legacyrevival op Fall 2011

legacy
revival
Fall 2011
Yarn Info
Zealana Kiwi Fingering, 40% NZ
Merino, 30% Organic Cotton,
30% Possum 40gr / 135 yd per
skein 9 (10, 11, 13, 15) skeins
shade 12
Supplies
3 US 6 (4mm) 16” Circular
needles
3 US 6 (4mm) 24” Circular
needles
3 US 5 (3.75mm) 16 “ & 24” circular needles
1 set of US 5 (3.75mm) DPNs
1 US 4 (3.5mm) needle
size G (4mm) crochet hook
stitch holders
stitch markers
scrap yarn
stitch markers
tapestry needle
Gauge
24 stitches & 32 rows = 4” in
stockinette stitch on US 6 needles
To save time and ensure proper
fit, take time to check gauge
Ann Young
Sizes S (M, L, XL, XXL)
When only one number is given,
it applies to all sizes.
Bust: 39 (42, 45, 48, 51)”
Total length: 22 (23, 24, 25, 26)”
New Zealand Lace Edged Top
Finished Size
Copyright © 2011 www.theyarnsisters.com
Right Front
Leave a 1 yard long end to 3-needle shoulder seams together. Pick up 22 (22, 24, 24, 24) stitches along a crochet chain
with size 5 16” circular needle.
NOTE: Always hook wrap to WS on following row & knit or purl with stitch
Rows 1, 3 & 5: (RS) Knit
Row 2: Purl to last 16 sts, W&T
Row 4: Purl to last 8 sts, W&T
Row 6: Purl
Front increase rows:
Row 1: Knit to last stitch, F&B
Row 2: Purl
Repeat last 2 rows 7 (7, 7, 9, 9) times, then row 1 once. 23 (23, 23, 27, 27) rows. 31 (31, 33, 35, 35) sts. Cut yarn.
Left Front
Leave long end same as right front. Pick up 22 (22, 24, 24, 24) stitches along crochet chain with 2nd size 5 16” circular
needle.
Row 1: (RS) Knit
Row 2 & 4: Purl
Row 3: Knit to last 16 sts, W&T
Row 5: Knit to last 8 sts, W&T
Front increase rows:
Row 1: Purl to last st. F&B
Row 2: Knit
Repeat last 2 rows 8 times. 23 (23, 23, 27, 27) rows. 31 (31, 33, 35, 35) sts. DO NOT CUT YARN
With size 5 24” circular needle purl to end, then pick up 18 sts along a crochet chain.
Continue & purl across right front sts. 80 (80, 82, 86, 88) sts
Work 2 (2, 4, 4, 6) rows. 26 (26, 30, 30, 34) rows all together. Cut yarn.
Back
Pick up 80 (80, 84, 88, 88) sts along a crochet chain with size 5 24” circular needle
Row 1: (RS) Knit
Row 2: Purl to last 16 sts. W&T
Row 3: Knit to last 16 sts. W&T
Row 4: Purl to last 8 sts. W&T
Row 5: Knit to last 8 sts. W&T
Row 6: Knit. Row 7: Purl
Continue in stockinette stitch until 26 (26, 30, 30, 34) rows are complete.
DO NOT CUT YARN
Transfer back shoulder sts from crochet chain to 2nd size 5 24’ circular needle
Transfer front shoulder sts from crochet chain to size 5 16” needles
Place back & front RS together & 3-needle across shoulder seams with size 4 needle
Place center 36 (36, 36, 40, 40) stitches on stitch holder. Continue with uncut back yarn.
Preparation Round 1: (RS) Knit across back sts, Pm, pick up 34 (34, 38, 38, 42) sts along edge (sleeve top), Pm, knit
across front sts, Pm, pick up 2nd 34 (34, 38, 38, 42) sts. Remember to hook wrapped sts to WS & knit or purl with stitch.
Preparation Round 2: Knit across back sts, Pm, *K22 (22, 24, 24, 26) W&T, P10, W&T, K16, W&T, P22, W&T, K28 (28, 30,
30, 32), Pm**. Knit across front sts. Repeat from * to **
Preparation Round 3: *K1, M1, knit to 2 sts before next marker, F&B, K1** Repeat from * to ** 3 times to end of round.
Preparation Rnd 4: Knit
Preparation Rnd 5: *K1, M1, knit to 1 st before next marker, M1, K1** Repeat from * to ** 3 times to end of round. 244
(244, 260, 260, 276) stitches
Copyright © 2011 www.theyarnsisters.com
Page 2 of 5
Rnds 1, 2 & 3: Knit
Rnd 4: *K1, M1, K2, M1, knit to 3 sts before next marker. M1, K2, M1, K1, Pm** Repeat from * to ** 3 times to end of
round. 260 (260, 276, 284, 292) sts. Divided stitches: Back & Front: 88 (88, 92, 96, 96) stitches each. 1st & 2nd sleeve
top: 42 (42, 46, 46, 50) stitches each.
Continue to knit 3 rounds & increase 16 sts in the 4th round until you have this number of stitches: Back & Front: 112
(120, 128, 136, 144) stitches each. st & 2nd sleeve top: 66 (74, 82, 90, 98) stitches each
Knit 2 rounds
Dividing front & back from sleeves:
Knit across back sts, cable cast on 5 (6, 7, 8, 9) sts. Thread scrap yarn through 1st sleeve stitches, knit across front sts,
cable cast on 5 (6, 7, 8, 9) sts. Thread 2nd sleeve sts on scrap yarn. Tie ends of scrap yarn together.
Continue to knit on these 234 (252, 270, 288, 306) sts until top measures 18 (19, 20 21, 22) inches down center back.
Lace Edge (4 inches deep)
18 stitch repeat pattern. Change to size 5 24” circular needle
Preparation round: K13, * W&T, (P1, K1)x 4, P1, W&T, K27. Repeat from *
Rnd 1: Sl 1, K2tog, PSSO, K2tog, K1 (YO, K1)x 6, K1, K2tog, Sl 1, K2tog, PSSO
Rnds 2 & 4: Knit
Rnd 3: K1, P1. Repeat to end.
Repeat last 4 rounds 6 times, then round 1 again. 29 rounds all together.
Turn to WS & bind off knitwise.
Sleeves
Transfer sts from scrap yarn to 16” size 6 needle
Pick up 6 (6, 6, 8, 10) sts along cable cast on sts. To get correct number of sleeve stitches the pick up stitches maybe 1
stitch more or less. Knit around to center at underarm. 72 (80, 88, 98, 108) sts. Pm. Knit 7 (5, 5, 3, 3) rounds.
Next round: K2tog, knit to last 2 sts. Ssk.
Continue to decrease 2 sts every 8th (6th, 6th, 4th, 4th) round until 54 (54, 58, 58, 62) sts remain. Knit 12 (10, 2, 16, 8)
rounds. 84 (88, 92, 96, 100) rounds all together.
Sleeve Band
9 stitch repeat pattern on center 54 stitches
Divide stitches between 3 16” size double pointed needles as follows
1st & 3rd needles 18 (18, 20, 20, 22) sts, 2nd needle 18 sts,
Preparation Rnd: K0 (0, 2, 2, 4) sts. *Knit 5, W&T, P1, W&T, K5, Pm. Repeat from * to last 0 (0, 2, 2, 4) sts. K0 (0, 2, 2, 4)
sts.
Rnds 1, 5, 9, 13, 17: YO, K2tog 0 (0, 1, 1, 2) times. *Sl 1, K2tog, PSSO, (YO, K1)x3, YO, Sl 1, K2tog, PSSO. Pm. Repeat
from * to last 0 (0, 2, 2, 4) sts. YO, K2tog 0 (0, 1, 1, 2) times.
Rnds 2, 4, 6, 8, 10, 12, 14, 16: Knit.
Rnds 3, 7, 11, 15: P1, K1. 0 (0, 1, 1, 2) times. *(K1, P1)x4, K1. Pm. Rep from * to last 0 (0, 2, 2, 4) sts, P1, K1 0 (0, 1, 1, 2)
times.
17 rnds all together
Turn to WS & bind off knitwise.
Neckband
9 stitch repeat pattern.
Transfer sts from back of neck from stitch holder to size 5 16” circular needle
Pick up 22 (22, 22, 25, 25) sts down left front side. Transfer center 18 sts from scrap yarn to needle. Pick up 23 (23, 23,
25, 25) sts up right front side. 99 (99. 99, 108, 108) sts.
Preparation Rnd: *K5, W&T, P1, W&T, K5, Pm. Repeat from * to end.
Rnd 1: *Sl 1, K2tog, PSSO, (YO, K1)x3, YO, Sl 1, K2tog, PSSO, Pm. Repeat from *
Copyright © 2011 www.theyarnsisters.com
Page 3 of 5
Rnds 2 & 4: Knit
Rnd 3: * (K1, P1)x4, K1, Pm. Repeat from *
Repeat last 4 rounds once, then 1st round once. 9
rounds all together.
Turn to WS & bind off knitwise.
Finishing
Sew in ends & gently block
Knitting abbreviations used in this pattern
K: Knit.
P: Purl
K2tog: Knit 2 stitches together
F&B: Increase a stitch by knitting or purling into the front and back of the same stitch
Make 1: Pull up horizontal thread below next stitch with right needle & place on left needle and knit. Be
careful not to twist stitch.
Ssk: Slip 2 sts individually knitwise, insert left needle into these 2 sts from left to right and knit them
together.
3-Needle Bind Off: With stitches on 2 needles, place RS together. *K2tog (1 st from each needle); repeat from * once. **Pass first stitch of right hand needle over second stitch (1 stitch bound off), knit next
2 stitches together; repeat from ** until desired stitches have been bound off.
Pm: Place/push marker
Psso: (Pass slip stitch over) Slip one stitch, knit next stitch & pass slipped stitch over knitted stitch.
Rs: Right side
Ws: Wrong side
W&T: (Wrap and Turn): Bring yarn to front (or back if purling) of work between needles, slip next st to
RH needle, take yarn to back (front if purling) of work, replace st to LH needle, turn. On following row,
hook wrap to WS and knit or purl with stitch except on lace edges
Ann Young © 2011 Exclusively for the YarnSisters Inc., www.theyarnsisters.com
www.zealana.co.nz/handknit
1-877 582-2900- All rights reserved – no part of this pattern may be reproduced without prior permission
from the YarnSisters Inc.
Copyright © 2011 www.theyarnsisters.com
Page 4 of 5