Agenda Property Maintenance Committee – FBC Halifax Date: April 8th, 2015, 1200 - 1300 hrs board room Agenda items; 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Update on the status of Sexton activities – Ken a. Coordination of maintenance activities Work plan for 2015 – finalized Space study committee – progress to date - Ken Flooring for the assembly room status - Ken Heating system repairs and control work for heating system - Ken Handrails for the sanctuary – Ken Church pew refurbishing – Ken Property condition assessment – Dave Exterior window upgrades - Ken Relocation of the Creche to the primary room - Ken Snow on the CE Wing flat roof – Ken Refinishing of the exterior wooden doors – Dr. Eisner New Business Next meeting –May 13, 2015 Closing the Parsonage 1290 Oxford Street Updated April 8th, 2015 NO. ACTIVITIES ACTION Status 1.0 Fuel – we will remove ourselves from the automatic fill up procedure with our fuel oil supplier. We will use a “will call” feature to keep fuel oil in the tank as required. Second fuel delivery this year was late March Ken Completed 2.0 Heat – reduce the heat in the parsonage to a minimum. Ken Completed 3.0 Electrical - we will de energized the electrical systems with the exception of the exterior lighting circuits as well as one electrical power circuit for the telephone system Telephone – we will maintain the telephone service in order for the communications for the security system to work. Ken Completed Ken Completed 5.0 Water – we will close the water service at the meter in the house, drain the water from the hot water tank, water piping and fill the water traps will antifreeze. Wayne Outstanding 6.0 Garbage cans / green bins – clean and secure the garbage cans / Green bin to the garage in the parsonage. Wayne Outstanding 7.0 Notify the insurance company of the change in use. Alana Completed 8.0 Set up a schedule to have Wayne walk thru the parsonage on a daily basis to confirm no issues with the parsonage. Ken Completed 9.0 Locks – arrange for the locks in the parsonage to be changed. Wayne Outstanding 4.0 FBCH Capital Works Program Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Rank 10 11 14 3 5 4 15 16 2 1 12 13 8 9 6 7 DEG 11 12 16 1 10 9 17 18 3 2 14 15 8 13 5 4 6 7 Project list 2015/2016 Refinish varnish on new wooden exterior doors New rear wooded doors on Assembly room, Crèche and maintenances room Repaint lower level hallways Planning for the heating system replacement Replacement of the HVAC Controls Replacement of the Heating systems piping and radiators Install inspection hatches in lower level hallway Continue asbestos mitigation program. Replacement of the ceiling in the north stairwell Masonary repairs on the north elevation above the north stairwell Reroofing work for the main sanctuary roof Repointing of the interior of the church tower Replacement of the combustion air intakes for the three boilers Exterior window upgrades New flooring in assembly room ( funding from the auxiliary for this project) New flooring in classroom off assembly room ( funding from the auxiliary for this project) Property condition assessment—long term replacement needs and estimated costs Evaluation of main sanctuary roof and church tower replacement/repair need/timing March 11, 2015 – PROPERTY MAINTENANCE COMMITTEE FIRST BAPTIST CHURCH HALIFAX Present: ; Ken Margeson, Chair, Property Maintenance; Doug Eisner, Member; Joanne Stonehouse, Past President, Church Aux.; Alan North, Member; Dave Gibson, Chair, Board of Management; Regrets: Ken Myers, Member; Naomi Nonnekes, Chair, Board of Trustees; Anthony Zadeh, Member; Sheila Stanley, Chair, Personnel: Louise Schurman, Secretary 1. Update on the status of Sexton activities – Wayne’s forecast return to work is mid May. Nature of the leave is a medical leave. 2. Work plan for 2015 – draft work plan will be circulated after the meeting, and we will need everyone’s comments. 3. Marvin windows replacement – Ken Margeson Marvin Windows continues with issues. We are keeping a record of any further issues with these windows. 4. Space study committee – progress to date – Ken Margeson 5. Ken is preparing a question and answers presentation to the Congregational Meeting. 6. Asbestos work a) Plan for the department of labor and BoM – Dave Gibson has prepared a number of volumes of documents for the Department of Labor, and these can be brought forward to BOM for the next meeting. 7. Grant Activities a) Wrap up Report – Ken Margeson 8. Flooring for the assembly room status – Alan North The FBC auxiliary has revised its decision to move forward with the funding for the flooring replacement, and will be funding this project. We will retain Cynthia Street to prepare a set of specifications for the project. Anticipated start will be July 04th 9. Heating system repairs and control work for heating system – Ken Margeson: First meeting of the sub-committee to be scheduled for this month. Sub-committee – A. Zadeh; B. Whalen; N. Nonnekes; K. Margeson 10. Handrails for the sanctuary – Alan North / Ken Margeson Handrails are proposed for Sanctuary: we have looked at several layouts, and have finalized a layout. We will be meeting with Rodney Enterprises shortly on site to review the particulars for this project. 11. Church pew refurbishing – Alan North: Church pews need to be cleaned / and a polish applied. Alan is to review a polish that we can try to see how it works. 12. Fee proposal for interior glazed windows is anticipated from Nova Windows, who is working with Cynthia Street. 13. The minutes from February have been revised, as revision 1 Dated April 7, 2015, and are attached to these minutes. 14. Dr Eisner will contact the exterior door supplier for the recommended maintenance program for the exterior doors. 15. New Business 16. Next meeting, April 08, 2015 Respectfully submitted, Ken Margeson P.Eng. FEBRUARY 11, 2015 – PROPERTY MAINTENANCE COMMITTEE FIRST BAPTIST CHURCH HALIFAX REVISION1 ARPIL 7, 2015 Present: Sheila Stanley, Chair, Personnel; Ken Margeson, Chair, Property Maintenance; Doug Eisner, Member; Marlene Dexter, President, Church Aux.; Alan North, Member; Dave Gibson, Chair, Board of Management; Louise Schurman, Secretary Regrets: Ken Myers, Member; Naomi Nonnekes, Chair, Board of Trustees; Anthony Zadeh, Member; 1. Update on the status of Sexton activities – Sheila Stanley Sheila informed the Committee that Wayne McPhee, Sexton will be off work for the next few weeks. Jennifer is working the interior 5 hours/day and Peter is looking after snow removal. Ken will be monitoring the Parsonage. It has been decided Wayne and Ken will meet prior to every PMC Meetings. Shared understanding of warranties as to who is responsible for all documentation and procedures for follow-through should a problem arise. 2. Work plan for 2015 – review previous and create forecast 3. Marvin windows replacement – Ken Margeson Marvin Windows continues with issues – Wayne has had them come and caulk 3-4 times and leakage persists. We will in future keep improved records and documentation in order to demand better service from Marvins. 4. Space study committee – progress to date – Ken Margeson Ken is preparing a question and answers presentation to the Congregational Meeting. 5. Asbestos work a) Plan for the department of labour and BoM – Dave Gibson Almost finished, just wandering around taking pictures. Taking down ceiling by vault. Abatement work being done by elevator. 6. Grant Activities a) Wrap up Report – Ken Margeson 7. Flooring for the assembly room status – Ken Margeson Flooring project funded by the Church Auxiliary has been withdrawn and money will be returned to Church Auxiliary Account as stated by President, Marlene Dexter. 8. Heating system repairs and control work for heating system – Ken Sub-committee – A. Zadeh; B. Whalen; N. Nonnekes; K. Margeson 9. Handrails for the sanctuary – Alan North Handrails are proposed for Sanctuary, they would be of brass and come from a company in Montreal. Handrails and brackets are a specialty of Warren Hoeg during his career days and Alan will call him as Alan is out of touch with these fixtures. It appears there are issues in the balcony where height is a risk factor and on the chancel steps the flooring is limestone and concrete. 10. Church pew refurbishing – Ken Church pews need to be cleaned. 11. New Business 12. Next meeting, March 11, 2015 Meeting adjourned at 1:10 p.m. Respectfully submitted, Ken Margeson
© Copyright 2024