PMO – Industry Forum 2012 – AIM

FAA
Air Traffic Organization
Mission Support Services
Federal NOTAM System
Presented by:
Diana Young, Chief Engineer, FAA
Aeronautical Information Management
Vinod Vallikat, Chief Technology Officer,
CGH Technologies, Inc.
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration
Agenda
• FNS History
– Framing the NOTAM problem
– Federal NOTAM System - Concept of Operations
– FNS Current Status
• FNS Demonstration
–
–
–
–
FNS Origination Services
FNS Management Services
FNS Distribution Services
FNS Graphical NOTAMS
• Q&A
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
Framing the NOTAM problem
NOTAM Users experience an
overload of information that is
not easily managed to provide
them with the critical real time
information on the NAS
relevant to their needs
NOTAM Originators
experience significant delays
between the time they observe
and report the hazard
condition and when the
NOTAM is issued to the
aviation community
PIB
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration
Analog (text) vs Digital NOTAM
• Analog NOTAM
– Text string distributed by telecommunication
• Limited validation
• Limited sorting/searching capability
ACY RWY 13/31 CLSD
• Digital NOTAM
– Data set made available through digital services
• Validate against baseline data
• Translate/Graphically Display
NOTAM Information
• Improve data quality
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration
Text Based Routing
• From DCA
• 600 Maryland Ave SW, Washington DC
Head north on S.Smith Blvd. Take the ramp onto George Washington
Memorial Parkway. Take the I-395 N exit toward Washington. Merge
onto US-1. Continue onto I-395N. Take the 12th St exit toward L’Enfant
Promenade. Slight right toward D. St. SW. Slight Right onto D St. SW.
Turn left at the 2nd cross stre onto 7th St. SW. Take the 2nd right onto
Maryland Ave SW. Destination will be right
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration
Digital Routing
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration
NOTAM Modernization Benefits
NOTAM Originator
– Quick and easy
issuance of NOTAMs
– Improved NOTAM
management
– Standardization of
NOTAM inputs
– Intuitive user
interface
– Instant validation
feedback
NOTAM End User
– Improved NOTAM
understanding
through standardized
information
– Increased situational
awareness
– Improved decision
making
– Advanced
capabilities
Higher quality
NOTAMs
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration
International Collaboration
• Two areas of International Collaboration
– Aeronautical Information Exchange Model (AIXM)
– Defining Event Scenarios for Digital NOTAMs
• Digital NOTAM Focus Groups – collaboration between the FAA,
EUROCONTROL, ECAC Member States, airlines, and industry
• Detailed description of the Event Scenarios and their encoding as a Digital
NOTAM (using AIXM version 5.1)
http://www.aixm.aero/public/subsite_homepage/homepage.html
• Benefits
– Establish a set of international standards and specifications for
exchanging digital information
– Efficient exchange of NOTAM information between operational
systems
• Goal
– Enable the machines that assist the specialist to provide a common
and accurate view of the aeronautical 4D environment
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
Federal NOTAM System: Concept of Operation
Collection
Management
Web
Distribution
Web
Webservice
Webservice
Originate NOTAMs at
the Source
Integrate Permanent and
Temporary Information
Distribute NOTAMs to
the Users
Digitally Capture
Temporary Hazard
Information
Apply Business Rules,
Validate Data,
Translate, and Publish
Electronic Distribution to
FAA customers,
Computer Readable
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
Federal NOTAM System: NOTAM Origination
Collection
Management
Web
Webservice
Originate NOTAMs at
the Source
Digitally Capture
Temporary Hazard
Information
NOTAM Manager
Digital NOTAMs
Distribution
Direct NOTAM Submission
Web
WebeNOTAMII
service
Analog NOTAMS
Flight Service Approval
Integrate Permanent and
Temporary Information
Distribute NOTAMs to
the Users
Apply Business Rules,
Electronic Distribution to
Validate Data,
customers,
NOTAM OriginationFAA
Service
Translate, and Publish
Digital NOTAMs Computer Readable
Direct NOTAM Submission
System-to-system interface
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
Federal NOTAM System: NOTAM Management
Management
Airport Self-Certification
Airport Registration
Agreements
User Training
FNS Administration
System Monitoring
Event Scenario Management
User Management
Integrate Permanent and
Temporary Information
FNS Database
Legacy NOTAM Sync
Transformation Service
Apply Business Rules,
Validate Data,
Translate, and Publish
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
FNS Dashboard
NOTAM Metrics
Safety Case Reports
NOTAM Trends
Federal Aviation
Administration
Federal NOTAM System: NOTAM Distribution
NOTAM Search
Graphical NOTAM Display
Contextual Information (links)
Distribution
Web
NOTAM Search ATC
Search Preferences
Assured Delivery
Webservice
Distribute NOTAMs to
the Users
FNS NOTAM Distribution Service
System-to-system interface
Enables Graphical Display
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Electronic Distribution to
FAA customers,
Computer Readable
Federal Aviation
Administration
FNS Current Status
•
•
•
•
NOTAM Manager deployed at 110 airports
ENII deployed to Flight Services
NOTAM Manger Tech Ops at the OCCs
FNS NOTAM Origination Services
supporting TLOs
• FNS NOTAM Statistics:
– 66% of domestic NOTAMS going through FNS
– 27 % NOTAMs digitalized
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
DEMONSTRATION
FAA moving to digitalized mission support safety system
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
Additional Information
• Web: https://notams.aim.faa.gov
• Email: [email protected]
• For additional information:
– Diana Young, FAA
• [email protected]
– Vinod Vallikat, CGH
• [email protected]
Federal NOTAM System
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
What is a Digital NOTAM?
AIXM (XML) Message
• Digital NOTAM Definition
– A dataset that contains NOTAM
information in a structured format
– Fully interpreted by an automated
system without human intervention
• Characteristics of Digital NOTAMs
–
–
–
–
–
–
Geo-referenced
Temporal
Linked to static data
Transformable
Query enabled
Electronically distributable
ACY RWY 22 CLSD
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
Aeronautical Information Exchange Model
• AIXM is designed to enable
the management and
distribution of Aeronautical
Information Services (AIS)
data through the use of a
common exchange model
• Developed by the FAA and
EUROCONTROL with
support from the
International Community
www.aixm.aero
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
Benefits to using AIXM
• Achieve neutrality against applications and their local views
of the data
– Display customized for end user
• Improved safety
– Reduce data inconsistencies, computer readable data means fewer
errors for pilots and other users
– Automated processing of information
– Ensure the quality of the Aeronautical Information required by modern
air navigation and ATC systems
• Represents both static and dynamic data
• International Digital Harmonization
– Establish a set of international standards and specifications for
exchanging digital information
PMO – Industry Forum 2012 – AIM
FAA –AIM
AJV-2
Federal Aviation
Administration
FNS Software Stack…
• PostgreSQL/PostGIS (Database)
• IBM Websphere (J2EE Application Server)
– FNS software is application server agnostic)
• F5 Big IP (Load balancer)
• Oracle Web cache (Proxy Server)
• Sun Solaris Operating System
– FNS Software is OS agnostic
• Apache CXF, ActiveMQ (Message Broker), Camel
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration
FNS Infrastructure…
• High Available Architecture
–
–
–
–
Replicated database for fault tolerance
Clustered Application Servers
Load balances
Redundant Proxy servers (NATing/Security)
• Real time Monitoring
– Nagios Monitoring system
– Integrated Feedback (Jira)
PMO – Industry Forum 2012 – AIM – AJV-2
Federal Aviation
Administration