ENERGY AUDITING tool to increase ENERGY EFFICIENCY Ing. Bronislava Herdová, PhD. energy auditor En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 Why energy efficiency? Overal EU policy objective: 20% GHG emissions – 20% RES – 20% Energy savings (until 2020) Directive No. 2006/32/ES on on energy end-use efficiency and energy services New Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency Tools to increase EE? => energy auditing, energy services En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 Why energy efficiency? cheapest energy is that which is not necessary to produce EE is in the center of economy and political attention EE contributes to fulfilment of main three targets of EU energy policy sustainability, security and competitivness EE decreases dependance of economy on non-stabile prices of oil and gas EE is part of healthy energy and economy policy of state It supports local economy and its growth based on innovations It increase lifetime of objects and technology equipment Decreases operational costs, environmental impact Saves money and time En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 WHAT IS AN ENERGY AUDIT (EA)? pool of activities (systematic procedure) focused on analysis of current energy need and consumption going out of valid technical standards, analysis of problems (weaknesses and deficiencies), EA identifies and in detail quantifies effective possibilities of energy savings tailored to the object being analyzed, „field-work“, economy tool having dynamic character, often basis for grant financing of projects. En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 WHAT IS THE AIM OF EA? to minimize costs for energy to minimize operational costs to minimize costs for repairs and reconstruction increase quality of environment that contributes to increased work productivity In case of EA as duty (Industrial consumers with annual energy consumption over 5,5 GWh/year) the procedure of EA as well as content of the report is determined by Regulation No. 429/2009. In case of voluntary EA is the content and focus as well as target given by customers requirement. En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 MAIN TOPICS/AREAS OF EA Subject of energy consumption analysis are energy resources consumed in the industrial area, i.e.: Electricity Natural gas Steam Coal Wood, wood chips/pellets Fuels (petrol, oil, propane-butane)..... En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 MAIN TOPICS/AREAS OF EA • thermal-technical protection of buildings, • heating systems • hot water preparation, • ventilation systems and air-conditioning (buildings and technology) • electric appliances (administrative and technological incl. electrical connection, transformation, distribution network, el. switchboards, el. compensation) • gas or other energy resources consuming appliances (furnaces, cleaning devices,..) • Indoor/outdoor lighting, • measurement and regulation. En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 WHAT OFFERS EA TO THE CUSTOMER? identifies highest achievable potential of energy and costs savings and its effort, points out on often visible as well as hidden technical/hygienic/safety deficiencies of buildings and building and production technology equipment,... recommends technical parameters of measures, calculates investment needs of measures, their asset - economical, technical, environmental, proposes procedure for realisation of measures, it is very effective technical, economical and management tool for investment decision processes going out of economical modelling, it is solid basement for effective control of energy consumption and herewith also operational costs En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 ENERGY AUDIT - PRACTICE 1. Identification of subject of EA 2. Data collection, analysis and evaluation of current status 3. Proposal of EE and RES measures 4. Economy and environmental evaluation of measures 5. Proposal of at least two variants for implementation of measures and recommendation of optimal variant 6. Drafting of written report from EA En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 CASE STUDY – chemical industry En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 Step 1: Identification – EA subject a) Collection of main data about the customer and basic description: Name of company: Legal status: Address: Responsible person: Contact: Sector: Subject of EA: OSPRA Invest, Ltd. Ltd Rovinka, BA (Istrochem) Chemical industry -buildings (administrative and production hall) and their technical equipment -production technology En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 Step 1: Identification – EA subject Identification of activities Type of activitiesi (NACE2) Number of heated buildings: 2222 4 (PH – administrative part, administrative building, portable container housing units, building for security) Site plan: Purpose of production Number of employees Operation regime (days a week) Buidings Main building- production hall Administrative building and Dressing rooms Container housing units Security building Production of PE and PP folies (Rovinka) Production of re-granulate (BA) 100 (Rovinka) + 30 (BA, Istrochem) 24 hours/ 7 days Shape factor of building Heated volume V [m3] A/V [1/m] 26 890,0 0,37 1 179,36 0,77 164,16 246,9 1,55 1,13 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 1 STEP: Identification of subject of EA – site plan b) Description of main activities of EA c) Site plan d) List of all buildings and theirs use, description of all energy consumers 4 6 3 – new storage hall 5 – storage hall – tent 8 3 2 – AB, dressing rooms, showers 4 – main production hall (offices, social spaces, production hall Bielloni, production hall A, B, welding hall) 5 7 1 – security 2 6 – crusher of waste follies recycling 1 Vstup do areálu 7 – container housing units 8 – transformer station - TS 1, TS 2 TS3 – out of the area of the company En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 1 STEP: Identification of subject of EA – site plan (ISTROCHEM) Production of re-granulate En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on energy inputs Input – fuels and energy Unit Amount Purchase – electricity Purchase - heat Natural gas Brown coal Black coal Coke Other solif fossil fuels Heavy heating oil Biomass Light heating oil Diesel Petrol MWe GJ m3 t t t t t t t t t 12 147,15 3,19 5,73 - Energy content in MWh 12 147 - 11, 66 12,22 37 70 Annual costs EUR excl. VAT 1 405 588 4 250 9 300 t 16,03 12,78 205 16 000 Secondary energy devided into not used heat and others - - - - RES devided into solar, wind, geothermal and others - - - - Other fuels - - - - 12 459 1 435 139 460 53 302 11 999 1 381 836 Other energy gases (Propane) caloric value Total fuel and energy input External customers Total consumption of fuels and energy OSPRA INVEST, s.r.o. - Collection of monthly energy and water consumption of at least of 3 last years! - Collect data on costs coupled with purchase of energy for relevant 3 years - Most of the data from INVOICES - If possible – readings from meters or data collected through e-manager application if available - Energy consumption that is given by climate conditions should be re-calculated with decree-days!!! En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on energy inputs Priemerné mes. spotreby a ceny elektrickej energie po mesiacoch za roky 2009-2010 v areále Rovinka 700 000 90 000 spotreba cena 650 000 80 000 600 000 kWh 550 000 70 000 € 500 000 60 000 450 000 400 000 50 000 OSPRA Invest, Ltd. (Rovinka+BA): - 97,4% of all energy consumed is ELECTRICITY (57% Rovinka, 43% BA) - No Natural gas consumption - 2,6% - fuels 350 000 december november október september august júl jún máj apríl január marec 40 000 február 300 000 Priemerné mes. spotreby a ceny el. energie po mesiacoch za roky 2008-2010 v areále Istrochem 700 000 90 000 spotreba cena 650 000 80 000 600 000 70 000 € 500 000 60 000 450 000 400 000 50 000 350 000 december november október september august júl jún máj apríl marec 40 000 február 300 000 január kWh 550 000 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on transformation and el. distribution - Who is power supplier (ZSE, a.s.), measurement on NN or VN side - Power supply through 3 TS, 3 x 22 kV line, transformation from 22 to 420/230 - Data about transformers (type, year of construction, output, connection, cooling?... - Data about VN and NN distribution lines (dimensions and lengths of distribution lines, used materials, transmission power, scheme of el. connection, technical state, technical state, equipment with measurement and regulation, control of el. review reports (duty)) - Data about switchboxes in the VN/NN - Control of power factor correction - Control of invoices on technical supply conditions and tariffs En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection about main energy consumers Main energy consumers: A. Buildings B. Production technology A. In case of buildings (thermal protection, heating, ventilation, air-conditioning): - Purpose and operation - Thermal-technical parameters of buildings - Building technical equipment (HVAC) - Thermal losses - Consumption of energy for operation of buildings En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on main en. consumers - buildings - Thermal-technical parameters of heated buildings, - check project documentation - check building materials and parameters of all building envelope components, - measure indoor temperature in heating period (ideally also in summer) - Heating/hot water system: - check for type of heating (steam, hot water, electricity), common system for heating and hot water? - type, characteristics and technical parameters of heat sources (el. boiler, gas boiler, coal boiler, biomass…) - types of heating bodies (el. convectors, infra-red heaters, radiators (hot water/steam)...) En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on main en. consumers - buildings - heat distribution network length and thermal insulation, materials and thickness - check if consumption of electricity for heating/hot water is measured, - make on site measurement of internal temperature 22oC, - how is the measurement and regulation (equithermic, hydraulic regulation, thermostatic valves...) - check all relevant documentation – project documentation, revisions, and etc. En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on main en. consumers - buildings - Heating: OSPRA INVEST (Rovinka, BA not analyzed) - electric heating – el. infra-red heaters in production hall, el. convectors, el. oil radiators - indoor temperature: 22oC - regulation (according to indoor temperature) - Hot water: OSPRA INVEST (Rovinka, BA not analyzed) - prepared for dressing rooms (showers) and toilets - el. heaters Number El. heaters FAICO El. convectors Technotherm E. convectors Technotherm El. heater Heler Oil el. radiators 8 19 2 2 2 Output kW 9-14 2,0 0,5 0,7 2,0 Počet DHW el. heater 150l DHW el. heater 200l Tatramat DHW flow el. heater 5l 5 1 3 Príkon kW 2 2,2 2 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on main en. consumers - buildings - Cooling and ventilation - Check and collect same data as in case of heating... characteristic and technical data of source, distribution, measurement®ulation… - OSPRA INVEST (Rovinka, BA not analysed) - ventilation - No central ventilation system, only ventilators placed in the roof ( 6 x 750 W) and by ventilation windows - these consumers are not important consumers - However the ventilation – fresh air intake and extraction of waste air was not satisfacory! - OSPRA INVEST (Rovinka, BA not analysed) – cooling/air-conditioning system - No central cooling system, only 2 adiabatic evaporative chillers installed on the roof En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on main en. consumers - buildings - OSPRA INVEST (Rovinka, BA not analysed) – coolling - No central cooling system, only 2 adiabatic evaporative chillers installed on the roof for 2 production halls Number of adiabatic evaporative chillers: Type: Parameters of chiller: 2 evaporative chillers JH 30 Qvzd. = 30 000 m3/hod. x 2 = 60 000 m3/hod. El. input power: 3,0 x 2= 6,0 kW, 3 x 380V, 50Hz. Coolling output (tout 30 °C and relative humidity 45%): Qch = 100 kW. Assumed average water consumption: 0,16 m3/hod / pH 5-7 / Regulation: according to indoor temperature Measurement: no separate measurement En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on main en. consumers - buildings - Indoor lighting - Check for lighting system characteristics and parameters – type of lamps, lighting sources, input power, type of ballast/driver and etc. - Check way of operation and regulation - Check consumption if measured, otherwise check all necessary inputs to calculate lighting electricity consumption - Check if lighting-technical conditions are observed En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on main en. consumers - buildings - Indoor lighting – OSPRA Invest (Rovinka) - Administrative spaces – associated lighting combined with daylight inbuilt lamps with linear fluoresenc lighting sources type T8 (1 x 18W, 2 x 36W) with conventional ballast, in some technical places are conventional incandescent lamps 60W - Production hall – ceilling lamps with IP65, hang down in high of 4,5 m, linear fluorescent lighting sources type T8 with input power 3x36W, conventional ballast....... Main object Administrative spaces Toilet Wellding hall Toilet number Num ber of functi onal Power input (W) 14 14 86 Pinšt(W) 1 204 Preal (W) 1 204 t (h/year ) W (kWh/year) 1 560 1 878,24 W (kWh/rok) 1 878,24 3 3 60 180 180 520 93,60 93,60 176 176 139 24 464 24 464 8 640 211 368,96 211 368,96 4 4 60 240 240 1 620 388,80 388,80 Office 2 2 86 172 172 8 640 1 486,08 1 486,08 Hall B 134 134 139 18 626 18 626 8 640 160 928,64 160 928,64 Hall B 135 135 139 18 765 18 765 8 640 162 129,60 162 129,60 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection on en. consumers – production processes In case of technology consumption - collection of technical data on electric appliances/devices from documentation and /or from labels (input power, voltage, output) - operating mode and time of processes/devices operation during year, - check for technological schemes - control of technical documentation - notes from operation - measured energy consumption of individual devices or production sections (if measured and processed) - level of control of energy consumption and regulation En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection electricity consumers - production Name Input power kW Output kW Number - Voltage V Year of construction M19 18 n.a. 1 230/400 n.a. BSM 1300 28 1 230/400 2009 Production of bags – welding of bags ROLO 3 16 n.a. 1 230/400 n.a. Production of bags – welding of bags ROLO2 n.a. n.a. 28 n.a. n.a. 28 n.a. n.a. n.a. n.a. 1 1 1 1 230/400 Production of bags COEMTER BETA 1 COEMTER BETA 2 COEMTER BETA 3 STIEGLER - 1 230/400 n.a. n.a. n.a. n.a. Production of bags STIEGLER - 2 28 n.a. 1 230/400 n.a. Dehumidification MAHLA 3 n.a. 1 230/400 new Production of bags GUNTER 28 n.a. 1 230/400 n.a. ROLLOMAT - 2 20 n.a. 1 230/400 n.a. Production of bags ROLLOMAT - 850-1 15 n.a. 1 230/400 n.a. Packing – heating of shrink foil BRUCHER 18 n.a. 1 230/400 n.a. Wellding hall Production of PP and PE bags Production of PE bags n.a. En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection electricity consumers - production Except directly technology consumers, it is necessary to focus also on energy carriers that are input for the production processes – OFTEN BIGGEST POTENTIAL FOR PROPOSAL OF MEASURES: - Compressed air - Heat / Hot water / steam for technology purposes - Cooling of technology devices - Water treatment - Waste water treatment - and etc.... En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection – main el. consumers - production Compressed air – OSPRA Invest (Rovinka) – pneumatic driver Is the most expensive energy carrier!!!!! - 3 compressed air production stations – delivery to 2 central compressed air distribution networks - Type of compressors – screw compressors - mater/slave – switch every 24 hours, regulation – according to pressure in the network 7/8,5 atm. - no continuous control of compressors (by inverter) - no regular measurement of pressure decrease in the distribution network - no heat recovery Hall A Screw compressor Hala Bielloni BELT 55-8 Zvarovňa Kaeser AS 35 number 8 m3/min power output 5,9 2 Year of production n.a. 60 n.a. n.a. 1 2011 22 7,5 n.a. 1 1986 kW bar power input Pe 37 ks En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection – main el. consumers production Cooling – technology purposes – OSPRA INVEST (Rovinka) - FRIGOSYSTEM – placed in hall B – producing of cooling water for extruder (16oC) - Hall Bielony – chiller - cool for central distribution system – only production purposes - Welding hall – chiller - cool for central distribution system – only production purposes - Cooling tower – cooling of recycling device REMA only (already ordered new cooling device) - Regulation – operation according to needed temperature in the cooling system - use of excess heat – in winter for heating, in summer – is exhausted out of the building En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection – main el. consumers - production Cooling – technology purposes – OSPRA INVEST (Rovinka) kW Cooling output kW 1 10 28 400 2009 FRIGOSYSTEM RACA2 1 47 140 400 2009 Water treatment EUROWATER 1 2 n.a. n.a. 2000 Cooling device ERS SC64V, 1 22 230/400 2003 Water treatment EUROWATER 1 2 n.a. n.a. 2000 New coolling device EVK 324/09 Cofely 1 3 n.a. 400 2011 New water treatment - EUROWATER 1 n.a. n.a. n.a. n.a. Device Number Output Voltage V Year of production Hall B Coolling device RACA AIR 80 - R1 Hall Bielloni Welding hall 74 (pri 15°C) Coolling for regranulation device REMA Old coolling tower – out of operation En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: data collection – main el. consumers - production Cooling – technology purposes – OSPRA INVEST At least for the purpose of preparing energy balance, it is necessary to check also small electric appliances – as their are not significant consumers further analysis were not necessary Administrative appliances Name PC Printer electric kettle Copy maschines Mikrovawe owen Fax maschine Input power Number kW 0,3 0,2 2 0,5 1,2 0,1 9 3 1 2 1 1 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 STEP 2: analysis and evaluation of current state OSPRA INVEST - compiling basic energy balance (Rovinka+BA) Row 1 2 3 4 5 6 7 Indicator Input of fuels and energy Change in stocks of fuel Consumption of fuels and energy Sale of energy to other customer Final consumption of fuels and energy (row 3 – row 4) – according to need devide other types of fuels and energy MWh/r 12 459 11 999 460 tisíc eur/r 1 435 139 1 381 836 53 302 11 687 1 352 286 Diesel Petrol Propane 37 70 205 4 250 9 300 16 000 Losses in own sources and distribution (from value given in row 5) – according needs devide into other types of fuels and energy Electricity 12 1 389 Heat - - Others - - Energy consumption for heating and DHW (from value given in row 5) – according needs devide into other types of fuels and energy Electricity Heating Electricity DHW 366 42 349 34 3 934 11 275 1 304 614 - - - - Electricity Heat Others 8 Energy consumption for technology purposes and other processes (from value given in row 5) – according needs devide into other types of fuels and energy Electricity Heat Others Rovinka En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 2 STEP: analysis and evaluation of current state OSPRA INVEST – analysis of electricity consumption Analysis and evaluation of supply tarrifs 3 delivery points with reserved and max. reserved capacity (Rovinka) Red – overrunning od ¼ max. Blue - overrunning of reserved capacity - Delivery point 3108116420 is overrunning these values (winter el. heating, external consumer) - Delivery point 3108132200 – possible measure – lowering of reserved cap. to 660 kW event. max. res. cap. to 700 kW - Electric distribution network and main electric devices are according to measurements and revisions in good technical state - el. distribution lines are currently over dimensioned – reason: reserve for connection of new devices/ retain variability for shifting of existing technology devices Rok Number of delivery point: Reserved capacity [kW] Max. reserved capacity [kW] Month January February March April May June July August September October November December 2009 2010 3106043653 3108116420 3108132200 3106043653 3108116420 3108132200 250 340 700 250 340 700 300 360* 880 300 360 880 1/4h max. kW 1/4h max. kW 1/4h max. kW 1/4h max. kW 1/4h max. kW 1/4h max. kW 226 231 230 223 219 225 225 217 207 218 204 207 351 359 348 277 267 266 249 268 263 321 319 336 593 603 609 571 565 572 558 568 574 591 579 652 227 219 225 229 206 234 219 207 201 241 226 236 376 371 354 294 282 273 260 273 308 313 321 393 631 619 588 574 589 592 559 564 510 418 581 623 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 2 STEP: analysis and evaluation of current state OSPRA INVEST – analysis of electricity consumption – production technology (Rovinka) Total installed power input and el. consumption - Assessment of energy consumption going out from operational hours, power input and load factors, Division of consumption according technological areas Technical state – satisfactory even most of the production devices are old and energy intensive Motors with input power up to 100 kW are replaced by asynchrony motors with inverter, large motors – larger investments – up to 50% of savings per device Hall A – input power and assumed consumption. A7 13% A7 7% A1 23% A1 28% A5 14% Suma Hala A 14% Regranulač ná linka 13% Regranulač ná linka 9% Zvarovňa 4% Stl. vzduch 1% Zvarovňa 10% Chladenie 2% Stl. vzduch 3% Chladenie 4% Suma Hala B + Bialloni 56% Suma Hala B + Bialloni 67% Hall B – input power and assumed consumption. Bialloni 3% B8 23% B2 B3 2% 2% B4 2% Bialloni 2% B8 9% B5 14% B2 2% B3 1% B4 2% B7 10% B5 24% A5 17% A4 14% A2 18% A4 17% B6 27% A3 14% A3 12% A2 23% B7 27% B6 50% En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 Suma Hala A 17% STEP 2: analysis and evaluation of current state OSPRA INVEST – analysis of electricity consumption – production technology Measurement and regulation - Production technology: - Full automatic regime of most of the devices - Way of operation is putted manually by employees - Measurement is not provided for large consumers! - Operation is given by order and type of foils ordered – in case of Rovinka is not evaluated specific energy consumption of electricity given by amount of produced foils (too many different processes – individual processes are not monitored) - In operation in BA – specific energy consumption has been evaluated Compressed air and cooling: - Consumption of el. for compressed air and cooling presents from total electricity for production only 3% - Evaluated as effective – new investments already planned - No measurement, only regulation – T/p - No use of heat recovery En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 2 STEP: analysis and evaluation of current state OSPRA INVEST – heating and hot water Evaluation of thermal-technical properties of heated buildings (no measurement): - Calculation of heat need for heated buildings (720540-2) - Estimation of heat gains - Estimation of consumption of electricity for heating - Technical state – satisfactory, regulation according internal temperature - Hot water – only teoretical calculation (no measurement) – going out of normative calculation BUDOVA Production hall A,B Administrative building and dressing rooms Container buildings Security building Total °C 22 kWh/rok 908 360 kWh/rok 630 465 Consumptio n of electricty for heating kWh/rok 277 895 20 52 320 - 52 848 20 20 18 173 16 464 995 317 630 465 18 356 16 630 365 729 Spotreba leto - zima 3 900 000 3 800 000 3 700 000 334 272 3 600 000 kWh Uni mo bunky; 18 173 kWh/r; 2% Heat need for heating Thermal gains from technology 4 000 000 Výpočtová potreba tepla na vykurovanie Budova a dmi ni s tra tívy a š a tne; 52 320 kWh/r; 5% Internal temperatur e Vrá tni ca ; 16 464 kWh/r; 2% 3 500 000 397 185 3 400 000 El. energia vykurovanie 277 895 kWh/r; 31% Tepelný zisk z techn.; 630 465 kWh/r; 69% 3 300 000 3 200 000 3 100 000 3 000 000 Výrobná ha l a A,B; 908 360 kWh/r; 91% apr - sept okt - mar apr - sept okt - mar leto 2009 zima 2009 - 2010 leto 2010 zima 2010 - 2011 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 2 STEP: analysis and evaluation of current state OSPRA INVEST – indoor lighting Calculation of consumption (no measurement) – Rovinka: - Calculation of electricity consumption going out of input power, operation hours and efficiency of lighting sources and type of ballast – 638,32 MWh/year - Lighting is under-dimensioned on places with permanent stay of persons - No regulation of lighting system that would switch or dim according to need – currently manual - Partly obsolete lighting – low efficiency of optical system, missing covers of lamps, used linear fluorescent lamps with low specific output with classical ballast (20% consumption of power input of lighting source) - In part of production hall was made reconstruction with appropriate lamps, but some of new lamps have classical ballast... En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of EE and RES measures Type of measures: a) - According to size of investment no cost measures (mostly organizational measures) low cost measures (coupled with low investments and quick payback) iinvestment measures (coupled with large investments and longer payback b) According to achievable savings and economic return - measuers with short payback period (up to 5 years) - measures with long payback or without payback period En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of EE and RES measures OSPRA Invest - Rovinka NON-COST Measures: - Monitoring and evaluation of energy consumption on monthly basis - Monitor and decrease internal temperature especially in administrative part were was measured temperature higher by 2,2°C in comparison to normative requirements! - Lower the reserved capacity to 660 kW eventually max. reserved capacity to 700 kW in case of el. delivery point 3108116420 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of EE and RES measures OSPRA Invest - Rovinka LOW-COST Measures: - Connect heaters (DHW) through thermostats with timer in order to provide for setback mode 3 hours before end of shift. - Connect el. convectors (heating) through thermostats with timer in order to provide setback mode of heating in administrative spaces (8 hours working time). - Provide for monitoring and measurement of el. consumption of biggest el. consumers En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of EE and RES measures OSPRA Invest - Rovinka Investment measures – production technology - Replacement of main driver of the production line line B5 with input power 160 kW with new el. motor with with frequency speed control. Investment costs Total in EUR Energy consumption per unit: Average el. price Energy savings: Achievable electricity savings Cost savings (electricity) Simple payback period EUR 36 500 EUR/kWh 0,11 MWh/year EUR/year year 150 16 474 2,2 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of EE and RES measures OSPRA Invest - Rovinka Investment measures – production technology, i.e.: - Replacement of main driver of the production line B6 with total input power 337 kW. The main driver input power is 160 kW, replacement with new el. motor with frequency speed control. Investment costs Total in EUR Energy consumption per unit: Average el. price Energy savings: Achievable electricity savings Cost savings (electricity) Simple payback period EUR 24 000 EUR/kWh 0,11 MWh/year EUR/year year 80 8 750 2,8 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of EE and RES measures OSPRA Invest - Rovinka Investment measures – buildings – thermal protection of buildings, i.e.: - Building for administrative purposes with dressing rooms – thermal insulation, replacement of windows, instalation of thermotat with timers on heating bodies Measure Investment costs Thermal insulation Roof – thermal insulation Replacement of windows Installation of thermotats with timers Total costs in EUR Unit price of energy: Average price of electricity/heat Energy savings: Achievable electricity savings Cost savings (electricity) Simple payback period EUR EUR EUR EUR EUR 8 496 3 297 4 665 291 16 749 EUR/kWh 0,11 MWh/rok EUR/rok rok 25,82 2 840 7,5 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of EE and RES measures OSPRA Invest - Rovinka Investment measures – buildings – indoor lighting, i.e.: - Replacement of existing lamps with lamps with IP65, high efficient optical system – reflector, linear fluorescent lamps type Master TL5 HE ECO 45W and electronic ballast. Investment costs Total in EUR Energy consumption per unit: Average el. price Energy savings: Achievable electricity savings Cost savings (electricity) Simple payback period EUR 47 000 EUR/kWh 0,11 MWh/year EUR/year year 208 22 880 2,1 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of at least 2 variants of EE measures OSPRA Invest - Rovinka i.e. - proposal of 2 variants Measure Frequency speed control of main driver of extruder A1+replacement of snail, gearbox and extrusion head (Rovinka) Frequency speed control of main driver of extruder B5 (Rovinka) Frequency speed control of main driver of extruder B6 (Rovinka) Frequency speed control of main driver of regranulation line (BA) Frequency speed control of main driver of automatic mill KUNG (BA) Main production hall in Rovinka – replacement of gates, thermal barriers, copilits and thermotats Administrative and dressing building – thermal insulation, replacement of windows, thermostats Rovinka Indoor lighting reconstruction - Rovinka Total Energy savings MWh/rok Costs savings (energy) EUR/rok EUR Simple payback rok 150 16 517 160 000 16,7 150 16 474 36 500 2,2 80 8 752 24 000 2,8 210 23 123 48 000 2,1 58 6 412 25 000 4,3 66 7 216 14 280 2,0 26 2 840 16 749 7,5 208 947 22 880 104 213 47 000 371 529 2,1 3,9 Investment En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 3. STEP: Proposal of at least 2 variants of EE measures OSPRA Invest - Rovinka i.e. – energy balance after realization for each variant Before R. Indicator 1 2 3 4 5 6 Inputs – fuels and energy Changed state of resources Consumption of fuels and energy Sale of energy to external consumer Final consumption of fuels and energy Losses in el. distribution network Losses in production and distribution of heat 7 from NG Consumption of electricity for heating and 8 DHW 9 Consumption of NG for heating and DHW 10 Consumption of el. for technology purposes After 12 459 11 999 460 11 999 12 thousand EUR/year 1 435 138 1 381 836 53 302 1 381 836 1 389 - - - - 400 11 275 46 283 1 304 614 309 10 419 36 227 1 210 457 GJ/year GJ/year EUR/year 11 512 11 052 460 11 052 12 1 330 925 1 277 623 53 302 1 277 623 1 389 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 4. STEP: Economy evaluation - Simple payback period IN = investment CF – cash-flow - Real payback period by considering discount rate TSD CFt = annual savings (changes of cash flow after realisation of measures) r – dsicount factor (1 + r)-t – odúročiteľ - Net present value CFt - Cash - Flow of the project in year t r - discount t – evaluated timeframe (1 to n years) Tž – lifetime of equipment - Internal Rate of Return En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 5. STEP: Environmental evaluation Emisssions Solid particles SO2 NOx CO CO2 Electricity kg/MWh 0,28 1,87 2,88 2,33 1084 En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 5. STEP: Selection of variant - Economy evaluation Indicator Total costs Change of costs for energy (– decrease/+ increase) Change of personal costs, i.e. slaries, insurance, ... (–/+) Changes of other operational costs, i.e repairs and maintenance, services,insurance of property, ... (–/+) Change of other individually given costs, i.e emissions, waste and others (– /+) Change of sales, i.e. of heat, electricity, used wastes, ... (–/+) Benefits from realisation total Timeframe of evaluation Discount factor Simple payback (Ts) Real payback (Tsd) Net present value (NPV) Internal rate of return (IRR) Value Unit 371 529 -104 213 0 EUR EUR 0 0 0 0 0 0 -104 213 20 5 3,9 6,1 756 666 23,63 0 EUR year % year year EUR % En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 5. STEP: Selection of variant - Environmental evaluation Emissions Before t/year after t/year Difference t/year 3,0 5,6 30,9 25,0 11 641,7 0,3 0,5 2,7 2,2 1 027,0 Variant 2 Solid partcles SO2 NOx CO CO2 3,3 6,1 33,7 27,2 12 668,7 Selection criterias: - Economy and environmental benefits - Technical – lifetime of variants - Operational – costs/changes of costs on maintenance and operation - Legislative – if variants can bring from legislative pouint of view any complications En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713 Thank you for your attention! En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713
© Copyright 2024