NATIONALCENTRE FOR EARTH SCIENCE STUDIES P.B. No. 7250, MEDICAL COLLEGE P.O., AKKULAM, THIRUVANANTHAPURAM-695 011, INDIA Tel: 91-471-2511531 Fax: 91-471-2442280 e-mail: [email protected] / [email protected] CORRIGENDUM dt 06/04/2015 Tender No. & Date : NCESS/PUR/5489/14 Dt.16/03/2015. Description of stores : Request for proposal for setting up of the Modular Data Centre at NCESS. Sl. No 1 2 3 4 Page No. in RFP Section No in the RFP Existing Clause Modified Requirement 39, 60 1. Integrated inbuilt Rack Infrastructure 6.2.1 Integrated inbuilt Rack Infrastructure include internal redundant power supply environmental controls (e.g., precision air conditioning, fire suppression (as per NFPA guidelines), smoke detection, Water leak detection, motion sensor, humidity sensor)security devices etc. include internal redundant power supply environmental controls (e.g., precision air conditioning, fire suppression (as per NFPA guidelines), smoke detection, Water leak detection,Cooling Sensor, motion sensor, humidity sensor)security devices etc. 40, 60 1. Integrated inbuilt Rack Infrastructure 6.2.1 Integrated inbuilt Rack Infrastructure Precision air conditioner with variable capacity digital scroll compressor, heater and humidifier Precision air conditioner with variable capacity digital scroll compressor, heater and humidifier.(Dual unit model with External chiller) 40, 61 1.Rack server 1 6.2.2 Rack Server 1 6Gbps RAID Controller with 1GB NV cache support 0,1,5,6,10 support Online Capacity Expansion and Online RAID Level Migration 12Gbps RAID Controller with 1GB NV cache support 0,1,5,6,10 support Online Capacity Expansion and Online RAID Level Migration 40, 61 1.Rack server 1 6.2.2 Rack Server 1 Up to 16 x 2.5” HDD: SAS, SATA, nearline SAS SSD: SAS (or) up to 8 x 3.5” HDD: SAS, SATA, nearline SAS SSD: SAS 6Gbps RAID Controller with 1GB NV cache support 0,1,5,6,10 support Online Capacity Expansion and Online RAID Level Migration 12Gbps RAID Controller with 1GB NV cache support 0,1,5,6,10 support Online Capacity Expansion and Online RAID Level Migration Minimum 16 x 2.5” HDD: SAS, SATA, nearline SAS SSD: SAS (or) Minimum 8 x 3.5” HDD: SAS, SATA, nearline SAS SSD: SAS 5 41, 62 2.Rack server 2 6.2.3 Rack Server 2 6 41, 62 2.Rack server 2 6.2.3 Rack Server 2 Form Factor- Rack 1U Form Factor- Rack 1U or 2U 41, 62 2.Rack server 2 6.2.3 Rack Server 2 Up to 8 x 2.5” HDD: SAS, SATA, nearline SAS SSD: SAS (or) up to 4 x 3.5” HDD: SAS, nearline SAS SSD: SAS Minimum 8 x 2.5” HDD: SAS, SATA, nearline SAS SSD: SAS (or) Minimum 4 x 3.5” HDD: SAS, nearline SAS SSD: SAS 7 8 42, 63 9 42, 63 10 48, 66 11 12 48, 66, 67 48, 67 3.San Storage 6.2.4 San Storage 3.San Storage 6.2.4 San Storage 8. On-Line Double Conversion UPS System - 15 KVA 6.2.10 15 KVA OnLine Double Conversion UPS System The system should have a minimum of 48 GB of memory across dual controller. Array should support cache destage to disk in order to avoid any data loss due to extended power outage. Array should support mirroring of write operation across controller Array should support minimum 4x10 Gbps IP port per controller for iSCSI and NAS Connectivity. The offered storage should also have 4 nos of 8G FC ports for block protocol. 8. On-Line Double Conversion UPS System 15 KVA 6.2.10 15 KVA On-Line Double Conversion UPS System Capacity: 15 KVA Supply, install, test and commissioning of one number true online, double conversion, high efficiency, high power factor Uninterruptible Power Systems (UPS) rated at 10 KVA with independent battery backup support for 10 minutes on full load. The backup batteries should be supplied with the necessary arrangements to mount inside a cabinet The system should have a minimum of 48 GB of (R/W Cache) memory across dual controller. Array should support cache destage to disk in order to avoid any data loss due to extended power outage. Array should support mirroring of write operation across controller Array should support minimum 2x10 Gbps IP port per controller for iSCSI and NAS Connectivity. The offered storage should also have 4 nos of 8G FC ports for block protocol. On-Line Double Conversion UPS System - 20 KVA 6.2.10 20 KVA OnLine Double Conversion UPS System Capacity: 20 KVA Supply, install, test and commissioning of one number true online, double conversion, high efficiency, high power factor Uninterruptible Power Systems (UPS) rated at 20 KVA with independent battery backup support for 30 minutes on full load. The backup batteries should be supplied with the necessary arrangements to mount inside a cabinet 8. On-Line Double Conversion UPS System - 15 KVA 6.2.10 15 KVA OnLine Double Conversion UPS System 8. On-Line Double Conversion UPS System - 15 KVA 6.2.10 15 KVA OnLine Double Conversion UPS System 8. On-Line Double Conversion UPS System - 15 KVA 6.2.10 15 KVA OnLine Double Conversion UPS System Back backup time: Having 2 Battery set in parallel with minimum 13000VAH (6500VAH x2) for recommended for 20-30 min at 15KVA load Back backup time: Having 2 Battery set in parallel with minimum 13000VAH (6500VAH x2) for recommended for 2030 min at 20KVA load UPS Architecture: Modular based UPS using minimum two or more similar power modules UPS Architecture: Modular based UPS using minimum two or more similar power modules. (has to be installed in a separate room allotted for UPS) Battery make: Amarraja/Panasonic/Num eric JISC Certified Batteries 13 48, 67 14 49, 68 15 49, 69 9.Tape Library 6.2.11 Tape Drive Number of tape drives - 1 Number of tape drives - 2 16 49, 69 9.Tape Library 6.2.11 Tape Drive Number of tape cartridges -1 Number of tape cartridges - 10 17 51 18 51 19 51 20 51 21 51, 66 22 51, 66 23 24 51, 66 26 ANNEXURE 8 BILL OF MATERIALS Hardware ANNEXURE 8 BILL OF MATERIALS Hardware ANNEXURE 8 BILL OF MATERIALS Hardware ANNEXURE 8 BILL OF MATERIALS Hardware ANNEXURE 8 BILL OF MATERIALS Software 6.2.9 Software ANNEXURE 8 BILL OF MATERIALS Software 6.2.9 Software 4. LTO Tape Drive, Quantity 1 4. LTO Tape Drive, Quantity 2 5. San Switch, Quantity 1 5. San Switch, Quantity 2 9. 15 Kva On-Line Double Conversion UPS System 9. 20 Kva On-Line Double Conversion UPS System 10. SMF Battery for 10 minute hour backup for UPS 10. SMF Battery for 30 minute backup for UPS 1. VMware vSphere 5 Enterprise Plus 1. VMware vSphere 5.5 Enterprise Plus 2. VMware vCenter Site Recovery Manager 5 Standard (25 VM Pack) 2. Vmware Vcenter 5.5 Standard ANNEXURE 8 BILL OF MATERIALS Software 6.2.9 Software 4. Windows Server standard 2012R2SNGL OLP NL 2Proc, Quantity 8 4. Windows Server standard 2012R2SNGL OLP NL 2Proc, Quantity 4 4.3.1 Penalties (c) In case of delay beyond 2 weeks,50% of total value of the contract will be charged as penalty (c) In case of delay beyond 2 weeks, 0.5% of total value of the contract will be charged as penalty The bidder shall plan various activities and submit the execution schedule within one week of award of the work. The execution schedule should clearly indicate all activities and the time required for completion of each activity taking the delivery time as 1 month. Delivery of all items shall be made within 1 months of award of order, failing which penalty clause will be invoked. The bidder shall plan various activities and submit the execution schedule within one week of award of the work. The execution schedule should clearly indicate all activities and the time required for completion of each activity taking the delivery time as 1 month. Delivery of all items shall be made within 2 months of award of order, failing which penalty clause will be invoked. 25 29 4.9 Delivery Schedule & Monitoring 26 51 New Addition in ANNEXURE 8 Software 6. IP based Monitoring Tool for All Components in the RACK - Optional Yours sincerely, Sd/Chief Manager
© Copyright 2024