COMPANY PRESENTATION The "Energotekhprom" enterprise created in 1998 is the fast-growth company, of which business profile includes creation of high-efficient thermal and electric energy generation systems based on the modern gas-turbine and combined-cycle technologies. The "Energotekhprom" LLC provides whole workpackage for creation of the heat and power supply systems starting from development of investment proposals to turnkey construction of power facilities. Specialists of the "Energotekhprom" Company are the team of professionals having many years' experience in engineering design. Key to the "Energotekhprom" Company’s success is aiming for the optimum solution of set tasks. We value our business reputation and authority we earned for many years of doing business in electric-power industry. Fair partnership based on the confidence and mutual understanding is our path in doing business! P.V. Fishman, Director General Corporate structure of the "ENERGOTEKHPROM" LLC Number of personnel – 120 persons KEY PROJECTS: CCPP, GTP – STEAM RECOVERY No. Project Description Design Stage Year of development 1. Expansion of the Dyagilevskaya CHPP. Construction of CCPP‐115MW, Russian Federation DD 2014 2. Construction of CCPP‐83‐83 at the “MAR DEL PLATA” TPP, Argentina TD 3. Construction of thermal power‐station with the installed electric power of 120 MW in Shokve, Republic of Mozambique 4. The “Obukhovoenergo Power (“Obukhovoenergo” LLC CHPP). improvement. Russian Federation. Park” Capital Year of commissioning Customerк Following equipment shall be installed within the scope of CCPP‐115 MW: •Gas‐turbine power units SGT‐800 (Siemens) N=45 MW – 2pcs. •Steam‐turbine SST‐400 (Siemens) N=38.5 MW – 1pc. •Heat‐recovery boilers Пр‐59/12‐7,45/0,7‐518/214 (ПК‐83) (“ZiO” OJSC) – 2pcs. 2015 ESK “SOYUZ” OJSC 2014 •Gas‐turbine power unit MS 5002 E manufactured by the “REP‐Holding” CJSC N=30MW ‐ 2pcs. •Heat‐recovery boiler П‐103 manufactured by the “ZIO Podolsk” OJSC – 2pcs. •Steam‐turbine of K‐25‐6,0 manufactured by the “REP‐Holding” CJSC N=25MW – 1pc. 2016 "South engineering center of electric‐power industry" DC OJSC ("ENEKS" OJSC) TD 2014 2016 "South engineering center of electric‐power industry" DC OJSC ("ENEKS" OJSC) PD (PDW) 2014 TPP is designed as composed of two CCPP monoblock units off at 60 MW. The 60 MW CCPP monoblock unit includes following equipment: •The GTP of SGT‐800 type with electric power of 45 MW (ISO specification) – 1pc. •Steam heat‐recovery boiler rated for two steam pressures for high‐temperature (540 ÷ 570°C) waste‐heat recovery after GTP – 1pc. •Condensing steam turbine generating unit with the electric power of 20 MW operating on the steam after heat‐recovery boiler – 1pc. Total electric power of two CCPP‐60 monoblock units installed at the TPP will make 120 MW. Construction of CCPP‐90 and peak‐load‐and‐auxiliary boiler station: •Gas‐turbine power units Siemens SGT‐700 N=31.2 MW – 2pcs. •Steam heat‐recovery boilers for high‐temperature waste‐heat recovery after GTP ‐ КГТ‐42,5‐6,1‐510 – 2pcs. •Steam turbine Siemens SST‐300 N=23MW – 1pc. For waste steam condensation, steam turbine is equipped with the air‐condensing unit (ACU). •Hot‐water boiler of ПТВМ‐60Э type manufactured by the “Dorogobuzhkotlomash” OJSC with the installed thermal power of 60 Gcal/h – 4pcs. 2016 ESK “SOYUZ” OJSC Master equipment KEY PROJECTS: CCPP, GTP – STEAM RECOVERY No Project Description Design Stage Year of development 5. Construction of energy supply source for providing the thermal and electric energy supply to the “KKBK” OJSC, Obukhov, Ukraine FS PD DD 2010‐2013 •Gas turbines Siemens SGT‐400 with capacity of 13.3 MW – 3pcs. •Steam heat‐recovery boilers КУП 45/26‐1,4‐2/7 manufactured by the Siemens with capacity of 26 to 45 t/h – 3pcs. 2012 “Kiev Cardboard and Paper Mill” OJSC, Obukhov 6. The “TERMOGAS Machala” TPP capital improvement with expansion to power of 320 MW. The “San Idelfonso” electric power substation expansion, Republic of Ecuador PDW 2013 The TPP expansion with construction of CCPP‐320 MW: •Gas‐turbine power unit PG6111(6FA) manufactured by the GE N=70 MW – 1pc. •Heat‐recovery boiler rated for two pressures КУП 105/15,76‐9,0/0,55‐540/210 – 3pcs. •Steam turbine K‐110‐8,8/0,5 N=110 MW ‐ 1pc. 2015 "South engineering center of electric‐power industry" DC OJSC ("ENEKS" OJSC) 7. Construction of GT‐TPP with power of 130 MW at the Arkhangelsk PPM, Russian Federation FS PD (1st stage) 2012‐2013 •Boilers E‐160‐100 GM manufactured by the "Sibenergomash" – 2pcs. •Steam turbine ПТ‐25/30‐8,8/1,0 manufactured by the KTZ OJSC – 1pc. •Gas turbines Siemens SGT‐600, N=23.1 MW – 3pcs. •Steam heat‐recovery boilers КУП 63,5‐1,0‐270 manufactured by the "Energomash", Belgorod – 3pcs. 2017 “Kiev Cardboard and Paper Mill” OJSC 8. Project and detailed design documentation for capital improvement of the Astrakhan SDPP with construction of CCPP 110 MW (ТГК‐8) (“Lukoil” PC), Russian Federation PD DD 2009‐2010 •Gas‐turbine power unit of LМ 6000 PF Sprint manufactured by the GE N=46,64MW – 2pcs. •Steam heat‐recovery boilers КГТ‐44/4,6‐435‐13/0,5‐210 manufactured by the “Energomash (Belgorod) – BZEM” OJSC – 2pcs. •Steam turbine of T‐14/23‐4,5/0,18 type manufactured by the “KTZ” OJSC N=23MW – 1pc. 2012 "Energokaskad" CJSC 9. Capital improvement of the Voronezh CHPP‐2 at existing industrial site with construction of CCPP‐ 110MW, Voronezh, Russian Federation PD (PDW) 2007 •Gas‐turbine power unit LМ 6000 PD Sprint manufactured by the "GE" N=46.6MW ‐ 2pcs. •Steam turbine ПТ‐25‐3,4/1 manufactured by the "Kaluga Turbine Works" OJSC N=25 MW – 1pc. •Steam heat‐recovery boilers КУП 75‐3,9‐440 manufactured by the "Yugtransenergo" JSC – 2pcs. •Standby gas‐and‐oil‐fired boiler of БЭМ‐25/1,4‐270 ГМ type – 1pc. 2011 "ENERGOKASKAD" CJSC Master equipment Year of commissioning Customer KEY PROJECTS: CCPP, GTP – STEAM RECOVERY Year of development Year of commissioning Customer Scope of the CCPP‐52MW construction includes following equipment: •Gas‐turbine power unit ГТУ‐20С manufactured by the MMPP “Salute” FSUE (Moscow) N=20 MW – 2pcs. •Steam turbine ПТ‐12/13‐3,4/1,0‐1 manufactured by the "Kaluga Turbine Works" OJSC (Kaluga) N=13 MW – 1pc. •Steam heat‐recovery boiler of ПКУ‐40‐3,9‐440 manufactured by the “ZiO‐Podolsk Machine Building Plant” OJSC (Podolsk) – 2pcs. 2009 "Energokaskad" CJSC 2005‐2006 •Gas‐turbine power unit UGT‐25000 N=25 MW manufactured by the NPKG "Zorya‐ Mashproekt” SOE – 2pcs. •Steam‐boiler КУП‐100‐41‐44Б manufactured by the “Energomash” OJSC – 2pcs. 2006 NPKG "Zorya‐Mashproekt” SOE P DD 2002 •Gas‐turbine power unit ГТУ‐15 (Дж‐59) manufactured by the NPKG "Zorya‐ Mashproekt" N=15.4 MW – 2pcs. •Supplementary‐fired steam heat‐recovery boiler КУП 60‐3,4‐440 manufactured by the "Yugtransenergo" JSC – 2pcs. 2003 “Rubeganskiy Cardboard Mill” OJSC FS PDW 2002 •Gas‐turbine power unit ГТУ‐15 (Дж‐59) manufactured by the NPKG "Zorya‐ Mashproekt" N=15.4 MW – 1pc. •Supplementary‐fired steam heat‐recovery boiler КУП 70‐3,9‐440 ГА manufactured by the "Yugtransenergo" JSC – 1pc. No. Project Description Design Stage 10. Repowering of the Yelets CHPP with installation of gas‐turbine equipment (ТГК‐4), Yelets, Russian Federation FS PD DD 2006‐2007 11. Construction of the ГТЭ‐25С gas‐turbine power plant at the “Concern Stirol” OJSC, Ukraine PDW PD DD 12. Construction of the automated co‐generation gas‐turbine power generating unit ГТЭ‐15К at the RUBEGANSKIY CADDBOADD MILL, Lugansk Region, Ukraine 13. Construction of the “OFF‐GRID POWER COMPLEX” facility of the “UKRTATNAFTA” JSC, Kremenchuk, Ukraine Master equipment “UKRTATNAFTA” JSC KEY PROJECTS: simple cycle GTP, hot-water heat-recovery GTP, GRU No. Project Description Design Stage Year of development 14. Project of construction of a 1st stage of co‐ generation gas‐turbine power‐station at the Yakutsk SDPP‐2 with electric power of 350 MW, Russian Federation FS 2011 Following equipment was installed within the scope of 1st construction stage: •Gas‐turbine power units (GTP) LM 6000 PF manufactured by the “General Electric”, N=46.64 MW – 4pcs. •System water boiler (SWB) manufactured by the “ORMA” CJSC, St. Petersburg (Russia) with rated heat output of 37.5 Gcal/h – 4pcs. •Peak‐load boilers КВГМ‐100 – 3pcs. At the second stage, the expansion is planned with the use of gas‐turbine power units (GTP) based on the gas turbine of LM 6000 PF type – 3pcs. 2016 “PK Energoprom” CJSC 15. Project and detailed design documentation for construction of captive gas‐turbine power plant with capacity of 200 MW, 240 Gcal/h at the Vankor deposit of “Rosneft” OJSC, Krasnoyarsk Territory, Russian Federation PD DD 2006‐2009 •Gas‐turbine power units of MS5001PA type manufactured by the “General Electric” Company – 8pcs. •Heat‐recovery hot water boilers of КУВ‐33 type manufactured by the "Yugtransenergo" JSC – 8pcs. 2011 "Energokaskad" CJSC 16. Construction of the “Muravlenkovskaya” gas‐ turbine power plant, Russian Federation TD 2007 •Gas‐turbine power unit SIEMENS SGT‐700 N=34.2MW – 2pcs. •Skid‐mounted water boiler – 1pc. 17. Detailed design documentation for co‐generation gas‐turbine power plant (COGTPP) with capacity of 50 MW, 90 Gcal/h in Qyzylorda, Republic of Kazakstan PDW DD 2005 •Gas‐turbine power unit UGT 16000 manufactured by the NPKG "Zorya‐Mashproekt" – 3pcs. •Heat‐recovery boiler КУВ 20/30 manufactured by the "Yugtransenergo" JSC – 3pcs. Master equipment Year of commissioning Customer ESK “SOYUZ” OJSC 2006 “AKTOBEMUNAY FINANCE” OJSC KEY PROJECTS: simple cycle GTP, hot-water heat-recovery GTP, GRU Year of development Year of commissioning No. Project Description Design Stage 18. Expansion of the Zhanazhol GTPP up to final capacity of 56 MW, Republic of Kazakstan WP DD 2004‐2005 •Gas‐turbine power units ГТУ‐16 manufactured by the NPKG "Zorya‐Mashproekt” SOE, Nikolaev – 2pcs. 2005 “AKTOBEMUNAY FINANCE” OJSC 19. Construction of co‐generation power plant at the FI “OREL‐LEADER POULTRY PLANT” CJSC, Dnepropetrovsk region, Ukraine WP 2004 •Co‐generation gas reciprocating units TCG 2020 V16 N=1544 kW manufactured by the “Deutz” AG – 2pcs. •System for the gas engines cooling system heat recovery and engine exhaust gas heat recovery – 2pcs. 2005 "Yugtransenergo" JSC 20. GTPP ‐ 10 MW of the Zapadno‐Poludennoye deposit (“YUKOS” OJSC), Tyumen Region, Russian Federation WP 2003 •Gas‐turbine power plants ЭГ‐2500 М1 manufactured by the "Yugtransenergo" JSC N=2.5 MW – 4pcs. •Heat‐recovery hot water boilers КУВ‐5,3/4,0 manufactured by the "Yugtransenergo" JSC – 4pcs. 2004 “MR Energostroy” CJSC Master equipment Customer KEY PROJECTS: Steam Turbine Generating Units, Boiler Stations Year of development Year of commissioning No. Project Description Design Stage 21. Repowering of the Gusinoozersk SDPP with replacement of st.No.3 turbine generating unit, Russian Federation PDW PD DD 2013‐2014 •Turbine generating unit ТГВ‐235‐2 МУ3 manufactured by the GPZ “Elektrotyagmash”, Kharkov. 2016 “Inter RAO ‐ Engineering “OJSC 22. Replacement of st.No.3 turbine generating unit at the “Aktobe CHPP” JSC, Republic of Kazakstan PDW WP 2012‐2013 Scope of turbine generating unit replacement includes following equipment: •In replacement of existing st. No.3 steam turbine of Р‐14‐29/10 type – new steam turbine ПТ‐30/40‐3,0/1,0 manufactured by the “Ural Power Engineering Works” LLC. •In replacement of existing generator of T2‐25‐2 type – new generator BDAX7‐290 ERH supplied manufactured by the “EnergoPromCity” LLP. 2015 “GMI&DESIGN” LLP 23. Project and detailed design documentation for the repowering with replacement of st.No.5 turbine generating unit ПТ 25‐90 at the TPP‐1 of the “Arkhangelsk PPM” OJSC, Russian Federation PD DD 2011 •Steam turbine ПТ‐25/30‐ 8,8/1,0‐1 (“KTZ” OJSC) ‐ 1pc. 2013 ESK “SOYUZ” CJSC 24. Project and detailed design documentation for construction of steam‐turbine generating station at the “Volzhsk ORGSINTEZ” OJSC, Volgograd Region, Russian Federation PD DD 2010 •Backpressure steam turbine of Р‐6‐3,4/1,0‐1 type (“KTZ” OJSC) – 1pc. •Steam turbine of Р‐2,5‐3,4/0,3‐1 type (“KTZ” OJSC) – 1pc. 2013 "Energokaskad" CJSC Master equipment Customer KEY PROJECTS: Steam Turbine Generating Units, Boiler Stations No. Project Description Design Stage Year of development 25. Installation of turbine generating units at the boiler station of “PERM CADDBOADD” LLC, Perm, Russian Federation WP 2004 26. Expansion and capital improvement of boiler station at Semafornaya street in Dnepropetrovsk, Ukraine FS WP 27. Installation of husk‐fired boiler at the Dnepropetrovsk oil‐extracting factory, Ukraine FS Year of commissioning Customer •Steam turbine ПР6‐3,4/1.5/0,5‐1 manufactured by the "Kaluga Turbine Works" OJSC off at N=6MW – 2pcs. 2005 “Perm cardboard” LLC 2000 •St. No.2 and 3 steam boilers ДКВр‐6,5/13 with capacity of 6,5 t/h by saturated steam with parameters of 7 kgf/cm and 164°C – 2pcs. •Hot water boilers КВГМ‐20 with thermal output of 20 Gcal/h by hot water as per the time‐temperature chart 150/70°C – 2pcs. 2002 Pridneprovskaya Railway 1999 •Steam boiler manufactured by the “Lardet‐Babcock”, Germany – 1pc. 2000 “DMEZ” CJSC Master equipment "ENERGOTEKHPROM" LLC IN THE XXI CENTURY Integrated design engineering of projects is performed with the use of three-dimensional intellectual design software IDPM - CADISON (ITF, Germany), construction part is performed with the use of Autodesk Revit, and automated cable laying is performed with the use of CSoft ElectriCS 3D (Russia), which constitute a total package of power plant 3D design. "ENERGOTEKHPROM" LLC IN THE XXI CENTURY "ENERGOTEKHPROM" LLC IN THE XXI CENTURY Main building. The 3D model "ENERGOTEKHPROM" LLC In 2005, the "Energotekhprom" LLC was acknowledged as the "Industry and entrepreneurial business leader of the Ukraine" and was awarded with the badge of honor by the President of the Ukrainian Unions of Industrialists and Entrepreneurs (USPP) Kinakh A.K. "ENERGOTEKHPROM" LLC In 2010 and 2012, the "Energotekhprom" LLC was acknowledged as the "ENTEPPRISE OF THE YEAR IN UKRAINE" based on results of international audit and was awarded with the "UKRAINE’s ECONOMY STAR" badge of honor of Economic Development Committee of Verkhovna Rada of the Ukraine. "ENERGOTEKHPROM" LLC The "Energotekhprom" possesses the Governmental license of Ukraine series AV No.192624, permission of the State Health and Safety Supervision Authority No.0.12.399 for design, construction and engineering of extrahazardous facilities, and licenses of the State Health and Safety Supervision Authority No.017.00.12.20600 for design of boiler stations, pressure vessels, lifting equipment and No.023.00.12.74201 for design of gas-supply systems, and license for design of fire-extinguishing installations. "ENERGOTEKHPROM" LLC Quality Management System of the "Energotekhprom" LLC is qualified by the Certificates of Conformity to the ISO 9001-2001 and ISO 9001-2009 international standards, which serve to ensure our Company’s commitment to the continuous quality improvement and is a key driver of Company’s competitiveness. "ENERGOTEKHPROM" LLC Since 2011, the "Energotekhprom" LLC is a member of the “Design Engineers Council” SRO (Moscow) and is authorized for planning of the works affecting the safety of extremely hazardous, technically sophisticated and unique facilities. "ENERGOTEKHPROM" LLC The "Energotekhprom" LLC has been officially recognized by the “RosTekhNadzor”: "ENERGOTEKHPROM" LLC Some Our Customers’ Feedback: "ENERGOTEKHPROM" LLC Some Our Customers’ Feedback:
© Copyright 2024