PCI Candidates for Natural Gas

PCI Candidates for Natural Gas
Corridor
Group Code
Project Number
ProjectName
NSI West
GR_1
TRA-N-012
GALSI Pipeline Project
NSI West
GR_2
TRA-N-027
NSI West
GR_3
LNG-N-030
NSI West
GR_4
LNG-N-211
NSI West
GR_8_NM
TRA-N-042
NSI West
GR_9
TRA-N-047
NSI West
GR_10
UGS-F-052
NSI West
GR_11
TRA-N-059
NSI West
NEW
submission
TRA-N-060
NSI West
GR_12
TRA-N-071
NSI West
GR_15
LNG-N-088
NSI West
GR_16
UGS-N-127
NSI West
GR_24
UGS-N-197
NSI West
GR_25
LNG-N-198
NSI West
NEW
submission
LNG-N-085
NSI West
GR_28
UGS-N-203
ProjectPromoter
Edison
Country
Weblink
IT
www.galsi.it
Physical reverse flow from Northern
Premier Transmission
Ireland to Great Britain and Republic of
Ireland via Scotland to Northern
Ireland pipeline
UK
http://www.premier-transmission.com/
Shannon LNG Terminal and Connecting
Pipeline
Connection of Malta to the European
Gas Network - LNG Regasification
Infrastructure
New interconnection IT-FR to connect
Corsica
Reverse capacity from France to
Germany at Obergailbach
Gas Storage Bergermeer (GSB)
Shannon LNG
IE
www.shannonlng.ie
Maltese Ministry for Energy
and Health
MT
http://energy.gov.mt/mt/Pages/gp1.aspx
GRTgaz
FR
GRTgaz
FR
TAQA Gas Storage B.V.
NL
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.gasstoragebergermeer.com/
Physical Reverse Flow at Moffat
Interconnection Point
Twinning of South West Scotland
Onshore System between Cluden and
Brighouse Bay (United Kingdom)
Gaslink Independent System
Operator Ltd
Gaslink Independent System
Operator Ltd
IE
http://www.gaslink.ie/index.jsp?p=93&n=301
IE
http://www.gaslink.ie/index.jsp?p=93&n=301
Physical Reverse Flow on South North
Pipeline
LNG Terminal of Gioia Tauro
Gaslink Independent System
Operator Ltd
Sorgenia S.p.A.
IE
http://www.gaslink.ie/index.jsp?p=93&n=301
IT
www.lngmed.it
Underground Gas Storage in salt
leached caverns in the Bages area,
North-Eastern Spain
Southwest Kinsale Storage Expansion
Project
Porto Empedocle LNG
Gas Natural
ES
http://www.gasnaturalfenosa.com/es/actividades/1285338591700/line
as+de+negocio.html
Kinsale Energy Ltd
IE
http://www.kinsale-energy.ie/useful-information.html
Nuove Energie S.r.l.
IT
http://www.enel.it/it-IT/eventi_news/news/terminale-dirigassificazione-di-porto-empedocle/p/090027d9819310b8/
LNG off-shore regasification terminal API Nova Energia S.r.l.
of Falconara Marittima (Ancona, Italy)
IT
Preesall Gas Storage
UK
http://apinovaenergia.gruppoapi.com/ and
http://www.sviluppoeconomico.gov.it/index.php/it/energia/gasnaturale/rigassificatori/2025708-terminale-off-shore-di-rigassificazionegnl-di-falconara-marittima
www.halite-energy.co.uk
Halite Energy Group Ltd
1
NSI West
GR_30
TRA-N-031
Connection of Malta to the European
Gas Network - Pipelines
Maltese Ministry for Energy
and Health
MT
http://energy.gov.mt/mt/Pages/gp1.aspx
NSI West
GR_32
LNG-N-229
LNG Terminal Zeebrugge - 5th tank
Fluxys Belgium SA/NV
BE
NSI West
GR_37
UGS-N-242
Cornegliano UGS
ITAL Gas Storage S.r.l.
IT
http://www.fluxys.com/belgium/en/About%20Fluxys/Investment/Inves
tmentProgramme/Zeebrugge_5th_storagetank
http://italgasstorage.it/eng/home.html
NSI West
GR_38
UGS-F-259
Bordolano
Stogit S.p.a
IT
NSI West
GR_43
UGS-N-294
Islandmagee Gas Storage Facility
UK
NSI West
GR_44
TRA-N-313
H-gas transport between NL to D
NSI West
GR_45
TRA-N-329
ZEELINK
Islandmagee Gas Storage
Limited
Gasunie Transport Services
B.V.
Open Grid Europe GmbH
DE
http://www.gasunietransportservices.nl/en/products-services/entryexitcapacity/pci
www.open-grid-europe.com/zeelink/pci-steckbrief
NSI West
GR_46_NM
TRA-N-335
An Access to the Italian and European Infrastrutture Trasporto Gas
Gas Network for Sardinia, Corsica and S.p.a.
Elba Islands
IT
http://www.infrastrutturetg.it/content/new-projects-description
NSI West
GR_51
LNG-N-368
Expansion of the Grain LNG Terminal
Grain LNG Terminal
UK
www.grainlng.com
NSI West
GR_64
TRA-F-041
Eridan
GRTgaz
FR
NSI West
GR_64
TRA-N-161
ES
NSI West
GR_64
TRA-N-252
NSI West
GR_64
TRA-N_253
Iberian-French corridor: Eastern Axis - Enagás S.A.
Midcat Project
Iberian-French corridor: Eastern Axis- TIGF
Midcat Project
Est Lyonnais pipeline
GRTgaz
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.enagas.es/enagas/en/MarcoRegulatorio/Proyectos_Interes
_Comun
http://www.tigf.fr/presse-actualites/actualites.html
NSI West
GR_64
TRA-N-256
Iberian-French corridor: Eastern Axis- GRTgaz
Midcat Project (CS Montpellier and CS
Saint Martin de Crau)
FR
NSI West
GR_65
LNG-N-227
Fos Cavaou LNG Terminal Expansion
Elengy
FR
NSI West
GR_65
TRA-F-041
Eridan
GRTgaz
FR
NSI West
GR_65
TRA-N-253
Est Lyonnais pipeline
GRTgaz
FR
NSI West
GR_65
TRA-N-269
Fosmax (Cavaou) LNG expansion
GRTgaz
FR
NSI West
GR_66
TRA-N-043
Val de Saône project
GRTgaz
FR
NSI West
GR_66
TRA-N-331
Artere Gascogne Midi
TIGF
FR
2
NL
FR
FR
http://www.stogit.it/it/attivita/innovazionericerca/Progetto_Bordolano.html
http://www.islandmageestorage.com/
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.fosmax-lng.com/en/who-are-we/projet-dedeveloppement.html
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.tigf.fr/presse-actualites/actualites.html
NSI West
GR_66
TRA-N-391
FR
TRA-N-013
Gascogne-Midi : adaptation of stations GRTgaz
in Cruzy and St Martin
OS GRTgaz/Creos
Creos Luxembourg S.A.
NSI West
GR_67
NSI West
GR_67
TRA-N-044
New interconnection to Luxembourg
GRTgaz
FR
NSI West
NSI West
GR_68
LNG-N-050
Gate terminal phase 3
Gate Terminal B.V.
NL
GR_68
TRA-N-192
GR_81
TRA-N-168
Gasunie Transport Services
B.V.
Enagás S.A.
NL
NSI West
Entry capacity expansion GATE
terminal
Interconnection ES-PT (3rd IP)
NSI West
GR_81
TRA-N-283
PT-ES Interconnector (3rd IP) Pipeline
Spanish Border-Celorico
REN - Gasodutos, S.A.
PT
NSI West
GR_82
TRA-N-168
Interconnection ES-PT (3rd IP)
Enagás S.A.
ES
NSI West
GR_82
TRA-N-284
PT-ES Interconnector (3rd IP)
Cantanhede Compressor Station
REN - Gasodutos, S.A.
PT
NSI West
GR_83
TRA-N-168
Interconnection ES-PT (3rd IP)
Enagás S.A.
ES
NSI West
GR_83
TRA-N-285
PT-ES Interconnector (3rd IP) Pipeline
Cantanhede-Mangualde
REN - Gasodutos, S.A.
PT
NSI West
GR_85
TRA-F-213
Support to the North West market
Snam Rete Gas S.p.A.
IT
NSI West
GR_85
TRA-F-214
Support to the North West market and Snam Rete Gas S.p.A.
bidirectional cross-border flows
IT
NSI West
GR_85
TRA-N-045
GRTgaz
FR
NSI West
GR_86
TRA-F-213
Reverse capacity from CH to FR at
Oltingue
Support to the North West market
Snam Rete Gas S.p.A.
IT
3
LU
ES
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.creos-net.lu/creos-luxembourg
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.gate.nl/en/home.html
http://www.gasunietransportservices.nl/en/products-services/entryexitcapacity/pci
http://www.enagas.es/enagas/en/MarcoRegulatorio/Proyectos_Interes
_Comun
http://www.ren.pt/o_que_fazemos/projetos_interesse_2015/
http://www.enagas.es/enagas/en/MarcoRegulatorio/Proyectos_Interes
_Comun
http://www.ren.pt/o_que_fazemos/projetos_interesse_2015/
http://www.enagas.es/enagas/en/MarcoRegulatorio/Proyectos_Interes
_Comun
http://www.ren.pt/o_que_fazemos/projetos_interesse_2015/
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
NSI West
GR_86
TRA-F-214
Support to the North West market and Snam Rete Gas S.p.A.
bidirectional cross-border flows
IT
NSI West
GR_86
TRA-N-207
Fluxys TENP
DE
NSI West
GR_86
TRA-N-208
Reverse flow interconnection from
TENP to Gaspool Market Area and
Eynatten interconnection point
(Bretella)
Reverse Flow on TENP
Fluxys TENP
DE
NSI West
GR_91
TRA-N-314
GR_91
TRA-N-316
Gasunie Transport Services
B.V.
Gasunie Deutschland
Transport Services GmbH
NL
NSI West
Transport from OSZ/Bunde to
Julianadorp
Expansion in Oude Statenzijl
NSI West
GR_102_NM
TRA-N-392
Adaptation L- Gas - H- Gas
GrDF
FR
NSI West
GR_102_NM
TRA-N-429
Adapatation L- gas - H-gas
GRTgaz
FR
NSI West
GR_102_NM
TRA-N-500
CONVERSION L/H
Fluxys Belgium SA/NV
BE
NSI East
GR_13
UGS-F-074
RWE
CZ
NSI East
GR_18
LNG-N-129
Expansion of the virtual storage
operated by RWE Gas Storage
Aegean LNG Import Terminal
http://www.grtgaz.com/grands-projets/projets-dinteretcommun/projets-dinteret-commun.html
http://www.fluxys.com/belgium/en/About%20Fluxys/Investment/Inves
tmentProgramme/LH_conversion
http://www.rwe-gasstorage.cz/cs/3230/
DEPA S.A.
EL
http://www.depa.gr/press/002009002.html
NSI East
GR_19_NM
TRA-N-135
Connection to Oberkappel
NET4GAS, s.r.o.
CZ
http://www.net4gas.cz/en/1703/
NSI East
GR_20
TRA-N-137
Interconnection Bulgaria - Serbia
Ministry of Economy and
Energy of Bulgaria
BG
http://www.mi.government.bg/bg/themes/proektmejdusistemna-gazova-vrazka-balgariya-sarbiya1473-347.html
NSI East
GR_21
UGS-N-138
UGS Chiren Expansion
Bulgartransgaz EAD
BG
http://www.bulgartransgaz.bg/bg/pages/pcis-118.html
NSI East
GR_23
P
Reverse flow at GR-BG border (2nd
phase - Greek part)
DESFA S.A.
EL
Website in Greek: http://www.desfa.gr/default.asp?pid=687&la=1
DE
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
http://www.fluxys.com/tenp/en/TenpSystemInfo/SouthNorthProject/R
everseFlow
http://www.fluxys.com/tenp/en/TenpSystemInfo/SouthNorthProject/R
everseFlow
http://www.gasunietransportservices.nl/en/products-services/entryexitcapacity/pci
http://www.gasunie.de/mainmenu/erdgastransport/leitungsnetz/vorhaben-von-gemeinsameminteresse
http://www.grdf.fr/particuliers/entreprise-grdf/conversion-gaz-l-h
Website in English: http://www.desfa.gr/default.asp?pid=687&la=2
NSI East
GR_26
UGS-F-199
KPMG Kosakowo
PGniG
PL
NSI East
GR_27
UGS-F-200
KPMG Mogilnio
PGniG
PL
NSI East
GR_31
UGS-N-219
PMG Wierzchowice extension
PGniG
PL
NSI East
GR_33
UGS-N-233
Depomures
GdF Suez Energy Romania
RO
http://www.depomures.ro/depomures.php
NSI East
GR_34
UGS-N-235
Nuovi Sviluppi Edison Stoccaggio
Edison Stoccagio S.p.A.
IT
http://www.edisonstoccaggio.it/site/
4
NSI East
GR_35
UGS-N-237
Palazzo Moroni
Edison Stoccagio S.p.A.
NSI East
GR_40
TRA-N-274
Upgrade of Poland - Germany
interconnection in Lasów
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
NSI East
GR_42
UGS-N-288
Grottole-Ferrandina Gas Storage
Geogastock
IT
http://www.geogastock.it/ITA/Home.asp
NSI East
GR_47
UGS-N-347
Peak storage facility Grubisno Polje
PSP d.o.o.
HR
http://psp.hr/peak-storage-facility-grubisno-polje
NSI East
GR_48
UGS-N-356
Nafta
SK
NSI East
GR_49
UGS-N-364
SPP Storage, s.r.o.
CZ
http://www.nafta.sk/sk/podzemny-zasobnik-zemneho-plynu-velkekapusany
http://www.sppstorage.cz/dolni-bojanovice-ugs-facility/projects
NSI East
GR_50
UGS-N-366
Underground Gas Storage Velke
Kapusany
Interconnection of UGS Dolní
Bojanovice to the Transmission
network of NET4GAS and
improvement of flexibility
New gas storage facility in Romania
Romgaz
RO
English: http://www.romgaz.ro/en/activities/storage/pci.html
Romanian: http://www.romgaz.ro/ro/activitati/inmagazinare/pci.html
NSI East
GR_52
UGS-N-371
Sarmasel storage facility upgrading
Romgaz
RO
English: http://www.romgaz.ro/en/activities/storage/pci.html
Romanian: http://www.romgaz.ro/ro/activitati/inmagazinare/pci.html
NSI East
GR_53
UGS-N-373
Expansion of UGS Ghercesti
Romgaz
RO
English: http://www.romgaz.ro/en/activities/storage/pci.html
Romanian: http://www.romgaz.ro/ro/activitati/inmagazinare/pci.html
NSI East
GR_55
TRA-N-378
Interconnector Greece-Bulgaria (IGB
Project)
ICGB AD
BG
www.icgb.eu and http://www.bgenh.com/index.php/bg/2014-04-13-2154-49/igb
NSI East
GR_56
UGS-N-385
South Kavala Underground Gas
Storage
EL
http://www.hradf.com/en/portfolio/south-kavala-natural-gas-storage.
NSI East
GR_57
UGS-N-386
SK
http://www.nafta.sk/sk/vysokoflexibilna-nova-uskladnovacia-kapacita
NSI East
GR_71
LNG-N-062
Hellenic Republic Asset
Development Fund and
Energean Oil & Gas S.A.
(Greece)
Highly flexible new storage capacity in Nafta
NSI East Gas corridor
Alexandroupolis Independent Natural Gastrade S.A.
Gas System - LNG Section
EL
http://www.gastrade.gr/en/alexandroupolis-ings/publicconsultation.aspx
NSI East
GR_71
TRA-N-063
Alexandroupolis Independent Natural
Gas System - Pipeline Section
Gastrade S.A.
EL
http://www.gastrade.gr/en/alexandroupolis-ings/publicconsultation.aspx
NSI East
GR_72
TRA-N-066
Interconnection Croatia/Bosnia and
Herzegovina (Slobodnica- Bosanski
Brod-Zenica)
Plinacro Ltd
HR
http://www.plinacro.hr/default.aspx?id=706
5
IT
http://www.edisonstoccaggio.it/site/
NSI East
GR_72
TRA-N-224
Gaspipeline Zenica - Brod
BH Gas d.o.o.
BA
NSI East
GR_72
TRA-N-334
Compressor stations at the Croatian
gas transmission system
Plinacro Ltd
HR
http://www.plinacro.hr/default.aspx?id=706
NSI East
GR_72
TRA-N-068
Ionian Adriatic Pipeline
Plinacro Ltd
HR
http://www.plinacro.hr/default.aspx?id=706
NSI East
NEW GROUP
TRA-N-070
Plinacro Ltd
HR
http://www.plinacro.hr/default.aspx?id=706
NSI East
GR_74
LNG-N-082
Interconnection Croatia/Serbia
Slobdnica - Sotin (Croatia) - Bačko
Novo Selo (Serbia)
LNG terminal in Croatia
LNG Hrvatska
HR
www.lng/en/about-us
NSI East
GR_74
TRA-N-075
LNG main gas transit pipeline (Part of
North-South Gas Corridor) ZlobinBosiljevo-Sisak-Kozarac-Slobodnica
Plinacro Ltd
HR
http://www.plinacro.hr/default.aspx?id=706
NSI East
GR_75
LNG-N-082
LNG terminal in Croatia
LNG Hrvatska
HR
www.lng/en/about-us
NSI East
GR_75
TRA-N-090
LNG evacuation pipeline Omišalj Zlobin (Croatia) - Rupa (Slovenia)
Plinacro Ltd
HR
http://www.plinacro.hr/default.aspx?id=706
NSI East
GR_75
TRA-N-093
CS Ajdovščina, 2nd phase of upgrade
Plinovodi d.o.o.
SI
NSI East
GR_75
TRA-N-099
M3/1a Šempeter - Ajdovščina
Plinovodi d.o.o.
SI
NSI East
GR_75
TRA-N-101
M8 Kalce - Jelšane
Plinovodi d.o.o.
SI
NSI East
GR_75
TRA-N-261
M3/1c Kalce - Vodice
Plinovodi d.o.o.
SI
NSI East
GR_75
TRA-N-262
M3/1b Ajdovščina - Kalce
Plinovodi d.o.o.
SI
NSI East
GR_76
TRA-N-086
Interconnection Croatia/Slovenia
(Bosiljevo - Karlovac - Lučko - Zabok Rogatec)
Plinacro Ltd
HR
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.plinacro.hr/default.aspx?id=706
NSI East
GR_76
TRA-N-094
CS Kidričevo, 2nd phase of upgrade
Plinovodi d.o.o.
SI
NSI East
GR_76
TRA-N-334
Compressor stations at the Croatian
gas transmission system
Plinacro Ltd
HR
NSI East
GR_76
TRA-N-390
Upgrade of Rogatec interconnection
Plinovodi d.o.o.
SI
NSI East
GR_78
TRA-N-112
R15/1 Pince - Lendava - Kidričevo
Plinovodi d.o.o.
SI
6
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.plinacro.hr/default.aspx?id=706
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
NSI East
GR_78
TRA-N-325
Slovenian-Hungarian interconnector
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
NSI East
GR_80
TRA-N-021
GAS CONNECT AUSTRIA
GmbH
AT
http://www.gasconnect.at/en/Unser-Netz/Projekte
NSI East
GR_80
TRA-N-133
NET4GAS, s.r.o.
CZ
http://www.net4gas.cz/en/1703/
NSI East
GR_87
TRA-N-190
Bidirectional Austrian-Czech
Interconnector (BACI, formerly LBL
project)
Bidirectional Austrian Czech
Interconnection (BACI)
Poland - Slovakia interconnection
eustream, a.s.
SK
NSI East
GR_87
TRA-N-245
The North-South Gas Corridor in
Eastern Poland
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
http://www.eustream.sk/en_transmission-system/en_pl-skinterconnector/en_project-of-common-interest-pci
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
NSI East
GR_87
TRA-N-275
Poland - Slovakia interconnection
within the North - South corridor
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
NSI East
GR_89
TRA-N-136
http://www.net4gas.cz/en/1703/
NSI East
GR_89
TRA-N-247
Poland-Czech Republic Interconnection NET4GAS, s.r.o.
CZ
(CZ)
The North-South Gas Corridor in
Operator Gazociągów
PL
Western Poland
Przesyłowych Gaz-System S.A.
NSI East
GR_89
TRA-N-273
Poland - Czech Republic
interconnection (PL)
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
NSI East
GR_92
LNG-N-328
Eagle LNG and Pipeline
Trans-Euroepean Energy
AL
http://www.eagle-lng.com
NSI East
GR_92
TRA-N-007
Development for new import from the Snam Rete Gas S.p.A.
South (Adriatica Line)
IT
NSI East
GR_96
TRA-N-431
Interconnection of the Northern ring of SNTGN Transgaz SA
the Bulgarian transmission system with
Podisor-Horia pipeline and expansion
of gas transmission capacity on
Hurezani – Horia – Csanadpalota
section
RO
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
http://www.transgaz.ro/_proiecte_majore.php?poz=444
7
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
NSI East
GR_96
TRA-N-379
​A project for the construction of a gas
pipeline (pipelines) aiming at
expansion of the capacity on the
interconnection of the Norther
Bulgartransgaz EAD
BG
http://www.bulgartransgaz.bg/bg/pages/pcis-118.html
NSI East
GR_98
TRA-N-094
CS Kidričevo, 2nd phase of upgrade
Plinovodi d.o.o.
SI
NSI East
GR_98
TRA-N-361
GCA 2014/04 Murfeld
AT
NSI East
GR_98
TRA-N-389
GAS CONNECT AUSTRIA
GmbH
Plinovodi d.o.o.
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.gasconnect.at/en/Unser-Netz/Projekte
SI
NSI East
GR_103_NM
TRA-N-298
NSI East
GR_104_NM
UGS-N-141
Upgrade of Murfeld/Ceršak
interconnection
Rehabilitation, modernisation and
Bulgartransgaz EAD
expansion of the existing gas
transmission system
Construction of new gas storage facility Bulgartransgaz EAD
on the territory of Bulgaria
NSI East
GR_105_NM
TRA-N-381
NSI East
GR_105_NM
SGC
BG
http://www.plinovodi.si/en/company/projects-of-common-interestpci/pci-2015/
http://www.bulgartransgaz.bg/bg/pages/pcis-118.html
BG
http://www.bulgartransgaz.bg/bg/pages/pcis-118.html
Gas transmission from South direction FGSZ
(Serbia) towards Austria and Slovakia 1
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
TRA-N-383
Gas transmission from South direction FGSZ
(Serbia) towards Austria and Slovakia 2
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
GR_101
TRA-F-051
Trans Adriatic Pipeline
Trans-Adriatic Pipeline AG
EL, IT
www.tap-ag.com
SGC
GR_101
TRA-F-221
Socar
TR
www.tanap.com
SGC
GR_101
TRA-F-395
http://www.bp.com/en_az/caspian/operationsprojects/Shahdeniz.html
GR_101
TRA-N-339
TM
http://w-stream-transcaspian.com/
SGC
GR_101
TRA-N-512
Azerbaijan South Caucasus
Pipeline Ltd
W-Stream Caspian pipeline
Company Ltd
DESFA S.A.
AZ
SGC
TANAP - Trans Anatolian Natural Gas
Pipeline Project
Expansion of the South Caucasus
Pipeline
Trans-Caspian
EL
Website in Greek: http://www.desfa.gr/default.asp?pid=687&la=1
Metering and Regulating Stations for
the connection of the Greek
transmission system with TAP
Website in English: http://www.desfa.gr/default.asp?pid=687&la=2
8
SGC
GR_101
TRA-N-007
Development for new import from the Snam Rete Gas S.p.A.
South (Adriatica Line)
IT
SGC
GR_17
TRA-N-128
Compressor Station Kipi
EL
DESFA S.A.
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
Website in Greek: http://www.desfa.gr/default.asp?pid=687&la=1
Website in English: http://www.desfa.gr/default.asp?pid=687&la=2
SGC
GR_22
TRA-N-140
Interconnection Turkey-Bulgaria
SGC
GR_58
TRA-N-007
SGC
GR_58
SGC
GR_58
Bulgartransgaz EAD
BG, TK
http://www.bulgartransgaz.bg/bg/pages/pcis-118.html
Development for new import from the Snam Rete Gas S.p.A.
South (Adriatica Line)
IT
TRA-N-010
Poseidon Pipeline
IGI Poseidon S.A.
EL
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
English: http://www.igi-poseidon.com/pannelli/popup.asp?id=725
Italian: http://www.igi-poseidon.com/pannelli/popup.asp?id=724 and
http://www.igi-poseidon.com/pannelli/popup.asp?id=726
TRA-N-014
Komotini-Thesprotia pipeline
DESFA S.A.
EL
Website in Greek: http://www.desfa.gr/default.asp?pid=687&la=1
Website in English: http://www.desfa.gr/default.asp?pid=687&la=2
SGC
GR_59
TRA-N-007
Development for new import from the Snam Rete Gas S.p.A.
South (Adriatica Line)
IT
SGC
GR_59
TRA-N-010
Poseidon Pipeline
EL
IGI Poseidon S.A.
9
http://www.snamretegas.it/it/servizi/Anno-termico_2013_2014/pianodecennale/ public consultation:
http://www.snamretegas.it/export/sites/snamretegas/repository/file/A
nno_termico_2013x14/pianodecennale/snam_piano_decennale_ita_web.pdf#page=22
Website in English: http://www.igiposeidon.com/pannelli/popup.asp?id=725 Website in Italian:
http://www.igi-poseidon.com/pannelli/popup.asp?id=724
http://www.igi-poseidon.com/pannelli/popup.asp?id=726
SGC
GR_59
TRA-N-014
Komotini-Thesprotia pipeline
DESFA S.A.
EL
Website in Greek: http://www.desfa.gr/default.asp?pid=687&la=1
Website in English: http://www.desfa.gr/default.asp?pid=687&la=2
SGC
GR_59
TRA-N-330
East Med Pipeline
IGI Poseidon S.A.
CY, EL
Website in English: http://www.igiposeidon.com/pannelli/popup.asp?id=725 Website in Italian:
http://www.igi-poseidon.com/pannelli/popup.asp?id=724
http://www.igi-poseidon.com/pannelli/popup.asp?id=726
SGC
GR_60
TRA-N-018
Városföld-Ercsi-Győr
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_60
TRA-N-061
Ercsi-Szazhalombatta
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_60
TRA-N-123
Városföld CS
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_60
TRA-N-286
Romanian-Hungarian reverse flow
Hungarian section 1st stage
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_60
TRA-N-358
Development on the Romanian
SNTGN Transgaz SA
territory of the National Gas
Transmission System on the Bulgaria –
Romania – Hungary – Austria Corridor
RO
http://www.transgaz.ro/_proiecte_majore.php?poz=444
10
SGC
GR_60
TRA-N-362
Development on the Romanian
SNTGN Transgaz SA
territory of the Southern Transmission
Corridor for taking over the Black Sea
gas
Romanian-Hungarian reverse flow
FGSZ
Hungarian section 2nd stage
RO
http://www.transgaz.ro/_proiecte_majore.php?poz=444
SGC
GR_60
TRA-N-377
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_60
TRA-N-423
GCA Mosonmagyaróvár
AT
http://www.gasconnect.at/en/Unser-Netz/Projekte
GR_69_NM
PRD-N-055
Mediterranean LNG Export Terminal
GAS CONNECT AUSTRIA
GmbH
Ministry of Cyprus
SGC
CY
SGC
GR_69_NM
TRA-N-054
Trans-Mediterranean Gas Pipeline
Ministry of Cyprus
CY, EL
SGC
GR_69_NM
UGS-N-067
Mediterranean Gas Storage
Ministry of Cyprus
CY
SGC
GR_79
TRA-N-018
Városföld-Ercsi-Győr
FGSZ
HU
http://www.mcit.gov.cy/mcit/mcit.nsf/page13_gr/page13_gr?OpenDoc
ument
http://www.mcit.gov.cy/mcit/mcit.nsf/page13_gr/page13_gr?OpenDoc
ument
http://www.mcit.gov.cy/mcit/mcit.nsf/page13_gr/page13_gr?OpenDoc
ument
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_79
TRA-N-061
Ercsi-Szazhalombatta
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_79
TRA-N-123
Városföld CS
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_79
TRA-N-126
Reverse flow on the interconnector
Romania - Hungary
SNTGN Transgaz SA
RO
http://www.transgaz.ro/_proiecte_majore.php?poz=444
SGC
GR_79
TRA-N-139
Interconnection of the national
transmission system with the
international gas transmission
pipelines and reverse flow at Isaccea
SNTGN Transgaz SA
RO
http://www.transgaz.ro/_proiecte_majore.php?poz=444
11
SGC
GR_79
TRA-N-286
Romanian-Hungarian reverse flow
Hungarian section 1st stage
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_79
TRA-N-377
Romanian-Hungarian reverse flow
Hungarian section 2nd stage
FGSZ
HU
http://www.kormany.hu/hu/nemzeti-fejlesztesiminiszterium/energiaugyert-felelos-allamtitkarsag/hirek/nyilvanoskonzultacio-indul-az-europai-unio-energia-infrastruktura-fejlesztesiprojektjeirol and https://fgsz.hu/content/javasolt-pci-projektekpublikalasa
SGC
GR_79
TRA-N-384
Bridging of Isaccea – Horia corridor by SNTGN Transgaz SA
construction of Onesti – Bacia section
RO
http://www.transgaz.ro/_proiecte_majore.php?poz=444
SGC
GR_79
TRA-N-423
GCA Mosonmagyaróvár
AT
http://www.gasconnect.at/en/Unser-Netz/Projekte
SGC
GR_93_NM
TRA-N-053
White Stream
GAS CONNECT AUSTRIA
GmbH
White Stream Ltd
AZ
http://www.white-stream.com/
SGC
GR_93_NM
TRA-N-339
Trans-Caspian
TM
http://w-stream-transcaspian.com/
SGC
GR_93_NM
TRA-F-395
AZ
http://www.bp.com/en_az/caspian/operationsprojects/Shahdeniz.html
SGC
GR_95
TRA-F-195
Expansion of the South Caucasus
Pipeline
AGRI Pipeline - Hungarian section
W-Stream Caspian pipeline
Company Ltd
Azerbaijan South Caucasus
Pipeline Ltd
AGRI LNG Project Company
SRL
HU
http://www.enmin.lt/en/activity/veiklos_kryptys/strateginiai_projektai/
lng_terminal.php?clear_cache=Y and
http://www.agrilng.com/Home/EUProjectsOfCommonInterest
SGC
GR_95
TRA-N-132
AGRI Pipeline - Romanian section (East- AGRI LNG Project Company
West Pipeline)
SRL
RO
http://www.enmin.lt/en/activity/veiklos_kryptys/strateginiai_projektai/
lng_terminal.php?clear_cache=Y and
http://www.agrilng.com/Home/EUProjectsOfCommonInterest
SGC
GR_95
TRA-N-376
Azerbaijan, Georgia, Romania
Interconnector - AGRI
AGRI LNG Project Company
SRL
GE
http://www.enmin.lt/en/activity/veiklos_kryptys/strateginiai_projektai/
lng_terminal.php?clear_cache=Y and
http://www.agrilng.com/Home/EUProjectsOfCommonInterest
Baltics
GR_100
TRA-N-394
Gassled - Danish upstream system
Energinet.dk
DK
http://energinet.dk/EN/GAS/Udfordringer-for-gassen-i-fremtidenny/Infrastruktur-efter-2014/Sider/Stoerre-sammenhaeng-medEuropa.aspx and
http://www.ens.dk/undergrund-forsyning/el-naturgasvarmeforsyning/pci-projekter-faelles-europaeisk-interesse
12
Baltics
GR_100
TRA-N-218
Tie-in of Norwegian off-shore natural Maersk Oil and Gas AS
gas transmission system to Danish offshore natural gas Infrastructure
NO
Baltics
GR_14
TRA-N-084
Karksi GMS (including CS)
Vörguteenus
EE
Baltics
GR_39
LNG-N-272
Upgrade of the LNG terminal in
Świnoujście
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
Baltics
GR_41
TRA-N-276
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
Baltics
GR_54
UGS-N-374
Upgrade of the entry point in Lwówek Operator Gazociągów
PL
on the Yamal-Europe pipeline in
Przesyłowych Gaz-System S.A.
Poland
Modernization and expansion of
Latvijas Gaze
LV
Incukalns UGS
Baltics
GR_6
UGS-N-034
Syderiai gas storage
Lietuvos energijos gamyba, AB LT
Baltics
GR_61
LNG-N-024
Finngulf LNG
Gasum Oy
FI
Website in Lithuanian:
http://www.gamyba.le.lt/lt/veikla/projektai/syderiu-duju-saugykla/
Website in English:
http://www.gamyba.le.lt/en/activities/projects/syderiai-undergroundgas-storage-/
Website in English:
http://www.gasum.com/Corporate_info/Investments/Finngulf-LNGimport-terminal/
Website in Finish:
http://www.gasum.fi/Tietoa_Gasumista/Investoinnit/Finngulf-LNG/
Baltics
GR_61
TRA-N-023
Balticconnector (FI-EE)
Gasum Oy
FI
Website in English:
http://www.gasum.com/Corporate_info/Investments/Finngulf-LNGimport-terminal/
Website in Finish:
http://www.gasum.fi/Tietoa_Gasumista/Investoinnit/Finngulf-LNG/
Baltics
GR_61
TRA-N-072
Balticconnector (Including CS)
Vörguteenus
EE
http://egv.ee/kasulikku/balticconnector/
Baltics
GR_62
LNG-N-079
Paldiski LNG Terminal
Balti Gaas plc
EE
www.baltigaas.eu
Baltics
GR_62
TRA-N-023
Balticconnector (FI-EE)
Gasum Oy
FI
Website in Finish:
http://www.gasum.fi/Tietoa_Gasumista/Investoinnit/Balticconnector/
Website in English & Estonian:
http://www.gasum.com/Corporate_info/Investments/Balticconnector/
13
http://egv.ee/en/public-information/enhancement-of-estonia-latviainterconnection/
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
http://www.lg.lv/index.php?id=3376&lang=lat and
http://www.lg.lv/index.php?id=3376&lang=eng
Baltics
GR_62
TRA-N-072
Balticconnector (Including CS)
Vörguteenus
EE
http://egv.ee/kasulikku/balticconnector/
Baltics
GR_63
LNG-N-146
Tallinn LNG Terminal
Vopak
EE
Baltics
GR_63
TRA-N-023
Balticconnector (FI-EE)
Gasum Oy
FI
http://www.vopak.com/about-us/about-us/vopak-lng/feasibilitystudies.html
Website in Finish:
http://www.gasum.fi/Tietoa_Gasumista/Investoinnit/Balticconnector/
Website in English & Estonian:
http://www.gasum.com/Corporate_info/Investments/Balticconnector/
Baltics
GR_63
TRA-N-072
Balticconnector (Including CS)
Vörguteenus
EE
http://egv.ee/kasulikku/balticconnector/
Baltics
GR_70
LNG-F-058
Klaipeda LNG terminal
Klaipedos Nafta
LT
Baltics
GR_70
TRA-N-238
Capacity enhancement of KlaipedaKiemenai pipeline in Lithuania
Amber Grid
LT
http://www.sgd.lt/index.php?id=home&L=1 and
http://www.enmin.lt/en/activity/veiklos_kryptys/strateginiai_projektai/
lng_terminal.php?clear_cache=Y
http://www.ambergrid.lt/en/transmission-system/dvelopment-of-thetransmission-system/the-gas-interconnection-Poland-Lithuania
Baltics
GR_88
TRA-N-212
Gas Interconnection Poland-Lithuania
(GIPL)
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
Baltics
GR_88
TRA-N-245
The North-South Gas Corridor in
Eastern Poland
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
Baltics
GR_88
TRA-N-341
Gas Interconnection Poland-Lithuania
(GIPL) (Lithuanian section)
Amber Grid
http://www.ambergrid.lt/en/transmission-system/dvelopment-of-thetransmission-system/the-gas-interconnection-Poland-Lithuania
Baltics
GR_90
TRA-N-271
Poland - Denmark interconnection
(Baltic Pipe)
Operator Gazociągów
PL
Przesyłowych Gaz-System S.A.
http://en.gaz-system.pl/wsparcie-z-ue/projekty-o-statusie-pci-pciproject-of-common-interest/
Baltics
GR_90
TRA-N-428
(Mirror) Baltic Pipe
Energinet.dk
DK
http://energinet.dk/EN/GAS/Udfordringer-for-gassen-i-fremtidenny/Infrastruktur-efter-2014/Sider/Stoerre-sammenhaeng-medEuropa.aspx and
http://en.gaz-system.pl/wsparcie-z-ue/transeuropejska-siecenergetyczna-ten-e/baltic-pipe/ and
http://www.ens.dk/undergrund-forsyning/el-naturgasvarmeforsyning/pci-projekter-faelles-europaeisk-interesse
Baltics
GR_97
TRA-N-342
Enhancement of Latvia-Lithuania
interconnection (Lithuanian part)
Amber Grid
LT
http://www.ambergrid.lt/en/transmission-system/dvelopment-of-thetransmission-system/the-gas-interconnection-Poland-Lithuania
14
LT
Baltics
GR_97
TRA-N-382
Enhancement of Latvia-Lithuania
interconnection (Latvian part)
Latvijas Gaze
LV
Website in Latvian: http://www.lg.lv/index.php?id=3377&lang=lat
Website in English: http://www.lg.lv/index.php?id=3377&lang=eng
Baltics
GR_5
LNG-N-032
GO4LNG Gothenburg AB
Swedegas AB
SE
http://www.lngterminalgoteborg.se/
15