Fishers Place and Twinbrook Metro Park Electronic Tenant® Portal Created on June 29, 2015 12725 Twinbrook Parkway: About 12725 Twinbrook Building Owner: JBG/BC Twinbrook, L.P. Building Manager: JBG Commercial Management, LLC Property Summary 12725 Twinbrook Parkway, located within the Twinbrook Metro Park complex, is a 58,880 square foot building housing both office and laboratory space. Fronting Twinbrook Parkway, 12725 Twinbrook exemplifies a Montgomery County business location at its best. Its close proximity onto the I-270 corridor from Rockville Pike offers access to all points in the Metropolitan area. The Twinbrook Metro Station, within close walking distance from the building, puts downtown Washington a mere thirty minutes away. Nearby shops, restaurants, and hotels further contribute to the quality of the working environment at 12725 Twinbrook. The property, which is situated on 3.96 acres, was constructed in 1968, and completely renovated in 1997. The upper floor lobby was renovated and the roof was replaced in third quarter 2009. Address: 12725 Twinbrook Parkway Rockville, MD 20852 Building Management: JBG’s on-site management team at JBG/BC Twinbrook, L.P. includes a Portfolio Manager, Senior Property Manager, Assistant Property Manager, Tenant Service Coordinator, Accounting Administrator, Administrative Assistant, and four Building Engineers. The Management Office is located in Suite 0200 on the terrace level at 5635 Fishers Lane, Rockville, Maryland 20852. Normal office hours are 8:00 a.m. to 5:00 p.m., Monday through Friday, closed on Saturdays and Sundays and most federal holidays. To contact the office, please call (301) 468-0200. During non-business hours, please call the engineer emergency line at (240) 372-3784 for after-hours emergencies. Both the management team and building engineers are available for emergencies on a 24-hour, 365 day-a-year basis; however, after normal business hours, all tenant requests for engineering services will result in a charge to the tenant of at least 4 hours overtime per engineer, plus equipment and/or supply charges. Other building services are provided through contracts with firms specializing in the disciplines needed to support the property. 12725 Twinbrook Parkway: Building Amenities Transportation JBG/BC Twinbrook, L.P.’s central location provides easy access to the Metro system. The Twinbrook stop (Red Line) is conveniently located approximately two blocks away. Parking Surface parking is available at this building. Additional parking spaces are available in the adjacent parking garage; Atlantic Services provides service for daily and monthly parking. Atlantic Parking Yohannes Kifle (202) 466-5050 Parking lots are located in the front and rear of the building. The building is within walking distance to Twinbrook Metrorail Station and bus service, hotels, and restaurants. 12725 Twinbrook Parkway: Building Hours & Holidays Normal building operating hours of JBG/BC Twinbrook, L.P. are 6:00 a.m. to 6:00 p.m., Monday through Friday. Normal hours of access into the building are 6:00 a.m. to 6:00 p.m., Monday through Friday. Access into the building at all other times requires use of a building access card. Security procedures are reviewed in detail later in this Section. Subject to individual lease provisions, JBG/BC Twinbrook, L.P. will be closed on the following holidays: New Year’s Day Memorial Day Independence Day Labor Day Thanksgiving Day Christmas Day Should you require cleaning, heating, ventilation, air conditioning or other special services on any of the above holidays, please contact Building Management at least 24 hours in advance. Building staff and contractors observe these holidays; therefore, you will be charged for any building services rendered on these days unless your lease stipulates otherwise. Management can provide you with an estimate for any of the above services. 12725 Twinbrook Parkway: Building Specifications Building: This 58,880 square foot two story building was completely renovated in 1997. Floor Size: 1- 29,579 rentable square feet (laboratory/office) 2- 29,301 rentable square feet (laboratory/office) HVAC: HVAC for the laboratory space is provided by four (4) gas-fired Mammoth 100-ton package units with Hitachi screw compressors. The labs are one-pass systems with 100% air exhausted. Two (2) 50-ton Trane Package units provide HVAC to the office areas located along the perimeter. Domestic hot water is produced by two (2) gas-fired water heaters. The water heaters are 85-gallon capacity units, and are manufactured by A.O Smith. Elevators: One Dover hydraulic elevator provides vertical transportation in the building. The elevator is a freight/passenger elevator, which is rated at 4,500 pounds. Schindler Elevator Company provides elevator service and preventative maintenance. Roof: Steel decking with built up system. The roof was recently replaced in 2009. Fire & Safety: All floors are fully sprinkled. The fire panel is monitored twenty-four hours per day seven days a week by ASG for alarm or trouble signals. 12725 Twinbrook Parkway: Important Phone Numbers Important Phone Numbers Management Office Management Office – Facsimile 24 Emergency Police Emergency Fire Emergency Fire Emergency Medical Emergency Poison Control Center Rockville MD Fire Department Non-Emergency Rockville MD Police Department Non-Emergency Metro Metrobus and Metrorail Schedule Information Utilities PEPCO Information and Billings Emergency and Lights Out/Power Off (all hours) Verizon Weather Time (301) 468-0200 (301) 468-3304 (240) 372-3784 911 911 911 (800) 222-1222 (301) 424-2311 (301) 424-2102 (202) 637-7000 (202) 637-1328 (202) 833-7500 (202) 833-7500 (703) 954-6282 Your area code + 936-1212 Your area code + 844-4444 5630 Fishers Lane: About 5630 Fishers Lane PROPERTY SUMMARY 5630 Fishers Lane is a two-story office building located in Rockville, Maryland. The building façade is brick with tinted glass. A surface parking lot containing two hundred and twenty spaces (220) is located at the front of the property, and is managed and controlled by the tenant. The tenant maintains all security for the property, security gates are located at the entrance and exit of the front and back parking lots and are also maintained by the tenant. The building offers excellent access to public transportation and highways. 5630 Fishers Lane exemplifies a Montgomery County business location at its best. Bordered by Parklawn Drive, Twinbrook Parkway and Fishers Lane, 5630 Fishers Lane enjoys outstanding visibility and identity. Its close proximity to the 1-270 corridor from Rockville Pike offers tenants access to all critical points in the Metropolitan area. The building is located within walking distance of the Twinbrook Metro Station, which serves rail transportation to the metropolitan area, and is located within a mile of a major arterial highway. 5630 Fishers Lane: Building Amenities Parking: 220 uncovered, unreserved surface spaces. Additional Parking spaces are available in the parking garage across the street. Atlantic Services provides services for daily and monthly parking. Atlantic Parking Yohannes Kifle (202) 466-5050 5630 Fishers Lane: Building Hours & Holidays Normal building operating hours of JBG/5630 Fishers Lane, L.L.C. are 6:00 a.m. to 6:00 p.m., Monday through Friday. Normal hours of access into the building are 6:00 a.m. to 6:00 p.m., Monday through Friday. Access into the building at all other times requires use of a building access card. Security procedures are reviewed in detail later in this Section. Subject to individual lease provisions, JBG/5630 Fishers, L.L.C. will be closed on the following holidays: New Year’s Day Memorial Day Independence Day Labor Day Thanksgiving Day Christmas Day Should you require cleaning, heating, ventilation, air conditioning or other special services on any of the above holidays, please contact Building Management at least 24 hours in advance. Building staff and contractors observe these holidays; therefore, you will be charged for any building services rendered on these days unless your lease stipulates otherwise. Management can provide you with an estimate for any of the above services. 5630 Fishers Lane: Building Security Building security is maintained by the tenant. Card readers and full time security guards are the sole direct expense of the tenant, and is coordinated by the tenant. 5630 Fishers Lane: Building Specifications This 54,583 square foot three story building was completely renovated in 1997. Office Building Size: 54,583 rentable square feet 1 2 27,292 rentable square feet (office) 27,291 rentable square feet (office) Elevators: One hydraulic elevator provides vertical transportation throughout the building. The elevator is a freight/passenger elevator rated at 3000 pounds. Schindler Elevator provides elevator maintenance. HVAC: Two Trane Intellipak roof top units. Two hot water boilers. Constant volume hot water VAV boxes. Security: Card readers and full time security guards are the sole direct expense of the tenant, and is coordinated by the FDA. Fire/Life Safety: All floors are fully sprinklered. Fire panels are monitored 24 hours per day 7 days a week by Tenn Security for alarm and trouble signals. Energy Management: The building is connected to a Siemens energy management system. Time switch controls are installed on all core A/C units and exterior lighting. Exterior Construction Materials: Constructed utilizing steel frame and structural steel decking. The foundations are reinforced concrete. The second floor is concrete poured over decking. The building exterior is brick façade with tinted glass. 5630 Fishers Lane: Important Phone Numbers Important Phone Numbers Management Office Management Office – Facsimile 24 Emergency Police Emergency Fire Emergency Fire Emergency Medical Emergency Poison Control Center Rockville MD Fire Department Non-Emergency Rockville MD Police Department Non-Emergency Metro Metrobus and Metrorail Schedule Information Utilities PEPCO Information and Billings Emergency and Lights Out/Power Off (all hours) Verizon Weather Time (301) 468-0200 (301) 468-3304 (240) 372-3784 911 911 911 (800) 222-1222 (301) 424-2311 (301) 424-2102 (202) 637-7000 (202) 637-1328 (202) 833-7500 (202) 833-7500 (703) 954-6282 Your area code + 936-1212 Your area code + 844-4444 5630 Fishers Lane: Building Security Building security is maintained by the tenant. Card readers and full time security guards are the sole direct expense of the tenant, and is coordinated by the tenant. 5635 Fishers Lane: About 5635 Fishers Lane Property Summary 5635 Fishers Lane is a six story office building with a terrace level containing prime corporate and retail space for large and small users alike. The building was completed in 2003, and totals 184,638 rentable square feet on Fishers Lane in Rockville, Maryland. Located just off Twinbrook Parkway, 5635 Fishers Lane exemplifies a Montgomery County multi-story business location at its best. Adjoining one of Rockville’s most vital intersections, Twinbrook Parkway and Fishers Lane, 5635 Fishers Lane enjoys outstanding visibility and identity. Its close proximity to the I-270 corridor from Rockville Pike offers access to all points in the Metropolitan area. The Twinbrook Metro Station, within close walking distance from the building, puts downtown Washington a mere thirty minutes away. Nearby shops, restaurants, and hotels further contribute to the quality of the working environment at 5635 Fishers Lane. Address: 5635 Fishers Lane Suite 0200 Rockville, MD 20852 Building Management JBG’s on-site management team at Fishers Place III includes a Portfolio Manager, Property Manager, Project Manager, Accounting Administrator, and four Building Engineers. The Management Office is located in Suite 0200 on the terrace level. Normal office hours are 8:00 a.m. to 5:00 p.m., Monday through Friday, closed on Saturdays and Sundays and some holidays. To contact the office, please call (301) 468-0200. During non-business hours, please call the engineer emergency line at (240) 372-3784 for after-hours emergencies. Both the management team and building engineers are available for emergencies on a 24-hour, 365 day-a-year basis; however, after normal business hours, all tenant requests for engineering services will result in a charge to the tenant of at least 4 hours overtime per engineer, plus equipment and/or supply charges. Other building services are provided through contracts with firms specializing in the disciplines needed to support the property. 5635 Fishers Lane: Building Amenities Transportation Fishers Place III’s central location provides easy access to the Metro system. The Twinbrook stop (Red Line) is conveniently located approximately two blocks away. Parking Parking is available at this building. Atlantic Services operates the parking garage; they provide service for daily and monthly parking. Atlantic Parking Yohannes Kifle (202) 466-5050 A parking garage is located on the premises. The building is within walking distance to Twinbrook Metrorail Station and bus service, hotels, and restaurants. 5635 Fishers Lane: Building Hours & Holidays Normal building operating hours of Fishers Place III are 7:00 a.m. to 6:00 p.m., Monday through Friday. Normal hours of access into the building are 7:00 a.m. to 6:00 p.m., Monday through Friday and Saturdays 9:00 a.m. to 1:00 p.m. Access into the building at all other times requires use of a building access card. Security procedures are reviewed in detail later in this Section. Subject to individual lease provisions, Fishers Place III will be closed on the following holidays: New Year’s Day Memorial Day Independence Day Labor Day Thanksgiving Day Christmas Should you require cleaning, heating, ventilation, air conditioning or other special services on any of the above holidays, please contact Building Management at least 24 hours in advance. Building staff and contractors observe these holidays; therefore, you will be charged for any building services rendered on these days unless your lease stipulates otherwise. Management can provide you with an estimate for any of the above services. 5635 Fishers Lane: Building Security The building is equipped with an access control system that is monitored by ASG. 5635 Fishers Lane: Building Specifications Building Owner: JBG/BC Fishers III, LLC Building Manager: JBG Commercial Management, LLC Building: 7 Story “Class A” Building with 184,525 rentable square feet Office Building Size: 184,638 rentable square feet Terrace 1 1 2 3 4 5 6 22,615 rentable square feet (office) 18,478 rentable square feet (office) 4,634 rentable square feet (retail) 27,761 rentable square feet (office) 27,761 rentable square feet (office) 27,761 rentable square feet (office) 27,867 rentable square feet (office) 27,761 rentable square feet (office) Specifications: Floor Size: 6 tenant floors: (average floor size approximately 27,000 square feet) HVAC: HVAC is provided by seven 80 ton McQuay water source self contained air handling units, (one unit per floor), with water side economizers. Air distribution is achieved through a fan powered VAV system and the perimeter VAV’s are equipped with electric heaters. Frequency drives are installed on each motor for the air handlers, and condenser water temperature is maintained through two 350 ton cooling towers. Heating and air conditioning is not regularly provided after 1:00 PM. on Saturdays, all day Sundays and holidays, or after normal business hours. Tenants desiring after-hours and holiday HVAC services must pay an hourly rate for these services. There is no additional charge for air conditioning on Saturdays from 9 a.m. to 1 p.m. Elevators: Four cable elevators provide vertical transportation throughout the building. All four elevators are freight/passenger elevators rated at a 3000 pound lift capacity. Schindler Elevator provides elevator service maintenance Ceiling: Typically the floor slabs consist of 8 inches of cast-in-place concrete slab to slab heights and floor-to-ceiling heights are generally 10’4” and 8’, respectively. Original Construction: 2004 All floors are fully equipped with a high rise package sprinkler system. Fire panels are monitored twenty-four hours per day, seven days a week by Tenn Security for alarm or trouble signals. 5635 Fishers Lane: Important Phone Numbers Important Phone Numbers Management Office Management Office – Facsimile 24 Emergency Police Emergency Fire Emergency Fire Emergency Medical Emergency Poison Control Center Rockville MD Fire Department Non-Emergency Rockville MD Police Department Non-Emergency Metro Metrobus and Metrorail Schedule Information Utilities PEPCO Information and Billings Emergency and Lights Out/Power Off (all hours) Verizon Weather Time (301) 468-0200 (301) 468-3304 (240) 372-3784 911 911 911 (800) 222-1222 (301) 424-2311 (301) 424-2102 (202) 637-7000 (202) 637-1328 (202) 833-7500 (202) 833-7500 (703) 954-6282 Your area code + 936-1212 Your area code + 844-4444 Building Operations: Landlord/Tenant Communication For the purpose of effective communication, two contacts are established within each tenant’s firm. The individual who interfaces with The JBG Commercial Management office on issues which are day-to-day in nature is referred to as the “Tenant Contact”. The individual who holds the most senior position (e.g. Doctor(s), Office Manager, Executive Assistant, etc.) is referred to as the “Principal Representative”. Kindly ensure that all official communications to the JBG Commercial Management office come directly from either the Tenant Contact or the Principal Representative. Please reference the Tenant Contact Form in the Forms section Building Security: Overview For 5635 Fishers, and 12725 Twinbrook Parkway Only: The building is equipped with an access control system that is monitored by ASG. Building Security: After Hours Access In order for an employee to access your suite’s office after-hours, the individual must be assigned an access card (available through the Management Office at the direction of the Tenant Contact). Once activated, the access card will enable access into the building. IMPORTANT: DO NOT LET ANY UNKNOWN INDIVIDUALS ENTER THE BUILDING WITH YOU. Obviously, it is important that the Tenant Contact retrieve access cards from employees who leave their office, and return them to, or promptly notify, the Management Office for deactivation of the card to prohibit access into the building. Building Security: Building Access Building hours for 5635 Fishers, and 12725 Twinbrook for tenants and visitors is as follows: 5635 Fishers Lane 7:00 a.m. through 6:00 p.m Monday - Friday 12725 Twinbrook 6:00 a.m. through 6:00 p.m Monday - Friday For the purpose of “access control,” all other times are considered “after-hours.” Visitors If you are expecting a visitor during security hours, you will need to inform them of the suite that you are in. There is a Directory board with a list of the tenants on the first floor. Vendor/Contractor Access There may be times when vendors or contractors need to perform work in your suite during non-business hours. In such instances, please provide written notification to Building Management, including the name(s) of the individual(s), the company, date and approximate time they will be arriving, the nature of the work to be performed, and a Certificate of Insurance. Please note that all work and contractors must be pre-approved by Building Management. This information is requested for informational purposes only. Under no circumstances will Building personnel provide access to anyone into any tenant premises. A tenant representative must be available to let vendors and contractors into their space. Building Security: Deliveries Please Note: This applies to 5635 Fishers Lane and 12725 Twinbrook properties only. General Deliveries must be made by using the loading dock. Tenants must sign for and accept all deliveries; they must also arrange for immediate transport of those items to their suite. Note: at 5635 Fishers Lane, all deliveries for tenants must take place in the service freight elevator, which is otherwise designated as elevator #4, and it is typically equipped with protective padding. All oversized/large deliveries (those requiring more than one hour or involving pieces with any dimension greater than 5 feet) need to be scheduled at least 24-hours in advance with the Building Management, and shall take place during non-business hours. All small deliveries can be arranged during non-peak times with Building Management (see scheduled times below). Elevator scheduling is on a first-come, first-served basis. A representative from your firm must be present to accept any delivery made after-hours. All delivery/moving companies must bring Masonite to protect lobby floors. Walls, corners, and doorframes must also be treated with appropriate protection to avoid damage. The schedule for small weekday deliveries only is as follows: Monday - Friday: 7 a.m. to 4 p.m. Weekends - By appointment only After-Hours Building staff will not accept or allow after-hours deliveries without prior arrangement and approval through the Building Management office. After-hours deliveries may not be scheduled before 6:00 p.m. Further, neither JBG Commercial Management staff nor building engineering staff will accept any type of mail or packages (i.e., general mail, certified or registered mail, FedEx packages, UPS packages, etc.) from couriers coming into or exiting tenant suites. Property insurance requirements prohibit this activity. Incoming deliveries should be referred directly to the tenant’s premises. Building Security: General Office Security As our society seems to have grown more dangerous, so has the need for all of us to be more security conscious - corporately and individually. It is important for tenants to recognize that JBG offers a level of security generally comparable to other first class office buildings in the Rockville area. This means that we seek to secure the building, while tenants retain the responsibility for their space and the safety of their employees. Your company and your employees must maintain a prudent level of security. Each individual needs to be security conscious, responsible and aware of his or her belongings and office area. Tenant Precautions Building security needs your full cooperation in order to effectively secure your premises. We recommend that your company implement these simple, but effective policies: 1. Do not leave your reception area unattended. If the area must be left unmanned, keep suite entry doors locked. 2. Keep valuables in secured areas (locked desks, file cabinets, etc.) when not attended and out of sight when attended. 3. Keep safes locked when unattended, and don’t leave the combination information where it is likely to be found. 4. Record serial numbers of all valuable office equipment. 5. Solicitation is not permitted within JBG/Fishers Place and Twinbrook Metro Park. Report all unauthorized or suspicious persons immediately to JBG Commercial Management office at (301) 468-0200. Provide a full description of the person(s), the last area in which they were observed, and, if possible, the direction in which they were headed. 6. Require identification from repairmen who come to work in your office suite. Messengers must also be prepared to show identification and delivery papers at all times. Security experts have found that the receptionist position is the best line of defense against potential perpetrators. The receptionist should be trained to be the best “security” employee in the company. When an employee leaves your office space, his or her need for vigilance continues. Remind your employees that whether leaving the building to go to a meeting, retrieving a car in the parking garage, or walking about the public areas of the building, move with a purpose and be reasonably on guard. This is particularly true during the dark hours. Meanwhile, do what you can to heighten the level of security awareness, and remind everyone to keep valuables locked and out of sight. Building Security: Key and Lock Policy Special Keying All keys for Fishers Place and Twinbrook Metro Park are keyed to a Building Master Key System. This key system is necessary so that building staff has access to all areas in the event of any emergency. A key to each of the doors in the tenant’s suite is provided by Building Management when a tenant moves-in. Additional keys may be obtained through Building Management at a nominal charge. Lock-Outs In the event a tenant forgets his or her key, or locks themselves out of their office, the JBG Commercial Management Office should be notified by calling (301) 468-0200. Access will only be granted once the person who signed the lease or the assigned Tenant Contact person(s) has been reached and approval given. Please add: After hour lockout will only be responded to in the event of an emergency and may result in after hour charges. Building Security: Lost and Found Please contact the Management Office at (301) 468-0200 to claim items that have been lost or found in the buildings. Building Security: Property Removal It may be necessary from time-to-time for someone from your office to remove property (i.e., boxes, computers, typewriters, furniture, copier, etc) from the premises. Prior to this taking place, we ask that you notify Building Management with the information listed below. Building Management can stop anyone leaving the building with equipment and request identification. If the party is unable to produce proper or matching identification, they may not be permitted to remove the property from the building. This procedure is for your protection. Information that is to be provided to Building Management includes: 1. Tenant’s name 2. Tenant’s phone number 3. Date materials are to be removed 4. List of all items and quantities to be removed (e.g., two boxes, one chair, one computer, etc) 5. Serial number of property, if applicable 6. Company or personal property 7. Name of individual(s) who will be removing property 8. Signature of tenant authorized party 9. Date authorization is given Building Security: Solicitation In order to relieve tenants of the burden of uninvited soliciting on the premises, soliciting is prohibited at Fishers Place and Twinbrook Metro Park. If someone is soliciting on your floor or in your suite, please notify the JBG Commercial Management Office at (301) 468-0200 and the appropriate personnel will be sent to request that the solicitor leave. Building Security: Theft and Insurance Any suspected theft, no matter how small, should be reported to Building Management. Additionally, the police should be notified immediately to file a report. Police need to be kept informed of any thefts in the building to establish a pattern to the thefts and to effectively complete an investigation. The insurance policy for Fishers Lane and Twinbrook Metro Park does not cover the personal belongings of tenants. Personal property insurance is the responsibility of each tenant and must be evidenced by an insurance certificate. Incident Report To provide an accurate record of every incident, Building Management is required to write an incident report for any accident, theft, or other incident occurring on the property. We appreciate your cooperation in answering any questions building staff may have. Building Security: Violence in the Workplace Threat of Violence 1. Call Montgomery County Police Department at 911 to report threat. 2. Call Building Management at 301-468-0200. 3. Notify Tenant Management. Violence in the Workplace The best defense against violence in the workplace is to have procedures in place that help prevent violent acts. Resources available for preventive measures include www.workplaceviolence911.com and www.pinkertons.com. If an incident occurs: 1. Immediately take cover – in a locked office if possible. 2. Call 911. 3. Call Building Management at 301-468-0200. 4. Stay under cover until Police Department has arrived. *If a robbery occurs, do NOT resist.* Building Services: Building Signage and Directory Note: For 5635 Fishers Lane and 12725 Twinbrook only An effective directory & signage program with consistently applied standards tends to create the most professional overall image for the building and its tenants. The Management Office will provide the initial signage for the suite and directory. Any future changes to the tenant’s suite or directory sign will be billed to the tenant’s account. A Signage Request Form will need to be filled out and faxed to the JBG Commercial Management at (301) 468-0200. The Signage form requests the: Tenant’s name and suit number, contact person and how they would like the company’s name to appear on their suite or directory sign. All suite entry signage is building standard and consistent within the building. If a tenant requests additional signage other than building standard, a written request must be submitted in advance to the Management Office, and must be approved by the Landlord prior to any signage installation. Building Services: Cleaning All common areas are cleaned on a daily basis, Monday through Friday. Tenants should contact the Management Office for any special cleaning needs, or to report any cleaning deficiencies. In situations where a tenant would like a box of trash disposed of, please write “TRASH/ BASURA” on the box. All empty moving boxes should be flattened. Please refer to the Cleaning Specifications Form Building Services: Forms For your convenience, we have included downloadable and printable PDF document forms that will expedite various building management service requests. Hard copies of all forms are available from the Property Management Office as well. To view and print PDF files, you need the Adobe Acrobat Reader software. If not already installed on your computer, it can be obtained for free at www.adobe.com. Bomb Threat Checklist Emergency Evacuation Team Floor Evacuation Roster Form Life Safety Systems Request for Approval for Contractors Signage Request Form Tenant Contact Form Tenant Move Out Policy Threat Level Matrix Utility Closet Access Building Services: Mail Service Mail is delivered and picked up once a day to each individual tenant space by a US Postal Service mail carrier. A branch is conveniently located at 143 Rollins Avenue, Rockville, MD. A Federal Express Drop Box is located at the loading dock behind 5625 Fishers Lane. Address Format For best mail service results, incoming mail should be formatted as follows: **YOUR SUITE NAME** **YOUR BUILDING** Suite _____ Rockville, Maryland 20852 Emergency Procedures: Bomb Threat All bomb threats must be taken seriously. Remain as calm as possible. Notify the Police Department at 911, and then notify Building Management. In the event that a bomb threat is made to your office, there are certain procedures you can follow that will be helpful to Building Management and the Police in determining the appropriate course of action. 1. Upon receiving a threat (phone, email, voicemail, mail) immediately utilize the Threat Checklist. A. If Threat is received from a live caller: Write down everything Ask questions on the Threat Checklist Ask caller to repeat request (keep on line) Immediately contact Building Management at 301-468-0200 during business hours and at 240-372-3784 during non-business hours Fill out Threat Checklist while information is still fresh B. If Threat is received via email, mail, or voicemail: Save message (including any envelope or packaging) Do NOT handle message further Immediately contact Building Management at 301-468-0200 during business hours and at 240-372-3784 during non-business hours 2. Once Building Management is notified, we will alert the Montgomery County Police Department and all tenant contacts, and begin search of building common areas (unless threat is more specific). 3. Tenant Management should implement internal procedures on bomb threats and begin searching own space (Neither the Police nor Building Staff will search tenant areas). Building evacuation may be ordered depending on all available information, however, if a detonation time is given then the building will be evacuated at least 1 hour before and until the Police Department permits occupancy. Emergency Procedures: Civil Disturbance Pickets, Protests, Riots: 1. Call Building Management at 301-468-0200. If a threat to persons or property is imminent call 911. 2. Stay inside building and close window blinds. 3. Avoid any confrontations. 4. Lock suites if threat is inside building. 5. Elevators may shut down. 6. Building may go to cardkey access only. 7. Garage may close. Emergency Procedures: Elevator Malfunction Elevators are a safe mode of transportation. However, like all other devices, they do malfunction. Be prepared for such an occurrence. In order to repair sophisticated automatic controls, time is necessary, so you may be detained in the elevator. The most important factor to remember is to REMAIN CALM! If you are inside an elevator during a malfunction: 1. Try buttons (other floors and open/close). 2. Press emergency call button: Phone will connect to a 24 hour call center Give the building address and elevator # State the specific problem / malfunction State if there is anyone ill or injured Do NOT attempt to manually open the elevator doors. Follow the directions printed on the emergency phone. If doors open between floors – STAY INSIDE until help arrives. Emergency elevator crews are available 24 hours a day. Please remain calm while crew is dispatched to the scene. Multiple safety features are built-in to prevent the elevator from making any unsafe movement. Emergency Procedures: Emergency Contacts Public Services: Police / Fire Emergency Montgomery County Police Non-Emergency Montgomery County Fire Department Non- Emergency Building Services: Building Management Tenn Security Hospitals: Suburban Hospital Shady Grove Adventist Hospital Children’s National Medical Center Public Utilities: Pepco (Power Outages) Washington Gas Washington Suburban Sanitary Commission Transportation: Amtrak Metro Bus/Rail Service Maryland Shuttle A-A-A Select Sedan Service 911 301-279-8000 240-683-6520 301-468-0200 301-881-0420 301896-3100 301279-6064 202884-5000 202-833-7500 703-750-4440 301-206-4002 202-906-3000 202-637-7000 301-230-0000 301-775-4480 Important notes If you call 911 as a result of a medical emergency, please be sure also to notify building management with your name, callback number, and location so that security may swiftly guide the paramedics to your exact location. If the audible alarm within the building sounds, please do not call the Management Office, unless you have something specific to report. Building Management is aware of the noise, as well as the source of the alarm, whether it’s false or a legitimate emergency. Please keep the telephone lines clear so that Management may to attend to the situation as quickly and efficiently as possible. Emergency Telephone Contact In the event of any emergency, such as theft, fire or other incident, which occurs after normal business hours, we will notify a designated emergency contact from your office. This procedure allows us to alert tenants as soon as possible in the event of any unforeseen circumstance. Building Management will periodically distribute forms to tenants to update contacts and telephone numbers. Your cooperation in supplying this information in a timely manner is appreciated. Emergency Procedures: Emergency Alerts/Communication Reporting an Emergency There are 3 ways to report an emergency: 1. Call 911. Give the following information to the operator: Address: *YOUR BUILDING*, Rockville, Maryland 20852 Nature of Emergency 2. Activate a fire alarm pull station anywhere in the building. Pull Stations are located next to each stairwell and exit. Activating a pull station will automatically summon the fire department and send the building into evacuation mode. Use this method for emergencies that threaten the building (fire, smoke). 911 should also be called once safe from danger. 3. Call the Building Management Office at 301-468-0200. Always call this number from a safe place after calling 911 or activating a pull station. Building Alarm System Fishers Place and Twinbrook Metro Park is equipped with audio and visual alarms. If the alarm system is activated the following will occur: Bells and Strobes will activate and continue until deactivated by the Fire Department or building engineers Elevators may return to lobby or other designated floor All stairwell and perimeter doors will unlock. Local Alert System For Regional Emergencies, some local resources for information: WTOP 1500 AM / 107.7 FM alert.montgomerycountymd.gov www.rockvillemd.gov www.maryland.gov Emergency Procedures: Emergency Management Program Overview The Emergency Management Program at JBG/ Fishers Place and Twinbrook Metro Park has been developed in order to maximize the safety and security of occupants and property in the building during an emergency. This manual provides information on the building systems and outlines guidelines to be followed for each type of emergency situation. Each tenant is required to complete an Emergency Evacuation Plan and fax the completed plan to the Management Office at (301) 468-3304. Program Components 1. Life Safety Systems– Fishers Place and Twinbrook Metro Park has a number of systems designed to keep building occupants safe during an emergency. Please click here to see detailed descriptions of the Life Safety Systems. 2. Emergency Management Team– Assembled and coordinated by Building Management. Comprised of JBG staff members, Montgomery County Fire & Rescue Department, and Montgomery County Police Department members. 3. Tenant Evacuation Teams– Each floor or suite should select employees to serve as Evacuation Team members. Please click here to view detailed responsibilities for each team member along with a roster template for the team. 4. Evacuation Drills– Evacuation Drills are held each year to provide practice and familiarity with evacuation guidelines. These drills are critically important to the success of the program, and participation by all tenant employees is strongly encouraged. 5. Tenant Employee Awareness – All tenant employees should be familiar with their Tenant Emergency Plan and should participate in periodic training sessions on safety and security awareness. Emergency Procedures: Emergency Preparedness The strategies for addressing fire emergencies; bomb threats, medical emergencies, natural disasters and other potentially dangerous situations are reflected on the following pages. Each tenant is required to complete an Emergency Evacuation Plan and fax the completed plan to the Management Office at (301) 468-3304. Also, please familiarize yourself with the following: Fire Alarm and Evacuation Procedures Evacuation for Individuals who are Physically Challenged Tornado Procedures Natural Disaster Elevator Malfunction Accident or Illness Bomb Threat Emergency Procedures: Evacuation and Fire Procedures Fishers Place and Twinbrook Metro Park is protected by a bell alarm system. When a manual fire alarm on a floor is pulled, the alarm will automatically ring throughout the building. Our fire alarm system is monitored by ASG, and they will automatically call the Fire Department. The Building Engineer will investigate the situation. Smoke and heat detectors are located in areas that might be prone to fire - those areas with electrical equipment and wiring such as mechanical rooms, electric rooms, telephone closets, elevator lobbies and janitorial closets. When activated, these will also initiate the alarm system. When a pull station, smoke detector, or heat detector is activated due to a fire condition, all elevators will be recalled to the lobby level and parked. Use only the stairwells to evacuate the building in the event of a fire. All tenants should familiarize themselves with the location of fire extinguishers and fire alarm manual stations. Tenants should also know the location of the exits, recognize the sound of the fire alarm, know how to activate the fire alarm and notify the Fire Department. Proceed directly to the exit whenever the fire alarm is heard. Prior to opening a door, feel the door front to determine if there is heat behind it. If the door is hot, do not open it. Find another means of egress. A. Upon Discovering a Fire 1. Alert personnel who may be immediately endangered and proceed to the nearest pull station to activate the alarm system. Sound the fire alarm, no matter how small the fire seems to be. 2. Notify the Management Office at (301) 468-0200. 3. Close all doors behind you, especially the door to the burning room. Notify the Management Office at (301) 468-0200. B. Evacuation of the Building 1. Upon hearing the alarm system, immediately evacuate the building in an orderly manner, using the designated evacuation routes and stairwell exits. When exiting, avoid crowding or undue haste, a fall might spell disaster for those who follow. Descend the stairs carefully, when you reach the ground floor, exit in an orderly fashion. DO NOT RUN! DO NOT USE ELEVATORS! 2. It is the tenant’s responsibility to assign an aide for physically challenged people to assist with their evacuation. Your designated Floor Monitors should notify the Management Office of all physically challenged persons or persons who may require assistance (e.g., pregnant employees, employees recovering from a recent illness, etc.,) so that we can account for these employees after the building is evacuated or notify a fire fighter of their location in the building. 3. When out of the building, employees should remain on the sidewalk and stay clear of the building entrance to allow access by the fire department. 4. Upon evacuation each designated Floor Monitor must report to Building Management to confirm that all personnel have been evacuated successfully. C. What to do if your exit route is blocked by smoke 1. Stay calm; crawl low in smoke, the air is easier to breathe near the floor. 2. If trapped in a room, close all the doors between you and the smoke, seal the cracks around the doors and vents. 3. Signal at the window to rescuers. If there is a phone in the room, give the Fire Department your exact location, even if they are on the scene. D. All Clear Signal The Fire Department will inform the Building Engineer and/or Building Management when it is safe for employees to return. The Building Engineer/Manager will give an “all clear” and notify the employees that they may return to the building. Please re-enter the building in an orderly fashion. E. Fire Prevention Rules All employees shall observe the following fire prevention rules: 1. Keep stairwell doors closed at all times except during evacuation to minimize spreading of fire from the “chimney effect”. 2. Keep aisles clear of obstacles. Do not store equipment in aisles or block doorways. Do not block exits. 3. Safeguard all flammable materials. 4. Do not plug in an excessive quantity of electrical equipment. Continuous overloading of electrical lines causes insulation to become brittle and fall away from the wires. The lack of adequate insulation may cause wires to become overheated, which can readily ignite, causing a fire. Avoid overloading plugs or power strips. (The circuit is probably overloaded if fuses or circuit breakers repeatedly blow out). Request an electrician through the Engineer’s office to determine the possible deficiency. 5. Maintain good housekeeping in all areas of the building, since this is one of the most effective means of preventing fire. 6. Avoid installing and using unauthorized and uninspected coffee makers, heating plates, microwave ovens, personal fans and similar items. Electric space heaters are prohibited. 7. Obey “No Smoking” signs. All areas in which smoking is prohibited will be clearly marked with “No Smoking” signs. 8. Do not use trashcans or paper disposal areas for cigarette ashes or butts. Evacuation For Individuals Who Are Physically Challenged The following are evacuation procedures for physically challenged individuals: 1. The Emergency Warden will maintain an up-to-date list of all physically challenged persons on his or her floor (a copy must be immediately provided to Building Management each time the list is modified). This list will include the following information about physically challenged person(s): a. Name b. Telephone Extension c. Suite/Room Number d. Type of Disability e. Type of Equipment needed to vacate 2. The Emergency Warden will assign an assistant (buddy) to the physically challenged person(s). The physically challenged person(s) will be moved to the Refuge Area (stairwell landing or, if stairwell landing is too small, just outside the stairwell landing) to await instructions (relocation or evacuation) from the Fire Department. Emergency Procedures: Hazardous Material Release (hazmat) This is any uncontrolled, accidental, or criminal release of a substance that can be harmful. Some examples are gas leaks, refrigerant leaks, sewer system back-ups, and terrorist acts. External Source If release is reported to have an external (outside building) source: 1. Building Management will contact each tenant concerning instructions on how to proceed (based on government recommendations). 2. Evacuation may or may not be necessary. 3. Sheltering-in-Place may be necessary. 4. HVAC and outside air intake vents may be shut down. Internal Source If release is discovered inside building (visual, odor, sound, illness): 1. Vacate immediate area of release to a safe place (possibly outside). 2. Call 911 from a safe area. 3. Identify source of release if possible. 4. Seal off area, if possible, to prevent others from entering vicinity. 5. Call Building Management at 301-468-0200 to report release. ***It is very important to isolate anyone exposed in order to keep the HAZMAT release contained*** Emergency Procedures: Homeland Security The JBG Companies recommends that each tenant have an emergency action plan in place to help their employees prepare for, and react quickly to, a regional emergency, including terrorist attacks. Click on the links below to access a variety of resources that aid in preparing for a regional emergency. Department of Homeland Security http://www.dhs.gov/dhspublic Federal Emergency Management Association http://fema.gov/ American Red Cross http://www.redcross.org/ Center for Diseases Control and Prevention Emergency Preparedness and Response http://www.bt.cdc.gov/ Local media outlets will provide important information during an emergency situation. Emergency Procedures: Life Safety Program Emergencies can and do occur in even the finest office buildings. The best we can do is to anticipate them where we can, and be prepared so as to minimize their effect. The life safety program centers around a “Floor Warden” program, where a few individuals on each floor are trained to lead the other ocIcupants through emergency situations. Tenants are taught where to seek safety for different life-threatening situations. The program includes annual drills, often with the involvement of the Montgomery County Fire Department. It is in every company’s best interests to have its employees learn and understand the property’s Emergency Preparedness guidelines, not only as a responsible employer, but to avoid OSHA fines for each employee found to be untrained to deal with various emergencies. Please review carefully the section in this Tenant Handbook on Emergency Preparedness. Emergency Procedures: Medical Emergency In the event an accident or sudden illness of an employee or visitor takes place in your office, we recommend that you: 1. Call Emergency at 911.GIVE THE OPERATOR THIS INFORMATION: a. Building Address – JBG/ Fishers Place and Twinbrook Metro Park. b. Floor or Location of Emergency c. Any and all details available on the accident or illness 2. Do not move injured or ill person(s). 3. Have someone meet the emergency unit at elevators in the main lobby and on the emergency floor. 4. Notify the Management Office at (301) 468-0200 of the situation. Inform them that you have called 911 and briefly describe the nature of the emergency. 5. An emergency unit will arrive as promptly as possible and will administer necessary medical assistance. Emergency Procedures: Natural Disaster Disasters and emergencies affecting large areas and many people can sometimes develop quickly. Flash floods and earthquakes, for example, can strike with little or no advance warning. There are certain things you do that will help you prepare and cope with an emergency. In the Event of a Natural Disaster 1. Whenever a major storm or other peacetime disaster threatens, keep your radio, computer, or television set tuned to hear weather reports and forecasts (issued by the National Weather Service) as well as other information and advice that may be broadcast by your local government. 2. Use your telephone only to report disaster events to authorities or Building Management. If you tie up phone lines simply to get information, you may prevent emergency calls from being completed. 3. Stay away from disaster areas. Warnings Some natural disasters allow us advance warning (hurricane) while some occur suddenly, without any warning (earthquake). If an advance warning occurs: 1. Close window blinds. 2. Close doors to outer offices. 3. Secure objects that could act as projectiles. 4. Initiate notification to all employees, vendors, and visitors. During an Event 1. Move away from exterior of building towards interior walls. 2. Take cover under sturdy furniture or lay flat on floor against wall. 3. Protect head and neck. 4. If inside an elevator, exit at nearest floor and take cover. 5. If floodwaters are expected, move above garage and/or lobby levels. 6. Remain under cover until incident has passed. 7. Call 911 for any injuries. 8. Listen for instructions from Building Management. 9. DO NOT go to the first floor lobby or outside of the building. **Most injuries occur while trying to enter or exit a building after a natural disaster.** Emergency Procedures: NBC Incident (nuclear, Biological, Chemical) Warnings There will be little or no warning for this type of incident. Symptoms of sickness may be the only warning in some cases – sometimes days later. Warnings may come from the government, media, tenants, or Building Management. Response The response is the same whether there is a threat or an actual incident: 1. Tenants will be contacted. 2. Decision whether to evacuate or shelter-in-place will be based on government’s recommendation and location of incident. 3. Tenants may choose to evacuate the building unless government directs otherwise. 4. Building will go to cardkey access only, HVAC will be shut down, and outside air intakes will be closed. Evacuation Initiate Emergency Evacuation Plan. Regional evacuation from the city may become necessary. Shelter-in-Place Congregate at inner areas of building (away from exterior walls) and wait for further instructions. Emergency Procedures: Pandemic Preparedness What you Need to Know An influenza (flu) pandemic is a worldwide outbreak of flu disease that occurs when a new type of influenza virus appears that people have not been exposed to before (or have not been exposed to in a long time). The pandemic virus can cause serious illness because people do not have immunity to the new virus. Pandemics are different from seasonal outbreaks of influenza that we see every year. Seasonal influenza is caused by influenza virus types to which people have already been exposed. Its impact on society is less severe than a pandemic, and influenza vaccines (flu shots and nasal-spray vaccine) are available to help prevent widespread illness from seasonal flu. Influenza pandemics are different from many of the other major public health and health care threats facing our country and the world. A pandemic will last much longer than most flu outbreaks and may include "waves" of influenza activity that last 6-8 weeks separated by months. The number of health care workers and first responders able to work may be reduced. Public health officials will not know how severe a pandemic will be until it begins. Importance and Benefits of Being Prepared The effects of a pandemic can be lessened if you prepare ahead of time. Preparing for a disaster will help bring peace of mind and confidence to deal with a pandemic. When a pandemic starts, everyone around the world could be at risk. The United States has been working closely with other countries and the World Health Organization (WHO) to strengthen systems to detect outbreaks of influenza that might cause a pandemic. A pandemic would touch every aspect of society, so every part of society must begin to prepare. All have roles in the event of a pandemic. Federal, state, tribal, and local governments are developing, improving, and testing their plans for an influenza pandemic. Businesses, schools, universities, and other faith-based and community organizations are also preparing plans. As you begin your individual or family planning, you may want to review your state's planning efforts and those of your local public health and emergency preparedness officials. State plans and other planning information can be found at http://www.flu.gov/professional/checklists.html. The Department of Health and Human Services (HHS) and other federal agencies are providing funding, advice, and other support to your state. The federal government will provide up-to-date information and guidance to the public if an influenza pandemic unfolds. Pandemic Flu Resources There are many publicly available resources in place to help communities, companies, and individuals plan for a possible pandemic flu outbreak. A few of the most useful sites are linked below: Pandemicflu.gov This is the official U.S. Government site for information on pandemic and avian influenza. The material on this site is organized by topic for easy reference. Centers for Disease Control and Prevention (CDC) The CDC Web site is another primary source of information on pandemic influenza. They also have a hotline—1-800-CDC-INFO (1-800-232-4636)—that is available in English and Spanish, 24 hours a day, 7 days a week (TTY: 1-888-232-6348). Or, if you prefer, questions can be e-mailed to [email protected]. Department of Homeland Security (DHS) DHS is working on a “Business Planning Guide,” which will be posted on the DHS home page and on Pandemicflu.gov as soon as it is completed. Also, for business-specific questions, the DHS has created an e-mailbox— [email protected]. BOMA Resources BOMA/Greater Toronto Pandemic Flu Report The report addresses the threat to commercial buildings from an avian flu pandemic. The resources above will provide a lot of information, but we also encourage you to: Listen to local and national radio Watch news reports on television Read your newspaper and other sources of printed and Web-based information Look for information on your local and state government Web sites Consider talking to your local health care providers and public health officials. Emergency Procedures: Power Failure 1. Stay calm and await instructions from Building Management. 2. Emergency lighting will activate. 3. Elevators will return to a designated floor and open. Do NOT Use. 4. All Life Safety Systems are supported by emergency power. 5. Tenants will be contacted once Building Management determines the cause of the outage. 6. HVAC system will not operate during power loss. 7. Plumbing (toilets/sinks) will not operate during power loss. 8. Turn off equipment until power is restored to avoid an overload. If a prolonged outage is expected or life safety may become compromised, an evacuation may be ordered. Emergency Procedures: Recovery Operations Communication Plan It is essential to maintain communications with both employees and Building Management during any recovery process in order to expedite the process and keep everyone informed. The Communication Plan should include: 1. Method for contacting and accounting for all employees 2. Method for employees to contact Tenant Management 3. Method for employees to contact relatives / friends 4. Current tenant contact information to Building Management Keep copies of all numbers at an off-site location. Business Continuity Plan We encourage all tenants to develop a plan for continuing business operations in the event of a disaster or other serious emergency. Some of the components of a Continuity Plan include: 1. Establishment of priorities for recovery 2. Identification of critical components to business function 3. Back-up plan for each business function 4. Plans for temporary space / alternate locations 5. List of vendors and emergency contractors that may be needed 6. Plans for substitute or temporary equipment 7. Plans for possible remote access to business operations 8. Insurance and damage documentation 9. Employee assistance / counselors Reommended Emergency Supply Kit Recommended items to assemble in an Emergency Supply Kit: 1. Battery-powered commercial radio with extra batteries 2. Non-perishable food and drinking water 3. Roll of duct tape and scissors 4. Plastic for the doors, windows, and vents for the room in which you will seek shelter 5. First aid kit – bandages, latex gloves, antibiotic towelettes, sterile dressings, antibiotic ointment, burn ointment, eye wash solution, aspirin or non-aspirin pain reliever 6. Sanitation supplies – soap, water, and bleach 7. Flashlight and extra batteries 8. Face masks or dense-weave cotton material 9. Garbage bags 10. Evacuation map 11. Blankets Emergency Procedures: Severe Weather When severe weather conditions become apparent, the U.S. Weather Bureau describes conditions by two (2) classifications, a Watch or a Warning. This applies to the reporting of severe thunderstorms, the approach of weather conditions favoring the formation of tornadoes, a hurricane condition, a winter storm condition, etc. A Watch becomes effective when atmospheric conditions are present that can produce the particular weather phenomenon. A Warning means that the weather condition has been spotted and prompt action must be taken to enhance safety. Except in very rare circumstances, the decision to evacuate the building based on the above weather reports will not be made by Building Management, but rather by each Tenant Company. However, in the event these conditions do exist, the following guidelines should adhered to: Move away from outside windows. If the windows in your offices are supplied with blinds, close the blinds (this will provide protection from broken glass). Do not panic. If evacuated, lock all desk drawers and take all items of value with you. If evacuated, use a route that is in the building interior and stay away from large expanses of glass and windows. Use the stairwells rather than the elevators. If evacuated, do not return to your office until advised to do so. Emergency Procedures: Tenant Training The JBG Companies would like to present our tenants with the Floor Warden Training video. The safety and security of our tenants is of the highest priority. This video generally reviews safety while in your building and specifically the key roles Wardens will play in responding to both fire and non-fire emergencies. The video is broken down into 3 sections. 1. Systems: Know your buildings systems 2. Team: Building staff management and floor warden teams 3. Procedures: Fire, earthquake, medical etc. Please take time to watch the video and familiarize yourself with the emergency procedures outlined. If you have any questions please direct them towards your Property Manager. The JBG Companies Emergency Procedures: Tornado Procedures Tornado Warning By definition, a tornado warning is an alert by the National Weather Service CONFIRMING A TORNADO SIGHTING AND LOCATION. The Weather Service will announce the approximate time of detection and direction of movement. Wind could be 75 mph or greater. Public Warning A public warning will come over the radio and/or television. In Case of a Tornado: 1. Move away from the perimeter of the building and exterior glass. Close the drapes or blinds. 2. Exit from exterior offices and close the doors. 3. Stairwells are the safest place on each floor. 4. Go to a stairwell and calmly move to basement level if safe to do so. 5. Sit down in a corridor or stairwell and protect yourself by putting your head as close to your lap as possible, or kneel protecting your head. 6. DO NOT go to the first floor lobby or outside the building. REMEMBER AT ALL TIMES, TRY TO REMAIN AS CALM AS POSSIBLE! Emergency Procedures: Toxic Hazards If there is a toxic spill or exposure, proceed immediately to an area where you are no longer exposed. Call 911. Provide the building’s address, your floor and phone number, and also what type of spill has occurred. Take appropriate action to contain the hazard; close doors behind you, and always follow all safety procedures when working with toxic materials. Emergency Procedures: Water Emergencies Flooding Inside the Building 1. Immediately contact Building Management at 301-468-0200. 2. Turn off all sources of electricity in flood area if safe to do so. 3. Identify source of flood and control if possible. 4. Keep clear of any area with wet electrical equipment. 5. Relocate valuables if possible. Flooding Outside the Building Flash floods, water main breaks, storm surge: 1. Contact Building Management at 301-468-0200. 2. Turn off all electrical equipment on ground and below grade floors. 3. Relocate to above street level if necessary. 4. Call 911 for any injuries. Water Supply Problems For a loss of water supply or a tainted supply 1. Contact Building Management at 301-468-0200. 2. Refrain from using restrooms or drinking fountains. 3. Await further instructions from Building Management. Introduction: Welcome The tenant information provided in this Electronic Tenant® Handbook is meant to provide you with a better understanding of 5635 Fishers Lane, and 12725 Twinbrook Parkway and to facilitate your company’s operations. There is a great deal of information contained within this handbook; take the time to familiarize yourself with this handbook and it will become a valuable resource for you and your company. Please note that the Building Management Office is available to help in any way possible. Your first call for any problem or question can always be directed to the Building Management Office, and we will assist you from there. Every attempt has been made to provide current and accurate information in this handbook, but it is possible that some items will change over time. The Building Management Office will promptly notify you of any such changes. Please feel free to contact the Building Management Office with any questions you may have. We are here to serve you. Welcome to 5635 Fishers Lane and 12725 Twinbrook Parkway. Introduction: About The JBG Companies History Since 1960, the JBG Companies has been an active investor, owner and developer in the Washington metropolitan area's real estate market - one of the most dynamic markets in the world. JBG's track record in securing superior risk-adjusted returns is widely recognized within this high-performance market. Our diverse portfolio encompasses millions of square feet of office, residential, hotel and retail projects, and includes many of the region's most distinguished properties. JBG is proud of its history of creating and preserving real estate values. We remain committed to continually improving the environment in the Washington metropolitan area; creating value for our investors, partners and employees; and maintaining the highest standards of integrity and dependability in all of our endeavors Introduction: Operating Instructions Navigation You move through The Electronic Tenant® Handbook just as you would a traditional Internet site. It’s as simple as pointing and clicking. The main page features a Table of Contents that provides links to each Chapter. Upon entering a Chapter, you will find links to the specific information provided in that chapter’s Sub-Sections. You may return to the Table of Contents or Chapter Overview at any time by clicking the clearly labeled link on every page. Special Features This Electronic Tenant® Handbook has special features, such as an Emergency Notification System and Search engine. In order to take advantage of these useful features, you must have Adobe Acrobat Reader installed on your computer. This software is free and easy to use, and can be obtained by clicking here. Updates The Electronic Tenant® Handbook is updated on a regular basis, so please be sure to periodically check for updates and new information. In order to keep you abreast of your property’s operations, we have included a monthly Building Calendar and Announcement Board. Here, you will find information regarding scheduled maintenance and events taking place at the property. If you are having trouble accessing the Electronic Tenant® Handbook or need assistance, please e-mail or call the Management Office. Introduction: Mobile Property Go Mobile...With Mobile Property! Your Electronic Tenant Portal is now in the palm of your hand! By downloading / bookmarking Fishers Place and Twinbrook Metro Park's Mobile Property app to your Smartphone, you can add an icon to the 'home screen' of your mobile device and have all the information and features of your Electronic Tenant Portal wherever you go. Simply follow these 2 steps to add Mobile Property to your Smartphone's home screen: Step 1: Access the Mobile Site: Type, or copy and paste, the Portal URL into your Smartphone's Web browser: http://jbgrockville.info//mobile.cfm?mode=toc The Portal will automatically redirect to the mobile site. Step 2: Add the App to your Mobile Deviceâs home screen: iPhone / iPad: 1. When you have the mobile property app displayed in your web browser, click on the share icon (bottom/center - box with arrow icon) and choose "Add to Home Screen" 2. Choose a name for the new application, or leave as is, and click "Add." BlackBerry: 1. When you have the mobile property app displayed in your web browser, use the menu button and choose "Add to Home Screen." 2. Choose the name and location for your application, or leave the default settings, and press "Add." Android: 1. When you have mobile property app displayed in your web browser, use the menu button and choose "Add Bookmark." 2. Go to your desktop / home screen and hold down a finger on any blank area until prompt comes up. At this prompt - select shortcuts - Bookmarks - Mobile Site. Policies and Procedures: Animal Admittance Animals are not permitted inside Fishers Place and Twinbrook Metro Park with the exception of service animals providing assistance to physically challenged persons. Policies and Procedures: Americans With Disabilities Act (ADA) The JBG Companies is striving to achieve ADA building compliance at Fishers Place and Twinbrook Metro Park Most measures have already been completed, while others will be completed as upgrades are performed in the Building. Compliance will be ongoing based on new regulations, priorities and budgetary allowances. Tenants are reminded that they are responsible for ADA compliance within their premises. In the interest of meeting the intent of the ADA, all tenants are advised of the following four policies designed to make Fishers Place and Twinbrook Metro Park as accessible and safe as possible where the property may not physically be in compliance with the ADA: ADA Policy #1: General Fishers Place and Twinbrook Metro Park Building Management continues to evaluate the building with respect to the Americans with Disabilities Act, and take measures to be in compliance. In addition to that action being taken, it is policy at this property that the building’s staff will assist disabled individuals as reasonably needed in the building’s public areas. Such assistance is to be provided upon request, or where observed to be needed by building staff. ADA Policy #2: Rescue Assistance Out of concern for life safety, Fishers Place and Twinbrook Metro Park building tenants must notify Building Management of any and all physically challenged persons using the tenant’s premises. Notification must include the nature of the disability and the normal location (floor and general area) of each individual. As changes occur (e.g. in the event that the individual’s office is reassigned or use of the premises is terminated, or a new physically challenged person begins to use the premises) Building Management must be notified accordingly. Strict adherence to this policy will help enhance proper, timely and efficient rescue assistance in the event of an emergency. Without proper adherence, a disabled individual could be placed at significantly higher risk with respect to life safety. ADA Policy #3: Rescue Assistance Education To be safely prepared for a building emergency (e.g. fire, tornado, etc.), physically challenged individuals must receive special advance education/training. The nature of a person’s specific disability is likely to dictate a particular response based on the physical nuances of Fishers Place and Twinbrook Metro Park and its emergency reaction plan. It is each tenant’s responsibility to ensure that their employees, both the physically challenged and those who may assist the physically challenged, are properly educated in this regard. Concerned tenants should contact Fishers Place and Twinbrook Metro Park Building Management to request help with rescue assistance education. Tenants are responsible for ensuring that this education is reviewed periodically, and is welcome to request Building Management’s assistance in this regard. This policy applies to physically challenged employees within the tenant office space, as well as physically challenged visitors. ADA Policy #4: Elevator Access In order to meet the intent of the ADA, it is policy at Fishers Place and Twinbrook Metro Park that the building’s staff will assist physically challenged persons where they are restricted by elevator accessibility. Such assistance is to be provided upon request or where observed to be needed by building staff. Policies and Procedures: Construction Rules and Regulations The following regulations establish the minimum criteria for all construction activities on the property. The regulations are subject to change and Contractors will be notified of changes that affect their work. JBG/Commercial Management LLC (Property Management) requires strict compliance with these regulations. ACCESS All construction personnel shall be identifiable as a representative of the contractor (i.e. Uniform, Contractor Identification Badge) at all times while they are on the property. Contractors shall obtain a building access card (for buildings requiring such devices) from the property management office prior to commencement of each project and access cards shall be returned to the property management office at the conclusion of each project. Contractor will be charged $25.00 for each access card that is not returned. In addition, any keys of any kind provided to the Contractor shall be promptly returned to the property management at the conclusion of each project. Failure to do so shall obligate the contractor to all costs associated with changing the locking mechanism or lock cylinders or other means deemed necessary by JBG/Commercial Management LLC to ensure the security of all related doors. PERSONNEL a. Alcohol and drugs are not permitted on the property or within the building. Construction Personnel found to be in the possession of or under the influence of drugs or alcohol are subject to immediate removal from the property and banned from doing any further work on the property. b. AM/FM radios, televisions, cassette players or other electronic devices with external speakers are not permitted. HOUSEKEEPING a. All common areas shall be kept clean at all times. These areas include but are not limited to common corridors, restrooms, stairwells, lobbies, elevators, loading dock and the grounds. b. Construction debris and trash shall be removed from the jobsite as soon as practicable. Property Management reserves the right to require trash removal on demand. c. Construction debris and trash shall not be stored for any period of time in Mechanical rooms, Service elevator lobbies, adjacent spaces or any other location outside of the jobsite. d. All trash removal shall be scheduled for weekends or Monday through Friday between the hours of 6:00 pm and 7:00 am. e. Contractor shall provide walk off mats at each exit from the jobsite. Mats shall be maintained or replaced as necessary to prevent construction dust from being tracked through out the buildings. SPRINKLER SYSTEMS a. Contractor shall notify Property Management (48) hours in advance of any work affecting the sprinkler system. b. Contractor shall check in at the Property Management office immediately prior to commencement of sprinkler work. c. Property Management personnel shall accompany Contractor and tag impaired devices. d. Sprinkler system drain down and refill are the responsibility of the Contractor. e. When notified by the Contractor, Property Management shall remove impaired device tags after the work is complete and the system is operational. f. The Contractor shall remain on site at all times when the sprinkler system is impaired and shall not leave until the system is refilled and all alarm or trouble conditions related to the work are clean. g. Sprinkler Standpipes or risers may not be drained or remain empty between the hours of 7:30 a.m. and 6:00 p.m. h. Sprinkler feed main, Cross-mains and branch mains shall be drained after 7:30 a.m. on regular business days only and must be refilled by 5:00 p.m. each day. Exceptions require approval of the Property Management. The Contractor may incur additional cost for Property Management personnel when these steps are not followed. BUILDING SYSTEMS Restrooms, toilets, janitor’s closets, wash-bowls and other apparatus shall not be used for any purpose other than that for which they were designed. Any expenses for repairs of damage to the above shall be borne by the Contractor. THERMOSTATS Existing thermostats shall be protected during demolition and construction to prevent malfunction of the HVAC operating systems. PLUMBING Insta-hot faucets shall not be installed in the tenant’s space. THE WORK a. The work shall not begin prior to authorization by Property Management. b. Noisy work: Noisy work shall be performed between 6:00 p.m. and 7:00 a.m. or on weekends regardless of the location in the building. Noisy work includes but is not limited to drilling, grinding, shooting stud track, or ceiling hangar wires, and the use of power saws. c. Welding: All welding shall be performed between 6:00 p.m and 7:00 a.m. and procedures for venting fumes shall be approved by Property Management (24) hours prior to commencement of the work. Contractor is to have an adequate fire extinguisher available at all times. d. Noxious fumes: All work that will produce noxious fumes shall be performed after 6:00 p.m. and shall be finished with ample time to clear the air of the fumes prior to 7:00 a.m. Procedures for venting fumes shall be approved by the Property Management staff (24) hours prior to commencement of the work. MSDS sheets should be available on site. e. Core drilling: No core drilling will take place without prior review and approval by Property Management, and will be performed after normal business hours. In addition Contractor will be required to x-ray concrete slabs prior to performing any such cuts, drilling, etc. The Work (Continued) f. Property Management reserves the right to stop any work that is disruptive to the tenants in the building. g. Contractor shall work in harmony with other Contractors and Subcontractors performing the work in the building on behalf of Property Management or other tenants. h. Contractor shall maintain an active and current safety training and record keeping program and require his Subcontractors to do likewise. i. Contractor shall notify Property Management (24) hours in advance of ceiling cover so that Property Management will have the opportunity to inspect the work. j. Signs or logs will not be permitted without prior approval of Property Management k. Demolished materials are property of Property Management unless noted otherwise. l. Stair doors are not to be propped open at any time. Contact Property Management for stairwell keys. MATERIALS a. Materials shall be hoisted via the freight elevators. Passenger elevators shall not be used for material transportation. b. No materials shall be hoisted outside the freight elevator cabs without prior notification and approval of Property Management. All costs associated with material hoisting shall be borne by the Contractor. c. Materials shall not be stored in the freight elevator lobbies, mechanical rooms or any other common space within the building. Materials shall not be stored in adjacent vacant space without prior consent of Property Management. d. Dollies, carts, and other moving or loading apparatus shall have rubber tires. The expense of any damage caused to floor/walls etc. by moving materials shall be borne by the Contractor causing the damage. It is advised that all public areas be sufficiently protected in advance by the Contractor to avoid damage. e. Freight elevators are available on a first come, first serve basis. The Contractor is advised to contact Property Management (24) hours in advance of any hoisting operations that will require extensive use of the freight elevators to determine the availability of the elevators. f. Property Management reserves the right to inspect all toolboxes, storage bins, trash bins, or other conveyances prior to removal from the property. g. The Contractor shall comply with all Federal, State and Local regulations pertaining to the use of hazardous materials or potentially hazardous materials. No hazardous material may be used on the property without the prior written approval of Property Management. h. All doors, hardware, door frames, light fixtures, HVAC units, air boots, slot diffusers, millwork and appliance to be removed from demolished leases are the property of the building and may be required elsewhere in the building. Please contact the Property Management Office for directions. INSURANCE a. Contractors and their Subcontractors shall provide insurance coverage in accordance with the requirements of the Landlord. b. The contractor shall submit a Certificate of Insurance evidencing the required coverage prior to the commencement of the work. The Certificate shall name JBG/ Commercial Management LLC and the building owner, as the additional insured on the policy. HAZARDOUS MATERIALS SPILL AND RELEASES a. If the materials can not be identified, assume they are hazardous. If a hazardous material is released or spilled, there are a few basic responses that must be followed regardless of the nature of the incident. 1. Notify Property Management of the incident immediately. State the location of the accident, the type of material released and any action taken. 2. Evacuate everyone in the vicinity immediately. This includes tenants, contractors, and building personnel. If the release of a dangerous vapor or gas occurs, a larger area of evacuation may be necessary. 3. Once you know the area is cleared, you may take safe and responsible steps to identify the released materials. If you can identify the materials, small spills of liquid may be limited with sandbags or absorbents. Isolated fumes and/or gases can be limited or decreased by closing the doors or shutting down the air handler units in the vicinity. 4. If the material has not been identified, the Property Manager or Chief Engineer will attempt to use Material Safety Data Sheets to classify the material according the its hazardous properties. If the spill or release is deemed to be a threat to a wide spread area of the property and its occupant’s call 911 and ask for the Fire Department HAZMAT Response Unit. Policies and Procedures: General Rules and Regulations Rules and regulations are important for the safety, appearance and integrity of any property. The JBG Companies strives to enforce the building rules and regulations with the best interests of the building and its tenants in mind. Please ensure that your employees abide by these rules and regulations accordingly. 1. The Common Areas shall not be obstructed or encumbered by any tenant or used for any purposes other than ingress and egress to and from the tenant’s premises. No tenant shall permit the visit to its premises of persons in such numbers or under such conditions as to interfere with the use and enjoyment of the Common Areas by other tenants. 2. No awnings or other projection shall be attached to the outside walls of the Building without the prior written consent of Landlord. No drapes, blinds, shades or screens shall be attached to or hung in, or used in connection with, any window or door of a tenant’s premises, without the prior written consent of Landlord. Such awnings, projections, curtains, blinds, screens and other fixtures shall be of a quality, type, design and color acceptable to Landlord and shall be attached in a manner approved by Landlord. 3. No sign, advertisement, notice or other lettering shall be exhibited, inscribed, painted or affixed by any tenant on any part of the outside or inside of the tenant’s premises or in the Building without the prior written consent of Landlord. In the event of any violation of the foregoing by any tenant, Landlord may remove the same without the prior written consent of Landlord. In the event of any violation of the foregoing by any tenant, Landlord may remove the same without any liability and my charge the expense incurred by such removal to the tenant or tenants responsible for violating this rule. All interior signs on the doors and directory tablet of the Building shall be inscribed, painted or affixed by Landlord at the expense of each tenant, and shall be of a size, color and style acceptable to Landlord. 4. No show cases or other articles shall be put in front of or affixed to any part of the exterior of the Building, nor placed in the Common Areas without the prior written consent of Landlord. 5. The water and wash closets and other plumbing fixtures shall not be used for any purposes other than those for which they were constructed, and no sweepings, rubbish, rags or other substances shall be thrown therein. No tenant shall throw anything out of the doors or windows or down any corridors of stairs. 6. There shall be no marking, painting, drilling into or other form of defacing of or damage to any part of Tenant’s Premises or the Building, except for the installation of small business equipment, shelving and artwork in a tenant’s premises; provided, however, all damage shall be repaired on or before the Lease Expiration Date. No boring, cutting or stringing of wires shall be permitted. No tenant shall construct, maintain, use or operate within its premises or elsewhere within or on the outside of the Building, any electrical devise, wiring or apparatus in connection with a loud speaker system or other sound system unless such sound is limited to the Tenant’s Premises. 7. No tenant shall make or permit to be made any disturbing noises or disturb or interfere with the occupants of the Building or neighboring buildings or premises or those having business with them, whether by the use of musical instrument, radio, tape recorder, whistling, singing or any other way. 8. No bicycles, vehicles, animals, birds or pets of any kind (except for assistance animals) shall be brought into or kept in or about a tenant’s premises or in the Building. 9. No cooking shall be done or permitted by any tenant on it’s premises, except that, with Landlord’s prior written approval (including approval of plans and specifications therefore), a tenant may install and operate for convenience of it’s employees a lounge or coffee room with a microwave, sink and refrigerator; provided that in doing so the tenant shall comply with all applicable building code requirements and any insurance or other requirements specified by Landlord. No tenant shall cause or permit any unusual or objectionable odors to odors to originate from its premises. 10. No space in or about the Building shall be used for the manufacture, storage, sale or auction of merchandise goods or property of any kind, except as provided in the Lease. 11. No tenants shall buy or keep in the Building or its premises any inflammable, combustible or explosive fluid, chemical or substance, except as otherwise provided in the lease. 12. No additional locks or bolts of any kind shall be placed upon any of the doors or windows by any tenant, nor shall any changes be made in existing locks or the mechanisms thereof. The doors leading to the corridors or main halls shall be kept closed during business hours except as they may be used for ingress and egress. Each tenant shall, upon the termination of its tenancy, return to Landlord all keys used in connection with its premises, including any keys to the premises, to rooms and offices within the premises, to storage rooms and closets, to cabinets and other build-in furniture, and to toilet rooms, whether or not such keys were furnished by Landlord or procured by the tenant, and in the event of the loss of such keys, such tenant shall pay to Landlord the actual cost of replacing the locks. On termination of the tenant’s lease, the tenant shall disclose to landlord the combination of all locks for safes, safe cabinets and vault doors, if any, remaining in the premises. 13. All removals, or the carrying in or out of any safes, freight, furniture or bulky matter of any description, must take place in such manner during such hours as Landlord may reasonably require. Landlord reserves the right (but shall not have the obligation) to inspect all freight brought into the Building and to exclude from the Building all freight which violates any of these rules and regulations or any provision of tenant’s lease. 14. Any person employed by any tenant to do janitorial work within the tenant’s premises must obtain Landlord’s approval prior to commencing such work, and such person shall comply with all instructions issued by the superintendent of the Building while in the building. No tenant shall engage or pay any employees on the tenant’s premises or in the Building, except those actually working for such tenant on said premises or for such tenant at another office location of such tenant. 15. No tenant shall purchase spring water, ice, coffee, soft drinks, towels or other like merchandise or service from any company or person who has, in Landlord’s opinion committed violations of Building regulations or caused a hazard or nuisance to the Building an/or its occupants; provided, however, that Landlord has notified the tenant in writing that such provider is unacceptable. 16. Landlord shall have the right to prohibit any advertising by any tenant which, in Landlord’s reasonable opinion, tends to impair the reputation or desirability of the Building as a building for offices and, upon written notice from Landlord, such tenant shall refrain from and discontinue such advertising. 17. Landlord reserves the right to exclude from the Building at all times any person who is not known or does not properly identify himself to the Building’s management or its agents. Landlord may at its option require all persons admitted to or leaving the Building to register between the hours of 6 p.m. and 8 a.m., Monday through Friday, and all times on Saturday, Sundays and Holidays. Each tenant shall be responsible for all persons for whom it authorized entry into the Building, and shall be liable to Landlord for all acts of such persons. 18. Each tenant shall ensure that all lights are turned off before closing and leaving its premises at the end of a day and when no one is in the Premises. 19. The requirements of tenants will be attended to only upon request at the office of the Building. Building employees have been instructed not to perform any work or do anything outside of their regular duties, except with special instruction from the management of the Building. 20. Canvassing, soliciting and peddling in the Building is prohibited, and each tenant shall cooperate to prevent the same. 21. No water cooler, plumbing or electrical fixture shall be installed by tenant without Landlord’s prior written consent. 22. No hand trucks, except those equipped with rubber tires and side guards, shall be used to deliver or receive any merchandise in any space or in the Common Areas of the Building, either by tenant or its agents or contractors. 23. Access plates to under door conduits shall be left exposed. Where carpet is installed, carpet shall be cut around the access plates. 24. Mats, trash and other objects shall not be placed in the Common Areas. 25. At least once every two years, each tenant at its own expense shall clean all drapes installed by Landlord for the use of the tenant and any drapes installed by the tenant which are visible from the exterior of the building. 26. Landlord shall not maintain suite finishes which are non-standard such as kitchens, bathrooms, wallpaper, special lights, etc. However, should the need for repairs arise, Landlord shall arrange for the work to be done at tenant’s expense. 27. Landlord’s employees are prohibited from receiving articles delivered to the Building and, if any such employee receives any article for any tenant, such employee shall be acting as the agent of such tenant for such purposes. 28. No smoking shall be permitted in any of the Common Areas of the Building or in the tenant’s premises. All cigarettes and related trash shall be disposed of in trash receptacles and not on sidewalk, parking lot or grass. 29. The use of space heaters in any office or laboratory space is a fire hazard and is strictly prohibited. Seasonal Decorations Holiday decorations (including trees and wreaths) set up in any place of public assembly or lobby shall be in conformance with the following specifications: 1. For safety purposes, only artificial trees may be displayed. 2. Artificial trees shall not be set up before December 1st, and must be removed by January 2nd or the first business day after the holiday. 3. Trees must be placed so they do not in any way block an exit door, nor obscure an exit sign. 4. Only decorations of non-flammable material are to be used. 5. Electrical wiring shall NOT be used on metallic Christmas trees. Metallic trees may be illuminated by use of spotlights placed a safe distance away. 6. Any electric lights used on trees must conform to electric code and be U.L. approved. 7. All artificial trees must be flameproofed to the satisfaction of the Montgomery County Fire Marshall. 8. Use of any candle or flame decorations is prohibited. Policies and Procedures: Insurance Protection Prior to moving into the building, and at all times during your suite’s tenancy, each tenant must have on file in the Management Office a Certificate of Insurance evidencing the coverage types and amounts stipulated in the lease agreement. JBG/Twinbrook, LP, JBG/BC Fishers III, LLC, or JBG/5630, L.L.C and JBG Commercial Management, LLC, must be included as additional insured. Building Management’s copy of your suite’s insurance certificate must be kept current at all times while your lease at Fishers Place and Twinbrook Metro Park is in effect. Certificates representing current insurance coverage must also be on file in the Management Office for each contractor (construction, remodeling, moving, etc.) that performs work for your Suite in the building before the work begins, and at all times while the work is underway Policies and Procedures: Moving Procedures General In an effort to act in the best interest of the tenants and to protect the property, the following policies regarding movement of office furniture and equipment into or out of the Building must be strictly adhered to. Before engaging a moving or Delivery Company, please contact the Building Management Office in writing no later than one week prior to any move to discuss your arrangements. All correspondence concerning your move is to be directed to: JBG/Twinbrook, LP or JBG/Fishers, LP JBG Commercial Management Office c/o Misti Hensley, Senior Property Manager 5635 Fishers Lane Suite 0200 Rockville, Maryland 20852 Fax: (301) 468-0200 A pre-move and follow-up walk-through should be coordinated with the Building Management Office in order to document the condition of the affected areas of the building before and after the move. Any damage caused by the movers will be repaired by a contractor of the Building Management’s choice, and paid for promptly by the tenant and/or the moving contractor. To help avoid such damage, movers must protect all flooring with Masonite, and walls, corners and doorframes are to be treated with appropriate protection. The actual relocation of a tenant’s offices begins with the tenant’s ideas on how the space is to function. Relocation ends when the Building Engineer hands the tenant the keys to the front door of the premises. In the interim, there is a tremendous amount of planning, estimating, and decision-making that must be completed within the time frame set forth in the lease. Many different people are involved in the process. Building Management will assist in every way possible to ensure a smooth and efficient relocation. Moving Into the Building All tenant move-ins must be coordinated with Building Management. Information concerning move-in procedures is included later in this section. Building Management should also be notified at least twenty-four (24) hours in advance regarding any arrangements made for various trades, such as telephone installation, copier installation, etc. Many of the items needing to be addressed prior to a move are listed below: 1. Change of address information to the U.S. Post Office. 2. Contact Phone Company to arrange for installation of new phones and equipment. 3. Provide Building Management with Certificates of Insurance for all contractors (i.e., movers, general contractors) providing services on behalf of the tenant. 4. All Certificates of Insurance should contain the information below: Certificates should list as additional insured: JBG/5630 Fishers, L.L.C c/o JBG Commercial Management, L.L.C. 5630 Fishers Lane 5635 Fishers Lane Terrace Level – Suite 0200 Rockville, Maryland 20852-7700 Attention – Misti Hensley JBG/Fishers Place III, LLC C/o JBG Commercial Management, LLC 5635 Fishers Lane 5635 Fishers Lane, Suite 0200 Rockville, MD 20852 (301) 468-0200/Phone (301) 468-3304/Fax JBG/BC Twinbrook, L.P. C/o JBG Commercial Management, LLC 12725 Twinbrook Parkway 12725 Twinbrook Rockville, MD 20852 (301) 468-0200/Phone (301) 468-3304/Fax 5. As soon as a move-in date has been determined, provide Building Management as soon as possible, with the information referenced in New Tenant Move-In Information in the Forms section of this manual. 6. Adherence of the Moving Procedures discussed later in this section. Moving Out of the Building All tenants moving out of the building should do the following: 1. Contact Verizon to discontinue telephone service at the building. 2. Turn over all keys and building access cards to Building Management prior to leaving the building. 3. Follow the Moving Procedures discussed later in this section. Move Procedures At A Glance The following procedures are provided for quick reference to help facilitate all tenant moves into or out of the building. Please be sure to provide a copy of these procedures to all moving companies bidding on your move: 1. It is absolutely necessary that the Building Management office be notified in writing, at least one week in advance of any intended moves into or out of the building so that the freight elevator can be reserved. 2. Provide Building Management with a Certificate of Insurance from the moving company evidencing the coverage’s in effect, and naming the building owner, and building manager, JBG Commercial Management, LLC as additional insured. 3. Weekday deliveries requiring the freight elevator are scheduled on a first come, first served basis. The freight car cannot be reserved or used exclusively during the week, except before or after normal business hours. Only small moves are permitted during weekdays. Use of the freight elevator on weekdays will be prohibited for any moves or deliveries between the hours of 8 a.m. – 6:00 p.m. 4. Larger moves (those requiring more than one hour or involving pieces of furniture or equipment with dimensions greater than 5 feet) must be scheduled after 6:00 p.m. weekdays or on weekends. 5. Masonite must be placed on all lobby floors, and walls, corners and door fames must also be treated with appropriate protection. 6. The tenant is responsible for taking every precaution to safeguard the building from damage (i.e., through means of crating and padding). In addition, materials should be removed from shelves, and file cabinets and desks should be emptied with drawer’s taped shut. 7. Moving or delivery companies and tenants are responsible for leaving the building and premises clean by removing all cartons and other trash generated during the move. If clean-up assistance is desired, building personnel can be provided on a time and material basis. To arrange for this service, please contact the Building Management office at least 48 hours in advance. 8. Should tenants wish to dispose of waste material or large, bulky items in the building dumpster, arrangements are to be made through the Building Management office at least 48 hours in advance. Again, any costs related to special use of the dumpster or removal of such materials will be charged to the tenant. Items are not to be left on the loading dock or next to the dumpster. 9. Any and all damage to the building, including lobbies, hallways, elevator, loading areas, and grounds, which is caused by the tenant, moving company or its employees or agents will be the responsibility of tenant. The Landlord will perform required repairs and all costs associated with such repair will be billed to the tenant for reimbursement. Policies and Procedures: Natural Resources Energy Conservation Your company’s employees can help reduce operating costs and conserve energy by ensuring that lights, office machines and coffee makers are turned off at the close of each work day. Further, remembering to turn off lights in private offices when they are unattended for several minutes or more can practice conservation. These simple ideas make sense - we all save money, and our environment benefits as well. Better Water As with many large office buildings, it is always a good idea to allow water at the drinking fountains to flow for a short period of time before drinking. You should find the water to be cooler (and healthier) if you purge a small amount of water before you drink. Policies and Procedures: Regulatory Conformance It is in the best interest of the building and its tenants that all federal, state and local regulations governing JBG/ Fishers Place and Twinbrook Metro Park are in practice at this property. Compliance with building codes, fire codes, health codes and other ordinances often seems too inconvenient, difficult or costly, but in fact are essential for life safety and well-being. JBG/ Fishers Place and Twinbrook Metro Park is operated so as to abide with regulations to the best of Building Management’s knowledge, and it is important that each tenant acts in the same fashion to avoid jeopardizing the safety of the other tenants. The “18-Inch Rule” The “18 inch rule” is commonly overlooked in office buildings. In order for fire detection and suppression systems to perform properly, nothing may be placed within 18 inches of the ceiling. This typically involves items stored on high shelving. Please monitor this carefully so as to prevent this occurrence in your premises. These two regulatory issues (and many others as well) are inherently relevant to your safe occupancy in this building. Please call Building Management if you have questions in this regard. Policies and Procedures: Remodeling Procedures Before Construction: Remodeling/redecorating work can be either minor or major, and may include any of the following: Installing electrical or phone outlets Installing or relocating light fixtures Relocating doors Repairing carpets Installing new carpet Adding or moving walls Painting or wallcovering Telephone or computer system cabling As your office contemplates remodeling work for your suite at JBG/ Fishers Place and Twinbrook Metro Park several factors involving the Landlord’s interface should be considered. 1. The Landlord must evaluate even the smallest change for its impact on the building. Written design approval by Building Management is required prior to the commencement of work. For most projects this can be accomplished in five (5) business days or less. 2. Be sure to provide two (2) copies of all applicable plans and specifications, so that we can return one copy to you with our comments, and keep one copy for our files. The Landlord’s review helps ensure that the proposed project will conform to the building’s core and shell systems, as well as the standard construction practices and appropriate materials for the building. 3. The scope of various projects may require that the Tenant engage a licensed architect and/or engineer. Check with Building Management to discuss our requirements in a specific instance. 4. Obtain approval of all contractors who will be working on your project by completing a Request for Approved Contractors form. Landlord reserves the right to withhold the approval of any contractor who cannot provide insurance coverage, is not licensed, or has previously caused problems. Please reference the Request for Approval of Contractors Form During Construction: The Landlord will require that all work that takes place comply with all governmental authorities with jurisdiction over the project. It tends to simplify matters if contractors are selected from a Management’s Approved Contractor List, though the tenant may still go through whatever process it feels necessary to ensure that the contractor is qualified for the work. 1. No contractor will be allowed to begin work until a Certificate of Insurance naming the additional insureds has been received by the Management Office, and contractor has returned a signed copy of the back page of the Contractor Rules and Regulations acknowledging that it has read and agrees to all terms and conditions. Please refer to Construction Rules and Regulations. 2. A pre-construction meeting with the contractor, tenant, Building Management, and engineer is strongly encouraged to ensure all parties are clear on the work to be performed and fully understand the rules and regulations. 3. All work must be performed in accordance with the Building Construction Rules & Regulations. 4. No loud noise is to take place during normal business hours, from 6:00 am to 6:00 pm, Monday through Friday. If a construction project is deemed to be disruptive to existing tenants and/or the Landlord, the General Contractor shall reschedule work so as to eliminate disruption to the satisfaction of Landlord at no additional cost to the Landlord. After Construction: Upon completion of the work, and depending on the nature of the project, the contractor will be required to furnish certain items to the Landlord to assist with the Landlord’s future maintenance of the suite; to ensure that the work was completed satisfactorily; and, to demonstrate that the property will remain free of liens. We suggest that final payment be withheld from the contractor until the applicable project close-out items have been obtained from the contractor and forwarded to the Landlord to ensure suitability (not all of these will be required for many small projects - ask Building Management). 1. Final Inspection Approval Certificate and Certificate of Occupancy Montgomery County Government. 2. As-built drawings depicting accurate field conditions in areas affected by the work. 3. Updated electrical panel schedules. 4. Lien releases from the General Contractor, subcontractors and suppliers. 5. Operating and Maintenance (O&M) Manuals. 6. HVAC Test & Balance Reports. 7. Written one (1) year warranty on all completed work and installed equipment. Please refer to Construction Rules and Regulations Floor Load Code requirements restrict placing loads upon floors that exceed the load per square foot for which the floor was designed. 5630 Fishers Information Pending 150 pounds per square foot – 80 pounds per 5635 Fishers square foot live load, plus 20 pounds per square foot partition load. 12725 150 pounds per square foot Twinbrook Should you find it necessary to utilize equipment that exceeds this rating, you must receive prior written approval from Building Management. The Landlord’s structural engineer shall review documentation provided by the tenant, and shall have the right to prescribe the weight, size and position of all equipment, materials, furniture or other property brought into the Building. Tenants will be invoiced for the structural engineer’s services. Heavy objects shall stand on such platforms as determined by Landlord to be necessary to properly distribute weight. Floor Covering All floor coverings should be approved through Building Management. In particular, please be aware that sponge or rubber-backed carpeting is not allowed. Electrical Requirements Prior to any alterations of electrical wiring, specifications must be submitted to Building Management, for review and approval by the building electrician to avoid any code violations. Window Covering Fishers Place and Twinbrook Metro Park is equipped with building standard blinds in all office suites. While blinds are provided initially to all tenants, repair or replacement of blinds is provided through Building Management at an additional charge. The blinds serve an insulating function both in the retention of heat in the winter months, and the exclusion of heat in the summer months. We recommend blinds be kept drawn at all times. Policies and Procedures: Smoking All public aspects of Fishers Place and Twinbrook Metro Park have been declared “Non-Smoking Areas.” This includes restrooms, stairways, surrounding area, loading dock, corridors, lobbies, and elevators, etc. Smokers may use areas on the exterior of the property that from time-to-time may be designated “smoking areas.” These areas are subject to change, and Building Management will notify tenants accordingly. We ask all smokers’ cooperation in properly extinguishing and disposing of cigarette butts. This will help Building Management maintain the cleanliness of the exterior of the property, and make for more pleasant surroundings for everyone. Tenants assistance in self-enforcing this policy is important in order for meaningful regulation. This sort of arrangement is generally consistent with the other first class office buildings in the Rockville area. Policies and Procedures: Telecommunications Phone System Location Each tenant’s phone system must be situated within its leased space, and NOT in the building’s core and shell telephone or electrical rooms. This allows for ease of access as needed, and less chance for damage to systems due to overheating situations. From a building manager’s perspective it alleviates much of the overcrowding situations that would otherwise tend to occur in a core telephone closet. The telephone closets are intended only to accept the main cable “feed” which extends from the building’s riser cables to your system. Code Issues: “Plenum Rated” Cable and Independent Supports For Cable As with most other modern office buildings, the space above your ceiling is used as a return-air plenum. Various code requirements affect plenum spaces. It is therefore essential that you instruct your cabling company (phone, data and other) to use “plenum rated” cable for all cabling which will run above the ceiling. The building code also requires that cables be independently supported, rather than sharing plumbing supports or wires installed to hold ceiling systems or electrical conduits. Many cabling companies do not abide by this requirement without specific instructions and follow-up by the tenant. Remedial work to correct improper installation can be costly and have serious time delay considerations. No Alternative Access Provider Without Landlord’s Approval Technological advances in the area of telecommunications are having a profound impact on office buildings throughout the country. Tenant’s demands for more sophisticated building provisions such as fiber optics and competition among access providers has placed a greater burden on buildings to try to keep pace with this modernizing industry. Most buildings are limited by the space available for competitive access providers to establish a “minimum point of presence,” as well as the size of each floor’s telephone closet and shaft space for riser cables. Other issues include access to equipment, safety and security. Presently, it is important for all tenants to recognize that no alternative access provider may be permitted a point of presence or riser cable space in the building without the Landlord’s prior written approval. Policies and Procedures: Utility Closet Access You must call the JBG Commercial Management office at (301) 468-0200 in order to have the Building Engineer access any Utility Closet for the purpose of a contracted vendor performing repairs or maintenance for your suite. Please reference the Request for Utility Closet Access Form.
© Copyright 2025