KEY PROJECTS: Steam Turbine Generating Units, Boiler Stations

COMPANY PRESENTATION
The "Energotekhprom" enterprise created in 1998 is the fast-growth
company, of which business profile includes creation of high-efficient
thermal and electric energy generation systems based on the modern
gas-turbine and combined-cycle technologies.
The "Energotekhprom" LLC provides whole workpackage for creation of the heat and power
supply systems starting from development of investment proposals to turnkey construction of
power facilities.
Specialists of the "Energotekhprom" Company are the team of professionals having many years'
experience in engineering design.
Key to the "Energotekhprom" Company’s success is aiming for the optimum solution of set tasks.
We value our business reputation and authority we earned for many years of doing business in
electric-power industry.
Fair partnership based on the confidence and mutual understanding is our path in doing
business!
P.V. Fishman, Director General
Corporate structure of the "ENERGOTEKHPROM" LLC
Number of personnel – 120 persons
KEY PROJECTS: CCPP, GTP – STEAM RECOVERY
No.
Project Description
Design Stage
Year of development
1.
Expansion
of
the
Dyagilevskaya
CHPP.
Construction of CCPP‐115MW, Russian Federation
DD
2014
2.
Construction of CCPP‐83‐83 at the “MAR DEL
PLATA” TPP, Argentina
TD
3.
Construction of thermal power‐station with the
installed electric power of 120 MW in Shokve,
Republic of Mozambique
4.
The
“Obukhovoenergo
Power
(“Obukhovoenergo”
LLC
CHPP).
improvement. Russian Federation.
Park”
Capital
Year of commissioning
Customerк
Following equipment shall be installed within the scope of CCPP‐115 MW:
•Gas‐turbine power units SGT‐800 (Siemens) N=45 MW – 2pcs.
•Steam‐turbine SST‐400 (Siemens) N=38.5 MW – 1pc.
•Heat‐recovery boilers Пр‐59/12‐7,45/0,7‐518/214 (ПК‐83) (“ZiO” OJSC) – 2pcs.
2015
ESK “SOYUZ” OJSC
2014
•Gas‐turbine power unit MS 5002 E manufactured by the “REP‐Holding” CJSC
N=30MW ‐ 2pcs.
•Heat‐recovery boiler П‐103 manufactured by the “ZIO Podolsk” OJSC – 2pcs.
•Steam‐turbine of K‐25‐6,0 manufactured by the “REP‐Holding” CJSC N=25MW – 1pc.
2016
"South engineering center of electric‐power industry" DC OJSC ("ENEKS" OJSC)
TD
2014
2016
"South engineering center of electric‐power industry" DC OJSC ("ENEKS" OJSC)
PD (PDW)
2014
TPP is designed as composed of two CCPP monoblock units off at 60 MW. The 60 MW
CCPP monoblock unit includes following equipment:
•The GTP of SGT‐800 type with electric power of 45 MW (ISO specification) – 1pc.
•Steam heat‐recovery boiler rated for two steam pressures for high‐temperature (540
÷ 570°C) waste‐heat recovery after GTP – 1pc.
•Condensing steam turbine generating unit with the electric power of 20 MW
operating on the steam after heat‐recovery boiler – 1pc.
Total electric power of two CCPP‐60 monoblock units installed at the TPP will make
120 MW.
Construction of CCPP‐90 and peak‐load‐and‐auxiliary boiler station:
•Gas‐turbine power units Siemens SGT‐700 N=31.2 MW – 2pcs.
•Steam heat‐recovery boilers for high‐temperature waste‐heat recovery after GTP ‐
КГТ‐42,5‐6,1‐510 – 2pcs.
•Steam turbine Siemens SST‐300 N=23MW – 1pc.
For waste steam condensation, steam turbine is equipped with the air‐condensing
unit (ACU).
•Hot‐water boiler of ПТВМ‐60Э type manufactured by the “Dorogobuzhkotlomash”
OJSC with the installed thermal power of 60 Gcal/h – 4pcs.
2016
ESK “SOYUZ” OJSC
Master equipment
KEY PROJECTS: CCPP, GTP – STEAM RECOVERY
No
Project Description
Design Stage
Year of development
5.
Construction of energy supply source for providing
the thermal and electric energy supply to the
“KKBK” OJSC, Obukhov, Ukraine
FS
PD
DD
2010‐2013
•Gas turbines Siemens SGT‐400 with capacity of 13.3 MW – 3pcs.
•Steam heat‐recovery boilers КУП 45/26‐1,4‐2/7 manufactured by the Siemens with
capacity of 26 to 45 t/h – 3pcs.
2012
“Kiev Cardboard and Paper Mill” OJSC, Obukhov
6.
The
“TERMOGAS
Machala”
TPP
capital
improvement with expansion to power of 320 MW.
The “San Idelfonso” electric power substation
expansion, Republic of Ecuador
PDW
2013
The TPP expansion with construction of CCPP‐320 MW:
•Gas‐turbine power unit PG6111(6FA) manufactured by the GE N=70 MW – 1pc.
•Heat‐recovery boiler rated for two pressures КУП 105/15,76‐9,0/0,55‐540/210 – 3pcs.
•Steam turbine K‐110‐8,8/0,5 N=110 MW ‐ 1pc.
2015
"South engineering center of electric‐power industry" DC OJSC ("ENEKS" OJSC)
7.
Construction of GT‐TPP with power of 130 MW at
the Arkhangelsk PPM, Russian Federation
FS
PD (1st stage)
2012‐2013
•Boilers E‐160‐100 GM manufactured by the "Sibenergomash" – 2pcs.
•Steam turbine ПТ‐25/30‐8,8/1,0 manufactured by the KTZ OJSC – 1pc.
•Gas turbines Siemens SGT‐600, N=23.1 MW – 3pcs.
•Steam heat‐recovery boilers КУП 63,5‐1,0‐270 manufactured by the "Energomash",
Belgorod – 3pcs.
2017
“Kiev Cardboard and Paper Mill” OJSC
8.
Project and detailed design documentation for
capital improvement of the Astrakhan SDPP with
construction of CCPP 110 MW (ТГК‐8) (“Lukoil” PC),
Russian Federation
PD
DD
2009‐2010
•Gas‐turbine power unit of LМ 6000 PF Sprint manufactured by the GE N=46,64MW –
2pcs.
•Steam heat‐recovery boilers КГТ‐44/4,6‐435‐13/0,5‐210 manufactured by the
“Energomash (Belgorod) – BZEM” OJSC – 2pcs.
•Steam turbine of T‐14/23‐4,5/0,18 type manufactured by the “KTZ” OJSC N=23MW –
1pc.
2012
"Energokaskad" CJSC
9.
Capital improvement of the Voronezh CHPP‐2 at
existing industrial site with construction of CCPP‐
110MW, Voronezh, Russian Federation
PD (PDW)
2007
•Gas‐turbine power unit LМ 6000 PD Sprint manufactured by the "GE" N=46.6MW ‐
2pcs.
•Steam turbine ПТ‐25‐3,4/1 manufactured by the "Kaluga Turbine Works" OJSC N=25
MW – 1pc.
•Steam heat‐recovery boilers КУП 75‐3,9‐440 manufactured by the "Yugtransenergo"
JSC – 2pcs.
•Standby gas‐and‐oil‐fired boiler of БЭМ‐25/1,4‐270 ГМ type – 1pc.
2011
"ENERGOKASKAD" CJSC
Master equipment
Year of commissioning
Customer
KEY PROJECTS: CCPP, GTP – STEAM RECOVERY
Year of development
Year of commissioning
Customer
Scope of the CCPP‐52MW construction includes following equipment:
•Gas‐turbine power unit ГТУ‐20С manufactured by the MMPP “Salute” FSUE (Moscow)
N=20 MW – 2pcs.
•Steam turbine ПТ‐12/13‐3,4/1,0‐1 manufactured by the "Kaluga Turbine Works" OJSC
(Kaluga) N=13 MW – 1pc.
•Steam heat‐recovery boiler of ПКУ‐40‐3,9‐440 manufactured by the “ZiO‐Podolsk
Machine Building Plant” OJSC (Podolsk) – 2pcs.
2009
"Energokaskad" CJSC
2005‐2006
•Gas‐turbine power unit UGT‐25000 N=25 MW manufactured by the NPKG "Zorya‐
Mashproekt” SOE – 2pcs.
•Steam‐boiler КУП‐100‐41‐44Б manufactured by the “Energomash” OJSC – 2pcs.
2006
NPKG "Zorya‐Mashproekt” SOE
P
DD
2002
•Gas‐turbine power unit ГТУ‐15 (Дж‐59) manufactured by the NPKG "Zorya‐
Mashproekt" N=15.4 MW – 2pcs.
•Supplementary‐fired steam heat‐recovery boiler КУП 60‐3,4‐440 manufactured by
the "Yugtransenergo" JSC – 2pcs.
2003
“Rubeganskiy Cardboard Mill” OJSC
FS
PDW
2002
•Gas‐turbine power unit ГТУ‐15 (Дж‐59) manufactured by the NPKG "Zorya‐
Mashproekt" N=15.4 MW – 1pc.
•Supplementary‐fired steam heat‐recovery boiler КУП 70‐3,9‐440 ГА manufactured by
the "Yugtransenergo" JSC – 1pc.
No.
Project Description
Design Stage
10.
Repowering of the Yelets CHPP with installation
of gas‐turbine equipment (ТГК‐4), Yelets, Russian
Federation
FS
PD
DD
2006‐2007
11.
Construction of the ГТЭ‐25С gas‐turbine power
plant at the “Concern Stirol” OJSC, Ukraine
PDW
PD
DD
12.
Construction of the automated co‐generation
gas‐turbine power generating unit ГТЭ‐15К at
the RUBEGANSKIY CADDBOADD MILL, Lugansk
Region, Ukraine
13.
Construction of the “OFF‐GRID POWER
COMPLEX” facility of the “UKRTATNAFTA” JSC,
Kremenchuk, Ukraine
Master equipment
“UKRTATNAFTA” JSC
KEY PROJECTS: simple cycle GTP, hot-water heat-recovery GTP, GRU
No.
Project Description
Design Stage
Year of development
14.
Project of construction of a 1st stage of co‐
generation gas‐turbine power‐station at the
Yakutsk SDPP‐2 with electric power of 350 MW,
Russian Federation
FS
2011
Following equipment was installed within the scope of 1st construction stage:
•Gas‐turbine power units (GTP) LM 6000 PF manufactured by the “General Electric”,
N=46.64 MW – 4pcs.
•System water boiler (SWB) manufactured by the “ORMA” CJSC, St. Petersburg
(Russia) with rated heat output of 37.5 Gcal/h – 4pcs.
•Peak‐load boilers КВГМ‐100 – 3pcs.
At the second stage, the expansion is planned with the use of gas‐turbine power
units (GTP) based on the gas turbine of LM 6000 PF type – 3pcs.
2016
“PK Energoprom” CJSC
15.
Project and detailed design documentation for
construction of captive gas‐turbine power plant
with capacity of 200 MW, 240 Gcal/h at the
Vankor deposit of “Rosneft” OJSC, Krasnoyarsk
Territory, Russian Federation
PD
DD
2006‐2009
•Gas‐turbine power units of MS5001PA type manufactured by the “General Electric”
Company – 8pcs.
•Heat‐recovery hot water boilers of КУВ‐33 type manufactured by the
"Yugtransenergo" JSC – 8pcs.
2011
"Energokaskad" CJSC
16.
Construction of the “Muravlenkovskaya” gas‐
turbine power plant, Russian Federation
TD
2007
•Gas‐turbine power unit SIEMENS SGT‐700 N=34.2MW – 2pcs.
•Skid‐mounted water boiler – 1pc.
17.
Detailed design documentation for co‐generation
gas‐turbine power plant (COGTPP) with capacity
of 50 MW, 90 Gcal/h in Qyzylorda, Republic of
Kazakstan
PDW
DD
2005
•Gas‐turbine power unit UGT 16000 manufactured by the NPKG "Zorya‐Mashproekt"
– 3pcs.
•Heat‐recovery boiler КУВ 20/30 manufactured by the "Yugtransenergo" JSC – 3pcs.
Master equipment
Year of commissioning
Customer
ESK “SOYUZ” OJSC
2006
“AKTOBEMUNAY FINANCE” OJSC
KEY PROJECTS: simple cycle GTP, hot-water heat-recovery GTP, GRU
Year of development
Year of commissioning
No.
Project Description
Design Stage
18.
Expansion of the Zhanazhol GTPP up to final
capacity of 56 MW, Republic of Kazakstan
WP
DD
2004‐2005
•Gas‐turbine power units ГТУ‐16 manufactured by the NPKG "Zorya‐Mashproekt”
SOE, Nikolaev – 2pcs.
2005
“AKTOBEMUNAY FINANCE” OJSC
19.
Construction of co‐generation power plant at
the FI “OREL‐LEADER POULTRY PLANT” CJSC,
Dnepropetrovsk region, Ukraine
WP
2004
•Co‐generation gas reciprocating units TCG 2020 V16 N=1544 kW manufactured by
the “Deutz” AG – 2pcs.
•System for the gas engines cooling system heat recovery and engine exhaust gas
heat recovery – 2pcs.
2005
"Yugtransenergo" JSC
20.
GTPP ‐ 10 MW of the Zapadno‐Poludennoye
deposit (“YUKOS” OJSC), Tyumen Region,
Russian Federation
WP
2003
•Gas‐turbine power plants ЭГ‐2500 М1 manufactured by the "Yugtransenergo" JSC
N=2.5 MW – 4pcs.
•Heat‐recovery hot water boilers КУВ‐5,3/4,0 manufactured by the
"Yugtransenergo" JSC – 4pcs.
2004
“MR Energostroy” CJSC
Master equipment
Customer
KEY PROJECTS: Steam Turbine Generating Units, Boiler Stations
Year of development
Year of commissioning
No.
Project Description
Design Stage
21.
Repowering of the Gusinoozersk SDPP with
replacement of st.No.3 turbine generating unit,
Russian Federation
PDW
PD
DD
2013‐2014
•Turbine generating unit ТГВ‐235‐2 МУ3 manufactured by the GPZ “Elektrotyagmash”,
Kharkov.
2016
“Inter RAO ‐
Engineering “OJSC
22.
Replacement of st.No.3 turbine generating unit at
the “Aktobe CHPP” JSC, Republic of Kazakstan
PDW
WP
2012‐2013
Scope of turbine generating unit replacement includes following equipment:
•In replacement of existing st. No.3 steam turbine of Р‐14‐29/10 type – new steam
turbine ПТ‐30/40‐3,0/1,0 manufactured by the “Ural Power Engineering Works” LLC.
•In replacement of existing generator of T2‐25‐2 type – new generator BDAX7‐290
ERH supplied manufactured by the “EnergoPromCity” LLP.
2015
“GMI&DESIGN” LLP
23.
Project and detailed design documentation for
the repowering with replacement of st.No.5
turbine generating unit ПТ 25‐90 at the TPP‐1 of
the “Arkhangelsk PPM” OJSC, Russian Federation
PD
DD
2011
•Steam turbine ПТ‐25/30‐ 8,8/1,0‐1 (“KTZ” OJSC) ‐ 1pc.
2013
ESK “SOYUZ” CJSC
24.
Project and detailed design documentation for
construction of steam‐turbine generating station
at the “Volzhsk ORGSINTEZ” OJSC, Volgograd
Region, Russian Federation
PD
DD
2010
•Backpressure steam turbine of Р‐6‐3,4/1,0‐1 type (“KTZ” OJSC) – 1pc.
•Steam turbine of Р‐2,5‐3,4/0,3‐1 type (“KTZ” OJSC) – 1pc.
2013
"Energokaskad" CJSC
Master equipment
Customer
KEY PROJECTS: Steam Turbine Generating Units, Boiler Stations
No.
Project Description
Design Stage
Year of development
25.
Installation of turbine generating units at the
boiler station of “PERM CADDBOADD” LLC, Perm,
Russian Federation
WP
2004
26.
Expansion and capital improvement of boiler
station at Semafornaya street in Dnepropetrovsk,
Ukraine
FS
WP
27.
Installation of husk‐fired boiler at the Dnepropetrovsk oil‐extracting factory, Ukraine
FS
Year of commissioning
Customer
•Steam turbine ПР6‐3,4/1.5/0,5‐1 manufactured by the "Kaluga Turbine Works"
OJSC off at N=6MW – 2pcs.
2005
“Perm cardboard” LLC
2000
•St. No.2 and 3 steam boilers ДКВр‐6,5/13 with capacity of 6,5 t/h by saturated
steam with parameters of 7 kgf/cm and 164°C – 2pcs.
•Hot water boilers КВГМ‐20 with thermal output of 20 Gcal/h by hot water as per
the time‐temperature chart 150/70°C – 2pcs.
2002
Pridneprovskaya Railway
1999
•Steam boiler manufactured by the “Lardet‐Babcock”, Germany – 1pc.
2000
“DMEZ” CJSC
Master equipment
"ENERGOTEKHPROM" LLC IN THE XXI CENTURY
Integrated design engineering of projects is performed with the use of three-dimensional intellectual design
software IDPM - CADISON (ITF, Germany), construction part is performed with the use of Autodesk Revit, and
automated cable laying is performed with the use of CSoft ElectriCS 3D (Russia), which constitute a total
package of power plant 3D design.
"ENERGOTEKHPROM" LLC IN THE XXI CENTURY
"ENERGOTEKHPROM" LLC IN THE XXI CENTURY
Main building. The 3D model
"ENERGOTEKHPROM" LLC
In 2005, the "Energotekhprom" LLC was acknowledged as the "Industry and entrepreneurial business leader of
the Ukraine" and was awarded with the badge of honor by the President of the Ukrainian Unions of
Industrialists and Entrepreneurs (USPP) Kinakh A.K.
"ENERGOTEKHPROM" LLC
In 2010 and 2012, the "Energotekhprom" LLC was acknowledged as the "ENTEPPRISE OF THE YEAR IN
UKRAINE" based on results of international audit and was awarded with the "UKRAINE’s ECONOMY STAR"
badge of honor of Economic Development Committee of Verkhovna Rada of the Ukraine.
"ENERGOTEKHPROM" LLC
The "Energotekhprom" possesses the Governmental license of Ukraine series AV No.192624, permission of the
State Health and Safety Supervision Authority No.0.12.399 for design, construction and engineering of extrahazardous facilities, and licenses of the State Health and Safety Supervision Authority No.017.00.12.20600 for
design of boiler stations, pressure vessels, lifting equipment and No.023.00.12.74201 for design of gas-supply
systems, and license for design of fire-extinguishing installations.
"ENERGOTEKHPROM" LLC
Quality Management System of the "Energotekhprom" LLC is qualified by the Certificates of
Conformity to the ISO 9001-2001 and ISO 9001-2009 international standards, which serve to ensure
our Company’s commitment to the continuous quality improvement and is a key driver of Company’s
competitiveness.
"ENERGOTEKHPROM" LLC
Since 2011, the "Energotekhprom" LLC is a member of the “Design Engineers Council” SRO
(Moscow) and is authorized for planning of the works affecting the safety of extremely hazardous,
technically sophisticated and unique facilities.
"ENERGOTEKHPROM" LLC
The "Energotekhprom" LLC has been officially recognized by the “RosTekhNadzor”:
"ENERGOTEKHPROM" LLC
Some Our Customers’ Feedback:
"ENERGOTEKHPROM" LLC
Some Our Customers’ Feedback: