PLANNING COMMISSION AGENDA Regular Meeting May 14th, 2015 6:00PM Harlem Public Safety Building 110 West Milledgeville Road, Harlem, GA 30814 1. Call to Order & Welcome 2. Invocation 3. Pledge of Allegiance 4. Approval of March 3rd, 2015 Regular Meeting Minutes Unfinished Business 5. RZ-2015-01-06 (Tabled from February 3rd Meeting) Location-Portion of Parcel ID 032 100 (Philips Crossing Phase II) Request: Rezone R-1A Residential to Planned Unit Development (PUD) Applicant: Larry S. Prather, Sr. Acreage: 18.3 AC New Business 6. RZ-2015-04-01 Location-Appling-Harlem Road Parcel ID-031 066 Request: Rezone R-1A Residential to R-3 Residential Agent: EGHC Independence Village Harlem L.P. Owner: Hatcher Properties LLC Acreage: 25.15 AC 7. RZ-2015-04-02 Location: End of North Bell Street Parcel ID: H01 068A Request: Rezone R-1A Residential to I-1 Industrial Applicant: Georgia Power Company Acreage: 11.3 AC 8. RZ-2015-04-03 Location: End of North Bell Street Parcel ID: H01 069 Request: Rezone R-1A Residential to I-1 Industrial Applicant: Georgia Power Company Acreage: .89 9. RZ-2015-04-04 Location: North Louisville Street Parcel ID: H01 068 Request: Rezone R-1A Residential to R-3 Residential Applicant: Peachtree Housing Communities, LLC Acreage: 17.75 AC 10. Proposed text amendment to Title XV (Land Usage), Chapter 152 (Planning & Zoning Code), Section 152.067 pertaining to the keeping of goats. 11. Staff Report 12. Chairman’s Comments 13. Adjourn nd The next Planning Commission meeting is scheduled for June 2 , 2015 at 6PM at City Hall. Please note that any actions taken at this meeting will be forwarded to the Mayor & City Council for final action at their regular meeting on May 26th, 2015 at 6:30PM in the Public Safety Building at 110 West Milledgeville Road. If you have any questions or comments please call City Hall at 706-556-0043. Planning & Zoning Commission Meeting, City of Harlem, Georgia March 3, 2015 Harlem City Hall Page 1 The Planning & Zoning Commission met for their Regular meeting on Tuesday, March 2, 2015 at Harlem City Hall at 6:00 p.m. with Vice Chairman John Neal presiding. Present: COMMISSION: Vice Chairman John Neal, Commissioner Tim Farr and Commissioner James Thomas, Jr.; CITY STAFF: Community Development Director William Butler, City Clerk Debra E. Moore and City Attorney Adam Nelson; ABSENT: Chairman Dale Arnold and Commissioner Lance Ellis. The meeting was called to order by Vice Chairman Neal at 6:00 p.m. Invocation: Vice Chairman Neal Pledge of Allegiance: Vice Chairman Neal Approval of February 3, 2015 Regular Meeting Minutes: Commissioner Farr made the motion to approve the minutes of the February 3, 2015 Regular meeting as written; 2nd by Commissioner Thomas. Motion carried with Commissioners Farr, Neal and Thomas voting in the affirmative. CU-2015-02-02: Location: 315 N. Louisville Street; Parcel ID: H02 039; Request: Conditional UseEducational Facility; Applicant: Glorious Jones: The educational facility is proposed for students with disabilities (including children and adults) and will focus on functional skills (cooking, daily activities, etc.) and on academics. The applicant indicated that the number of students will typically be one since direct tutoring works best for students with disabilities. Staff is making the recommendation for approval with condition. The only concern is with the safety of any pupil of the facility. Because of this, staff recommends the following condition: 1. Before a business license is issued to the applicant and for subsequent applications, any teacher or employee of the facility shall submit a criminal background check through the Columbia County Sherriff’s Office and be forwarded to the City of Harlem prior to issuance of a business license. Comments from Applicant: Glorious Jones-520 Kelly Acres: Ms. Jones presented an updated mission statement and her background criminal check (updated). As an education professional she is required to have one. Comments from the Commission: There were no questions or comments from the Commission for Ms. Jones. Commission Discussion: The Commission asked for comments from City Attorney Nelson. He spoke favorably of the application. With no further discussion, Commissioner Farr made the motion to recommend to Council to approve the application with the condition of the criminal history check as recommended by staff; 2nd by Commissioner Thomas. Motion carried with Commissioners Farr, Neal and Thomas voting in the affirmative. This will go to Council for consideration to approve on March 23rd. Planning & Zoning Commission Meeting, City of Harlem, Georgia March 3, 2015 Continued from page 1 Page 2 Proposed text amendment to Title XV (Land Usage), Chapter 155 (Subdivision Regulations), Section 155.04 (F) pertaining to streets within a subdivision: The purpose of this proposed text amendment stems from a rezoning request (RZ-2015-01-06) that went before the Planning Commission in February 2015. At that meeting the Commission requested that staff make changes to the current ordinance to give more flexibility and guidance to the Commission when making decisions on existing streets. The following is recommended to give the Commission flexibility and guidance in making their decisions. It is also intended to balance the privacy of future residents with connectivity provided by a grid system of roadways, provide for access by police and emergency personnel, and access by school buses: (F) Streets. The street and road system of any subdivision shall give due consideration to the Major Thoroughfare Plan. (1) Access. Every lot of every subdivision shall abut a public street with a minimum right-of-way as indicated in subsection (F) (12) of this section, which is or shall be maintained by the appropriate governing body. Where the subdivision does not immediately adjoin a public street, the sub divider shall provide a public street from the subdivision to a public street. In special situations, private roadways will be allowed per division (F) (15). Driveways connecting the public road with adjoining property are the responsibility of the property owner. Prior to installation, approval of any needed drainage pipe, under the driveway, must be received from the City Engineer. (2) Relocation to present, proposed, and future streets. The proposed street system within a subdivision shall be determined by the Planning Commission to adequately balance the privacy of the future occupants with connectivity throughout the City, and to adequately provide for access for public safety by fire, police and emergency medical vehicles, and for school buses. In making such determination, satisfaction of the following requirements shall be considered by the Planning Commission: a. Unless approved otherwise by the Planning Commission, a subdivision shall provide a street connection to each public street that it adjoins, and shall provide continuity through the subdivision between each connection. b. To the greatest extent practical, cul-de-sacs should be avoided in favor of loop streets or a curvilinear of grid system of streets Mr. Butler was questioned on the inclusion of City staff and the Fire Marshall. City Attorney Nelson commented that there may be ISO repercussions/considerations. The text amendment gives flexibility to the ordinance addressing connectivity. As there were no further comments, Commissioner Farr made the motion to recommend to Council to approve the amendment to Title XV (Land Usage), Chapter 155 (Subdivision Regulations), Section 155.04 (F) pertaining to street within a subdivision as proposed and presented by Staff; 2nd by Commissioner Thomas. Motion carried with Commissioners Farr, Neal and Thomas voting in the affirmative. Planning & Zoning Commission Meeting, City of Harlem, Georgia March 3, 2015 Continued from page 2 Page 3 Conceptual Review: Location: Appling-Harlem Road, Parcel ID: 031 066, Zoned: R-1A Residential, Acreage: 25.12 Acres: The Comprehensive Plan Character Area is that of Low Density Residential. This area calls for low to moderate density residential uses including single-family, duplexes, and townhouses. Apartments are not specifically mentioned. However, staff has noted that townhouses are of a higher permitted density than apartments (8 per gross acre for townhouses; 5 per gross acre for apartments). The applicant has requested a conceptual review of a proposed 125 unit apartment development using tax credits. The applicant has provided a conceptual land use plan showing 125 units, parks and greenspace, and a relocated historic home (the Wilson House from downtown). The land use plan indicates that the density will be within current ordinances (5 units per gross acre) and will present a townhouse appearance. Staff has had preliminary discussions with the applicant and would be requesting the following before approval: 1. 2. 3. 4. 5. 6. Elevations of proposed apartments Verification of setbacks and open space requirements Location of buildings and proposed stories Preliminary location of water supply, sanitary, and storm sewer systems Location of all curb-cuts, driving lanes, and parking areas Locations and types of all common areas including how they will be maintained in perpetuity The proposed re-zoning will come up at the April meeting from R-1A (Residential) to R-3 (Multi-Family). The need re-zoning in order to be able to get tax credits. They will apply by June 1, 2015 and will find out the results in 2016. They will build in two phases: 80 +/- units in the front; the balance will be in the back. There will possibly be a connection to Campbell’s Way. Staff Report: The Urban Redevelopment Plan has gone before Council; it was approved. The next step is the implementation of the Plan. This could be done by an Urban Redevelopment Agency, by the City or City Staff. There will be a meeting on the 17th on the Comprehensive Plan; the steering committee will be formed. The meetings in June and July will be held at the Public Safety Building. Training information for the Commission will be forthcoming. The next meeting will be held on Tuesday, April 14th, at 6 p.m. at City Hall. Chairman’s Comments: Vice Chairman Neal commented about the moratorium that the County currently has in place on apartments and how it will affect our area. Planning & Zoning Commission Meeting, City of Harlem, Georgia March 3, 2015 Continued from page 3 Page 4 As there was nothing further to come before the Commission, Commissioner Farr made the motion to adjourn the meeting; 2nd by Commissioner Thomas. Motion carried with Commissioners Farr, Neal and Thomas voting in the affirmative. The meeting adjourned at 7:00 p.m. Respectfully submitted, Debra E. Moore City Clerk CITY OF HARLEM PLANNING & ZONING COMMISSION STAFF RECOMMENDATION May 14th, 2015 Regular Meeting Application Number……………………………………………………………………………………….......RZ-2015-01-06 Applicant.………………………………………………………………………………………………………….Larry Prather, Sr. Request………………………………………………………………………………………………….…Rezoning-R-1A to PUD Location……………..…………….…….………………..….Phillips Crossing, Morgan Drive, Harlem, GA 30814 Property Information…….…Parcel ID 032 100 (Portion), R-1A Residential, approximately 18.3 AC Adjacent Use and Zoning…………………………………….………………………..North: PUD (Phillips Crossing) ………..……………………………………………………………………………..South: R-1A Residential (Single Family) …….……………………….……………………………………………...East: R-1A Residential (Single Family-Vacant) ……….…………………………………………………………..……………West: R-3 Multi-Family & R-1A Residential Comprehensive Plan Character Area:…….…………..………..……………………..Conservation Subdivision Staff Recommendation………………………………………..……………………………............................Approval The Request: The applicant is requesting to rezone 18.3 acres of property adjacent to the Philips Crossing subdivision for phase II of that subdivision. Applicant is requesting a Planned Unit Development (PUD) designation, similar to the existing PUD at Philips Crossing. Existing Conditions: The existing 18.3 acres is a small portion of the tracts 126 acres. The area is wooded and has not been developed recently. The topography of the land slopes downward from the west to east of the property towards Sandy Run Creek. Phillips Crossing, an existing subdivision, is along the northwestern border. Proposed Narrative: (As submitted by the applicant.) Phillips Crossing, a planned unit development, is located on the south side of Harlem. It lies on the east side of GA. Route 47 (South Louisville Street). The site for Phase II consists of 18.3 acres of terrain that slopes downward from the west to east of the property. The property is presently zoned R-1A Residential. The site is served by an 8” sanitary sewer and 8” water line from Phillips Crossing Phase I. Developed storm water flows will be controlled through the installation of a storm water detention pond. The owner is requesting a PUD zoning classification in order to take advantage of the property which is suited for development of residential lots and infrastructure. Although a minimum lot area of 10,000 square feet is requested, the plan submitted contains 35 lots that have an average lot area of 18,142 square feet, slightly smaller than the average lot area of 19,834 square feet in Phase I. The proposed density for this project is 1.91 lots per acre, slightly higher than the 1.74 lots per acre of Phase I. The PUD zoning will allow the developer to reduce the front and side setbacks to 30 feet and 10 feet respectively with a rear setback of 20 feet, the same as in Phase I. Lots along the southern and western boundaries of the development also have a 20 foot undisturbed buffer. A reduction of right-a-way width from 60 to 50 feet is proposed. A seven-foot utility easement will be included along the right-a-way in order to facilitate the installation of 5 foot sidewalks on both sides of the roadway. The sidewalks are proposed as indicated in the submitted street section diagram and lot plan. Decorative Street Lights and Signage will be installed once the street construction is complete. The developer desires to start construction as quickly as possible after the review and approval process is complete. A six-month construction period is anticipated for completing the project. Phillips Crossing, Phase II will be developed under restrictive covenants in order to protect homeowners’ investments. A sample copy is attached hereto. The following table sets forth lot requirements and building setbacks: District Minimum Lot Area Front Setback Side Setback Rear Setback Maximum Height PUD 10,000 Sq. Ft. 30 ft. 10 ft. 20 ft. 35 ft. *All setbacks are from property line and apply to principal structure. Maximum height is of any structure. Review of the Request: In reviewing this request, staff utilized Chapter 152, §152.219 (Relevant Factors in Rezoning Evaluation) and Chapter 155, §155.04 (Minimum Design Standards) of the Harlem Code of Ordinances to make a recommendation on the proposed conditional use. In regards to Chapter 152, § 152.219 (Relevant Factors in Rezoning Evaluation) staff offers the following comments: The following factors are considered when applying the balancing test which is required to arrive at a rezoning decision: A. Existing uses and zoning of nearby property. Would the requested zoning permit land uses of a similar nature to those uses of similarly situated nearby land? Staff thinks that the proposal is in line with the uses of nearby land. This is a continuation of an existing subdivision to the north. To the west are single and multi-family residences. While multi-family is not a component of this proposal, the density is much less than permitted in the multi-family area. B. Extent to which property value is diminished by present zoning. How much more would the property be worth if the rezoning request was approved? A subdivision will typically be worth more than raw land, especially when access to sewer and water is factored in. The property value is diminished by the present zoning and will be increased with a rezoning. C. Extent to which destruction of the property value of the petitioner promotes the health, safety, morality, or general public welfare. How would approval of the request adversely impact the public interest? Consider the following: (1) Traffic. Potential increase in congestion. (2) Diminution of value. Immediate diminution or gradual diminution resulting from deterioration of a neighborhood over a period of time (3) Environmental impact. Potential for generation of noise, air pollution, or deterioration of unique or sensitive environmental conditions. In terms of traffic, the increased number of homes in the area will increase traffic. According to ITE Trip Generation the increase will be an additional 333 average daily trips onto South Louisville Street. South Louisville Street is considered a Rural Minor Arterial road which is defined as providing links between cities and larger towns and should provide for relatively high overall travel speeds with minimum interference to through movement. In 2014, a traffic counter located just south of the intersection of Holleys Road and South Louisville Street (approximately 4,000 feet south of the proposed subdivision) averaged 2,030 average daily trips. Models anticipate that the proposed 35 single family residences will add 333 average daily trips to South Louisville Street. This is a small amount of additional trips, especially considering the road is designed to handle upwards of 15,000 average daily trips per day. With that being said, staff is concerned with the subdivision only having one entrance. There is not any anticipated diminution of value for the surrounding area. Typically a slight boost is seen with a new subdivision for the area. The proposal does not encroach on any flood plains or riparian buffers around Sandy Run Creek. However, with the proximity to the creek there is the potential for deterioration of the environmental conditions of the area. However, this will be mitigated through erosion and sedimentation controls which will be checked by the city engineers. D. Zoning of the property when purchased. Is the request a result of speculative purchase of the property? The current owner purchased the property in 1982 according to county records and was probably zoned agricultural. Staff does not believe this qualifies as a speculative purchase of the property. E. The suitability of the subject property for the current zoning. Are natural environmental features conducive to the type of development permitted by the present zoning? Are the utilities present for development of the site? Would the topography or other natural environmental characteristics of the site be conducive to development under the present zoning? The current zoning is suitable for the subject property, utilities are present, and topography is acceptable for development. However, the applicant wishes to continue an existing subdivision which would require several variances if not submitted as a Planned Unit Development. F. Length of time the property has been vacant as zoned. Considered in the context of land development in the area in the vicinity of the property. Staff does not know when the property was last developed in any way. G. The extent to which the rezoning request conforms with the City Comprehensive Plan. The character area for this site is Conservation Subdivision. The Conservation Subdivision character area is characterized by residential development with limited commercial supporting commercial or recreational uses that clusters small building lots on confined portions of the site in order to preserve larger amounts of open space. This was put into place with the 2006 Comprehensive Plan. Phase I of Phillips Crossing was started in 2008 and does not conform to the adopted comprehensive plan character area. This proposal does include undisturbed buffers, so it does have a slight conformity to the character area. However, staff is comfortable with the proposal because it is a continuation of an existing subdivision that already has an established character that would be drastically altered if the comprehensive plan character area was required. H. Districts. The possible creation of an isolated district unrelated to adjacent and nearby districts. This proposed rezoning would not create an isolated district since Phillips Crossing Phase I is immediately to the north of it and already zoned PUD. I. Public effects. The population density pattern and possible increase or overtaxing of the loan on public facilities including, but not limited to, schools, utilities, and streets. It is not known if the addition of 35 new homes would overtax the local school system. However, with the information available from the Board of Education, the Harlem schools have the most room compared to other schools in the county. The Public Works Department keeps a close watch on usage at our sewer treatment plant. Estimates based on average gallon per day usage by single family residences indicate that the development could produce 10,500 average gallons per day of wastewater that would need to be treated at the Harlem treatment plant. Current usage averages approximately 193,000 gallons per day of our 250,000 allotment. The addition of the estimated usage would bring the total to an estimated 203,500 leaving 46,500 in reserve. Please note that the figures used here are projections and typically do not reflect the actual usage. They are used to gauge capacity needs and when to plan for expansion of sewer treatment plants. For instance, using this model the City of Harlem would already be over its allotment if each citizen used 100 gallons per day of wastewater. Because of this, the City has begun plans to double the size of the wastewater treatment plant to accommodate future growth. In terms of traffic, the increased number of homes in the area will increase traffic. According to ITE Trip Generation the increase will be an additional 333 average daily trips onto South Louisville Street. South Louisville Street is considered a Rural Minor Arterial road which is defined as providing links between cities and larger towns and should provide for relatively high overall travel speeds with minimum interference to through movement. In 2014, a traffic counter located just south of the intersection of Holleys Road and South Louisville Street (approximately 4,000 feet south of the proposed subdivision) averaged 2,030 average daily trips. Models anticipate that the proposed 35 single family residences will add 333 average daily trips to South Louisville Street. This is a small amount of additional trips, especially considering the road is designed to handle upwards of 15,000 average daily trips per day. With that being said, staff is concerned with the subdivision only having one entrance. J. Boundaries. Whether existing district boundaries are illogically drawn in relation to existing conditions on the property proposed for change. In staff’s opinion, existing district boundaries in the area are logically drawn. The area is heavily single family residential with a small multi-family component. The character is maintained with this proposal. K. Changing conditions. Whether changed or changing conditions make the passage of the proposed amendment necessary. The housing market in Harlem is seeing steady growth and more lots for development are needed to keep pace. Therefore, staff is comfortable that changing conditions are ripe for new development. L. Drainage. Whether the proposed change will create a drainage problem. With review by both city engineers and the state, it is not anticipated that the proposal will create a drainage problem. M. Effects. Whether the proposed change will seriously reduce light and air to adjacent areas. Staff does not anticipate any reduction of light and air to adjacent areas. N. Property values. Whether the proposed change will adversely affect property values in the adjacent area. Staff does not anticipate an adverse effect on property values in the area. O. Adjacent property. Whether the proposed change will be a deterrent to the improvement or development of adjacent property in accordance with existing regulations. The proposed change will have little impact on development in adjacent property. The only potential issue staff sees is if commercial development is proposed on adjacent property and that is unlikely to occur with the surrounding development pattern. P. Privilege. Whether the proposed change will constitute a grant of special privilege to an individual owner as contrasted with the public welfare. Staff does not think that the proposed change constitutes a granting of special privilege. The applicant has submitted a fairly standard PUD. Q. Need for change. Whether there are substantial reasons why the property cannot be used in accordance with existing zoning. The applicant could easily do a by right subdivision development with the property. However, the proposed setbacks and road width would require several variances to the property. A PUD zoning is the easier solution for the applicant and provides for a negotiated process between the applicant and city. R. Neighborhood. Whether the change suggested is out of scale with the needs of the neighborhood or would adversely affect living conditions in the neighborhood. The proposed PUD is very similar to the existing Phillips Crossing Phase I PUD that it connects to. It is not out of scale. However, staff is concerned with the lack of a connection to Peachtree Street. There is the opportunity to make a connection there for better connectivity in the area and this has not been made in the proposal. S. General. Any other factors relevant to balancing the interest in promoting the public health, safety, morality, or general welfare against the right to the unrestricted use of property. Staff does not have any other relevant factors to add to the recommendation. In regards to Chapter 155, §155.04 (Minimum Design Standards) staff offers the following comments: *Please note that the Planning Commission tabled the request at their February, 2015 meeting to allow for changes to be made to the above code section. The following comments are drawn from that revised code section which is presented in its entirety below. (1) Relation to present, proposed, and future streets. The proposed street system within a subdivision shall be determined by the Planning Commission to adequately balance the privacy of the future occupants with connectivity throughout the City, and to adequately provide for access for public safety by fire, police and emergency medical vehicles, and for school buses. In making such determination, satisfaction of the following requirements shall be considered by the Planning Commission: a. Unless approved otherwise by the Planning Commission, a subdivision shall provide a street connection to each public street that it adjoins, and shall provide continuity through the subdivision between each connection. b. To the greatest extent practical, cul-de-sacs should be avoided in favor of loop streets or a curvilinear or grid system of streets. In terms of access, Peachtree Street is not a viable solution in this case. The street includes approximately 70 feet of roadway that would have to be extended to the applicant’s property line to make a connection into the subdivision. Since this is a city right of way, it is anticipated that the applicant would not be required to pay for the extension and the city would be responsible. After consultation with the City Manager and a review of LMIG & TSPLOST funds available, it was found that all funds have been allocated to existing repaving projects for this year. Any allocation of funds for this project would need to come from the City Council due to the funding source. Comprehensive Plan Character Area: The Conservation Subdivision Character Area encompasses an area on the southeast side of Harlem that has seen little development. The development pattern for the area is residential development with limited commercial supporting commercial or recreational uses that clusters small building lots on confined portions of the site in order to preserve larger amounts of open space. This means clustered development on smaller lots, open space is prevalent, preservation of woodlands, and low impact development techniques. Staff Recommendation: Approve Overall, staff is comfortable with the proposed development. Planning & Zoning Commission Recommendation-Pending The Planning & Zoning Commission is tentatively scheduled to hear this request at their May 14th, 2015 meeting. Their recommendation will be forwarded to the Mayor & City Council for final action on May 26th, 2015 at the Public Safety Building. Proposed Phillips Crossing Phase II Site Site Photos End of Peachtree Street. Phillips Crossing Phase II is proposed for just beyond the pines. Lot that would be turned into Kelly Greene Drive. Kelly Greene Drive lot looking towards northwest. Lot that would be turned into Kelly Greene Drive. NARRATIVE FOR PHILLIPS CROSSING, PHASE II A PLANNED UNIT DEVELOPMENT Phillips Crossing, a planned unit development, is located on the south side of Harlem. It lies on the east side of GA. Route 47 (South Louisville Street). The site for Phase II consists of 18.3 acres of terrain that slopes downward from the west to east of the property. The property is presently zoned R-1A Residential. The site is served by an 8” sanitary sewer and 8” water line from Phillips Crossing Phase I. Developed storm water flows will be controlled through the installation of a storm water detention pond. The owner is requesting a PUD zoning classification in order to take advantage of the property which is suited for development of residential lots and infrastructure. Although a minimum lot area of 10,000 square feet is requested, the plan submitted contains 35 lots that have an average lot area of 18,142 square feet, slightly smaller than the average lot area of 19,834 square feet in Phase I. The proposed density for this project is 1.91 lots per acre, slightly higher than the 1.74 lots per acre of Phase I. The PUD zoning will allow the developer to reduce the front and side setbacks to 30 feet and 10 feet respectively with a rear setback of 20 feet, the same as in Phase I. Lots along the southern and western boundaries of the development also have a 20 foot undisturbed buffer. A reduction of right-away width from 60 to 50 feet is proposed. A seven-foot utility easement will be included along the right-a-way in order to facilitate the installation of 5 foot sidewalks on both sides of the roadway. The sidewalks are proposed as indicated in the submitted street section diagram and lot plan. Decorative Street Lights and Signage will be installed once the street construction is complete. The developer desires to start construction as quickly as possible after the review and approval process is complete. A six-month construction period is anticipated for completing the project. Phillips Crossing, Phase II will be developed under restrictive covenants in order to protect homeowners’ investments. A sample copy is attached hereto. The following table sets forth lot requirements and building setbacks: District PUD Minimum Lot Area Front Setback Side Setback Rear Setback Maximum Height 10,000 Sq. Ft. 30 ft. 10 ft. 20 ft. 35 ft. *All setbacks are from property line and apply to principal structure. Maximum height is of any structure. CITY OF HARLEM PLANNING & ZONING COMMISSION STAFF RECOMMENDATION May 14th, 2015 Regular Meeting Application Number……………………………………………………………………………………….......RZ-2015-04-01 Applicant.………………………………………………………………………EGHC Independence Village Harlem L.P. Request………………………………………………………….…………Rezone R-1A Residential to R-3 Residential Location……………..…………….…….………………..…………………Appling-Harlem Road, Harlem, GA 30814 Property Information……………………Parcel ID 031 066, R-1A Residential, approximately 25.15 AC Adjacent Use and Zoning………..…………….………………………..North: R-1A Residential (Single Family) .………………………………………..South: R-1A Residential (Single Family) & B-2 Local Business (Vacant) …….……………………….……………………………………….………………...East: R-1A Residential (Single Family) ………………West: R-1A Residential (Single Family), R-1 (Columbia County), R-A (Columbia County) Comprehensive Plan Character Area:…….…………..………..……………………....Low Density Residential Staff Recommendation………………………………………..……………………………..................................Deny The Request: The applicant is requesting to rezone 25.15 acres of land along Appling-Harlem Road from R-1A Residential to R-3 Residential for the development of 125 apartment units broken into 80 units in phase one and 45 units in phase two. The 80 units in phase one would be broken down into the following: 40 one bedroom, 32 two bedroom, and 8 three bedroom. Phase two breakdowns were not presented. Submitted site plans indicate that the site would include four buildings of five units each and ten buildings with six units each for eighty overall units. Applicant has also indicated that the buildings would be a villa style and have included photos of previous projects. Proposed amenities include a club house, raised “victory gardens”, nature trail, and pocket parks. Applicant has indicated that the proposed development would use Georgia Department of Community Affairs tax credits and would have a focus on veteran housing. The applicant meets initial R-3 standards and would be further evaluated if approved to meet standards for design. Existing Conditions: The existing parcel is irregularly shaped. The topography slopes downward from the southwest to northeast and an intermittent stream is located approximately in the middle of the parcel. The lot is wooded throughout. Review of the Request: In reviewing this request, staff utilized Chapter 152, §152.219 (Relevant Factors in Rezoning Evaluation) of the Harlem Code of Ordinances to make a recommendation on the rezoning request. In regards to Chapter 152, § 152.219 (Relevant Factors in Rezoning Evaluation) staff offers the following comments: The following factors are considered when applying the balancing test which is required to arrive at a rezoning decision: A. Existing uses and zoning of nearby property. Would the requested zoning permit land uses of a similar nature to those uses of similarly situated nearby land? As indicated, the existing uses and zoning are predominantly single-family. To the south is a single parcel zoned commercial. The land of Hardy Station, a Planned Unit Development, is located approximately 500 feet from the parcel. When originally proposed and approved, Hardy Station did have a multi-family component that was subsequently removed. While an argument can be made that this proposal, combined with the existing subdivision Campbell’s Crossing and the unused commercial property brings a “multi-use” component similar to the original proposal for Hardy Station, staff does not agree that this proposal is similar and is out of character with the surrounding land. B. Extent to which property value is diminished by present zoning. How much more would the property be worth if the rezoning request was approved? The property is currently sitting unused. There have been several proposals to redevelop the parcel as single family, but those have never gone beyond the conceptual stage. If approved, it can be assumed that the property would be worth more if rezoned considering the proposal and the fact that the land is currently unused. However, it is unknown what the worth would be dependent on which residential rezoning was desired by the owner. C. Extent to which destruction of the property value of the petitioner promotes the health, safety, morality, or general public welfare. How would approval of the request adversely impact the public interest? Consider the following: (1) Traffic. Potential increase in congestion. (2) Diminution of value. Immediate diminution or gradual diminution resulting from deterioration of a neighborhood over a period of time (3) Environmental impact. Potential for generation of noise, air pollution, or deterioration of unique or sensitive environmental conditions. In terms of traffic, the addition of 125 proposed apartment units will of course cause a rise in traffic. Appling-Harlem Road is considered a Rural Minor Arterial road which is defined as providing links between cities and larger towns and should provide for relatively high overall travel speeds with minimum interference to through movement. In 2014, a traffic counter located just south of the intersection of Harlem-Grovetown and North Louisville averaged 6,141 average daily trips. Models anticipate that the proposed 125 units will add 831 average daily trips to Appling-Harlem Road. While this may seem like a high number, the road is designed to handle upwards of 15,000 average daily trips per day. Staff is concerned with the increased traffic, but based on the data it is within limits. The proposed site does include an intermittent stream running through the property, wetlands, and backs up to a pond on the western side of the property. The proposed site plan does seek to impact these areas as little as possible and the applicants engineer has been informed to design the storm water system in such a way to account for any failure of the adjacent pond since it would flow through the site. D. Zoning of the property when purchased. Is the request a result of speculative purchase of the property? The property has not been purchased by the applicant, but a contract has been signed contingent on the approval of the rezoning. Therefore, it is a speculative purchase. E. The suitability of the subject property for the current zoning. Are natural environmental features conducive to the type of development permitted by the present zoning? Are the utilities present for development of the site? Would the topography or other natural environmental characteristics of the site be conducive to development under the present zoning? The current zoning is suitable for the subject property. Water is available to the site, but sewer will require a pump station for development. The site loses some viability due to the stream and wetlands, but can be designed to be integrated into a new development if needed. F. Length of time the property has been vacant as zoned. Considered in the context of land development in the area in the vicinity of the property. Staff does not know when the property was last developed in any way. G. The extent to which the rezoning request conforms with the City Comprehensive Plan. The character area for this site is Low Density Residential and includes developed and undeveloped areas of the city intended for low density residential land uses. The recommended development pattern in that area is primarily single family housing options in the R-1A, R-1B, R2, and Planned Unit Development (PUD) districts. In terms of design, a variety of architectural styles are to be promoted, street linkages between arterial streets and adjacent developments are proposed, and neighborhood parks or recreation space should be part of development. In terms of the history of the area, the Comprehensive Plan has been followed well with developments meeting those standards having been approved. Staff must note, however, that Hardy Station, approved in 2007 by the City of Harlem with subsequent changes, does include a commercial and townhouse component as part of the overall Planned Unit Development design. Neither of these phases have been built, but they were approved during this existing comprehensive plan. That being said, staff does not view this development as being similar to the previously approved Hardy Station. They do both have multifamily, Hardy Station with townhomes at eight dwellings per acre and the submitted proposal with apartments that look like townhomes at five dwellings per acre. However, the difference is that the townhomes in Hardy Station are part of an overall development that includes different densities of single-family, multi-family in the townhomes, and a commercial component, not a stand-alone development of only apartments. Additionally, R-3 is not a listed appropriate zoning classification. Staff cannot agree that the submitted proposal, even though it is less dense than a previously approved development, is in line with the Comprehensive Plan. H. Districts. The possible creation of an isolated district unrelated to adjacent and nearby districts. The proposed rezoning would create an isolated R-3 district and is not in relation to nearby districts. The closest R-3 zoned property is approximately .5 mile away on Knox Road off of Harlem-Grovetown Road. I. Public effects. The population density pattern and possible increase or overtaxing of the loan on public facilities including, but not limited to, schools, utilities, and streets. It is not known if the addition of 125 apartments would overtax the local school system. It can be assumed that these units will attract people with children, but it is not known what impact it will have on the school system. However, with the information available from the Board of Education, the Harlem schools have the most room compared to other schools in the county. The Public Works Department keeps a close watch on usage at our sewer treatment plant. Estimates based on average gallon per day usage by individuals indicate that the development could produce 25,600 average gallons per day of wastewater that would need to be treated at the Harlem treatment plant. Current usage averages approximately 188,000 gallons per day of our 250,000 allotment. The addition of the estimated usage would bring the total to an estimated 213,600 leaving an estimated 36,400 in reserve. Please note that the figures used here are projections and typically do not reflect the actual usage. They are used to gauge capacity needs and when to plan for expansion of sewer treatment plants. For instance, using this model the City of Harlem would already be over its allotment if each citizen used 100 gallons per day of wastewater. Because of this, the City has begun plans to double the size of the wastewater treatment plant to accommodate future growth. As part of the review process, the Harlem Fire Department is also consulted with. Fire hydrants are to be placed not any more than 500 feet apart. Turnarounds for emergency vehicles may be an issue with the submitted site plan and will require further review. A sprinkler system and fire walls will be a must. The Harlem Police Department was also consulted with and had the following comments. The proposed apartment complex could have both negative and positive effects for the City. The positive effects are affordable housing for our citizens and increased revenue for the city and businesses. The negative effects are the potential for increased call volume to the Police Department. Depending on the call volume, call type, and work load this could lead to additional personnel. As mentioned previously, this proposed development will add additional vehicles to the roadway system. Appling-Harlem Road is considered a Rural Minor Arterial road which is defined as providing links between cities and larger towns and should provide for relatively high overall travel speeds with minimum interference to through movement. In 2014, a traffic counter located just south of the intersection of Harlem-Grovetown and North Louisville averaged 6,141 average daily trips. Models anticipate that the proposed 125 units will add 831 average daily trips to Appling-Harlem Road. While this may seem like a high number, the road is designed to handle upwards of 15,000 average daily trips per day. Staff is concerned with the increased traffic, but based on the data it is within limits. The development is not large enough to warrant a traffic study. J. Boundaries. Whether existing district boundaries are illogically drawn in relation to existing conditions on the property proposed for change. In staff’s opinion, existing district boundaries in the area are logically drawn. The parcel zoned B-2 to the south is somewhat out of character, but it is logical that a small business serving the area may want to locate on that parcel due to Campbell’s Crossing. Additionally, several parcels owned by the city (fire station along Campbell’s Way and treatment plant) and the Harlem Housing Authority are zoned A-1. K. Changing conditions. Whether changed or changing conditions make the passage of the proposed amendment necessary. Multifamily is a popular form of development and statistics from across the country have shown that the United States as a whole is lacking in multifamily housing. Additionally, Columbia County recently placed a moratorium on townhome and other high density development which may have an impact on the applications the City of Harlem sees in the future dependent on how the County proceeds on that issue. L. Drainage. Whether the proposed change will create a drainage problem. With review by both city engineers and the state, it is not anticipated that the proposal will create a drainage problem. M. Effects. Whether the proposed change will seriously reduce light and air to adjacent areas. Staff does not anticipate any reduction of light and air to adjacent areas. N. Property values. Whether the proposed change will adversely affect property values in the adjacent area. Staff looked at several literature reviews of studies on how projects like this impact property values of adjacent areas. The general consensus was that they have no change or a small boost on adjacent property values. However, one of the more thorough reports indicated that more research is needed. Staff is hesitant to provide a comment to this question due to the varying levels of the studies and also that a penultimate study has yet to be performed. O. Adjacent property. Whether the proposed change will be a deterrent to the improvement or development of adjacent property in accordance with existing regulations. The proposed change could have an impact on adjacent property primarily with wastewater allocation and an increase in traffic in the area. P. Privilege. Whether the proposed change will constitute a grant of special privilege to an individual owner as contrasted with the public welfare. Staff does not think that the proposed change constitutes a granting of special privilege. Q. Need for change. Whether there are substantial reasons why the property cannot be used in accordance with existing zoning. The property could be used in accordance with existing zoning. Staff questions if the housing market would accept the by right setbacks since a non-PUD subdivision has not been presented in quite some time, but it could still be done. In addition, several concepts for subdivisions have been presented to staff in the past. R. Neighborhood. Whether the change suggested is out of scale with the needs of the neighborhood or would adversely affect living conditions in the neighborhood. The proposed development is out of scale with the surrounding development from a density standpoint. The adjacent subdivision is built at approximately 1.1 units per acre (47 lots over approximately 43 acres). The proposal is for a development of 125 apartments on 25.15 acres at 5 units per acre. The disparity in the density is out of scale as indicated. S. General. Any other factors relevant to balancing the interest in promoting the public health, safety, morality, or general welfare against the right to the unrestricted use of property. Staff does not have any other factors to add to the review. Comprehensive Plan Character Area: The Low Density Residential area is the largest character area on the Character Area map of the City of Harlem Comprehensive Plan and encompasses generally all areas outside of the original boundaries of the City. The recommended development pattern is low-density housing options of primarily single family with a variety of architectural styles, bicycle and pedestrian features with direct linkages to greenways and community facilities, and incorporation of neighborhood parks. Staff Recommendation: Deny Staff appreciates the overall design of the proposal from an amenities, greenspace, and site design standpoint and commends the applicant on their work. However, the proposed density and use is not in keeping with the Comprehensive Plan or the surrounding land uses. For the stated reasons and the documentation provided throughout this recommendation, staff recommends denial of the submitted rezoning proposal. Planning & Zoning Commission Recommendation-Pending The Planning & Zoning Commission is tentatively scheduled to hear this request at their May 14th, 2015 meeting. Their recommendation will be forwarded to the Mayor & City Council for final action on May 26th, 2015 at the Public Safety Building. Proposed site for RZ-2014-04-01 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART ONE - PROJECT INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County HOME Consent Only Please note: Blue-shaded cells are unlocked for your use and do not contain references/formulas. Green-shaded cells are unlocked for your use and do contain references/formulas that can be overwritten. DCA Use - Pre-App Nbr: 2015PA-0 Yellow cells - DCA Use ONLY I. DCA RESOURCES LIHTC (auto-filled based on later entries) DCA HOME (amount from Consent Form) II. TYPE OF APPLICATION Competitive Round III. APPLICANT CONTACT FOR APPLICATION REVIEW Kelly S. Evans Name 219 Pecan Avenue Address Thomson City GA State Office Phone $ $ 644,268 2,400,000 30824-1736 E-mail Zip+4 Ext. Executive Director Title (706) 690-1149 Direct Line Fax (706) 690-1149 Cellular [email protected] (Enter phone numbers without using hyphens, parentheses, etc - ex: 1234567890) IV. PROJECT LOCATION Project Name Site Street Address (if known) Nearest Physical Street Address * Site Geo Coordinates City Site is predominantly: In USDA Rural Area? V. Independence Village Harlem Phase 1 Appling Harlem Road 6461 Campbells Way 33.426866, -82.312961 9-digit Zip** Harlem 30814-5357 Within City Limits County Columbia In DCA Rural County? Yes No Overall: Rural * If street number unknown Legislative Districts ** If on boundary, other district: Congressional 10 Political Jurisdiction Name of Chief Elected Official Address Zip+4 City of Harlem Robert W. Culpepper 320 North Louisville Street 30814-5357 PROJECT DESCRIPTION A. Type of Construction: New Construction Substantial Rehabilitation Acquisition/Rehabilitation State Senate 23 Title Phone State House 121 Mayor (706) 556-3448 80 ----------------------------> Phased Project? Scattered Site? If Yes, Number of Sites Acreage Census Tract Number QCT? No MSA HUD SA: Yes- w/Master Plan No 25.1500 0305.04 DDA? Augusta-Richmond Co. ** Must be verified by applicant using following websites: Zip Codes http://zip4.usps.com/zip4/welcome.jsp Legislative Districts: http://votesmart.org/ Website Email City Fax www.harlemga.org [email protected] Harlem (706) 556-3293 Adaptive Reuse Historic Rehab For Acquisition/Rehabilitation, date of original construction: B. Mixed Use 2015PA-0xxProjNameHOMEConsent v1 Harlem Part I-Project Information 1 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART ONE - PROJECT INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County C. Unit Breakdown Number of Low Income Units Number of 50% Units Number of 60% Units Number of Unrestricted (Market) Units Total Residential Units Common Space Units Total Units E. Buildings HOME Consent Only 77 16 61 3 80 # of PBRA Units D. Unit Area Total Low Income Residential Unit Square Footage Total Unrestricted (Market) Residential Unit Square Footage Total Residential Unit Square Footage Total Common Space Unit Square Footage Total Square Footage from Units 70,950 3,050 74,000 74,000 80 Number of Residential Buildings Number of Non-Residential Buildings Total Number of Buildings Total Common Area Square Footage from Nonresidential areas Total Square Footage 2,500 76,500 (minimum 1.5 spaces per unit for family projects, 1 per unit for senior projects) F. Total Residential Parking Spaces VI. TENANCY CHARACTERISTICS A. Family or Senior (if Senior, specify Elderly or HFOP) If Other, specify: Family If combining Other with Family or Sr, show # Units: Family Elderly HFOP Other B. Mobility Impaired Roll-In Showers Nbr of Units Equipped: Nbr of Units Equipped: 6 6 % of Total Units % of Units for the Mobility-Impaired C. Sight / Hearing Impaired Nbr of Units Equipped: 6 % of Total Units 7.5% 100.0% 7.5% VII. RENT AND INCOME ELECTIONS 40% of Units at 60% of AMI A. Tax Credit Election 20% of HOME-Assisted Units at 50% of AMI B. DCA HOME Projects Minimum Set-Aside Requirement (Rent & Income) VIII. SET ASIDES A. LIHTC: Nonprofit Yes General B. HOME: CHDO Yes (must be pre-qualified by DCA as CHDO) IX. COMPETITIVE POOL X. Rural TAX EXEMPT BOND FINANCED PROJECT Issuer: Office Street Address City Contact Name 10-Digit Office Phone 2015PA-0xxProjNameHOMEConsent v1 Harlem Inducement Date: Applicable QAP: State Title Fax Zip+4 E-mail Direct line Part I-Project Information Cellular 2 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART ONE - PROJECT INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County XI. AWARD LIMITATIONS FOR CURRENT DCA COMPETITIVE ROUND HOME The following sections apply to all direct and indirect Owners, Developers and Consultants (Entity and Principal) : 2 A. Number of Applications Submitted: Consent Only B. Amount of Federal Tax Credits in All Applications: C. Names of Projects in which an Owner, Developer and Consultant(s) and each of its principals has a direct or indirect Ownership interest: Project Participant Name of Project Project Participant Name of Project Beverly J. Searles Foundation Beverly J. Searles Foundation 3 4 5 Live Oak Villas Midway Independence Village of Harlem 6 7 8 9 10 D. Names of Projects in which the Owner, Developer and Consultant(s) and each of its principals is partnering with an inexperienced unrelated entity for purposes of meeting DCA Experience Requirements: Project Participant Name of Project Project Participant Name of Project 1 2 3 4 5 6 7 8 9 10 XII. PRESERVATION A. Subsequent Allocation Year of Original Allocation Original GHFA/DCA Project Number First Year of Credit Period Expiring Tax Credit (15 Year) Date all buildings will complete 15 yr Compliance pd First Building ID Nbr in Project Last Building ID Nbr in Project GAGA- B. Expiring Section 8 C. Expiring HUD HUD funded affordable nonpublic housing project 2015PA-0xxProjNameHOMEConsent v1 Harlem HUD funded affordable public housing project Part I-Project Information 3 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART ONE - PROJECT INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County XIII. ADDITIONAL PROJECT INFORMATION A. PHA Units Is proposed project part of a local public housing replacement program? Number of Public Housing Units reserved and rented to public housing tenants: Nbr of Units Reserved and Rented to PHA Tenants w/ PBRA or Households on Waiting List: Local PHA Street Address City Zip+4 Area Code / Phone Fax HOME Consent Only % of Total Residential Units % of Total Residential Units Contact Email Direct line Cellular B. Existing properties: currently an Extension of Cancellation Option? If yes, expiration year: Nbr yrs to forgo cancellation option: New properties: to exercise an Extension of Cancellation Option? If yes, expiration year: Nbr yrs to forgo cancellation option: C. Is there a Tenant Ownership Plan? D. Is the Project Currently Occupied? If Yes ----------------->: Total Existing Units Number Occupied % Existing Occupied E. Waivers and/or Pre-Approvals - have the following waivers and/or pre-approvals been approved by DCA? Amenities? Qualification Determination? Architectural Standards? Payment and Performance Bond (HOME only)? Sustainable Communities Site Analysis Packet or Feasibility study? Other (specify): HOME Consent? State Basis Boost (extraordinary circumstances) Operating Expense? If Yes, new Limit is -------------------------------------------->: Per Unit Cost Limitation? If Yes, new Limit is -------------------------------------------->: Credit Award Limitation (extraordinary circumstances)? If Yes, new Limit is -------------------------------------------->: F. Projected Place-In-Service Date Acquisition Rehab New Construction XIV. APPLICANT COMMENTS AND CLARIFICATIONS XV. DCA COMMENTS - DCA USE ONLY CRT Realty is a Development Consultant to Antioch A.M.E. Community Development Corporation, Inc. in Antioch Summit. 2015PA-0xxProjNameHOMEConsent v1 Harlem Part I-Project Information 4 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART TWO - DEVELOPMENT TEAM INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. OWNERSHIP INFORMATION Do NOT delete this tab from this workbook, nor Copy it to "Paste" into a workbook. Use "Paste Special" and select "Values". A. OWNERSHIP ENTITY Office Street Address City State 10-Digit Office Phone / Ext. EGHC Independence Village Harlem, L.P. 219 Pecan Avenue Thomson Fed Tax ID: Applied for Census Tract 30824-5357 GA Zip+4 * Fax (Enter phone nbrs w/out using hyphens, parentheses, etc - ex: 1234567890) B. PROPOSED PARTNERSHIP INFORMATION 1. GENERAL PARTNER(S) EGHC Harlem General, LLC a. Managing Gen'l Partner 219 Pecan Avenue Office Street Address Thomson City Website 30824-5357 State GA Zip+4 * 10-Digit Office Phone / Ext. Fax b. Other General Partner Office Street Address City Website State Zip+4 10-Digit Office Phone / Ext. Fax c. Other General Partner Office Street Address City Website State Zip+4 10-Digit Office Phone / Ext. Fax 2. LIMITED PARTNERS (PROPOSED OR ACTUAL) Affordable Equity Partners, Inc. a. Federal Limited Partner 206 Peach Way Office Street Address Columbia City Website 65203-4905 State MO Zip+4 10-Digit Office Phone / Ext. Fax Affordable Equity Partners, Inc. b. State Limited Partner 206 Peach Way Office Street Address Columbia City Website 65203-4905 State MO Zip+4 10-Digit Office Phone / Ext. Fax 3. NONPROFIT SPONSOR Beverly J. Searles Foundation, Inc. Nonprofit Sponsor 3555 Sweetwater Road Office Street Address Duluth City Website 30096-4720 State GA Zip+4 10-Digit Office Phone / Ext. Fax 2015PA-0xxProjNameHOMEConsent v1 Harlem Kelly S. Evans Name of Principal Executive Director Title of Principal (706) 690-1149 Direct line (706) 690-1149 Cellular E-mail [email protected] * Must be verified by applicant using following websites: *Zip Codes http://zip4.usps.com/zip4/welcome.jsp Kelly S. Evans Name of Principal Manager Title of Principal (706) 690-1149 Direct line (706) 690-1149 Cellular E-mail [email protected] Name of Principal Title of Principal Direct line Cellular E-mail Name of Principal Title of Principal Direct line Cellular E-mail www.aepartners.com www.aepartners.com www.bjsfoundation.org Part II-Development Team Jeffrey E. Smith Name of Principal President Title of Principal (573) 443-2021 Direct line (573) 424-8811 Cellular E-mail [email protected] Jeffrey E. Smith Name of Principal President Title of Principal (573) 443-2021 Direct line (573) 424-8811 Cellular E-mail [email protected] Philip E. Searles Name of Principal President Title of Principal (678) 467-6861 Direct line Cellular E-mail [email protected] 1 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART TWO - DEVELOPMENT TEAM INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County II. DEVELOPER(S) A. DEVELOPER Office Street Address City State 10-Digit Office Phone / Ext. East Georgia Housing Corporation, Inc. 219 Pecan Avenue Thomson Website 30824-5357 GA Zip+4 Fax Kelly S. Evans Name of Principal President Title of Principal (706) 690-1149 Direct line (706) 690-1149 Cellular E-mail [email protected] B. CO-DEVELOPER 1 Office Street Address City State 10-Digit Office Phone / Ext. Beverly J. Searles Foundation, Inc. 3555 Sweetwater Road Duluth Website 30096-4720 GA Zip+4 Fax Philip E. Searles Name of Principal President Title of Principal (678) 467-6861 Direct line Cellular E-mail [email protected] C. CO-DEVELOPER 2 Office Street Address City State 10-Digit Office Phone / Ext. Name of Principal Title of Principal Direct line Cellular Website Zip+4 Fax D. DEVELOPMENT CONSULTANT Office Street Address City State 10-Digit Office Phone / Ext. E-mail Name of Principal Title of Principal Direct line Cellular Website Zip+4 Fax III. OTHER PROJECT TEAM MEMBERS A. OWNERSHIP CONSULTANT Office Street Address City State 10-Digit Office Phone / Ext. E-mail Name of Principal Title of Principal Direct line Cellular Website Zip+4 Fax B. GENERAL CONTRACTOR Office Street Address City State 10-Digit Office Phone / Ext. Fairway Construction, Inc. 206 Peach Way Columbia Zip+4 C. MANAGEMENT COMPANY Office Street Address City State 10-Digit Office Phone / Ext. Fairway Managemet, Inc. 3290 Northside Parkway, Suite 330 Atlanta Website 30327-2245 Zip+4 Fax 2015PA-0xxProjNameHOMEConsent v1 Harlem Website 65203-4905 Fax E-mail Will Markel Executive VP (573) 443-2021 (573) 424-8811 www.fairwayconstruction.net Name of Principal Title of Principal Direct line Cellular E-mail [email protected] www.fairwaymanagement.com Ryan Stevens Name of Principal Director of Operations Title of Principal (573) 443-2021 Direct line (573) 424-8811 Cellular E-mail [email protected] Part II-Development Team 2 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART TWO - DEVELOPMENT TEAM INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County D. ATTORNEY Office Street Address City State 10-Digit Office Phone / Ext. Butler Snow, LLP 1170 Peachtree Street, NE Atlanta Website 30309-7649 GA Zip+4 Fax David H. Williams, Jr. Name of Principal Partner Title of Principal (678) 515-5050 Direct line (404) 803-0087 Cellular E-mail [email protected] E. ACCOUNTANT Office Street Address City State 10-Digit Office Phone / Ext. Habif Arogeti & Wynne, LLP 5 Concourse Parkway, NE Sandy Springs Website 30328-5350 GA Zip+4 Fax www.hawcpa.com Ed Deck Name of Principal Partner Title of Principal (404) 892-9651 Direct line Cellular E-mail [email protected] F. ARCHITECT Office Street Address City State 10-Digit Office Phone / Ext. Martin Riley Associates 215 Church Street Decatur GA Zip+4 www.martinriley.com Mike Riley Name of Principal Principal Title of Principal (404) 373-2800 Direct line Cellular E-mail [email protected] Website 30030-3330 Fax IV. OTHER REQUIRED INFORMATION (Answer each of the questions below for each participant listed below.) A. IDENTITY OF INTEREST Is there an ID of interest between: Yes/No If Yes, explain relationship in boxes provided below, and use Comment box at bottom of this tab or attach additional pages as needed: 1. Developer and No Contractor? 2. Buyer and Seller of Land/Property? No 3. Owner and Contractor? No 4. Owner and Consultant? No 5. Syndicator and Developer? No 6. Syndicator and Contractor? No 7. Developer and Consultant? No 8. Other No 2015PA-0xxProjNameHOMEConsent v1 Harlem Part II-Development Team 3 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART TWO - DEVELOPMENT TEAM INFORMATION - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County IV. OTHER REQUIRED INFORMATION - Continued (Answer each of the questions below for each participant listed below.) B. ADDITIONAL INFORMATION Participant 1. Has any person, principal, or agent for this entity ever 2. Is entity 3. Org Type 4. Project 5. Does this entity or a member of this entity have a conflict of interest with any been convicted of a felony (Yes or No)? a MBE/ (FP,NP, Ownership member, officer, or employee of an entity that partners or contracts with the WBE? CHDO) Percentage Applicant? If yes, explain briefly in boxes below and use Comment box at the bottom of this tab or attach explanation. If yes, explain briefly in boxes below and either use Yes/No Comment box or attach explanation. Yes/No Brief Explanation Managing No CHDO 100.0000% No Genrl Prtnr Other Genrl No No Prtnr 1 Other Genrl No No Prtnr 2 Federal Ltd No No Partner State Ltd No No Partner NonProfit No No Sponsor Developer No No CoDeveloper 1 CoDeveloper 2 Owner Consultant Developer Consultant Contractor No No No No No No No No No No Management Company No No Total 100.0000% V. APPLICANT COMMENTS AND CLARIFICATIONS VI. DCA COMMENTS - DCA USE ONLY East Georgia Housing Corp. is a new nonprofit corporation created by the East Georgia Housing Authority. The 501(c)(3) and CHDO applications for East Georgia Housing Authority are pending. 2015PA-0xxProjNameHOMEConsent v1 Harlem Part II-Development Team 4 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART THREE - SOURCES OF FUNDS - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. GOVERNMENT FUNDING SOURCES (check all that apply) Yes HOME Consent Tax Credits Section 8 PBRA HUD CHOICE Neighborhoods Historic Rehab Credits Rental Assistance Demonstration Program (RAD) FHA Risk Share Tax Exempt Bonds USDA 515 FHA Insured Mortgage USDA 538 FHLB / AHP * McKinney-Vento Homeless Taxable Bonds CDBG Yes DCA HOME* --> enter amount from DCA Consent Ltr: $ 2,400,000 Other HOME* Specify Other HOME Source here Other Type of Funding - describe here Specify Source of Other Funding Type *This source may possibly trigger Uniform Relocation Act and/or HUD 104(d) reqmts. Check with source. For DCA HOME, refer to Relocation Manual. II. CONSTRUCTION FINANCING Financing Type Name of Financing Entity Mortgage A DCA HOME Mortgage B Effective Interest Rate Term (In Months) 2,400,000 1.000% 24 Sterling Bank Construction Loan 2,313,102 4.250% 24 Federal Housing Credit Equity Affordable Equity Partners 2,667,003 State Housing Credit Equity Affordable Equity Partners 724,630 Amount Mortgage C Federal Grant State, Local, or Private Grant Deferred Developer Fees Other Type (specify) Other Type (specify) Other Type (specify) Total Construction Financing: 8,104,735 Total Construction Period Costs from Development Budget: 8,104,735 0 Surplus / (Shortage) of Construction funds to Construction costs: 2015PA-0xxProjNameHOMEConsent v1 Harlem Part III-Sources of Funds 1 of 2 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART THREE - SOURCES OF FUNDS - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County III. PERMANENT FINANCING Principal Amount Name of Financing Entity Financing Type 2,400,000 Mortgage A (Lien Position 1) DCA HOME Mortgage B (Lien Position 2) Mortgage C (Lien Position 3) Other: Foundation or charity funding* 87,066 Deferred Devlpr Fee 6.88% EGHC Harlem General, LLC Federal Grant State, Local, or Private Grant Affordable Equity Partners 5,605,132 Federal Housing Credit Equity Affordable Equity Partners 1,932,804 State Housing Credit Equity Historic Credit Equity Invstmt Earnings: T-E Bonds Invstmt Earnings: Taxable Bonds Income from Operations Other: Other: Other: 10,025,002 Total Permanent Financing: 10,025,002 Total Development Costs from Development Budget: 0 Surplus/(Shortage) of Permanent funds to development costs: *Foundation or charity funding to cover costs exceeding DCA cost limit (see Appendix I, Section II). IV. Effective Int Rate 1.000% Amort. (Years) 25 Annual Debt Service in Year One 108,539 Loan Type Amortizing Target DCR 1.20 Cash Flow Equity Check 5,605,132 1,932,804 APPLICANT COMMENTS AND CLARIFICATIONS 2015PA-0xxProjNameHOMEConsent v1 Harlem Term (Years) 20 TC Equity 0.40 0.00 % of TDC 56% 19% 75% HOME Consent IV. Part III-Sources of Funds +/- DCA COMMENTS - DCA USE ONLY 2 of 2 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART FOUR - USES OF FUNDS - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. DEVELOPMENT BUDGET Consent PRE-DEVELOPMENT COSTS Property Appraisal Market Study Environmental Report(s) Soil Borings Boundary and Topographical Survey Zoning/Site Plan Fees TOTAL COST Acquisition Basis Rehabilitation Basis Amortizable or Non-Depreciable Basis PRE-DEVELOPMENT COSTS Subtotal ACQUISITION Land Site Demolition Acquisition Legal Fees (if existing structures) Existing Structures 6,500 14,000 10,000 20,000 6,500 14,000 10,000 20,000 50,500 50,500 ACQUISITION - - 327,000 10,000 Subtotal LAND IMPROVEMENTS Site Construction (On-site) Site Construction (Off-site) Subtotal STRUCTURES Residential Structures - New Construction Residential Structures - Rehab Accessory Structures (ie. community bldg, maintenance bldg, etc.) - New Constr Accessory Structures (ie. community bldg, maintenance bldg, etc.) - Rehab Subtotal CONTRACTOR SERVICES 14.00% 6.00% 349,099 Builder Profit: 2.00% 116,366 Builder Overhead 6.00% 349,099 General Requirements* *Refer to General Requirements policy in QAP Subtotal OTHER CONSTRUCTION HARD COSTS (Non-GC work scope items done by Owner) Other: <Enter detailed description here; use Comments section if needed> T otal C onstruction H ard C osts 6,632,872.00 New Construction Basis HOME Average TCHC: CONSTRUCTION CONTINGENCY Construction Contingency 2015PA-0xxProjNameHOMEConsent v1 Harlem 337,000 LAND IMPROVEMENTS 800,000 744,000 800,000 744,000 4,884,000 4,884,000 134,310 134,310 5,018,310 5,018,310 349,098 116,366 349,098 814,562 349,098 116,366 349,098 814,562 STRUCTURES - - - CONTRACTOR SERVICES - - - - OTHER CONSTRUCTION HARD COSTS (Non-GC work scope items done by Owner) 82,910.90 per Res'l unit 89.63 per Res'l unit SF 82,910.90 89.63 per unit per unit sq ft 86.70 per total sq ft CONSTRUCTION CONTINGENCY 5.0000% 331,644 Part IV-Uses of Funds 331,644 1 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART FOUR - USES OF FUNDS - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. DEVELOPMENT BUDGET (cont'd) HOME Consent CONSTRUCTION PERIOD FINANCING Bridge Loan Fee and Bridge Loan Interest Construction Loan Fee Construction Loan Interest Construction Legal Fees Construction Period Inspection Fees Construction Period Real Estate Tax Construction Insurance Title and Recording Fees Payment and Performance bonds Other: <Enter detailed description here; use Comments section if needed> Other: <Enter detailed description here; use Comments section if needed> Subtotal PROFESSIONAL SERVICES Architectural Fee - Design Architectural Fee - Supervision Green Building Consultant Fee Max: $20,000 Green Building Program Certification Fee (LEED or Earthcraft) Accessibility Inspections and Plan Review Construction Materials Testing Engineering Real Estate Attorney Accounting As-Built Survey Other: <Enter detailed description here; use Comments section if needed> Subtotal LOCAL GOVERNMENT FEES Building Permits Impact Fees Water Tap Fees waived? Sewer Tap Fees waived? Subtotal PERMANENT FINANCING FEES Permanent Loan Fees Permanent Loan Legal Fees Title and Recording Fees Bond Issuance Premium Cost of Issuance / Underwriter's Discount Other: <Enter detailed description here; use Comments section if needed> Subtotal 2015PA-0xxProjNameHOMEConsent v1 Harlem TOTAL COST New Construction Basis Acquisition Basis Rehabilitation Basis Amortizable or Non-Depreciable Basis CONSTRUCTION PERIOD FINANCING 37,000 15,000 14,000 37,000 15,000 14,000 12,500 15,000 12,500 15,000 93,500 93,500 156,800 39,200 25,000 12,500 12,000 40,000 25,000 20,000 8,000 156,800 39,200 338,500 338,500 26,750 80,000 48,000 120,000 274,750 26,750 80,000 48,000 120,000 274,750 PROFESSIONAL SERVICES - LOCAL GOVERNMENT FEES - PERMANENT FINANCING FEES - 25,000 12,500 12,000 40,000 25,000 20,000 8,000 20,000 12,000 40,000 12,500 84,500 Part IV-Uses of Funds 2 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART FOUR - USES OF FUNDS - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. DEVELOPMENT BUDGET HOME (cont'd) Consent DCA-RELATED COSTS DCA HOME Loan Pre-Application Fee ($1000 FP/JV, $500 NP) Tax Credit Application Fee ($6500 ForProf/JntVent, $5500 NonProf) DCA Waiver and Pre-approval Fees 51,541 LIHTC Allocation Processing Fee 64,000 LIHTC Compliance Monitoring Fee DCA HOME Front End Analysis Fee (when ID of Interest; $2700) DCA Final Inspection Fee (Tax Credit only - no HOME; $3000) Other: <Enter detailed description here; use Comments section if needed> Other: <Enter detailed description here; use Comments section if needed> Subtotal EQUITY COSTS Partnership Organization Fees Tax Credit Legal Opinion Syndicator Legal Fees Other: <Enter detailed description here; use Comments section if needed> Subtotal DEVELOPER'S FEE Developer's Overhead 20.000% Consultant's Fee 0.000% Developer's Profit 80.000% Subtotal START-UP AND RESERVES Marketing Rent-Up Reserves 70,963 196,196 Operating Deficit Reserve: Replacement Reserve Furniture, Fixtures and Equipment Avg Per Unit: 1,563 Other: <Enter detailed description here; use Comments section if needed> Subtotal OTHER COSTS Relocation Other: <Enter detailed description here; use Comments section if needed> Subtotal Unit: 125,312.53 Square Foot: 2015PA-0xxProjNameHOMEConsent v1 Harlem Acquisition Basis Rehabilitation Basis Amortizable or Non-Depreciable Basis DCA-RELATED COSTS 500 5,500 2,000 51,541 64,000 123,541 EQUITY COSTS 25,000 25,000 DEVELOPER'S FEE 253,072 253,072 1,012,287 1,265,359 1,012,287 1,265,359 START-UP AND RESERVES - 65,000 70,883 206,953 125,000 125,000 467,836 125,000 10,025,002 TOTAL DEVELOPMENT COST (TDC) Average TDC Per: TOTAL COST New Construction Basis 9,056,125 OTHER COSTS - - - - - - - - 135.47 Part IV-Uses of Funds 3 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART FOUR - USES OF FUNDS - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County II. TAX CREDIT CALCULATION - BASIS METHOD Subtractions From Eligible Basis New Construction Basis HOME Consent Amount of federal grant(s) used to finance qualifying development costs Amount of nonqualified nonrecourse financing Costs of Nonqualifying units of higher quality Nonqualifying excess portion of higher quality units Historic Tax Credits (Residential Portion Only) Other <Enter detailed description here; use Comments section if needed> Total Subtractions From Basis: Eligible Basis Calculation Total Basis Less Total Subtractions From Basis (see above) Total Eligible Basis Eligible Basis Adjustment (DDA/QCT Location or State Designated Boost) Adjusted Eligible Basis Multiply Adjusted Eligible Basis by Applicable Fraction Qualified Basis Multiply Qualified Basis by Applicable Credit Percentage Maximum Tax Credit Amount Total Basis Method Tax Credit Calculation 4% Acquisition Basis Rehabilitation Basis 0 0 Type: <<Select>> 9,056,125 0 9,056,125 100.00% 9,056,125 95.88% 8,682,866 7.42% 644,269 0 0 0 0 0 0 95.88% 0 0 95.88% 0 0 644,269 0 III. TAX CREDIT CALCULATION - GAP METHOD Equity Gap Calculation Project Cost Limit (PCL) - Explain in Comments if Applicant's PCL calculation > QAP PCL. Total Development Cost (TDC, PCL, or TDC less Foundation Funding; explain in Comments if TDC > PCL) Subtract Non-LIHTC (excluding deferred fee) Source of Funds Equity Gap Divide Equity Gap by 10 Annual Equity Required Enter Final Federal and State Equity Factors (not including GP contribution) Total Gap Method Tax Credit Calculation 13,523,730 10,025,003 2,400,000 7,625,003 / 10 762,500 1.1700 651,710 TAX CREDIT PROJECT MAXIMUM - Lower of Basis Method, Gap Method or DCA Limit: 644,269 TAX CREDIT REQUEST - Cannot exceed Tax Credit Project Maximum, but may be lower: 644,268 IV. TAX CREDIT ALLOCATION - Lower of Tax Credit Request and Tax Credit Project Maximum 2015PA-0xxProjNameHOMEConsent v1 Harlem Part IV-Uses of Funds If TDC > QAP Total PCL, provide amount of funding If Historic Designation from foundation or charitable organization to cover the involved, indicate below cost exceeding the PCL: (Y/N): Funding Amount = Federal 0.8700 Hist Desig 0 + State 0.3000 644,268 4 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART FOUR - USES OF FUNDS - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County V. APPLICANT COMMENTS AND CLARIFICATIONS VI. DCA COMMENTS - DCA USE ONLY Construction Hard Costs are determined based on historical value and input by the contractor for price creep. 2015PA-0xxProjNameHOMEConsent v1 Harlem Part IV-Uses of Funds 5 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SIX - PROJECTED REVENUES & EXPENSES - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County Finish Row! I. RENT SCHEDULE 1 1 1 3 Do NOT cut, copy or paste cells in this tab. Complete ALL columns. For Common Space (non-income producing) units, select "N/A-CS" for Rent Type and "Common" for Employee Unit. HOME projects - Fixed or Floating units: Are 100% of units HUD PBRA? Rent Type 50% AMI 60% AMI Unrestricted 50% AMI 60% AMI Unrestricted 50% AMI 60% AMI Unrestricted <<Select>> Nbr of Bdrms 1 1 1 2 2 2 3 3 3 No. of Baths 1.0 1.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0 TOTAL Unit Count 8 31 1 6 23 1 2 7 1 80 Unit Area 750 750 750 1,050 1,050 1,050 1,250 1,250 1,250 74,000 Floating No HOME Consent Max Gross Proposed Rent Limit Gross Rent 524 524 625 625 600 625 625 750 750 675 725 725 870 870 700 MSA/NonMSA: Augusta-Richmond Co. PBRA Provider or Operating Utility Allowance 155 155 197 197 245 245 Subsidy *** (See note below) Monthly Net Rent Per Unit 369 470 600 428 553 675 480 625 700 MONTHLY TOTAL ANNUAL TOTAL Total 2,952 14,570 600 2,568 12,719 675 960 4,375 700 Employee Unit No No No No No No No No No Building Design Type Townhome Townhome Townhome Townhome Townhome Townhome Townhome Townhome Townhome AMI 55,900 Type of Activity New Construction New Construction New Construction New Construction New Construction New Construction New Construction New Construction New Construction Certified Historic or Deemed Historic? No No No No No No No No No 40,119 481,428 *** NOTE: When selecting "PHA Operating Subsidy" in the "PBRA Provider or Operating Subsidy" column above, please also then enter a zero in the "Proposed Gross Rent" column above AND include the PHA operating subsidy amount in the "III. Ancillary and Other Income" section below. Also refer to the Application Instructions provided separately. 2015PA-0xxProjNameHOMEConsent v1 Harlem Part VI-Revenues & Expenses 1 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SIX - PROJECTED REVENUES & EXPENSES - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County II. UNIT SUMMARY Efficiency Units: Low-Income NOTE TO APPLICANTS: If the numbers compiled in this Summary do not appear to match what was entered in the Rent Chart above, please verify that all applicable columns were completed in the rows used in the Rent Chart above. HOME 60% AMI Consent 50% AMI Total Unrestricted Total Residential Common Space Total PBRA-Assisted (included in LI above) 1BR 2BR 3BR 31 8 39 1 40 23 6 29 1 30 7 2 9 1 10 4BR Total 61 (Includes manager units that are 16 income restricted) 77 3 80 40 30 10 80 39 1 40 29 1 30 9 1 10 77 3 80 40 30 10 80 (no rent to be charged) 60% AMI 50% AMI Total PHA Operating Subsidy-Assisted 60% AMI (included in LI above) Type of Construction Activity 50% AMI Total New Construction Low Inc Unrestricted Total + CS Low Inc Acq/Rehab Unrestricted Total + CS Substantial Rehab Low Inc Only Unrestricted Total + CS Adaptive Reuse Historic Adaptive Reuse Historic Building Type: Multifamily 1-Story Historic 2-Story Historic 2-Story Wlkp Historic 3+-Story Historic (for Utility Allowance and other purposes) SF Detached Historic Townhome Historic Duplex Historic Manufactured home Historic 2015PA-0xxProjNameHOMEConsent v1 Harlem Part VI-Revenues & Expenses 2 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SIX - PROJECTED REVENUES & EXPENSES - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County Building Type: (for Cost Limit purposes) Detached / SemiDetached HOME Consent Historic 40 30 10 80 23,250 6,000 29,250 750 30,000 24,150 6,300 30,450 1,050 31,500 8,750 2,500 11,250 1,250 12,500 56,150 14,800 70,950 3,050 74,000 30,000 31,500 12,500 74,000 Row House Historic Walkup Historic Elevator Historic Unit Square Footage: Low Income 60% AMI 50% AMI Total Unrestricted Total Residential Common Space Total III. ANCILLARY AND OTHER INCOME (annual amounts) Ancillary Income Other Income (OI) by Year: Included in Mgt Fee: 1 Operating Subsidy Other: Total OI in Mgt Fee Laundry, vending, app fees, etc. Actual pct of PGI: 9,629 2 - 3 - 4 - 5 - 6 - 7 - 2.00% 8 - 9 - 10 - - NOT Included in Mgt Fee: Property Tax Abatement Other: Total OI NOT in Mgt Fee Included in Mgt Fee: Operating Subsidy Other: Total OI in Mgt Fee - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - - - - - - - - - - - - - - - - - - - - NOT Included in Mgt Fee: Property Tax Abatement Other: Total OI NOT in Mgt Fee Included in Mgt Fee: Operating Subsidy Other: Total OI in Mgt Fee 21 22 - 23 - 24 - 25 - 26 27 28 29 30 - - - - - - - - - - - - NOT Included in Mgt Fee: Property Tax Abatement Other: Total OI NOT in Mgt Fee Included in Mgt Fee: Operating Subsidy Other: Total OI in Mgt Fee - 31 - 32 - 33 - 34 35 - - - - - - - - - - NOT Included in Mgt Fee: Property Tax Abatement Other: Total OI NOT in Mgt Fee 2015PA-0xxProjNameHOMEConsent v1 Harlem Part VI-Revenues & Expenses 3 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SIX - PROJECTED REVENUES & EXPENSES - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County IV. ANNUAL OPERATING EXPENSE BUDGET HOME Consent On-Site Staff Costs Management Salaries & Benefits 49,600 On-Site Security Contracted Guard Maintenance Salaries & Benefits 24,180 Electronic Alarm System Subtotal Support Services Salaries & Benefits Taxes and Insurance Real Estate Taxes (Gross)* 85,989 2,400 Insurance** 18,000 2,400 Other (describe here) Other (describe here) Subtotal 73,780 On-Site Office Costs Office Supplies & Postage 5,000 Professional Services Legal 2,000 306.91 Telephone 2,800 Accounting 8,000 25.58 750 Advertising 8,000 Travel Leased Furniture / Equipment Activities Supplies / Overhead Cost Management Fee: Other (describe here) 3,000 (Management Fee is from Pro Forma, Section 1, Operating Assumptions) 3,548.16 Utilities 6,000 Electricity General Repairs 8,000 Natural Gas Grounds Maintenance 8,900 Water&Swr Extermination 3,000 Trash Collection Maintenance Supplies 4,000 Other (describe here) Elevator Maintenance Average per unit Replacement Reserve (RR) (Avg$/mth/unit) Contracted Repairs 6,000 6 4 4,000 Unit Type 8,400 Multifamily 18,400 Subtotal Other (describe here) Units x RR Rehab 0 units x $350 = New Constr 80 units x $250 = SF or Duplex 0 units x $420 = 80 TOTAL ANNUAL EXPENSES VI. Total by Type 20,000 0 units x $420 = Totals V. APPLICANT COMMENTS AND CLARIFICATIONS 250 Average per unit Historic Rhb 32,900 20,000 Proposed avg RR/unit amount: 250 3,000 Subtotal Average per unit per month TOTAL OPERATING EXPENSES 283,853 11,550 Maintenance Expenses Redecorating 22,834 Average per unit per year 18,000 Subtotal Other (describe here) Subtotal 103,989 Subtotal 20,000 303,853 DCA COMMENTS Real Estate property taxes for Columbia county were detemined by using the estimate property tax tool found on the county website. Insurance is calculated based on $225/unit/year which is in line with historcial values. 2015PA-0xxProjNameHOMEConsent v1 Harlem Part VI-Revenues & Expenses 4 of 4 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SEVEN - OPERATING PRO FORMA - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. OPERATING ASSUMPTIONS Revenue Growth Expense Growth Reserves Growth Vacancy & Collection Loss Ancillary Income Limit HOME Consent 2.00% 3.00% 3.00% 7.00% 2.00% Green-shaded cells are unlocked for your use and contain references/formulas that may be overwritten if needed. Please Note: Asset Management Fee Amount (include total 8,000 Yr 1 Asset Mgt Fee Percentage of EGI: -1.75% charged by all lenders/investors) Property Mgt Fee Growth Rate (choose one): Expense Growth Rate (3.00%) Percent of Effective Gross Income Yr 1 Prop Mgt Fee Percentage of EGI: No --> If Yes, indicate Yr 1 Mgt Fee Amt: Yes --> If Yes, indicate actual percentage: 5.00% 5.000% II. OPERATING PRO FORMA Year Revenues Ancillary Income Vacancy Other Income (OI) OI Not Subject to Mgt Fee Expenses less Mgt Fee Property Mgmt Reserves NOI Mortgage A Mortgage B Mortgage C D/S Other Source DCA HOME Cash Resrv. Asset Mgmt DDF Cash Flow DCR Mortgage A DCR Mortgage B DCR Mortgage C DCR Other Source Oper Exp Coverage Ratio Mortgage A Balance Mortgage B Balance Mortgage C Balance Other Source Balance DDF Balance 1 481,428 9,629 (34,374) (261,019) (22,834) (20,000) 152,830 (108,539) - 2 491,057 9,821 (35,061) (268,850) (23,291) (20,600) 153,076 (108,539) - 3 500,878 10,018 (35,763) (276,915) (23,757) (21,218) 153,243 (108,539) - 4 510,895 10,218 (36,478) (285,223) (24,232) (21,855) 153,326 (108,539) - 5 521,113 10,422 (37,207) (293,779) (24,716) (22,510) 153,323 (108,539) - 6 531,535 10,631 (37,952) (302,593) (25,211) (23,185) 153,225 (108,539) - 7 542,166 10,843 (38,711) (311,670) (25,715) (23,881) 153,032 (108,539) - 8 553,009 11,060 (39,485) (321,020) (26,229) (24,597) 152,738 (108,539) - 9 564,070 11,281 (40,275) (330,651) (26,754) (25,335) 152,336 (108,539) - 10 575,351 11,507 (41,080) (340,571) (27,289) (26,095) 151,823 (108,539) - (8,000) (29,016) 7,274 1.41 (8,000) (29,229) 7,307 1.41 (8,000) (28,821) 7,882 1.41 (8,000) 36,787 1.41 (8,000) 36,783 1.41 (8,000) 36,686 1.41 (8,000) 36,493 1.41 (8,000) 36,199 1.41 (8,000) 35,797 1.40 (8,000) 35,284 1.40 1.50 2,315,072 1.49 2,229,291 58,050 28,821 2015PA-0xxProjNameHOMEConsent v1 Harlem 1.48 2,142,648 - 1.46 2,055,135 1.45 1,966,743 - Part VII-Pro Forma - 1.44 1,877,463 - 1.42 1,787,285 - 1.41 1,696,202 - 1.40 1,604,204 - 1.39 1,511,282 - 1 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SEVEN - OPERATING PRO FORMA - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. OPERATING ASSUMPTIONS Revenue Growth Expense Growth Reserves Growth Vacancy & Collection Loss Ancillary Income Limit HOME Consent 2.00% 3.00% 3.00% 7.00% 2.00% Green-shaded cells are unlocked for your use and contain references/formulas that may be overwritten if needed. Please Note: Asset Management Fee Amount (include total 8,000 Yr 1 Asset Mgt Fee Percentage of EGI: -1.75% charged by all lenders/investors) Property Mgt Fee Growth Rate (choose one): Expense Growth Rate (3.00%) Percent of Effective Gross Income Yr 1 Prop Mgt Fee Percentage of EGI: No --> If Yes, indicate Yr 1 Mgt Fee Amt: Yes --> If Yes, indicate actual percentage: 5.00% 5.000% II. OPERATING PRO FORMA Year Revenues Ancillary Income Vacancy Other Income (OI) OI Not Subject to Mgt Fee Expenses less Mgt Fee Property Mgmt Reserves NOI Mortgage A Mortgage B Mortgage C D/S Other Source DCA HOME Cash Resrv. Asset Mgmt DDF Cash Flow DCR Mortgage A DCR Mortgage B DCR Mortgage C DCR Other Source Oper Exp Coverage Ratio Mortgage A Balance Mortgage B Balance Mortgage C Balance Other Source Balance DDF Balance 11 586,858 11,737 (41,902) (350,788) (27,835) (26,878) 151,193 (108,539) - 12 598,595 11,972 (42,740) (361,311) (28,391) (27,685) 150,440 (108,539) - 13 610,567 12,211 (43,594) (372,151) (28,959) (28,515) 149,559 (108,539) - 14 622,778 12,456 (44,466) (383,315) (29,538) (29,371) 148,544 (108,539) - 15 635,234 12,705 (45,356) (394,815) (30,129) (30,252) 147,388 (108,539) - 16 647,939 12,959 (46,263) (406,659) (30,732) (31,159) 146,084 (108,539) - 17 660,897 13,218 (47,188) (418,859) (31,346) (32,094) 144,628 (108,539) - 18 674,115 13,482 (48,132) (431,425) (31,973) (33,057) 143,011 (108,539) - 19 687,598 13,752 (49,094) (444,367) (32,613) (34,049) 141,226 (108,539) - 20 701,350 14,027 (50,076) (457,698) (33,265) (35,070) 139,267 (108,539) - (8,000) 34,653 1.39 (8,000) 33,901 1.39 (8,000) 33,020 1.38 (8,000) 32,004 1.37 (8,000) 30,848 1.36 (8,000) 29,545 1.35 (8,000) 28,089 1.33 (8,000) 26,472 1.32 (8,000) 24,687 1.30 (8,000) 22,728 1.28 1.37 1,417,426 1.36 1,322,627 - 2015PA-0xxProjNameHOMEConsent v1 Harlem - 1.35 1,226,876 - 1.34 1,130,163 1.32 1,032,479 - Part VII-Pro Forma - 1.31 933,813 - 1.30 834,156 - 1.29 733,498 - 1.28 631,828 - 1.26 529,137 - 2 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SEVEN - OPERATING PRO FORMA - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. OPERATING ASSUMPTIONS Revenue Growth Expense Growth Reserves Growth Vacancy & Collection Loss Ancillary Income Limit HOME Consent 2.00% 3.00% 3.00% 7.00% 2.00% Green-shaded cells are unlocked for your use and contain references/formulas that may be overwritten if needed. Please Note: Asset Management Fee Amount (include total 8,000 Yr 1 Asset Mgt Fee Percentage of EGI: -1.75% charged by all lenders/investors) Property Mgt Fee Growth Rate (choose one): Expense Growth Rate (3.00%) Percent of Effective Gross Income Yr 1 Prop Mgt Fee Percentage of EGI: No --> If Yes, indicate Yr 1 Mgt Fee Amt: Yes --> If Yes, indicate actual percentage: 5.00% 5.000% II. OPERATING PRO FORMA Year Revenues Ancillary Income Vacancy Other Income (OI) OI Not Subject to Mgt Fee Expenses less Mgt Fee Property Mgmt Reserves NOI Mortgage A Mortgage B Mortgage C D/S Other Source DCA HOME Cash Resrv. Asset Mgmt DDF Cash Flow DCR Mortgage A DCR Mortgage B DCR Mortgage C DCR Other Source Oper Exp Coverage Ratio Mortgage A Balance Mortgage B Balance Mortgage C Balance Other Source Balance DDF Balance 21 715,377 14,308 (51,078) (471,429) (33,930) (36,122) 137,125 (108,539) - 22 729,684 14,594 (52,099) (485,572) (34,609) (37,206) 134,791 (108,539) - 23 744,278 14,886 (53,141) (500,139) (35,301) (38,322) 132,260 (108,539) - 24 759,163 15,183 (54,204) (515,144) (36,007) (39,472) 129,520 (108,539) - 25 774,347 15,487 (55,288) (530,598) (36,727) (40,656) 126,565 (108,539) - 26 789,834 15,797 (56,394) (546,516) (37,462) (41,876) 123,383 (108,539) - 27 805,630 16,113 (57,522) (562,911) (38,211) (43,132) 119,967 (108,539) - 28 821,743 16,435 (58,672) (579,799) (38,975) (44,426) 116,306 (108,539) - 29 838,178 16,764 (59,846) (597,193) (39,755) (45,759) 112,389 (108,539) - 30 854,941 17,099 (61,043) (615,108) (40,550) (47,131) 108,208 (108,539) - (8,000) 20,585 1.26 (8,000) 18,252 1.24 (8,000) 15,720 1.22 (8,000) 12,981 1.19 (8,000) 10,025 1.17 (8,000) 6,844 1.14 (8,000) 3,428 1.11 (8,000) (233) 1.07 (8,000) (4,150) 1.04 (8,000) (8,332) 1.00 1.20 (109,038) 1.19 (219,172) 1.18 (330,412) 1.16 (442,769) 1.15 (556,255) Year Revenues Ancillary Income Vacancy Other Income (OI) OI Not Subject to Mgt Fee 31 872,040 17,441 (62,264) - 1.25 425,415 - 2015PA-0xxProjNameHOMEConsent v1 Harlem 1.24 320,650 32 889,481 17,790 (63,509) - 1.23 214,834 33 907,271 18,145 (64,779) - 1.22 107,954 1.21 0 34 925,416 18,508 (66,075) - - - - - - - 35 943,924 18,878 (67,396) - Part VII-Pro Forma 3 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SEVEN - OPERATING PRO FORMA - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. OPERATING ASSUMPTIONS Revenue Growth Expense Growth Reserves Growth Vacancy & Collection Loss Ancillary Income Limit HOME Consent 2.00% 3.00% 3.00% 7.00% 2.00% Green-shaded cells are unlocked for your use and contain references/formulas that may be overwritten if needed. Please Note: Asset Management Fee Amount (include total 8,000 Yr 1 Asset Mgt Fee Percentage of EGI: -1.75% charged by all lenders/investors) Property Mgt Fee Growth Rate (choose one): Expense Growth Rate (3.00%) Percent of Effective Gross Income Yr 1 Prop Mgt Fee Percentage of EGI: No --> If Yes, indicate Yr 1 Mgt Fee Amt: Yes --> If Yes, indicate actual percentage: 5.00% 5.000% II. OPERATING PRO FORMA Expenses less Mgt Fee Property Mgmt Reserves NOI Mortgage A Mortgage B Mortgage C D/S Other Source DCA HOME Cash Resrv. Asset Mgmt DDF Cash Flow DCR Mortgage A DCR Mortgage B DCR Mortgage C DCR Other Source Oper Exp Coverage Ratio Mortgage A Balance Mortgage B Balance Mortgage C Balance Other Source Balance DDF Balance (633,562) (41,361) (48,545) 103,749 (108,539) - (652,568) (42,188) (50,002) 99,004 (108,539) - (672,146) (43,032) (51,502) 93,958 (108,539) - (692,310) (43,892) (53,047) 88,601 (108,539) - (713,079) (44,770) (54,638) 82,919 (108,539) - (8,000) (12,790) 0.96 (8,000) (17,536) 0.91 (8,000) (22,582) 0.87 (8,000) (27,938) 0.82 (8,000) (33,620) 0.76 1.14 (670,881) 1.13 (786,659) 1.12 (903,600) 1.11 (1,021,716) 1.10 (1,141,018) - 2015PA-0xxProjNameHOMEConsent v1 Harlem - - - Part VII-Pro Forma - 4 of 5 Georgia Department of Community Affairs 2015 HOME Consent Pre-Application Housing Finance and Development Division HOME Consent PART SEVEN - OPERATING PRO FORMA - 2015PA-0 Independence Village Harlem Phase 1, Harlem, Columbia County I. OPERATING ASSUMPTIONS Revenue Growth Expense Growth Reserves Growth Vacancy & Collection Loss Ancillary Income Limit 2.00% 3.00% 3.00% 7.00% 2.00% HOME Consent Green-shaded cells are unlocked for your use and contain references/formulas that may be overwritten if needed. Please Note: Asset Management Fee Amount (include total 8,000 Yr 1 Asset Mgt Fee Percentage of EGI: -1.75% charged by all lenders/investors) Property Mgt Fee Growth Rate (choose one): Expense Growth Rate (3.00%) Percent of Effective Gross Income II. OPERATING PRO FORMA III. Applicant Comments & Clarifications Yr 1 Prop Mgt Fee Percentage of EGI: No --> If Yes, indicate Yr 1 Mgt Fee Amt: Yes --> If Yes, indicate actual percentage: 5.00% 5.000% IV. DCA Comments APPLICANTS: Explain any any debt service payment amounts that deviate from the amount shown in Permanent Sources (Part III) 2015PA-0xxProjNameHOMEConsent v1 Harlem Part VII-Pro Forma 5 of 5 CITY OF HARLEM PLANNING & ZONING COMMISSION STAFF RECOMMENDATION May 14th, 2015 Regular Meeting Application Number……………………………………………………………………………………….......RZ-2015-04-02 Applicant.…………………………………………………………………………………………….Georgia Power Company Request…………………………………………………………………………………………………….…Rezoning-R-1A to I-1 Location……………..…………….…….…………………….North end of North Bell Street, Harlem, GA 30814 Property Information…….…………….Parcel ID H01 068A, R-1A Residential, approximately 11.3 AC Adjacent Use and Zoning………………….…………….………………………..North: R-1A Residential (Vacant) ………..……………………………………………………………………………..South: R-1A Residential (Single Family) …….……………………….………………………………………………………………...East: R-1A Residential (Religious) ……….…………………………………………………………..…………………West: PUD & R-1A Residential (Vacant) Comprehensive Plan Character Area:…..………..……………………..Traditional Neighborhood Reserve Staff Recommendation………………………………………..……………………………............................Approval The Request: This is not a typical rezoning since it deals with a property owned by Georgia Power/Southern Company. The applicant notified the City in January that they would be placing a communications tower on the site near the existing substation. The property is currently zoned R-1A and a communications tower is not permitted on that zoning classification. City staff informed the applicant that due to local zoning code we could not permit the communications tower as currently zoned. In order for Georgia Power to proceed, the City elected to rezone the property after discussions between legal counsels for both parties. In addition, the substation never received a conditional use from the city as required by code. The rezone will remedy both issues. The submitted proposal is for a “slick” monopole that will stand 193 feet high located just north of the existing substation. According to city code, the tower will be required to be setback a distance equal to the height of the tower from any property containing a residential use. The proposed location will be within that setback to all existing properties, whether containing a residential use or not. Staff Recommendation: Approve Planning & Zoning Commission Recommendation-Pending The Planning & Zoning Commission is tentatively scheduled to hear this request at their May 14th, 2015 meeting. Their recommendation will be forwarded to the Mayor & City Council for final action on May 26th, 2015 at the Public Safety Building. Parcel H01 068A with proposed location of monopole Example of typical monopole CITY OF HARLEM PLANNING & ZONING COMMISSION STAFF RECOMMENDATION May 14th, 2015 Regular Meeting Application Number……………………………………………………………………………………….......RZ-2015-04-03 Applicant.………………………………………………………………….………………………….Georgia Power Company Request…………………………………………………………………………………………………….…Rezoning-R-1A to I-1 Location……………..…………….…….…………………….North end of North Bell Street, Harlem, GA 30814 Property Information…….……………..….Parcel ID H01 069, R-1A Residential, approximately .89 AC Adjacent Use and Zoning………………….…………….………………………..North: R-1A Residential (Vacant) ………..………………………………………………………………………………………..South: R-1A Residential (Utility) …….……………………….………………………………………..…………………………...East: R-1A Residential (Utility) ……….…………………………………………………………..……………………………….………………West: PUD (Vacant) Comprehensive Plan Character Area:…..………..……………………..Traditional Neighborhood Reserve Staff Recommendation………………………………………..……………………………............................Approval The Request: Similar to RZ-2015-04-02, this is a rezone for Georgia Power/Southern Company. This parcel is adjacent to parcel ID H01 068A. Currently there are not any plans by Georgia Power for the site. Staff Recommendation: Approve Planning & Zoning Commission Recommendation-Pending The Planning & Zoning Commission is tentatively scheduled to hear this request at their May 14th, 2015 meeting. Their recommendation will be forwarded to the Mayor & City Council for final action on May 26th, 2015 at the Public Safety Building. Location map for RZ 2015 04 03 CITY OF HARLEM PLANNING & ZONING COMMISSION STAFF RECOMMENDATION May 14th, 2015 Regular Meeting Application Number……………………………………………………………………………………….......RZ-2015-04-04 Applicant.……………………………………………………………………….…Peachtree Housing Communities, LLC Request………………………………………………………….…………Rezone R-1A Residential to R-3 Residential Location……………..…………….…….………………..………………North Louisville Street, Harlem, GA 30814 Property Information……………………Parcel ID H01 068, R-1A Residential, approximately 17.75 AC Adjacent Use and Zoning………..…………….…..…….North: A-1 Agricultural (Waste Treatment Plant) .……………………………………………………………………………….South: R-1A Residential (Religious & Utility) …………………………….………………...East: R-1A Residential (Single Family) & R-2 (Residential-Duplex) …………………………………………………………….…West: Planned Unit Development (PUD/Undeveloped) Comprehensive Plan Character Area:..………..……………………....Traditional Neighborhood Reserve Staff Recommendation.……………..…………………………….............................Approval with Conditions The Request: The applicant is requesting to rezone 17.75 AC from R-1A Residential to R-3 Residential for 48 senior housing apartment units in 6 single story buildings in a cottage style of architecture and have included examples. Proposed amenities include a club house, raised planting gardens, covered picnic areas, and covered patio areas. The applicant meets initial R-3 standards and would be further evaluated if approved to meet standards for design. Applicant has also indicated that the project would use Georgia Department of Community Affairs tax credits. A packet indicating how that process works, more details on the development, and photos of other projects was provided by the applicant. Existing Conditions: The existing parcel is irregularly shaped. The topography slopes downward from the southwest to northeast. A small pond is on the southeast corner of the parcel and an intermittent stream extends northward from that pond towards the waste treatment plant. Along the southern property line and taking up the southeast corner of the parcel is a Georgia Power easement for overhead power lines. The lot is wooded, but does have areas that are cleared near the center. Review of the Request: In reviewing this request, staff utilized Chapter 152, §152.219 (Relevant Factors in Rezoning Evaluation) of the Harlem Code of Ordinances to make a recommendation on the rezoning request. In regards to Chapter 152, § 152.219 (Relevant Factors in Rezoning Evaluation) staff offers the following comments: The following factors are considered when applying the balancing test which is required to arrive at a rezoning decision: A. Existing uses and zoning of nearby property. Would the requested zoning permit land uses of a similar nature to those uses of similarly situated nearby land? The zoning around the property is varied. To the north is a parcel zoned A-1 Agricultural, to the south, east, and west are properties zoned R-1A, R-2, and Planned Unit Development. The uses are also varied as well. To the north is the waste treatment plant, to the south are a religious use and a utility (Georgia Power), to the east are single family and duplex residences, and to the west is an undeveloped PUD. The closest R-3 zoning with apartments is located approximately 1,000 feet away on West Forrest Street. From a use standpoint, a duplex is across the street from the parcel at 525 North Louisville and a housing authority property with a duplex and a single unit is located at 202 Douglas Street. Both of these uses are of similar density to the submitted proposal and are of a similar use, albeit not the same. B. Extent to which property value is diminished by present zoning. How much more would the property be worth if the rezoning request was approved? The property is currently sitting unused and has some difficulties. Access to the site is limited by an intermittent stream and pond along the North Louisville property line. A 300 foot wastewater treatment plant buffer is on the north side of the property and severely limits the usable property on the site. It could still be developed at the present zoning, but would be very difficult with the lot standards in place in R-1A. The property would conceivably be worth more if rezoned to a district that allowed more density, which this request does seek to do. C. Extent to which destruction of the property value of the petitioner promotes the health, safety, morality, or general public welfare. How would approval of the request adversely impact the public interest? Consider the following: (1) Traffic. Potential increase in congestion. (2) Diminution of value. Immediate diminution or gradual diminution resulting from deterioration of a neighborhood over a period of time (3) Environmental impact. Potential for generation of noise, air pollution, or deterioration of unique or sensitive environmental conditions. In terms of traffic, the addition of 48 senior housing apartment units will cause a slight rise in traffic according to ITE Trip Generation. North Louisville Street is considered a Rural Minor Arterial road which is defined as providing links between cities and larger towns and should provide for relatively high overall travel speeds with minimum interference to through movement. In 2014, a traffic counter located just south of the intersection of HarlemGrovetown and North Louisville averaged 6,141 average daily trips. Models anticipate that the proposed 48 units will add 165 average daily trips to North Louisville Street. This is a small amount of additional trips, especially considering the road is designed to handle upwards of 15,000 average daily trips per day. The proposed site does include an intermittent stream running through the property along North Louisville Street and a pond. The applicant has taken both of these environmental features into account. Staff is concerned somewhat with detention being located so close to the intermittent stream. D. Zoning of the property when purchased. Is the request a result of speculative purchase of the property? The property has not been purchased by the applicant, but a contract has been signed contingent on the approval of the rezoning. Therefore, it is a speculative purchase. E. The suitability of the subject property for the current zoning. Are natural environmental features conducive to the type of development permitted by the present zoning? Are the utilities present for development of the site? Would the topography or other natural environmental characteristics of the site be conducive to development under the present zoning? The current zoning is suitable for the subject property, but does limit it. As mentioned, the site is limited for R-1A residential development due to the environmental features along the front of the property and the buffer from the wastewater treatment plant. Water and sewer is available to the site. F. Length of time the property has been vacant as zoned. Considered in the context of land development in the area in the vicinity of the property. Staff does not know when the property was last developed in any way. G. The extent to which the rezoning request conforms with the City Comprehensive Plan. The character area for this site is Traditional Neighborhood Reserve. Please note that the character area guidelines are not in the Community Agenda and staff used the guidelines from the Land Use section of the Comp Plan. Traditional Neighborhood is designed to promote traditional neighborhood site development geared toward pedestrian comfort and accessibility, and promotes building design that respects the scale, orientation and principal features of older housing stock. Development pattern recommendations are for neighborhoods promoting primarily single-family detached and attached housing types, limited townhouse or singlefamily attached development clustered on specific blocks, traditional architecture, traditional lot, block, and street layout, neighborhood parks, and smaller building lots for higher singlefamily densities than in the historic neighborhoods. This character area is fairly spread out and includes pockets of the city that are undeveloped. Because of this there has been little new development built within the character area with only the Ansley Place subdivision and Planer Mill Village senior independent housing being completed during the Comprehensive Plan time period. A proposed PUD was rezoned adjacent to the subject site, but has not been developed. While this application is not single family and is instead an attached dwelling unit, it is very similar to the approved Planer Mill Village senior independent housing development. Both are senior focused and have a similar development pattern, but with Planer Mill being at a higher, 5 units per acre density. The issue for staff is that it is unknown what the thought process was on approving that development. As a local government, our comprehensive plan does allow for some interpretation on lots that are along the “boundary” lines for each character area. This development would have fit within the Declining Residential character area quite easily and is along that boundary line. It also has a very compelling argument to fit within the Traditional Neighborhood Reserve due to it being attached and at a higher density than what is typical. Staff is inclined to say that this proposal does fit the comprehensive plan, but there are questions of relying on one previous rezoning. H. Districts. The possible creation of an isolated district unrelated to adjacent and nearby districts. The proposed rezoning would create an isolated R-3 district. However, the density is similar to the Harlem Heights neighborhood across the street (approximately 3 single family dwellings per acre compared to 2.7 apartments per acre on the subject property). I. Public effects. The population density pattern and possible increase or overtaxing of the loan on public facilities including, but not limited to, schools, utilities, and streets. The applicant has indicated that children would not be permitted to live in the development, so it would have a minimal impact on the school system. The Public Works Department keeps a close watch on usage at our sewer treatment plant. Estimates based on average gallon per day usage by individuals indicate that the development could produce 16,800 average gallons per day of wastewater that would need to be treated at the Harlem treatment plant. Current usage averages approximately 193,000 gallons per day of our 250,000 allotment. The addition of the estimated usage would bring the total to an estimated 209,800 leaving 40,200 in reserve. Please note that the figures used here are projections and typically do not reflect the actual usage. They are used to gauge capacity needs and when to plan for expansion of sewer treatment plants. For instance, using this model the City of Harlem would already be over its allotment if each citizen used 100 gallons per day of wastewater. Because of this, the City has begun plans to double the size of the wastewater treatment plant to accommodate future growth. As part of the review process, the Harlem Fire Department is also consulted with. Due to the applicant changing their overall site plan and target market after comment requests had gone out, comments from the fire department were not received before the publication of this recommendation. Comments will be included to the Planning Commission as soon as they are received and will be available online and at the meeting for the public. The Harlem Police Department was also consulted with. Due to the applicant changing their overall site plan and target market after comment requests had gone out, comments from the Police department were not received before the publication of this recommendation. Comments will be included to the Planning Commission as soon as they are received and will be available online and at the meeting for the public. In terms of traffic, the addition of 48 senior housing apartment units will cause a slight rise in traffic according to ITE Trip Generation. North Louisville Street is considered a Rural Minor Arterial road which is defined as providing links between cities and larger towns and should provide for relatively high overall travel speeds with minimum interference to through movement. In 2014, a traffic counter located just south of the intersection of HarlemGrovetown and North Louisville averaged 6,141 average daily trips. Models anticipate that the proposed 48 units will add 165 average daily trips to North Louisville Street. This is a small amount of additional trips, especially considering the road is designed to handle upwards of 15,000 average daily trips per day. J. Boundaries. Whether existing district boundaries are illogically drawn in relation to existing conditions on the property proposed for change. In staff’s opinion, existing district boundaries in the area are logically drawn, albeit haphazardly. However, with the site being close to the central core and the fact that those areas are rarely “clean” from a zoning district standpoint since they have evolved over time the somewhat hodgepodge nature is to be expected. K. Changing conditions. Whether changed or changing conditions make the passage of the proposed amendment necessary. Multifamily is a popular form of development and statistics from across the country have shown that the United States as a whole is lacking in multifamily housing. Additionally, Columbia County recently placed a moratorium on townhome and other high density development which may have an impact on the applications the City of Harlem sees in the future dependent on how the County proceeds on that issue. L. Drainage. Whether the proposed change will create a drainage problem. With review by both city engineers and the state, it is not anticipated that the proposal will create a drainage problem. M. Effects. Whether the proposed change will seriously reduce light and air to adjacent areas. Staff does not anticipate any reduction of light and air to adjacent areas. N. Property values. Whether the proposed change will adversely affect property values in the adjacent area. Staff looked at several literature reviews of studies on how LIHTC projects impact property values of adjacent areas. The general consensus was that they have no change or a small boost on adjacent property values. However, one of the more thorough reports indicated that more research is needed. Staff is hesitant to provide a comment to this question due to the varying levels of the studies and also that a penultimate study has yet to be performed. O. Adjacent property. Whether the proposed change will be a deterrent to the improvement or development of adjacent property in accordance with existing regulations. The proposed change could have an impact on the lot to the west that is zoned Planned Unit Development. Staff is mostly concerned with that site only having access on West Forrest Street and the impact that would have on West Forrest Street if developed as intended. However, staff must mention that those issues have existed since the property was rezoned and have not been addressed. P. Privilege. Whether the proposed change will constitute a grant of special privilege to an individual owner as contrasted with the public welfare. Staff does not think that the proposed change constitutes a granting of special privilege.. Q. Need for change. Whether there are substantial reasons why the property cannot be used in accordance with existing zoning. The property could be used in accordance with existing zoning. However, the site lends itself more to a clustered or small lot development due to the environmental factors on the site and the character area. R. Neighborhood. Whether the change suggested is out of scale with the needs of the neighborhood or would adversely affect living conditions in the neighborhood. The proposed development is not out of scale with the needs of the neighborhood from a density standpoint as indicated previously. With the low number of additional daily trips to the road system and the age requirement, staff does not think it would adversely affect living conditions in the neighborhood. S. General. Any other factors relevant to balancing the interest in promoting the public health, safety, morality, or general welfare against the right to the unrestricted use of property. Staff does not have any other factors to add to the review. Comprehensive Plan Character Area: The Traditional Neighborhood Reserve character area is made up primarily of large tracts that have previously been left largely undeveloped and extend from both pre-existing contemporary and historic neighborhoods. The development patter is to promote traditional neighborhood site development geared towards pedestrian comfort and accessibility, and promotes building design that respects the scale, orientation and principal features of older housing stock. Staff Recommendation: Approval with Conditions Overall, staff is comfortable with the proposed development due to the density, location, and character area development recommendations. While the proposed development does introduce a new use into that area, its overall density is within the same ratio as surrounding uses. The proposal also provides much of the recommended development patterns from that character area. That being said, staff does have several recommended conditions that are as follows: 1. Pedestrian access shall be provided from the interior of the site to the proposed pedestrian walkway along North Louisville Street. 2. Proof of deed filing as indicated on submitted documentation from the applicant will be presented to the City of Harlem upon filing. Any change pertaining to the land use restrictions placed on the property shall be presented at filing. Planning & Zoning Commission Recommendation-Pending The Planning & Zoning Commission is tentatively scheduled to hear this request at their May 14th, 2015 meeting. Their recommendation will be forwarded to the Mayor & City Council for final action on May 26th, 2015 at the Public Safety Building. Proposed site for RZ-2015-04-04 SITE INFO APPROX. N. LOUISVILLE ST. HARLEM, GA 30814 PARCEL ID: H01-068 OWNER: ALVIN K. HARRIS PO BOX 642 HARLEM, GA 30814 DEVELOPER: PEACHTREE HOUSING COMMUNITIES 80 WEST WIEUCA RD., NE SUITE 204 ATLANTA, GE 30342 EN E AC P S P TO CURRENTLY ZONED R-1A-RESIDENTIAL PROPOSED ZONING R-3 PER ORDINANCE SHALL CONFORM TO DENSITY AND DIMENSIONAL STANDARDS OF THE RESIDENTIAL DISTRICT R-3 N NE A M R PE GROSS SITE AREA = 17.75+/- ACRES DENSITY REQUIREMENTS PER R3 DESIGNATION = 5 UNITS/ACRE x 17.75 ACRES = 88UNITS MAX 2.7 UNITS/ACRE PROPOSED = 48 UNITS /17.75 ACRES FRONT SETBACK REAR SETBACK SIDE SETBACK MAX. BLDG. HEIGHT = 75' MIN. = 15' MIN. = 15' MIN. = 60' MAX A TOTALS: H F C 200 300 400 500 600 4 4 0 0 4 0 4 8 8 4 8 TOTAL UNITS PER MA NEN TO 8 PARKING PARKING REQUIRED 2.0 SPACES PER UNIT - 96 SPACES REQUIRED - 96 SPACES PROVIDED + 16 FOR VISITORS (112 TOTAL PROVIDED) REQUIRED AMENITIES PER GADCA: - RAISED PLANTING GARDENS - MULTIPURPOSE ROOM - COVERED PICNIC AREA (W/ 2 PICNIC TABLES & A GRILL) ADDITIONAL AMENITIES : - COVERED PATIO WITH SEATING - EXERCISE ROOM (W/ NEW EQUIPMENT) ADDITIONAL SPACES : - OFFICES - MAINTENANCE - MAIL KIOSK OPEN SPACE REQUIREMENTS PER R3 DESIGNATION = NOT LESS THAN 25% GROSS ACREAGE MUST BE MAINTAINED AS PERMANENT OPEN SPACE (P.O.S.) 17.75 ACRES * 25% = 4.44 MIN.ACRES FOR P.O.S. (193,406 SQ.FT.) P.O.S. PROVIDED = 6.42 ACRES> 4.44 ACRE MIN. (279,614 SQ.FT.) -100% ACCESSIBLE TO RESIDENTS -10% OF REQ. OPEN SPACE TO BE IMPROVED OPEN SPACE (I.O.S.) = 19,341 I.O.S. PROVIDED = 28,408 SQ.FT. (15% WHICH IS GREATER THAN THE 10% REQUIRED BUT LESS THAN THE 25% MAX) VICINITY MAP - RESIDENT COMPUTER CENTER (MIN. 2 COMPUTERS) - COMMON LAUNDRY B D 100 2 BR/2 BA - B E I.O.S #1 UNIT MIX 1 BR/1 BA - A G J K SITE PEN SPA CE Louisville Senior Village Harlem, Georgia A proposed development by: www.peachtreehousing.com CONTENTS OF THIS PACKAGE: PAGE 3: Brief overview of the proposed development and development team PAGE 10: Listing of properties either completed or under development by Peachtree Housing Communities PAGE 15: Pictures of other senior tax credit communities developed by Peachtree Housing Communities in Georgia (Louisville Senior Village will be nearly identical to the properties depicted in this section) 2 OVERVIEW OF THE PROPOSED DEVELOPMENT AND DEVELOPMENT TEAM 3 About the Development Team: Peachtree Housing Communities, LLC (“Peachtree”) will be the owner and developer of the property. Peachtree is a real estate development company focused on developing apartment communities in the southeastern United States with a focus in the states of Georgia and South Carolina. Peachtree is an “asset based” developer and retains ownership in developments for at least twenty years before disposition of the property. The principals and employees of Peachtree have over 50 years of combined experience in developing, constructing and financing affordable housing properties. About the affordable housing program: The Affordable Housing Program, which is based on Section 42 of the Internal Revenue Code, was enacted by Congress in 1986 to provide the private market with an incentive to invest in affordable rental housing. Federal housing tax credits are awarded to developers of qualified projects. Developers then market these credits to investors to raise capital (or equity) for their projects, which reduces the debt that the developer would otherwise have to borrow. Because the debt is lower, a tax credit property can in turn offer lower, more affordable rents. This reduced rental rate will not affect the property’s ability to maintain itself and provide superior service to its residents because of the reduced debt. In fact, through a combination of regular site visits and audits by Georgia Department of Community Affairs (“DCA”) and the equity investor, the tax credit program ensures that the property is well maintained and kept in compliance with the numerous program requirements. Investors receive a dollar‐for‐dollar credit against their Federal tax liability each year over a period of 10 years provided the property maintains compliance with the program requirements,. The amount of the annual credit is based on the amount invested in the affordable housing project. We will apply to DCA for an allocation of tax credits to allow for the development to proceed. In return for accepting the allocation of tax credits, the development will agree to rent all units to seniors (age 55 and older) in addition to renting 20% of the units to seniors with incomes at or below 50% of area median income (“AMI”) and renting the remaining 80% of the units to seniors with incomes at or below 60% of AMI. The age restriction and income restriction will be recorded on the deed to the property. The property will not receive any rent subsidies from the federal or state government. The residents will need to make sufficient income to pay their rent. 4 Please see the following chart detailing the structure of our proposed development: Affordable Housing Structure and Participants IRS Louisville Senior Village 2. Submit Project Proposal 1. Allocates Tax Credits to Georgia 4. Sells Credits 5. Builds Project Using Equity Proceeds 3. Awards Credits Private Equity Investors GA DCA All of the equity and debt placed on the proposed development will be from private sources. The allocation of tax credits is not a federal funding of the development, but rather it is an incentive to facilitate the private investment in and development of affordable housing. The rents will not be subsidized by the program and each resident must pay their rent or face eviction. 5 How will this development help the senior residents of Harlem? Louisville Senior Village will provide quality affordable housing to the senior residents of Harlem. The following tables show the targeted income levels for the proposed development and the current projected rents: Unit Type 1 Bedroom Unit 2 Bedroom Unit 1 Bedroom Unit 2 Bedroom Unit UNIT RENT STRUCTURE Income Level Maximum Monthly Rent Allowed 50% AMI 50% AMI 60% AMI 60% AMI $383 $448 $494 $581 Projected Monthly Rent $382 $425 $410 $485 INCOME LEVELS FOR 60% AMI UNITS # of Residents Income Level 1 Person Household 2 Person Household 60% AMI 60% AMI INCOME LEVELS FOR 50% AMI UNITS # of Residents Income Level 1 Person Household 2 Person Household 50% AMI 50% AMI Maximum Income $24,840 $28,380 Maximum Income $20,700 $23,650 Our target market for our residents includes the following: Seniors that currently live in a larger home and may wish to downsize to ease the burden of upkeep on their property and the financial strains that may be caused by homeownership. Seniors that are currently renting a nice home or apartment but are over rent burdened and might find difficulty acquiring the daily necessities of life (groceries, prescription medications, etc.). 6 Seniors that are currently living in substandard housing so that they may indeed afford the necessities of life mentioned above. Louisville Senior Village will provide benefits to each of the target markets above. We will provide a maintenance free life for our residents. Furthermore, we will provide a high quality, secure property at an affordable price, thus ensuring that our residents don’t have to make the choice between a nice residence and the necessities of life. We have found that once a resident moves into one of our senior properties, they tend to live there for a much longer period when compared to a normal apartment community that is not deed restricted for seniors. Proposed Site Location: Louisville Senior Village will be located on the west side of N Louisville Street approximately ½ of a mile north of downtown. Proposed Community Characteristics: The proposed development will be for active adults (age 55 and older) and will consist of 48 apartment homes consisting of one and two bedroom units located in six single story buildings. The community highlights will include the following at a minimum: Unit Amenities and Characteristics: 100% of the units will be accessible and adaptable, as defined by the Fair Housing Amendments Act of 1988 and the entire site will conform to the Americans with Disabilities Act. All one bedroom units will have one full bath All two bedroom units will have two full baths The living areas and bathrooms in all units will have vinyl plank flooring The bedrooms in all units will be carpeted All appliances Energy Star Certified (including water heaters) All of the units will have a balcony or patio Upgraded interior doors with lever hardware Upgraded cabinetry with loop handles All units will be constructed to Earth Craft Multifamily Standards (please visit http://www.earthcraft.org/builders/programs/earthcraft‐multifamily/ for details). The EarthCraft Multifamily program provides certifications for multifamily properties and these standards address a wide range of sustainability considerations, including environmental performance, indoor air quality, building durability, comfort and affordability. EarthCraft Multifamily addresses these concerns at the unit level and for 7 the structure as a whole. Obtaining this certification ensures that the property is constructed in an environmentally friendly manner and further ensures that our residents will be living in a healthy environment with the lowest possible utility bills which enhances the affordability, viability and sustainability of our proposed development. Site/Building Amenities and Characteristics: A community center (club house) that includes a kitchen, dining area, sitting areas with televisions, computer center, a library and a furnished exercise/fitness room with low‐impact exercise equipment will be provided A full time property manager will be located on site A full time maintenance person will be located on site A landscaping company will be hired to provide regular landscaping services to ensure the proposed development is well maintained and attractive A covered picnic area with grilling stations will be provided A well constructed and maintained raised garden for resident’s use. Tools, soils and seeds will be provided to the residents and gardening classes will be provided. The raised garden will assist our residents in that it is tailored for an aging population. An on‐site laundry facility will be provided for residents who do not have washers and dryers. Complete built‐in fire sprinkler system in every unit At least 40% of the exterior of all buildings will be brick or stone, with the remainder consisting of fiber cementious siding 30 year architectural roofing shingles Social Services: Social and recreational programs will be planned and overseen by the property manager (semi‐monthly birthday parties/holiday dinners or parties, potluck dinners, movie nights, etc.) Semi‐monthly classes will be conducted on site (examples: arts and crafts, exercise, computer tutoring, and gardening) Direct Economic Impact to Harlem: Water and Sewer Tap Fees: The water and sewer tap fees for the proposed development are estimated to be $85,901. 8 Construction dollars Construction costs are estimated to be $5.2M. These construction dollars will have a direct economic impact on the City of Harlem and surrounding areas. Deed Restriction for seniors: The italicized section below is an excerpt from the land use restriction agreement that must be placed upon the property when it receives tax credits. This deed restriction must be recorded. The recording of this deed restriction allows us to be exempt from the Fair Housing rule that does not allow a community to discriminate based on familial status (i.e. families with children). The Housing For Older Persons Act of 1995 allows us to not allow children to reside in our community as long as we follow the parameters set forth in our deed restriction, which we must do. Therefore, all of our residents will be age 55 and older (with the exception of a spouse of someone who is age 55 and older and the spouse might be younger) and no children will reside in our community. Excerpt from the land use restriction agreement: Housing for Older Persons Project Accessible, adaptable, and intended for and operated for occupancy by persons 55 years of age or older. 80% of the total housing units in the Project must be occupied by at least one person who is 55 years of age or older. Up to 20% of the units may be occupied by others, including the landlord’s employees, surviving spouses or children of residents who were 55 years of age or older when they died, and caregivers. Owner must adhere to policies and procedures that demonstrate intent of Owner and manager to provide housing for persons 55 years of age or older. Throughout the Compliance Period, unless otherwise permitted by GHFA, Owner has agreed to provide the following: Housing for Older Persons Project: Owner must provide at least 2 different activities/services designed to meet the physical or social needs of tenants aged 55 and older in at least three of the following categories: recreation/social, transportation, health/wellness, education, counseling, and security. 9 LIST OF PROPERTIES EITHER COMPLETED OR UNDER DEVELOPMENT BY PEACHTREE HOUSING COMMUNITIES 10 Completed Properties: Forrester Senior Village‐Leesburg, GA Completed 2012 Forrester Senior Village (“Forrester”) is a fifty unit apartment community designed for seniors (age 55 and older). Forrester is located in Leesburg, GA at 197 Forrester Parkway. Forrester provides its residents with numerous amenities, including a fitness center, a computer center, a large all‐purpose community building for community events, a garden for our residents’ use, a picnic pavilion and a walking path that meanders through the open space of the property. All units feature upgraded insulation (R15 walls/R‐38 ceilings), energy star appliances and lighting as well as high‐efficiency HVAC. All units have solar water heaters that reduce tenant utility costs. The clubhouse is powered by a photovoltaic system. Conners Senior Village Phase I‐Villa Rica, GA Completed 2012 Conners Senior Village (“Conners”) is a sixty unit apartment community designed for seniors (age 55 and older). Conners is located in Villa Rica, GA off of Conners Road, adjacent to Mirror Lake. Conners provides its residents with numerous amenities, including a fitness center, a computer center, a large all‐purpose community building for community events, a garden for our residents’ use, a picnic pavilion and a walking path that meanders through the open space of the property. All units feature upgraded insulation (R15 walls/R‐38 ceilings), energy star appliances and lighting as well as high‐efficiency HVAC. The clubhouse is powered by a photovoltaic system. Conners Senior Village Phase II‐Villa Rica, GA Completed 2014 Conners Senior Village Phase II (“Conners II”) is the second and final phase of a master planned phased project and is designed for seniors (age 55 and older). Conners II consists of 60 additional units which are located in five buildings along with a second clubhouse. Conners Senior Village Phase II has other amenities such as: a raised and fenced community garden that is ADA compliant, picnic pavilions with grilling stations, a community room for community events, a computer center, a centralized laundry facility and sitting areas throughout the interior common space of the building for our residents to rest and commensurate. Conners II also includes a putting green for our residents’ recreation. Oak Forest Apartments‐Eastman, GA Completed 2013 Oak Forest Senior (“Oak Forest”) is a forty‐one unit apartment community designed for seniors (age 62 and older) that underwent a complete renovation and rehabilitation that was completed in June, 2013. Peachtree added a number of amenities including an ADA compliant raised and fenced community garden, a fitness center equipped with low impact exercise equipment appropriate for aging populations, a new covered mail kiosk, a gazebo, a computer room and a revamped community gathering room for our residents’ use. 11 Fairgrounds Senior Village‐Laurens, SC Completed 2013 Fairgrounds Senior Village (“Fairgrounds”) is a 42 unit apartment community designed for seniors (age 55 and older). Fairgrounds is located at 197 Fairgrounds Road in Laurens, SC on the northwest corner of the Fairgrounds Road/Osborne Road intersection, just north of U.S. Highway 76 (East Main Street). The property has amenities specifically designed for seniors such as a gazebo, a walking path that meanders through the open space of the property, an exercise room with low impact exercise equipment and a spacious community building that is furnished with televisions, a leasing area, a computer center and gathering areas. Properties under development: Longleaf Senior Village‐Aiken, SC Coming Spring 2015 Longleaf Senior Village (“Longleaf”) started construction in the first quarter of 2014. Longleaf is being developed in conjunction with Neighborhood Concepts, Inc., a housing focused non‐profit corporation based in Huntsville, AL. Longleaf will be located in Aiken, SC off York Street, just north of the intersection of York and Rutland. The property will consist of 50 apartments for seniors age fifty‐five and older. The property will have amenities specifically designed for seniors such as an exercise room with low impact exercise equipment; a spacious community building that will be furnished with televisions, a computer center and gathering areas. Horizon Senior Village‐Grovetown, GA Coming Late 2015 Horizon Senior Village started construction in late 2014. The property will be a 68 unit senior housing development for those age fifty‐five and older. Horizon Senior Village will be located in the city of Grovetown, Columbia County, Georgia (a suburb of Augusta). The property is located off Wrightsboro Road. The development of Horizon Senior Village will provide quality affordable housing to the residents of Columbia County. There are a multitude of shopping and dining opportunities within two miles of Horizon Senior Village. Furthermore, Horizon Senior Village will have a raised and fenced community garden that is ADA compliant, a community building with a covered porch for community events, a fitness center with low impact exercise equipment appropriate for an aging population, a fully equipped computer center, and a centralized laundry facility. Pointe North Senior Village‐Albany, GA Coming Summer 2015 Pointe North Senior Village started construction in the summer of 2014. The property will be a 59 unit senior housing development for those age fifty‐five and older. Pointe North Senior Village will be located in Albany, Dougherty County, Georgia. The property is located off Pointe North Boulevard between Colonial Drive and Pointe North Court. The development of Pointe North Senior Village will provide quality affordable housing to the senior residents of Dougherty County. There are a multitude of shopping and dining opportunities within a mile of Pointe North 12 Senior Village. Pointe North Senior Village will have a community room for community events, a fitness center with low impact exercise equipment appropriate for an aging population, a fully equipped computer center, a centralized laundry facility, a covered patio and sitting areas throughout the interior common space of the building for our residents to rest and socialize. Laurel Street Village‐Honea Path, SC Coming Spring 2016 Laurel Street Village will be located in Honea Path, SC off Laurel Street, just west of the intersection of Laurel Street and Eastview Street. Construction commenced in April 2015. The property will consist of 42 townhomes targeted to families and will include 23 two bedroom units and 19 three bedroom units. Laurel Street Village will be located within 1/2 mile of a grocery store, a pharmacy, numerous restaurants, retail stores, doctor’s offices, a public elementary school, a bank and a public park. All of the amenities offer close proximity to services and employment opportunities. We believe Laurel Street Village is located in an area that offers the best of both worlds with regards to price reasonableness and proximity to amenities and services. The property will provide a spacious community building that will be furnished with televisions, a leasing area, a computer center and gathering areas. We will also provide a playground for our resident’s children. A.L. Miller Village‐Macon, GA Coming Late 2016 Peachtree Housing Communities in partnership with Oracle Consulting Services announced the rehabilitation and adaptive reuse of A.L. Miller Village. Work is expected to start in late summer of 2015. A.L. Miller Village is a Historic Landmark School campus located on an eleven acre site at 2241 Montpelier Avenue, Macon, Bibb County, Georgia. A.L. Miller Village is centrally located with off‐site amenities within walking distance including churches, medical offices, Mercer University, local parks and numerous retail outlets. The campus consists of three separate buildings, the High School, the freestanding Gymnasium building and the Elementary School building with an attached Administration building. Both Low‐Income Housing Tax Credits and Historic Tax Credits will be utilized to finance the development of A.L. Miller Village. The Development will consist of 62 one, two and three bedroom units located in the existing historic building and 9 freestanding single family homes. Park Senior Village‐Leesburg, GA Coming Summer 2016 Park Senior Village is expected to start construction in the summer of 2015. Park Senior Village will be a 50 unit senior housing development for those age fifty‐five and older. Park Senior Village will be located in Leesburg, Lee County, Georgia. The property is located at the intersection of Robert B. Lee Drive and Park Street, which is the commercial growth corridor of Leesburg and Lee County and a suburb of Albany. The development of Park Senior Village will provide quality affordable housing to the residents of Lee County. There are a multitude of 13 shopping and dining opportunities within two miles of Park Senior Village. Furthermore, Park Senior Village will have a raised and fenced community garden that is ADA compliant, a community building with covered porch for community events, a fitness center with low impact exercise equipment appropriate for an aging population, a fully equipped computer center, and a centralized laundry facility. 14 PICTURES OF OTHER SENIOR TAX CREDIT COMMUNITIES DEVELOPED BY PEACHTREE HOUSING COMMUNITIES IN GEORGIA (Louisville Senior Village will be nearly identical to the properties depicted in this section) 15 Pictures of Forrester Senior Village in Lee County Georgia (completed May 2012) Pictures of Conners Senior Village in Villa Rica, Georgia (completed July 2012) CITY OF HARLEM PLANNING & ZONING COMMISSION PETITION TO CHANGE §152.067 (AGRICULTURAL, FARM, AND ANIMAL STRUCTURES AND USES) Mr. Paul Kirkland, who resides at 430 South Louisville Street, has requested a revision to §152.067. The current sections states: §152.067 AGRICULTURAL, FARM, AND ANIMAL STRUCTURES AND USES Buildings and structures related to agriculture, farming, or the keeping of animals, shall be set back a minimum of 100 feet from any property line. The minimum lot size for the keeping of livestock shall be five acres. One horse may be boarded for non-commercial use on a lot containing five acres or more in area, and an additional acre of are shall be required for each additional horse to be boarded. Mr. Kirkland petitions to allow for the temporary use of goats for the purposes of clearing an overgrown lot with a 3 month maximum. STAFF COMMENT The 2006 ordinance is written in such a way that pushes livestock/farm animals to the larger lots on the periphery of town where a more rural character is present, not the central core. This is a fairly common practice with land use since many people residing in dense areas do not want to have livestock or farm animals close to them. Restrictive covenants in subdivisions would take precedence over local ordinances in this case. Staff is fully aware that we have permitted backyard chickens less than a year ago. Goats present other issues, such as smell, that is not present with chickens. There are ways to mitigate those issues, but overall staff remains skeptical. If the Commission wishes to pursue the proposed changes staff would be concerned with the following factors: 1. Smell. Male goats do produce an odor that is unpleasant and would be of a concern. 2. Changing of an ordinance to benefit one land owner when a variance process exists that could be used since they are requesting a 3 month time limit. 3. Size of the lot and enclosures.
© Copyright 2024