Agenda Number: PC15-01 PC MEETING: May 7, 2015 REPORT TO THE PLANNING COMMISSION SUBJECT: Glenn Farms Subdivision, Lots 2 and 3 Request approval of a Preliminary Site Plan for two multi-tenant flex buildings totaling 99,528 combined square feet on 10.28 combined acres located on East Shelby drive just west of the proposed extension of Progress Road. 1. 2. 3. 4. EXHIBITS: Applicant’s cover letter (3/10/15) Preliminary Site Plan (received 3/11/15) Site Rendering (received 3/11/15) Building Elevations (typical of both buildings) (received 3/11/15) Viper LED Light Fixture Detail (received 3/11/15) April 7, 2015 Draft PC Minutes April 9, 2015 Draft DRC Minutes 5. INTRODUCTION: Brenda Solomito-Basar, 6. representing property owner Glenn Farms Corporate 7. Park Number One GP (Curtis Wegener), is requesting a recommendation from the Planning Commission (PC) for approval of a Preliminary Site Plan to create two multi-tenant flex buildings by a separate pending subdivision (PC14-30). The Board of Mayor and Aldermen (BMA) will consider any recommendations tentatively on May 26, 2015. The subject property is zoned RI: Restricted Industrial, with property to the north also zoned RI. To the south of the subject property is vacant land zoned MPO: Medical-Professional-Office and vacant property to the west is zoned FAR: Forest-Agricultural-Residential. The subject property is in close proximity to the right-of-way of I-269 (under construction) and the shared corporate limits of Piperton (in Fayette County) and Collierville (Shelby County). BACKGROUND AND KEY QUESTIONS: The PC may find the following questions helpful in determining whether the application for a Preliminary Site Plan complies with the Zoning Ordinance: 1. What has changed since the Planning Commission last considered this application? On April 7, 2015, the Planning Commission unanimously voted to defer this application to its next meeting as there were concerns (see Exhibit 6) about the use of septic systems on an interim basis for the 7-lot pending subdivision (PC14-30). Based on the High Intensity Soil maps dated January 13, 2015 and April 1, 2015, Greg Parker, with the Water Quality Branch & Septic Tank Program of the Shelby County Health Department, has stated that all seven lots in the subdivision are suitable for the installation of a subsurface sewage disposal system on them for commercial use . Furthermore, the applicant, Town Staff, and Planning Commission Chairman Greg Cotton worked to refine language (see PC14-30) for plat notes, deeds for the lots, and the restrictive covenants for the neighborhood, to restrict uses that would generate industrial waste or discharge industrial waste byproduct into the interim septic systems. Using the language developed since the April 2015 PC meeting, and using the Town’s established Business License, Certificate of Occupancy, and discharge permit processes through the Public Services Department, sufficient oversight exists to determine the type of discharge/waste byproduct appropriate for the interim septic systems and to prevent 5/1/2015 10:44:20 AM Page 1 of 6 inappropriate uses that may be allowed in the RI Zoning until the sewer trunk lines are installed in the area. Since the landscaping, lighting, and architectural design were not impacted by the use of septic systems, the Design Review Commission (DRC) considered the Preliminary Site Plan on April 9, 2015, and unanimously recommended approval, with conditions (see Exhibit 7). The DRC considered the issues of tree mitigation, lighting, and exterior building materials at the meeting, and the Final Site Plan will need to comply with the conditions of approval (Exhibit 7) if the BMA accepts the DRC’s recommendation. 2. What is the relationship of this Preliminary Site Plan (Lot 2 and 3) to the Glen Farms Preliminary Subdivision Plat (a PC concern)? The pending subdivision (PC14-30) will create seven “pad-ready” industrial lots along Shelby Drive and extend Progress Road southward. This subdivision will create Lot #s 2 and 3, and provide infrastructure to serve these lots. Building permits for the proposed buildings cannot be issued until the Final Subdivision Plat is approved by the Planning Commission and recorded. Before that can happen, the applicant must enter into a Development Agreement with the BMA for the installation of the subdivision infrastructure (water lines, septic tanks and dry sewer lines, road access, ingress/egress easements, etc) and the work be substantially completed. DISCUSSION: Both lots “stand alone” for meeting the requirements in the RI: Restricted Industrial Zoning District. The bulk requirements and site data are summarized in a summary table (right). This industrial subdivision is zoned to allow warehousing, research and development, and light manufacturing uses, which may not be appropriate in other parts of Town. Glenn Farms will create a campus-like setting, with industrial traffic diverted away from residential, office and commercial areas and collector streets. Over time, this industrial area will be heavily screened from the adjoining land uses/zoning districts that are not industrial and the portions of an industrial building that are visible from public roads should be designed to meet commercial standards to the maximum extent practicable. With these first two buildings, the applicant intends to establish a “high tech” design theme for the industrial park where the low wall at the intersection of Progress Road and Shelby Drive, roof forms, building heights, materials, site layouts, green-tinted windows, and canopies all relate closely to one another, creating a unified “campus” appearance. Existing Conditions and Preliminary Site Layout (Exhibits 2 and 3): The Existing Conditions plan shows both lots with the existing contours, existing trees, and the public rights-ofway. The site rendering (Exhibit 3) also provides insight in the existing site conditions as well as the proposed layout. Lot #s 1 and 2 will each include one multiple tenant industrial building. The primary entrances of the buildings face away from each other, which creates a 125-foot wide truck loading dock area in the back that is well-screened due to the building configuration, landscaping, and low walls. 5/1/2015 10:44:20 AM Page 2 of 6 Site Data Summary and Bulk Requirements Applicable Lots 2 and 3 of the Glenn Farms Subdivision Total Combined – 10.28 Total Site Lot #2 – 5.02 Area (acres) Lot #3 – 5.26 Zoning/Permitted RI: Restricted Industrial [3] Uses Total Combined – 95,000 Building Square Lot #2 – 46,000 Footage: Lot #3 – 49,000 1 space per 1,000 square Parking feet minimum Required/Provided: Lot #2 – 46/72 Lot #3 – 49/74 Maximum – 50% [2] Lot Lot #2 – 22.6% Coverage: Lot #3 – 21.6% Minimum – 20% Pervious Lot #2 – 45.1% Area: Lot #3 – 49.9% Minimum None in RI Lot Size Front- 40 feet Minimum Building Side- 25 feet Setbacks Rear- 200 feet [1] Minimum n/a Lot Width [1] Larger setback is due to TDEC protected stream [2] It is estimated that, at build-out, the entire Glenn Farms industrial subdivision will contain 330,000 square feet of “business park” uses. [3] Plat notes, deeds for the lots, and restrictive covenants for the neighborhood will be used to restrict uses that would generate industrial waste or discharge industrial waste byproduct to septic systems. Also, the discharge permit process through the Public Services Department will determine the type of discharge/waste byproduct appropriate for the interim septic systems and prevent inappropriate uses that may be allowed in the RI until the sewer trunk lines are installed in the area. Parking for the site is distributed around the fronts of each building, with no more than one bay (a 62-foot “blade” of parking) between the building and Progress Road, which complies with the Design Guidelines for this area. No parking will be created between the buildings and Shelby Drive. The extension of Progress Road will be constructed as part of a Preliminary Ssubdivision Plat (PC14-30) that is under review. Those improvements will include curb, gutter, and sidewalk per the Subdivision Regulations. The internal drive aisles and circulation within the site meet the requirements of the Zoning Ordinance and the Fire Marshal. Pedestrian Access (Exhibit 3): The Design Guidelines (Chapter III.C.1.) emphasizes the importance of the pedestrian network in Collierville, declaring that the pedestrian network should be as complete as the vehicular street network. There are new sidewalks proposed along Lot #s 2 and 3 and throughout the site for access to the parking and buildings, with two direct connections to the public sidewalk system (one on Shelby Drive and one on Progress Road). Preliminary Grading Plan (Exhibit 2): The grading for this industrial subdivision will create seven “pad-ready” lots ready for building construction. According to the Subdivision Infrastructure Construction Plans submitted with the Preliminary Subdivision Plat, a 0.82 acre regional detention facility will be provided within an easement on Lot #1 and will be constructed to accommodate runoff from Lot #s 1, 2 and 3. Another regional detention facility will likely be needed to the east of the Progress Road extension, but the exact location will not be known until site plans are submitted. Fine grading will occur incrementally with the development of site plans for each lot. A Drainage Report, including calculations showing the capacity of the downstream system to be built on Lot #1 will be reviewed by the Town Engineer with the Final Site Plan application. A portion of the site and rooftop drainage will be collected into bio-retention swales along the Progress Road frontage. “Bioswales” are landscape elements designed to remove silt and pollution from surface runoff water. The water's flow path, along with the wide and shallow ditch, is designed to maximize the time water spends in the swale, which aids the trapping of pollutants and silt. It is common to see bioswales around parking lots, where substantial automotive pollution is collected by the paving and then flushed by rain. The bioswale, or other type of biofilter, wraps around the parking lot and treats the runoff before releasing it to the watershed or storm sewer system. Preliminary Utility Plan (Exhibit 2): Electricity and water are available to the site, but sewer is not available yet in the area. The applicant has received approval from the Shelby County Health Department to use septic tanks for Lot #s 2 and 3 until sewer lines are extended to the area, but such approval for all seven lots are needed before the Board of Mayor and Aldermen (BMA) should enter into a development agreement with the subdivision infrastructure. The applicant plans to install “dry” gravity sewer lines in new 20-foot public sewer easements along the creek. Once sanitary sewer service is extended to the area, the property owners will be required to abandon use of the septic systems and tie to the Town’s public system. Special notes will be placed on the plats and in the property owners association (POA) documents related to this requirement. Preliminary Landscape & Lighting Plan (Exhibit 2): There is a 40-foot buffer provided along both Progress Road and Shelby Drive. Additional pervious area is located to the south due to a protected stream, area reserved for the planting of mitigation trees, and a septic system for use until sanitary sewer is provided to the area. There are street trees along both street frontages, foundation plantings around the building, and a low wall at the intersection of Progress Road and Shelby Drive (as required by the Design Guidelines for major intersections), and the parking lots are screened with evergreen shrubs. A 4.5-foot grass strip will be created between the new 5-foot public sidewalk to be installed by this application. Lighting is provided within the site with wall-mounted fixtures and pole lights, but details were not provided on the combination lighting and landscape plan as required for a Preliminary Site Plan (see Condition E). The applicant has indicated that they plan to use “Viper” style LED lights made by Beacon for both the wall- and 5/1/2015 10:44:20 AM Page 3 of 6 pole-mounted fixtures (see Exhibit 5). These fixtures, or their equivalent, along with pole details, will need to be reflected on the Final Site Plan. The ground sign locations have not been shown. Any light fixtures for the ground sign must be labeled, fully shielded, and the fixtures screened with evergreen shrubs. Tree Preservation & Mitigation Ratio (see Exhibit 2): All existing trees that will remain on Lot #s 2 and 3 after the Final Subdivision Plat is recorded will be preserved; however, several existing trees will be removed because of grading and infrastructure installation associated with the seven-lot Glenn Farms Industrial Subdivision. According to the subdivision plans, 512 existing trees will be preserved; however, 226 existing trees will be removed to install the subdivision infrastructure and to make the lots “pad ready”, which does not include 78 trees being removed to extend Progress Road. The applicant has asked the Planning Commission with the Preliminary Subdivision Plat application to approve what equates for a formula of 1.23 new trees installed per 1 tree removed, which is almost “tree-per-tree” replacement, with native species mitigation trees installed along the existing protected stream and in the Shelby Drive median. Additional mitigation trees will not have to be planted with the site plans for Lot #s 2 and 3. Preliminary Elevations (Exhibit 2): The primary fronts of the buildings face east (towards Progress Road) and west (towards a private drive between Lot #s 1 and 2). These facades have been designed with a “storefront” appearance broken into multiple bays with anodized aluminum storefront windows and green metal canopies. Banding, columns, texture and articulation (4-inch wide reveals) of the façade and roof have been incorporated into the tilt-up concrete panels, which are the primary building material used on the building. Tilt-up panel construction is used to reference a nontraditional cement building processes and is a material this is most appropriate for industrial areas or in commercial areas when a masonry veneer is to be applied. For the proposed tilt-up concrete building, the walls are created by assembling forms (which is how the textured panels and 4-inch deep reveals will be created) and pouring large slabs of concrete called panels directly at the job site. The panels, which will be very wide and tall, are then tilted up into position around the building's slab. Tilt-up panel construction (not used on the proposed building), is similar to precast concrete, which is appropriate as primary façade material in commercial areas usually for trim, accent, or wall panels. The precast concrete building process is similar to tilt-up construction, but pre cast concrete panels are instead produced indoors in forms at a manufacturing facility and are trucked to the job site. Precast concrete panels are usually smaller and more manageable and a more versatile material for architects. Three different colors of gray are used on the front and side facades visible off the lot, but the unadorned rear façade is a “remote wall” and is appropriate for less ornamentation. The differing materials, colors, and textures for these large buildings add visual interest and reduce their scale. More information is needed about the colors and materials proposed with the Final Site Plan (see Conditions C and D in Exhibit 7). Signage is not included in this approval. A sign permit application shall be submitted to the Planning Division prior to the erection of any signage. Traffic/Circulation: This subdivision is being planned for access control with curb cuts allowed at median breaks on Shelby Drive. The private service drives to be built with each building will also help limit curb cuts due to the shared ingress/egress easements. A portion of this site plan shows a drive being built in the ingress/egress easement on Lot #1. It is estimated that, at build-out, the entire Glenn Farms industrial subdivision will contain 330,000 square feet of “business park” uses. A Level II traffic impact study was required for this industrial subdivision, which looked at vehicular trip generation and included an evaluation of the nearest intersections. The study concluded 5/1/2015 10:44:20 AM Page 4 of 6 the development (at build-out) will generate 453 vehicular trips during the morning and 201 trips during the evening peak hour, which will have a minimal impact on the roadway network developing in the I-269 area. All intersections will continue to operate at a level of service (LOS) “C”, with the Town needing to make adjustments to the timing of the Shelby Drive and US Highway 72 intersection at some point. Progress Road will be extended to the southernmost terminus of the property with the subdivision infrastructure and have a similar cross section to the existing Progress Road segment to the north (four lane section with a center turn lane). Shelby Drive is already improved per the Major Road Plan. NEXT STEPS: x Board of Mayor and Aldermen (BMA) Approval of Preliminary Site Plan: The Design Review Commission (DRC) made its formal recommendation for conditional approval on April 7, 2015. Once the PC Planning Commission (PC) has made a recommendation, the BMA will consider the Preliminary Site Plan (tentatively scheduled for May 26, 2015). x Preliminary Subdivision Plat and Subdivision Infrastructure Construction Plans: The Preliminary Subdivision Plat will be reviewed by the PC on May 7, 2015. If approved by the Planning Commission, then the applicant must enter into a Development Agreement for the Subdivision Infrastructure Construction Plans with the BMA. x Final Subdivision Plat: The Final Subdivision Plat must also be approved by the PC at a future meeting. The Final Subdivision Plat must be recorded prior to the issuance of building permits for the buildings on Lot #2 and/or #3. x Final Site Plan Application(s): Assuming the BMA approves the Preliminary Site Plan, an application for approval of a Final Site Plan shall be submitted for review by the Departmental Review Team (DRT) followed by a Development Agreement to the BMA. The Final Subdivision Plat must be recorded prior to the issuance of building permits for the building on either lot. x Building Permit Review: Prior to the issuance of a building permit for either building, construction plans must be submitted to the Codes Department for review. PC EXAMPLE MOTION: Recommend approval of a Preliminary Site Plan (see Exhibit 2) to the Board of Mayor and Aldermen (BMA) for Glenn Farms Subdivision, Lots 2 and 3, which would allow two multi-tenant flex buildings totaling 95,000 combined square feet on 10.28 combined acres located on East Shelby Drive just west of the proposed extension of Progress Road, subject to the following conditions: 1. This development is subject to all applicable standard conditions of approval as adopted by the Board of Mayor and Aldermen, Resolution 2006-54. 2. Provide top and toe elevations along the wall on the Final Site Plan for the wall and fence along behind the northernmost parts of the building. 3. With the grid photometric plan on included with the Final Site Plan, ensure that the westernmost access drive is properly illuminated. The maximum light levels at the property line will not apply where there is an ingress/egress easement. 4. Provide a Traffic Control Plan with the Final Site Plan application. 5. Engineering comments applicable to the Preliminary Site Layout: a. Note #4 – correct the spelling of “meander”. a. Please label the 50’ drainage esmt. b. Ing./Egr. Esmt. – Please make sure that the plat esmt. matches exactly what you are proposing on these plans. c. Remove the water. d. Northern D/W on Progress – Labeled as 24’/44’ curb cut but it is dimensioned as 30’. e. Rear setback is shown as 100’. It is shown as 200’ on the plat. f. Site Data Table Lot 2 – The acreage listed does not match what is shown on the lot. g. Site Data Table Lot 3 – The acreage listed does not match what is shown on the lot. 5/1/2015 10:44:20 AM Page 5 of 6 2. h. Site Data Table – Double check the number of provided parking spaces you have listed and revise the data chart accordingly. Related to parking, address the following: i. Southwest of the #2 building – The number of spaces is labeled 8. There are only 7 spaces. And the spaces across the drive are labeled with 7 & 8. ii. Northeast of the #3 building – The number of spaces is labeled 9. There are 10 spaces. iii. Southeast of the #3 building – The number of spaces is labeled 12. There are 13 spaces. Engineering comments applicable to the Grading & Drainage Plan: a. Add a note that all drainage is Private. b. At the time of the Final Site Plan application, a detailed drainage report will be required. c. Provide a separate exhibit to show buffer calculations with the Final Site Plan application. d. Coordinate with the Town Engineer to determine if it is possible for DP-20 to empty into the wing-wall of the box culvert. e. The outlet pipes and headwalls DS-1 and DS-19 will need to be extended to discharge near the bottom of the stream and oriented to be more in line with the flow of the stream – These were extended some but they need to extend into the stream to discharge near the bottom elevation. f. At time of the Final Site Plan application, the size of the domestic water meters will need to be shown Utility Plan. CONTACTS: Contact: Organization: Address: Phone: Fax: Email: Owner Applicant (Owner’s Representative) Curtis Wegener Brenda Solomito Basar Glenn Farms Corporate Park No. 1 GP 4278 Spotswood Avenue, Suite 207 Memphis, Tennessee 38117 901-683-6837 [email protected] 5/1/2015 10:44:20 AM Solomito Land Planning 2067 Kirby Parkway Memphis, TN 38119 901-755-7495 [email protected] Page 6 of 6 Design Professional Project Planners Rusty Norville, P.E. Jaime Groce, AICP (Primary) Sean Isham, AICP Civil Engineering Solutions, LLC Town of Collierville 317 W. Market Street Dyersburg, TN 38024 500 Poplar View Parkway Collierville, TN 38017 731-285-1698 731-285-2096 [email protected] 457-2360 457-2354 [email protected] &YIJCJU &YIJCJU AG FL= 371.17 CLP S37°42'25"E 33.69' S37°42'25"E 5.00' GV S89°43'57"W CLP Reference is hereby made to a Application for Greenbelt Assessment-Agricultural recorded in Instrument No. 05009751 and in Instrument No. 05009752 for conditions, restrictions, etc. that affect this property. Reference is hereby made to a 8' Wide Memphis Light, Gas and Water Division Electrical Easement recorded in Book 3946, Page 27 that affect this property. Reference is hereby made to Instrument No. 05094988 for conditions, restrictions etc. that affect this property. 26. 27. 28. L A N D S U R V E Y I N G, By: ______________________________ Daryl Menard, RLS Date President Tennessee Certificate No. 2135 M I L E S T O N E I N C. CLP 8.07' 30' X 30'WIDE DRAINAGE ESMT. PER PLANS N00°10'17"W 7.24' 377 C2 C 3 PP D AG S89°43'57"W 68.00' D N83°04'04"W 3 37 325. 85' E S89°43'57"W 2" PVC FL=375.68 374 37 CLP 7 163.78' 375 37 5 37 N88°50'27"W 9 30' WIDE DRAINAGE ESMT. PER PLANS FL=373.64 FL=375.18 C8 6-72 INLET TOP=381.45 27" RCP IN (N) FL=375.95 27" RCP OUT (S) FL=375.85 WHITTEN BEND INVESTORS, LP C0259S A00006, C0259S A0000 7, C0259S A0000 8 , C0259S A0000 9, C0259S A000 10, C0259S A000 11 INST. NO. 05094988 ZONED: MPO 46.05 Acres Remaining 37 5 6-72 INLET TOP=381.35 27" RCP IN (N) FL=375.38 27" RCP OUT (S) FL=375.28 GV PLAT SHOWING LOCATIONS AND ELEVATIONS ON PART OF THE 157 .67 ' S81°25'27" C7 7.93' S00°10'17"E 7.44' CLP FL=375.29 ± DMH TOP=383.63 48" RCP IN (NW) FL=377.22 30" RCP IN (W) FL=377.22 42" RCP OUT (S) FL=377.20 6-72 INLET TOP=383.25 18" RCP OUT (SW) FL=379.45 TOP OF DMH ELEV.=382.94 (NAVD 88) T.B.M. D 12054701 12054702 12054703 12054704 14037255 15008323 DATE: DECEMBER 9, 2013 COLLIERVILLE, TENNESSEE INSTRUMENT NO. 05094988 RECORDED IN WHITTEN BEND INVESTORS, L.P. PROPERTY NO. NO. NO. NO. NO. NO. RECORDED IN INSTRUMENT INSTRUMENT INSTRUMENT INSTRUMENT INSTRUMENT INSTRUMENT N83°06'54"W CMP E EB GV FH INST. NO. OHE PP LP N S WV W R.O.W. EOP AG H/W P.B. PG. BK. CLP LEGEND: 374 6 823.47' 37 37 9 8 38 4 7 0 37 39 381 444. 47' CORRUGATED METAL PIPE EAST ELECTRICAL BOX GAS VALVE FIRE HYDRANT INSTRUMENT NUMBER OVERHEAD ELECTRICAL POWER POLE LIGHT POLE NORTH SOUTH WATER VALVE WEST RIGHT-OF-WAY EDGE OF PAVEMENT ANCHOR GUY HEADWALL PLAT BOOK PAGE BOOK CONCRETE LIGHT POLE 38 6-72 INLET TOP=382.15 48" RCP IN (NE) FL=374.95± 48" RCP OUT (SW) FL=374.85 ± (HOLDING WATER) 38 3 FL=375.29 6-72 INLET TOP=382.40 48" RCP IN (NE) FL=375.50± 48" RCP OUT (SW) FL=375.50 ± (HOLDING WATER) 3 REVISION 387 S67 02"E 385 239 .9 0 ' N89°52'41"E 8.22' N00°04'10"W 12.00' LOTS 2 & 3 APPROVAL DATE °04' 376 37 8 39 1 S89°55'50"W 83.42' GLENN FARMS SUBDIVISION DESCRIPTION OF CHANGE 3 C9 6-72 INLET TOP=386.37 (UNABLE TO ACCESS "BARRIERS") 40 3 D BOX CULVERT 1 NORTH OF 1 0 55.16' 55.16' 50.70' 55.16' SCALE: 1"=100' 50' 170.00' 170.00' 55.00' 170.00' SURVEY: MILESTONE LAND SURVEYING DESIGN BY: CES-RBN DRAWN BY: CES-RBN 03/09/15 03/09/15 03/28/14 100' 54.91' 54.91' 48.93' 54.91' 54.91' 48.93' CHORD 44.83' 54.91' 49.01' 54.91' 54.91' 48.85' 54.91' 192.29' 203.13' SHEET 1 OF PROJECT #: 1504 BOOK: SCALE: 1 " = 1 0 0 ' TENNESSEE REVIEWED DATE: DATE: DATE: COLLIERVILLE, EXISTING CONDITIONS/SURVEY 27.82' 27.82' 27.31' 27.82' CURVE TABLE RADIUS LENGTH TANGENT 25.00' 55.61' 50.63' 170.00' 55.16' 27.82' 55.00' 50.80' 27.37' 170.00' 55.16' 27.82' 170.00' 55.16' 27.82' 55.00' 50.61' 27.26' 170.00' 55.16' 27.82' 1541.38' 192.42' 96.33' 1674.54' 203.25' 101.75' 55.16' 27.82' 170.00' 50.70' 27.31' 55.00' 100' CURVE C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 N.T.S. VICINITY MAP Site DIVISION OF ENGINEERING DMH TOP=387.11 18" RCP IN (N) FL=381.97 18" RCP IN (S) FL=382.12 18" RCP IN (E) FL=381.67 30" RCP OUT (S) FL=380.67 6-72 INLET TOP=386.32 (UNABLE TO ACCESS "BARRIERS") BRIDGE DEVELOPER: GLENN FARMS CORPORATE PARK NO. 1 GP ENGINEER: CIVIL ENGINEERING SOLUTIONS, LLC ITEM No. 38 39 6-72 INLET TOP=383.96 (UNABLE TO ACCESS "BARRIERS") D DMH TOP=384.97 18" RCP IN (N) FL=379.53 18" RCP IN (S) FL=379.73 30" RCP IN (E) FL=378.68 46" RCP OUT (S) FL=378.25 6-72 INLET TOP=383.92 (UNABLE TO ACCESS "BARRIERS") PHASE 1 PROGRESS BUSINESS PARK (P.B. 216, PG. 1) T.B.M. - Temporary Benchmark - Top of DMH as located on Shelby Drive as shown hereon. Elevation = 382.94 (NAVD 88) 48" RCP IN (NW) FL=375.51 ± 36" RCP IN (E) FL=375.83± 48" RCP OUT (S) FL=375.83± (HOLDING WATER) GLENN FARMS CORPORATE PARK #1, GP PROPERTY 373 36.85 Acres INST. NO. 12054701, INST. NO. 12054702, INST. NO. 12054703, INST. NO. 12054704, INST. NO. 14037255, INST. NO. 15008323 GLENN FARMS CORPORATE PARK #1, GP 378 8' WIDE MEMPHIS LIGHT, GAS AND WATER DIVISION ELECTRICAL EASEMENT (BOOK 3946, PAGE 27) CERTIFICATION: T. I hereby certify that the elevations shown hereon were taken on the ground on December 9, 2013. T 25. Reference is hereby made to a Phase 1 of Progress Business Park recorded in Plat Book 216, Page 1 for conditions that affect this property. N 24. Reference is hereby made to a American Louisiana Pipe Line Company, Right-Of-Way Easement recorded in Book 140, Page 580 that appears to affect this property. Said easement is global in nature and, as such, could not be plotted hereon. 23. Reference is hereby made to a Truckline Gas Company, Right-Of-Way Agreement recorded in Book 124, Page 151 that appears to affect this property. Said easement is global in nature and, as such, could not be plotted hereon. 404.73' 370 373 37 5 387 D D R I V E GV 2 22. Reference is hereby made to a American Louisiana Pipe Line Company, Right-Of-Way Agreement recorded in Book 3625, Page 134 that appears to affect this property. Said easement is global in nature and, as such, could not be plotted hereon. 1113.75' 6 Milestone Land Surveying, Inc. 10360 Highway 70, Suite 1 Lakeland, TN 38002 Phone: (901) 867-8671 Fax: (901) 867-9889 D 21. Reference is hereby made to a Michigan Wisconsin Pipe Line Company, Right-Of-Way Agreement recorded in Instrument No. H8-2798 that appears to affect this property. Said easement is global in nature and, as such, could not be plotted hereon. A 20. Reference is hereby made to a 3' Wide Memphis Light, Gas and Water Division Electrical Easement recorded in Instrument No. 06146268 that may affect this property. We were unable to plot said easement do to insufficient information contained therein. E A 19. The approximate location of the gaslines shown hereon were plotted using some gas line markers located in the field and scaled from a survey done by James O. Wiles Surveying Co. (Fayette County Surveyor) dated January 12, 1999. For the exact location of said gaslines or gas line easements the proper authorities should be contacted. PP S89°43'57"W CLP 38 S H E L B Y GV DMH TOP=383.45 18" RCP IN (NE) FL=378.45 30" RCP IN (NW) FL=377.88 42" RCP IN (N) FL=377.86 48" RCP OUT (S) FL=377.31 6 18. The Fayette County and Shelby County line shown hereon was plotted from a survey done by James O. Wiles Surveying Co. (Fayette County Surveyor) dated January 12, 1999. Milestone Land Surveying, Inc. did not survey said county line. L A O 17. Reference is hereby made to a Michigan Wisconsin Pipe Line Company, Right-Of-Way Agreement recorded in Book 184, Page 535 that appears to affect this property. Said Agreement is global in nature and, as such could not be plotted. P S E 16. Reference is hereby made to a Trunk Line Gas Supply Company, Right-Of-Way Agreement recorded in Book 99, Page 421 that appears to affect this property. Said Agreement is global in nature and, as such could not be plotted. 2 R 15. Reference is hereby made to a American Louisiana Pipe Line Company, Right-Of-Way Agreement recorded in Book 112, Page 335 that appears to affect this property. Said Agreement is global in nature and, as such could not be plotted. PP FL=364.14 37 FL=376.11 ± (BURIED) 5 38 E. DMH TOP=386.37 30" RCP IN (NW) FL=384.87 30" RCP OUT (E) FL=384.17 6-72 INLET TOP=382.89 30" RCP OUT (SE) FL=378.52 374 14. Distances shown on this plat are in feet and can be converted to meters by multiplying by 0.3048. CLP 30' WIDE DRAINAGE ESMT. (P.B. 216, PG. 1) '3 28 4' 8° .9 S3 171 M S09 °08 '46" 128 .87 ' 13. Plat is valid only if print has original seal of surveyor. 96" RCP 0 37 2 12. If this survey plat is also provided in electronic form, the electronic copy must be compared to the original hard copy issued at the survey date with its original seal to insure the accuracy of the information and to further insure that no changes, alterations or modifications have been made. No reliance should be made on a document transmitted by computer or other electronic means unless first compared to the original sealed document issued at the time of the survey. PP 38 6-72 INLET TOP=362.86 42" RCP IN (N) FL=356.75 42" RCP OUT (S) FL=356.75 37 1 11. Governmental jurisdictional areas, if any, which might impact on the use of the premises were not located. No liability is assumed by the undersigned for any loss resulting from the exercise of any governmental jurisdiction affecting the use of the premises. CLP FL=364.07 9 6-72 INLET TOP=362.85 42" RCP IN (N) FL=356.55 42" RCP OUT (S) FL=356.55 E 1" 10. Subsurface and environmental conditions were not examined or considered as a part of this survey. 9. There may be underground or non-visible utilities, drain and/ or sewer lines across this property that are not shown. The proper utility authorities should be contacted for more specific locations and information on underground utilities. 8. There may be non-visible underground utilities crossing or serving this property of which we have no knowledge. 37 6-72 INLET TOP=375.41 18"X30" RCP IN (NW) FL=371.55 18"X30" RCP OUT (S) FL=371.55 "E '29 32 0 ' 7 .6 20 7. Underground pipes were assumed to be straight from structure to structure. 6. This property does not appear to be located in a Special Flood Harzard Area per Flood Insurance Rate Map, Map No. 47047C 0395 C, Community Panel No. 470401 0395 C, Effective Date: November 5, 2008. 5. This property does not appear to be located in a Special Flood Harzard Area per Flood Insurance Rate Map, Map No. 47157C 0495 F, Community Panel No. 470263 0495 E, Effective Date: September 28, 2007. 4. All deed book references shown hereon are recorded in the Register's Office of Fayette County and Shelby County, Tennessee. PP DMH TOP=374.95 18" RCP IN (N) FL=371.62 18"X30" RCP OUT (SE) FL=371.52 3. This plat was prepared without benefit of an abstract of title. No liability is assumed by the undersigned for loss relating to any matter that might be discovered by an abstract or title search of the property. 2. Bearings are relative to NAD 83. 1. Plat prepared for Grace Development. NOTES: 30' WIDE DRAINAGE ESMT. (P.B. 216, PG. 1) S50°30'58"W 20.01' PP D C1 2 38 PHASE 1 PROGRESS BUSINESS PARK (P.B. 216, PG. 1) 6 C 6-72 INLET TOP=375.33 15" RCP IN (N) FL=372.24 18" RCP OUT (S) FL=371.99 C5 FAYETTE COUNTY, TENNESSEE SHELBY COUNTY, TENNESSEE 374 The contours lines shown hereon were plotted for convenience only. Milestone Land Surveying, Inc. did not do a complete Topographic Survey of the subject property. 59'50" E 119. 75' SMH TOP=386.82 IN (N) OUT (S) FL=377.42 N16° ? 320.37' SHELBY CO. TN FAYETTE CO. TN 269 INTERSTATE S 269 PROGR ESS ROAD 37 4 "E 8° 6 3-SURVEY-EXISTING.DWG S3 40 N03°11'57"E '29 N03°11'57"E 32 0' 227.75' 8° (Unde r Const ruction ) S3 7 .2 Inters tate 40 9 STATE OF TENNESSEE INST. NO. 12020884 INST. NO. 12001018 40 COLLIERVILLE, SHELBY COUNTY PIPERTON, FAYETTE COUNTY C4 37 0 STATE OF TENNESSEE INST. NO. 12020884 INST. NO. 12001018 38 41 8 4 3 1 Scale: 1/16" = 1'-0" Building "2" West Elevation Scale: 1/16" = 1'-0" Building "2" East Elevation Scale: 1/16" = 1'-0" Building "2" South Elevation 2 5 Scale: 1/4" = 1'-0" Building "2" Partial Elevation Scale: 1/16" = 1'-0" Building "2" North Elevation Keynotes: 1 1 NORTH t 60' 120' SCALE: 1"=120' 0 a R Site Rendering.dwg M l P . s ea nt LOT 1 Storm Water Detention PREPARED BY: CIVIL ENGINEERING SOLUTIONS, LLC 317 WEST MARKET DYERSBURG, TN 38024 (P) 731.285.1698 OWNER/DEVELOPER: GLENN FARMS CORPORATE PARK GP 4728 SPOTSWOOD, SUITE 207 MEMPHIS, TN 38117 (P) 901-683-6837 COLLIERVILLE, TENNESSEE GLENN FARMS SUBDIVISION Site Rendering d a o ONLY ONLY LOT 2 218,814 S.F. 5.02 ACRES 46,000 S.F. BUILDING 67 SPACES F.F.E. = 381.00 Shelby Drive &YIJCJU LOT 3 228,990 S.F. 5.26 ACRES 49,000 S.F. BUILDING 74 SPACES F.F.E. = 381.00 Progress Road ONLY 4 3 1 Scale: 1/16" = 1'-0" Building "2" West Elevation Scale: 1/16" = 1'-0" Building "2" East Elevation Scale: 1/16" = 1'-0" Building "2" South Elevation 2 5 Scale: 1/4" = 1'-0" Building "2" Partial Elevation Scale: 1/16" = 1'-0" Building "2" North Elevation 1 1 &YIJCJU Keynotes: Exhibit 6 Draft 4/7/15 PC Minutes PC14-30 – Glenn Farms Subdivision – Request approval of a Preliminary Subdivision Plat for 7 industrial lots on 36.85 acres located south of East Shelby Drive and bisected by the proposed extension of Progress Road. Mr. Jaime Groce gave the staff presentation. He explained that he would be combing the presentation of this item and the next item, PC15-01, but each will need a separate motion. Progress Road will be extended through this property and will eventually go on even further. The long range vison for this area anticipates light industrial uses, office and warehouse type uses so the current zoning is already consistent with the 2040 Plan. He described the site data information. There is a creek that bisects this property and runs east and west and is a very significant feature of this piece of property. TDEC requires a buffer along the creek’s bed. He showed the proposed entry monument plans and explained that Lot 7 will actually front on Shelby Drive and I269 under construction. He explained that the PC may find the following questions helpful in determining if the applications meet the intent of the Subdivision Regulations and Zoning Ordinance. 1. How will sanitary sewer be provided? While the Town has plans for sanitary sewer lines in the area, the nearest sewer lines in this basin going to Collierville’s Northwest Wastewater Treatment Plant are around 3,900 feet away. The applicant has received approval from the Shelby County Health EXHIBITS: Department to use septic tanks for two of the 1. Applicant’s cover letter (3/10/15) industrial lots until sewer lines are extended to 2. Preliminary Subdivision Plat (3/9/15) the area, but it is still not clear that they have 3. Existing Conditions (3/9/15) approval for septic systems on all seven lots. This 4. Tree Mitigation Plan (3/9/15) is a significant issue and the PC should be 5. Shelby Drive Curb Cut Plan (3/9/15) concerned that the applicant does not have an 6. Excerpts from Traffic Impact Study December approved plan for accommodating the sanitary 2014) sewer needs for this industrial subdivision. The 7. Adjacent Property Owner’s Letter (3/6/15) applicant plans to install “dry” gravity sewer 8. Email from Shelby County Health Department lines in new 20-foot public sewer easements (3/3/15) along the creek. Once sanitary sewer service is 9. Town’s Local Trail Detail, 2000. extended to the area, the property owners will be 10. Letter regarding Sewer Capacity to Piperton, required to abandon use of the septic systems and 2008. tie to the Town’s public system. Special notes 11. Email from Rusty Norville, (4/2/15) will be placed on the plats and in the property owners association documents related to this requirement. There is a certificate on the plat that must be signed by the Shelby County Health Department before the Final Plat can be recorded, which will prevent lots being created that will not have a clear plan to handle sanitary sewer waste. The Town is not responsible for extending sewer transmission lines to this subdivision to create developable lots. 2. What are the implications to the transportation network in the I-269/SR385 area due to this industrial Subdivision? This subdivision is near the confluence of US Highway 72, I-269, and SR 385. This subdivision will allow for Progress Road, which is shown as a Major Collector on the Major Road Plan, to be extended 640 linear feet to the south of Shelby Drive. The applicant also owns the property to the south, which will allow for the eventual extension of Progress Road to US Highway 72. The applicant prepared a traffic study that looked at the build-out of all seven lots, and found that the existing/planned infrastructure in the area should be adequate to accommodate the eventual 330,000 gross square feet of “business park” uses. Shelby Drive is already in an improved condition, and the applicant plans to install median breaks for controlled access with the construction of the buildings. PC 4-7-15 1 3. Is it appropriate to vacate Mount Pleasant Road? The property is bound to the west by Mt. Pleasant Road, which is a local road currently in a rural condition. The applicant has asked that the Planning Commission approval a rural cross section for this frontage, as they intended to acquire the property to the west and apply to the Town for closure and vacation of the right-of-way for Mt. Pleasant Road. As Mt. Pleasant Road is still a public local street, the Preliminary Subdivision Plat should be revised to show rightof-way dedication, with front yard setbacks shown measured from the right-of-way-line. The applicant’s request has merit, as Mt. Pleasant Road is not foreseen to be a major part of the transportation network in the area long-term and making and maintaining improvements to a roadway that would ultimately be abandoned is not a prudent use of funds. 4. How will existing trees removed be mitigated? There will be minimal tree removal to install the subdivision infrastructure, which includes a “dry” sewer line and the extension of Progress Road including a box culvert to cross the creek. Internal service drives to serve Lot #s 2 and 3, as well as the other lots, will be constructed with the site plan for those lots, and not as part of the subdivision infrastructure. The site contains a stream protected by TDEC via a 30-foot stream buffer on each side of the bank. As part of its review of a subdivision, the Planning Commission typically sets a mitigation ratio for proposed trees to be removed. The applicant has asked the PC to approve a “custom approach” for their on-site planting of migration trees so they can plant native trees that can reforest the area to the south of the protected stream. The applicant plans to plant more replacement trees than normally required, 1.23 new trees for every tree removed, but would like the caliper size at installation to be smaller than normal because of the desire for the area to become “naturalized”. If approved, 49% of the 183 mitigation trees will be 1-inch caliper trees, with the remote trees in marshy areas along the stream to be irrigated in dry times by watering truck or other broadcast system. The applicant also plans to install 2-inch mitigation trees in the existing medians along Shelby Drive, which is not irrigated. With this approach, additional trees will not have to be planted with the site plans for each lot. For the developments that they would like to do to Lots 2 and 3, combined they have about 10 acres and there will be about 95,000 square feet of industrial buildings. One building is larger than the other but are mirror buildings and they meet all of our landscaping requirements and they exceed the 30% rule for open space due to the large creek that runs across the property. They meets all of the parking and setback requirements. 5. What is the relationship of this Preliminary Site Plan, Lot 2 and 3, to the Glen Farms Preliminary Subdivision Plat (a PC concern)? The pending subdivision PC14-30 will create seven “pad-ready” industrial lots along Shelby Drive and extend Progress Road southward. This subdivision will create Lot #s 2 and 3, and provide infrastructure to serve these lots. Building permits for the proposed buildings cannot be issued until the Final Subdivision Plat is approved by the Planning Commission and recorded. Before that can happen, the applicant must enter into a Development Agreement with the BMA for the installation of the subdivision infrastructure, water lines, septic tanks and dry sewer lines, road access, ingress/egress easements, etc., and the work be substantially completed. This subdivision is zoned to allow warehousing, research and development, and light manufacturing uses, which may not be appropriate in other parts of Town. Glenn Farms will create a campus-like setting, with industrial traffic diverted away from residential, office and commercial areas and collector streets. Over time, this industrial area will be heavily screened from the adjoining land uses/zoning districts that are not industrial and the portions of an industrial building that are visible from public roads should be designed to meet commercial standards to the maximum extent practicable. With these first two buildings, the applicant intends to establish a “high tech” design theme for the industrial park where the low wall at the intersection of Progress Road and Shelby Drive, roof forms, building heights, materials, site layouts, green-tinted windows, and canopies all relate closely to one another, creating a unified “campus” appearance. PC 4-7-15 2 They have provided specs for the lights and wall packs and they are shown to be full cutoff and further details will be provided for the DRC to review. 6. Is the use of tilt-up concrete panels appropriate in this context (a DRC concern)? This is an industrial area of Town, but we still hold them to the standards to commercial standards and the Design Guidelines do equivocate and acknowledge that in an industrial area there needs to be some flexibility given. A building across the street does use tilt-up concrete and they have added a lot of deep scores to these concrete panels and used three different colors on the building, along with glass and canopies to try to dress up the façade to make it look more like a high tech office park. The DRC is set to review this issues on April 9, 2015. He reviewed the next steps for the applicant and explained that if the subdivision plat is approved tonight, they can go forward to the BMA for their development agreement for the subdivision infrastructure. It’s important that staff obtain information from Shelby County to prove that the septic systems will work for all 7 lots. If you send it forward, the BMA would also take up the Preliminary Site Plan and later this month the DRC will look at it as well. Eventually you will see the Final Subdivision Plat to create the lots after they install infrastructure. Staff reviews the Final Site Plans and eventually the BMA will enter into a development agreement for those buildings and they could pull their building permits. Two separate motions are needed to approve each action. Chairman Cotton asked if there were any questions of staff. Commissioner Priester asked if there were any other commercial developments in Collierville using a septic system. Mr. Groce stated that he was not aware of any. Mr. Perryman, sitting in the audience, shook his head no, that he was not aware of any as well. Commissioner Priester asked if we know how long it will be before a real gravity sewer system will be installed there. Mr. Clay Holobird, representative with the Public Utilities Department for the Town, addressed the commissioners. He explained that he didn’t know how long it will be, but they are not aware of any other commercial buildings using a septic system. However, as part of their plat notes and deed restrictions, only domestic type uses and no industrial type wastes will be allowed. This will be audited by the Town’s pretreatment coordinator and periodic inspections will be made to make sure there is no industrial waste going down into the septic system. There was a brief discussion about the example conditions of approval that cover the restrictions and allowance by Shelby County and that this will only be a temporary situation. There are uses allowed by zoning that cannot go into these buildings and a note stating this will be listed on the plat. Commissioner Priester stated that if there is truly a storefont type business with warehouse in the back, then it may use, but what happens if the first or second tenant moves out and the next tenant comes in and they are not in compliance with the use of the septic system. He just feels that this is not going to work. Alderman Worley agreed and asked about the Shelby County letter of approval and the stipulation that the Town will not be responsible for running the sewer system as we don’t know when it’s going to be built in that area. It may be a long time before this development can come off the septic system and the cost of completing the sewer PC 4-7-15 3 system is usually done by the developer and the cost could be astronomical. He is not opposed to the project, but he cannot go forward until more information is provided. He wants the project to move forward, but cannot support it with so many open options at this time, especially since we don’t have anything from Shelby County yet that says they are going to okay all seven lots on septic system, and there is nothing else like this in Collierville. Commissioner Tebbe asked what the cost would be to run the sewer line now. Mr. Holobird stated that this area drains to a different basin than to the north of Shelby Drive, but a ball park amount would be about $300,000.00 or so. A discussion ensued regarding scenarios of different tenants and the sewer capacity restrictions and the conditions of approval that would be in place, along with equity concerns. The hope is that the future development on the other lots will help to pay for the future sewer system. Hearing none, he called the applicant to the podium. Mrs. Brenda Solomito-Basar, design professional for the applicant, addressed the commissioners. She explained that the entire development team is present tonight for questions as well. The property is at the end of the Collierville property lines and the applicant is going out on a limb to provide the septic system and develop the lots at this time as the traffic will be here for this area, but the sewer will not be there yet. These are 49,000 square foot buildings so they are not high level industrial uses. The uses will be the office/distribution showroom type businesses. This will not be high intensity uses where the sewer use will need to be monitored. They don’t want their clients to miss out on this opportunity just because the sewer is not installed yet. They feel they will get final approval from Shelby County on all 7 lots, but because they are only filing for the 2 lots at this time, that is all that they asked for. These first two lots will supply the economic demand for the sewer being completed in the future. The traffic study was completed and showed this will operate at a LOS B. They will be covering the expenses of extending the rest of the road as planned and will be done as the property is expanded. Mr. Rusty Norville, civil engineer for the project, addressed the commissioners. He stated that the sewer concerns were theirs as well and they hired Dr. John Smith as their sewer consultant as he is an expert in septic systems. After meeting with staff they saw the limitations with the sewer and felt like they had some solutions that might not be accepted. They have good documentation on developments in Memphis where this type of septic system works and there is no reason why it won’t work in Collierville. The study is very thorough and available for public review. Soil samples have been done and the septic systems have been review and approved by Shelby County. The two septic systems are only on lots 2 and 3 at this time because they don’t know the design on the other lots yet. They can’t design a full blown septic plan until they know for sure what the sizes of the other buildings will be, but they can get approval from Shelby County on the soil acceptability and they are looking to get that this week. As in the conditions, the buck stops with Shelby County and the health department. They can’t get a building permit until they sign off on the paperwork of the septic system design for each lot. He has met with TDEC on two occasions and they are in agreement with them to bore under the creek for the least impact to the site. They have gone as far as they can go at this time and they feel they have a legal opportunity to do that at this time. All the soil testing has been done on all the lots and they all have been preliminarily approved. A discussion ensued regarding where they will tie into the gravity sewer system when the time arrives and where it will be located. PC 4-7-15 4 A discussion ensued regarding whether or not the applicant should ask for a deferral until further information is obtained from Shelby County regarding the approval of the septic system for all seven lots. Mr. Sean Aldridge, partner in the development and ownership group, addressed the commissioners. He explained that we are looking at their flex product and will match Collierville’s 2040 Plan, known as an employment center. This will be a tech center with an office/warehouse/showroom center and not industrial use. They have well over 130 tenants in similar buildings all over the region. They bought this land in 2003 prior to the I-269 identification process. They used actual averages of 1,000 gallons per day from their other sites they have to estimate discharge. I-269 is the driver of traffic to the property, but the two buildings alone will not be. However, once they are established, they will draw the income needed to further the actual sewer costs of the system. They have exhausted all other options in trying to come up with the solution. Alderman Worley stated that he wants the project, but he is uncomfortable with the septic system at this point. Based on the lack of some information tonight, he would like to see them defer this item until they can get more information to staff, such as the letter from Shelby County which confirms that all 7 lots can operate under the septic system. Based on what he sees tonight, he would have to vote no. A discussion ensued on whether or not the applicant has to ask for a deferral or the commission can make a motion to defer the project. Mrs. Solomito-Basar addressed the commissioners. She stated that if they make a motion to defer, she would like specific direction about what they feel they need to see happen so they know which direction to take. Alderman Worley asked staff if they can defer the Preliminary Subdivision Plat tonight to allow time for staff to get more information on the septic system, but move forward with the DRC on Thursday evening on the Preliminary Site Plan approval. Mr. Groce stated that this was possible. A discussion ensued regarding putting a restriction in the conditions of approval on what types of tenants can go into these buildings and a time limit that the septic system can be used on the property. The Ordinances and conditions would be in place to oversee this until they can access a gravity sewer system. A discussion ensued about whether or not the applicant could go ahead and build the needed off-site sewer line now and have other property owners later pay the fees to help to defray the initial cost of the sewer lines. Mr. Groce explained that they could technically do that per adopted Town policy but easement agreements would have to be obtained from properties not under their control, and then because a property owner doesn’t want to grant those expenses it’s not a guaranteed situation. Hearing no further discussion, Chairman Cotton asked for a motion to approve. Motion by Vice-Chairman Rozanski, and seconded, to recommend approval of Approve the Preliminary Subdivision Plat (Exhibit 2) for Glenn Farms Subdivision, which would create 7 industrial lots on 36.85 acres located south of East Shelby Drive and bisected by the proposed extension of Progress Road, subject to the following conditions of approval: 1. 2. This development is subject to all applicable standard conditions of approval as adopted by the Board of Mayor and Aldermen, Resolution 2006-54. Use the standard Town of Collierville site data chart on the Preliminary Subdivision Plat. PC 4-7-15 5 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Regarding sanitary sewer service for the subdivision: a. The applicant must provide documentation (see Exhibits 8 and 11) to the Town Engineer demonstrating that all seven lots will perk for septic systems in the zoned shown on the Preliminary Plat (Exhibit 2) and documentation from the Shelby County Health Department that it is appropriate to use septic tanks for all seven lots. The Board of Mayor and Aldermen (BMA) shall not enter into a development agreement for the subdivision infrastructure until this documentation is provided. b. Sanitary sewer service shall not be extended under I-269 to serve areas outside of the Town of Collierville (see Exhibit 10). c. The Shelby County Health Department shall sign the certificate declaring all lots are appropriate for septic systems before the Final Plat can be recorded. If this condition cannot be met, the Town of Collierville is not responsible for extending sewer transmission lines to this subdivision to create developable lots. Regarding Mt. Pleasant Road: a. The Preliminary Subdivision Plat shall be revised to show right-of-way dedication for Mt. Pleasant Road, as it is a public local street, with the front yard setbacks shown measured from the new rightof-way-line. Adjust the lot acreages accordingly. b. As requested by the applicant, a rural road cross section is approved for use for Mt. Pleasant Road. It may remain in its existing rural condition. If the right-of-way for Mt. Pleasant Road is not vacated by the Board of Mayor and Aldermen (BMA) by the time Lot #1 is developed, the owner of Lot #1 shall improve the frontage to an urban standard or pay fees in lieu of road improvements to the Town, as determined by the BMA. c. Access to Mount Pleasant Road, which is a rural and unimproved condition, will not be allowed. Provide a note on the plat stating this. Regarding the Progress Road extension: a. Note #9 shall be reworded to explain that the extension of Progress Road is to be done by the developer of Glenn Farms Subdivision to the southernmost limits of the property. Delete the second sentence of note #9. b. Note #10 shall be reworded to explain that the extension of Progress Road is “southward of the southernmost limits of the property”. Regarding the mitigation of existing trees proposed for removal outside of the Progress Road extension: a. The tree ratio shall be 1.23 trees planted for every two trees removed in excess of eight (8) inches at 4.5 feet above ground level, provided that any tree less than 2 inches in caliper be a native species (e.g. willow oak, nuttall oak, black gum, and sycamore) and that such trees be placed to the south of the protected stream and irrigated during dry times by watering truck or other broadcast system; and b. If mitigation trees are to be planted in the existing medians along Shelby Drive, the trees shall be a minimum of 2-inches in caliper. Such trees shall be planted in the month of November. The applicant must provide security to ensure that the trees leaf out for two springs after planning. Add notes explaining who the easements are in favor of and what they are for – A note was added but a better explanation is needed. The two required permanent concrete corner monuments were shown; however, they are shown in the centerline of Mt. Pleasant Road. Confirm that these can be set per the Town’s standard detail in the road. If not, revise their locations accordingly. Provide an 11x17 drawing showing the area (in square feet) of all public easements and right-of-way to be dedicated with the Final Plat. Provide a 10’x80’ Temporary Easement, to be coordinated with the Town Engineer, along with any required text. The Detention Area needs to be dimensioned and tied down. The ingress/egress easements for the private drives as described in Note # 13 on the Preliminary Plat shall be graphically depicted on the plat. Notes #9 and 10 are the same. Remove any duplicate notes. The “20’x60’ Public Drainage Easement” needs to be tied down. PC 4-7-15 6 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Remove the 30’x30’ drainage easement that is in the right-of-way. An easement needs to be shown for the future water main. If the main is going to be completely within the ingress/egress easement, add “utility easement” to the label and explain it in the notes as well. Remove 30’ from the buffer label since the width varies. Provide separate exhibit to show buffer calculations. Also, add a note on the Preliminary Subdivision Plat explaining the stream buffer requirements that no land disturbance shall take place within the buffer limits without Town approval. Notes #8 and #13 both discuss the drives. Remove duplicate and/or redundant language. Delete in Note #8 the language about “final plats for each lot,” as there is to be only one Final Plat for this subdivision. The centerline of the new Progress Road needs to be dimensioned. The asphalt trail that is labeled to be in the Greenbelt Easement shall be revised to concrete. The minimum FFEs are set so much lower than the FFE shown on pending site plans and below the pads. Raise the FFE to match the pending site plans. Note #13 states “Full D/W Access” on lots 6 & 7 at their property line; however, the Shelby Drive Proposed Curb Cuts Plan shows right-in/right-out only. Resolve this conflicting language. Note #13 – There is no mention of the ingress/egress easement that is shown on lot # 6. Correct this. Also, this easement needs to be on the property line like the other ones. On Sheet 2, the L60 label is obscured by a note. Correct this. On Sheet 2, the Drainage Easement and Buffer are not tied down. There are no dimensions between the lines where they meet the boundary/right-of-way. Either revise this or tie down the north and south line of the easement/buffer. All of these shall have the proper dimensions/ties so that anybody can reproduce them. On Sheet 2, there is a dimension missing on the sewer easement in the area of lot #2. Provide this. Add the Town’s standard certificate for “Certification of Declaration of Covenants and Restrictions and Maintenance of Common Areas and Facilities” pursuant to the standard certificate in the Subdivision Regulations. The certificate that was added uses the term “Homeowners,” which needs to be replaced with the term “Property Owners”. Hearing no further discussion, Chairman Cotton asked Mrs. Michael to call the roll. Roll call: Bradford – yes, Rozanski – yes, Priester – no, Tebbe – no, Murdock – no, Hansen – yes, Worley – no, Cotton – yes. Motion tied and did not pass. Mr. Groce explained that lack of a majority vote means the PC took no action and a Preliminary Plat does not go forward to the BMA as the PC has the final decision on this. A vote to defer could allow the applicant time to get the missing information and be heard again at the May 7, 2015 Planning Commission meeting. Commissioner Priester stated that he has concerns about the use of septic systems and that the types of tenants that would use the septic system. Alderman Worley made a motion to have this item deferred until the May 7, 2015 Planning Commission meeting, and it was seconded. Roll call: Bradford – yes, Rozanski – yes, Priester – yes, Tebbe – yes, Murdock – yes, Hansen – yes, Worley – yes, Cotton – yes. Motion Approved. PC 4-7-15 7 PC15-01 Glenn Farms Subdivision, Lots 2 and 3 – Request approval of a Preliminary Site Plan for two multi-tenant flex buildings totaling 99,528 combined square fee on 10.28 combined acres located on East Shelby Drive just west of the proposed extension of Progress Road. Chairman Cotton asked if there were any further questions. EXHIBITS: 1. Applicant’s cover letter (3/10/15) 2. Preliminary Site Plan (received 3/11/15) Hearing no further discussion, Chairman Cotton 3. Site Rendering (received 3/11/15) asked for a motion. 4. Building Elevations (typical of both buildings) (received 3/11/15) Motion by Alderman Worley, and seconded, to 5. Viper LED Light Fixture Detail (received defer the Preliminary Site Plan (see Exhibit 2) for 3/11/15) Glenn Farms Subdivision, Lots 2 and 3, which would allow two multi-tenant flex buildings totaling 95,000 combined square feet on 10.28 combined acres located on East Shelby Drive just west of the proposed extension of Progress Road, to the May 7, 2015 Planning Commission meeting. Hearing no further discussion, Chairman Cotton asked Mrs. Michael to call the roll. Roll call: Bradford – yes, Rozanski – yes, Priester – yes, Tebbe – yes, Murdock – yes, Hansen – yes, Worley – yes, Cotton – yes. Motion Approved. PC 4-7-15 8 Exhibit 7 4/9/15 DRC Draft Minutes DRC15-01 Glenn Farms Subdivision, Lots 2 and 3 – Request approval of a Preliminary Site Plan for Two multi-tenant flex buildings totaling 99,528 combined square feet on 10.28 combined acres located on East Shelby Drive just west of the proposed extension of Progress Road. Mr. Jaime Groce gave the staff presentation. EXHIBITS: He explained the site data summary of the 1. Applicant’s cover letter (3/10/15) property. Each lot is a little over 5 acres and 2. Preliminary Site Plan (received 3/11/15) the applicant plans on building industry flex/ 3. Site Rendering (received 3/11/15) office space on each lot. These buildings could 4. Building Elevations (typical of both buildings) be used for warehouses, offices, or evening (received 3/11/15) light manufacturing. Parking is not as 5. Viper LED Light Fixture Detail (received 3/11/15) restrictive for these uses as for retail or office uses. The minimum pervious area is only 20% in industrial districts than with the rest of the Town which is 30%. The applicant is providing a substantial amount of pervious area largely contributed by a creek that runs through the property. There is more possible build-out to come; these are just the first of what could be 330,000 square feet of office flex space in the subdivision. Glenn Farms is a 7-lot industrial subdivision that was considered by the Planning Commission (PC) this past Tuesday (4/7/15,) which they deferred the action for this item until their May 7, 2015 meeting. The PC had questions about how sewer systems would be provided to the lots. This Plat still needs to be approved in order to add infrastructures to the “pad ready” lots and the Final Plat needs to be recorded before these lots can be recorded and building permits pulled. The role of the DRC this evening is to give a recommendation to the BMA for of the Preliminary Site Plan and decide if it meets the Design Guidelines. There is entry signage that was designed to enhance the gateway entrance at a major intersection of Progress Road and Shelby Drive. This site is located across the street from Exact Commerce which was built in 2009 under the new Design Guidelines which have been revised since. Exact Commerce used tiltup concrete construction which is what the applicant would like to use. The applicant also plans on having a similar parking layout as Exact Commerce, and parking in the front yard as required by the Guidelines. The applicant has provided the 40-foot buffers along Shelby Drive and Progress Road which will contain street trees as required. There will be sidewalks located along the public streets as well as internal ones that connect to those systems. There will be a bio-swale that will help clean the water before it enters into the storm water system. There is tree mitigation south of the creek to act as a buffer. There will be an off-site detention on Lot 1 that will handle Lots 1-3. The loading docks are located between the two buildings and will be screened on the northside causing minimal or no viewing of the loading dock zone. There are 512 existing trees that will be preserved. The 226 existing trees are going to be removed with 78 trees being removed for Progress Road. The trees being removed for the widening of Progress Road will not be mitigated, but as for the rest, the applicant is requesting to install 1.23 new trees per 1 removed. The applicant is required to have light pole details as part of the application. We still need more details on the light fixtures that have been submitted and we try to uphold the same standards in industrial areas as we do in commercial areas. The applicant would like to use three different colors on the buildings, lots of glass on the storefront, to try and bring a high-tech look. To achieve this look they will use canopies to capture the storefront area, use of individual doors and change in roof lines. The applicant would like to use three different shades of gray with the tilt-up concrete construction and a deep reveal and deep score joint with the forming of onsite panels which will set it apart from the Exact DRC 4-9-15 1 Commerce building. Chairman Doss asked if there were any questions of staff. Alderman Allen asked if the PC voted this site plan down at the last Planning Commission meeting. Mr. Groce stated they did not turn it down. It was a split vote on approval of the subdivision and the way the PC bylaws read, is that a split vote means there was no affirmative motion. Then a commissioner made the motion to defer this item and the plat to May, and those motions passed. Alderman Allen asked if the applicant had Shelby County’s permission to use the septic tanks for all lots in the subdivision. Mr. Groce stated they have not received it yet but are hopping to have it in hand by the time Glenn Farms goes back to the May7, 2015, Planning Commission meeting. There was discussion over whether or not it is the responsibility of the Town to approve the subdivision if the County granted permission as there are no clear plans for getting sewer to the area. There was a discussion over the lack of lighting information in the preliminary site plan. Commissioner Compeau asked if this area was part of the 2040 Land Use Plan or the I-269 Plan. Mr. Groce stated it is in the I-269 Plan Small Area Plan from 2009 predating the 2040 Land Use Plan. Both the Site Plan and the current zoning are consistent with the vision for the area as an employment center. There was a brief discussion regarding the use of tilt-up concrete panels and if it is appropriate in this context. Hearing no further discussion, Chairman Doss called the applicant to the podium. Mrs. Benda Solomito-Basar, Solomito Land Planning, 2067 Kirby Parkway, Memphis, representative for the applicant, addressed the commissioners. She stated they are zoned for Restricted Industrial and intend to have it be a very clean and light industrial area. She stated they are approved by the Shelby County Health Department for septic on Lots 2 and 3. She explained that the building will have a hightech service type of tenants, and they do not feel that they will be high-end sewer users. Alderman Allen inquired Mrs. Solomito-Basar about her awareness of the inevitable sewer lines they will have to install. Mrs. Solomito-Basar stated yes, they will be including a dry sewer in the development later and have been working closely with Bill Kilp and the Town’s Engineers. The Preliminary Subdivision Plan they submitted to the Town were looked at by the PC in April and had illustrated the developer installing the dry sewer at his own cost. There was a discussion over the pros and cons of septic systems the current proposed site versus moving the site project across the street. Chairman Doss asked if there were any questions for the applicant. DRC 4-9-15 2 Vice-Chairman McCarty asked if there was anything else that could be added to the north façade to have it match the other sides in looking like a storefront. Mr. Scott Woodard, Woodard Architecture, 1014 Courtfield Cove, stated they can consider doing something more with the elevation of the north façade. The only problem is the roof slopes down to the back which limits the use of glass and other storefront contributors. They are willing to look at adding some more 3D features to help make that walls stand out more. Chairman Doss asked if there was any discussion regarding all tilt-up concrete panels. Commissioner Compeau stated these will be the first two built in this area and will therefore set the tone. There was discussion over the brick used at the FedEx building in the area. Chairman Doss asked if there was any discussion regarding the light poles and fixtures and if they comply and meet the Town standards before permits are issued. Mr. Groce stated there are conditions of approval that will guarantee the light poles and fixtures will comply with the Town standards. Mrs. Solomito-Basar stated that they are in agreement with the conditions of approval contained in the staff report and the light poles will comply with the Town’s Standards. Commissioner Compeau asked about the corner treatments. Chairman Doss stated the corner treatments will be on both sides evidentially. One side now and the other one will be completed when lot 4 is developed. A discussion ensued regarding the appropriateness of tilt-up concrete panels at this location given the RI zoning and its use on Exact Commerce across the street. Hearing none, Chairman Doss asked for a motion. Motion by Alderman Allen, and seconded, to recommend approval of a Preliminary Site Plan (see Exhibit 2) to the Board of Mayor and Aldermen (BMA) for Glenn Farms Subdivision, Lots 2 and 3, which would allow two multi-tenant flex buildings totaling 95,000 combined square feet on 10.28 combined acres located on East Shelby Drive just west of the proposed extension of Progress Road, subject to the following conditions: A. Identify how the solid waste needs of the development will be addressed. Provide, with the Final Site Plan, a detail of any dumpster enclosures. B. Show and label on the landscaping plans with the Final Site Plan the sight triangles, along with their regulatory basis and how measured. C. Change the labels of the “painted concrete” panels used on all parts of the building except for the rear/loading facades to read “painted & scored concrete tilt wall panel”. Use another label/note for the less-ornate concrete tilt wall panels used at the rear/loading facades. D. Label the color of the canopy, metal coping, gutters, downspouts, and the overhead doors. E. Provide details of all light fixtures on the Final Site Plan (e.g. fixtures P1, WP, and P2). These fixtures shall be full-cutoff fixtures. The color of the LED light shall be equivalent to metal halide. DRC 4-9-15 3 F. Provide at least one bicycle rack for each building and related detail with the Final Site Plan (D.G. III.D.2.). G. All parking areas shall use white striping to designate spaces (D.G. III.B.1). H. All ground and attached appurtenances (i.e. backflow preventers, utilities, meters, mechanical equipment, etc.) shall be screened with evergreen landscaping and/or a wall matching the principle façade and all rooftop appurtenances shall be screened by the parapet. Paint wall mounted appurtenances to match the color of the surrounding building material (D.G. III.H.). I. With the Final Site Plan, provide a roof plan indicating all rooftop appurtenances and indicate both a roofline and appurtenances on the elevations with a dashed line (Site Plan Checklist). Roof membrane shall not be visible from streets or adjacent property with the back of the parapet finished with the facade material (D.G. IV.C.). J. With the final site plan, provide the required “light corridor” on the grid and a data chart to demonstrate compliance with the lighting ordinance (min, max, average, etc) using the footcandle equivalent. Use white light for the LED and notes that describe the conversion methods (Town regulations are in footcandles). Hearing no further discussion, Chairman Doss asked for a roll call. ROLL CALL: McCarty – yes, Lesnick – yes, Sarrio – yes, Compeau –yes, Allen - yes Doss – yes. Motion Approved. DRC 4-9-15 4
© Copyright 2024