CITY OF NAPLES UTILITIES DEPARTMENT TWO 6” WATER MAIN CONNECTIONS “CINDY AVENUE & OUTER DRIVE” & “DALE AVENUE & OUTER DRIVE” ITEM 1 2 3 4 DESCRIPTION DALE AVENUE & OUTER DRIVE: 6” WATER MAIN INSTALLATION, PER DRAWINGS AND DESCRIPTION. CINDY AVENUE & OUTER DRIVE: 6” WATER MAIN INSTALLATION, PER DRAWINGS AND DESCRIPTION. CINDY AVENUE & OUTER DRIVE: 6” TAP, VALVE, AND FIRE HYDRANT ASSEMBLY, PER DRAWINGS AND DESCRIPTION. CINDY AVENUE: 6”X2” TAPPING SADDLE, 2” CORP VALVE, REDUCER/ CONNECTOR/POLY & ADAPTOR TO EXISTING SERVICE LINE, PER DRAWINGS AND DESCRIPTION. QUANT UNIT TOTAL PRICE$ 1 LS $ 1 LS $ 1 LS $ 1 LS $ TOTAL BID: $ COMPANY NAME:___________________________________________ COMPANY REP:______________________________ Date:_____________ Proposals are requested to be returned to the Utilities Department via email to David Graff at [email protected] not later than 2 pm, on Friday, April 10, 2015. For questions and/or site visits, please contact David Graff via email [email protected] or Cell 239253-5864. All work and materials shall comply with the City of Naples Utilities Standards, Specifications, and Details; The Project’s Drawings, Details, and Notes. The City has obtained the Collier County ROW Permit for this project and has an approved MOT Plan. The Contractor shall provide all approved MOT signage and Traffic Safety procedures during the work. Page 1 SCOPE OF WORK: ITEM 1: DALE AVENUE & OUTER DRIVE: 6” WATER MAIN INSTALLATION, PER DRAWINGS AND - DESCRIPTION: This item shall include the following: 1. The Contractor shall provide all materials, supplies, labor, dewatering, and equipment to complete the specified work. 2. Directional Drill 6” HDPE DR11 pipe under Outer Drive as shown on plans. Fuse MJ adaptor to HDPE Pipe. Include Tracer Wire with pull. 3. Install 6” S.S. Tapping Saddle w/valve on AC water main. Provide thrust block to stabilize tap. City to witness pressure test and coordinate tap. 4. Connect HDPE Pipe with fittings & PVC Pipe to valve. Include valve box, concrete pad, and ID Tag. 5. Remove/Replace sidewalk panels as required for proper excavation. 6. Use Excavate-able Flow-able fill over pipe where adequate pipe coverage is not accomplished. 7. On Dale Avenue side; use fused MJ adaptor on HDPE Pipe; transition and extend line with restraint fittings and 6” C900 PVC DR14 Pipe; install flush discharge; full bore flush; cap; pressure test; disinfect line, flush; 2 day compliance tests by City. 8. Coordinate with City for existing line shutdown; install 6” MJ cap w/restraint & 2” Threaded Port; Brass and Poly fittings and pipe to transition to existing 2” galvanized water main. 9. Restore all to original condition. ITEM 2: CINDY AVENUE & OUTER DRIVE: 6” WATER MAIN INSTALLATION, PER DRAWINGS AND - DESCRIPTION: This item shall include the following: 1. The Contractor shall provide all materials, supplies, labor, dewatering, and equipment to complete the specified work. 2. Directional Drill 6” HDPE DR11 pipe under Outer Drive as shown on plans. Fuse MJ adaptor to HDPE Pipe. Include Tracer Wire with pull. 3. Install 6” S.S. Tapping Saddle w/valve on AC water main. Provide thrust block to stabilize tap. City to witness pressure test and coordinate tap. 4. Connect HDPE Pipe with fittings & PVC Pipe to valve. Include valve box, concrete pad, and ID Tag. 5. Use Excavate-able Flow-able fill over pipe where adequate pipe coverage is not accomplished. 6. On Cindy Avenue side; use fused MJ adaptor on HDPE Pipe; transition and extend line with restraint fittings and 6” C900 PVC DR14 Pipe; install flush discharge; full bore flush; cap; pressure test; disinfect line, flush; 2 day compliance tests by City. 7. Coordinate with City for existing line shutdown; install 6” Pipe and Fittings to couple to existing 6” PVC water main. 8. Restore all to original condition. Page 2 ITEM 3: CINDY AVENUE & OUTER DRIVE: 6” TAP, VALVE, AND FIRE HYDRANT ASSEMBLY, PER - DRAWINGS AND DESCRIPTION: This item shall include the following: 1. The Contractor shall provide all materials, supplies, labor, dewatering, and equipment to complete the specified work. 2. Install 6” S.S. Tapping Saddle w/valve on AC water main. Provide thrust block to stabilize tap. City to witness pressure test and coordinate tap. 3. Connect PVC Pipe, fittings, Fire Hydrant (Yellow per EN Fire). Include valve box, concrete pad, and ID Tag. Provide thrust block and break-away pad per details. 4. Restore all to original condition. ITEM 4: CINDY AVENUE: 6”X2” TAPPING SADDLE, 2” CORP VALVE, REDUCER/ - CONNECTOR/POLY & ADAPTOR TO EXISTING SERVICE LINE, PER DRAWINGS AND DESCRIPTION.(For existing water service at 4214/4518) : This item shall include the following: 1. The Contractor shall provide all materials, supplies, labor, dewatering, and equipment to complete the specified work. 2. Install 6”X2” Tapping Saddle, 2” Corp valve, reducer, poly tube, and transition fitting to existing service line. (Currant service line is connected to existing 6” cap). 3. Restore all to original condition. Page 3
© Copyright 2024