STAFF REPORT DATE: May 27, 2015 TO: Planning Commission FROM: Bob Blyth, Accounting and Fiscal Analyst SUBJECT: FY 15/16 CIP Finding of General Plan Consistency Recommendation Staff recommends that the Planning Commission find that the list of new capital improvement projects included in the FY 15/16 budget are consistent with City of Davis’ General Plan. Background State law, as outlined in Government Code 65403, requires that planning agencies review a city’s Capital Improvement Plan (CIP) solely for determination of consistency with the current General Plan. The issue is simply: do the CIP projects have some basis in the General Plan and are they consistent with the policies outlined therein. The City of Davis generally brings this forward in conjunction with the adoption of the City’s annual budget by the City Council. Under the Government Code, the Council considers the Planning Commission finding and makes final determination of consistency when they adopt the budget. On June 25, 2014, the Planning Commission reviewed the 2014-15 Capital Improvement Plan (CIP) for consistency with the General Plan and any applicable specific plans. The Commission passed a motion finding that the list of CIP projects in the 2014-15 budget are consistent with the City’s General Plan, provided that the reference to the Transportation Element, including 12 transportation projects listed, are removed. Commissioner comments included: The Transportation Element is missing consideration of predictable increase in vehicular traffic from projects already approved; Reducing the size of vehicular travel lanes (such as in the Fifth Street improvements project) would create congestion on major corridors throughout the City; and the Commission needs to see data regarding impacts. At the meeting, staff was not prepared to fully review the provisions in the State Government Code related to the Planning Commission’s CIP findings. The purpose of the CIP review is to find consistency with the General Plan or any applicable specific plans. The purpose is not to review the merits of the General Plan, the adequacy of environmental documents, or data supporting the plan or environmental documents. The FY 15/16 CIP contains 35 projects in five categories: Facilities, Parks, Wastewater, Transportation, and Water. Of the projects, 29 were previously approved and are carry-overs from last year. Six of the projects are new and require a determination of General Plan consistency. The total budget equals $165,448,474 of which approximately 83.2% comes from three major items: the Wastewater Treatment Plant Facilities Improvement project, the Davis Woodland Water Supply project and the Local Surface Water Pipelines project. 05-27-15 Planning Commission Meeting 05A - 1 Staff notes the relevant General Plan goals and the policies for the 6 new projects in the descriptions below. 1. Facilities There is one new Facilities project in FY2015/16, City Hall Emergency Generators. There are two generators at City Hall, one that serves Information Services (IS) and a second that serves the rest of City Hall. The IS generator needs replacing and perhaps upsizing. There is an option to combine the two generators into one and this project is a study of available options to see if it is better in the long term to replace both or combine into a single unit. Relocation of one or both will also be investigated to ensure that they are properly configured for maximum efficiency. The emergency backup generators help to facilitate General Plan goal HAZ 3 to provide for the safety and protection of citizens from natural and environmental hazards as it would provide a stable power supply for an emergency care and shelter facility at City Hall 2. Sewer (Wastewater) There is one new Wastewater project, Sewage Lift Stations Rehabilitation. Sewage lift stations are positioned around the City and help to safely move wastewater away from the City and to the wastewater treatment plant. The City hired an outside firm, Hydroscience, to prepare a City-wide assessment of all the sanitary and storm lift stations and generated a report of their condition and recommendations for future projects. There are three sewer lift stations that are in need for rehabilitation in FY2015/16: lift stations #4, #1 and #3. The three lift stations were constructed in the mid-sixties to mid-seventies and are beyond their useful lives. A failure at one or more of these stations could result in sewage backup and spillage which could affect ground water. This project will prevent this type of leakage and therefore satisfies policy Water 2.2 to manage groundwater resources to preserve quantity and quality. 3. Transportation There are two new transportation projects included in the FY 2015/16 budget, Covell/L Street Intersection Improvements and Fifth Street Reconstruction around Maintenance Holes. Covell/L Street Intersection Improvements will improve the intersection per the East Covell Corridor Plan (ECCP) and direction given by the City Council in October of 2014 to proceed with implementation of this intersection design as a component of the ECCP. This action is also consistent with the entitlements approved in November 2013 for the Cannery project. Improvements include a new geometry and striping to conform to a bicycle friendly “Dutch junction”, new signalization and ADA ramps. This is in line with MOB 1.6 by redesigning the existing intersection to maximize pedestrian and bike convenience and safety relative to automobile needs. The Fifth Street Reconstruction around Maintenance Holes is currently a study only for FY 2015/16. The street, curb, gutter, and sidewalk near and around several maintenance holes along Fifth Street, from Pena to Alhambra have sunken while the maintenance holes have not. This results in a very uneven condition for all modes of transportation, especially vehicles. This project would repair the sections around the maintenance holes, bringing the finish elevations up 05-27-15 Planning Commission Meeting 05A - 2 to conform to the maintenance holes. The actual repair treatment won't be known until the study is complete. Currently this roadway is very uneven and once the study is completed the repair work will help to provide and maintain a roadway network that meets the needs of vehicular traffic in Davis (Policy MOB 1.1 to provide such a network). 4. Water There are two new Water projects in the upcoming budget, Well 11 Conversion to Irrigation Well and Water Well Standby Generator. The Well 11 Conversion to Irrigation Well project will convert the existing drinking water well in the SE corner of Community Park to an irrigation well. Work will include replacing the pump with a smaller one, replumbing the above ground piping, removing the chlorine facility, and reprograming the SCADA system. This project will provide a well separate from the current City potable water system and provide an independent source of water for irrigation. It will eliminate any need to draw water from the City’s new surface water infrastructure which will help to ensure sufficient supply of high quality water to the Davis Planning Area (Water Goal 2) and will assist in managing the groundwater resources of the City (Water 2.2). The Water Well Standby Generator project is a study only in FY 2015/16. The standby generator is used in an emergency situation when electricity is lost at a well. The generator allows for continuing operation of important functions. This project will help to provide for the safety and protection of citizens from natural hazards (HAZ 3) by improving options for the continuing availability of potable water in an emergency. The option of a fixed generator or one that is mobile and can be moved to different water wells will be determined during the study phase. Attachments x FY 15/16 CIP Project sheets o 8277 – City Hall Emergency Generators o 8275 – Sewage Lift Station Rehabilitation o 8270 – Covell/L Street Intersection Improvements o 8272 – Fifth Street Reconstruction around Maintenance Holes o 8273 – Well 11 Conversion to Irrigation Well o 8278 – Water Well Standby Power Generator 05-27-15 Planning Commission Meeting 05A - 3 8277 – City Hall Emergency Generators City of Davis Capital Improvement Project Planning Sheet Project Name: City Hall Emergency Generators Project Proponent: Project Number: Facilities 8277 Project Category: CIP Admin. Facilities Parks/OS Project Manager: Last Revision Date: XXX Transportation Fleet/Equip I/S Terry Jue Jan-15 Stormwater Wastewater Water Description: The two generators at City Hall serve IS and the rest of City Hall. The IS one needs replacing and perhaps upsizing. There is another option to combine the two into one. Relocation of one or both will also be investigated. The first step is for a Consultant to review all the options in a feasibility study. After the City decides which option to choose, a design can take place taking into consideration the historic nature of the bulidling. Location: 23 Russell Boulevard 05-27-15 Planning Commission Meeting 05A - 4 8275 – Sewage Lift Stations Rehabilitation City of Davis Capital Improvement Project Planning Sheet Project Name: Sewage Lift Stations Rehabilitation Project Proponent: Project Number: Wastewater 8275 Project Category: CIP Admin. Facilities Parks/OS Project Manager: Last Revision Date: Transportation Fleet/Equip I/S Terry Jue Jan-15 Stormwater Wastewater Water XXX Description: Hydroscience prepared a City-wide assessment of all the sanitary and storm lift stations and generated a report of their condition and recommendations for future projects. There are three sewer lift stations that are in need for rehabilitation, listed in the order of priority: lift stations #4, #1 and #3. Sewer Lift Station #4 was constructed in the mid-seventies and has outlasted it's life cycle. Most components need replacing. Additionally, it is located in the median at Fifth Street, between L Street and Pole Line. The report recommends installing a new lift station entirely within the Corporate Yard at 1717 Fifth Street. Sewer Lift Station #1 was also constructed in the mid-seventies and the site is very small. The report recommends a study to locate a replacement site and construct a new lift station. Sewer Lift Station #3 was constructed in the mid-sixties. The report recommends replacing the lift station in the current location. The three lift stations will be studied and designed concurrently and the construction will be spaced out over three years. Location: 05-27-15 Planning Commission Meeting 05A - 5 8272 – Fifth Street Reconstruction around Maintenance Holes City of Davis Capital Improvement Project Planning Sheet Project Name: Covell / L Street Intersection Improvements Project Proponent: Project Number: Transportation 8270 Project Category: CIP Admin. Facilities Parks/OS Project Manager: Last Revision Date: Transportation Fleet/Equip I/S Jennifer Border Jan-15 XXX Stormwater Wastewater Water Description Improve the intersection of Covell and L Street per the East Covell Corridor Plan (ECCP). Improvements include a new geometry and striping to confirm to a Dutch junction, new signalization and ADA ramps. The Cannery Developer is responsible for the cost of the new signals. Location: Covell Boulevard and L Street intersection 05-27-15 Planning Commission Meeting 05A - 6 8272 – Fifth Street Reconstruction around Maintenance Holes City of Davis Capital Improvement Project Planning Sheet Project Name: Fifth Street Reconstruction around Maintenance Holes Project Proponent: Project Number: Transportation 8272 Project Category: CIP Admin. Facilities Parks/OS Project Manager: Last Revision Date: Transportation Fleet/Equip I/S Jennifer Border Jan-15 XXX Stormwater Wastewater Water Description The street, curb, gutter, and sidewalk near and around several maintenance holes along Fifth Street, from Pena to Alhambra have sunken while the maintenance holes have not. This results in a very uneven condition for all modes of transportation, especially vehicles. This CIP would repair the sections around the maintenance holes, bringing the finish elevations up to conform with the maintenance holes. The actual repair treatment won't be known until the study is complete. Location: Fifth Street, from Pena to Alhambra 05-27-15 Planning Commission Meeting 05A - 7 8273 – Well 11 Conversion to Irrigation Well City of Davis Capital Improvement Project Planning Sheet Project Name: Well 11 Conversion to Irrigation Well Project Proponent: Project Number: Water 8273 Project Category: CIP Admin. Facilities Parks/OS Project Manager: Last Revision Date: Transportation Fleet/Equip I/S Terry Jue Jan-15 Stormwater Wastewater Water XXX Description: Well 11, located in the SE corner of Community Park, will be converted to become an irrigation well for Community Park. Work will include replacing the pump with a smaller one, replumbing the above ground piping, removing the chlorine facility, reprograming the SCADA system and MCP. Location: SE corner of Community Park 05-27-15 Planning Commission Meeting 05A - 8 8278 – Water Well Standby Power Generator City of Davis Capital Improvement Project Planning Sheet Project Name: Water Well Standby Power Generator Project Proponent: Project Number: Water Div. 8278 Project Category: CIP Admin. Facilities Parks/OS Project Manager: Last Revision Date: Transportation Fleet/Equip I/S Terry Jue Feb-15 Stormwater Wastewater Water XXX Description The scope of this project is to design and install a standby power generator. The option for a fixed generator or one that is mobile and can be moved to different water wells will be determined during the study phase. Location: If the study points to a fixed generator, the location will be determined then. If the study points to a mobile generator, it can be moved to different wells. 05-27-15 Planning Commission Meeting 05A - 9
© Copyright 2024