERE A. For Finish Hardware, See Section 08700. B. For Caulking, See Section 08810. C. For Glazing, See Section 08800. 1.04 QUALITY ASSURANCE A. Standards: Comply with the requirements and recommendations in applicable specification and standards by AAMA, except to the extent where more stringent requirements are indicated herein. B. Performance: A minimum ten-year record of production manufacturing of frames, doors and panels, and completion of similar type and size projects is required. C. Instruction: The manufacturer or his representative will be available for consultation to all parties engaged in the project including instruction to installation personnel. D. Field Measurement: The supplier shall field verify all information prior to fabrication and furnishing of materials. Omitted details due to lack of verification shall be furnished at no additional cost to Owner. E. Regulations and Codes: Comply with the current edition in force at the project location of all local, state, and federal codes and regulations, including the Americans with Disabilities Act of 1992. 1.05 SUBMITTALS A. Product Data: Submit manufacturer’s product data, specifications and instructions for each type of door and frame required in accordance with Section 01340 and the following: 1. 2. 3. 4. B. Include details of core stile and rail construction, trim for lights and all other components. Include details of finish hardware mounting. Include samples of each aluminum alloy to be used on this project. Where normal finish color and texture variations are expected, include two or more samples to show the range of such variations. Include one sample of typical fabricated section, showing joints, fastenings, quality of workmanship, hardware and accessory items before fabrication of the work proceeds. Submit shop drawings for the fabrication and installation of the doors and frames, and associated components. Details to be shown full scale. Include glazing details and finish hardware schedule. June 21, 2010 67 1.06 PRODUCT DELIVERY, STORAGE AND HANDLING A. Deliver materials to job site in their original, unopened packages with labels intact. Each door and frame will be tagged with a mark or number, which correlates with designation system used for shop drawings. Inspect materials for damage and advise manufacturer immediately of any unsatisfactory materials. B. Package door assemblies in individual corrugated cartons so no portion of the door has contact with the outer shell of the container. Package and ship frames pre-assembled to the greatest possible extent. C. Store material in a secure, weatherproof space. D. Handle doors and frames with care. Do not walk or place other materials on top of stacked doors. Contractor shall use all means necessary to protect doors from damage prior to, during, and after installation. All damaged doors shall be repaired or replaced by the Contractor at no cost to the Owner. 1.07 PROJECT WARRANTY A. Provide a written warranty signed by manufacturer agreeing to replace, at no cost to the Owner, any doors, frames, hardware, or factory hardware installation, which fail in materials or workmanship, within the warranty period. Failure of materials or workmanship includes: excessive deflection; faulty operation of entrances; deterioration of finish, or construction, in excess of normal weathering; and defects in hardware installation. 1. 2. FRP doors will carry a 25 year limited warranty on doors structural integrity, mainframe, and the lamination between face sheets and core. System manufacturer will guarantee THE ENTIRE SYSTEM for a period of 10 years. PART 2 – PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. 2.02 Manufacturer: Subject to compliance with requirements, provide products manufactured by: 1. Commercial Door Systems (CDS) – Philadelphia, PA – 215-244-9080 – www.commercialdoorsystems.com 2. Insolrae Bldg. Products – Southampton, PA – 215-673-6050 3. Or other manufacturers meeting these specifications and approved in writing by Owner prior to bid date. MATERIALS AND ACCESSORIES A. Aluminum Members: Alloy and temper as recommended by manufacturer for strength, corrosion resistance, and application of required finish and control of color; ASTM B 221 for extrusions, ASTM B209 for sheet/plate with a minimum wall thickness of 0.125”. B. Components: Furnish door and frame components from the same manufacturer. The use of a different manufacturer of door and frame components is not permitted. C. Fasteners: Provide Aluminum, non-magnetic stainless steel or other non-corrosive metal fasteners, guaranteed by the manufacturer to be compatible with the doors, frames, stops, panels, hardware, anchors, and other items being fastened. For exposed fasteners (if any), provide Oval Phillips Head screws with finish matching the item to be fastened. The use of sex bolts or thru bolts will not be accepted. D. Glazing Gaskets: For glazing factory-installed glass, and for gaskets which are factory-installed in “captive” assembly of glazing stops, manufacturer’s standard stripping of molded neoprene, complying with ASTM D 2000 (designation 2BC415 to 3BC620), or molded PVC complying with ASTM C 509 Grade 4. 2.03 FABRICATION A. Sizes and Profiles: The required sizes for door and frame units, and profiles requirements are shown on the drawings. B. Coordination of Fabrication: Field measure before fabrication, and show recorded measurements on final shop drawings. C. Complete the cutting, fitting, forming, drilling, and grinding of all metal work prior to assembly. Remove burrs from cut edges, and ease edges and corners to a radius of approximately 1/64”. D. No welding or joinery of doors or frames will be provided except with owner request. June 21, 2010 68 E. 2.04 Maintain continuity of line and accurate relation of planes and angles. Secure attachments and support at mechanical joints, with hairline fit at contacting members. FIBERGLASS REINFORCED POLYESTER FRP FLUSH DOORS – F500HD A. Materials and Construction 1. 2. 3. 4. 5. 2.05 ARCHITECTURAL PANELS A. FRP Panels 1. 2. 3. 4. 2.06 Construct 1-3/4 thick doors of 6063-T6 aluminum alloy with minimum stiles of 5-1/2” tube, top rails minimum of 6” and bottom rails minimum of 10”. Provide joinery 3/8” diameter full width tie rods through extruded splines top and bottom as standard .125” tubular shaped stiles and rails reinforced to accept hardware as specified. Provide hex type aircraft nuts for joiner without welds, glues, or other methods for securing internal door extrusions. Furnish reglets to accept face sheet to permit a flush appearance. Door face sheeting .120” thickness fiberglass reinforced polyester. Provide Model F500HD doors with an abuse resistance engineered surface of the standard colors: white, light gray, red, blue, green, beige, dark gray, dark bronze, or black as selected. Core of door assembly will be minimum 25-pound PSI density polystyrene with a flame spread rating of no more than 25. Meeting stiles on pairs of doors top and bottom weather bar with FIN-SEAL wool pile brush weather stripping. Manufacture doors with cutouts for vision lights, louvers, or panels, as scheduled. Factory to furnish and install all glass, louvers, and panels prior to shipment. Pre-machine doors in accordance with templates from the specified hardware manufacturers and approved hardware schedule. Factory installs hardware except door closers. Model: P25 one quarter inch, P75 one inch or thickness as shown. FRP face sheets with finish color throughout. FRP option: Construct insulated panels of two .120” minimum thickness sheets with core of minimum 2½ pound PSI density polystyrene. Class A option for flame spread and smoke developed rating on interior faces of exterior panels and both faces of interior panels as shown. Flame spread no greater than 25, smoke developed no greater than 450 per ASTM E-84. ALUMINUM FRAMING SYSTEMS All aluminum framing must be heavy duty and reinforced A. Tubular Framing 1. 2. 3. 4. 5. 6. June 21, 2010 Framing system shall be by the door manufacturer and of the size and type shown. Framing shall be type 6063-T6 aluminum alloy with minimum wall thickness of .125” and .625” high applied door stops with screws and weather stripping. Frame members are to be box type with four (4) enclosed sides. Open back framing will not be acceptable. Caulk joints before assembling from members. Secure joint with fasteners and provide a hairline butt joint appearance. Pre-fit doors using “stick” materials are not acceptable. Applied stops for side, transom and borrowed lights and panels, with fasteners exposed on interior or unsecured portion only. Pre-machine and reinforced frame members for hardware in accordance with manufacturer’s standards and the approved hardware schedule. Factory installs hardware except closers. Anchors appropriate for wall conditions to anchor framing to wall materials. A minimum of five anchors up to 7’4” on jamb members and one additional anchor for each foot over 7’4”. Secure head and still members of transom, side lights, and similar conditions. Factory pre-assembles side light to the greatest extent possible, and mark frame assemblies according to location. Provide framing in a knock-down condition and attach to door assembly. Mark frames members according to location. 69 7. 2.07 GLAZING A. 2.08 Hardware installations for aluminum doors must beet all installation requirements called for in the hardware specs. Design system for replacement of glass 1. Manufacturer’s standard flush glazing system of recessed channels and captive glazing gaskets or applied stops as shown. 2. Allow for thermal expansion on exterior units. 3. Glass as shown and factory glazed into doors. ALUMINUM FINISHES A. Anodized surfaces; AAM12C22A41 Clear 215-R1; AAM12C22A42 Light Bronze 311, Medium Bronze 312, Dark Bronze 313, and Black 315. Special painted finishes as specified. PART 3 – EXECUTION 3.01 INSTALLATION A. Comply with manufacturer’s recommendations and specifications for the installation of the doors and frames. Factory installs hardware, glass, and louvers in doors. Factory assembled side-lights and transoms to the greatest extent possible. B. Set units plumb, level and true to line, without harp or rack of doors or frames. Anchor securely in place. Separate aluminum and other metal surfaces with bituminous coatings or other means as approved by architect. C. Set thresholds in a bed of mastic and back seal. D. Clean surfaces promptly after installation of doors and frames, exercising care to avoid damage to the protective coating. E. Ensure that the doors and frames will be without damage or deterioration (other than normal weathering) at the time of acceptance. F. Provide Owner with all adjustment tools and instruction sheets. Arrange an in-service session for Owner at Owner’s convenience. Provide a minimum one year written warranty on all labor related to this section. Any workmanship which is defective or deficient shall be corrected to the Owner’s satisfaction and at no additional cost to the Owner. June 21, 2010 70 ALUMINUM STILE AND RAIL DOORS AND FRAMING ANY OPENINGS REQUIRING HURRICANE IMPACT SYSTEMS MUST BE COORDINATED WITH AND APPROVED BY HORRY COUNTY SCHOOLS BEFORE FINAL APPROVAL OF A GIVEN SYSTEM. PART 1 – GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified in this section. 1.02 DESCRIPTION OF WORK A. B. 1.03 RELATED WORK SPECIFIED ELSEWHERE A. B. C. 1.04 The elevation of each type of door and frame is shown on the drawings and in the schedules. The following types of doors and frames are required: 1. Aluminum stile and rail doors 2. Aluminum frames For Finish Hardware, See Section 08700. For Caulking, See Section 08810. For Glazing, See Section 08810. QUALITY ASSURANCE A. Standards: Comply with the requirements and recommendations in applicable specification and standards by AAMA, except to the extent where more stringent requirements are indicated herein. B. Performance: A minimum ten-year record of production manufacturing of frames, doors and panels, and completion of similar type and size projects is required. C. Instruction: The manufacturer or his representative will be available for consultation to all parties engaged in the project including instruction to installation personnel. D. Field Measurement: The supplier shall field verify all information prior to fabrication and furnishing of materials. Omitted details due to lack of verification shall be furnished at no additional cost to Owner. E. Regulations and Codes: Comply with the current edition in force at the project location of all local, state, and federal codes and regulations, including the Americans with Disabilities Act of 1992. 1.05 SUBMITTALS A. Product Data: Submit manufacturer’s product data, specifications and instructions for each type of door and frame required in accordance with Section 01340 and the following: 1. 2. 3. 4. B. 1.06 Include details of core stile and rail construction, trim for lights and all other components. Include details of finish hardware mounting. Include samples of each aluminum alloy to be used on this project. Where normal finish color and texture variations are expected, include two or more samples to show the range of such variations. Include one sample of typical fabricated section, showing joints, fastenings, quality of workmanship, hardware and accessory items before fabrication of the work proceeds. Submit shop drawings for the fabrication and installation of the doors and frames, and associated components. Details to be shown full scale. Include glazing details and finish hardware schedule. PRODUCT DELIVERY, STORAGE AND HANDLING A. Deliver materials to job site in their original, unopened packages with labels intact. Inspect materials for damage and advise manufacturer immediately of any unsatisfactory materials. June 21, 2010 71 B. 1.07 Package door assemblies in individual corrugated cartons so no portion of the door has contact with the outer shell of the container. Package and ship frames pre-assembled to the greatest possible extent. PROJECT WARRANTY A. Provide a written warranty signed by manufacturer, installer and contractor, agreeing to replace, at no cost to the Owner, any doors, frames, hardware, or factory hardware installation, which fail in materials or workmanship, within the warranty period. Failure of materials or workmanship includes: excessive deflection; faulty operation of entrances; deterioration of finish, or construction, in excess of normal weathering; and defects in hardware installation. The minimum time period of limited warranty is 25 years for doors manufactured with polystyrene core and only 10 years for doors manufactured with urethane core from project acceptance. PART 2 – PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. 2.02 Manufacturer: Subject to compliance with requirements, provide products manufactured by Commercial Door Systems (CDS). MATERIALS AND ACCESSORIES A. Aluminum Members: Alloy and temper as recommended by manufacturer for strength, corrosion resistance, and application of required finish and control of color; ASTM B 221 for extrusions, ASTM B209 for sheet/plate with a minimum wall thickness of 0.125”. B. Components: Furnish door and frame components from the same manufacturer. The use of a different manufacturer of door and frame components is not permitted. C. Fasteners: Provide Aluminum, non-magnetic stainless steel or other non-corrosive metal fasteners, guaranteed by the manufacturer to be compatible with the doors, frames, stops, panels, hardware, anchors, and other items being fastened. For exposed fasteners (if any), provide Oval Phillips Head screws with finish matching the item to be fastened. D. Glazing Gaskets: For glazing factory-installed glass, and for gaskets which are factory-installed in “captive” assembly of glazing stops, manufacturer’s standard stripping of molded neoprene, complying with ASTM D 2000 (designation 2BC415 to 3BC620), or molded PVC complying with ASTM C 509 Grade 4. 2.03 FABRICATION A. Sizes and Profiles: The required sizes for door and frame units, and profiles requirements are shown on the drawings. B. Coordination of fabrication: Field measure before fabrication, and show recorded measurements on final shop drawings. C. Complete the cutting, fitting, forming, drilling, and grinding of all metal work prior to assembly. Remove burrs from cut edges and ease edges and corners to a radius of approximately 1/64”. D. No welding or joinery of doors or frames will be provided except with owner request. E. Maintain continuity of line and accurate relation of planes and angles. Secure attachments and support at mechanical joints, with hairline fit at contacting members. 2.04 STILE AND RAIL DOORS A. Materials and Construction 1. 2. 3. June 21, 2010 Stile and rails of type 6063-T5 aluminum alloy 1-3/4” minimum thickness and with tubular extrusions with a minimum .125” wall thickness. Overall stiles and rail requirements for MID-PANEL RAIL DOORS type R500MP are: 6-1/2” wide top rail, 4 ½” wide stiles and a 10” minimum bottom rail. True mortise and tenon joinery at corners with full width 3/8” diameter tie rods secured with locking washers and hex nuts. No welding of joinery is used, except by owner request. 72 4. 5. 6. 7. 2.05 Exterior glazing stops are permanent and integral to stile and rail extrusions. Provide interior glazing stops with counter punched holes and flat head screws. No applied snap-on stops are permitted. Factory to furnish and install glass, panels, and louvers. Mid-Rail Option: 12” mid-rail as shown. Fasten with mortise/tenon joinery and 3/8” tie rod/locking hex nuts. Mid-Panel Option: Mid-Panels constructed of aluminum tubes with extruded spline and interlocking edges to secure face sheets. Poured-in-place urethane core of minimum five pounds per cubic foot density. Urethane core to be free of CFC. Fasten with mortise/tenon joinery and 3/8” tie rod/locking hex nuts. Aluminum, FRP or other face sheet as shown. Pre-machine doors in accordance with templates from the specified hardware manufacturers and approved hardware schedule. Factory installed hardware. ALUMINUM FRAMING SYSTEMS A. Tubular Framing 1. Framing system from the door manufacturer of the size and type shown: .125” minimum wall thickness and type 6063-T5 aluminum alloy. .625” high applied door stops with screws and weather stripping. Frame members are to be box type with four (4) enclosed sides. Open back framing will not be acceptable. 2. Caulk joints before assembling from members. Secure joint with fasteners and provide a hairline butt joint appearance. Pre-fit doors using “stick” materials are not acceptable. 3. Applied stops for side, transom and borrowed lights and panels, with fasteners exposed on interior or unsecured portion only. Pre-machine and reinforced frame members for hardware in accordance with manufacturer’s standards and the approved hardware schedule. Factory installed hardware. 4. Anchors appropriate for wall conditions to anchor framing to wall materials. A minimum of five anchors up to 7’4” on jamb members and one additional anchor for each foot over 7’4”. Secure head and still members of transom, side lights, and similar conditions. 5. Factory pre-assembled side light to the greatest extent possible, and mark frame assemblies according to location. 6. Provide framing in a knock-down condition and attach to door assembly. Mark frames members according to location. B. Insert Framing Systems 1. Model: CDS 225 and CDS 226. 2. Insert frame as shown, using an integral stop fitted with weather stripping. 3. Corner joints of miter design, secure with furnished aluminum clips, and screw into place. 4. Reinforce and pre-machine insert frame members for hardware in accordance with manufacturer’s standards and the approved hardware schedule. 5. Anchors of a suitable type to fasten insert framing to existing frame materials, using a minimum of five anchors on jambs up to 7’4” height, three on headers. One additional anchor for each additional lineal foot of frame. C. Frame Capping 1. Model: C2 and C4. 2. 0.90 wall thickness capping as indicated on drawings with insert frame as shown. Finish of capping to match framing. 2.06 GLAZING A. 2.07 Design system for replacement of glass 1. Manufacturer’s standard flush glazing system of recessed channels and captive glazing gaskets or applied stops as shown. 2. Allow for thermal expansion on exterior units. 3. Glass as shown and factory glazed into doors. ALUMINUM FINISHES A. Anodized surfaces; AAM12C22A41 Clear 215-R1; AAM12C22A42 Light Bronze 311, Medium Bronze 312, Dark Bronze 313, and Black 315. Special painted finishes as specified. June 21, 2010 73 PART 3 – EXECUTION 3.01 INSTALLATION A. Comply with manufacturer’s recommendations and specifications for the installation of the doors and frames. Factory installed hardware, glass, and louvers in doors. Factory assembled side-lights and transoms to the greatest extent possible. B. Set units plumb, level and true to line, without harp or rack of doors or frames. Anchor securely in place. Separate aluminum and other metal surfaces with bituminous coatings or other means as approved by architect. C. Set thresholds in a bed of mastic and backseal. D. Clean surfaces promptly after installation doors and frames, exercising care to avoid damage to the protective coating. E. Ensure that the doors and frames will be without damage or deterioration (other than normal weathering) at the time of acceptance. F. Provide Owner with all adjustment tools and instruction sheets. Arrange an in-service session for Owner at Owner’s convenience. Provide a minimum one year written warranty on all labor related to this section. Any workmanship which is defective or deficient shall be corrected to the Owner’s satisfaction and at no additional cost to the Owner. June 21, 2010 74 TOILET PARTITIONS PART 1 – GENERAL 1.1 RELATED DOCUMENTS A. 1.2 1.3 SUMMARY A. Provide Overhead-Braced and Floor-Anchored, Solid Phenolic Toilet Partitions and Privacy Screens as indicated on Drawings and as specified herein. Grab Bars provided under Toilet and Bath Accessories. B. Related Sections include the following: 1. Division 5 Section "Metal Fabrications" for supports that attach units to overhead structural system. 2. Division 10 "Toilet and Bath Accessories" for toilet paper holders, grab bars, purse shelves, and similar accessories. REFERENCES A. 1.4 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. American Society for Testing and Materials (ASTM). SUBMITTALS A. Product Data: Submit manufacturer's detailed technical data for materials, fabrication, and installation, including catalog cuts of anchors, hardware, fasteners, and accessories. B. Shop Drawings: For fabrication and installation of Toilet Partition and Screen assemblies. Include plans, elevations, sections, details, and attachments to other work. C. Samples for Initial Selection: 1. Submit manufacturer's color chart with manufacturer's full range of Standard Colors. Color shall be selected on a basis of four (4) stalls or more per color. 2. Submit certification that materials furnished comply with requirements specified. D. Samples for Verification: 1. Submit 6" square samples of each color and finish on same substrate used in work, for color verification after selections have been made. 2. Submit one (1) sample of the following: a. Hardware (Complete) b. Pilaster (12" x 12") c. Divider Panel (12" x 12") d. Full High Aluminum Mounting Bracket (57.5") e. Continuous Full High 14 Gauge Stainless Steel Hinge (57.5") 1.5 E. Maintenance Instructions: Provide manufacturer's printed Instructions for Maintenance of Installed Work. F. Written Warranty PROJECT CONDITIONS A. Field Measurements: Verify dimensions in areas of installation by field measurements before fabrication and indicate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the work. June 21, 2010 75 1. 1.6 DELIVERY, STORAGE AND HANDLING A. 1.7 Established Dimensions: Where field measurements cannot be made without delaying the Work, establish dimensions and proceed with fabricating units without field measurements. Coordinate supports, adjacent construction, and fixture locations to ensure actual dimensions correspond to establish Dimensions. Delivery, store, and handle compartments as recommended by manufacturer to protect from damage. MANUFACTURER'S WARRANTY A. Provide manufacturer's written two part warranty: The entire Toilet Partition shall be warranted for fifteen (15) years, against breakage, corrosion and delamination, to include Hardware; replaced without charge, excluding labor. Panels, Pilasters and Doors shall be warranted for twenty-five (25) years against breakage, corrosion and delamination, replaced without charge, excluding labor. PART 2 – PRODUCTS 2.1 MANUFACTURERS COLUMBIA PARTITIONS SUPER HD - 8433, by Partition Systems, Inc., or equal. Capitol Toilet Partitions, Scranton Products, and Columbia Partitions. 2.2 MATERIALS A. General: Provide material which has been selected for surface flatness and smoothness. Exposed surfaces which exhibit pitting, seam marks, roller marks, stains, discolorations, telegraphing of core material, or other imperfections on finished units are not acceptable. Solid Phenolic shall meet or exceed all requirements for Class "A" Flame Spread Rating calculated according to ASTM E-84-91A, and shall carry a UL Class "A" Fire Rating Certification. B. Material shall be Solid Phenolic with a High Pressure Melamine matte finish surface made as an integral part of the core material. Laminated surfaces are not acceptable. 1. Doors - Minimum .75" (19 mm) Finished Thickness 2. Divider Panels - Minimum .50" (13mm) Finished Thickness 3. Pilasters - Minimum .75" (19 mm) Finished Thickness C. Colors: To be selected by Project Architect from Manufacturer's Standard Colors. Must also be approved by District representative. D. Pilaster Shoes: ASTM 167, Type 302/304 Stainless Steel, minimum 4" high, 18 gauge, finished with #3 Directional Polish, attached with Stainless Steel through bolts. E. Continuous Brackets must be used: Full High (57.5") Extruded 6063-T5 Aluminum with a satin anodized finish. The minimum weight shall be 1.685 pounds per lineal foot. Inside of opening of Bracket shall be .50" for panels, .75" for pilasters. All holes for mounting to wall and panel/pilaster shall be pre-drilled. Holes are to be spaced at 9" O.C. along the full length of the bracket for a total of fourteen (14) holes for mounting to the wall and seven (7) holes for mounting to the panel/pilaster. Each bracket is to have minimum wall thickness of .125". Each bracket is to be packaged in a separate poly tube, and is to be labeled by stock number and manufacturer. F. Heavy Duty Continuous Hinges must be used: Continuous 14 gauge stainless steel hinge (57.5"). Hinge shall be 3" wide and shall have five (5) stainless steel wire springs for self-closing action. Pivot pin shall be .250" in diameter, and shall be made of Type 302/304 stainless steel. Hinges shall provide emergency access by lifting the door. Hinges shall be pre-drilled for mounting to door and pilaster. Mounting holes shall be at 9" O.C. for through bolting with stainless steel fasteners. Each hinge is to be packaged in a separate poly tube, and is to be labeled by stock number, manufacturer, and left or right hand. June 21, 2010 76 G. Strike and Keeper: Heavy duty cast stainless steel with a satin finish. The Strike and Keeper shall be 2.50" high, with the mounting holes at 1.50" O.C., and the wall thickness shall be a minimum of .125". The Strike and Keeper shall have an integral rubber bumper door stop. The stock number shall be molded into the back of the Strike and Keeper for ease in identification. Each Strike and Keeper shall be packaged in a separate poly bag, and is to be labeled by stock number and manufacturer. Furnish one per door. H. Panel and doors must have heat sync strip. I. Solid phenolic products are not allowed. J. Slide Latch: Heavy Duty Cast Stainless Steel with a Satin finish. The Slide Latch shall be surface mounted. The slide bar shall be .150" thick, 1.020" wide and 3.720" long. Latch shall have an internal Stainless Steel buffering spring to prevent damage when door is inadvertently slammed against the Latch. Mounting holes are to be spaced at 3.50" O.C. Latch knob is to be riveted to the slide bar and then welded to insure that the knob will not come off. The stock number is to be molded into the back of the Slide Latch for ease in identification. Each Slide Latch shall be packaged in a separate poly bag, and is to be labeled by stock number and manufacturer. Furnish one per door. K. Coat Hook: Heavy duty cast stainless steel with a satin finish. Coat hook and bumper shall be 2.340" high, 1.230" wide and shall protrude out from the door 3.05". The hook portion shall have a finished diameter of .250" The stock number shall be molded into the back of the coat hook and bumper for ease in identification. Each coat hook and bumper shall be packaged in a separate poly bag and is to be labeled by stock number and manufacturer. Furnish one per door. L. Door Stop: Heavy duty cast stainless steel with a satin finish. Plated Zamac Door Stops are unacceptable. Door Stop shall have a 2.125" base diameter and shall protrude 1.80" from the wall. The bumper at the end of the Door Stop shall be .20" thick. The diameter of the shaft shall be .6875". The stock number shall be molded into the back of the Door Stop for ease in identification. Each doorstop shall be packaged in a separate poly bag and is to be labeled by stock number and manufacturer. Furnish one for each Disabled Accessible door. M. Pull Handle: Heavy duty cast stainless steel with a satin finish. Plated Zamac Door Pulls are unacceptable. Pull Handle shall protrude from the face of the door .940" and shall be 4.735" long. The pull handle shall have mounting holes drilled and tapped for 10/24 threads at 3.50" O.C. The pull handle shall be .655" wide and shall be mounted back to back with the Slide Latch. The stock number shall be molded into the back of the Pull Handle for ease in identification. Each pull handle shall be packaged in a separate poly bag and is to be labeled by stock number and manufacturer. Furnish one for each Disabled Accessible door. N. Overhead Bracing (Headrail): Continuous Heavy Duty Extruded 6063-T5 Aluminum Headrail with Anti-Grip profile. Headrail shall have integral reinforcing channel and curtain track. Headrail shall have a satin anodized finish. Provide Headrail Corner Brackets, Wall Brackets, and Headrail End Caps as required. The Headrail and Headrail Brackets shall have a minimum wall height of 2". The minimum wall thickness of the Headrail and Headrail Brackets shall be .125". Each Headrail Bracket is to be packaged in a separate poly bag and is to be labeled by stock number and manufacturer. O. Anchorages and Fasteners: All fasteners shall be chrome plated brass with theft proof heads, through-bolted unless noted otherwise. No chrome-plated steel will be acceptable. 2.3 FABRICATION A. General: Provide standard doors, panels, screens, and pilasters fabricated for partition system, complete with all accessories and hardware listed above and as required for installation of fully functional system, unless otherwise noted. Provide units with cutouts and drilled holes to receive partition-mounted hardware, accessories, and grab bars as indicated. B. Overhead-Braced and Floor-Anchored Partitions: June 21, 2010 77 1. 2. 3. Furnish Heavy Duty Cast Stainless Steel "Z" Bars, complete with Stainless Steel threaded rods, lock washers and leveling-adjusting nuts at pilaster, to permit structural connection at floor. Make provision for setting and securing continuous Extruded Aluminum Anti-Grip Headrail at top of each pilaster. Furnish Stainless Steel Shoe at each pilaster to conceal supports and leveling mechanism. C. Doors: Unless otherwise indicated, provide 24" (610 mm) wide in-swinging doors for standard Toilet Partitions and 36" (914 mm) wide out-swinging doors with a minimum 32" (813 mm) wide clear opening for Partitions indicated to be Handicapped Accessible. D. Floor Anchored Privacy Screens: Furnish Privacy Screens consisting of a pilaster and a panel of the same construction and finish as the Toilet Partitions. Furnish in accordance with the drawings. PART 3 – EXECUTION 3.1 INSTALLATION A. General: Comply with manufacturer's written installation instruction. Install Partitions rigid, straight, plumb, and level. Provide clearances of not more than .50" (13 mm) between pilasters and panels, and not more than 1.0" (25 mm) between panels and walls. No evidence of drilling, cutting, and patching shall be visible in finished work. B. Attach Continuous Wall Brackets to the wall with the following: 1. 2. At solid masonry: #14 x 1.50" long Stainless Steel Phillips Pan head Screws and Plastic #14/16 Anchors at 9" O.C. vertical spacing. At cavity masonry: .25" diameter x required length Stainless Steel toggle bolts at 9" O.C. vertical spacing. C. Overhead-Braced and Floor-Anchored Partitions: Secure pilasters to floor and level, plumb, and tighten. Secure continuous headrail to each pilaster with not less than two (2) Through-Bolted Stainless Steel fasteners. Hang doors and adjust so tops of doors are parallel with overhead brace when doors are in closed position. D. Screens: Attach with anchoring devices according to manufacturer's written instructions and to suit supporting structure. Set units level and plumb and to resist lateral impact. 3.2 ACCESSORIES A. 3.3 Mount accessories to Partition units in accordance with manufacturer's instruction. ADJUSTING AND CLEANING A. B. Hardware Adjustment: Adjust and lubricate hardware according to manufacturer's written instructions for proper operation. Provide final protection and maintain conditions that ensure Toilet Partitions and Screens are without damage or deterioration at the time of Substantial Completion. June 21, 2010 78 LOCKERS - STUDENT CORRIDOR AND ATHLETIC All lockers in the building shall be of all steel that meets or exceeds Debourgh specifications including lifetime warranty. Lock system must be master built-in combination locks installed according to manufacturer’s specifications. Upper lockers must be sloped. Top of locks and lockers must be located at an acceptable height for students. June 21, 2010 79 OPERABLE WALL SPECIFICATIONS Modernfold: Acousti-Seal 931 or 932 Use #17 Track STC 47 Minimum Hufcor: Classic 7500 or 7600 Use #38 Track STC 47 Minimum Panelfold: 610 or 620 Series Use #5 Track STC 47 Minimum * Substitutions will be considered but must be approved. * The District prefers not to have operable walls unless absolutely necessary. June 21, 2010 80 ACCORDION WALL SPECIFICATIONS Modernfold: SM8 STC 39 Minimum Hufcor: Model 3900 STC 39 Minimum Panelfold: Fabricwal STC 39 Minimum * Substitutions will be considered but must be approved. * The District prefers not to have accordion walls unless absolutely necessary. June 21, 2010 81 FENCE CHAIN LINK FENCE REQUIREMENTS GENERAL SPECIFICATIONS ***Any deviation in these specifications shall be indicated in each solicitation.*** General Note: 1. When using regular galvanized chain link fencing, 9 gauge steel wire is required. 2. When using vinyl coated chain link fencing, 9 gauge core is required. DESCRIPTION Contractor shall provide chain link fencing. The work shall include chain link fencing systems, gates, related hardware, and installation. QUALITY ASSURANCE Contractor shall have been in business a minimum of five years and provide chain link fences as complete units produced by the manufacturer, including necessary erection accessories, fittings, and fastenings. Contractor shall use experienced chain link fence installers with a minimum of one year of experience. The Contractor shall have and maintain an office within Horry County. MATERIAL Chain link fabric shall be one piece with full height up to 12’ 0”, 2” mesh, 9 gauge steel wire (plastic coating excluded). The finish shall be galvanized steel chain link fabric. The top and bottom selvages shall be knuckled for fabric 72” high and under. The framework shall be round steel pipe. The pipe shall be galvanized steel pipe, schedule 40. All Fittings and Hardware shall be matching galvanized steel. COMPONENTS (HEAVY INDUSTRIAL FENCE) All pipe shall be Schedule 40 material. End, corner, and pull posts up to 6’ 0” fabric height shall be 3” OD. Line posts up to 6’ 0” fabric height shall be 2” OD. Gate posts with gate leaves 7’ 0” wide or less shall be 3” OD. Gate posts with gate leaves over 7’ 0” wide shall be 4” OD. Top and brace rails shall be 1 5/8” OD – Schedule 40 pipe. Gate frames up to 6’ 0” high and leaf width 8’ 0’ or less shall be 1 5/8” OD. Bottom tension wire shall be 7 gauge (.177”) coil spring wire with a finish matching the fabric. June 21, 2010 82 GATES Fabricate gate perimeter frames of tubular steel members assembled by welding or with special fittings at corners. Provide additional horizontal and vertical members to ensure proper operation and attachment of fabric, hardware, and accessories. Gate fabric shall match metal and fence fabric. Provide manufacturer’s standard gate hardware complete with matching latches, stops, keepers, and hinges. Provide hardware of sufficient design and strength for satisfactory and proper gate operation. Main gate openings need to be 28’ minimum, 30’ maximum for future portable access. Playground area/retention pond gates would be a standard one to two man gate size. All roll gates must be commercial heavy duty type. INSPECTION Examine final grades and installation conditions. The Contractor is responsible for all grading and installation conditions and work shall not proceed until the Contractor remedies all unsatisfactory conditions. The Contractor shall be responsible for the safeguarding of all underground infrastructure (including electrical, water, sewer, computer cabling, telephone, gas piping, and etc.). If the Contractor cuts, breaks or damages the underground infrastructure, it must be repaired and repairs approved by the Horry County Schools Maintenance staff. Infrastructure damage shall be reported to the HCS Maintenance department immediately at 843-488-6963 or 843-241-6100. PREPARATION Contractor shall lay out each complete fence line. Contractor shall locate and mark post positions. Contractor shall space line posts equally and at maximum of 10’ 0” on center. Contractor shall provide corner posts at positions where fence changes direction more than 10 degrees. INSTALLATION Install the chain link fence in accordance with manufacturer’s installation instructions and specifications. Provide a rigid and plum finish fence structure with fabric tight and in proper tension. Drill post holes into firm, undisturbed, or compacted earth. Install gate, end, corner, pull, and line posts in concrete foundations (minimum 3000 psi. concrete). Hole diameter shall be a minimum of 3 times the post diameter. Posts and gate posts depth shall be a minimum of 36”. All posts shall be aligned both vertically and laterally. Concrete depth shall be a minimum of 30” and a minimum of 2” below grade. Extra post hole soil and any extra debris shall be removed from the site daily. Set keeps, stops, sleeves, and other accessories into concrete as required. Top rails shall be installed continuously through post caps or extension arms. Center rails and brace assemblies are optional and used only if specified by the District as an additional requirement. June 21, 2010 83 Install tension wires on security side of post before stretching fabric and tie wire to each post with wire or clips. Stretch fabric tight between terminal posts. Install on security side and anchor securely to framework so that tension remains after the pulling force is released. Position bottom of fabric a maximum of 2” above ground level at each post unless otherwise instructed. Bend wire binding to minimize hazards to persons. Install gates plum, level, and secure for full opening without interference. Hardware shall be adjusted for smooth operation and lubricate where necessary. Site cleaning shall be performed during and after completion of fencing project. All debris and excess soil shall be removed from the site. Any site damage (tire ruts, heavy indentions in ground surface, and etc.) shall be repaired to the District’s satisfaction at no expense to the District. ALTERNATE FINISH PVC (Poly vinyl chloride) coated over 9 gauge galvanized steel wire, not less than Class 2a 15 mil thick fabric coated before fabric fabrication. Color to be determined by the District from the Contractor’s available color chart. WARRANTY The Contractor shall warranty all materials, installation, and workmanship for two years. June 21, 2010 84 FLOOR FINISHES The decision to specify VCT, carpet squares, epoxy floors, wood floors, sports flooring or no-wax tile will be made during the design phase and approved by the owner. Any time standard VCT tile is specified, a minimum of eight coats of wax shall be applied by the contractor. This must be clearly stated on the plans. When epoxy flooring is used only dark colors are permitted such as black, navy or terracotta. Rubber base is required when sports flooring, VCT, or carpet squares are used. Environmental backing on carpet is not allowed. The color of carpet/carpet squares must be approved by owner. Woven carpet cannot be used. It’s important that the architect specify carpet that seams well. June 21, 2010 85 CEILING TILE Acoustical Ceiling Specifications All acoustical tiles used must be standard 2’ x 2’ or 2’ x 4’ only. Decorative tiles are not permitted. 2’ x 4’ tiles must be Armstrong #823A, #769A, USG #2310, or approved equal. 2’ x 2’ tiles must be Armstrong #824, #770, USG #2110, or approved equal. Media Center and Classrooms: Provide 2' x 4' acoustical tiles. Architect shall specify grid and detail wall molding. Panels must have Bio Block paint on front and back of panels to inhibit or retard surface growth of mold or mildew. Corridors: Provide 2' x 4' acoustical tiles. Architect shall specify grid detail and 2' x 4' wall molding. Bio Block paint finish on front and back #1773. Administrative Area: Provide 2' x 2' acoustical tiles. Architect shall specify grid detail and wall molding. Locker Rooms, Wet Areas, and Kitchen Area: Provide Armstrong Fine Fissured Ceramaguard 2' x 2' Panels. Architect shall specify grid and wall molding. Bio Block paint finish on front and back of panels. All grid around kitchen dry storage and bathrooms must be caulked to the wall. Substitutions will be considered but must be approved. June 21, 2010 86 CABINETRY All cabinetry shall have laminate tops and laminate faces. All hardware shall be standard hardware that can be purchased locally from local distributors. All OSF guidelines for millwork heights should be followed. The Owner would prefer that all K-3 classrooms have elevated cubbies with coat hooks below, kindergarten classrooms to have 30 cubbies, grades 1-3 classrooms to have 30 cubbies. All 4-5 classrooms shall have 30 wall cubbies with 26 hooks underneath. All 4th and 5th grades shall have equal storage space. Fourth and fifth grade classes with no storage closets will have wall cabinets 8' long and 12" deep with shelving. Shelving inside storage closets will be equal to wall cabinets. All classrooms shall have a teacher cabinet. Teacher cabinets and all admin cabinets, including the nurse’s office, must have locks. All classroom cabinet locks must be keyed the same. Teacher cabinets are required for all new schools and renovations. Corner cabinets are preferred whenever possible. All base cabinetry and counter tops must be constructed of AWI custom grade except in wet areas where it must be marine grade or exterior grade plywood. June 21, 2010 87 WINDOWS Heavy-duty aluminum frame, double insulated. Glass and tint specified should be such that it is easily obtained through local suppliers. Degree of tint must be strong enough to prevent glare on marker boards and to avoid damage to books and materials due to direct sunlight. Windows with internal blinds are not permitted. Glass tint shall be limited to three tints (solar grey, bronze, or light green). Window tint must be approved by the Owner during the design phase. A UV light and heat blocker tint must be used and the degree of tint must be capable of eliminating the need for blinds. * Skylights are not permitted. June 21, 2010 88 MULTIPURPOSE WALL SPECIFICATIONS Wall between multipurpose room and cafeteria shall be a solid block wall. Doors in multipurpose must be double doors with removable mullion. Accordion and operable walls are not allowed in this area. June 21, 2010 89 MEDIA CENTER All media centers shall have a studio/production area with a large window for viewing between media and production. Shelving/casework shall be located under large viewing glass area to allow for computer and equipment. At floor level under viewing area and shelving shall be a 5” conduit opening to allow pass through wiring from production and studio. Power and data for this cabinet must be specified in electrical drawings. Production area must have a counter area with sink and wall cabinets. Media center shall have a staff toilet. Circulation Desk Circulation desk must have front exterior privacy panel to hide equipment wiring and work area. Counter must also contain handicap accessible check out station. 1. 2. 3. 4. Elementary - 32" height Middle - 40" height High - 40" height Grommets must be provided in all casework in the media center for cords to accommodate computer, keyboard, monitor, and print drawer. 5. Drawers, adjustable shelves 6. Shelves behind desk 7. Area for legs and feet 8. Four computer drops 9. Outlets must include electrical outlets for computer and printer and additional electrical outlets for miscellaneous equipment. 10. Shelf depth should be 12" 11. Counter height shelves for free standing storage 12. Book drop with box with wheels underneath to catch books AV Equipment Storage Room 1. 2. 3. 4. 5. Door to both hallway and Library Media Center Counters and cabinets above on one wall with strip of outlets between counter and cabinet Two computer drops Large open shelves for equipment storage on other three walls. Shelves should be ceiling height. Outlets in the baseboard of wall shelves every 10 feet. In some media centers, it may be necessary to specify flooded data cable in a small area but Owner must approve this during Design Phase. June 21, 2010 90 STORMWATER DRAINAGE MAINTENANCE DURING CONSTRUCTION In reference to retention ponds, ongoing maintenance for storm water compliance shall include: 1. Vegetation around the pond bank shall be maintained so as not to become a nuisance but shall be thick enough and maintained to prevent erosion of the ponds' banks. 2. Outlet control structures shall be kept free of debris and trash and shall be inspected at least once per week. 3. Periodically during construction, the contractor shall be responsible for measuring the bottom of the ponds for silt and sediment buildup. When the sediment has built up to approximately 1.0 ft. above the pond bottom elevation as shown on the design plans, the silt shall be dredged out of the pond to return the pond to original grade and disposed of offsite in an upland spoils pit. 4. All catch basins shall be inspected monthly for sediment build-up and assure no foreign objects are restricting positive flow through the system. This must be conducted on new schools and renovations. 5. Piping to storm drains must be totally sealed on top, sides, and bottom. June 21, 2010 91 LANDSCAPING All vegetation specified by the architect must be native to the area and hardy. No small flowers or flower beds are permitted. Landscaping vegetation and watering plans are to be specified by the architect and approved by Horry County Schools. Weed protection must be used in bed areas. Myrtle bushes and holly bushes are not allowed. Irrigation Pipe: Refer to Plumbing section and specify as indicated. Emphasis must be made on specifications and plans regarding depth of irrigation pipe installation. Mesh backed sod is not allowed on any Horry County Schools’ property. June 21, 2010 92 CIVIL Provide sufficient downspouts to ensure there is not water overflow on all roof drains. The engineer shall coordinate drainage in play areas so that, if possible, large storm drain covers are not located in playground areas and if storm drains are required they are pedestrian type designed specifically for small children. Curb and gutter is required in all parking, drive, and drop off areas. Make sure design drains water away from all playground areas. The Civil Engineer must provide adequate drainage in all foot traffic, driving, and playground areas. Sod must be specified for all immediate areas adjacent to the building. June 21, 2010 93 CONSTRUCTION PROJECT SINAGE REQUIREMENTS All verbiage listed on the sample sign below must be included on the construction project sign. The architect shall include the logo or signage identification for Horry County Schools and the contractor on the top of the project sign. June 21, 2010 94 TECHNOLOGY CABLING STANDARDS AND SPECIFICATIONS As of 06.17.10 I m portant I nform ation We require that each party involved, Architect, Engineers, Contractor, Subcontractors, etc review these specifications in full. Any deviation to these specifications without written consent of HORRY COUNTY SCHOOL personnel will not be allowed. In the event that any work has been incorrectly installed as defined within these specifications, HORRY COUNTY SCHOOL will not be held liable for any Change Order that may need to occur in order to bring the workmanship in line with these specifications. Any cost, labor, or time will be the responsibility of the Architect or others as the Architect designates as being at fault. Again, Horry County Schools will not pay for any change order that is needed in order to bring the work up to our specifications. June 21, 2010 95 TECHNOLOGY CABLING STANDARDS AND SPECIFICATIONS Introduction and Special Notes The District goal is to have certified cable installations at all sites. Cabling Contractors are required to be certified by the appropriate manufacturer(s) for the cabling plant that exists at the campus the work is requested. Installation must include a minimum 15-year manufacturer’s warranty (Section 2.1). PANDUIT brand connectivity products and PANDUIT partner cables will be used unless the District specifies different manufacturers. No equivalents other than what the District specifies will be accepted. Areas of Special Note: Test Results Each port must pass the appropriate tests for the type of cable installed. Test results for each port will be delivered to the District in electronic EXCEL formats. (Section 3.2-all sub-sections) Labeling Each port (fiber or Cat 6/6a) must be labeled according to the standards listed in Sections 6.0, 6.1, 6.1.1, and 6.1.2. As-built Drawings As-built drawings are to be included for any cabling installed (Section 1.4.2.1). District requires a laminated copy of the final as-built, plus an electronic copy of the CAD file. Electronic drawings for the site will be provided to the contractor if they exist. If there are no electronic as-builts, the contractor will be expected to create an original CAD drawing. Work added to an existing as-built is to be “clouded” on the drawing and appropriate notes are to be added to the legend indicating the scope, contractor, and date of completion. See Diagram F for sample as-built drawing. Inspection of Work All inspections of work done in the scope of these specs shall be the responsibility of the General Contractor and/or Architect. Changes in Building Codes At any time during construction that there is a change in building codes not reflected within these documents, the District shall not be charged for a change order for work required to comply with current building codes. STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM PART 1 – GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. June 21, 2010 96 SOUTH CAROLINA BUILDING STANDARDS South Carolina Electrical Code ELECTRONIC INDUSTRIES ASSOCIATION (EIA) EIA/TIA TSB-75 (1996) Additional Horizontal Cabling Practices for Open Offices EIA/TIA-455-21 (1988) FOTP-21 Mating Durability of Fiber Optic Interconnecting Devices EIA-492AAAA (1989) 62.5 uM Core Diameter/125 uM Cladding Diameter Class Ia Multimode, Graded-Index Optical Waveguide Fibers EIA/TIA-526-7 (1994) Optical Power Loss Measurements of Installed Single-Mode Fiber Cable Plant EIA/TIA-526-14 (1990) OFSTP-14 Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant TIA/EIA-568-B.1, B.2 (Fall 2001) Commercial Building Telecommunications Wiring Standard TIA/EIA-568-B.2-1 (2002) Transmission Performance Specifications for 4-Pair 100 Ohm Category 6 Cabling TIA/EIA-568-B.2-2 (2001) Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted-Pair Cabling Components - Addendum 2 (ANSI/TIA/EIA-568B.2-2-2001) TIA/EIA-568-B.2-3 (2002) Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted-Pair Cabling – Addendum 3 - Additional Considerations for Insertion Loss and Return Loss Pass/Fail Determination (ANSI/TIA/EIA-568-B.2-32002) TIA/EIA-568-B.2-5 (2003) Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted-Pair Cabling Components - Addendum 5 - Corrections to TIA/EIA-568-B.2-5 TIA/EIA-568-B.3 2000) (2000) Optical Fiber Cabling Components Standard (ANSI/TIA/EIA-568-B.3- TIA/EIA-569-A (1998) Commercial Building Standard for Telecommunications Pathways and Spaces (ANSI/TIA/EIA-569-A-98) TIA/EIA-569-A-1 (2000) Commercial Building Standard for Telecommunications Pathways and Spaces, Addendum 1 (ANSI/TIA/EIA-569-A-1-2000) This addendum defines the surface raceways contained in the work area outlets. TIA/EIA-569-A-2 (2000) Commercial Building Standard for Telecommunications Pathways and Spaces, Addendum 2 (ANSI/TIA/EIA-569-A-2-2000) This addendum defines the furniture pathways and spaces contained in work areas. TIA/EIA-570-A (1999) Residential and Light Commercial Telecommunications Wiring Standard TIA/EIA-606-A (2002) Administration Standard for the Telecommunications Infrastructure of Commercial Buildings June 21, 2010 97 TIA/EIA-607-A (2002) Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications (ANSI/JSTD--607-A-2002) TIA-568-B.1-4 Commercial Building Telecommunications Cabling Standard - Part 1: General Requirements - Addendum 4 - Recognition of Category 6 and 850 nm LaserOptimized 50/125 µm Multimode Optical Fiber Cabling (ANSI/TIA-568-B.1-4-2003) TIA/EIA-568-B2-1 Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted Pair Components - Addendum 1 - Transmission Performance Specifications for 4-Pair 100 Ohm Category 6 Cabling (ANSI/TIA/EIA-568-B.2-12002) TIA/EIA-854 A Full Duplex Ethernet Specification for 1000 Mbis/s (1000BASE-TX) Operating Over Category 6 Balanced Twisted-Pair Cabling (ANSI/TIA/EIA-854-2001) FEDERAL COMMUNICATIONS COMMISSION (FCC) FCC Part 68.5 Establishment of Telephone Premises Wiring Attestation List INSULATED CABLE ENGINEERS ASSOCIATION (ICEA) ANSI/ICEA S-80-576 (1994) Communication Wire and Cable for Wiring of Premises NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) NEMA WC 63 (1994) Telecommunications Cables NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) NFPA 70 (2002) National Electrical Code RURAL ELECTRIFICATION ADMINISTRATION (REA) REA 345-165 (1989) Digital Stored Program Controlled Central Office Equipment (Form 522) REA TECM 823 (1980) Electrical Protection by Use of Gas Tube Arrestors UNDERWRITERS LABORATORIES INC. (UL) UL 444 (1994; R 1995, Bul. 1995 and 1996) Communications Cables UL 467 (1993; Bul. 1994 and 1996, R 1996) Grounding and Bonding Equipment UL 497 (1995) Safety Protector for Paired Conductor Communication Circuit UL 514C (1988; R 1989, Bul. 1993 and 1994) Nonmetallic Outlet Boxes, Flush-Device Boxes and Covers UL 910 (1995; R 1995, Bul. 1995 and 1996) Flame-Propagation and Smoke-Density Values for Electrical and Optical-Fiber Cables Used in Spaces Transporting Environmental Air UL 969 (1995) Marking and Labeling Systems June 21, 2010 98 UL 1286 (1993) Office Furnishings UL 1581 (1991; Bul. 1993, 1994, 1995, and 1996, R 1996) Electrical Wires, Cables, and Flexible Cords UL 1666 (1991; Bul. 1995 and 1996) Flame Propagation Height of Electrical and OpticalFiber Cables Installed in Vertical Shafts UL 1863 (1995) Communication Circuit Accessories 1.2 DEFINITIONS 1.2.1 Main Distribution Frame (MDF) A. A physical concentration or central location for terminating backbone cables to interconnect with local exchange carrier (LEC) equipment at the activity minimum point of presence. The MDF generally includes vendor specific components to support voice and data circuits, building surge protector assemblies, main cross connect blocks, equipment support frames, and plywood backboard equipment. Depending upon local site conditions, the MDF and IDF may be identical. 1.2.2 Intermediate Distribution Frame (IDF) A. An intermediate termination point for horizontal wiring and cross connections normally within another structure separate from the MDF. 1.3 SYSTEM DESCRIPTION A. The structured telecommunications cable and pathway distribution and wiring system shall include permanently installed backbone and horizontal cabling, horizontal and backbone pathways, workstation pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for terminating, and interconnecting. B. The horizontal system includes the cabling and pathway between the IDF and the work area telecommunications outlet. C. The backbone cabling and pathway system includes the interconnecting cabling, pathway, and terminal hardware to provide connectivity between the MDF's and IDF's. D. The backbone system shall be wired in a star topology with the MDF at the center or hub of the star. E. Hardware and terminating equipment shall consist of UL approved, Cat 6/6a patch panels, jacks, and fiber optic terminating equipment. F. Backbone cable shall consist of Multimode fiber optic cable (OFN) 50/125µm will be used for all multimode backbone cable. (2.3.1). G. Inter-building backbone pathways will consist of 2” conduits, except where noted per the drawings. H. Horizontal pathways will consist of 1.25” conduits, existing conduit, cable trays and raceways, Wire mold 5500 raceway or combination of both, as per the drawings. Wire basket cable trays are preferred. I. Structured Telecommunications Cabling and Pathways Systems shall be installed in a “neat and workmanlike manner” as specified or recommended by ANSI/NECA/BICSI 568-2001 and National Electrical Code, Sections 110-12 and 800-6. June 21, 2010 99 1.4 SUBMITTALS A. If there is an installed base in an existing building other than PANDUIT brand connectivity, the Contractor is to submit the following information to the Horry County Schools Building Technology Coordinator for approval prior to purchasing and installation: 1.4.1 Manufacturer's Catalog Data A. Telecommunications cabling, specifications make and model (backbone and horizontal) 1. 2. 3. 4. 5. 6. 7. 8. 9. Fiber optic type SC connectors Telecommunications outlet/connector assemblies RJ45 jack Equipment support rack Patch Panels (Copper and Fiber optic) Power Strips Cable Hangers Fire stop material External mounted raceway Cable tray (Wired baskets type is preferred) B. All Telecommunications equipment is subject to Horry County Schools’ approval. 1.4.2 Drawings A. Telecommunications Drawings B. Distribution Frame Elevations 1.4.2.1 Telecommunications Drawings A. Show the layout of cabling and pathway runs, MDF, IDF, and ground system. B. Drawings shall depict final telecommunications cabling configuration, including location, gauge, pair assignment, and patch panels after telecommunications cable installation. C. Provide one set of plastic laminated diagrams of the overall telecommunications cable system showing cabling, IDF's, MDF's, and equipment rooms keyed to floor plans by room number attached to the rack in the MDF. Provide rack drawings showing the cabling equipment layout in each rack. (See diagram B for example) In IDFs, supply a rack drawing layout of the IDF and the IDF area as-builts which are laminated and attached to the rack. D. Provide two (2) electronic copies of as-builts to HCS. AutoCAD drawing with mark-up of data placement and labeling or approved equivalent. Drawings shall be provided within one week of project completion and prior to final payment for project. 1.4.2.2 Distribution Frames A. Provide shop drawing showing layout of applicable equipment including incoming IDF racks, patch panels, and LAN equipment. June 21, 2010 100 1.4.3 Statements A. Installer qualifications B. Testing plan and Documentation Samples C. Professional References D. Labeling Scheme Samples (refer to Section 6.1) 1.4.3.1 Installer Qualifications 1. Provide information on company background including number of years in business, size of firm, and experience. 2. Provide the location of your company’s main office. Provide the name, location, and experience/background of representative(s) who will be providing service and assistance to the district staff in developing, installing, and maintaining the system. 3. Provide the name, location, and experience/background of the primary trainer(s) who will be providing training to district and school staff in learning to use the components of the system. 4. Provide, as reference, the names of at least three organizations, preferably K-12 school districts that are currently using the company’s product. 5. Provide name, location, and experience/background of supervisor of installation personnel on project site. 6. Provide a copy of the Vendor’s current Panduit PCI Certified Installer certification documenting approval/training as an installer of the specified products for new schools and select renovation projects. 7. The Vendor shall be required to establish, to the satisfaction of the Owner, the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Proposal Document. 8. The Vendor shall demonstrate the Vendor’s experience by providing a list of three (3) successful installations of similar size and scope as the Work described in these documents. Vendor shall also provide documentation showing a minimum of five (5) years experience in Structural Low Voltage wiring, and any certifications documenting that the Vendor is an approved, trained installer of the equipment. 9. Vendor shall employ, full-time, an RCDD/NTS/LAN Specialist or RCDD. Subcontracting this individual for District projects is unacceptable. Provide copy of current RCDD registration certificate with bid response. 10. Vendor shall employ a competent Project Manager with five (5) years minimum experience in networked multimedia systems that shall be in attendance at the Project premises during performance of the Work. The Project Manager must attend all meetings pertaining to the Project. The Project Manager will attend weekly meetings with the Owner to provide project status and updates. The Project Manager shall not be changed except with written consent of the Owner. 11. The Vendor will have a SPIN (Service Provider Identification Number) and FCC Number and will be knowledgeable about E-Rate and eligibility of services and June 21, 2010 101 products/equipment. The awarded bidder will not depend on the District to provide guidance about E-Rate, but rather will be a resource for the District in regard to ERate. Proposals and invoices will be broken down by eligible and ineligible items. 12. The Vendor must be specialized in performing the work of this section and approved by the manufacturer. 13. The Vendor must be able to service and install all aspects of this network with internal personnel. Any applicants that do not employ personnel that can service and install all data, voice, audio, and video components may be disqualified. 14. The Vendor must maintain a service department located within fifty (50) miles of the District Office and stock sufficient replacement parts and equipment to provide the specified warranty service. 15. The Vendor must be an authorized distributor of the equipment supplied. 16. The Vendor must demonstrate proof of after-hours service arrangements and provide the telephone number being used for such service. Contractor shall provide warranty service during normal business hours, but shall also demonstrate full capability of providing 24-hour local service for emergency calls after hours. After hours emergency service shall be charged at the Contractor’s standard published service rate. 17. This system is to be installed only by contractors and/or personnel authorized to do so by the manufacturer of the equipment being provided. The Vendor must have a minimum of five (5) years experience in Structural Low Voltage Wiring. Upon request, the Owner, or the Owner’s agent, may request the contractor supply project references which substantiate the above experience. All system equipment installations and tests are to be made by workers skilled in the specific trade and task assigned to them. 18. The Vendor’s RCDD/NTS/LAN Specialist or RCDD will be responsible for reviewing architectural drawings for accuracy and reporting to District IT department. 19. Vendor will have a representative on-site to assist in troubleshooting wiring problems for the first three (3) days of “turning up” of system. 1.4.3.2 Test Plan A. Provide a complete and detailed test plan for the telecommunications cabling system including a complete list of test equipment for the UTP and OFN components and accessories. Include procedures for certification, validation, and testing. B. Furnish documentation samples for the testing results. 1.4.3.3 Professional References A. Provide a list of at least five professional references for similar projects. Include company names, contacts, phone numbers, and a description of project. 1.4.3.4 Factory Test Reports A. Factory reel tests 1. June 21, 2010 Furnish factory reel tests for fiber optic cables. 102 1.4.3.5 Field Test Reports A. Telecommunications cabling testing 1.4.3.6 Operation and Maintenance Manuals A. Telecommunications cabling and pathway system 1.4.3.7 Schedules A. Construction Schedules are required for each project and should be coordinated with the General Contractor and Architect. A weekly report shall be furnished in writing to the District detailing project schedule to include start date, project completion date, and a summary of completed work detailing project milestones. This report shall be furnished to Facilities and Technology contacts defined after project award date and prior to project start date. 1.5 DELIVERY AND STORAGE A. Provide protection from weather, moisture, dirt, dust, and other contaminants for telecommunications cabling and pathway equipment placed in storage. PART 2 – PRODUCTS 2.1 COMPONENTS A. UL or third party certified. Provide a complete system of telecommunications cabling and pathway components using star topology and support structures, pathways, and spaces complete with conduits, pull wires, raceways, pull boxes, outlets, cables, and ground boxes, as per the drawings. Fixed cables and pathway systems for telecommunications systems shall be UL listed or third party independent testing laboratory certified, and shall comply with NFPA 70. Horizontal cable and termination equipment shall be of a manufacturer, installed and certified so as to provide a 15-year warranty. B. For installations in ‘new’ buildings and for select renovation/addition projects, the District has standardized on PANDUIT brand connectivity hardware and wire management products. Part numbers for District approved products are defined in this document. NO DEVIATION FROM PANDUIT PRODUCTS OR FROM THE SUPPLIED PART NUMBERS WILL BE TOLERATED WITHOUT WRITTEN CONSENT FROM THE DISTRICT. A list of approved products is included in Section 2.11 of this document. 2.2 PATHWAYS (BACKBONE AND HORIZONTAL) A. TIA/EIA-569-A. Pathway shall be basket-style cable tray, conduit and raceway installations. Provide grounding and bonding as required by TIA/EIA-607-A. B. Pathways shall be installed in accordance with NEC Article 314 and Article 800.51 (J), (K), or (L), as applicable, and installed in accordance with Articles 362.24 through 362.56, where the requirements applicable to electrical nonmetallic tubing apply. June 21, 2010 103 2.3 TELECOMMUNICATIONS CABLING A. Cabling shall be UL listed for the application and shall comply with EIA TSB-67, TIA/EIA-568-B.1, B.2, and NFPA 70. Cabling shall consist of Cat 6 or Cat6a UTP (TBD project-by-project by the District) and OFNP/FT6. Plenum cables shall comply with UL 910. Provide a labeling system for as stated in Supplemental 1 at the end of this document. Cabling manufactured more than 12 months prior to date of installation shall not be used. OFN shall comply with UL 1581 vertical tray flame test. OFNP may be substituted for OFNR. OFNG and OFN may be substituted for OFNP and OFNR. B. Provide and install plenum-rated Cat 6/6a and optical fiber cabling manufactured by companies that are included in the PANDUIT extended warranty program. 2.3.1 Backbone Cabling A. Data backbone cabling shall be indoor/outdoor rated, tight-buffered 12 strand 50/125 multimode fiber optic cable placed in innerduct within the cable tray or armored cable may be used in the cable tray. Terminate with SC connectors. B. 1 – Cat 6/6a cable shall be installed and terminated, RJ45, between the Demark and the MDF in places where the Demark and the MDF are NOT co-located. C. ETV cabling backbones shall be RG-11. In addition to cabling from the MDF to all IDFs, backbones shall be installed from the MDF to the ITFS Tower and to the Satellite Dish. Three (3) RG-11 cables shall be installed to the ITFS tower. Two (2) RG-11 cables shall be installed to the Satellite Dish. Leave a 10’ service loop at both ends of each cable. Terminate with RG-11 connectors. D. Paging applications shall use 12-conductor 18 gauge non-shielded twisted pair backbone cable. Terminate on Krone blocks in the IDF and MDF. E. A minimum of one 25-pair, Category 3 or Category 5e, 14 gauge, copper backbone cable shall be installed from the MDF to each IDF unless otherwise specified by the District. The pair count to support voice / IR / Video applications may vary based on the converged system selected. Provide 20% additional pairs for future growth beyond immediate project requirements. Terminate cable(s) on patchpanels in ‘new’ installations and in ‘new’ additions to existing facilities. In existing MDF or IDF, terminate cable on wall-mounted blocks matching existing system (66 or 110 type) in use. 2.3.2 Horizontal Cabling A. Comply with NFPA 70, NEMA WC 63, ANSI/ICEA S-80-576 and performance characteristics in TIA/EIA-568-B.1 and B.2 UTP, four-pair 100 ohm. B. Ultimate breaking strength shall be minimum 90 pounds. C. Four pair cable shall withstand a bend radius of one-inch minimum at a temperature of minus 20° C maximum without jacket or insulation cracking. D. Conductors shall be color coded and polarized in accordance with TIA/EIA-568-B.1 and B.2. June 21, 2010 104 E. Enhanced performance Cat 6a UTP plenum cable for local area networks shall meet or exceed TIA/EIA-568-B.1 and B.2 standards. F. Conductor shall be 24 awg solid annealed copper unless otherwise specified. G. Primary insulation shall be FEP fluoropolymer resin for each pair. H. Cable shall be plenum rated and shall comply with NFPA 70, UL 444, and UL 910. 2.3.2.1 Fiber Optic Cabling A. 12 – strands of multimode amour fiber optic cable (50/125µm) shall be pulled from the MDF to each IDFs and terminated with SC connectors on both ends. Cables shall be placed in a proper SC bulkhead. B. All fiber optic cable shall be properly labeled and tested bi-directionally at 850 nm and 1300 nm. 2.3.2.2 Fiber Optic Patch Cables. A. Fiber Optic Patch Cables shall be multimode patch cords pre-made to connect fiber optic equipment with fiber optic cross connects, interconnects, and outlets. B. The patch cords (jumpers) shall be impact-resistant multi fiber cables, SC connectors, of the same performance characteristics as the multimode fiber backbone being connected (50/125µm). C. These fiber optic patch panel connections shall provide 0.4 dB or less insertion loss and provide connection between the Active LAN devices and the Fiber Optic patch panel. Quantities for 100% population plus 10% Spares. 2.4 DISTRIBUTION FRAMES A. Provide 19” x 7’ equipment racks in each MDF and IDF. See Section 5.2. 2.4.1 Copper Patch Panels A UTP patch panels shall be rack mounted, rated to exceed EIA/TIA Cat 6/6a modular (8 position) patch panels each wired to terminate modular jacks per the EIA/TIA T568A standard. B. Quantities of jacks are based on the number of UTP cables originating at wall outlets and terminating at the patch panel. C. All patch panels shall be grounded. D. 10% growth on Patch Panels shall be provided. 2.4.2 Fiber Optic Patch Panel A. Provide panel for maintenance and cross connecting of fiber optic cables. B. Panel shall be constructed of 0.125-inch minimum aluminum and shall have connectors which interface the inside plant fiber optic jumper cable with the outside plant fiber optic cable. C. Panels shall be equipped with engraved laminated plastic nameplates above each connector. June 21, 2010 105 D. Rack-mounted fiber patch panels shall be equipped to terminate or splice the incoming interbuilding fiber and any required backbone or interconnect cables. E. Each cable must be properly dressed. F. These units will terminate the fiber optic cables, provide a place for jumper cables, and will provide room to terminate additional optics. G. All connectors will be type SC. H. The fiber optic patch panel connections shall provide 0.4 dB or less insertion loss. I. 2.5 All patch panels shall be grounded. TELECOMMUNICATIONS OUTLET/CONNECTOR ASSEMBLIES A. Jacks shall comply with FCC Part 68.5, and TIA/EIA-568-B.1 and B.2. B. Jacks shall accommodate UTP or OFN and work in concert with Wire mold 5500 raceway. C. UTP jacks shall be RJ45 designation T568A type, UL 1863 listed, eight-position constructed of high impact rated thermoplastic housing rated for Cat 6a service. D. UTP jacks for data shall be Cat 6a hardware and shall comply with the attenuation requirements contained in TIA/EIA-568-B.1 and B.2. E. Telecommunications cover plates shall comply with UL 514C and TIA/EIA-568-B.1 and B.2; flush design constructed of high impact metal material. F. Stenciled lettering for voice and data circuits shall be provided using thermal ink transfer process. 2.6 RACEWAY (EXPOSED) A. Conceal cable pathways within walls whenever possible. B. Raceway shall be ivory in color or a color approved by HCS personnel. C. Notching or modifications of raceway will not be permitted. D. All Raceway and conduit will be provided by the electrical contractor. 2.7 BACKBOARDS A. Provide fire rated plywood 3/4 inch thick 4’ x 8’ lining at least 2 adjoining walls in the MDF and each IDF for mounting of PA, Video, Security, and other termination equipment. This will be the responsibility of the General Contractor. B. Plywood backboards shall be painted with a light color, nonconductive fire-resistant overcoat. Do not paint over the fire retardant marking/stamp of the plywood. 2.8 GROUNDING AND BONDING PRODUCTS June 21, 2010 106 A. Comply with UL 467, TIA/EIA-607-A, and NFPA 70. Components shall be identified as required by TIA/EIA-606-A. 2.9 FIRE STOPPING MATERIAL A. Contractor shall provide all necessary fire stopping of openings through which cable is installed under this specification, in accordance with NFPA 70 and all local codes. This includes installation in conduits, raceways, or bare penetrations. Provide and install UL 1479 approved (Fire Barrier Caulk) fire stop material. 2.10 TV Mounting Brackets (If Required) A. TV mounting and brackets shall be determined by the type of flat panel TV purchased. General Contractor shall be responsible for mounting, purchasing and installing TVs. Contact Horry County Schools for the type and model of TVs being purchased for approval. June 21, 2010 107 2.11 District Approved Products Description Manufacturer Part Number Horizontal plenum-rated UTP Cable Panduit Warranty Partner Panduit Warranty Partner 50/125 µm Optical fiber Backbone Cable Panduit Warranty Partner Panduit Warranty Partner BLUE Jack for Data – Category 6a PANDUIT CJ6X88TGBU BLUE Jack for Data – Category 6 PANDUIT CJ688TGBU BLUE Jack for Data – Category 5e RETROFITS / RENOVATIONS ONLY PANDUIT CJ5E88TGBU RED Jack for Voice & Wireless – Category 6a PANDUIT CJ6X88TGRD RED Jack for Voice & Wireless – Category 6 PANDUIT CJ688TGRD RED Jack for Voice & Wireless – Category 5e RETROFITS / RENOVATIONS ONLY PANDUIT CJ5E88TGRD YELLOW Jack for Video / IR – Category 6a PANDUIT CJ6X88TGYL YELLOW Jack for Video / IR – Category 6 PANDUIT CJ688TGYL YELLOW Jack for Video / IR – Category 5e RETROFITS / RENOVATIONS ONLY PANDUIT CJ5E88TGYL Hanging Wallphone Kit – Category 6 PANDUIT KWP6PY PANDUIT 2 Port : CFPL2SY 4 Port : CFPL4SY 6 Port : CFPL6SY Stainless Steel Faceplate Single Gang Equipped with label windows & lens covers June 21, 2010 108 Vertical Cable Manager 80.4”H x 6.7” W x 13.8” D PANDUIT WMPVHC45E Horizontal Cable Manager 3.5”H x 19” W x 9.8” D PANDUIT NCMH2 48 Port Patch Panel – Category 6a PANDUIT DP486X88TGY 48 Port Patch Panel – Category 6 PANDUIT DP48688TGY 48 Port Patch Panel – Category 5e RETROFITS / RENOVATIONS ONLY PANDUIT DP485E88TGY 24 Port Patch Panel – Category 6a PANDUIT DP246X88TGY 24 Port Patch Panel – Category 6 PANDUIT DP24688TGY 24 Port Patch Panel – Category 5e RETROFITS / RENOVATIONS ONLY PANDUIT DP245E88TGY Siecor UV or 3M Hotmelt Siecor UV or 3M Hotmelt RTC18B (18 port) RTC36B (36 port) RTC72B (72 port) SC Connectors Rack Mount Fiber Cabinets – Black, regular density SMP Fiber Optic Adapter Plate – 6 Port Multimode SC SMP 616MMSC Fiber Optic Adapter Plate – Blank SMP 600 Copper Patch Cords – Category 5e, 6, 6a Provided by District Provided by District Optical Fiber Patch Cords Provided by District Provided by District June 21, 2010 109 PART 3 – EXECUTION 3.1 INSTALLATION A. Telecommunications cabling and pathway systems, including the horizontal and backbone cable, pathway systems, telecommunications outlet/connector assemblies, and associated hardware shall be installed in accordance with TIA/EIA-568-B.1, B.2, B.3, TIA/EIA-569-A, NFPA 70, and UL standards as applicable. B. Cabling shall be connected in a star topology network. C. Contractor shall provide all necessary tools and materials not specified (tie wraps, “D” rings, screws, consumables, hardware, etc.) and equipment (ladders, hydraulic lifts, storage containers, etc.) necessary to provide a complete and operating system. D. Installation methodologies shall adhere to manufacturer installation procedures so as to not violate certifications (i.e. UL). E. All work shall be performed in a good workmanship-like manner leaving each location in the same or better condition as at the start of each project. Daily housekeeping of cabling site is required. F. The designated District representative shall be provided weekly written progress reports. G. Periodic on-site inspections will be done during the course of installation. H. The District reserves the right of “local jurisdiction” for final approval. I. All cabling shall be routed from the bottom of the connecting blocks, dressed, and secured in a professional manner. J. Spools/mushrooms shall be installed for efficient routing of cross-connect wires. Cross-connect wires shall be routed in acceptable telecommunications industry practices and shall be routed above the punch down blocks. K. Cat 6/6a cables (Video, Voice, Data) shall have all 4 pair punched down. Termination will be on patch panels in MDFs or IDFs. In existing communication closets, termination will be blocks or similar to existing termination in existing closet. L. Size and quantity of feeder cables plus quantities of Cat 6/6aa voice and IR cables installed determine the number of termination blocks required. Termination will be on patch panels in new MDFs or IDFs. In existing communication closets, termination will be blocks or similar to existing termination in existing closet. M. All 66-type and Krone punch down blocks plus coax cables at the MDF/IDF shall be uniquely labeled and identified. Cat 6/6a, PA, and RG11 feeder cables shall be uniquely labeled and identified. Cat 6/6a UTP cables for voice and IRs shall be uniquely labeled and identified as per Supplemental 1 at the end of this document. Termination will be on patch panels in new MDFs or IDFs. In existing communication closets, termination will be blocks or similar to existing termination in existing closet. N. Cat 6/6a cables for telephones (If IP based phone system will be installed, check with HCS Technology before installing.), video rebroadcast, and IR control will be required to each IDF and to the telephone demarcation point. O. All cabling, IR, Voice, Data and CATV shall be installed in separated areas on backboard or data rack as determined by HCS or its consultants. Installation of such cabling shall be in sequential order as related to an appropriate numbering scheme and clearly marked. All racks shall have 3 foot of open/unused rack space available from base of rack. Data shall be placed on one rack. An empty rack shall be place next to the data rack. Phone and WAPs shall be placed onto one rack. Video, video rebroadcast and IR shall be place onto June 21, 2010 110 one rack. Combining racks maybe permitted, ONLY if pre-approved by HCS-Technology. (i.e., All drops in Room XXX shall occupy sequential ports on patch panels.) P. Speaker wiring shall be terminated on backboard on Krone. 18 gauge stranded pair shall be used for all speakers wiring. Q. “Loop wiring” IS NOT acceptable with any cabling. R. No data connection shall be greater that 250 ft. from a MDF/IDF. S. All faceplates shall be metal and shall have windows and lenses to accommodate labels. T. Data Jacks (RJ45) shall be BLUE in color. U. Phone/IP Phone & Wireless Jacks (RJ45) shall be RED in color. V. Video Jacks (RJ45) shall be yellow in color. This includes TV, IR, Video, Cameras. W. Installation of speaker cabling, termination of closet end of cables, and labeling of both ends of cables shall be performed by the Cabling Contractor. Installation of speakers shall be the responsibility of other District Vendor. Purchase of speaker will be by other District Contractor. General Contractor will be responsible for coordinating and procuring speaker installation with District Vendor. X. Installation of camera cabling, termination in surface mounted box with Yellow Jacks in ceiling and termination on patch panels in closets by the Cabling Contractor. Installation of cameras and camera mounts by Other District Vendor. Connection to Network and alignment/adjustment of cameras to be performed by Other District Vendor. Y. Installation of Data Cable, terminations & labeling on both ends will be done by the cabling contractor. Z. All projector cabling by Other District Vendor. 3.1.1 Cabling A. Install Cat 6/6a UTP and OFN telecommunications cabling and pathway system in accordance with TIA/EIA-568-B.1, B.2, 569-A and the drawings. B. Cabling installation shall comply with EIA TSB40-A and EIA TSB-36. C. Screw terminals shall not be used except where specifically indicated on plans. D. Do not untwist Cat 6/6a UTP cables more than 1/4 inch from the point of termination to maintain cable geometry. E. Do not exceed manufacturers' cable pull tensions for copper and fiber optic cables. Provide a device to monitor cable pull tensions. Do not exceed 25 pounds pull tension for four pair copper cables. F. Do not chafe or damage outer jacket materials. G. Use only lubricants approved by cable manufacturer. H. Do not over cinch cables or crush cables with staples. June 21, 2010 I. For UTP cable bend, radii shall not be less than four times the cable diameter. I. Plenum cable shall be used. 111 3.1.1.1 Open Cable A. Use only where specifically indicated on plans or determined during site surveys. B. When not run in surface mounted raceway or conduit, utilize Cable Trays above suspended ceilings and in all ceiling spaces. Cable Trays is the preferred method. C. Comply with TIA/EIA-568-B.1 and B.2. D. Install cabling above suspended ceilings 6 to 12 inches above ceiling in cable trays and securely attach to structural ceiling. E. Do not exceed cable pull tensions recommended by the manufacturer. 3.1.1.2 1. Plenum cable shall be used in all appropriate areas. Plenum cables shall comply with flammability plenum requirements of NFPA 70 and shall comply with UL 910. 2. Avoid routing copper cable in areas where there may be high levels of electromagnetic interference (EMI). EMI is caused by AC power lines, broadcast signals, X-ray equipment, motors, generators, and fluorescent lights. UTP cables shall be routed at least 5 inches away from fluorescent lighting fixtures. 3. Cables shall be placed in the support device, Cable Tray, and wrapped using Velcro ties or other ties as approved by HCS. 4. Cabling shall be organized and identified so as to facilitate locating and handling individual sheaths for maintenance functions. 5. Each bundle shall be neatly tied without over cinching or stressing cable. 6. Bundles shall be clearly marked identifying the IDF and room to which routed, the station numbers served by the bundle, and any other information that may assist in administration. 7. Great care shall be taken to protect all cabling from physical damage. 8. A minimum 5’ or a maximum 10’ service loop shall be installed on each cable installation where possible. Installation shall be above the ceiling on J-Hooks in 3 foot diameter loop. Backbone Cable A. Fiber Optic Backbone Cable. Install backbone OFN in pathways. B. Do not exceed manufacturer's recommended bending radii and pull tension. C. Prepare cable for pulling by cutting outer jacket 10 inches leaving strength members exposed for approximately 10 inches. Twist strength members together and attach to pulling eye. D. Terminate individual strands into fiber optic type SC connectors. E. All fiber shall be placed in innerduct or be armored jacket construction. June 21, 2010 112 3.1.1.3 Horizontal Cabling A. Install horizontal cabling and pathway as shown on drawings or as determined at site survey between IDF and telecommunications outlet assemblies at workstations, in accordance with TIA/EIA-568-B.1, B.2, and 569-A. 3.1.1.4 Feeder Cables A. TV Cabling (where TV are installed) Two Cat 6/6a cables terminated with RJ45 connector from each TV location to the MDF/IDF. One Cat 6/6a will be for TV signal and one for IR. These two Cat 6/6a cables may be in place into a single box. RG11 cable will be run from each IDF to the MDF where needed. B. Feeder Cable 1 - RG11 for TV 1 - 12 conductor 18 gauge (non-shielded) stranded wire for paging 1 - 12 strand 50 µm multimode optical fiber. Provide enough 24 gauge copper feeder (25 pr, 50 pr, 100 pr, etc.) to provide feeder pairs to all required telephones (if not IP phones), speakers, paging, IR, and TV controls (if required). A minimum of one 25 pair to each closet shall be installed. These counts may vary based on the converged system selected. Also there will be 20% additional feeder cable for future growth. Termination will be on patch panels in new MDFs or IDFs and on matching wallmounted blocks for retrofits/renovations. Coordinate this with HCS-Technology. 3.1.1.5 ETV Cabling One 3 inch conduit shall be provided from the ITFS tower location to the MDF. Three RG11 cables shall be pulled in this conduit. Leave a service loop of 10 ft at each end. One 3 inch conduit shall be provided from the Satellite Dish location to the MDF. Two RG11 cables shall be pulled in this conduit. Leave a service loop of 10 ft at each end. 3.1.2 Work Area Outlets A. Terminate UTP cable in accordance with TIA/EIA-568-B.1, B.2, and wiring configuration T568A. 3.2 TESTING 3.2.1 Cabling Testing A. Perform cabling inspection, verification, and performance on all cabling. B. All testing personnel shall be trained on testing equipment tools to assure that complete and accurate testing results are obtained/provided. June 21, 2010 113 3.2.1.1 Inspection A. Visually inspect cabling jacket materials for UL or third party certification markings. B. Visually inspect UTP and OFN jacket materials for UL or third party certification markings. C. Inspect cabling terminations in telecommunications rooms and at workstations to confirm color code for tip and ring pin assignments, and inspect cabling connections to confirm compliance with TIA/EIA-568-B.1 and B.2. D. Visually confirm Cat 6/6a marking of outlets, cover plates, jacks, and patch panels. 3.2.1.2 Verification Tests A. Perform copper cabling certification testing to appropriate ANSI/TIA/EIA Standard for category rating of system installed (5e / 6 / 6a). B. Perform optical fiber backbone end-to-end attenuation tests using a power meter and source. Perform tests bi-directionally and at both 850nm & 1300 nm wavelengths. 3.2.1.3 Performance Tests A. Cat 6/6a Links. Perform UTP Permanent Link tests in accordance with TIA/EIA568 B.2-1 and manufacturer’s guidelines. B. Tests shall include wire map, length, attenuation, NEXT, FEXT, and propagation delay. C. OFN Links. Perform OFN end-to-end attenuation tests and reel tests at job site. D. RG6 (Coax), RG11 (Coax Backbone) and speaker cabling will be tested for continuity. 3.2.1.4 Final Verification Tests A. Perform verification tests for UTP and OFN systems after the complete telecommunications cabling and workstation jacks are installed. B. Provide District representative with written final tests verification within 1 week of completion of installation. C. Final test results shall include summary pages for each IDF/MDF as required. D. Test results shall be provided in both hard and soft copy. Acceptable format shall be Access database, Excel spreadsheet, or CSV. (Section 4.0 - Pathway Installations will be provided by separate vendor) PART 4 – PATHWAY INSTALLATIONS A. Comply with TIA/EIA-569-A, NEC, and CEC. June 21, 2010 114 B. Shall be installed in accordance with NEC Article 314 and Article 800.51 (J), (K), or (L), as applicable, and installed in accordance with Articles 362.24 through 362.56, where the requirements applicable to electrical nonmetallic tubing apply. C. Conceal interior conduit within finished walls, ceilings, and floors ( conduit in floors or under slab will need approval from HCS Personnel) where possible. D. Keep conduit minimum 6 inches away from parallel runs of electrical power equipment, flues, steam, and hot water pipes. E. Install conduit parallel with or at right angles to ceilings, walls, and structural members where located above accessible ceilings and where conduit is visible after completion of project. F. No communication conduits are to be installed in crawl spaces or under floor slabs. All data cabling is to be done above ceiling unless written permission is given by Horry County Schools. G. Install no more than two 90-degree bends for a single horizontal cable run. If run requires more than two 90 degree bends, then a 4 inch x 4 inch “pull box” must be installed. H. Run raceway as determined by site survey. I. Provide Pull boxes with “Sealtight” flex conduit only where flexible connections are required. HCS approval required prior to all “Sealtight” flex conduit installations. J. Provide all coring, patching, and painting as needed for Intra-Building and Inter-Building pathways. Caulking is not an acceptable patching method for conduit penetrations into exterior walls. Coordinate with HCS for acceptable patching methods. 4.1 Ground Boxes and Pull Boxes A. Ground boxes shall be made of concrete and the minimum size shall be 35½” x 17½” x 12”. B. Ground box covers shall be rated for traffic (type T.05) and shall be marked communications. C. Metal covers shall be used in all locations subject to vehicle traffic. D. Gravel shall be installed below all ground boxes for drainage. E. Ground boxes and pull boxes shall not be placed in areas subject to flooding. F. Unless otherwise noted, exterior pull boxes shall have minimum dimensions of 20” x 20” x 6”. 1. Interior pull boxes shall consist of 16 gauge steel minimum, unless otherwise noted on plans. 2. Indoor enclosures shall conform to NEMA Type 4, unless otherwise noted. 3. Size pull boxes to not less than minimum Code requirements. Increase size above Code requirements where necessary to provide space for pulling, racking, or splicing enclosed conductors, or where specified or indicated dimensions exceed Code requirements. 4. Exterior metal pull boxes exposed to weather (and not installed in or below grade) shall be equipped with rain tight or weatherproof-hinged doors. 5. Exterior pull boxes shall have 16 gauge steel bodies and 14 gauge steel doors. 6. Exterior pull boxes shall be equipped with external mounting feet. June 21, 2010 115 7. Exterior pull boxes shall be equipped with stainless steel door clamps on three sides and a removable stainless steel continuous hinge pin. 8. Exterior pull boxes shall be equipped with a hasp and staple for padlocking. 9. Enclosures installed on vertical exterior walls shall conform to NEMA Type 3R. 10. Enclosures installed on exterior horizontal surfaces such as rooftops or breezeways shall conform to NEMA Type 4 unless otherwise noted. 11. Rain tight or weatherproof boxes shall use threaded watertight hubs for top or side entry and may use knockout for bottom entry only. 12. Exterior pull boxes shall conform to these industry standards: a. b. c. d. e. UL 508 Type 4 NEMA/EEMAC Type 3, Type 4, Type 12, Type 13 JIC standard EGP-1-1967 CSA Type 4 IEC 529, IP66 13. Tamper resistant screws shall be used on all exterior, aboveground junction/pull boxes that are exposed to public/student areas. 14. Exterior pull boxes shall be manufactured by Hoffman or HCS approved equal. 4.2 Communication Duct-Banks and Conduits 4.2.1 Trenches A. All underground trenches shall be 24” wide by 30” deep. B. Trenches shall be back-filled at 95% compaction. C. Contractor shall restore surface to same or better condition. D. Contractor shall contact appropriate Utilities a minimum of 72 hours prior to excavation to verify the location of existing underground utilities. E. Modifications to pathway design may be dictated by field conditions subject to approval by HCS. F. Compaction testing notification must be provided to the District 72 hours prior to testing so that a District inspector may be present. G. Slurry fill trenches to within three inches (3”) of finished grade whenever crossing paved areas. “Two Sack” slurry shall be used with an overlay of 10 feet on either side. 4.2.2 Conduit A. Underground conduit shall consist of Schedule 40 PVC – 2 inch inside diameter or type C telephone conduit - 2 inch inside diameter (if concrete encased). 1. June 21, 2010 Inner duct, where specified, corrugated, or splined (inside and outside) flexible orange inner duct, 1 inch in diameter, riser rated, will be placed for fiber optic cable protection. 116 2. One (1) inner duct shall be placed in a 2-inch conduit. Inner ducts are to be equipped with 1/8" pull ropes. 3. Conduit shall have a factory formed bell on one end for interconnecting segments. 4. Conduit located under heavy use highways or railroad rights-of-ways shall be encased in steel casing consistent with the AASHTO or AREA specifications. The thickness of the steel casing shall be engineered for each specific application. This may vary based on campus codes. 5. Spacers: High impact spacers shall be used in all multi-duct systems, for both solely owned or joint telecommunications/power construction. They shall conform with NEMA TC-2, TC-6, TC-8, and ASTM F 512 dimensions. 6. All fittings shall be designed specifically for use with the type of conduit placed. 7. All conduits shall be equipped with seal plugs in all ground boxes and expansion rubber seal plugs within all buildings. 8. A horizontal and vertical separation of 1 inch shall, between the ducts, be maintained by installing high impact spacers with horizontal and vertical locking intervals of ten feet. B. All communications conduits shall be placed in a uniform manner between ground boxes and pull boxes. Conduit in position #1 at one ground box or pull box shall maintain its position within the duct run and terminate in the #1 position at the next box. The position of all conduits between ground boxes and pull boxes shall be maintained. C. Long radius bends (over 30 feet) shall be used whenever possible to make changes in direction. If it is found to be necessary to place a 90-degree bend in the conduit run, a factory-made sweep of no less than 60-inch radius shall be used. D. No conduit run shall exceed a total of 180 degrees of bend between any two points (such as manholes or buildings) considering both vertical and horizontal sweeps. E. Cold-formed trench bends shall have a radius of not less than 60 inches and shall pass mandrel integrity. Bend radius criterion is 2" or less 6 times the diameter of the conduit and any conduit larger than 2" is 10 times the diameter of the conduit. F. The length and destination of all conduits shall be identified in each ground box, pull box, and building. Embossed metal or heavy plastic tags strapped to each conduit shall be used. G. After installation of communications conduits, the contractor shall prove all conduits by pulling a mandrel with a diameter ¼ inch smaller than the conduit and 6 inches long through each conduit end-to-end. An inspector designated by the contractor and HCS shall be notified 24 hours before this procedure. Each conduit shall be cleaned with a bristle brush to remove any debris. H. Utility marking tape (see 4.2.2.3) shall be buried 12 inches below the surface directly above the conduit. June 21, 2010 I. Where communications and power conduits occupy the same trench, all conduit structures shall be built with the telecommunications conduits placed above the power conduits and separated by a minimum of 12” of compact earth or 3” of concrete encasement, unless otherwise called out on the construction drawings and approved by HCS. If this type of construction is required, it shall receive the prior approval of the contractor and HCS. J. Electrical Contractor will install new ¼” pull rope in all conduits placed. 117 K. All conduit and raceway installations shall be the responsibility of the electrical contractor. 4.2.2.1 Overhead Conduit A. Where overhead conduit is required between or within buildings, Contractor shall utilize EMT conduit with an inside diameter of 3”, unless otherwise specified. B. All fittings shall be compression type connectors and couplers designed specifically for use with the type of conduit placed. C. All fittings shall be watertight. Fitting types shall be pre-approved by the designated District representative. Unless pre-approved by the designated District representative, all conduits shall be installed by a qualified electrical contractor who has at least five years experience in similar installations. D. Contractor shall install conduit at roof locations utilizing the current District approved methodology and process. All conduit pathways and locations must be approved by HCS prior to installation. E. All roof penetrations must be approved by HCS prior to installation. F. Electrical Contractor will install new ¼” pull rope in all conduits placed. G. All conduit and raceway installations shall be the responsibility of the electrical contractor. 4.2.2.2 Communications Entrance Conduit A. To prevent shear, all inter-building conduit (either underground or aerial) shall transition from PVC or metal to Sealtight flex conduit when attaching to a permanent structure. The contractor and HCS shall determine the placement of all entrance conduit. All applicable standards shall be adhered to, i.e., HCS, NEC, BICSI, or G.O. 128. B. Sealtight flex conduit lengths shall not exceed 24”, unless approved by HCS. C. Sealtight flex conduit may be used between adjacent bungalows within 24” of one another using District approved connectors and methods. Use of Sealtight flex conduit between bungalow locations beyond the 24” distance shall require written authorization (email) from HCS. D. Contractor shall install new ¼” pull rope in all conduits placed. E. All conduit installation shall be the responsibility of the electrical contractor. 4.2.2.3 Duct-bank locating cable (electronically detectable warning tape) A. Warning tape shall be a minimum of 3" wide, orange in color, and shall have a nondegradable imprint as follows: June 21, 2010 1. “Caution Fiber Optic Cable Buried Below” 2. The tape shall be electronically detectable. 118 4.2.2.4 Pull Rope A. Pull rope shall be new ¼" polypropylene over polyester rope with a minimum 1700 lb. Tensile strength. B. Pull rope shall be new material that is free of knots, kinks, and abrasions and shall be placed as a single continuous length in every new conduit. C. All pull rope shall be the responsibility of the conduit installer. D. Pull rope shall be secured at each end. PART 5 – COMMUNICATION ROOMS 5.1 MDF A. Minimum MDF room size shall be 12’ x 10’ B. Two quad 20 amp power outlets shall be provided on a minimum of 3 walls and on a minimum of two separate circuits and placed on emergency power. C. One 208v, NEMA L6-30R, outlet shall be provided. D. Room shall be provided with conditioned air on its own thermostat. Room must maintain a temperature between 68 F and 72 F. E. 7’ x 19” open bay equipment racks shall be used and securely mounted to the floor. One rack shall be for Data and one empty rack shall be place beside data rack. One rack for POE (power over Ethernet) devices. Separate Patch Panels for the POE devices shall be provided. Current POE devices are Wireless Access Points and IP phones. . Video can coexist on rack with POE devices with prior approval from HCS-Technology and where it would be cost effective. Ladder rack shall be used as a transition from wall to open bay rack. Must have 3 ft of unused/open space measure from the bottom of each rack. (See Supplemental 1 at end of Document) F. Panduit wire management shall be used and shall be mounted on each side of rack (8 inch minimum on sides, front and rear) and in between each patch panel front and rear. (See Section 2.11 and Diagram B at end of Document) G. An additional 7’x19” open bay enclosed and lockable equipment shall be installed and securely mounted to the floor for the mounting of servers. H. A 2-inch conduit shall be provided from the MDF to the school’s Marquee sign if a marquee sign is provided in the contract. I. 16 – Cat6/6a cables shall be provided from the Media Headend (Teknet) to the MDF. Cables shall be properly terminated, tested and labeled. J. Pathway from the MDF to the outside for accepting Public phone, CATV, etc will be provided. Coordination with District phone/CATV provider may be necessary. June 21, 2010 119 The Following shall be provided by Electrical contractor… A. All MDF Racks shall be installed with a Telecommunications Grounding Busbar (TGB) and the TGB shall be installed in accordance with TIA/EIA-607-A. Grounding source shall be provided by another contractor. (Electrical Contractor). B. The TGB shall be grounded to a grounding system as provided by electrical contractor and described below… “Building ground is identified as cold water pipe, building structural steel, or ground rod. Gas pipes and electrical conduits are not acceptable ground attachment points. Ground conductors are not to exceed 40’. If building ground connection is beyond 40’, contractor is to install a new ground round at the nearest outside location. Ground rod location shall be approved by HCS prior to installation. Provide ohms testing for ground. Ground connections shall not exceed 5 ohms. Fargo clamp shall be cast from copper, silver-plated, and furnished with copper bolt. Ground rod shall be manufactured of high strength high carbon steel, with electrolytically bonded jacket of copper on surface, and meet UL spec. 467 and ANSI C-33.8-1072. Two quad 20 amp power outlets shall be provided on a minimum of 3 walls and on a minimum of two separate circuits and placed on emergency power.” All wiring penetrations, including low voltage wiring, shall be the responsibility of the Electrical Contractor. 5.1.1 Essential Communication Connections / DEMAC It will be the responsibility of the architect and/or contractor to assure that essential communication lines remain operational during construction. This may include communications between MDF and IDFs and Demarcation from service providers. It will be the responsibility of the architect and/or contractor to do any line locations necessary. It will also be the responsibility of the architect and/or contractor to coordinate with appropriate vendors or service providers in securing and relocating these communication lines. Any damaged lines will be repaired by the contractor or subcontractor at no cost to Horry County Schools. 5.2 IDF Rooms & Racks A. Minimum IDF room size shall be 8’ x 10’. B. Room shall be provided with conditioned air on its own thermostat. Room will maintain a temperature between 68 F and 72 F. C. 7’ x 19” open bay equipment racks shall be used and securely mounted to the floor. One rack shall be for Data and non-POE devices and one empty rack shall be place beside the data rack. One rack for POE (power over Ethernet) devices. Separate Patch Panels for the POE devices shall be provided. Current POE devices are Wireless Access Points and IP phones. Video can coexist on rack with POE devices with prior approval from HCS-Technology and where it would be cost effective. Ladder rack shall be used as a transition from wall to open bay rack. (See Supplemental 1 at end of Document) Allow three feet of unused/open space as measured from the bottom of each rack. D. Panduit wire management or an HCS approved equivalent shall be used and shall be mounted on each side of rack and in between each patch panel front and rear. (See Section 2.11 & Diagram B at end of Document) Oversized width Panduit 7’ wire vertical management is to be used. Panduit horizontal wire June 21, 2010 120 management shall be double-sided to accommodate patch cords on the front and horizontal/backbone cabling on the rear. E. 12 strands 50/125 µm Multimode Optical Fiber Cabling shall be run between each IDF to the MDF. Fiber will be terminated with SC connectors. The Following shall be provided by Electrical Contractor… “IDF racks shall be installed with a telecommunications grounding busbar (TGB). The TGB shall be installed in accordance with TIA/EIA-607-A. The TGB shall be grounded to the nearest building ground with a #6 AWG insulated conductor. Building ground is identified as cold water pipe, building structural steel, or ground rod. Gas pipes and electrical conduits are not acceptable ground attachment points. Ground conductors are not to exceed 40’. If building ground connection is beyond 40’, contractor is to install a new ground round at the nearest outside location. Ground rod location shall be approved by HCS prior to installation. Provide ohms testing for ground. Ground connections shall not exceed 5 ohms. Fargo clamp shall be cast from copper, silver-plated, and furnished with copper bolt. Ground rod shall be manufactured of high strength high carbon steel, with electrolytically bonded jacket of copper on surface, and meet UL spec. 467 and ANSI C-33.8-1072. One dual - 20 amp power outlet shall be provided on a minimum of 3 walls on a minimum of two separate circuits and placed on emergency power.” All wiring penetrations, including low voltage wiring, shall be the responsibility of the Electrical Contractor. PART 6 – DATA SYSTEMS LABELING PROCEDURES A. The labeling shall be in accordance with the TIA/EIA-606-A standards for data. B. The labeling shall be computer software generated and printed with readable fonts and black ink. C. The ink and label shall be water and smear-proof for both indoor and outdoor use. D. Samples of each type of media showing label type, labeling format, font size, and ink shall be submitted for HCS approval prior to application. E. Hand written labels are unacceptable. F. Room numbers will be assigned by the District’s Energy Management Department. The room numbers on the architectural plans are not to be used. Translation between architectural drawing and formal room numbers will be done by District’s Energy Management Department. 6.1 Cabling Systems Labeling (See Supplemental 1 at the end of this document.) A. See Section 2.11 for Approved Products List June 21, 2010 121 PART 7 – CABLING REQUIREMENTS (See Supplemental 1 at the end of this document) 7.1 Instructional Area (Classrooms) A. Teacher Area. a. Two Cat 6/6a cables shall be installed at the teacher location. One Cat 6/6a will be located at 48 inches (red jack) for phone with appropriate metal face plate to accommodate a wall mounted phone. Location shall be unobstructed by marker boards or any other objects (an 8x11 sheet of paper, horizontally should fit in this area). One Cat 6/6a cable shall be installed at 18 inches AFF (blue jack). Cables may be installed in the same conduit. Cables shall be properly terminated and tested. B. Student Area. a. Five Cat 6/6a data jacks shall be provided in the student computer area. Data drops shall be divided into 2 single gang boxes. One will have 3 data and one will have 2 data. Separate conduit will be used for each single gang boxes. Install height shall be 18 inches AFF unless approved change by HCS. Cables shall be properly terminated and tested. C. LCD Projector Area. a. Projector wall mount shall be 3 inches left of center line of the Smart Board. Bottom of Wall mount shall be placed 2 inches above the top of the Smart Board. (See Diagram F) b. Wall mount has cut outs for placement of power and data/SVGA cables. Single gang boxes shall be installed in line with the cutouts. As you face the cutouts, the left side shall be used for power and the right side shall be used for Data/SVGA cables. Data cable shall have 1.25 inch conduit to the cable tray. SVGA shall have 1.25 inch conduit to the teacher location. Cabling will be done by other vendor. (See Diagram F) D. One 2 conductor 18 gauge (shielded) stranded wire for a ceiling mount speaker. E. A Cat 6/6a data jack shall be provided above ceiling as per drawings for future camera installation. F. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than 2 inches. 7.2 Offices A. Two Cat 6/6a data/voice cables shall be installed in each office area. B. One 2-conductor 18 gauge stranded wire for a ceiling mount speaker as indicated on the electrical drawing. C. Principal Office shall also have a Cat 6/6a cable, located as per drawings, installed for Emergency Phone. 7.3 Multipurpose Room A. One Cat 6/6a cable housed in a recessed box and terminated on an RJ45 wall jack for an IP Telephone as indicated on the electrical drawings. The height of this outlet will be at 48 inches. B. Two Cat 6/6a data cables. The exact location will be determined from the electrical drawings and through discussions with the Horry County School District’s Technology department. The height of this outlet will be at 18 inches. Termination shall be at the nearest MDF/IDF. C. ( IF REQUIRED) Two Cat 6/6a video cable and electrical power shall be installed for each location as per drawings for accommodating flat screen TV. Height shall be at 66 inches. Contact HCS-Technology for space requirements for flat panel TV. June 21, 2010 122 D. One 2-conductor 18 gauge stranded cable will be run to each speaker. E. An auxiliary sound system will be required as indicated on the electrical drawings. F. General Contractor shall be responsible for the installation of any and all auxiliary sound systems with HCS approval.. G. One Cat 6/6a shall be installed above ceiling for access point as shown on drawings. H. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than 2 inches. 7.3.1 Commons Area A. Cat 6/6a data cables shall be installed at each POS location in the cafeteria. Each POS outlet will receive two cables: one data run to the Cafeteria Office and terminated on a 110 block, and one data run to the nearest MDF/IDF. Modify the RJ-45 patch cord in the Cafeteria Office to comply with the POS system. If POS conduit is under slab, use flooded type underground rated cable. B. Two Cat 6/6a video cable and electrical power shall be installed for each location as per drawings for accommodating flat screen TV. Height shall be reflected on the drawings. Contact HCS-Technology for space requirements for flat panel TV. C. Cat 6/6a data cables shall be installed for Access Points as determined by HCS Personnel and as defined on drawings. D. Camera outlets, Cat 6/6a, will be determined on each project and will be reflected in the drawings for locations and heights. 7.4 Media Center A. One Cat 6/6a cable terminated on a RJ45 jack for each IP Phone as indicated on the electrical drawings. B. A minimum of twelve Cat 6/6a data cables will be required for student use. Four Cat 6/6a data cables will also be required at all administration jacks indicated on the electrical drawings. The height of these outlets will be at 18 inches. C. Two Cat 6/6a Video cable and electrical outlet shall be installed at 66 inches AFF where indicated on drawings for TV connections. D. One 2-conductor 18 gauge stranded cable will be run to each speaker. E. A minimum of two Cat 6/6a cables shall be terminated on RJ45 jack above ceiling and terminated at the nearest MDF/IDF. One jack per single gang box. ( wireless ) F. Cat 6/6a Data Cables ( camera) shall be installed in Media Center as noted on drawings. The data drops shall be 10 ft. AFF or above ceiling if ceiling is less than 10 ft. Termination shall be at the nearest MDF/IDF. One cable per single gang box. G. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than 2 inches. June 21, 2010 123 7.5 High School and Middle School Gymnasiums A. One Cat 6/6a cable terminated in a recessed box on a RJ45 jack at 48 inches above floor level for wallmounted IP phone. May need to install a separate wall box to mount IP phones, but phone must cover both boxes. Phone area must also be recessed into the wall. B. Two Cat 6/6a data cables at 18 inches above floor level at each end of Gymnasium. One for data and one for video. C. One 2 conductor 18 gauge stranded cable will be run to each speaker indicated on the prints. D. One Cat 6/6a cable shall be installed for each wireless access points at a location and height as determined by HCS-Technology. Minimum of 2 APs drops are required. E. General Contractor shall be responsible for the installation of any and all auxiliary sound systems. F. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than 2 inches. 7.5.1 Auditorium Projection room. A. One Cat 6/6a cable terminated on a RJ45 jack for phone. The height of this outlet will be 18 inches above floor level. B. Two Cat 6/6a data cables at 18 inches above floor level. In Auditorium A. One Cat 6/6a Video cable and electrical power shall be installed at each TV locations as noted on drawings. The height will be 72 inches AFF. Contact HCS-Technology for space and bracket requirements for flat panel TV. B. One Cat 6/6a data drop shall be installed on the front and at each end of the stage area. C. One Cat 6/6a cable is to be installed at a location designated on drawing for each wireless access point. D. LCD Projector and sound system shall be provided under the General Contractor contract by a vendor that specializes in audio/visual systems. E. General Contractor shall be responsible for the installation of any and all auxiliary sound systems. F. All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than 2 inches. June 21, 2010 124 7.5.2 Computer Labs A. Each computer lab will have a total of 33 data drops at 18 inches AFF. One wall will have 3 sets of 6 data drops spaced 5 feet intervals. On the opposite wall will be 3 sets of 4 data drops spaced at 5 feet intervals. First set of Drops will be 10 ft from marker board wall. Two data drops will be installed at the teacher area. One data (blue jack - data) will be at 18 inches AFF and one at 48 inches (red jack - Phone) with phone faceplate. One Cat 6/6a shall be installed for a printer as located on the drawings. (See Diagram E) All other typical classroom wiring applies. B. 7.6 All communication drops shall be placed in conduit to the cable tray. If drops are run to a central box and then a single conduit is ran from this central box to the cable tray, that conduit shall be no less than 4 inches. Server Farm A. Twelve Cat 6/6a data cables to MDF if Server Farm IS NOT located in MDF. B. Twelve strand multi-mode fiber optic cable with SC connectors to MDF terminated (at the server farm). C. Server Farm location shall have conditioned air. 7.7 Video Surveillance Cabling & Camera Installation Each camera location indicated on the electrical drawing will require one Cat 6/6a cables. the Cat 6/6a will be terminated at the nearest MDF/IDF All Cat 6/6a cables will be properly terminated and tested from each camera location. One inch conduit shall be provided to each outdoor camera location from cable tray. 7.8 Wireless Access Point One Cat 6/6a data cable shall be provided to all Wireless Access Points as indicated on the electrical drawings. All Cat 6/6a cables will be properly terminated and tested from each Access Point location to the nearest MDF/IDF. The location of these outlets will be above ceiling in corridors and/or common walls in classrooms as determined by HCS Technology. Access Point locations shall be clearly marked on ceiling grid. Color of jacks shall be RED and termination shall be on appropriate patch panel. 7.9 Climate Control A. One Cat 6/6ae data cable shall be provided in the climate control location. Cable shall be properly terminated and tested to the nearest MDF/IDF. Contact HCS Energy Management for location. Also there shall be an analog phone line provided in this same location. 7.10 Computer Labs A. See Classroom configuration for LCD projectors. June 21, 2010 125 PART 8 – REMOVAL OF OLD CABLING A. Contractor shall be responsible for the removal of all cabling not in use. This shall include, but not be limited to, phone cables, data cables, and CATV cables. B. Contractor shall identify cables using a method which will assure that current working cabling remains intact. C. Working cabling which is removed purposely or accidentally shall be replaced by the contractor at no additional cost to Horry County Schools. Please Reference Supplemental 1 at end of document for Diagram A Diagram A Data Rack Wire Management Wireless (POE) Wire Management Video Phones (POE) Phones (POE) VRB 3.00 3.00 3.00 Typical MDF/IDF Layout June 21, 2010 126 Diagram B June 21, 2010 127 Diagram E 4 Data 4 Data 4 Data Teacher Area 6 Data 6 Data 6 Data 2 Data 1 Phone Diagram E - Computer Lab Data Wiring June 21, 2010 128 Diagram F (consist of this page and the next two pages.) Data To Cable Tray 1.25 in conduit SVGA Data Electrical Outlet SVGA to Teacher Location 1.25 in conduit White Marker Board SMART BOARD (Board measurements are Below) White Marker Board Due to cable length restrictions, SVGA must have a direct conduit to the teacher location. Installation of conduit will need to be horizontal through the wall to cut down on distance. SMART Board™ 660 Interactive Whiteboard Size 54 3/4" W ᅲ41 5/8" H ᅲ5 1/8" D (139.1 cm ᅲ105.7 cm ᅲ13 cm) Active Screen Area (maximum interactive, projected image) 51 1/4" W ᅲ38 1/4" H (130.2 cm ᅲ97.2 cm) 64" (162.6 cm) diagonal Weight 21 lb. 14 oz. (9.9 kg) Shipping Size 46" W ᅲ64 1/2" H ᅲ5 1/2" D (116.8 cm ᅲ163.8 cm ᅲ14 cm) Shipping Weight 35 lb. (15.9 kg) June 21, 2010 129 June 21, 2010 130 June 21, 2010 131 Diagram G – example of Panduit Warranty Certificates as required June 21, 2010 132 June 21, 2010 133 Horry County Schools TECHNOLOGY DEPARTMENT Supplemental 1 CABLING STANDARDS & SPECIFICATIONS MDF and IDFs Labeling and Room Layouts June 21, 2010 134 MDF & IDF CABLING RACK LAYOUT DESIGN & INSTALLATION: • Install Rack-mounted Fiber cabinets at the top of a rack. • Leave 2RU (two rack units) of open space between a Rack-mounted Fiber Cabinet and the first horizontal wire manager for copper cabling on patchpanels. • Horizontal wire managers are to be installed above the first copper patch panel in a rack. Example: Rack-mounted Fiber Enclosure 2 RU Open Space Horizontal Manager 1 1 2 2 3 3 4 4 5 5 6 6 DP6 P LUS PatchPanel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 7 Copper Patchpanel 7 8 8 9 9 10 10 DP6 P LUS PatchPanel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 11 June 21, 2010 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40 40 41 41 42 42 43 43 44 44 45 45 135 MDF CABLING RACK LAYOUT DESIGN & INSTALLATION: • Install the rack to be left open for the Technology Department to install IT equipment in between the data rack(s) and the Voice/Wireless rack. • Leave three feet of unused rack space as measured from the floor up. Example: June 21, 2010 136 FACEPLATE PORT NUMBERING SCHEME: Faceplates are to be numbered/counted from: • • the leftmost port to the rightmost port on the first row of a faceplate, continuing with the leftmost port to the rightmost port on the second row. Example: 1 1 2 12 3 2 3 4 4 56 Faceplate Port Numbering Scheme FIBER CABINET LABELING SCHEME: All rack-mounted and wall-mounted optical fiber cabinets are to be labeled. The label shall indicate: • • the closet room number the other end of the cable goes to, and the port numbers the connectors are installed in. Example: For a 6-strand fiber cable installed from MDF Room #222 to IDF Room # 333, the labeling on each end is as follows: In the MDF, the label reads: IDF Room 333 Ports 1-6 In the IDF, the label reads: MDF Room 222 Ports 1-6 June 21, 2010 137 HORIZONTAL CABLE LABELING SCHEME: The following changes are made to Section 6.1 of the Technology Cabling Standards & Specifications Last Revised 09/30/08: Device/Function Abbreviations: V = Voice S = Camera D = Data E = Video W = Wireless M = Mechanical (HVAC, etc.) I = IR Control For cameras and wireless outlets in hallways, use P-Touch or other label printer to make a label that can be fastened to the ceiling grid at the location of the device. Attach this label to the metal ceiling grid, not the ceiling tile. This label shall be in addition to the faceplate label located in the ceiling at the point of termination. At the rack end, camera and wireless labeling for devices in hallways or outdoors shall be: • • • • • Wireless in a hallway gets the designation WH followed by the hallway/corridor number = 300.W.H A camera in a hallway receives the designation SH followed by the hallway/corridor number = 200.C.H Cameras located outdoors will have the letter B (for Breezeway Location) or O (for general outdoor location not on a breezeway) and will have the number of the nearest room used to identify their location. A camera in a breezeway near Lobby Room 100 = 100.C.B A camera outside located near classroom #410 = 410.S.O Labeling for cameras and wireless outlets located inside the building are to use the usual labeling scheme for all horizontal cabling. June 21, 2010 138 ROOM OUTLET CONFIGURATION The first outlet to the left of the door is designated “A”. The alphabetical naming then continues clockwise from “A” around the room back to the door. Example: C CLASSROOM 610 B A When adding cabling to an existing room, the outlet is labeled using two letters. The first letter is that of the nearest outlet to the door from the new add. The second letter is that of the next existing outlet in a clockwise motion from the door. Example: C CLASSROOM 610 This new outlet will be ‘BC’. B This new outlet will be ‘AA’. A June 21, 2010 AA 139 When a ‘Teacher Outlet’ has the voice in a wall-phone plate and the data 18” AFF, the Teacher voice outlet is designated “A”, the teacher data outlet is designated “B”, and then C, D, etc follow as clockwise around the room. Example: D CLASSROOM 610 C Teacher Voice @ 48" A B June 21, 2010 Teacher Data @ 18" 140 HORIZONTAL CABLE LABELING SCHEME In the closet, each patch panel port is labeled to the corresponding room number the cable resides in, the faceplate letter, faceplate port number, and device/function at the other end of the cable. Room #, Faceplate Letter, Faceplate Port, 400.A.1.D (‘D’ for data, ‘V’ for Voice, etc.) At the faceplate, each jack is labeled with the telecom closet room number, the rack number in the closet, the patch panel number in the closet, and the port number on the patch panel. Telecom Room #, Rack#, Patch Panel #, Port # 210.1.A.24 Example: CLASSROOM 400 Telecom Closet IDF 210 Example outlet with 1 Data & 1 Voice At this end of the cable, the lable reads: At this end of the cable, the label reads: 210.Rack #.Patchpanel #,Port #. 400.A.1.D 400.A.2.V June 21, 2010 141 JACK COLOR SCHEME: Colored jacks to identify outlet function are to be installed in new projects as well as for MAC (move/add/change) work. Colors to be used are as follows: • • • Red – Telephone/IP Telephone & Wireless Yellow – Video (TV, IR, Surveillance Cameras) Blue - Data AS-BUILT DRAWINGS: • Drawings for the entire project performed are to be laminated and located in the MDF. If the MDF was not the source of the cabling work performed (such as MAC work), the drawings for any and all closets are still to be located in the MDF. Both floor plan drawings and rack layout drawings are to be included. The laminated drawings are to be hole-punched and chained to a rack so that they remain in the MDF. • Each IDF closet is to have a laminated copy of its area/wing floor plan & rack layout drawing holepunched and chained to the rack so that they remain in the IDF. • Additional copies of the drawings are to be delivered to Mike Cherry along with test results. Payment will not be rendered without as-built documentation and warranty. • Blue lettering/text is to be used for jack and port numbers on as-built drawings rather than black which is difficult to distinguish from room numbering. June 21, 2010 142 PORTABLE CLASSROOMS: • Do not cover or encroach on the electrical panel with the installation of the ‘Teacher Outlet’ containing 1 Data and 1 Voice. • Utilize the number painted on the exterior AC unit as the portable number. Do not use any school assigned numbering schemes. • When adding a surveillance camera to a portable classroom, run the cabling to the closest closet in the main building if it does not exceed 295’ from the outlet to the patch panel. Teacher 1 Voice /1 Data Student 4 Data S TV & IR 2 Video Speaker Closet TYPICAL PORTABLE CLASSROOM Cable used (Cat 6 or cat 5e) is to Match the cabling in the school. VIDEO BACKBONES: • Do not include RG-11 cabling for video backbone unless RG-6 cabling is being used to the classroom. • In new school installations and entire wing additions/renovations, optical fiber cabling will be used for the video backbone when copper cabling is used to the TV/IR outlet. OFFICE CABLING: • • If a Storage Room is 6’ x 6’ in size or larger, it will receive an ‘Office Outlet’. The configuration of an ‘Office Outlet’ is changed from 1 Data / 1 Voice / 1 Printer / 1 Video to 2 Data / 1 Voice. June 21, 2010 143 GENERAL CABLING INFORMATION: • No cables are to be installed such that they lay on top of ceiling tiles without support of either cable tray or J-hooks. • No cables are to be run through building joists. All cabling is to be supported by either cable tray or Jhooks. End of requirement updates. June 21, 2010 144
© Copyright 2026