AGENDA GREEN BAY METROPOLITAN SEWERAGE DISTRICT

AGENDA
GREEN BAY METROPOLITAN SEWERAGE DISTRICT
COMMISSION MEETING
March 25, 2015
Daniel J. Alesch Training Center, 2231 N. Quincy Street
8:30 a.m.
1)
Safety moment.
2)
Convene in closed session under State Statute 19.85 (1) (e) for the purpose of deliberating or
negotiating the purchasing of public properties, the investing of public funds, or conducting other
specified public business, whenever competitive or bargaining reasons require a closed session:
a)
Brown County Household Hazardous Waste Facility Agreement
3)
Reconvene in open session.
4)
Approval of minutes of Commission meeting held February 25, 2015.
5)
January financials.
Click Here:
Click Here:
Click Here:
Click Here:
Click Here:
6)
(Sigmund)
(Diaz)
Financial Memo
Income Statement
Income Statement Legends
Statements of Net Position
Statements of Net Position Legends
Request Commission approval to enter into an agreement with Arcadis U.S., Inc. for a
Billing Program Design Project.
(Vander Loop)
Click Here: Memo
7)
Request Commission approval to award the 2015 Green Bay Facility Mechanical Building
Roof Replacement Project to Northern Metal & Roofing Co., Inc.
(Erschnig)
Click Here: Memo
8)
Request Commission approval to enter into an agreement with Starboard Consulting for
replacement of NEW Water’s Computerized Maintenance Management System.
(Erschnig)
Click Here: Memo
9)
Request Commission approval to close out the West Tower Drive Interceptor Relocation
Project 10-621 and issue final payment of $40,574.65 to PTS Contractors, Inc.
(Angoli)
Click Here: Memo
Click Here: Final Project Report
10)
Request Commission approval of Amendment No. 12 for CH2M HILL to provide bid and award
services for the Resource Recovery and Electrical Energy Project – Contract 34 Digestion and
Solids Facility.
(Angoli)
Click Here: Memo
11)
Request Commission approval of Amendment No. 13 for the additional Nutrient Recovery design
services for the Resource Recovery and Electrical Energy Project.
(Angoli)
Click Here: Memo
12)
Request Commission approval to increase the contingency amount for the Green Bay Facility
Disinfection System Upgrades Project design services.
(Sarau)
Click Here: Memo
13)
2013 significant noncompliance summary and pretreatment update.
(Oldenburg)
Click Here: Memo
14)
2013 Industrial Achievement Awards.
(Oldenburg)
Click Here: Memo
15)
Update of projects:
a)
Resource Recovery and Electrical Energy (R2E2)
Click Here: Memo
b)
Primary Switchgear and Utility Relocation (R2E2 – Contract 33)
Click Here: Project Report
c)
MCC-B1/B1A Replacement
(Angoli)
(Brown)
(Sarau)
Click Here: Project Report
16)
Operation report:
(Wescott)
Click Here: Memo
a)
Effluent quality for February
Click Here:
Click Here:
Click Here:
Click Here:
b)
Effluent Report – Green Bay Facility
Graph of Effluent Report – Green Bay Facility
Effluent Report – De Pere Facility
Graph of Effluent Report – De Pere Facility
Air quality for February
Click Here: Air Report – Green Bay Facility
Click Here: Graph of Air Report – Green Bay Facility
17)
Executive Director’s report:
Click Here: Memo
a)
b)
c)
d)
e)
f)
g)
h)
April Commission meeting
NR101 Fees
Umbrella limits for suspended solids and phosphorus
Construction air permit
NACWA awards
Executive Director’s approval authority for R2E2 Project
Insurance coverage renewal
Phosphorus Summit
(Sigmund)
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Maridey Diaz
DATE:
March 17, 2015
SUBJECT:
2015 January Financial Statements
Please find attached the Financial Statements for your review.
Operating Revenues
 January’s operating revenues were favorable to budget by $255K or 10% due to the warmer weather
causing snowmelt that led to more flows received than anticipated and other revenues from septage of the
three cheese facilities.
NEW Water User Fees Revenues – Comparison by Parameters
January
Parameters
Actual Variances
Compared to Budget
% Compared
to Budget
Volume
$48,002
106.9%
BOD
$99,308
116.7%
($28,561)
94.0%
$1,469
107.4%
TKN
$21,290
113.3%
I&I
($36)
99.8%
$141,472
105.9%
Suspended Solids
Phosphorus
Total
5.9%
Note: The chart summarizes variances, in comparison to budget, of user fees from municipalities and mill waste.
Operating Expenses
 January’s operating expenses were favorable to budget by $156K or 10% due to less expenditures than
budgeted from:
- No chemical purchase on polymer (based on purchase versus usage).
- Natural gas and fuel oil from less gas used in heating at Green Bay Facility than projected.
- Contracted services of environmental programs delay from receiving waters planning.
- Maintenance interceptors due to less expenditures than budgeted.
- Supplementary expenses due to less expenditures on small tools than budgeted.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda

January’s operating favorable expenses were offset by unfavorable results as compared to budget from
maintenance plant of an unbudgeted incinerator hearth replacement of $63K.
Net Income
The net income for the month of January was $515K from operating income (Operating Revenues less Operating
Expenses).
Reporting and Information
Following are the Operating Revenue and Expense graphs, and the Income Statement and Statements of Net
Position Legends are attached.
No Commission action is required.
NEW Water
2015 Operating Revenues
4,400,000
Operating Revenues
4,000,000
3,600,000
3,200,000
2,800,000
2,400,000
2,000,000
1,600,000
1,200,000
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
2015 BUDGET 2,545,612 2,366,186 2,791,484 4,197,248 2,827,313 2,615,620 2,533,227 2,513,587 2,430,138 2,638,667 2,593,605 2,506,172
2015 ACTUAL 2,800,393
% from Budget
10.0%
2015 Operating Expenses
Operating Expenses
1,800,000
1,600,000
1,400,000
1,200,000
1,000,000
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
2015 BUDGET 1,609,238 1,663,847 1,645,605 1,558,973 1,606,094 1,744,245 1,534,319 1,534,412 1,579,865 1,515,268 1,472,174 1,628,498
2015 ACTUAL 1,453,143
% from Budget
9.7%
Return to Agenda
NEW Water
Green Bay Metropolitan Sewerage District
INCOME STATEMENT
For the Month Ending January 31, 2015
Current Month
Actual
2015
Budget
2015
Year to Date
Actual
2014
Budget
vs. Actual
Favorable/
(Unfavorable)
Operating Revenues
User Fees - Municipal Waste
$
2,318,948
User Fees - Mill Waste
$
92,806
Capital - Mills
$
97,072
-
Other Revenues
2,460,749
$
4,266
-
133,858
141,802
92,035
-
242,571
2,373,151
-
108,713
218,420
--------------------- ------------------------------------------ ----------------------Total Operating Revenues
$
2,545,612
$
2,800,393
$
254,781
$
2,683,606
$
578,583
$
576,708
$
1,875
$
557,750
Operating Expenses
Salaries
Benefits
220,341
208,462
11,879
219,309
18,783
9,874
8,909
10,524
4,871
2,409
2,462
794
Power
192,671
188,881
3,790
190,979
Natural Gas & Fuel Oil
185,182
149,883
35,299
187,867
47,556
8,989
38,568
93,840
102,563
134,992
( 32,429 )
121,195
Employee Development
Travel and Meetings
Chemicals
Maintenance - Plant
Maintenance - Interceptors
23,727
315
23,411
10,247
121,497
93,180
28,317
104,094
Insurance
16,945
16,945
-
16,989
Solid Waste Disposal
24,590
11,855
12,735
13,781
Office Related Expenses
21,888
23,673
( 1,786 )
29,526
Supplementary Expenses
50,041
26,977
23,064
20,038
Contracted Services
(See Legend)
--------------------- ------------------------------------------ ----------------------Total Operating Expenses
$
1,609,238
$
1,453,143
$
156,095
$
1,576,934
--------------------- ------------------------------------------ ----------------------Operating Income
$
936,374
$
1,347,250
$
410,875
$
1,106,672
--------------------- ------------------------------------------ ----------------------Non-Operating Revenues and Expenses
Investment Income
$
Depreciation
45,906
$
(617,011)
Gain (Loss) on Disposal of Fixed Assets
-
Interest Expense
( 468,045 )
56,246
$
( 617,011 )
10,340
$
-
-
( 568,231 )
-
( 271,051 )
39,300
-
196,994
( 123,596 )
--------------------- ------------------------------------------ ----------------------Total Non-Operating Revenues and Expenses
$ ( 1,039,151 ) $
( 831,816 ) $
207,335
$
( 652,527 )
--------------------- ------------------------------------------ ----------------------Net Income (Loss)
$
( 102,777 ) $
515,433
$
618,210
$
454,144
--------------------- ------------------------------------------ ----------------------Note: Please reference attached legends by categories.
Return to Agenda
1
NEW Water
Green Bay Metropolitan Sewerage District
Income Statement Legends per Categories
Operating Revenues:
User Fees - Municipal Waste:
Volume, Biochemical Oxygen Demand, Suspended Solids,
Phosphorus, Kjeldahl Nitrogen, Direct Charges
User Fees – Mill Waste:
Volume, Biochemical Oxygen Demand, Suspended Solids,
Phosphorus, Kjeldahl Nitrogen Direct Charges from Procter &
Gamble, and Fox River Fiber
Capital and Direct Revenue Mills:
Capital and Debt Service Charges.
Other Revenues:
Excess Capacity Rental and Exceedance Surcharges, Discounts
Permit Fees, Leases and miscellaneous revenues.
Operating Expenses:
Salaries:
Departmental, Pretreatment, Interceptor, Meter and Lift Stations (East
River Lift Stations and Old Plank Lift Stations).
Benefits:
Health, Dental, & Life Insurances, Retirement, Social Security, Fringe and
Compensated Benefits, Workers and Unemployment Compensations,
Uniforms, Employee Referral Services, Long Term Disability, and
Wellness.
Employee Development:
Registration, Conference, Seminar, Tuition Fees and Training.
Travel and Meetings:
Lodging, Transportation, Meals, Mileage, and Meetings (prior were
included in Employee Development and Supplementary Expenses).
Power:
All Power related.
Natural Gas & Fuel Oil:
Generators, Incineration and Heating.
Chemicals:
Sodium, Polymer, Ferric Chloride, Muriatic Acid, Lime, etc., Interceptor
Odor Control and Lab Chemicals.
Maintenance Plant:
Repair and Maintenance Building and Equipments, Inventories
(Obsolescence, Variances), Telephones for Lift and Meter Stations,
Pretreatment Programs, Inventory Obsolescence, Leases and Rental.
Return to Agenda
2
NEW Water
Green Bay Metropolitan Sewerage District
Income Statement Legends per Categories
Operating Expenses (Continued):
Maintenance Interceptors:
Repair and Maintenance of Interceptors, Lift Stations, and Meter
Stations.
Contracted Services:
Contractors, Legal, Audit, Studies, Occupational Health, Custodial
Services, Environmental Programs, Sponsorship, Hazardous Waste
Disposal, Class and Compensation, Household Hazardous Waste
Disposal, DNR Environmental Fees, In District Sustainability, Risk Based
Asset Management, Watershed Based Planning, Reg/Muni Environment
Service and Contingency.
Insurances:
Automobile, Property, Boiler and Machinery, Liability, Umbrella,
Commercial Crime, and Public Officials.
Solid Waste Disposal:
Hickory Meadows Landfill and Veolia Environmental Services.
Office Related Expenses:
Supplies, Postage, Data Processing (computer software, main
application, support, etc.), Publishing, Sales and Use Tax, Bank Service
Charges and Employee Recognition.
Supplementary Expenses:
Telephones (main lines, cells), Fuel Vehicles, (New) Fuel Equipment,
Small Tools, Public Information, Memberships and Dues, Publications
and Subscriptions, Licenses & Permits, Freight In, Freight Out, Safety
Shoes and Glasses, and Water (including Fire Protection supplemental
fee).
Non-Operating Revenues and Expenses:
Investment Income:
Interest on Investments and Interceptor Cost Recovery Interest.
Depreciation Expense:
Monthly Depreciation on all Fixed Assets such as Land, Land
Improvements, Buildings, Vehicle, Boats & Trailers, Machinery
Equipment, Furniture and Fixtures, Interceptors, Meters & Lift
Stations.
Gain (Loss) on Disposal of Fixed Assets: Sale, Disposal, and Transfer of Fixed Asset.
Interest Expense:
Debt Service and Bond Anticipation Note Interest.
Return to Agenda
NEW Water
GREEN BAY METROPOLITAN SEWERAGE DISTRICT
For the Month Ending January 31, 2015
STATEMENTS OF NET POSITION
Assets
Current Assets
Cash and Investments
Receivables
Sewage Treatment Service
Other
Inventories
Prepaid Expenses
$
11,304,446
$
4,623,432
313,354
898,595
160,622
---------------------------$
17,300,449
Total Current Assets
Restricted Assets
Cash and Investments
Accrued Interest Receivables
Interceptor Cost Recovery Receivable
$
80,479,218
195,894
5,039,159
---------------------------$
85,714,270
Total Restricted Assets
Capital Assets
Wastewater Treatment Facilities
Interceptor Sewers
Construction in Progress
$
200,270,734
82,988,041
36,904,530
---------------------------$
320,163,305
Total Capital Assets
Less: Accum Depreciation and Amortization
Net Capital Assets
Total Assets
( 121,525,244 )
---------------------------$
198,638,061
---------------------------$
301,652,781
================
Liabilities and Equity
Current Liabilities
Accounts Payable
Salaries Payable
Other Accrued Liabilities
$
4,322,912
257,768
100,798
---------------------------$
4,681,478
Total Current Liabilities
Liabilities Payable from Restricted Assets
Accounts Payable
Current Maturities of General Long-Term Debt
Interest Accrued
Total Liabilities Payable from Restricted Assets
$
226,423
5,446,191
764,409
---------------------------$
6,437,023
Long-Term Liabilities
General Long-Term Debt, Less Current Maturities
Compensated Absences
Deferred Revenue
Total Long-Term Liabilities
Total Liabilities
$
86,688,780
1,571,476
2,690,553
---------------------------$
90,950,809
---------------------------$
102,069,310
----------------------------
Net Position
Net Position
Invested in Capital Assets, net of Related Debt
Restricted for Equipment & Interceptor Replacement
Restricted for Debt Retirement
Restricted for Capital Projects
Unrestricted
Total Net Position
Note: Please reference attached legends by categories.
$
106,503,091
44,902,447
22,253,191
16,420,693
9,504,050
---------------------------$
199,583,471
================
Return to Agenda
1
NEW Water
Green Bay Metropolitan Sewerage District
Statements of Net Position (previously Balance Sheet) Legends per Categories
Assets
Current Assets:
Are cash and other assets that will be converted to cash or used by
GBMSD in a relative short period of time, usually a year or less.
Cash and Investments:
Petty cash, cash in checking, general savings and investment
accounts, discounts/premiums for unrestricted and restricted.
Accounts Receivables:
All amounts owed to GBMSD by customers.
Sewage Treatment Service:
Accounts receivable for sewage treatment services.
Accrued Interest:
accrued interest and interest received on investments.
Other: Accounts receivable from septage, pretreatment, and
other customers such as Procter and Gamble Paper Products, West
Shore Pipeline Co, etc.
Inventories:
Are goods and materials held available in stock by GBMSD such as
electrical, instrumentation, mechanical, hardware, janitorial, lubes
& oils, fuel oils, polymer, and all other miscellaneous related
products such as copy paper, gloves, respirator or filter head piece,
cartridge, cleaners, towels, etc.
Prepaid Expenses:
Insurances that have been paid for and not yet used such as worker
compensation, liability base, automotive, umbrella base, property
base, boiler & machinery, commercial crime, public officials, health,
dental, and fringe benefits.
Restricted Assets
Cash and Investments:
Savings, investment and money market accounts for debt, plant
and equipment replacement fund (PERF), interceptor cost recovery
(ICR), bond proceeds, and unrealized gain/loss.
Accrued Interest Receivable:
Accrued interest and interest received periodically on restricted
investments.
Return to Agenda
2
NEW Water
Green Bay Metropolitan Sewerage District
Statements of Net Position (previously Balance Sheet) Legends per Categories
Interceptor Cost Recovery Receivable: Deferred receivable from municipal customers in which the
municipalities have agreed to reimburse GBMSD for the cost of
interceptors owned by GBMSD whose capacity has been allocated.
Capital/Fixed Assets:
Capital:
Are all items of property other than inventories, receivables, copy
rights, certain governmental obligations, and real and depreciable
property used by GBMSD (Ex: capital stocks and bonds).
Fixed Assets:
Are long term assets acquired by GBMSD rather than for resale.
Wastewater Treatment Facilities:
Land & land improvements, structures, machinery & equipment,
furniture & fixtures, vehicle, boats & trailers, and amortize assets.
Interceptor Sewers:
Meter & lift stations and interceptors.
Construction in Progress (CIP):
Asset entry records the cost of construction work, which is not yet
completed. A CIP item is not depreciated until the asset is placed in
service.
Accumulated Depreciation &
Amortization:
Shows the total of all depreciation and amortization recorded on
the asset up through the balance sheet date (land & land
improvements, structures, machinery & equipment, furniture &
fixtures, vehicle, boats & trailers, and accumulated amortization).
Depreciation:
Is the amount of plant asset cost allocated to each accounting
period benefiting from the asset’s use; it is a process of allocation,
not valuation.
Amortization:
Is the systematic write–off of the cost of an intangible asset to
expense. A portion of intangible asset cost is allocated to each
accounting period in the economic (useful) life of the asset.
Return to Agenda
3
NEW Water
Green Bay Metropolitan Sewerage District
Statements of Net Position (previously Balance Sheet) Legends per Categories
Other Assets:
Other Receivable:
Miscellaneous receivable such as credits and adjustments received.
Bond Issuance Cost:
Expenditures incurred in preparing and selling a bond issue such as
legal, underwriting, registration fees, etc. These deferred charges
are amortized over the period the bonds are outstanding (date of
issue to the maturity date).
Liabilities and Equity
Current Liabilities:
Are debts, usually due within one year, and the payment of which
normally will require the use of current assets.
Accounts Payable:
Are amounts owed by GBMSD to creditors for items or services
purchased from them. Contains all vouchers that have been
prepared and approved as proper liabilities such as accounts
payable, retainage payable for projects and accounts payable
accruals.
Salaries Payable:
Accrued salaries incurred and not yet paid.
Other Accrued Liabilities:
Amounts owed to employees for services rendered and for which
payment has not been made at the balance sheet date such as
fringe benefits payable, federal income tax payable, FICA payable,
Medicare payable, life insurance, dependent care withholding,
child support payment, United Way payable, and Wisconsin income
tax payable.
Liabilities Payable for Restrictive Assets:
Accounts Payable:
Contains all vouchers that have been prepared and approved as
proper liabilities for restrictive assets.
Current Maturity of Long Term Debt:
Interest Accrued:
Accrual and interest payment on debt services, Clean Water Fund
loan, bond anticipation note, and Wisconsin environmental
improvements.
Return to Agenda
4
NEW Water
Green Bay Metropolitan Sewerage District
Statements of Net Position (previously Balance Sheet) Legends per Categories
Long-Term Liabilities:
General Long-Term Debt,
Less Current Maturities:
Are those debts not due for a relatively long period of time, usually
more than one year.
Clean Water Fund loans, general obligation notes, bond issuance,
bond anticipation notes, and promissory notes.
Compensated Absences:
Are compensation received by employees such as accrued vacation
& sick pay, severance, and paid leave conversion. Accumulated
unpaid vacation and sick paid amounts are accrued when benefits
vested to employees.
Deferred Revenues:
Involves transfer of data already recorded in asset and liability
accounts to expense and revenue accounts (Ex: De Pere
consolidation).
Net Assets
Invested in Capital Assets,
Net of Related Debt:
Restrictive for Equipment and
Interceptor Replacement:
Capital Assets net of debt such as Clean Water Fund loans, general
obligation note, bond issue, bond anticipation loan, promissory
note, bond issuance costs, and discount on bond issue.
Plant and equipment replacement fund (PERF), interceptor cost
recovery (ICR) investments, Rate Stabilization Fund and accrued
interest received.
Restricted for Debt Retirement:
Restrictive debt investment, accrued interest received debt, and
interest payable.
Restricted for Capital Projects:
Restrictive for capital project expenditures for the R2E2 Solids
Project.
Unrestricted:
All other net assets that do not meet the definition of “restricted”
or “invested in capital assets, net of related debt.”
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Brian Vander Loop
DATE:
March 10, 2015
SUBJECT:
Billing Program Design Project – Consultant Recommendation
Background
On March 26, 2014, the Commission approved staff to enter into a contractual agreement with Arcadis
U.S., Inc. (Arcadis) to conduct a Billing Methodology Development Project. The scope of the project was to
review the current billing methodology, research alternative wastewater treatment service billing
methodologies, engage NEW Water municipal stakeholders, compare options against the status quo, and
recommend a framework for a new billing methodology.
In October 2014, NEW Water staff, stakeholders, and Arcadis completed the Billing Methodology
Development Project, which recommended a new Mass Loading billing alternative. This alternative was
approved by NEW Water’s Commission on October 22, 2014 and communicated to all stakeholder
customers. The approved Mass Loading billing alternative will be designed in 2015 and implemented
within the 2016 budget.
Proposed Project
NEW Water staff developed a request for proposal (RFP) document to design a new customer billing
program for the Commission approved new Mass Loading billing alternative. The project contains three
core tasks: 1) Project Management and Quality Assurance, 2) Billing Program Design and 3) Billing
Program User Guide, Documentation, Training and Testing. The new customer Billing Program is to be
tested and accepted by NEW Water by December 15, 2015.
The RFP document was sent to five qualified consulting firms. Three proposals were received from:
WIPFLI CPAs and Consultants, Infinity Technology, and Arcadis. A qualification based selection tool was
used to score and rank each firm based on: project understanding, project approach, related project
experience (similar size projects), project team, and cost(s) and level of effort (value and cost of services).
The qualification based scoring results are attached.
NEW Water staff is recommending award of the Billing Program Design Project to Arcadis based upon the
following:

Project Experience – Most relevant experience: Bergen County, New Jersey – LIMS selection
and implementation, New Haven, Connecticut – development of a custom application to
calculate billing rates, NEW Water – Rate and Billing Methodology projects.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda





NEW Water Experience – Past experience with the Rate and Billing Methodology projects.
These projects ultimately translate to less NEW Water administrative staff burden and continue
to build off the consultant’s established relationships with staff, municipal customers, and the
Commission.
Project Team – A strong and familiar project manager with a technically balanced project team
comprised of computer programmers and wastewater engineers who understand the
wastewater business.
Project Approach – A ground up computer program design approach comprised of a more
robust and defined project development path and model. The approach offers innovative ideas
to enhance the final program. Appropriate level of effort for the project tasks and expected
deliverables.
Project Understanding – Possess greater confidence as evident in Arcadis’ thorough
understanding of the technical and functional project requirements. Arcadis has a clear vision
of NEW Water’s expectations.
Project risks –The project team and approach reduce the risk associated with a timely delivery
of the new Billing Program. The Billing Program is a significant NEW Water computer program
that is responsible for quantifying 95% of NEW Water’s revenue.
Consulting Firm
Infinity Technology
Arcadis
WIPFLI CPAs and Consultants *
Proposal Cost
$125,180
$154,530
$136,000 to $204,000
Total Score
7.56
8.01
NA*
*Note: WIPFLI CPAs and Consultants’ proposal was not scored because the consultant did not follow the
submittal requirements of the RFP document.
Following selection of Arcadis, staff of NEW Water and Arcadis negotiated a reduction of $4,530 through
agreed upon efficiencies and work planning without sacrificing work scope content or quality.
Recommendation
NEW Water staff recommends Commission approval to authorize the Executive Director to enter into a
contractual agreement with Arcadis for NEW Water’s Billing Program Design Project in the amount of
$150,000 and a 10% contingency of $15,000 to be administered under the authority of the Executive
Director.
Commission Action
Request Commission approval to enter into an agreement with Arcadis U.S., Inc. for a Billing Program
Design Project in the amount of $150,000 and a 10% contingency of $15,000 under the authority of the
Executive Director for a total authorized amount of $165,000.
Attachments: Scoring Qualifications Based Selection Documentation
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Mike Erschnig
DATE:
March 4, 2015
SUBJECT:
2015 Green Bay Facility Mechanical Building Roof Replacement Project
Background
NEW Water has budgeted for the replacement of the Green Bay Facility (GBF) Mechanical Building roofs in
2015. The planned roof replacement project is:
1. GBF East Mechanical Building replacement
2. GBF Center Mechanical Building replacement
3. GBF West Mechanical Building replacement
All of the roofs planned for replacement are currently experiencing leaks, which creates the potential for
water damage to critical electrical, sampling, and metering equipment inside the buildings. The mechanical
building roofs were installed in 1975 and were constructed for a 30-year service life. Staff is recommending
that the roofs be replaced before significant and more costly damage is done.
The replacement project will include the removal of the existing roofing systems down to the support
structures and installation of new built up roofing systems. Project proposals were prepared with the
assistance of Tremco, who has been supporting NEW Water with roof condition assessments and
recommendations for many years.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
NEW Water sent out Requests for Proposals for the 2015 GBF Mechanical Building Roof Replacement
Project. The roof replacement project was bid as a package. Proposals were received from: Northern
Metal & Roofing Co., Inc.; E.D. Chase Co., Inc.; and Schaus Roofing & Mechanical Contractors, Inc. All
three of the proposals were evaluated by the Maintenance Department.
GBF Mechanical Buildings
Project Contingency (5%)
Total Project Amount
Northern Metal &
Roofing Co., Inc.
E. D. Chase
Co., Inc.
Schaus Roofing & Mech.
Contractors, Inc.
$166,430
$184,719
$236,390
$8,322
$174,752
NEW Water has budgeted $184,000 for the 2015 GBF Mechanical Building Roof Replacement Project.
Recommendation
NEW Water staff requests Commission approval to award the 2015 GBF Mechanical Building Roof
Replacement Project to Northern Metal & Roofing Co., Inc. in the amount of $166,430 and a 5%
contingency of $8,322 under the authority of the Executive Director for a total project amount of $174,752.
Commission Action
Request Commission approval to award the 2015 GBF Mechanical Building Roof Replacement Project to
Northern Metal & Roofing Co., Inc. in the amount of $166,430 and a 5% contingency of $8,322 under the
authority of the Executive Director for a total project amount of $174,752.
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Mike Erschnig
DATE:
March 13, 2015
SUBJECT:
Computer Maintenance Management System (CMMS) Replacement and Implementation
Project
Background
NEW Water’s current MP2 CMMS was installed and implemented in 1999. Although this system has
served NEW Water well, support and technological improvements for the product have been non-existent
since 2003. The database is currently running on Windows SQL 2000, and the product will not operate on
any system newer than Windows XP. As identified in the Risk Based Asset Management (RBAM) study by
Arcadis in 2011, the MP2 system has been mainly utilized for plant equipment maintenance management,
with no integration capability with the conveyance system assets maintained in the ArcGIS database.
NEW Water staff formed a team to evaluate the current MP2 system and review the recommendation from
Arcadis in the RBAM study of 2011 to determine if a CMMS replacement project was necessary. The cross
functional team, which included purchasing, engineering, maintenance, treatment, information technology,
and accounting, determined that NEW Water should strongly consider evaluating the existing CMMS
program and determine if an upgrade of the existing system or a replacement of it would better align with
the needs of the organization.
NEW Water staff developed a Business Case detailing the need to strengthen the asset management
program at NEW Water and provide for long-term financial planning. A new CMMS would offer
technological capability to effectively manage NEW Water’s assets in the ways and means identified in the
Arcadis RBAM study. The current MP2 system has limited functionality to enable a comprehensive RBAM
solution. Newer technology offers tools to manage assets according to current accepted practices and
standards. Condition and criticality data would provide additional support during the budget process, and
assist in determining the best allocation of financial resources.
Current CMMS technology exists that enables incorporating the GIS capabilities of a linear asset inventory
system with the plant equipment maintenance system. A new CMMS system would provide the opportunity
to combine the functionality of maintenance management, risk-based asset management, and GIS into one
system.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
Proposed Project
In July 2014 NEW Water engaged MWH Americas, Inc. as a professional consultant to evaluate and assist
in the review and selection of CMMS alternatives. As part of this effort, the team evaluated the following
alternatives: maintain status quo with MP2, upgrade MP2 to the latest version, upgrade to a new stand
alone application, or upgrade to a hosted application. After reviewing the benefits, costs, and risks for each
alternative, NEW Water staff recommended upgrading to a new stand alone CMMS system to replace
MP2.
MWH Americas, Inc. assisted NEW Water in establishing the business/functional and technical
requirements for a replacement CMMS application, defined the replacement application process, assisted
in the development of a Request for Proposal (RFP), and participated in the evaluation of software
application proposals.
RFP documents were sent to six qualified CMMS software application providers. Five proposals were
received from: Lucity, Inc.; Asnerlytics, LLC; EMA, Inc.; Nexgen Asset Management; and Starboard
Consulting. The proposal from EMA was eliminated from the final scoring as it was one of two providers
proposing the IBM Maximo product and EMA’s implementation fee was double that of the other provider. A
qualification based selection tool was used to score and rank each firm based on: software functionality and
product demonstration, project team staffing and experience, project approach and methodology, and the
cost of software and implementation. The qualification based scoring results are attached.
NEW Water staff is recommending award of the CMMS Replacement and Implementation Project to
Starboard Consulting, who will implement IBM Maximo V7.6 based upon the following:




Software Functionality – Maximo is recognized worldwide as one of the top CMMS software
packages. By purchasing Maximo, NEW Water will receive a robust CMMS application that
will allow NEW Water employees the ability to enter work requests and requisitions. Licensed
users will have the additional flexibility of a mobile application included with Maximo.
Software Demonstration – The software demonstration provided by Starboard showcased the
functionality of its product, the demonstrated ability for Maximo to be able to successfully
perform tasks using NEW Water’s organizational requirements, the flexibility of the Maximo
mobile application, and its ability to integrate with NEW Water’s ESRI GIS Program.
Project Team Staffing & Experience – A strong project manager with over 15 years of Maximo
implementation experience and teams of functional and technical implementation specialists to
ensure the success, maintainability, and sustainability of the project. The project team brings
experience in implementation of Maximo at wastewater treatment facilities, utilities and
municipalities across the country.
Project Approach & Methodology – The primary goal of this effort is to ensure that technology
systems and data are capable of supporting the most critical asset management needs and
decision making, including: asset condition and criticality analysis, cost tracking, performance
reporting, and capital planning efforts. The project team’s proposed solution will provide
support for the goals identified in NEW Water’s RBAM Program.
Return to Agenda
Consulting Firm
Lucity Inc.; Lucity *
Asnerlytics, LLC; Infor EAM
Nexgen Asset Management
Starboard Consulting; Maximo
Proposal Cost
$211,850
$537,464
$683,400
$505,319
Total Score
4.46
7.23
7.63
9.91
*Note: Lucity Inc.’s proposal was scored, but the team was unanimous in its agreement that the software
package would not meet NEW Water’s needs.
Recommendation
NEW Water staff recommends Commission approval to authorize the Executive Director to enter into a
contractual agreement with Starboard Consulting for replacement of NEW Water’s CMMS in the amount of
$505,319 and a 10% contingency of $50,500 to be administered under the authority of the Executive
Director for a total authorized amount of $555,819.
Commission Action
Request Commission approval to enter into an agreement with Starboard Consulting for replacement of
NEW Water’s CMMS in the amount of $505,319 and a 10% contingency of $50,500 under the authority of
the Executive Director for a total authorized amount of $555,819.
Attachments: Business Case Analysis for RBAM – Computerized Maintenance Management System
Scoring Qualifications Based Selection Documentation
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Bill Angoli
DATE:
January 15, 2015
SUBJECT:
Final Close Out of Project 10-621, West Tower Drive Relocation
Background
On August 22, 2012, the Commission awarded the West Tower Drive Interceptor Relocation Project to PTS
Contractors, Inc. (PTS) in the amount of $6,678,202.50 with a 10% contingency of $667,820.50 for a total
amount of $7,346,023.00. This work was performed to move the existing West Tower Drive Interceptor and
a small portion of the Bayview Interceptor to accommodate the upgrades for State Highway 41.
The contingency was increased at the March 27, 2013 Commission meeting for $1,000,000 because of
difficulties encountered while jacking a 60-inch interceptor sewer pipe under Highway 41. In March 2014 it
was discovered that there were serious issues with the condition of the 48-inch interceptor. At the August
27, 2014 Commission meeting the contingency was increased an additional $1,000,000 to slip-line the
existing gravity sewer pipe and to address the bypass pumping costs.
PTS has completed the work in accordance with the contract documents and is ready for close out and final
payment. Project costs are summarized below:
Original Contract Amount:
Contract Change Orders:
Bypass Pumping Costs (14-034):
Total Project Amount:
$6,678,202.50
$1,873,814.58
$ 226,833.74
$8,778,850.82
This project received 90% reimbursement from the Wisconsin Department of Transportation (WDOT) for
original contract work. The work performed to slip-line the pipe cost $437,087.23 and is reflected in the
contract change order amount above. It has not been determined if NEW Water will receive 90% funding
from the WDOT for the additional costs to address the failing pipe. If funding is not approved by the WDOT,
this cost will be funded from the Interceptor Cost Recovery Reserve.
Recommendation
Staff recommends Commission approval to close out the West Tower Drive Interceptor Relocation Project
and issue final payment to PTS Contractors, Inc. in the amount of $40,574.65.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
Commission Action
Request Commission approval to close out the West Tower Drive Interceptor Relocation Project 10-621
and issue final payment of $40,574.65 to PTS Contractors, Inc.
Attachment
cc:
Nathan Qualls
Return to Agenda
Monthly Construction Progress Report
Project Name:
Project Number:
Report Number:
Reporting Period:
Project Manager:
West Tower Drive Interceptor Relocation to Accommodate Highway 41
10-621
9 - FINAL
May 2013 – January 2015
William Angoli
Contractor: PTS Contractors, Inc.
Contract Cost (As of Last Approved Pay Request)
Amount
A. Original Contract Sum:
$6,678,202.50
B. Net Change by Change
$1,873,814.58
Orders:
$8,552,017.08
C. Contract Sum to Date
$8,552,017.08
(A+B):
$40,574.65
D. Total Complete and
$8,511,442.43
Stored to Date:
$8,511,442.43
E. Retainage:
$40,574.65
F. Total Earned Less
Retainage (D-E):
G. Previous Payments:
H. Balance to Final
Completion (C-G):
Contract Contingency
Authorized Amount: $2,667,820.50
Work Progress
Contract Budget Spent (G/C):
Contract Time
Date
Original Substantial Completion:
06/01/2013
Original Contract Completion:
07/12/2013
Revised Substantial Completion:
06/21/2013
Revised Final Completion:
11/15/2014
Actual Substantial Completion:
04/10/2013
Actual Final Completion:
11/15/2014
Contract Milestones
Do milestones apply?
Yes
If yes, list: WTD 60-inch and 66-inch pipe to be
substantially completed by March 8, 2013.
Amount Used: $1,873,814.58
99%
Contract Work Completed:
100%
Work Accomplished During Reporting Period
Completed the slip-lining of the failed Bayview Interceptor and demobilized the standby bypass pumping equipment. Agreed
with contractor on final quantities of materials used for final change order to close out project.
Work Scheduled for Next Reporting Period
None
Outstanding Issues
None
Issues Resolved
None
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
William Angoli
DATE:
March 11, 2015
SUBJECT:
Resource Recovery and Electrical Energy (R2E2) Project – Amendment No. 12 - Bid and
Award Services for Contract 34 Digestion and Solids Facility
Background
CH2M HILL has submitted Amendment No. 12 to the professional services agreement to provide bid and
award services associated with the construction contract for Contract 34 Digestion and Solids Facility at
NEW Water’s request. CH2M HILL will provide services to assist NEW Water in selection of a contractor for
the R2E2 Contract 34 Digestion and Solids Facility. The services will consist of the following:








Prepare and place advertisements and notices requesting bids for construction of the project.
Post electronic bid documents for prospective bidders.
Receive and answer bidders’ questions and request for additional information. Provide technical
interpretation of the contract bid documents and prepare responses to questions and requests.
Assist NEW Water in arranging and conducting a pre-bid conference with bidders for project. This
will include developing an agenda, taking minutes and record all questions and respond to
questions and requests from bidders.
Prepare and issue addenda to bidders.
Review all bids and evaluate them for responsiveness and bid amount. Verify financial and
performance history documentation submitted by low bidder and second low bidder. Provide a
report recommending award of the contract from CH2M HILL’s review of the bid documents.
Prepare and distribute conformed contract documents to the selected contractor for signature.
Review signed contract documents for completeness before owner’s signature.
Post contract award services including initiating the document control system and working with
contractor on initial work breakdown structure and construction schedule.
Staff has reviewed the level of effort with respect to the scope of services and finds it to be reasonable for
the work requested. The scope of work and level of effort is attached for reference.
Recommendation
Staff recommends Commission approval to authorize CH2M HILL to provide bid and award related services
in the amount of $362,049.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
Commission Action
Request Commission approval of Amendment No. 12 for CH2M HILL to provide bid and award services for
R2E2 Project – Contract 34 Digestion and Solids Facility in the amount of $362,049 for a total authorized
amount of $12,111,398, which includes previously authorized contingency amount of $901,325 under the
authority of the Executive Director.
Attachment
cc:
Nathan Qualls
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
William Angoli
DATE:
March 13, 2015
SUBJECT:
Resource Recovery and Electrical Energy Project – Nutrient Recovery Design Amendment
Background
At the January 2104 Commission meeting, the Commission approved Amendment No. 7 to the design
services agreement to include the nutrient recovery system for the Resource Recovery and Electrical
Energy (R2E2) Project in the amount of $1,366,308. The nutrient recovery process recovers nutrients from
the dewatering centrate and thickening filtrate to produce struvite, a solid that has a high value as a
fertilizer. During design obstacles were encountered, which could not be anticipated during development of
the design costs.
The following is a summary of major impacts on the design of the nutrient recovery system:





After an update to the R2E2 capital cost estimate, it was found that the original digestion system
capital cost estimate received from the manufacturer was in error by $8 million dollars. Staff
requested that the designer stop progress on the nutrient recovery system design until revisions to
the R2E2 Project to reduce costs were completed. This delay, in part, led to loss of efficiency in the
design effort.
Design costs were based on the approach that the designer would provide a building for their
equipment and the vendor would contract directly for installation. After review by NEW Water legal
counsel, there was a concern that this method of equipment procurement could be considered
design-build. The design approach was modified to a more traditional design-bid-construction
approach and resulted in significant additional process and platform design effort by the designer.
Due to the complex nature of the nutrient recovery systems and ongoing contractual relationship
between NEW Water and the preselected vendor, the preselection documents were sent to the
vendors for their review and comments. This resulted in several exchanges between the vendor,
designer, and legal counsel before final document language was agreed upon.
After receiving vendor preselection proposal documents, a vendor was considering a protest of
selection based on patent infringement. The designer’s senior technologist and additional legal
counsel were requested to assist in the review of the patent infringement.
Final design is being completed eight months after design is substantially completed for the
adjoining facilities. This required restarting of all disciplines which resulted in the loss of efficiency
of a continuous design.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda


Unanticipated design iterations for the waste activated sludge phosphorus release process
including primary sludge thickening, centrifuge thickening, and primary sludge pumping.
Updating plant operation model with actual waste flow data from the mill pretreatment process.
Staff and CH2M HILL have negotiated an additional amendment (Amendment No. 13 – attached) to the
design services agreement to address the scope and design cost changes detailed above. Staff has
determined that the additional costs are appropriate.
Recommendation
Staff recommends Commission approval of Amendment No. 13 for the R2E2 Project in the amount of
$314,236.
Commission Action
Request Commission approval of Amendment No. 13 for the additional Nutrient Recovery design services
for the R2E2 Project in the amount of $314,236 for a total authorized amount of $12,425,634, which
includes the previously authorized contingency amount of $901,325 under the authority of the Executive
Director.
Attachment
cc:
Nathan Qualls
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Lisa Sarau
DATE:
March 12, 2015
SUBJECT:
Request to Increase Contingency Amount for the Design Services for the Green Bay Facility
Disinfection System Upgrades Project (14-040-DS)
Background
On October 22, 2014, the Commission approved the agreement for design services for the Green Bay
Facility Disinfection System Upgrades Project to Strand Associates, Inc. (Strand) in the amount of
$165,044 with a contingency of $24,756 for a total authorized amount of $189,800. The original
contingency is 15% of the agreement cost. The 15% contingency was requested because the project
included several unknowns that would not be discovered until further inspection was completed.
Since the award, Strand has completed the code review and has made several design recommendations to
address safety related issues. These design recommendations include design changes to the emergency
eyewash and showers related to the disinfection system, and HVAC updates in the Dechlorination Building.
Strand has recommended providing tepid water to the emergency eyewash and safety showers (EEWS).
The American National Standards Institute (ANSI) has defined “tepid” as being between 60F and 100F.
Currently, the EEWS related to the disinfection system are unable to meet this requirement. The existing
EEWS use unheated potable water. It is recommended that employees that are exposed to harmful
chemicals stand under the safety shower for 15 minutes. Providing tepid water is important to encourage
users to complete the full 15 minute drench period.
Strand has also recommended HVAC updates in the Dechlorination Building. The driver for these
improvements is to provide year-round fire protection with the existing sprinkler system. The existing
system is shut down every winter because the HVAC in the building is not adequate to provide enough heat
to prevent the sprinkler system from freezing. According to the NFPA 1-2012, the sprinkler system must be
maintained at all times. By shutting down the sprinkler system, NEW Water is not meeting that code. NEW
Water has contacted the State of Wisconsin Fire Protection Plan Reviewer to see if it would be possible to
remove the sprinkler system, but International Building Code (IBC 2009) 903.2.5.1 requires an automatic
fire sprinkler system in all Hazardous occupancies. Because sodium bisulfite is stored in this area, it is
considered a Hazardous occupancy; therefore, the sprinkler system cannot be removed.
Both design change recommendations will result in a safer facility. Staff is recommending approval of the
design changes.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
The cost of the additional design services to implement these recommendations is $28,400. This exceeds
the contingency that was originally requested for the project by $3,644. The contract amendment including
the additional scope of services and level of effort cost breakdown is attached.
Because the design has not been completed, an extra 5% contingency amount is requested to cover any
additional unexpected design changes. The 5% contingency amount of the original contract price is
$8,252.
Recommendation
New Water staff recommends Commission approval to increase the contingency amount for the Green Bay
Facility Disinfection System Upgrade Project design services from $24,756 to $36,652, an increase of
$11,896, to be administered under the authority of the Executive Director.
Commission Action
Recommend Commission approval to increase the contingency amount for the Green Bay Facility
Disinfection System Upgrade Project design services by $11,896 to be administered under the authority of
the Executive Director for a total authorized project amount of $201,696.
Attachment
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Bill Oldenburg
DATE:
March 11, 2015
SUBJECT:
2014 Significant Noncompliance Summary and Pretreatment Update
Significant Noncompliance for Publication
NEW Water is required to publish the following Significant Industrial Users for being in Significant
Noncompliance in 2014:
Badger Sheet Metal Works was in Significant Noncompliance and received a Notice of Violation for
exceeding the categorical monthly average Technical Review Criteria limit for copper, the categorical
daily maximum Technical Review Criteria limit for copper, and the categorical monthly average Chronic
Criteria limit for chromium during the period of July 1 – December 31, 2014. Badger Sheet Metal Works
was also in Significant Noncompliance and received a Notice of Violation for exceeding the categorical
monthly average Technical Review Criteria limit for chromium and zinc and the categorical daily
maximum Technical Review Criteria limit for zinc during the period of January 1 – June 30, 2014.
Scott’s Industrial Coatings – Ontario was in Significant Noncompliance and received a Notice of
Violation for exceeding the categorical monthly average Technical Review Criteria limit for zinc during
the monitoring period July 1 – December 31, 2014.
Attached is the text of the publication as it will be published in the Green Bay Press-Gazette.
Notices of Violation
The following Significant Industrial Users were in violation in the second half of 2014 and received Notices
of Violation:
Marquis Yacht Group for failing to submit a complete and accurate Periodic Compliance Report within
30 days of the due date (January 15, 2015) as required by its permit for the monitoring period July 1 –
December 31, 2014.
Dean Foods for exceeding the 5.0-12.5 s.u. allowable pH range by more than 1% of total minutes
monitored during the period July 1 – December 31, 2014.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
Notice of Noncompliance
The following Significant Industrial User was out of compliance in the second half of 2014 and received a
Notice of Noncompliance:
Paper Converting Machine Company – Northern Engraving for exceeding the monthly average
categorical limit for copper during the period of July 1 – December 31, 2014.
All facilities have taken or are in the process of taking corrective action in order to return to full compliance.
NEW Water continues to offer assistance to its pretreatment industries when noncompliant issues arise in
an effort to reduce the occurrence of enforcement action and return them to full compliance.
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Bill Oldenburg
DATE:
March 12, 2015
SUBJECT:
2014 Industrial Achievement Awards
Background
In 2012, NEW Water implemented a new pretreatment program element called the Industrial Achievement
Awards, which gives recognition to Significant Industrial Users (SIU) that demonstrate exceptional
pretreatment performance. The estimated cost of printing certificates and publication is $525 per year.
The awards will be given at three different levels for each consecutive year of meeting established
requirements. These levels distinguish between dischargers and zero dischargers and are as follows:
Silver Award & Silver Zero Discharger Award:
Gold Award & Gold Zero Discharger Award:
Platinum Award & Platinum Zero Discharger Award:
Meet requirements for the previous regulatory year.
Meet requirements for three consecutive years.
Meet requirements for five consecutive years.
For facilities discharging to the sewerage system, criteria 1, 2, 3 and 4 from the list below apply. For zero
discharge facilities, criteria 1, 2, and 3 from the list below apply.
SIUs are evaluated with the following criteria:
1. The industry must meet NEW Water’s definition of a Significant Industrial User (SIU) and been in
operation and permitted for the entire calendar year.
2. The facility must be in full compliance with its Industrial Wastewater Discharge permit.
3. The SIU must meet all permit self-monitoring and reporting requirements during the calendar year.
4. The SIU must not have any numerical effluent limits violations except for pH during the calendar
year.
o The pH criteria is as follows:
 For those SIUs that do not monitor for pH continuously, no pH effluent limitation
may be violated during the calendar year.
 Where the 5.0 to 12.5 s.u. pH limitation applies to a SIU, no pH may be recorded
at a value less than or equal to 4.6 or greater than or equal to 12.9 s.u. during the
calendar year.
 No individual excursion from a pH limit may exceed sixty minutes in duration over
the course of the calendar year.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda

The total time during which the pH values were outside the 5.0 to 12.5 s.u. pH
limitation may not exceed 4 hours and 20 minutes over the course of either
monitoring period.
Recipients for 2014
NEW Water has evaluated its 54 SIUs according to these criteria and the following 11 SIUs qualify for the
2014 Gold Award:
Expera Specialty Solutions
Georgia-Pacific Landfill
Green Bay Embossing
Green Bay Nonwovens-Plant 1
Green Bay Nonwovens-Plant 2
Industrial Engraving Corporation
Omnova Solutions
Proactive Solutions
Procter & Gamble Paper Products Company
U.S. Paper Mills-Sonoco
Ultra Plating Corporation
The only SIU that qualifies for the 2014 Gold Zero Discharger Award is Green Bay Packaging-Mill Division
The following 16 SIUs qualify for the 2014 Silver Award:
American Metal Finishing
Astro Industries
Austin Straubel International Airport
Brown County Landfill East
Fox River Fiber
Green Bay Anodizing
Green Bay Dressed Beef—Acme
Green Bay Dressed Beef—East River
Green Bay Dressed Beef—Northland
Green Bay Packaging—Coated Products
Green Bay Packaging—Shipping Container Division
JBS
Klemm Tank Lines
RR Donnelley
Sanimax LLC
Valley Plating of Green Bay
The following three SIUs qualify for the 2014 Silver Zero Discharger Award:
EDL Packaging Engineers
MECA & Technology Machine
R-Tek Coatings
Return to Agenda
NEW Water staff would like to congratulate the recipients of the 2014 Industrial Achievement Awards.
Consistent compliance with NEW Water’s Pretreatment Program ensures the protection of the local
waterways and the environment.
Recommendation
This Commission item is informational only.
Commission Action
No action is required.
Return to Agenda
Memorandum
TO:
Commissioners
Tom Sigmund
FROM:
William Angoli
DATE:
March 11, 2015
SUBJECT:
R2E2 Project Update
Project Activity
All prequalification documents from nine general contractors, five mechanical contractors, five electrical contractors
and three third tier subcontractors have been reviewed by the engineer and NEW Water. The following is the list of
contractors who are prequalified to bid on Contract 34 Digestion and Solids Facility:
General Contractor
1. Alberici in St. Louis, MO
2. Boldt in Appleton, WI
3. CD Smith in Fond du Lac, WI
4. Findorff and Sons in Madison, WI/Kenaidan Contracting in Mississauga, Ontario (Joint Venture)
5. Miron Construction in Neenah, WI
6. Walsh in Atlanta, GA
Two general contractors, Kenny Construction Inc. and Lunda Construction Co., did not meet one of the requirements
for prequalification. These two firms did not meet the following requirements:



Within the last ten years to have a minimum of five wastewater treatment plants, including construction of
new or rehabilitation of existing facilities at wastewater treatment facilities.
At least one project exceeding $50 million or greater.
At least 25 percent of the work on the projects shall have been performed by the applicant’s own forces.
Mechanical Contractors
1. August Winters and Sons in Appleton, WI
2. Coenen Mechanical in Appleton, WI
3. H&H Industries in Madison, WI
4. J.F. Ahern in Fond du Lac, WI
One mechanical contractor, Reeke-Marold Co. Inc., was not prequalified because it exceeded the Safety Experience
Modification Rate of 1.0.
Electrical Contractors
1. Faith Technologies in Green Bay, WI
2. Northern Electric in Green Bay, WI
3. Sachs Electric Company in St. Louis, MO
4. Van Ert Electric Company in Green Bay, WI
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
One electrical contractor, Elmstar Electric Corporation, was not prequalified because it exceeded the Safety
Experience Modification Rate of 1.0.
The three third tier contractors, DeGroot Inc, Michels Corporation, and Spancrete Inc., were not required to be
prequalified for this contract. They will be allowed to provide bids to the general contractor as a subcontractor on this
project.
The Construction Air Permit was issued by the Wisconsin Department of Natural Resources for the Resource
Recovery and Electrical Energy (R2E2) Project on March 4, 2015. The issuance of this permit allows NEW Water to
move forward with the construction of the R2E2 Project.
Designer is moving into final design on nutrient recovery and continues to work on review comments and finalizing
the Contract 34 Digestion and Solids Facility bidding documents. Schedule for bidding this contract will start on April
6, 2015 and receive bids from the contractors on May 29, 2015.
Pending Issues
Staff is in the process of negotiating the following items with the designer and will be brought to the April Commission
meeting for approval:


Contract 33 Services During Construction amendment for additional costs
Contract 34 Services During Construction scope of work and costs
Return to Agenda
Monthly Construction Progress Report
Project Name:
Project Number:
Report Number:
Reporting Period:
Project Manager:
Primary Switchgear and Utility Relocation (R2E2 - Contract 33)
08-503-CO
9
February 15, 2015 to March 14, 2015
Bob Brown
Contractor: Miron Construction Co., Inc.
Contract Cost
Original Contract Sum:
Net Change by Change Orders:
Contract Sum to Date:
Total Completed and Stored to Date:
Retainage:
Total Earned Less Retainage:
Previous Payments:
Balance to Finish with Retainage:
Contract Time
Amount
$ 6,243,260.00
$ 15,931.20
$ 6,259,191.20
$ 5,846,959.20
$ 156,479.78
$ 5,690,479.42
$ 5,461,039.42
$ 798,151.78
Original Substantial Completion:
Original Contract Completion:
Revised Substantial Completion:
Revised Final Completion:
Contract Milestones
Do milestones apply?
If yes, list:
Contract Contingency
Authorized Amount: $ 624,300.00
Amount Used: $ 15,931.20
Work Progress
Contract Budget Spent:
Contract Work Completed:
87%
Date
4/20/2015
7/17/2015
4/21/2015
N/A
No
95%
Work Accomplished During Reporting Period
Miscellaneous issues identified during final inspection of the Storage Building were addressed, and a request for partial
substantial completion was received from the contractor. Remaining doors and frames for the Switchgear Building were
received. Final splicing and cutovers were completed, and all primary service cables into the old building were removed. All
mercury containing devices were removed from the old building. Revisions to communication cables were completed, and
regulatory approval was secured for necessary fuel oil system modifications. Functional testing for diesel generator
integration was initiated on February 23, but the discovery of unanticipated conflicts will require additional modification and
testing prior to closing out the project.
Work Scheduled for Next Reporting Period
The new Storage Building will be turned over for owner use. Remaining doors and trim for the Switchgear Building will be
installed. Revisions to the fuel oil system supplying the diesel generators will be completed and inspected. Asbestos
containing materials will be removed from the old Switchgear Building the week of March 16, and building demolition work
will immediately follow. Generator and control system modifications will be completed, and final testing will be performed.
Employee training on the new switchgear components, instrumentation, and HVAC equipment will be conducted in mid to
late March. Final grading and restoration will take place as weather and site conditions permit.
Outstanding Issues
Resolve diesel generator functional testing issues.
Issues Resolved
None.
Return to Agenda
Monthly Construction Progress Report
Project Name:
Project Number:
Report Number:
Reporting Period:
Project Manager:
MCC-B1/B1A Replacement Contract
14-033-CO
3
2/12/2015 to 3/12/2015
Lisa Sarau
Contractor: Van Ert Electric Company, Inc.
Contract Cost
Original Contract Sum:
Net Change by Change Orders:
Contract Sum to Date:
Total Complete and Stored to Date:
Retainage:
Total Earned Less Retainage:
Previous Payments:
Balance to Final Completion:
Contract Contingency
Authorized Amount: $ 40,832
Work Progress
Contract Budget Spent:
31%
Contract Time
Amount
$ 408,320.00
$ 26,432.07
$ 434,752.07
$129,238.40
$6,461.92
$122,776.48
$ 122,776.48
$311,975.59
Original Substantial Completion:
Original Contract Completion:
Revised Substantial Completion:
Revised Final Completion:
Date
4/6/2015
5/6/2015
N/A
N/A
Contract Milestones
Do milestones apply?
Yes
If yes, list: All components of the disinfection system must have
uninterrupted power by April 15, 2015.
Amount Used: $ 26,432.07
Contract Work Completed:
45%
Work Accomplished During Reporting Period
Van Ert Electric has continued with preliminary work necessary before the installation of the MCC, including verification of
MCC loads and conduit installation. Work on the PLC is nearing completion. Work has continued with panelboard
installation and lighting panel installations. Work has continued with the re-feeds of the MCC-E1 loads. Existing MCC-E1
will be demolished as part of the project. The new MCC-B1 arrived on site on March 11, 2015 – almost two weeks earlier
than anticipated.
Work Scheduled for Next Reporting Period
Van Ert Electric intends to start MCC installation by Thursday, March 19, 2015. In conjunction with the MCC construction,
Van Ert Electric will continue with panelboard, lighting panel, and conduit installation.
Outstanding Issues
NA
Issues Resolved
Because the MCC arrived earlier than expected, Van Ert Electric expects to finish the MCC by April 7, 2015 and complete all
required functional testing on April 8, 2015. This schedule meets the requirement to finish the work by April 15, 2015 so that
NEW Water can prepare for the disinfection season.
Return to Agenda
Memorandum
TO:
Commission
Tom Sigmund
FROM:
Patrick Wescott
DATE:
March 16, 2015
SUBJECT:
February Effluent Quality & Air Quality Summary Reports
CC:
Bruce Bartel – Treatment
Mike Erschnig – Maintenance
Effluent Quality
Both facilities were in full compliance with all effluent limits for the month of February. Attached are graphs
showing a rolling 12-month average for effluent quality and permit limits for both facilities.
Air Quality
The Green Bay Facility was in compliance with all air quality limits for the month of February. There was
one event in the month that resulted in a “Deviation Notification” submittal to the Wisconsin Department of
Natural Resources. Attached is a graph showing a rolling 12-month average incinerator operating time and
emergency bypass damper opening.
Attachments
Date
02/04/15
Incinerator
#1
Deviation
Particulate and
Opacity Limit
Duration
21 min. 4
sec.
Cause
Loss of power caused
the Induced Draft (ID)
Fan to shut down
resulting in the
Emergency Bypass
Damper (EBD) opening.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Corrective Action
Contractor working on
Contract 33 that was
working on the control
wiring for the emergency
generators tripped an
electrical breaker causing
a plant wide power
outage. All plant power
was switched over to line
137 for additional
contractor work.
Return to Agenda
EFFLUENT QUALITY - CURRENT YEAR 2015
NEW Water (GBMSD) - GREEN BAY FACILITY
Permit Limits:
FLOW
Million
Gallons
780.376
633.691
MONTH
MGD
JAN
25.17
FEB
22.63
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Average
707.034
23.90
Total
1,414.067
All time record best(s) ->
30 mg/L
Ave
mg/L
9.0
11.3
TSS
Ave
#/Day
1,895
2,132
10.2
2,014
2.0
425
N/A
25 mg/L
Total
#/Month
58,744
59,700
Ave
mg/L
10.6
16.2
T-BOD
Ave
Total
#/Day #/Month
2,218
68,760
3,066
85,842
Ave
mg/L
5.8
7.1
59,222
118,444
13,187
13.4
2,642
6.5
1,278
2.0
336
2.0
329
77,301
154,602
10,267
C-BOD
Ave
Total
#/Day #/Month
1,217
37,736
1,338
37,474
37,605
75,210
9,223
Ammonia Limits
Jan-Apr. Monthly Avg = 15 mg/L
May-Sept Monthly Avg = 4.7 mg/L Weekly Avg = 13 mg/L
1.0 mg/L
October Monthly Avg =14 mg/L Weekly Avg = 38 mg/L
Nov-Dec. Monthly Avg. = 26 mg/L
T. PHOSPHORUS
AMMONIA
TKN
Ave
Ave
Total
Ave
Ave
Total
Ave
Ave
Total
mg/L
#/Day #/Month
mg/L
#/Day #/Month
mg/L
#/Day
#/Month
0.52
108
3,353
2.41
505
15,661
4.23
889
27,553
0.38
72
2,014
5.31
1,002
28,058
7.16
1,351
37,821
0.45
90
0.11
27
2,684
5,367
803
3.86
754
0.02
4
21,860
43,719
128
5.70
1,120
1.01
225
32,687
65,374
6,986
The effluent quality was in compliance with all of the above permit parameters for February 2015.
EFFLUENT QUALITY - CURRENT YEAR 2014
NEW Water (GBMSD) - GREEN BAY FACILITY
Permit Limits:
FLOW
Million
MONTH
Gallons
MGD
JAN
733.985
23.68
FEB
692.546
24.73
MAR
1,004.587
32.41
APR
1,290.321
43.01
MAY
1,216.509
39.24
JUN
1,124.868
37.50
JUL
949.704
30.64
AUG
924.206
29.81
SEP
973.155
32.44
OCT
972.244
31.36
NOV
860.091
28.67
DEC
1,002.525
32.34
Average
978.728
32.15
Total
11,744.741
All time record best(s) ->
30 mg/L
Ave
mg/L
8.7
10.3
8.5
7.1
6.9
9.0
5.3
4.1
4.9
5.9
6.3
7.0
7.0
TSS
Ave
#/Day
1,722
2,126
2,193
2,558
2,254
2,775
1,358
1,015
1,318
1,539
1,501
1,876
1,853
2.0
425
N/A
Total
#/Month
53,378
59,540
67,984
76,753
69,867
83,252
42,107
31,470
39,550
47,700
45,028
58,144
56,231
674,773
13,187
Ave
mg/L
6.2
6.8
6.9
6.5
6.0
6.1
4.5
3.7
4.3
4.6
5.0
6.4
5.6
2.0
T-BOD
Ave
Total
#/Day #/Month
1,223
37,906
1,411
39,514
1,846
57,224
2,332
69,969
1,949
60,417
1,911
57,315
1,161
35,984
929
28,802
1,165
34,946
1,213
37,590
1,189
35,656
1,746
54,122
1,506
45,787
549,445
336
10,267
25 mg/L
Ave
mg/L
3.5
3.6
3.8
4.1
3.4
3.8
2.8
2.1
2.4
2.4
2.7
3.5
3.2
2.0
C-BOD
Ave
Total
#/Day #/Month
697
21,617
744
20,825
1,010
31,303
1,481
44,440
1,119
34,685
1,189
35,682
719
22,275
528
16,379
648
19,440
635
19,691
639
19,157
962
29,830
864
26,277
315,324
329
9,223
Ammonia Limits
Jan-Apr. Monthly Avg = 15 mg/L
May-Sept Monthly Avg = 4.7 mg/L Weekly Avg = 13 mg/L
1.0 mg/L
October Monthly Avg =14 mg/L Weekly Avg = 38 mg/L
Nov-Dec. Monthly Avg. = 26 mg/L
T. PHOSPHORUS
AMMONIA
TKN
Ave
Ave
Total
Ave
Ave
Total
Ave
Ave
Total
mg/L
#/Day #/Month
mg/L
#/Day #/Month
mg/L
#/Day
#/Month
0.29
57
1,768
0.10
19
601
1.76
347
10,758
0.39
79
2,225
0.09
19
524
1.92
398
11,135
0.41
96
2,988
0.18
58
1,786
1.72
460
14,256
0.25
88
2,651
0.26
97
2,905
1.60
577
17,307
0.32
105
3,249
0.10
32
1,001
1.42
464
14,374
0.49
148
4,441
0.13
39
1,175
1.43
444
13,316
0.62
159
4,944
0.13
33
1,030
1.19
304
9,412
0.19
48
1,498
0.15
39
1,211
1.13
282
8,744
0.33
88
2,634
0.12
33
983
1.16
311
9,320
0.47
119
3,690
0.08
23
702
1.24
325
10,077
0.58
135
4,050
0.03
7
195
1.31
312
9,366
0.55
147
4,571
0.13
38
1,189
1.50
410
12,715
0.41
106
3,226
0.13
36
1,109
1.45
386
11,732
38,709
13,302
140,780
0.11
27
803
0.02
4
128
1.01
225
6,986
MGD
Return to Agenda
Flow - Green Bay
50.00
45.00
40.00
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
12 Month Ave. Daily Flow 32.41
43.01
39.24
37.50
30.64
29.81
32.44
31.36
28.67
32.34
25.17
22.63
Total Suspended Solids - Green Bay
35.0
30.0
mg/L
25.0
20.0
15.0
10.0
5.0
0.0
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
12 Month Ave. Conc.
8.5
7.1
6.9
9.0
5.3
4.1
4.9
5.9
6.3
7.0
9.0
11.3
Permit Limit
30
30
30
30
30
30
30
30
30
30
30
30
Carbonaceous Biochemical Oxygen Demand - Green Bay
30.0
25.0
mg/L
20.0
15.0
10.0
5.0
0.0
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
12 Month Ave Conc.
3.8
4.1
3.4
3.8
2.8
2.1
2.4
2.4
2.7
3.5
5.8
7.1
Permit Limit
25
25
25
25
25
25
25
25
25
25
25
25
mg/L
Total Phosphorus - Green Bay
1.10
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
12 Month Ave. Conc.
Permit Limit
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
0.41
0.25
0.32
0.49
0.62
0.19
0.33
0.47
0.58
0.55
0.52
0.38
1
1
1
1
1
1
1
1
1
1
1
1
Ammonia - Green Bay
35.0
30.0
mg/L
25.0
20.0
15.0
10.0
5.0
0.0
12 Month Ave. Conc.
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
0.18
0.26
0.10
0.13
0.13
0.15
0.12
0.08
0.03
0.13
2.41
5.31
Return to Agenda
EFFLUENT QUALITY - CURRENT YEAR 2015
NEW WATER (GBMSD) - DE PERE FACILITY
Permit Limits:
FLOW
Million
Gallons
192.676
164.420
MONTH
MGD
JAN
6.22
FEB
5.87
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Average
178.548
6.05
Total
357.096
All time record best(s) ->
10 mg/L
Ave
mg/L
0.0
0.5
TSS
Ave
#/Day
2
26
0.3
14
0.0
2
N/A
9.0 mg/L
T-BOD
Ave
Total
#/Day #/Month
77
2,394
146
4,092
Total
#/Month
54
724
Ave
mg/L
1.5
3.0
389
778
54
2.3
112
1.5
77
3,243
6,486
2,394
Ave
mg/L
0.7
2.1
C-BOD
Ave
Total
#/Day #/Month
34
1,053
101
2,816
1.4
68
0.7
34
1,935
3,869
1,053
Ammonia Limits
Jan-Mar. Monthly Avg = 27 mg/L Daily Max = 34 mg/L
April
Monthly Avg = 24 mg/L Daily Max = 34 mg/L
1.0 mg/L
May-Oct Monitor only
Nov-Dec. Monthly Avg. = 31 mg/L Daily Max = 34 mg/L
T. PHOSPHORUS
AMMONIA
TKN
Ave
Ave
Total
Ave
Ave
Total
Ave
Ave
Total
mg/L
#/Day #/Month
mg/L
#/Day #/Month
mg/L
#/Day
#/Month
0.14
7
228
0.03
2
50
1.29
67
2,067
0.18
9
252
0.05
2
64
1.41
69
1,934
0.16
8
0.05
3
240
480
83
0.04
2
0.02
1
57
114
41
1.35
68
0.96
56
2,001
4,001
1,739
The effluent quality was in compliance with all of the above permit parameters for February 2015.
EFFLUENT QUALITY - CURRENT YEAR 2014
NEW WATER (GBMSD) - DE PERE FACILITY
Permit Limits:
FLOW
Million
MONTH
Gallons
MGD
JAN
197.409
6.37
FEB
184.987
6.61
MAR
204.345
6.59
APR
206.825
6.89
MAY
213.248
6.88
JUN
211.125
7.04
JUL
162.849
5.25
AUG
207.500
6.69
SEP
238.643
7.95
OCT
223.683
7.22
NOV
214.390
7.15
DEC
242.675
7.83
Average
208.973
6.87
Total
2,507.679
All time record best(s) ->
10 mg/L
Ave
mg/L
1.0
3.6
4.8
1.3
1.0
1.0
2.1
1.3
1.3
1.1
1.1
1.2
1.7
TSS
Ave
#/Day
56
203
272
78
60
60
94
71
87
64
63
81
99
1.0
40
N/A
Total
#/Month
1,721
5,682
8,430
2,342
1,852
1,804
2,925
2,204
2,622
1,970
1,898
2,523
2,998
35,973
1,203
Ave
mg/L
2.3
3.8
4.0
2.3
2.0
2.0
4.3
3.3
3.0
2.1
2.2
2.2
2.8
2.0
T-BOD
Ave
Total
#/Day #/Month
124
3,848
210
5,887
222
6,886
142
4,249
115
3,557
118
3,530
196
6,076
179
5,537
206
6,188
124
3,849
129
3,860
145
4,504
159
4,831
57,971
85
2,545
9.0 mg/L
Ave
mg/L
2.1
2.7
2.9
2.1
2.0
2.0
3.2
2.3
2.1
2.1
2.0
2.1
2.3
2.0
C-BOD
Ave
Total
#/Day #/Month
114
3,519
150
4,195
162
5,035
120
3,588
115
3,578
117
3,522
145
4,491
129
3,986
144
4,331
126
3,912
120
3,590
134
4,158
131
3,992
47,905
79
2,370
Ammonia Limits
Jan-Mar. Monthly Avg = 27 mg/L Daily Max = 34 mg/L
April
Monthly Avg = 24 mg/L Daily Max = 34 mg/L
1.0 mg/L
May-Oct Monitor only
Nov-Dec. Monthly Avg. = 31 mg/L Daily Max = 34 mg/L
T. PHOSPHORUS
AMMONIA
TKN
Ave
Ave
Total
Ave
Ave
Total
Ave
Ave
Total
mg/L
#/Day #/Month
mg/L
#/Day #/Month
mg/L
#/Day
#/Month
0.20
10
325
0.15
8
235
1.36
73
2,250
0.21
12
332
0.23
13
351
1.89
105
2,941
0.25
14
446
0.45
26
801
1.86
104
3,219
0.16
10
292
0.27
21
618
1.26
76
2,283
0.16
9
294
0.12
7
212
1.20
67
2,079
0.29
16
484
0.14
9
273
1.17
67
2,007
0.66
30
915
3.86
187
5,802
5.49
259
8,017
0.33
18
573
1.53
77
2,375
2.77
145
4,480
0.31
20
614
0.73
55
1,638
1.81
126
3,788
0.27
16
483
0.09
6
171
1.04
62
1,921
0.28
16
493
0.02
1
42
1.16
69
2,076
0.19
12
384
0.02
2
48
1.07
69
2,150
0.28
15
470
0.63
34
1,047
1.84
102
3,101
5,635
12,566
37,211
0.05
3
83
0.02
1
41
0.96
56
1,739
Return to Agenda
Flow - De Pere
9.00
8.00
7.00
MGD
6.00
5.00
4.00
3.00
2.00
1.00
0.00
mg/L
12 Month Ave. Daily Flow
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
6.59
6.89
6.88
7.04
5.25
6.69
7.95
7.22
7.15
7.83
6.22
5.87
Total Suspended Solids - De Pere
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
12 Month Ave. Conc.
4.8
1.3
1.0
1.0
2.1
1.3
1.3
1.1
1.1
1.2
0.0
0.5
Permit Limit
10
10
10
10
10
10
10
10
10
10
10
10
Carbonaceous Biochemical Oxygen Demand - De Pere
mg/L
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
12 Month Ave Conc.
mg/L
Permit Limit
1.10
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
12 Month Ave. Conc.
Permit Limit
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL 2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
2.9
2.1
2.0
2.0
3.2
2.3
2.1
2.1
2.0
2.1
0.7
2.1
9
9
9
9
9
9
9
9
9
9
9
9
Total Phosphorus - De Pere
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL
2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
0.25
0.16
0.16
0.29
0.66
0.33
0.31
0.27
0.28
0.19
0.14
0.18
1
1
1
1
1
1
1
1
1
1
1
1
Ammonia - De Pere
35.0
30.0
25.0
mg/L
20.0
15.0
10.0
5.0
0.0
-5.0
12 Month Ave. Conc.
Permit Limit
MAR
2014
APR
2014
MAY
2014
JUN
2014
JUL 2014
AUG
2014
SEP
2014
OCT
2014
NOV
2014
DEC
2014
JAN
2015
FEB
2015
0.45
0.27
0.12
0.14
3.86
1.53
0.73
0.09
0.02
0.02
0.03
0.05
27
24
31
31
27
27
Return to Agenda
INCINERATOR EMISSIONS REPORT - CURRENT YEAR 2015
NEW Water (GBMSD) - GREEN BAY FACILITY
(Preliminary Results)
Incinerator #1 - System Operating Parameters Assessment
Incinerator Parameters
Monthly Run
Time
(%)
Maximum
Wet Lbs / Hr
Sludge
Maximum
Dry Tons / Hr
Sludge
Control Point
NA
(1)
January
February
March
April
May
June
July
August
September
October
November
December
60%
96%
10,671
10,983
Evaporation
Lbs / Hr Water
Average
Secondary
Temp. (°F)
Average
Oxygen
%
Average
Opacity
%
CEMS Parameters
Maximum
Days Above
Maximum
Average
Maximum
Hearth Temp.
(°F)
Corrected
Average THC Data Capture %
(ppm)
(2)
≤ 8,800 (3)
NA
≤ 8,800 (2)
1936 (2)
≥ 950 (4)
≤ 8.45 (5)
< 20 (6)
< 100 (7)
1.023
1.087
8,561
8,548
0
0
8,117
8,012
1,662
1,697
1,074
1,109
6.03
6.75
4.77
4.04
4.70
3.20
Annual Average
Incinerator #2 System Operating Parameters Assessment
Incinerator Parameters
Monthly Run
Time
(%)
Maximum
Wet Lbs / Hr
Sludge
Maximum
Dry Tons / Hr
Sludge
Control Point
NA
(1)
January
February
March
April
May
June
July
August
September
October
November
December
84%
48%
10,903
11,064
Evaporation
Lbs / Hr Water
Monthly Hours
on Line
Total
Scrubber
Δ P " WC
Pre- Cooler
Temperature (°F)
> 90 (8)
NA
> 13.71 (5)
< 200
98.2%
96.7%
445
642
19.72
20.58
160
158
97.5%
CEMS Parameters
Maximum
Days Above
Maximum
Average
Maximum
Hearth Temp.
(°F)
(2)
≤ 8,800 (3)
NA
≤ 8,800 (2)
1862 (2)
≥ 950 (4)
≤ 8.16 (5)
< 20 (6)
< 100 (7)
1.048
1.073
8,636
6,137
0
0
8,095
7,488
1,573
1,628
1,143
1,083
5.26
6.37
3.55
4.22
3.70
3.70
Key Notes
(1) - Wet solids throughput will vary based on the variance in dry cake % solids.
(2) - Hourly average
(3) - 14 day rolling average.
(4) - Twenty Four (24) hour rolling average
(5) - Daily average
(6) - Three (3) minute average
(7) - Monthly average
(8) - Annual average
(9) - Twelve (12) month rolling average.
Scrubber Parameters
Average
Secondary
Temp. (°F)
Average
Oxygen
%
Average
Opacity
%
Corrected
Average THC Data Capture %
(ppm)
Scrubber Parameters
Monthly Hours
on Line
Total
Scrubber
Δ P " WC
Pre- Cooler
Temperature (°F)
> 90 (8)
NA
> 13.87 (5)
< 200
42.9%
87.7%
624
323
20.42
20.23
166
159
Annual Average
65.3%
CARBON MONOXIDE (CO) EMISSIONS
Total Facility (tons/month)
Permit Limit ≤ 20.42 (9)
Monthly
12 Month Ave
January
11.92
13.33
February
9.49
12.98
March
April
May
June
July
August
September
October
November
December
Return to Agenda
Incinerator Emergency Bypass Damper - Combined
Operating Hours - Deviation Minutes
1,400
1,200
1,000
800
600
400
200
0
Deviation, min
MAR
2014
5.0
APR
2014
0.0
MAY
2014
0.0
JUN
2014
6.0
JUL
2014
0.0
AUG
2014
0.0
SEP
2014
1.0
OCT
2014
19.2
NOV
2014
11.4
DEC
2014
0.0
JAN
2015
5.3
FEB
2015
21.1
Operating Time, hr
1,330
1,255
1,274
1,379
965
1,018
1,043
1,174
1,098
1,340
1,069
965
Return to Agenda
Memorandum
TO:
Commissioners
FROM:
Tom Sigmund
DATE:
March 16, 2015
SUBJECT:
March Commission Meeting – Executive Director’s Report
a)
The April Commission meeting will be held on Wednesday, April 22, 2015, beginning at 8:30 a.m.
b)
Every year the Wisconsin Department of Natural Resources (WDNR) levies an Environmental Fee to
point source dischargers based on discharge limits and actual discharge of pollutants. That fee is
commonly known as the NR101 Fee based on the Administrative Code chapter. The estimated
NR101 fee for NEW Water for 2014 is $193,015. NEW Water discharges well below permit limits for
BOD, TSS, and phosphorus. Comparing actual discharges and what is allowable under the WPDES
permit limits, NEW Water staff saved its customers about $545,000 in NR101 Fees in 2014 by
optimizing facility performance at the Green Bay and De Pere Facilities.
c)
NEW Water and the Cities of Green Bay and De Pere staff met with WDNR on March 6 to discuss a
concept proposed by the WDNR to create overall umbrella limits for suspended solids and
phosphorus that NEW Water and municipalities with stormwater discharge permits could use to
jointly manage overall discharges among all entities rather than each separately managing their own
limits. The parties decided that there was merit in the concept and agreed to develop questions and
have a subsequent meeting to discuss details of the concept.
d)
NEW Water was issued a construction air permit by the WDNR on March 4, which allows NEW
Water to begin construction of the R2E2 Project. EPA approval of a modified operating air permit is
expected by late April.
e)
NEW Water qualified for and submitted an application to NACWA for a 2014 Platinum level award for
the Green Bay Facility and a Gold level award for the De Pere Facility. NEW Water is also submitting
an application for the NACWA Excellence in Management award. If NEW Water is selected, the
awards would be presented at the 2015 NACWA Summer meeting in July.
f)
The construction phase contract for the R2E2 Project Contract 34 is expected to be brought to the
Commission for approval in June. Staff expects the amount of the contract to be about $110 million. I
will prepare a memo and schedule an agenda item at a subsequent Commission meeting to discuss
a procedure for approving change orders and amendments for this project. A five percent
contingency on the project would be $5.5 million. The Executive Director’s $100,000 approval
authority without Commission approval may need to be adjusted or a revised approval process may
be needed to allow the project to proceed between regularly scheduled Commission meetings.
Green Bay Metropolitan Sewerage District
2231 North Quincy Street | Green Bay, WI 54302 | Phone (920) 432-4893
Return to Agenda
g)
NEW Water received insurance renewal quotes from its broker Arthur J. Gallagher & Co. for all
insurance other than property damage insurance. Staff reviewed the coverage, limits, and proposed
rates for April 2015 – April 2016 coverage. Premium for the coming year is $157,411 compared to
$161, 532 for the previous year. There was a significant reduction in workers’ compensation
insurance due to a reduced experience modification factor. Staff will proceed with renewal of the
insurance coverage.
h)
U.S. Congressman Reid Ribble is hosting a Phosphorus Summit on April 1 from 7:30 – 11:30 a.m. at
the Neville Museum. An agenda for the summit is attached. Commissioners interested in attending
should let me know before April 1 so a name tag can be prepared for you by the Congressman’s
staff.