Enlistment of “Manufacturers/Suppliers for Poly House and

Maharashtra State Horticulture and Medicinal Plants Board
SakharSankul, Shivajinagar, Pune 411 005
Ph: (020)-25534860
Fax : 020-25511302
Email : [email protected]
Enlistment of “Manufacturers/Suppliers for
Poly House and Net House”for the Year 2015-16
Terms and Conditions
1.
“Manufacturers/Suppliers for Poly House and Net House” means the providers of all the specified
components/materials along with installation of polyhouse and net house to the cultivators.
2.
The Enlistment of manufacturers/suppliers of polyhouses and net houses is compulsory for obtaining
subsidy under this scheme.
3.
The Enlistment is for the supply of complete polyhouse and net house to the cultivators and not for
the supply of individual components/materials of the polyhouse and net house
4.
The Enlistment shall be for the State of Maharashtra.
5.
The design of polyhouses and net houses must confirm to the models approved by Department of
Agriculture/ Maharashtra State Horticulture and Medicinal Plant Board (MSHMPB)/State NHM,
Maharashtra State (Annex-1).
6.
The poly house and net house manufacturers/suppliers must use all the components required for the
installation of polyhouses and net houses confirming to the relevant BIS standards and/or as per
specifications provided by the Department of Agriculture/ Maharashtra State Horticulture and
Medicinal Plant Board (MSHMPB)/State NHM, Maharashtra State(Annex-2).
7.
The manufacturers/suppliers must have at least one service center in Maharashtra.
8.
The invoices in respect of supply of polyhouses and net houses shall be raised by the registered
manufacturers/suppliers. However the local sub contractor/supplier if any for civil material,installation
and transportation work for the polyhouses and net houses installation will be permitted provided that
the manufacturers/suppliers undertake the responsibility/guarantee of these works. In such cases
invoices/bills given by the subcontractor & authenticated by the manufacturers/suppliers are valid for
civil material, installation and transport work only.
9.
The manufacturers/suppliers shall under take the responsibility/guaranteeof different components of
polyhouses and net houses supplied to the cultivators (Annex-2).
10.
The manufacturer /supplier shall undertake to provide guaranty/ warranty as below.
(a) Cladding material (polyfilm, all types of net and fabric): One year guarantee (i.e. replacement)
against natural wear and tear (excluding the natural calamities, vandalism and any other forced action).
Two years warranty (i.e. repairs) against natural wear and tear (excluding the natural calamities, vandalism
and any other forced action).
(b) Structure: Five years warranty (i.e. repairs) against natural wear and tear (excluding the natural
calamities, vandalism and any other forced action)The decision of Managing Director, Maharashtra State
Horticulture and Medicinal Plant Board, Pune shall be final in this regard.
11.
The manufacturers/suppliers must undertake to supply the components at the rates equal to or less than
the rates given as per the Annex-3 and/or the rates per unit area of polyhouse/net house in any case
should not be higher than those prescribed in the Annex-4.
12.
If Manufacturers/suppliers not follow the rules and regulations mentioned in the Para No. 9,10,11then
above the entire Bank Guarantee amount will be deposited in government account and such
manufacturers/supplierswill be black listed.
Page | 1
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
13.
Following documents are required for Enlistment of manufacturers/suppliers(a) Completely filled in application cum company profile in the prescribed Pro-forma (Annex-5).
(b) Enlistment feeRs. 10,000.00 (Rupees Ten Thousand only). ThisEnlistment fee is nonrefundable.
The Enlistment fee shall be paid in the form of demand draft only, issued in favour of “Managing
Director, Maharashtra State Horticulture and Medicinal Plant Board, Pune”
payable at Pune along with application for Enlistment.
(c) Copy of VAT Enlistment certificate/s.
(d) Copy of SSI Enlistment certificate/Enlistment issued by the Director of Industries.
(e) Latest Sales Tax clearance certificate (Maharashtra State)/VAT return.
(f) The make/brand name/s of different components as per the format given in Annex-6.
(g) List of service centers in Maharashtra. Service centre must be as per description given in the item
No. 15.
(h) Price list of additional components (other than listed in Annex-2 if any) for poly house and net
house system as per the format provided in Annex-7.
(i) Latest “Certificate of Performance status from the concerned State authority”
(Agriculture/Horticulture Department / State Horticulture and Medicinal Plant Board) for the
manufacturers/suppliers from outside Maharashtra. They must have regional office in Maharashtra
State for better co-ordination and efficient implementation of the scheme.
(j) Copy of valid BIS certificates/undertaking by manufacturers/suppliers to supply the different
components of polyhouses/net houses according to the specifications provided by the Department
of Agriculture/ Maharashtra State Horticulture and Medicinal PlantBoard (MSHMPB)/State NHM,
Maharashtra Statefor all components of poly house/shade net house system.
(k) Turnover of minimum Rs. 50.00 lakh per year for previous two years which will be counted based
on copies of balance sheet.
(l) Experience of more than two years for installation and supply of polyhouse/nethousewhich will be
counted based on the copies of firm orders/bills amounting to minimum Rs. 25.00 lakh per year.
14.
The performance guarantee of Rs. One Lakh in the form of bankguarantee(only of Nationalized
bank)in favor of“Managing Director, Maharashtra State Horticulture and Medicinal Plant
Board, Pune”according to the format provided in Annex-8 will be required at the time of signing the
agreement for Enlistment. The performance guarantee should be renewed after every year. However
for the manufacturers/suppliers registered in Maharashtra State as small scale unit, the performance
guarantee of Rs. 50,000/- (Rupees Fifty Thousand only) is required.
15.
Service Centre: The service center must be of following description(a) The service center should be manned with at least two technical persons; one of them must be
an Agricultural Engineer with minimum qualification of B. Tech (Agricultural Engineering).
(b) The technical person other than Agricultural Engineer should have completed the training on
Polyhouses/Nethouses from one of the State Agricultural Universities (SAUs) or Horticultural
Training Center (HTC), TalegaonDabhade. In process of time and as per additional
requirements, no. of trained technical persons (either agricultural engineer or trained from
SAUs/HTC) should be increased.
(c) At least one “service center” shall be located in the State of Maharashtra.
(d) The service center must provide free after sales service to the farmers for at least five years.
This may exclude the material cost, transportation of material and installation cost.
Page | 2
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
(e) The service center shall also provide the service as per clause (10) above of these terms and
conditions.
(f) Service center shall have the information board as per the format provided in Annex-9 or as
prescribed by Department of Agriculture/ Maharashtra State Horticulture and Medicinal Plant
Board (MSHMPB)/State NHM, Maharashtra State from time to time.
(g) Service center shall maintain the list of farmers covered under the scheme.
(h) Service center shall maintain the registers as per the format provided in Annex-10 or as
prescribed by Department of Agriculture/ Maharashtra State Horticulture and Medicinal Plant
Board (MSHMPB)/State NHM, Maharashtra State from time to time.
(i) It will be the responsibility of the manufacturer/supplier to see that the service center is kept
functional all the year and grievances/complaints of cultivators/farmers are attended to within a
week after receiving written complaints.
(j) The service center must be equipped with the communication facilities such as phone,
internet/email etc.
16.
The information furnished for Enlistment should be signed by the competent authority of the
manufacturer/supplier. The true copies should be attested by a Gazzetted officer. The competent
authority means.
(a) For the private and public ltd company: Chairman/CEO/MD or the authorized Person/Director
from the Board of Directors. (Copy of resolution passed by the board for this purpose shall be
submitted)
(b) For Partnership firm/company: One partner duly authorized.(Copy of Authorization signed by
all the partners shall be submitted)
The above mentioned authorities (as stated in (a) and (b)) will have to submit MOU/Partnership
deed in prescribed form.
(c) Proprietorship firm/company: Proprietor.
17.
The manufacturer must submit the application in prescribed format with all details to the office of the
“Managing Director, Maharashtra State Horticulture and Medicinal Plant Board, Pune”.
18.
Maharashtra State Horticulture and Medicinal Plant Board (MSHMPB)/State NHM, Maharashtra State
reserve the right to reject the Enlistment and the decision of Managing Director, Maharashtra State
Horticulture and Medicinal Plant Board, M. S, Pune shall be final in this regard.
19.
The Enlistment will be subjected to conditions of guidelines issued by Government of
India/Government of Maharashtra/ State Horticulture Mission/ MSHMPB from time to time.
20.
These guidelines are available at www.mahanhm.gov.in
Managing Director
Maharashtra State Horticulture and
Medicinal Plants Board, Pune-5
Page | 3
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Annex-1
+) ½þÊ®úiÉMÉÞ½þ =¦ÉÉ®úhÉÒºÉÉ`öÒ ÊxÉζSÉiÉ Eäò±Éä±Éä Ê´ÉÊ´ÉvÉ +É®úÉJÉbä÷ (Designs).
½þÊ®úiÉMÉÞ½þÉSªÉÉ xÉèºÉÌMÉEò ´ÉɪÉÖÊ´ÉVÉxÉ (Open Vent Poly house) ´É ´ÉÉiÉÉ´É®úhÉ ÊxɪÉÆÊjÉiÉ (Climate Control Poly house)
|ÉEòÉ®úÉSªÉÉ ½þÊ®úiÉMÉÞ½þɺÉÉ`öÒ +ÉEòÉ®ú¨ÉÉxÉÉxÉÖºÉÉ®ú Ê´ÉÊ´ÉvÉ ¨ÉÉìb÷ä±ºÉ ÊxÉζSÉiÉ Eäò±Éä +ºÉÚxÉ iªÉÉSÉä +É®úÉJÉbä÷ (Designs) {ÉÖføÒ±É|ɨÉÉhÉä
+ɽäþiÉ. ±ÉɦÉÉlÉÔxÉÒ
ªÉÉ `ö®úÊ´ÉhªÉÉiÉ +ɱÉ䱪ÉÉ +É®úÉJÉb÷¬ÉxÉÖºÉÉ®úSÉ ½þÊ®úiÉMÉÞ½þÉSÉÒ =¦ÉÉ®úhÉÒ
Eò®úÉ´ÉÒ.
(Êb÷ZÉÉ<ÇxÉ Gò. 1.1 iÉä 2.8)
Design No. 1.1 Open Ventilated Polyhouse.(560 Sq.mtrs)
OVPH 20 m X 28 m
Page | 4
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 1.2 Open Ventilated Polyhouse.(1008 Sq.mtrs)
OVPH 28m X 36 m
Page | 5
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 1. 3 Open Ventilated Polyhouse.(1008 Sq.mtrs)
OVPH 36 m X 28 m =1008
Page | 6
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 1.4 Open Ventilated Polyhouse.(2016 Sq.mtrs)
OVPH 36 m X 56 m = 2016
Page | 7
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.5 Open Ventilated Polyhouse.(2080 Sq.mtrs)
OVPH 52 m X 40 m =2080
Page | 8
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.6 Open Ventilated Polyhouse.(3120 Sq.mtrs)
OVPH 52 m X 60 m =3120
Page | 9
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.7 Open Ventilated Polyhouse.(3120 Sq.mtrs)
OVPH 60 m X 52 m =3120
Page | 10
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.8 Open Ventilated Polyhouse.(4080 Sq.mtrs)
OVPH 60 m X 68 m =4080
Page | 11
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.9 Open Ventilated Polyhouse.(4000 Sq.mtrs)
OVPH 100 m X 40 m =4000
Page | 12
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.1 Climate Controlled Polyhouse.(1008 Sq.mtrs)
CCPH 28 m X 36 m = 1008
Page | 13
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.2 Climate Controlled Polyhouse.(1008 Sq.mtrs)
CCPH 36 m X 28 m = 1008
Page | 14
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.3 Climate Controlled Polyhouse.(2016 Sq.mtrs)
CCPH 36 m X 56 m = 2016
36
Page | 15
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.4 Climate Controlled Polyhouse.(2016 Sq.mtrs)
CCPH 52m X 40 m = 2080
Page | 16
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 2.5Climate Controlled Polyhouse.(3120 Sq.mtrs)
CCPH 52m X 60 m = 3120
Page | 17
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.6 Climate Controlled Polyhouse.(3120 Sq.mtrs)
CCPH 60 m X 52 m = 3120
Page | 18
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.7 Climate Controlled Polyhouse.(4080 Sq.mtrs)
CCPH 68 m X 60 m = 4080
Page | 19
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.8 Climate Controlled Polyhouse.(4000 Sq.mtrs)
CCPH 100 m X 40 m = 4000
100
40
Page | 20
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
¤É) ¶Éäb÷xÉä]õ½þÉ>ðºÉþ =¦ÉÉ®úhÉÒºÉÉ`öÒ ÊxÉζSÉiÉ Eäò±Éä±Éä Ê´ÉÊ´ÉvÉ +É®úÉJÉbä÷ (Designs).
¶Éäb÷xÉä]õ½þÉ>ðºÉSªÉÉ ®úÉ=Æb÷ ]õÉ<Ç{É (Round Type) ´É }±Éì]õ ]õÉ<Ç{É (Flat Type) ªÉÉ |ÉEòÉ®úÉSªÉÉ ¶Éäb÷xÉä]õ½þÉ>ðºÉºÉÉ`öÒ
+ÉEòÉ®ú¨ÉÉxÉÉxÉÖºÉÉ®ú Ê´ÉÊ´ÉvÉ ¨ÉÉìbä÷±ºÉ ÊxÉζSÉiÉ Eäò±Éä +ºÉÚxÉ iªÉÉSÉä +É®úÉJÉbä÷ (Designs) {ÉÖføÒ±É|ɨÉÉhÉä +ɽäþiÉ. ±ÉɦÉÉlÉÔxÉÒ ªÉÉ
`ö®úÊ´ÉhªÉÉiÉ +ɱÉ䱪ÉÉ +É®úÉJÉb÷¬ÉxÉÖºÉÉ®úSÉ ¶Éäb÷xÉä]õ½þÉ>ðºÉSÉÒ =¦ÉÉ®úhÉÒ Eò®úÉ´ÉÒ. (Êb÷ZÉÉ<ÇxÉ Gò. 1.1 iÉä 4.8)
Design No.1.1 Shadenet house (NHM SNH RT 5 M)
18 m X 28 m = 504 Sq.mtrs.
Page | 21
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.2 Shadenet house (NHM SNH RT 5 M)
36 m X 28 m = 1008 Sq.mtrs.
Page | 22
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 1.3 Shadenet house (NHM SNH RT 5 M)
36 m X 56 m = 2016 Sq.mtrs.
Page | 23
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 1.4 Shadenet house (NHM SNH RT 5 M)
42 m X 48 m = 2016 Sq.mtrs.
Page | 24
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 1.5 Shadenet house (NHM SNH RT 5 M)
42 m X 72 m = 3024 Sq.mtrs.
2
Page | 25
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 1.6 Shadenet house (NHM SNH RT 5 M)
48 m X 64 m = 3072 Sq.mtrs.
2
Page | 26
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.7 Shadenet house (NHM SNH RT 5 M)
54m X 56 m = 3024 Sq.mtrs.
Page | 27
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1.8 Shadenet house (NHM SNH RT 5 M)
48 m X 84 m = 4032 Sq.mtrs.
Page | 28
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1. 9 Shadenet house (NHM SNH RT 5 M)
60 m X 68 m = 4080 Sq.mtrs.
Page | 29
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1. 10 Shadenet house (NHM SNH RT 5 M)
72 m X 56 m = 4032 Sq.mtrs.
Page | 30
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.1. 11 Shadenet house (NHM SNH RT 5 M)
78 m X 52 m = 4056 Sq.mtrs.
Page | 31
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2. 1 Shadenet house (NHM RT 4 M)
18 m X 28 m = 504 Sq.mtrs.
2
Page | 32
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2. 2 Shadenet house (NHM SNH RT 4 M)
36m X 28 m = 1008 Sq.mtrs.
2
Page | 33
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2. 3 Shadenet house (NHM SNH RT 4 M)
36m X 56 m = 2016 Sq.mtrs.
2
Page | 34
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2. 4 Shadenet house (NHM SNH RT 4 M)
42m X 48 m = 2016 Sq.mtrs.
2
Page | 35
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 2.5 Shadenet house (NHM SNH RT 4 M)
42m X 72 m = 3024 Sq.mtrs.
2
Page | 36
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.6 Shadenet house (NHM SNH RT 4 M)
48m X 64 m = 3072 Sq.mtrs.
2
2
Page | 37
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.7 Shadenet house (NHM SNH RT 4 M)
54m X 56 m = 3024 Sq.mtrs.
Page | 38
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.8 Shadenet house (NHM SNH RT 4 M)
48 m X 84 m = 4032 Sq.mtrs.
2
Page | 39
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.9 Shadenet house (NHM SNH RT 4 M)
60 m X 68 m = 4080 Sq.mtrs.
2
Page | 40
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No.2.10 Shadenet house (NHM SNH RT 4 M)
72 m X 56 m = 4032 Sq.mtrs.
Page | 41
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 2.11 Shadenet house (NHM SNH RT 4 M)
78 m X 52 m = 4056 Sq.mtrs.
2
Page | 42
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.1 Shadenet house (NHMSNH FT 4 M)
20 m X 52 m =1040 Sq.mtrs.
Page | 43
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.2 Shadenet house (NHMSNH FT 4 M)
32 m X 34 m =1088 Sq.mtrs.
Page | 44
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.3 Shadenet house (NHMSNH FT 4 M)
32 m X 64 m =2048 Sq.mtrs.
Page | 45
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.4 Shadenet house (NHMSNH FT 4 M)
44 m X 46 m =2024 Sq.mtrs.
Page | 46
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.5 Shadenet house (NHMSNH FT 4 M)
52 m X 58 m =3016 Sq.mtrs.
Page | 47
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.6 Shadenet house (NHMSNH FT 4 M)
40 m X 76 m =3040 Sq.mtrs.
Page | 48
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.7 Shadenet house (NHMSNH FT 4 M)
40 m X 100 m =4000 Sq.mtrs.
Page | 49
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 3.8 Shadenet house (NHMSNH FT 4 M)
64 m X 64 m =4096 Sq.mtrs.
Page | 50
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.1 Shadenet house (NHMSNH FT 3.25 M)
22m X 46 m = 1012 Sq.mtrs.
Page | 51
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.2 Shadenet house (NHMSNH FT 3.25 M)
40m X 52 m = 2080 Sq.mtrs.
Page | 52
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.3 Shadenet house (NHMSNH FT 3.25 M)
52m X 58 m = 3016 Sq.mtrs.
Page | 53
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.4 Shadenet house (NHMSNH FT 3.25 M)
40m X 76 m = 3040 Sq.mtrs.
Page | 54
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.5 Shadenet house (NHMSNH FT 3.25 M)
40m X 100 m = 4000 Sq.mtrs
Page | 55
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.6 Shadenet house (NHMSNH FT 3.25 M)
64m X 64 m = 4096 Sq.mtrs.
Page | 56
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.7 Shadenet house (NHMSNH FT 3.25 M)
46 m X 88 m = 4048 Sq.mtrs.
Page | 57
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Design No. 4.8 Shadenet house (NHMSNH FT 3.25 M)
58 m X 70 m = 4060 Sq.mtrs.
Page | 58
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
ANNEX-2
+) ½þÊ®úiÉMÉÞ½þ =¦ÉÉ®úhÉÒºÉÉ`öÒ ±ÉÉMÉhÉÉ-ªÉÉ ºÉÉʽþiªÉÉÆSÉä iÉÉÆÊjÉEò ÊxÉEò¹É
½þÊ®úiÉMÉÞ½þÉSªÉÉ Ê´ÉÊ´ÉvÉ ¨ÉÉìbä÷±ÉxÉÖºÉÉ®ú ´É |ÉEòÉ®úÉxÉÖºÉÉ®ú +ɴɶªÉEò +ºÉhÉÉ-ªÉÉ ºÉÉʽþiªÉÉÆSÉä iÉÉÆÊjÉEò ÊxÉEò¹É {ÉÖÊfø ±É|ɨÉÉhÉä +ɽäþiÉ.
iªÉÉxÉÖºÉÉ®ú ±ÉɦÉÉlÉÔxÉÒ ºÉÉʽþiªÉÉÆSÉÉ ´ÉÉ{É®ú ½þÊ®úiÉMÉÞ½þÉSªÉÉ =¦ÉÉ®úhÉÒºÉÉ`öÒ Eò®úÉ´ÉÉ.
१) ºÉ´ÉǺÉÉvÉÉ®úhÉ |ÉEòÉ®úSÉä ½þÊ®úiÉMÉÞ½ (NHM-OVPH) =¦ÉÉ®úhÉÒºÉÉ`öÒ Ê´ÉÊ´ÉvÉ ¦ÉÉMÉ/¤ÉɤÉÓºÉÉ`öÒSÉä
iÉÉÆÊjÉEò ÊxÉEò¹É.
Table No. 1 : General Specifications for OVPH models
1.
2.
All members of the structure should be made of Galvanized Iron (GI) with minimum 50
microns thick galvanizing
All members should be of minimum 2 mm thickness which shall be verified by equivalent
minimum weight as follows- 2 ½"-3.75Kgs/mtr.; 2"-2.9Kgs/mtr.; 1 ½”"-2.3Kgs/mtr.;-1 ¼"2.1Kgs/mtr.; 1"-1.6Kgs/mtr.; ¾"-1.25Kgs/mtr.; ½"-1Kgs/mtr.
3.
4.
5.
Members should not be wielded to one another, but fixed with the nut bolts
Members should not have any weilded joints upto 6.5 mtrs. length
6.
The shape of the Polyhouse should be according to aerodynamic so as to reduce the impact of
wind & consequent damage of Polyhouse. The structure should also follow aerodynamics along
all four sides with corridors.
Grid should be of 4m X 8m
7.
8.
9.
10.
11.
12.
The overall slope of the foundation should be between 1.25 % and 2 % so as to keep the Gutter
slope accordingly
Top height should be minimum 6 mts for Konkan, Marathawada & W. maharashtra and
6.5 mtrs for Khandesh and Vidarbh.
Gutter height should be minimum 4 mtrs.
Side curtains should be of minimum 2m height for OVPH of area below 1008 Sq.mtrs. and 3m
for area above 1009 Sq.mtrs.
Top Vent should be of minimum 0.8m height
Cross bracing should be provided as follows- Horizontal cross bracing on 4 corners of
Polyhouse (For all models)Vertical Cross bracings on 4 corners of Polyhouse (For all models
above 1009 Sq.mtrs.)
Page | 59
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
2) ºÉ´ÉǺÉÉvÉÉ®úhÉ |ÉEòÉ®úSªÉÉ
ÊxÉEò¹É
(NHM-OVPH)
½þÊ®úiÉMÉÞ½þɺÉÉ`öÒ ´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ VÉÒ. +ɪÉ. {ÉÉ<Ç{ÉSÉä iÉÉÆÊjÉEò
Table No. 2 Specification of GI pipe for OVPH Models
Sr.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Particulars
Tor bar for hold-fast in foundation
Columns
Foundations for all columns
Truss bottom-Big
Truss bottom-Small Sides & Front/Back(F/B)
All Corridors
Top cross
Corridor support members(sides & F/B)
Trusses-Top curved members
Purlins-(All except curtain)
Door column
Door
Purlins-Curtain
Truss members (minimum 5 nos per Bay)
Cross bracing
Door top
Curtain-Universal
Runners (for top UV Film)
Curtain pipe
Curtain handle
Curtain guide
Size
(Outside
Diameter)
8mm
76 mm
60 mm
60 mm
48 mm
48 mm
43 mm
43 mm
43 mm
43 mm
43 mm
33 mm
33 mm
33 mm
33 mm
33 mm
33 mm
27 mm
27 mm
27 mm
21 mm
Size
(Nominal
Diameter)
n.a.
2 ½”
2”
2”
1 ½”
1 ½”
1 ¼”
1 ¼”
1 ¼”
1 ¼”
1 ¼”
1”
1”
1”
1”
1”
1”
¾”
¾”
¾”
½”
Page | 60
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
3) =SSÉ iÉÆjÉYÉÉxÉÉ´É®ú +ÉvÉÉÊ®úiÉ ½þÊ®úiÉMÉÞ½þÉSªÉÉ
(NHM-CCPH)
=¦ÉÉ®úhÉÒºÉÉ`öÒ ºÉ´ÉǺÉÉvÉÉ®úhÉ iÉÉÆÊjÉEò ÊxÉEò¹É-
Table No. 3 General Specification for CCPH Models
1
2
All members of the structure should be made of Galvanized Iron (GI) with minimum 50
microns thick galvanizing
All members should be of minimum 2 mm thickness which shall be verified by equivalent
3
4
5
Members should not be wielded to one another, but fixed with the nut bolts
Members should not have any weilded joints upto 6.5 mtrs. Length
6
The shape of the Polyhouse should be according to aerodynamic so as to reduce the impact of
wind & consequent damage of Polyhouse. The structure should also follow aerodynamics
along two sides with corridors.
Grid should be of 4m X 8m
Top height should be minimum 4.5 mtrs.
Gutter height should be minimum 3 mtrs.
Excavation of top loose soil upto 0.45 m deep & 0.3m wide, Brick/UCR solling below soil
surface of 0.2m depth, 0.1m PCC of 1:4:8, 0.23m Brick wall of 0.15m height below soil
surface & 0.6m height above ground surface below the pads & below the fans. Brick wall
above ground surface shall be duly plastered with two coats of exterior cement paint. OR A
rigid independent strcuture should be provided for installation of Fans, which shall be strong
enough so as to give proper suppport to the Fans & prevent the vibrations from being
transferred to the polyhouse structure.
Enterance Room should be provided which shall be of minimum 2mtrs Wide X 2mtrs.Length
X 2.4mtrs. Height, with double door entry system.
7
8
9
10
11
12
13
The overall slope of the foundation should be between 1.25 up to % and 2 % so as to keep the
Gutter slope accordingly
Distance between the Fans & Pads should not exceed 32mtrs
Pads should be necessarily be of Cellulose & no other material shall be allowed
Page | 61
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
४÷)
=SSÉ iÉÆjÉYÉÉxÉÉ´É®ú +ÉvÉÉÊ®úiÉ (NHM-CCPH) ªÉÉ |ÉEòÉ®úÉSªÉÉ ½þÊ®úiÉMÉÞ½þÉSªÉÉ =¦ÉÉ®úhÉÒºÉÉ`öÒ
´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ VÉÒ.+ɪÉ.{ÉÉ<Ç{ÉSÉä iÉÉÆÊjÉEò ÊxÉEò¹É.
Table No. 4 : Specifications of GI pipe for CCPH models
(1) All members shall be of minimum 2 mm thickness.
(2) All members should be made of Galvanized Iron (GI).
(3) Members should not be welded but fixed with the nut bolts.
(4) Members should not have any welded joints,
Sr.No.
Particulars
Size
(Outside
Diameter)
Size
(Nominal
Diameter)
8mm
n.a.
1
Tor bar for hold-fast in foundation
2
All Columns
76 mm
2 ½”
3
Foundations for all Columns
60 mm
2”
4
Truss Bottom-Big
60 mm
2”
5
Truss Bottom-Small F/B
48 mm
1 ½”
6
Truss Bottom-Small Sides
48 mm
1 ½”
7
All Corridors
48 mm
1 ½”
8
Corridor support members
43 mm
1 ¼”
9
Trusses-Top curved members
43 mm
1 ¼”
10
Purlins
43 mm
1 ¼”
11
Door Column
43 mm
1 ¼”
12
Door
33 mm
1”
13
Truss members (minimum 5 nos
per Bay)
33 mm
1”
14
Cross bracing
33 mm
1”
15
Door Top
33 mm
1”
Page | 62
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
5) ½þÊ®úiÉMÉÞ½þÉSªÉÉ ºÉ´ÉǺÉÉvÉÉ®úhÉ (NHM-OVPH) ´É ´ÉÉiÉÉ´É®úhÉ ÊxɪÉÆÊjÉiÉ
|ÉEòÉ®úɺÉÉ`öÒ ´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ <iÉ®ú ºÉÉʽþiªÉÉÆSÉä iÉÉÆÊjÉEò ÊxÉEò¹É.
(NHM-CCPH)
ªÉÉ
Table No. 5: Specifications of other items for OVPH and CCPH models
Sr.No. Particulars
1
Clamps
2
Nuts & bolts
3
Insect net
Laminated
wovenPE film
for apron
Aluminium
profiles
4
5
6
Springs
7
Screws
8
Shade net
9
UV film
Specification
Minimum Pregalvanized G P Sheet 2.0mm thick duly zinc
plated.Which resist 400hrs of Salt spray test.
Minimum 10mm High tensile duly zinc Plated. Which
resist 150hrs of Salt spray test. For structure joint 6-mm8mm shall be allow for pertins titting gutter to perlin
40mesh/50 mesh UV stabilised below curtains.
UV stabilized (minimum 140 gsm)and having minimum
tearing strenth 140 Kg/m2 should be used for side Apron
which shall be of 1m to 1.5m above ground level.
Minimum 190grms per mtr.
GI Profiles shall not be allowed.
Minimum 2.3mm spring steel duly zinc plated& hardened
/plastic/powder coated.
Minimum 20 mm Self drilling tapping.
35% or 50% UV stabilized shadenet preferably white
colour. 95 GSm for 50 % and 75 GSM for 35%
Minimum 200 microns thick, UV stabilized diffused
Multilayer (Min 3 Layers)
Made out of minimum 1mm thick GI or 1.2 mm aluminium
HardenedSheet.& minimum 500 mm perimeter trapezoidal
section.
Door should be made out of UV stabilized FRP with
minimum 1mm thickness.& fixed on SS heavy Hinges.
10
Gutter
11
Door
11
GI wire for
Shednet Support
12
Pulleys assembly
with nuts & bolts
13
Plastic rope
14
Curtain rings
UV stablised ropes should be used with minimum 4mm
thickness.
Visibly strong & effective
15
Curtain clamps
Visibly strong & effective.
Minimum 12 Gauge G.I wire/PEI min. 2.2 thickess should
be used to fix shadenet with sliding arrangement for
opening & closing as per requirement.
According to standard specification.
Page | 63
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
6) =SSÉ iÉÆjÉYÉÉxÉÉ´É®ú +ÉvÉÉÊ®úiÉ (NHM-CCPH) ªÉÉ |ÉEòÉ®úÉSªÉÉ ½þÊ®úiÉMÉÞ½þɨÉvªÉä ´ÉÉiÉÉ´É®úhÉ ÊxɪÉÆjÉhɺÉÉ`öÒ ´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ
Ê´ÉÊ´ÉvÉ ºÉÉʽþiªÉ ´É ={ÉEò®úhÉÉÆSÉä iÉÉÆÊjÉEò ÊxÉEò¹É.
Table No. 6 : Specifications of climate control equipments for CCPH models
1
Exhaust FANS
(Minimum 50" size &
having about 20000 to
25000 cfm)
For effective cooling inside the green house Exhaust Fans having heavy galvanised
steel box frame each having capacity of minimum 20000 CFM at 0 static pressure.
The number of Fans shall be calculated as per the requirement so as to maintain
temperature inside the green house as followsbelow When ambient temperature is 42 C & ambient humidity is 35oC between 3040%
BelowWhen ambient temperature is 42 C & ambient humidity is 37oC between 6070%
Fans shall have SS blades with aerodynamic design so as to give maximum efficiency
with minimum power consumption, and belt driven axcial flow fan, having centrally
auto openable louvers & GI sheet & Grills.
2
Cellulose
CoolingPADS
4" or 6" thick impregnated cellulose cooling pads of suitable area,calculated so
as to maintain the temperature inside the green house as follows
below When ambient temperature is 42 C & ambient humidity is 35oC between 3040%
BelowWhen ambient temperature is 42 C & ambient humidity is 37oC between 6070%
The Pads shall be stifff enough to make it self supporting even at
continuous water flow and at the same time is efficiently protected against any
decomposition caused by water and air, resulting in minimum working life
span of 3 years.
3
4
WATER
CIRCULATING
SYSTEM FOR PADS
FOGGING SYSTEM
Water circulating system shall comprise of all Aluminium Frame, Gutter & Cover,
PVC Pipe for water distribution on cooling pad so as to wet the pad completely.
Fogging system, including 16mm Lateral Pipes at a spacing of 3 mtrs. & make 4 way
with antileak distance Foggers at spacing of max. 3 mtrs.PVC submain shall be aloud
it buried under ground HDPE Submain, Ball valves, Fittings & accessories, including
Disc/Screen Filter & Water storage tank (minimum 1000ltrs.)PVC submain shall be
allowed it buried under ground.
Brass/SS/PVC Ball Valves, Flush Valves, Disc/Screen Filter, Water storage Tank of
min1000 Ltrs. Capacity, Electricity Pump set of ISI mark of sufficient capacity so as
to keep the pads always wet.
5
CONTROLL HEAD
FOR WATER
CIRCULATING
SYSTEM
6
Control Head for
Fogging system
Control head consisting of1) Water storage tank having capacity to hold minimum water requiredfor
continuous operation of fogging system for 1 hour,
2) ISI marked Pump having sufficient discharge so as to operate all thefoggers
at any given time, at minimum pressure of 35mtrs. at the pointof emitter
3) Sand Filter & Disc Filters having capacity required for above system
4) By-pass assembly, valves, pressure gauge, fitting & accessories
5) Powder coated Panel box including digital timer, MCB, contactors,relays,
auto starter, auto manual switch, Voltmeter, wiring, e
7
CONTROLLER
8
CONTROL PANEL
BOX
For maintaining the proper & adequate temperature & humidity simultaneously inside
the Polyhouse a microprocessed based programmable temperaure, Humidity & time
based Conroller. User Friendly, with 1 Humidity Probe & 2 temperaure Probes shall
be installed. The Controller shall controll Pad Pump, Fogger Pump & Fans
individually for controlling climate. The controller shall be provided with suitable
constant voltage transformer for the safe working of the controller.
All electricals shall be enclosed inside a control panel duly powder coated and
consisting of a set of MCB, relays, contactors, manual/Auto Mode including wiring
ISI mark copper cable of suitable size & inclosed conduit pipe MCB seperate set for
each Fans, Pump of Pad & Pump of Foggers..
9 Wiring
All electricals shall be connected by using ISI marked copper wire cableof
required size. These wires shall be enclosed in ISI marked conduit pipe. The
entire electrical work shall be certified by licenced electrical engineer.
Page | 64
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
7) BäÎSUôEò JÉSÉÇ (Additional Cost forOptional Items) : (½þÊ®úiÉMÉ޽ɺÉÉ`öÒþ)
½þÉ JÉSÉÇ BäÎSUôEò (Optional) +ɽäþ.´É®úÒ±É|ɨÉÉhÉä ½þÊ®úiÉMÉÞ½þÉSªÉÉ |ÉEòÉ®úÉxÉÚºÉÉ®ú ´É +ÉEòÉ®ú¨ÉÉxÉÉxÉÚºÉÉ®ú `ö®úÊ´ÉhªÉÉiÉ
+ɱÉ䱪ÉÉ JÉSÉÉÇSªÉÉ +ÆnùÉVÉ{ÉjÉEòÉƨÉvªÉä xɨÉÚnù Eäò±Éä±ÉÉBäÎSUôEòJÉSÉÇ ½þÉ ½þÊ®úiÉMÉÞ½þÉSªÉÉ =¦ÉÉ®úhÉÒºÉÉ`öÒ ±ÉÉMÉhÉÉ-ªÉÉ ºÉÉʽþiªÉÉÆSªÉÉ Bä´ÉVÉÒ
{ɪÉÉǪÉÒ Eäò±Éä±ÉÉ +ºÉÉ´ÉÉ. iɺÉäSÉ ªÉÉ BäÎSUôEò º´É°ü{ÉÉSªÉÉ JÉSÉÉǨÉvªÉä JÉɱÉÒ±É|ɨÉÉhÉä ºÉÉʽþiªÉÉSÉÉ {ɪÉÉǪÉÒ ´ÉÉ{É®ú Eäò±ÉÉ MÉ䱪ÉɺÉ
BEÚòhÉ |ÉEò±{É JÉSÉÉÇSªÉÉ VÉɺiÉÒiÉ VÉɺiÉ 5 ]õCEäò ¨ÉªÉÉÇnùäiÉSÉ ºÉnù®úSÉÉ BäÎSUôEò JÉSÉÇ näùªÉ ®úÉʽþ±É. ±ÉɦÉÉlÉÔxÉä ºÉnù®úSÉÉ BäÎSUôEòJÉSÉÇ
Eäò±ÉÉ xɺɱªÉÉºÉ ªÉÉ ¤ÉɤÉÒ+ÆiÉMÉÇiÉ +xÉÖnùÉxÉ näùªÉ ½þÉähÉÉ®ú xÉɽþÒ. iɺÉäSÉ ±ÉɦÉÉlÉÔxÉä +¶ÉÉ|ÉEòÉ®úSÉÉ BäÎSUôEò {ɪÉÉǪÉÒ JÉSÉÇ Eäò±ªÉÉSÉÒ
JÉÉjÉÒ ºÉƤÉÆÊvÉiÉ +ÊvÉEòÉ-ªÉÉxÉä Eò®úÉ´ÉÒ.
 xÉèºÉÌMÉEò ´ÉɪÉÖÊ´ÉVÉxÉ ´É =SSÉiÉÆjÉYÉÉxÉÉ´É®ú +ÉvÉÉÊ®úiÉ ½þÊ®úiÉMÉÞ½þɺÉÉ`öÒ BäÎSUôEò JÉSÉÉÇSÉÉ iÉ{ɶÉÒ±É.
Tabel No. 7
+.Gò.
{ɪÉÉǪÉÒ ºÉÉʽþiªÉ ´ÉÉ{É®úÉSÉÉ iÉ{ɶÉÒ±É
1
¶Éäb÷xÉä]õSªÉÉ (]äõ{ÉxÉä]õ) Bä´ÉVÉÒ ¶Éäb÷xÉä]õSÉÉ (¨ÉÉäxÉÉäxÉä])
´ÉÉ{É®ú Eäò±ªÉɺÉ(Use of Mononet instead of
Shadenet (Tape net)
2
¶Éäb÷xÉä]õSªÉÉ (]äõ{ÉxÉä]õ) Bä´ÉVÉÒ GòÉä¨ÉìÊ]õEò xÉä]õSÉÉ
´ÉÉ{É®ú Eäò±ªÉÉºÉ (Use of Chromatic net instead
4
(+) °ü. 10/- |ÉÊiÉ SÉÉè.¨ÉÒ.
SÉÉè.¨ÉÒ.
(+) °ü. 25/- |ÉÊiÉ SÉÉè.¨ÉÒ.
SÉÉè.¨ÉÒ.
(+) °ü. 65/- |ÉÊiÉ SÉÉè.¨ÉÒ.
SÉÉè.¨ÉÒ.
( ) °ü. 10/- |ÉÊiÉ SÉÉè.¨ÉÒ.
ÊEò±ÉÉä.
(+) °ü. 65/- |ÉÊiÉ ÊEò±ÉÉä.
)
¡òCiÉ ¤ÉÉVÉÚ±ÉÉ ÊEò]õEò®úÉävÉEò VÉɳýÒ Bä´ÉVÉÒ
¶Éäb÷xÉä]õSÉÉ (]äõ{ÉxÉä]õ)´ÉÉ{É®ú Eäò±ªÉɺÉ(Use of
Shadenet (Tape net) instead of Insect netQuantity only on sides
5
SÉÉè.¨ÉÒ.
)
¶Éäb÷xÉä]õSªÉÉ (]äõ{ÉxÉä]õ) Bä´ÉVÉÒ lɨÉDZÉxÉä]õSÉÉ ´ÉÉ{É®ú
Eäò±ªÉÉºÉ (Use of Thermal net instead of
Shadenet (Tape net)
ºÉ´ÉǺÉÉvÉÉ®úhÉ{ÉhÉä nù®úɨÉvÉÒ±É ¡ò®úEò
)
of Shadenet (Tape net)
3
{ÉÊ®ú¨ÉÉhÉ
(ªÉÚÊxÉ]õ)
_
)
¨ÉÉä`ö¬É +ÉEòÉ®úÉSªÉÉ VÉÒ.+ɪÉ.MÉ]õ®ú¶ÉÒ]õSÉÉ ´ÉÉ{É®ú
Eäò±ªÉɺÉ(Use of Higher size of GI gutter sheet)
(estimate extra weight)
)
Page | 65
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Tabel No 8. List of Optional items that can be considered for subsidy if actually installed on
site & invoices provided
Subsidy will be 50% of - "Maximum Cost or actual cost as per invoice" whichever is less
Maximum Maximum cost to be considered for following
Sr. List of Items & their specifications
Cost in
OVPH/SNH models
No.
Rupees
1
Lux meter digital
2 Wet bulb Dry bulb thermometer
3 Tensiometers
Tensiometer Standard model fitted with
suction meter, 0-100 centibar vacuum,
with screwable ceramic tip and translucent
head assembly with water trap: following
sizes
15cm
30cm
45cm
60cm
75cm
90cm
AccessoriesTensiometer insertion coring tool
Hand suction Tensiometer priming syringe
Tensiometer gauge recording chart
(monthly) – pack of 12
Air circulating Fans ( to be used only
4
when air circulation is limited due to
following reasons-1) big area , 2) Less
wind flow, 3) use of insect nets/bionets on
sides & subsidy will only be applicable for
structures above 2000 Models)
5000
1500
4778
4918
5123
5289
5391
5557
2223
881
256
1000
5000
1500
2000
5000
1500
3000
5000
1500
4000
5000
1500
9836
9836
10246
10246
9836
10246
9836
10246
2223
881
256
2223
881
256
2223
881
256
2223
881
256
0
42000
54000
60000
Each air circulating fans should have
minimum 6 nos. of SS blades with
following specifications as per the sizes
Number of fans to be allowed for subsidy
should be limited as follows
Model-1000
Notallowed
Model-2000
Maximum 7 Nos.
Model-3000
Maximum 9 Nos.
Model-4000
Size
18"
24"
30"
36"
Maximum 10
Nos.
4500
5000
6000
7500
Page | 66
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
5
Fertilizer injecting unitsa
Gator pump
b
Venturi
c
HTP single piston pump (with
electric motor & panel box)
d
HTP double piston pump (with
electric motor & panel box)
Self acting diaphragm
pump
e
Self acting piston pump
6 PH measuring devices
7 EC measuring devices
8 Cladding material used
The cost will be calculated by multiplying
the total area of cladding material used (as
given in the detailed estimates) by the
following additional cost which is given in
Rs. Per Sq.mtrs.
i) Cladding material used on Roof
a
Shadenet (Mononet) instead of
Shadenet (Tape net)
b
Insect net instead of Shadenet
(Tape net)
Chromatic coloured net (the
c
supplier should warranty that
the colour will not fade for
minimum 3 years) instead of
Shadenet (Tape net)
Thermal net instead of Shadenet
(Tape net) to be allowed only
for roof
ii)Cladding material used on sides
Shadenet (Tape net) instead of
Insect net
Total in Rupees
Rate Rs Per Sq.mtrs.
d
5000
3500
25000
25000
25000
25000
25000
10000
10000
10000
10000
10000
10000
10000
10000
54000
108000
162000
216000
129942
226942
293942
354942
130
113
98
89
35000
10000
18000
10000
10000
10
15
20
60
-15
Page | 67
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of Control head for Irrigation (Item No F(a) mentioned in detail
estimates of all OVPH, SNH-RT, SNHFT models) systems for various models
1
Sr.
No.
I
Table No.9.1: NHM(OVPH/SNH-RT/SNH-FT) - 500 models
Submain Discharge
Control headModel
NHM-OVPH-500
LPH
500
Size (m)
20
28
Drip
Foggers
Area
560
4978
1742
(Sq.mtrs.)
Particulars
Rate (Rs)
Unit
Quantity
Estimated
Amount
Rupees
Cost of material
1
Concrete Bed - 6 Sq.mtrs.
6000
Unit
0
0
2
Pump 1.5 HP
9500
Nos.
1
9500
3
Water Storage Tank
5
Ltrs.
1000
5000
4
Pane Box with timer
7000
Nos.
1
7000
5
Sand Filter 10 m3/hr.
11500
Nos.
1
11500
6
Disc Filter 10 m3/hr.
3000
Nos.
1
3000
7
GI fittings & accessories
2000
Nos.
1
2000
8
By pass assembly
1500
Nos.
1
1500
Sub Total
VAT (compulsory)
39500
5%
Total Material Cost
II
Installation cost
41475
5%
Grand total
Unit rate
1975
2074
43549
Rs/Sq.mtrs.
77.77
Page | 68
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No.9.2:NHM(OVPH/SNH-RT/SNH-FT) - 1000 models
2
Control head1000
Model
Size (m)
Area(Sq.mtrs.)
Particulars
Sr.
No.
A
28
1008
Rate (Rs)
Submain Discharge LPH
36
Drip
Foggers
8960
3136
Unit Quantity Amount
Estimated Rupees
Cost of material
1
2
3
4
5
6
7
8
B
NHM-OVPH-500
Concrete Bed - 6 Sq.mtrs.
Pump 2.0 HP
Water Storage Tank
Pane Box with timer
Sand Filter 10 m3/hr.
Disc Filter 10 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
6000
15500
5
7000
11500
3000
2000
1500
5%
5%
Rs/Sq.mtrs.
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Nos.
1
1
3000
1
1
1
1
1
6000
15500
15000
7000
11500
3000
2000
1500
61500
3075
64575
3229
67804
67.27
Page | 69
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No.9.3 : NHM(OVPH/SNH-RT/SNH-FT) - 2000 models
3
Control head2000
Sr.
No.
A
NHM-OVPH-500
Size (m)
Area(Sq.mtrs.)
Particulars
36
2016
Rate (Rs)
Submain Discharge
LPH
56
Drip
17920
Foggers
6272
Unit
Quantity
Amount
Estimated
Rupees
Cost of material
1
2
3
4
5
6
7
8
B
Model
Concrete Bed - 6 Sq.mtrs.
Pump 3.0 HP
Water Storage Tank
Pane Box with timer
Sand Filter 25 m3/hr.
Disc Filter 25 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
6000
18500
5
7000
20500
6500
4000
1500
5%
5%
Rs/Sq.mtrs.
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Nos.
1
1
7000
1
1
1
1
1
6000
18500
35000
7000
20500
6500
4000
1500
99000
4950
103950
5198
109148
54.14
Page | 70
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
4
Table No.9.4 : NHM(OVPH/SNH-RT/SNH-FT) - 3000 models
Control headModel
NHM-OVPH-500
Total Discharge LPH
3000
Size (m)
52
60
Drip
Foggers
Area
3120
27733
9707
(Sq.mtrs.)
Sr.
No.
A
Particulars
Rate (Rs)
Unit
Quantity Amount
Estimated Rupees
1 Concrete Bed - 6 Sq.mtrs.
6000
Unit
2
12000
2 Pump 5.0 HP
22500
Nos.
1
22500
3 Water Storage Tank
5
Ltrs.
10000
50000
4 Pane Box with timer
7000
Nos.
1
7000
5 Sand Filter 25 m3/hr.
20500
Nos.
1
20500
6 Disc Filter 25 m3/hr.
6500
Nos.
1
6500
7 GI fittings & accessories
5000
Nos.
1
5000
8 By pass assembly
1500
Nos.
1
1500
Cost of material
Sub Total
VAT (compulsory)
125000
5%
Total Material Cost
B
Installation cost
131250
5%
Grand total
Unit rate
6250
6563
137813
Rs/Sq.mtrs.
44.17
Page | 71
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No.9.5 : NHM(OVPH/SNH-RT/SNH-FT) - 4000 models
5
Control head4000
Sr.
No.
A
Particulars
NHM-OVPH-500
40
100
4000
Rate (Rs)
Unit
6000
22500
5
7000
20500
6500
5000
1500
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Nos.
Total Discharge LPH
Drip
Foggers
35556
12444
Quantity
Estimated
Amount
Rupees
Cost of material
1
2
3
4
5
6
7
8
B
Model
Size (m)
Area
(Sq.mtrs.)
Concrete Bed - 6 Sq.mtrs.
Pump 5.0 HP
Water Storage Tank
Pane Box with timer
Sand Filter 25 m3/hr.
Disc Filter 25 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
5%
5%
Rs/Sq.mtrs.
2
1
12500
1
1
1
1
1
12000
22500
62500
7000
20500
6500
5000
1500
137500
6875
144375
7219
151594
37.90
Page | 72
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
 ¶Éäb÷xÉä]õ ½þÉ>ðºÉSªÉÉ ®úÉ>Æðb÷ ]õÉ<Ç{É
(RT)
´É }±Éì]õ ]õÉ<Ç{É
(FT)
|ÉEòÉ®úɺÉÉ`öÒ ºÉɨÉÉʪÉEòò iÉÉÆÊjÉEò ÊxÉEò¹É {ÉÖføÒ±É|ɨÉÉhÉä +ɽäþiÉ.
Common Specifications for FT and RT models
Note: 1) All pipes should be made of Galvanized Iron (GI).
2) All pipes shall be of minimum 2 mm thickness.
3) Pipes should not be welded but fixed with the nut bolts.
4) Pipe should not have any wielded joint up to 6 meters
5) Height for FT should be 4.00 meter and LC model should beminimum 3.25
6) Height for RT model should be minimum 5.00 m. at the centre,
Height -5 m. & side height -4m and Span 4 X 6 m
 ¶Éäb÷xÉä]õ ½þÉ>ðºÉSªÉÉ RT |ÉEòÉ®úɺÉÉ`öÒ ´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ VÉÒ.+ɪÉ. {ÉÉ<Ç{ÉSÉä iÉÉÆÊjÉEò ÊxÉEò¹É {ÉÖføÒ±É|ɨÉÉhÉä +ɽäþiÉ.
Table No. - 1
T
RT Models – 6 X 4 m, Center Height -5m and Sideheight-4m More Height model
Size
Size
Sr.No.
Particulars
(Nominal Diameter)
(Outside Diameter)
1
Tor bar for hold-fast in
foundation
8mm
n.a.
2
Foundation for columns
48mm
1½“
3
Columns
60mm
2’’
4
Truss bend
48mm
1½“
5
Purlins
43mm
1¼“
6
Truss Bottom
43mm
1¼“
7
Truss Member
43mm
1 ¼"
8
Door
33mm
1”
9
Door Coloumn
43mm
1 ¼"
10
Door top
33mm
1”
Corridor (Hocky)
No Corridors
Page | 73
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No. -2: RT Models – 6 X 4 m, Center Height -4 m Less Height model
Size
Size
Sr.No.
Particulars
(Nominal Diameter)
(Outside Diameter)
1
Tor bar for hold-fast in
foundation
8mm
n.a.
2
Foundation for columns
48mm
1½“
3
all columns
60mm
2“
4
Truss bend
48mm
1½“
5
Purlins
43mm
1¼“
6
Truss Bottom
33mm
1”
7
Truss Member
33mm
1”
8
Door
33mm
1”
9
Door Coloumn
33mm
1”
10
Door top
33mm
1”
11
Corridor (Hocky)
No Corridors
Page | 74
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
¶Éäb÷xÉä]õ ½þÉ>ðºÉSªÉÉ
FT|ÉEòÉ®úɺÉÉ`öÒ
´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ VÉÒ.+ɪÉ. {ÉÉ<Ç{ÉSÉä iÉÉÆÊjÉEò ÊxÉEò¹É {ÉÖføÒ±É|ɨÉÉhÉä +ɽäþiÉ.
Table No. -3: FT Models - Span - 4X6m,Height -4mMore height Model
Sr.No.
1
2
3
Size
Size
(Outside Diameter)
(Nominal Diameter)
Particulars
Tor bar for hold-fast in
foundation
Foundation for main
Columns
n.a.
8mm
1½“
48mm
1 ¼”
Foundation for periphery
middle Columns
43mm
4
Main Coloumns
60 mm
5
Periphery Middle
Coloumns
48mm
6
Truss
43 mm
1 ¼”
7
Purlin
43 mm
1 ¼”
8
Main Corridor
48 mm
1½“
9
Middle Corridor
43 mm
1 ¼”
10
Door
33 mm
1”
11
Door coloumn
43 mm
1 ¼”
12
Door corridor
43 mm
1 ¼”
13
Door top
33 mm
1”
14
2m Wide periphery corridors on all 4 sides shall be used
2”
1½“
Page | 75
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Eò¨ÉÒ =ÆSÉÒSÉä ¶Éäb÷xÉä]õ ½þÉ>ðºÉSªÉÉ
FT|ÉEòÉ®úɺÉÉ`öÒ
´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ VÉÒ.+ɪÉ. {ÉÉ<Ç{ÉSÉä iÉÉÆÊjÉEò ÊxÉEò¹É {ÉÖføÒ±É|ɨÉÉhÉä +ɽäþiÉ.
Table No. -4: FT Models - Span –6 X6m, Height -3.25 m Less height Models
Sr.No.
1
2
3
Particulars
Tor bar for hold-fast in
foundation
Foundation for main
Columns
Size
Size
(Outside
(Nominal
Diameter)
Diameter)
n.a.
8mm
1 ¼”
43mm
1”
Foundation for
periphery middle
Columns
33mm
4
Main Coloumns
48mm
5
periphery middle
Columns
43 mm
6
Truss
33 mm
1”
7
Purlin
33 mm
1”
8
Main Corridor
43 mm
1 ¼”
9
Middle Corridor
33 mm
1”
10
Door
33 mm
1”
11
Door coloumn
33 mm
1”
12
Door corridor
33 mm
1”
13
Door top
33 mm
1”
14
1 ½”
1 ¼”
2m Wide periphery corridors on all 4 sides shall be used
Page | 76
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
¶Éäb÷xÉä]õ ½þÉ>ðºÉSªÉÉ
RT ´É FT |ÉEòÉ®úɺÉÉ`öÒ
´ÉÉ{É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ <iÉ®ú ºÉÉʽþiªÉÉÆSÉä iÉÉÆÊjÉEò ÊxÉEò¹É {ÉÖføÒ±É|ɨÉÉhÉä+ɽäþiÉ.
Table No. -5: Specifications of other items for FT and RT models
Sr.No.
Particulars
Specifications
1
Clamps
Made out of pre galvanised sheet having
minimum 2.5mm thickness & shall resist 400
hours of salt spray test
High tensile nuts & bolts of minimum 8mm thick,
duly zinc plated & shall resist 150 hours of salt
spray test
40mesh/50 mesh UV stabilised & having
minimum weight of 110 gsm
UV stabilized, having minimum 100 gsm weight
& minimum tear strength of 100 Kg/cm2 should
be used for side apron which shall be minimum
1m above ground level
2
Nuts & bolts
3
Insect net
4
Laminated woven
film for apron
5
Aluminium profiles Minimum 190 gms per mtr.
6
Springs
7
Screws
8
Shade net Tape net
9
Shade net Mono
net
10
Door
Minimum 2.3 mm thick spring steel, duly
hardened & zinc plated/plastic coated/powder
coated
Min. 20 mm Self drilling tapping
35% to 50% UV stabilized shadenet, preferably
white colour & having minimum 95 gsm for 50 %
& 75 gsm for 35 %
35% to 50% UV stabilized shadenet, preferably
white colour & having minimum 95 gsm for 50 %
& 75 gsm for 35 %
Door should be made out of UV stabilized FRP
with minimum 1mmthickness.& fixed on SS
heavy Hinges.
Page | 77
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of Control head for Foggers -Item No A (21) mentioned in detail
estimates of all CCPH models
Table No.10.1 : NHM CCPH - 500 models
1
Control head500
Sr.
No.
A
NHM-OVPH-500
Size (m)
Area
(Sq.mtrs.)
Particulars
20
28
560
Rate (Rs)
Unit
6000
9500
5
11500
3000
2000
1500
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Submain Discharge
LPH
Drip
Foggers
4978
1742
Quantity
Estimated
Amount
Rupees
Cost of material
1
2
3
4
5
6
7
B
Model
Concrete Bed - 6 Sq.mtrs.
Pump 1.0 HP
Water Storage Tank
Sand Filter 10 m3/hr.
Disc Filter 10 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
5%
Rs/Sq.mtrs.
1
1
2000
1
1
1
1
6000
9500
10000
11500
3000
2000
1500
43500
0
43500
2175
45675
81.56
Page | 78
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No.10.2 : NHM CCPH - 1000 models
2
Control head1000
Sr.
No.
NHM-OVPH-500
Size (m)
Area
(Sq.mtrs.)
Particulars
A
28
36
1008
Rate (Rs)
Unit
6000
15500
5
12500
3500
3000
1500
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Submain Discharge
LPH
Drip
Foggers
8960
3136
Quantity Amount
Estimated Rupees
Cost of material
1
2
3
4
5
6
7
B
Model
Concrete Bed - 6 Sq.mtrs.
Pump 2.0 HP
Water Storage Tank
Sand Filter 10 m3/hr.
Disc Filter 10 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
5%
Rs/Sq.mtrs.
1
1
3000
1
1
1
1
6000
15500
15000
12500
3500
3000
1500
57000
0
57000
2850
59850
59.38
Page | 79
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No.10.3 : NHM CCPH - 2000 models
3
Control head2000
Sr.
No.
A
NHM-OVPH-500
Size (m)
Area
(Sq.mtrs.)
Particulars
36
56
2016
Rate (Rs)
Unit
Submain Discharge
LPH
Drip
Foggers
17920
6272
Quantity
Estimated
Amount
Rupees
Cost of material
1
2
3
4
5
6
7
B
Model
Sub Total
6000
18500
35000
20500
6500
4000
1500
92000
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
0
92000
4600
96600
47.92
Concrete Bed - 6 Sq.mtrs.
Pump 3.0 HP
Water Storage Tank
Sand Filter 25 m3/hr.
Disc Filter 25 m3/hr.
GI fittings & accessories
By pass assembly
6000
18500
5
20500
6500
4000
1500
5%
Rs/Sq.mtrs.
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
1
1
7000
1
1
1
1
Page | 80
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No.10.4 : NHM CCPH - 3000 models
4
Control head3000
Sr.
No.
Particulars
A
NHM-OVPH-500
52
60
3120
Rate (Rs)
Unit
6000
22500
5
20500
6500
5000
1500
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Total Discharge LPH
Drip
Foggers
27733
9707
Quantity Amount
Estimated Rupees
Cost of material
1
2
3
4
5
6
7
B
Model
Size (m)
Area
(Sq.mtrs.)
Concrete Bed - 6 Sq.mtrs.
Pump 5.0 HP
Water Storage Tank
Sand Filter 25 m3/hr.
Disc Filter 25 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
5%
Rs/Sq.mtrs.
2
1
10000
1
1
1
1
12000
22500
50000
20500
6500
5000
1500
118000
0
118000
5900
123900
39.71
Page | 81
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No.10.5 :CCPH- 4000 Models
5
Control head4000
Sr.
No.
A
Particulars
NHM-OVPH-500
60
68
4080
Rate (Rs)
Unit
6000
22500
5
20500
6500
5000
1500
Unit
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Total Discharge LPH
Drip
Foggers
36267
12693
Quantity
Estimated
Amount
Rupees
Cost of material
1
2
3
4
5
6
7
B
Model
Size (m)
Area
(Sq.mtrs.)
Concrete Bed - 6 Sq.mtrs.
Pump 5.0 HP
Water Storage Tank
Sand Filter 25 m3/hr.
Disc Filter 25 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
5%
Rs/Sq.mtrs.
2
1
12500
1
1
1
1
12000
22500
62500
20500
6500
5000
1500
130500
0
130500
6525
137025
33.58
Page | 82
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of Control head for pad circulation -Item No A (20)
mentioned in detail estimates of all CCPH models
Table No. 11.1 NHM CCPH - 500 models
1
Control head500
Sr.
No.
A
NHM-OVPH-500
Size (m)
Area
(Sq.mtrs.)
Particulars
20
28
560
Rate (Rs)
Unit
Submain Discharge
LPH
Drip
Foggers
4978
1742
Quantity
Estimated
Amount
Rupees
Cost of material
1
2
3
4
5
6
B
Model
Pump 0.5 HP
Water Storage Tank
Sand Filter 10 m3/hr.
Disc Filter 10 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
7500
5
11500
3000
2000
1500
5%
Rs/Sq.mtrs.
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
1
500
1
1
1
1
7500
2500
11500
3000
2000
1500
28000
0
28000
1400
29400
52.50
Page | 83
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No. 11.2 NHM CCPH - 1000 models
2
Control head1000
Sr.
No.
NHM-OVPH-500
Size (m)
Area
(Sq.mtrs.)
Particulars
A
28
36
1008
Rate (Rs)
Unit
12500
5
12500
3500
3000
1500
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Submain Discharge
LPH
Drip
Foggers
8960
3136
Quantity Amount
Estimated Rupees
Cost of material
1
2
3
4
5
6
B
Model
Pump 1.5 HP
Water Storage Tank
Sand Filter 10 m3/hr.
Disc Filter 10 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
5%
Rs/Sq.mtrs.
1
3000
1
1
1
1
12500
15000
12500
3500
3000
1500
48000
0
48000
2400
50400
50.00
Page | 84
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No. 11.3 NHM CCPH - 2000 models
3
Control head2000
Sr.
No.
A
NHM-OVPH-500
Size (m)
Area
(Sq.mtrs.)
Particulars
36
56
2016
Rate (Rs)
Unit
15500
5
20500
6500
4000
1500
Nos.
Ltrs.
Nos.
Nos.
Nos.
Nos.
Submain Discharge
LPH
Drip
Foggers
17920
6272
Quantity
Estimated
Amount
Rupees
Cost of material
1
2
3
4
5
6
B
Model
Pump 2.0 HP
Water Storage Tank
Sand Filter 25 m3/hr.
Disc Filter 25 m3/hr.
GI fittings & accessories
By pass assembly
Sub Total
VAT (compulsory)
Total Material Cost
Installation cost
Grand total
Unit rate
5%
Rs/Sq.mtrs.
1
7000
1
1
1
1
15500
35000
20500
6500
4000
1500
83000
0
83000
4150
87150
43.23
Page | 85
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No. 12
Specifications for irrigation system -drip / mini sprinkler / overhead irrigation fas per item
no F-(b) mentioned in detail estimates of all NHM models
1 Power supply arrangement should be available at site
2 Lateral size should not be less than 16mm OD & minimum Class-II
3 Emitters spacing in drip irrigation should not be more than 0.3m
4 Emitters discharge in drip irrigation should not be more than 2lph
5 Lateral length in drip irrigation should not exceed 40 mtrs.
6 Submain should be necessarily be of HDPE
7 Mini sprinkler & overhead irrigation systems should be designed to achieve minimum
Emission Uniformity of 85%
8 If any of the above specifications are not followed then no subsidy will be sanctioned for this
item
Table No. 13
Specifications for fogging system as per item no F-(c) mentioned in detail estimates of all
NHM models
1 Power supply arrangement should be available at site
2 Lateral size should not be less than 16mm OD
3 Emitters spacing should not be less than 3m x 3m grid
4 Emitters discharge should not be more than 7.5 lph per fogger i.e. 7.5x4 =30 lph per 4-way
5 Submain should be necessarily be of HDPE
6 Lateral length should not exceed 40 mtrs.
Foggers should be able to creat droplet sizes of less than 90 microns (supported by the
7 literature)
8 Foggers pump should be operated by auto digital timers
9 Foggers should be operated at minimum 3 kg/cm2
10 Foggers should be provided with drainage prevent devices.
11 If any of the above specifications are not followed then no subsidy will be sanctioned for this
item
Page | 86
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
ANNEX-3
½þÊ®úiÉMÉÞ½þÉSªÉÉ |ÉEòÉ®úÉxÉÖºÉÉ®ú ´É +ÉEòÉ®ú¨ÉÉxÉÉxÉÚºÉÉ®ú iɺÉäSÉ iÉÉÆÊjÉEò {ÉÊ®ú¨ÉÉhÉÉxÉÚºÉÉ®ú ºÉʴɺiÉ®ú JÉSÉÉÇSÉÒ +ÆnùÉVÉ{ÉjÉEä÷
(Estimates)÷ {ÉÖføÒ±É {ÉÉxÉÉ´É®ú Ênù±ÉÒ +ɽäþiÉ. (Table No. 1.1 to 2.4)
The detail estimates of NHM-OVPH models
Table No.1.1 The detail estimates of NHM-OVPH-500 model
Model
NHM-OVPH-500
Structural material
G.I. Pipes
Size
560 sq m
Dimensions
20 m x 28 m
28m x 20 m
Height
Minimum 6.5 m at center
20 m x 28 m
Rate
Particulars
Unit
560
(Rs)
Sr.
No.
Quantity
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
B
C
1
2
3
D
E
F
G
Cost of Material
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Curtain Clamps
Pulley assembly
Curtain Rings
UV stabilised FRP-Door
Sub Total
VAT (compulsory)
Total Material Cost
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
a) Control Head
b) Irrigation System
c) Fogging System
Irrigation System
Total Unit Rate
Optional Items as per table no 8 Max limit
65
55
65
45
22
25
40
43
10
8
1.5
60
4
10
30
2
3000
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Mtrs.
Nos.
Nos.
Nos.
Nos.
2791
1101
115
406
560
428
252
126
590
560
775
13
145
67
8
84
1
5%
150
Nos.
70
120
70
Sq.mtrs.
Nos.
Sq.mtrs.
12.36%
2.00%
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
56
560
56
560
Amount (Rs)
181415
60555
7475
18270
12320
10700
10080
5418
5900
4480
1163
780
580
670
240
168
3000
323214
16161
339374
8400
39200
6720
39200
85120
432894
10521
8658
452073
807
78
25
25
128
935
0
Page | 87
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-OVPH models
Table No.1.2 The detail estimates of NHM-OVPH-1008 model
Model
NHM-OVPH-1008
Structural material
G.I. Pipes
Size
1008 sq m
Dimensions
28 m X 36 m,36 m X 28 m
Height
Minimum 6.5 m at center
28 m X 36 m
1008
Particulars
Rate (Rs)
Unit
Sr.
No.
Quantity
A
Amount
(Rs)
36 m X 28 m
1008
Quanti
ty
Amount (Rs)
Cost of Material
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
B
C
1
2
3
D
E
F
G
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Curtain Clamps
Pulley assembly
Curtain Rings
UV stabilised FRP-Door
Sub Total
VAT (compulsory)
Total Material Cost
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
a) Control Head
b) Irrigation System
c) Fogging System
Irrigation System
65
55
65
45
22
25
40
43
10
8
1.5
60
4
10
30
2
3000
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Mtrs.
Nos.
Nos.
Nos.
Nos.
4805
1809
287
676
1008
840
353
176
983
1008
1290
24
231
93
16
108
1
5%
150
Nos.
68
120
68
Sq.mtrs.
Nos.
Sq.mtrs.
12.36%
2.00%
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Total Unit Rate
Rs/Sq.mtr
Optional Items as per table no 8
Max limit
Rs/Sq.mtr
83
1008
83
1008
312325
99495
18655
30420
22176
21000
14120
7568
9830
8064
1935
1440
924
930
480
216
3000
552578
27629
580207
12450
4872
1862
325
699
1008
832
353
176
1017
1008
1335
24
218
93
12
84
1
68544
9960
68544
147048
739705
18175
14794
772674
767
67
25
25
117
1008
82
1008
82
316680
102410
21125
31455
22176
20800
14120
7568
10170
8064
2002.5
1440
872
930
360
168
3000
563341
28167
591508
12300
884
68544
9840
68544
146928
750736
18160
15015
783911
778
67
25
25
117
895
(näùªÉ 890)
51
40
Page | 88
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-OVPH models
Table No.1.3 - The detail estimates of NHM-OVPH-2000 model
Model
Structural material
NHM-OVPH-2000
G.I. Pipes
Size
2016 sq m & 2080 sqm
Dimensions
36 m x56 m
52 m X 40 m
Height
Sr.
No.
Minimum 6.5 m at center
Particulars
A
Cost of Material
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Curtain Clamps
Pulley assembly
Curtain Rings
UV stabilised FRP-Door
Sub Total
VAT (compulsory)
Total Material Cost
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
a) Control Head
b) Irrigation System
c) Fogging System
Irrigation System
Total Unit Rate
16
17
B
C
1
2
3
D
E
F
G
Optional Items as per table no 8 Max
limit
36 m X 56 m
2016
Rate
(Rs)
Unit
65
55
65
45
22
25
40
43
10
8
1.5
60
4
10
30
2
3000
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Mtrs.
Nos.
Nos.
Nos.
Nos.
9641
3303
680
1254
2016
1802
530
265
1824
2016
2394
51
428
140
24
336
1
150
Nos.
138
66
120
66
Sq.mtrs.
Nos.
Sq.mtrs.
2016
138
2016
Quantity
52 m X 40 m
2080
Amount
(Rs)
Quant
ity
626665
181665
44200
56430
44352
45050
21200
11395
18240
16128
3591
3060
1712
1400
720
672
3000
1079480
53974
1133454
20700
9891
3493
795
1336
2080
1852
529
265
1945
2080
2551
52
410
140
26
240
1
2080
138
2080
Rs/Sq.mtr
133056
16560
133056
282672
1436826
34938
28737
1500501
744
54
25
25
104
848
Rs/Sq.mtr
42
5%
12.36%
2.00%
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
138
Amount
(Rs)
642915
192115
51675
60120
45760
46300
21160
11395
19450
16640
3826.5
3120
1640
1400
780
480
3000
1121777
56089
1158721
20700
137280
16560
104000
257840
1437261
31869
28745
1497875
720
54
25
25
104
824
66
Page | 89
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-OVPH models
Table No.1.4 The detail estimates of NHM-OVPH-3000 model
Model
NHM-OVPH-3000
Structural material
G.I. Pipes
Size
3120 sq m
Dimensions
52 m X 60 m
60 m X 52 m
Height
Minimum 6.5 m at center
52 m X 60 m
Sr.
Rate
3120
Particulars
Unit
No.
(Rs)
Amount
Quantity
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
B
C
1
2
3
D
E
F
G
(Rs)
60 m X 52 m
3120
Quantity
Amount
(Rs)
Cost of Material
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Curtain Clamps
Pulley assembly
Curtain Rings
UV stabilised FRP-Door
Sub Total
VAT (compulsory)
Total Material Cost
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
a) Control Head
b) Irrigation System
c) Fogging System
Irrigation System
Total Unit Rate
Optional Items as per table no 8 Max
limit
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Mtrs.
Nos.
Nos.
Nos.
Nos.
14530
4942
1216
1908
3120
2881
655
328
2776
3120
3643
80
610
173
32
360
1
150
Nos.
188
65
120
65
Sq.mtrs.
Nos.
Sq.mtrs.
3120
188
3120
65
55
65
45
22
25
40
43
10
8
1.5
60
4
10
30
2
3000
5%
12.36%
2.00%
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
944450
271810
79040
85860
68640
72025
26200
14104
27760
24960
5465
4800
2440
1730
960
720
3000
1633964
81698
1715662
28200
14521
4994
1254
1932
3120
2873
655
328
2810
3120
3689
80
596
173
36
312
1
943865
274670
81510
86940
68640
71825
26200
14104
28100
24960
5533.5
4800
2384
1730
1080
624
3000
1639966
81998
1721964
187 28050
202800
22560
202800
428160
2172022
52921
43440
3120
187
3120
202800
22440
202800
428040
2178054
52906
43561
2268383
727
44
25
25
94
821
2274521
729
44
25
25
94
823
23
21
Page | 90
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-OVPH models
Table No.1.5 . The detail estimates of NHM-OVPH-4000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
Particulars
A
Cost of Material
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Curtain Clamps
Pulley assembly
Curtain Rings
UV stabilised FRP-Door
Sub Total
VAT (compulsory)
Rate
(Rs)
65
55
65
45
22
25
40
43
10
8
1.5
60
4
10
30
2
3000
NHM-OVPH-4000
G.I. Pipes
4080 sq m, 4000 sq. m.
60 m X 68 m
100 m X 40 m
Minimum 6.5 m at center
60 m X 68 m
4080
Unit
Amount
Quantity
(Rs)
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Mtrs.
Nos.
Nos.
Nos.
Nos.
18761
6375
1704
2484
4080
3822
756
378
3613
4080
4742
106
763
200
40
360
1
5%
Total Material Cost
B
Foundation-civil material
C
Labour Cost
Fabrication
Foundation
3 Installation
1
2
D
E
F
G
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
a) Control Head
1219465
350625
110760
111780
89760
95550
30240
16254
36130
32640
7113
6360
3052
2000
1200
720
3000
100 m X 40 m
4000
Amount
Quantity
(Rs)
18554
6532
1752
2535
4000
3667
832
416
3687
4000
4839
102
718
220
56
240
1
1206010
359260
113880
114075
88000
91675
33280
17888
36870
32000
7258.5
6120
2872
2200
1680
480
3000
2116649
105832
2116549
105827
2222481
2222376
150
Nos.
230
34500
234
35100
64
Sq.mtrs.
4080
261120
4000
256000
120
64
Nos.
230
27600
234
28080
Sq.mtrs.
4080
261120
4000
256000
549840
2806821
67960
56136
540080
2797556
66754
55951
Rs/Sq.mtr
2930918
718
2920261
730
12.36%
2.00%
Rs/Sq.mtr
38
38
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
Irrigation System
Total Unit Rate
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
25
88
806
25
88
818
Rs/Sq.mtr
38
26
Page | 91
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-CCPH models
Table No.2.1 - The detail estimates of NHM-CCPH -1000 model
Model
Structural material
NHM-CCPH-1000
G.I. Pipes
Size
1008 sq m
28 m X 36 m
Dimensions
36 m X 28 m
Height
Sr.
No.
Particulars
A
Cost of Material
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Pulley assembly
Curtain Rings
UV stabilised FRP-Door assembly
Exhaust Fan
Cellulose Cooling pads-4"
Water Circulating System
Fogging System
Control Head for pad circulation
Control Head for Foggers
Climate Controller
Panel Box
Civil Work Brick Wall below fan &
Pads
Sub Total
VAT (compulsory)
Total Material Cost
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
b) Irrigation System
Irrigation System
Total Unit Rate
24
B
C
1
2
3
D
E
F
G
Optional Items as per table no 8 Max
limit
Rate
(Rs)
Minimum 4.5 m at center
28 m X 36 m
1008
Unit
Amount
Quantity
(Rs)
36 m X 28 m
1008
Amount
Quantity
(Rs)
65
55
65
45
22
25
40
10
8
1.5
60
4
30
2
3000
22000
2300
2700
25
50400
59850
60000
45000
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Nos.
Nos.
Nos.
Nos.
Sq. Mtrs
Mtrs.
Sq.Mtrs
No.
No.
No.
No.
4187
1866
316
684
1008
945
107
589
1008
810
24
231
10
216
2
8
39
26
1008
1
1
1
1
272155
102630
20540
30780
22176
23625
4280
5890
8064
1215
1440
924
300
432
6000
176000
89700
70200
25200
50400
59850
60000
45000
4280
1920
378
748
1008
970
139
639
1008
878
24
218
12
168
2
8
26
34
1008
1
1
1
1
278200
105600
24570
33660
22176
24250
5560
6390
8064
1317
1440
872
360
336
6000
176000
59800
91800
25200
50400
59850
60000
45000
1500
Sq.Mtrs
38
57000
46
69000
1133801
56690
1190491
11400
72
1155845
57792
1213637
10800
5%
150
Nos.
76
68
130
68
Sq.mtrs.
Nos.
Sq.mtrs.
1008
76
1008
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
68544
9880
68544
146968
1348859
18165
26977
1394001
1383
25
25
1408
Rs/Sq.mtr
57
12.36%
2%
1008
72
1008
68544
9360
68544
146448
1370885
18101
27418
1416404
1405
25
25
1430
35
Page | 92
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-CCPH models
Model
Structural material
Size
Dimensions
Height
Sr.
No.
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
B
C
1
2
3
D
E
F
G
Table No.2.2 - The detail estimates of NHM-CCPH -2000 model
NHM-CCPH-2000
G.I. Pipes
2016 Sq.mtrs., 2080 Sq.mtrs.
36 m X 56 m
52 m X 40 m
Minimum 4.5 m at center
Particulars
Cost of Material
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Pulley assembly
Curtain Rings
UV stabilised FRP-Door assembly
Exhaust Fan
Cellulose Cooling pads-4"
Water Circulating System
Fogging System
Control Head for pad circulation
Control Head for Foggers
Climate Controller
Panel Box
Civil Work Brick Wall below fan &
Pads
Sub Total
VAT (compulsory)
Total Material Cost
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
b) Irrigation System
Irrigation System
Total Unit Rate
Optional Items as per table no 8 Max
limit
36 m X 56 m
2016
52 m X 40 m
2080
Amount
Quantity
(Rs)
Rate
(Rs)
Unit
65
55
65
45
22
25
40
10
8
1.5
60
4
30
2
3000
22000
2300
2700
25
87150
96600
60000
78750
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Nos.
Nos.
Nos.
Nos.
Sq. Mtrs
Mtrs.
Sq.Mtrs
No.
No.
No.
No.
8380
3331
728
1179
2016
1940
139
907
2016
1248
51
428
24
336
2
14
51
34
2016
1
1
1
1
544700
183205
47320
53055
44352
48500
5560
9070
16128
1872
3060
1712
720
672
6000
308000
117300
91800
50400
87150
96600
60000
78750
8639
3515
881
1333
2080
2058
204
1019
2080
1401
52
410
32
240
2
14
75
50
2080
1
1
1
1
561535
193325
57265
59985
45760
51450
8160
10190
16640
2101.5
3120
1640
960
480
6000
308000
172500
135000
52000
87150
96600
60000
78750
1500
Sq.Mtrs
58
87000
74
111000
1942926
97146
2040072
19200
122
2119612
105981
2225592
18300
Quantity
5%
150
Nos.
128
66
130
66
Sq.mtrs.
Nos.
Sq.mtrs.
2016
128
2016
Amount (Rs)
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
133056
16640
133056
282752
2342024
34948
46840
2423813
1202
25
25
1227
Rs/Sq.mtr
113
12.36%
2%
2080
122
2080
137280
15860
137280
290420
2534312
35896
50686
2620894
1260
25
25
1285
113
Page | 93
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-CCPH models
Table No.2.3 - The detail estimates of NHM-CCPH -3000 model
Model
NHM-CCPH-3000
Structural material
G.I. Pipes
Size
3120 Sq.mtrs.
52 m X 60 m
Dimensions
60 m X 52 m
Height
Minimum 4.5 m at center
52 m X 60 m
Sr.
Rate
3120
Particulars
Unit
No.
(Rs)
Amount
Quantity
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
B
C
1
2
3
D
E
F
G
Cost of Material
GI Pipes
UV stablised Poly Film
GI Gutter
Aluminium Profiles
Clamps & Accessories
Shade Net (Tapenet on roof)
Insect Net (on sides)
Locking spring
High Tensile Nuts & Bolts
Self drilling tapping Screws
GI Wire
Plastic Rope
Pulley assembly
Curtain Rings
UV stabilised FRP-Door
assembly
Exhaust Fan
Cellulose Cooling pads-6"
Water Circulating System
Fogging System
Control Head for pad circulation
Control Head for Foggers
Climate Controller
Panel Box
Civil Work Brick Wall below
fan & Pads
Sub Total
VAT (compulsory)
Total Material Cost
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
b) Irrigation System
Irrigation System
Total Unit Rate
65
55
65
45
22
25
40
10
8
1.5
60
4
30
2
Kgs.
Sq.mtrs
Kgs.
Mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs.
Sq.mtrs
Mtrs.
Sq.mtrs.
Nos.
Kgs.
Nos.
Nos.
12595
4901
1302
1773
3120
3087
204
1275
3120
1753
80
610
32
720
3000
Nos.
2
22000
3500
2700
25
107100
123900
60000
137813
Nos.
Sq. Mtrs
Mtrs.
Sq.Mtrs
No.
No.
No.
No.
22
75
50
3120
1
1
1
1
1500
Sq.Mtrs
83
5%
150
Nos.
172
66
130
66
Sq.mtrs.
Nos.
Sq.mtrs.
3120
172
3120
Optional Items as per table no 8
Max limit
Quantity
(Rs)
818675
269555
84630
79785
68640
77175
8160
12750
24960
2629.5
4800
2440
960
1440
6000
484000
262500
135000
78000
107100
123900
60000
137812.5
124500
2975412
148771
3124183
25800
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
205920
22360
205920
434200
3584183
53667
71684
3709533
1189
25
25
1214
Rs/Sq.mtr
98
12.36%
2%
60 m X 52 m
3120
12611
4956
1359
1837
3120
3112
236
1324
3120
1820
80
596
36
624
2
22
87
58
3120
1
1
1
1
91
168
3120
168
3120
Amount
(Rs)
819715
272580
88335
82665
68640
77800
9440
13240
24960
2730
4800
2384
1080
1248
6000
484000
304500
156600
78000
107100
123900
60000
137812.5
136500
3064030
153201
3217231
25200
205920
21840
205920
433680
3676111
53603
73522
3803236
1219
25
25
1244
98
Page | 94
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-CCPH models
Sr.
No.
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
B
C
1
2
3
D
E
F
G
Table No.2.4 - The detail estimates of NHM-CCPH -4000 model
Model
NHM-CCPH-4000
Structural material
G.I. Pipes
Size
4080 Sq.mtrs., 4000 Sq.mtrs.
68 m X 60 m
Dimensions
100 m X 40 m
Height
Minimum 4.5 m at center
68 m X 60 m
100 m X 40 m
Rate
Particulars
Unit
4080
4000
(Rs)
Quantity Amount (Rs) Quantity Amount (Rs)
Cost of Material
Kgs.
16246
1055990
16183
1051895
65
GI Pipes
UV stablised Poly Film
Sq.mtrs
6270
344850
6487
356785
55
GI Gutter
Kgs.
1819
118235
1934
125710
65
Aluminium Profiles
Mtrs.
2306
103770
2534
114030
45
Clamps & Accessories
Sq.mtrs.
4080
89760
4000
88000
22
Sq.mtrs.
4095
102375
4074
101850
25
Shade Net (Tapenet on roof)
Sq.mtrs.
268
10720
397
15880
40
Insect Net (on sides)
Sq.mtrs
1604
16040
1813
18130
10
Locking spring
Mtrs.
4080
32640
4000
32000
8
High Tensile Nuts & Bolts
Sq.mtrs.
2205
3307.5
2493
3739.5
1.5
Self drilling tapping Screws
Nos.
106
6360
102
6120
60
GI Wire
Kgs.
763
3052
718
2872
4
Plastic Rope
Nos.
40
1200
56
1680
30
Pulley assembly
Curtain Rings
Nos.
720
1440
480
960
2
UV stabilised FRP-Door
Nos.
2
6000
6000
3000
2
assembly
Exhaust Fan
Nos.
28
616000
28
616000
22000
Sq. Mtrs
99
346500
99
346500
3500
Cellulose Cooling pads-6"
Water Circulating System
Mtrs.
66
178200
66
178200
2700
Fogging System
Sq.Mtrs
4080
102000
4000
100000
25
Control Head for pad circulation
No.
1
124425
1
124425
124425
Control Head for Foggers
No.
1
137025
1
137025
137025
Climate Controller
No.
1
60000
1
60000
60000
Panel Box
No.
1
241171.875
1
241171.875
241172
Civil Work Brick Wall below fan
Sq.Mtrs
108
162000
140
210000
1500
& Pads
Sub Total
3863061
3938973
193153
196949
5%
VAT (compulsory)
Total Material Cost
4056214
4135922
Nos.
208
31200
200
30000
Foundation-civil material
150
Labour Cost
Fabrication
Sq.mtrs.
4080
269280
2080
137280
66
Foundation
Nos.
208
27040
200
26000
130
Installation
Sq.mtrs.
4080
269280
2080
137280
66
Total Labour cost
565600
300560
Total
4653014
4466482
69908
37149
Service Tax on Labour cost
12.36%
93060
89330
Transport cost
2%
Grand total
4815983
4592961
Unit rate
1180
1148
Rs/Sq.mtr
b) Irrigation System
25
25
Rs/Sq.mtr
Irrigation System
25
25
Rs/Sq.mtr
Total Unit Rate
1205
1173
Rs/Sq.mtr
Opptional Items as per table no
8 max limit
Rs/Sq.mtr
89
89
Page | 95
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
¶Éäb÷xÉä]õ½þÉ>ðºÉþSªÉÉ |ÉEòÉ®úÉxÉÖºÉÉ®ú ´É +ÉEòÉ®ú¨ÉÉxÉÉxÉÚºÉÉ®ú iɺÉäSÉ iÉÉÆÊjÉEò {ÉÊ®ú¨ÉÉhÉÉxÉÚºÉÉ®ú ºÉʴɺiÉ®ú JÉSÉÉÇSÉÒ +ÆnùÉVÉ{ÉjÉEä÷
(Estimates)÷ {ÉÖføÒ±É {ÉÉxÉÉ´É®ú Ênù±ÉÒ +ɽäþiÉ. (Table No. 1.1 to 4.5)
The detail estimates of NHM-RTNH 5M models
Table No. 1.1 - The detail estimates and technical specifications of NHM-RTNH5M-500 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
Particulars
A
1
2
3
4
5
6
7
8
9
10
Cost of Material
GI Pipes
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Aluminium Profiles
Locking spring
Self drilling tapping Screws
Clamps & Accessories
High Tensile Nuts & Bolts
UV stabilised FRP-Door
Sub Total
Excise
VAT
NHM-RTNH5M-500
G.I. Pipes
504 sq m
18 m x 28 m
Minimum 5.0 m at Center
Rate (Rs)
Unit
65
25
40
45
45
11
1.5
15
10
3000
Kgs.
Sq.mtrs
Sq.mtrs
Sq.mtrs
Mtrs.
Mtrs.
Nos.
Sq.mtrs
Sq.mtrs
Nos.
18 m x 28 m
504
Quantity
Amount (Rs)
1630
653
313
148
223
324
426
504
504
1
5%
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
179858
150
Nos.
34
5100
40
Sq.mtrs
504
20160
130
Nos.
34
4420
40
Sq.mtrs
504
20160
44740
Total
229698
D
Service Tax on Labour cost
12.36%
5530
E
Transport cost
2.00%
4594
Grand total
F
G
105950
16325
12520
6660
10035
3564
639
7560
5040
3000
171293
8565
239821
Unit rate
a) Control Head - 500
Rs/Sq.mtr
476
Rs/Sq.mtr
78
b) Irrigation System
Rs/Sq.mtr
25
c) Fogging System
Rs/Sq.mtr
Rs/Sq.mtr
25
Irrigation System
Total Unit Rate
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
128
604
Rs/Sq.mtr
130
Page | 96
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH5M models
Table No. 1.2 - The detail estimates and technical specifications of NHM-RTNH5M-1000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
A
Particulars
NHM-RTNH5M-1000
G.I. Pipes
1008 sq m
36 m x 28 m
Minimum 5.0 m at Center
Rate (Rs)
36 m x 28 m
1008
Unit
Quantity
Amount (Rs)
Cost of Material
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
3124
203060
25
Sq.mtrs
1305
32625
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
461
18440
43
Sq.mtrs
205
8815
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
390
17550
10
Mtrs.
567
5670
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
745
1117.5
15
Sq.mtrs
1008
15120
10
Sq.mtrs
1008
10080
3000
Nos.
1
3000
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
315477.5
5%
15774
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
331251
150
Nos.
58
8700
40
Sq.mtrs
1008
40320
130
Nos.
58
7540
40
Sq.mtrs
1008
40320
88180
Total
428131
D
Service Tax on Labour cost
12.36%
10899
E
Transport cost
2.00%
8563
Grand total
F
G
447593
Unit rate
a) Control Head - 500
Rs/Sq.mtr
444
Rs/Sq.mtr
67
b) Irrigation System
Rs/Sq.mtr
25
c) Fogging System
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
117
Total Unit Rate
Rs/Sq.mtr
561
Optional Items as per table no 8
Max limit
Rs/Sq.mtr
130
Page | 97
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH5M models
Table No. 1.3- The detail estimates and technical specifications of NHM-RTNH5M-2000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
Particulars
A
1
2
3
4
5
6
7
8
9
10
Cost of Material
GI Pipes
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Aluminium Profiles
Locking spring
Self drilling tapping Screws
Clamps & Accessories
High Tensile Nuts & Bolts
UV stabilised FRP-Door
Sub Total
VAT
Rate
(Rs)
65
25
40
43
45
10
1.5
15
10
3000
NHM-RTNH5M-2000
G.I. Pipes
2016 sq m
36 m x 56 m
42 m x 48m
Minimum 5.0 m at Center
36 m x 56 m
42 m x 48 m
2016
2016
Unit
Amount
Amount
Quantity
Quantity
(Rs)
(Rs)
Kgs.
Sq.mtrs
Sq.mtrs
Sq.mtrs
Mtrs.
Mtrs.
Nos.
Sq.mtrs
Sq.mtrs
Nos.
5924
2565
619
293
606
881
1156
2016
2016
1
5%
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
385060
64125
24760
12599
27270
8810
1734
30240
20160
3000
577758
28888
5942
2573
623
287
623
904
1187
2016
2016
1
606646
386230
64325
24920
12341
28035
9040
1780.5
30240
20160
3000
580072
29003
609075
150
Nos.
107
16050
106
15900
40
Sq.mtrs
2016
80640
2016
80640
130
Nos.
107
13910
106
13780
40
Sq.mtrs
2016
80640
2016
80640
Total
175190
175060
797886
784135
D
Service Tax on Labour cost
12.36%
21653
21637.4
E
Transport cost
2.00%
15958
15682.7
835497
821455
Grand total
F
G
Unit rate
a) Control Head - 500
Rs/Sq.mtr
414
407
Rs/Sq.mtr
54
54
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
Rs/Sq.mtr
Rs/Sq.mtr
25
25
Irrigation System
104
104
Total Unit Rate
Rs/Sq.mtr
518
511
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
113
113
Page | 98
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH5M models
Table No. 1.4 - The detail estimates and technical specifications of NHM-RTNH5M-3000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
A
Particulars
Rate
(Rs)
NHM-RTNH5M-3000
G.I. Pipes
3024 sq m
42 m x 72 m
48 m x 64m
Minimum 5.0 m at Center
42 m x 72 m
48 m x 64m
3024
3072
Unit
Amount
Amount
Quantity
Quantity
(Rs)
(Rs)
Cost of Material
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
8727
567255
8874
576810
25
Sq.mtrs
3833
95825
3900
97500
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
759
30360
763
30520
43
Sq.mtrs
362
15566
356
15308
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
833
37485
858
38610
10
Mtrs.
1212
12120
1248
12480
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
1590
2385
1638
2457
15
Sq.mtrs
3024
45360
3072
46080
10
Sq.mtrs
3024
30240
3072
30720
3000
Nos.
1
3000
1
3000
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
5%
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
839596
853485
41979.8
42674.25
881576
896159
150
Nos.
154
23100
155
23250
45
Sq.mtrs
3024
136080
3072
138240
130
Nos.
154
20020
155
20150
45
Sq.mtrs
3024
136080
3072
138240
Total
292180
296630
1196856
1216039
D
Service Tax on Labour cost
12.36%
36113
36663
E
Transport cost
2.00%
23937
24321
1256906
1277024
Grand total
F
G
Unit rate
a) Control Head - 500
Rs/Sq.mtr
416
416
Rs/Sq.mtr
44
44
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
25
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
94
94
Total Unit Rate
Rs/Sq.mtr
510
510
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
98
98
Page | 99
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH5M models
Table No. 1.5 - The detail estimates and technical specifications of NHM-RTNH5M-3000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
NHM-RTNH5M-3000
G.I. Pipes
3024 sq m
54 m x 56 m
Minimum 5.0 m at Center
54 m x 56 m
3024
Quantity Amount (Rs)
Rate
(Rs)
Unit
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
8764
569660
25
Sq.mtrs
3848
96200
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
767
30680
43
Sq.mtrs
350
15050
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
865
38925
10
Mtrs.
1258
12580
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
1651
2476.5
15
Sq.mtrs
3024
45360
10
Sq.mtrs
3024
30240
3000
Nos.
1
3000
A
Particulars
Cost of Material
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
844172
5%
42208.575
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
886380
150
Nos.
152
22800
45
Sq.mtrs
3024
136080
130
Nos.
152
19760
45
Sq.mtrs
3024
136080
291920
Total
D
Service Tax on Labour cost
E
Transport cost
1201100
12.36%
36081
2%
24022
Grand total
F
G
1261203
Unit rate
a) Control Head - 500
Rs/Sq.mtr
417
Rs/Sq.mtr
44
b) Irrigation System
Rs/Sq.mtr
25
c) Fogging System
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
Total Unit Rate
Rs/Sq.mtr
511
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
98
94
Page | 100
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH5M models
Table No. 1.6 - The detail estimates and technical specifications of NHM-RTNH5M-4000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
A
1
2
3
4
5
6
7
8
9
10
B
C
Particulars
Rate
(Rs)
NHM-RTNH5M-4000
G.I. Pipes
4032 sq m
4080 sq m
48 m x 84 m
60 m x 68m
Minimum 5.0 m at Center
48 m x 84 m
60 m x 68m
4032
4080
Unit
Amount
Amount
Quantity
Quantity
(Rs)
(Rs)
Cost of Material
GI Pipes
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Aluminium Profiles
Locking spring
Self drilling tapping Screws
Clamps & Accessories
High Tensile Nuts & Bolts
UV stabilised FRP-Door
Sub Total
VAT
Total Material Cost
Foundation-civil material
Labour Cost
1 Fabrication
2 Foundation
3 Installation
65
25
40
43
45
10
1.5
15
10
3000
Kgs.
Sq.mtrs
Sq.mtrs
Sq.mtrs
Mtrs.
Mtrs.
Nos.
Sq.mtrs
Sq.mtrs
Nos.
11515
5100
876
419
1056
1536
2016
4032
4032
1
150
Nos.
200
45
130
45
Sq.mtrs
Nos.
Sq.mtrs
4032
200
4032
5%
Total Labour cost
Total
D
E
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
a) Control Head - 500
b) Irrigation System
F
12.36%
2%
748475
127500
35040
18017
47520
15360
3024
60480
40320
3000
1098736
54936.8
1153673
30000
11681
5175
884
406
1097
1595
2094
4080
4080
1
181440
26000
181440
388880
1572553
48066
31451
4080
200
4080
200
759265
129375
35360
17458
49365
15950
3141
61200
40800
3000
1114914
55745.7
1170660
30000
183600
26000
183600
393200
1593860
48600
31877
Rs/Sq.mtr
Rs/Sq.mtr
1652069
410
38
1674336
410
38
Rs/Sq.mtr
25
25
25
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
88
88
Total Unit Rate
Rs/Sq.mtr
498
498
89
89
c) Fogging System
Optional Items as per table no 8
G
Max limit
Page | 101
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH5M models
Table No. 1.7- The detail estimates and technical specifications of NHM-RTNH5M-4000 model
Model
Structural material
NHM-RTNH5M-4000
G.I. Pipes
4032 sq m
4056 sq m
72 m x 56 m
78 m x 52m
Minimum 5.0 m at Center
72 m x 56 m
Size
Dimensions
Height
Sr.
No.
Particulars
Cost of Material
1
2
3
4
5
6
7
8
9
10
GI Pipes
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Aluminium Profiles
Locking spring
Self drilling tapping Screws
Clamps & Accessories
High Tensile Nuts & Bolts
UV stabilised FRP-Door
Sub Total
VAT
Total Material Cost
Foundation-civil material
Labour Cost
1 Fabrication
2 Foundation
3 Installation
65
25
40
43
45
10
1.5
15
10
3000
Kgs.
Sq.mtrs
Sq.mtrs
Sq.mtrs
Mtrs.
Mtrs.
Nos.
Sq.mtrs
Sq.mtrs
Nos.
11605
5130
914
406
1124
1635
2147
4032
4032
1
150
Nos.
197
45
130
45
Sq.mtrs
Nos.
Sq.mtrs
4032
197
4032
5%
Total Labour cost
Total
D
E
Service Tax on Labour cost
Transport cost
12.36%
2.00%
Grand total
F
G
4032
Unit
Quantity
A
B
C
Rate (Rs)
78 m x 52m
4056
Amount
(Rs)
Quantity
754325
128250
36560
17458
50580
16350
3220.5
60480
40320
3000
1110544
55527
1166071
29550
11703
5168
941
413
1149
1672
2194
4056
4056
1
181440
25610
181440
388490
1584111
48017
31682
4056
198
4056
198
Amount
(Rs)
760695
129200
37640
17759
51705
16720
3291
60840
40560
3000
1121410
56071
1177481
29700
182520
25740
182520
390780
1597961
48300
31959
1663810
1678220
Unit rate
a) Control Head - 500
Rs/Sq.mtr
413
414
Rs/Sq.mtr
38
38
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
25
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
88
88
Total Unit Rate
Rs/Sq.mtr
501
502
Optional Items as per table no 8
Max limit
Rs/Sq.mtr
89
89
Page | 102
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH4M models
Table No. 2.1 - The detail estimates and technical specifications of NHM-RTNH4M-500 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
Particulars
A
1
2
3
4
5
6
7
8
9
10
Cost of Material
GI Pipes
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Aluminium Profiles
Locking spring
Self drilling tapping Screws
Clamps & Accessories
High Tensile Nuts & Bolts
UV stabilised FRP-Door
Sub Total
Excise
VAT
Total Material Cost
B Foundation-civil material
C Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
Total
D Service Tax on Labour cost
E Transport cost
Grand total
Unit rate
a) Control Head - 500
b) Irrigation System
F
c) Fogging System
Irrigation System
Total Unit Rate
Optional Items as per table no 8 Max
G limit
NHM-RTNH4M-500
G.I. Pipes
504 sq m
18 m x 28 m
Minimum 4.0 m at Center
18 m x 28 m
504
Quantity
Amount (Rs)
Rate
(Rs)
Unit
65
25
40
45
45
11
1.5
15
10
3000
Kgs.
Sq.mtrs
Sq.mtrs
Sq.mtrs
Mtrs.
Mtrs.
Nos.
Sq.mtrs
Sq.mtrs
Nos.
1285
653
206
148
208
303
397
504
504
1
150
Nos.
34
40
130
40
Sq.mtrs
Nos.
Sq.mtrs
504
34
504
5%
83525
16325
8240
6660
9360
3333
595.5
7560
5040
3000
143638.5
7182
150820
5100
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
Rs/Sq.mtr
20160
4420
20160
44740
200660
5530
4013
210203
417
78
25
25
128
545
Rs/Sq.mtr
130
12.36%
2.00%
Page | 103
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH4M models
Table No. 2.2 - The detail estimates and technical specifications of NHM-RTNH4M-1000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
A
Particulars
Rate
(Rs)
NHM-RTNH4M-1000
G.I. Pipes
1008 sq m
36 m x 28 m
Minimum 4.0 m at Center
36 m x 28 m
1008
Unit
Quantity
Amount (Rs)
Cost of Material
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
2448
159120
25
Sq.mtrs
1305
32625
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
320
12800
43
Sq.mtrs
205
8815
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
364
16380
10
Mtrs.
530
5300
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
695
1042.5
15
Sq.mtrs
1008
15120
10
Sq.mtrs
1008
10080
3000
Nos.
1
3000
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
264282.5
5%
13214
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
277497
150
Nos.
58
8700
40
Sq.mtrs
1008
40320
130
Nos.
58
7540
40
Sq.mtrs
1008
40320
88180
Total
374377
D
Service Tax on Labour cost
12.36%
10899
E
Transport cost
2.00%
7488
Grand total
F
G
392763
Unit rate
a) Control Head – 500
Rs/Sq.mtr
390
Rs/Sq.mtr
67
b) Irrigation System
Rs/Sq.mtr
25
c) Fogging System
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
117
Total Unit Rate
Rs/Sq.mtr
507
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
130
Page | 104
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH4M models
Table No. 2.3 - The detail estimates and technical specifications of NHM-RTNH4M-2000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
A
Particulars
Rate
(Rs)
NHM-RTNH4M-2000
G.I. Pipes
2016 sq m
36 m x 56 m
42 m x 48m
Minimum 4.0 m at Center
36 m x 56 m
2016
Unit
Amount
Quantity
(Rs)
42 m x 48 m
2016
Amount
Quantity
(Rs)
Cost of Material
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
4658
302770
4666
303290
25
Sq.mtrs
2565
64125
2573
64325
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
408
16320
421
16840
43
Sq.mtrs
293
12599
287
12341
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
569
25605
583
26235
10
Mtrs.
827
8270
848
8480
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
1086
1629
1113
1669.5
15
Sq.mtrs
2016
30240
2016
30240
10
Sq.mtrs
2016
20160
2016
20160
3000
Nos.
1
3000
1
3000
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
5%
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
484718
486581
24236
29003
508954
515584
150
Nos.
107
16050
106
15900
40
Sq.mtrs
2016
80640
2016
80640
130
Nos.
107
13910
106
13780
40
Sq.mtrs
2016
80640
2016
80640
Total
175190
175060
700194
690644
D
Service Tax on Labour cost
12.36%
21653
21637.4
E
Transport cost
2.00%
14004
13812.9
735851
726094
Grand total
F
G
Unit rate
a) Control Head - 500
Rs/Sq.mtr
365
360
Rs/Sq.mtr
54
54
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
25
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
104
104
Total Unit Rate
Rs/Sq.mtr
469
464
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
113
113
Page | 105
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH4M models
Table No. 2.4 - The detail estimates and technical specifications of NHM-RTNH4M-3000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No
.
A
Rate
(Rs)
Particulars
NHM-RTNH4M-3000
G.I. Pipes
3024 sq m
42 m x 72 m
48 m x 64m
Minimum 4.0 m at Center
42 m x 72 m
3024
Unit
Amount
Quantity
(Rs)
48 m x 64m
3072
Amount
Quantity
(Rs)
Cost of Material
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
6863
446095
6972
453180
25
Sq.mtrs
3833
95825
3900
97500
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
496
19840
509
20360
43
Sq.mtrs
362
15566
356
15308
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
784
35280
806
36270
10
Mtrs.
1140
11400
1173
11730
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
1496
2244
1539
2308.5
15
Sq.mtrs
3024
45360
3072
46080
10
Sq.mtrs
3024
30240
3072
30720
3000
Nos.
1
3000
1
3000
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
5%
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
704850
716456.5
35242.5
35822.825
740092.5
752279.33
150
Nos.
154
23100
155
23250
45
Sq.mtrs
3024
136080
3072
138240
130
Nos.
154
20020
155
20150
45
Sq.mtrs
3024
136080
3072
138240
Total
292180
296630
1055372.5
1072159.3
D
Service Tax on Labour cost
12.36%
36113
36663
E
Transport cost
Grand total
Unit rate
a) Control Head - 500
2.00%
Rs/Sq.mtr
21107
1112593
368
21443
1130266
368
Rs/Sq.mtr
44
44
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
25
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
94
94
Total Unit Rate
Rs/Sq.mtr
462
462
Optional Items as per table no 8
Max limit
Rs/Sq.mtr
98
98
F
G
Page | 106
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH4M models
Table No. 2.5 - The detail estimates and technical specifications of NHM-RTNH4M-3000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
NHM-RTNH4M-3000
G.I. Pipes
3024 sq m
54 m x 56 m
Minimum 4.0 m at Center
54 m x 56 m
3024
Quantity
Amount (Rs)
Rate
(Rs)
Unit
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
6879
447135
25
Sq.mtrs
3848
96200
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
521
20840
43
Sq.mtrs
350
15050
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
812
36540
10
Mtrs.
1181
11810
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
1551
2326.5
15
Sq.mtrs
3024
45360
10
Sq.mtrs
3024
30240
3000
Nos.
1
3000
A
Particulars
Cost of Material
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
708502
5%
35425.075
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
743927
150
Nos.
152
22800
45
Sq.mtrs
3024
136080
130
Nos.
152
19760
45
Sq.mtrs
3024
136080
291920
Total
D
Service Tax on Labour cost
E
Transport cost
1058647
12.36%
36081
2%
21173
Grand total
F
G
1115901
Unit rate
a) Control Head - 500
Rs/Sq.mtr
369
Rs/Sq.mtr
44
b) Irrigation System
Rs/Sq.mtr
25
c) Fogging System
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
Total Unit Rate
Rs/Sq.mtr
463
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
98
94
Page | 107
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Table No. 2.6 - The detail estimates and technical specifications of NHM-RTNH4M-4000 model
Model
Structural material
Size
Dimensions
Height
Sr. No.
Particulars
A
GI Pipes
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Aluminium Profiles
Locking spring
Self drilling tapping Screws
Clamps & Accessories
High Tensile Nuts & Bolts
UV stabilised FRP-Door
Sub Total
VAT
Total Material Cost
Foundation-civil material
Labour Cost
1 Fabrication
2 Foundation
3 Installation
65
25
Kgs.
Sq.mtrs
Sq.mtrs
Sq.mtrs
Mtrs.
Mtrs.
Nos.
Sq.mtrs
Sq.mtrs
Nos.
9055
5100
572
419
994
1446
1898
4032
4032
1
150
Nos.
200
45
130
45
Sq.mtrs
Nos.
Sq.mtrs
4032
200
4032
40
43
45
10
1.5
15
10
3000
5%
Total Labour cost
Total
D
E
F
G
60 m x 68m
4080
Quan Amount
tity
(Rs)
Cost of Material
1
2
3
4
5
6
7
8
9
10
B
C
Rate
(Rs)
NHM-RTNH4M-4000
G.I. Pipes
4032 sq m
4080 sq m
48 m x 84 m
60 m x 68m
Minimum 4.0 m at Center
48 m x 84 m
4032
Unit
Quan
Amount
tity
(Rs)
Service Tax on Labour cost
Transport cost
Grand total
Unit rate
a) Control Head - 500
12.36%
2%
588575
127500
22880
18017
44730
14460
2847
60480
40320
3000
922809
46140.45
968949
30000
9172
5175
597
406
1031
1500
1969
4080
4080
1
181440
26000
181440
388880
1387829
48066
27757
4080
200
4080
200
596180
129375
23880
17458
46395
15000
2953.5
61200
40800
3000
936241
46812
983053
30000
183600
26000
183600
393200
1406254
48600
28125
Rs/Sq.mtr
1463652
363
1482978
363
Rs/Sq.mtr
38
38
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
25
25
Irrigation System
Rs/Sq.mtr
Rs/Sq.mtr
88
88
Total Unit Rate
Rs/Sq.mtr
451
451
Optional Items as per table no 8
Max limit
Rs/Sq.mtr
89
89
Page | 108
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-RTNH4M models
Table No. 2.7- The detail estimates and technical specifications of NHM-RTNH4M-4000 model
Model
Structural material
Size
Dimensions
Height
Sr. No.
A
Rate (Rs)
GI Pipes
Shade Net (Tapenet on roof)
Insect Net (on sides)
Laminated woven film (apron)
Aluminium Profiles
Locking spring
Self drilling tapping Screws
Clamps & Accessories
High Tensile Nuts & Bolts
UV stabilised FRP-Door
Sub Total
VAT
Total Material Cost
Foundation-civil material
Labour Cost
1 Fabrication
2 Foundation
3 Installation
65
25
40
43
45
10
1.5
15
10
3000
Kgs.
Sq.mtrs
Sq.mtrs
Sq.mtrs
Mtrs.
Mtrs.
Nos.
Sq.mtrs
Sq.mtrs
Nos.
Service Tax on Labour cost
Transport cost
Quanti
ty
Amount (Rs)
932377
46619
978995.85
29550
Nos.
197
45
130
45
Sq.mtrs
Nos.
Sq.mtrs
4032
197
4032
12.36%
2.00%
181440
25610
181440
388490
1397035.85
48017
27941
9172
5168
660
413
1078
1569
2059
4056
4056
1
596180
129200
26400
17759
48510
15690
3088.5
60840
40560
3000
198
941227.5
47061
988288.875
29700
4056
198
4056
182520
25740
182520
390780
1408768.875
48300
28175
1472994
1485245
Unit rate
a) Control Head - 500
Rs/Sq.mtr
365
366
Rs/Sq.mtr
38
38
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
Rs/Sq.mtr
Rs/Sq.mtr
25
25
88
88
Rs/Sq.mtr
453
454
89
89
Irrigation System
G
591565
128250
25400
17458
47520
15360
3024
60480
40320
3000
150
Grand total
F
9101
5130
635
406
1056
1536
2016
4032
4032
1
5%
Total Labour cost
Total
D
E
78 m x 52m
4056
Cost of Material
1
2
3
4
5
6
7
8
9
10
B
C
Particulars
NHM-RTNH4M-4000
G.I. Pipes
4032 sq m
4056 sq m
72 m x 56 m
78 m x 52m
Minimum 4.0 m at Center
72 m x 56 m
4032
Unit
Quan
Amount (Rs)
tity
Total Unit Rate
Opetional Items as per table
no 8 Max limit
Page | 109
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH4M models
Table No. 3.1 - The detail estimates and technical specifications of NHM-FTNH4M-1000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
NHM-FTNH4M-1000
G.I. Pipes
1040 sq m, 1088 sq m
20 m x 52 m, 32m X 34m
Minimum 4.0 m
Unit
1 GI Pipes
65
Kgs.
2245
2 Shade Net (Tapenet on roof)
25
Sq.mtrs
3 Insect Net (on sides)
40
4 Laminated woven film (apron)
Particulars
32m X 34m
1088
Quantity
Amount
(Rs)
145925
2269
147485
806
20150
882
22050
Sq.mtrs
522
20880
476
19040
43
Sq.mtrs
217
9331
198
8514
5 Aluminium Profiles
45
Mtrs.
358
16110
384
17280
6 Locking spring
10
Mtrs.
520
5200
558
5580
7 Self drilling tapping Screws
1.5
Nos.
715
1072.5
768
1152
8 Clamps & Accessories
10
Sq.mtrs
1040
10400
1088
10880
5
3000
Sq.mtrs
Nos.
1040
1
5200
3000
1088
1
5440
3000
A
Quantity
Sub Total
VAT
Total Material Cost
B Foundation-civil material
C Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
Total
D Service Tax on Labour cost
E Transport cost
5%
237268.5
11863
240421
12021
150
Nos.
123
249132
18450
252442
18900
35
120
35
Sq.mtrs
Nos.
Sq.mtrs
1040
123
1040
12.36%
2.00%
Grand total
F
Amount
(Rs)
Cost of Material
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
G
20 m x 52 m
1040
Rate
(Rs)
36400
14760
36400
87560
355142
10822
7103
126
1088
126
1088
38080
15120
38080
91280
362622
11282
7252
373067
381157
Unit rate
a) Control Head – 500
Rs/Sq.mtr
359
350
Rs/Sq.mtr
67
67
b) Irrigation System
Rs/Sq.mtr
25
25
c) Fogging System
Rs/Sq.mtr
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Rs/Sq.mtr
25
117
476
25
117
467
Rs/Sq.mtr
130
130
Optional Items as per table no 8 Max
limit
Page | 110
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH4M models
Table No. 3.2 - The detail estimates and technical specifications of NHM-FTNH4M-2000 model
Model
Structural material
NHM-FTNH4M-2000
G.I. Pipes
Size
2048 sq m,2024 sq m
32 m x 64 m
44 m x 46m
Minimum 4.0 m
Dimensions
Height
Sr.
No.
Particulars
Rate
(Rs)
Unit
32 m x 64 m
2048
44 m x 46m
2024
Quantity
Amount
(Rs)
Quantity
Amount
(Rs)
A
Cost of Material
1
GI Pipes
65
Kgs.
3929
255385
3852
250380
2
Shade Net (Tapenet on roof)
25
Sq.mtrs
1764
44100
1764
44100
3
Insect Net (on sides)
40
Sq.mtrs
703
28120
658
26320
4
Laminated woven film (apron)
43
Sq.mtrs
293
12599
274
11782
5
Aluminium Profiles
45
Mtrs.
648
29160
655
29475
6
Locking spring
10
Mtrs.
942
9420
952
9520
7
Self drilling tapping Screws
1.5
Nos.
1296
1944
1309
1963.5
8
Clamps & Accessories
15
Sq.mtrs
2048
30720
2024
30360
9
High Tensile Nuts & Bolts
10
Sq.mtrs
2048
20480
2024
20240
10
UV stabilised FRP-Door
Sub Total
3000
Nos.
1
3000
1
3000
VAT
5%
Total Material Cost
B
C
1
2
3
D
E
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
G
427141
21746
29003
456674
456144
150
Nos.
196
29400
196
29400
35
130
35
Sq.mtrs
Nos.
Sq.mtrs
2048
196
2048
71680
25480
71680
168840
654914
20869
13098
2024
196
2024
70840
25480
80640
176960
633104
21872
12662
12.36%
2.00%
Grand total
F
434928
688881
667638
Unit rate
a) Control Head – 500
Rs/Sq.mtr
336
330
Rs/Sq.mtr
54
54
b) Irrigation System
Rs/Sq.mtr
c) Fogging System
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Rs/Sq.mtr
25
25
104
440
25
25
104
434
Rs/Sq.mtr
113
113
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
Page | 111
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH4M-3000 models
Table No. 3.3 - The detail estimates and technical specifications of NHM-FTNH4M-3000 model
Model
Structural material
Size
NHM-FTNH4M-3000
G.I. Pipes
3016 sq m,3040 sq m
52 m x 58 m
40 m x 76 m
Minimum 4.0 m
Dimensions
Height
Sr.
No.
Particulars
Rate
(Rs)
Unit
52 m x 58 m
3016
Quantity
40 m x 76 m
3040
Amount
(Rs)
Quantity
Amount
(Rs)
A
Cost of Material
1
GI Pipes
65
Kgs.
5464
355160
5542
360230
2
Shade Net (Tapenet on roof)
25
Sq.mtrs
2722
68050
2722
68050
3
Insect Net (on sides)
40
Sq.mtrs
809
32360
854
34160
4
Laminated woven film (apron)
43
Sq.mtrs
337
14491
356
15308
5
Aluminium Profiles
45
Mtrs.
936
42120
930
41850
6
Locking spring
10
Mtrs.
1362
13620
1352
13520
7
Self drilling tapping Screws
1.5
Nos.
1872
2808
1859
2788.5
8
Clamps & Accessories
15
Sq.mtrs
3016
45240
3040
45600
9
High Tensile Nuts & Bolts
10
Sq.mtrs
3016
30160
3040
30400
10
UV stabilised FRP-Door
Sub Total
3000
Nos.
1
3000
1
3000
VAT
5%
Total Material Cost
B
C
1
2
3
D
E
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
G
614907
30350.45
30745.33
637359
645652
150
Nos.
262
39300
262
39300
35
130
35
Sq.mtrs
Nos.
Sq.mtrs
3016
262
3016
105560
34060
105560
245180
921839
30304
18437
3040
262
3040
106400
34060
106400
246860
931812
30512
18636
12.36%
2.00%
Grand total
F
607009
970580
980960
Unit rate
a) Control Head - 500
Rs/Sq.mtr
322
323
Rs/Sq.mtr
44
44
b) Irrigation System
Rs/Sq.mtr
c) Fogging System
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Rs/Sq.mtr
25
25
94
416
25
25
94
417
Rs/Sq.mtr
98
98
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
Page | 112
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH4M models
Table No. 3.4 - The detail estimates and technical specifications of NHM-FTNH4M-4000 model
Model
Structural material
NHM-FTNH4M-4000
G.I. Pipes
4000 sq m
4096 sq m
40 m x 100 m
64 m x 64 m
Minimum 4.0 m
Size
Dimensions
Height
Sr.
No.
40 m x 100 m
4000
Amount
Quantity
(Rs)
64 m x 64 m
4096
Amount
Quantity
(Rs)
Rate
(Rs)
Unit
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
7139
464035
7186
467090
25
Sq.mtrs
3629
90725
3780
94500
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
1036
41440
945
37800
43
Sq.mtrs
432
18576
394
16942
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
1194
53730
1246
56070
10
Mtrs.
1736
17360
1813
18130
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
2387
3580.5
2493
3739.5
15
Sq.mtrs
4000
60000
4096
61440
10
Sq.mtrs
4000
40000
4096
40960
3000
Nos.
1
3000
1
3000
A
Particulars
Cost of Material
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
Total Material Cost
B Foundation-civil material
C Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
Total
D Service Tax on Labour cost
E Transport cost
792447
799672
5%
39622.33
39983.58
150
Nos.
326
832069
48900
839655
49800
35
130
35
Sq.mtrs
Nos.
Sq.mtrs
4000
326
4000
12.36%
2.00%
Grand total
F
G
140000
42380
140000
322380
1203349
39846
24067
332
4096
332
4096
143360
43160
143360
329880
1219335
40773
24387
1267262
1284495
Unit rate
a) Control Head - 500
Rs/Sq.mtr
317
314
Rs/Sq.mtr
38
38
b) Irrigation System
Rs/Sq.mtr
c) Fogging System
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Rs/Sq.mtr
25
25
88
405
25
25
88
402
Rs/Sq.mtr
89
89
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
Page | 113
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH3.25M models
Table No. 4.1 - The detail estimates and technical specifications of NHM-FTNH3.25M-1000 model
Model
Structural material
Size
Dimensions
Height
Sr.
No.
A
NHM-FTNH3.25M-1000
G.I. Pipes
1012 sq m
22 m x 46 m
Minimum 3.25 m
Unit
1 GI Pipes
65
Kgs.
1428
92820
2 Shade Net (Tapenet on roof)
25
Sq.mtrs
903
22575
3 Insect Net (on sides)
40
Sq.mtrs
425
17000
4 Laminated woven film (apron)
43
Sq.mtrs
213
9159
5 Aluminium Profiles
45
Mtrs.
285
12825
6 Locking spring
10
Mtrs.
414
4140
7 Self drilling tapping Screws
1.5
Nos.
544
816
8 Clamps & Accessories
10
Sq.mtrs
1012
10120
5
3000
Sq.mtrs
Nos.
1012
1
5060
3000
Particulars
Quantity
Sub Total
VAT
Total Material Cost
B
Foundation-civil material
C
Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
Total
D
Service Tax on Labour cost
E
Transport cost
5%
177515
8876
150
Nos.
98
186391
14700
35
120
35
Sq.mtrs
Nos.
Sq.mtrs
1012
98
1012
12.36%
2.00%
Grand total
G
Amount
(Rs)
Cost of Material
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
F
22 m x 46 m
1012
Rate
(Rs)
35420
11760
35420
82600
283691
10209
5674
299574
Unit rate
a) Control Head – 500
Rs/Sq.mtr
296
Rs/Sq.mtr
67
b) Irrigation System
Rs/Sq.mtr
25
c) Fogging System
Rs/Sq.mtr
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Optional Items as per table no 8 Max limit
Rs/Sq.mtr
25
117
413
130
Rs/Sq.mtr
Page | 114
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH3.25M models
Table No. 4.2 - The detail estimates and technical specifications of NHM-FTNH3.25M-2000 model
Model
Structural material
NHM-FTNH 3.25M-2000
G.I. Pipes
Size
2080 sq m
40 m x 52 m
Dimensions
Height
Sr.
No.
Minimum 3.25 m
Particulars
Rate
(Rs)
Unit
40 m x 52 m
2080
Quantity
Amount
(Rs)
A
Cost of Material
1
GI Pipes
65
Kgs.
2493
162045
2
Shade Net (Tapenet on roof)
25
Sq.mtrs
2058
51450
3
Insect Net (on sides)
40
Sq.mtrs
576
23040
4
Laminated woven film (apron)
43
Sq.mtrs
288
12384
5
Aluminium Profiles
45
Mtrs.
509
22905
6
Locking spring
10
Mtrs.
741
7410
7
Self drilling tapping Screws
1.5
Nos.
972
1458
8
Clamps & Accessories
15
Sq.mtrs
2080
31200
9
High Tensile Nuts & Bolts
10
Sq.mtrs
2080
20800
10
UV stabilised FRP-Door
Sub Total
3000
Nos.
1
3000
VAT
335692
5%
16785
Total Material Cost
B
C
1
2
3
D
E
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
352477
150
Nos.
153
22950
35
130
35
Sq.mtrs
Nos.
Sq.mtrs
2080
153
2080
72800
19890
72800
165490
540917
20455
10818
12.36%
2.00%
Grand total
F
G
572189
Unit rate
a) Control Head - 500
Rs/Sq.mtr
275
Rs/Sq.mtr
54
b) Irrigation System
Rs/Sq.mtr
c) Fogging System
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Optional Items as per table no 8 Max limit
Rs/Sq.mtr
25
25
104
379
113
Rs/Sq.mtr
Rs/Sq.mtr
Page | 115
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH3.25M-3000 models
Table No. 4.3 - The detail estimates and technical specifications of NHM-FTNH3.25M-3000 model
Model
Structural material
Size
NHM-FTNH3.25M-3000
G.I. Pipes
3016 sq m,3040 sq m
52 m x 58 m
40 m x 76 m
Minimum 3.25 m
Dimensions
Height
Sr.
No.
Particulars
Rate
(Rs)
Unit
52 m x 58 m
3016
40 m x 76 m
3040
Quantity
Amount
(Rs)
Quantity
Amount
(Rs)
A
Cost of Material
1
GI Pipes
65
Kgs.
3399
220935
3472
225680
2
Shade Net (Tapenet on roof)
25
Sq.mtrs
3080
77000
3066
76650
3
Insect Net (on sides)
40
Sq.mtrs
690
27600
728
29120
4
Laminated woven film (apron)
43
Sq.mtrs
345
14835
364
15652
5
Aluminium Profiles
45
Mtrs.
701
31545
694
31230
6
Locking spring
10
Mtrs.
1019
10190
1010
10100
7
Self drilling tapping Screws
1.5
Nos.
1338
2007
1325
1987.5
8
Clamps & Accessories
15
Sq.mtrs
3016
45240
3040
45600
9
High Tensile Nuts & Bolts
10
Sq.mtrs
3016
30160
3040
30400
10
UV stabilised FRP-Door
Sub Total
3000
Nos.
1
3000
1
3000
VAT
5%
Total Material Cost
B
C
1
2
3
D
E
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
G
469420
23125.6
23470.98
485638
492890
150
Nos.
198
29700
205
30750
35
130
35
Sq.mtrs
Nos.
Sq.mtrs
3016
198
3016
105560
25740
105560
236860
752198
29276
15044
3040
205
3040
106400
26650
106400
239450
763090
29596
15262
12.36%
2.00%
Grand total
F
462512
796517
807948
Unit rate
a) Control Head - 500
Rs/Sq.mtr
264
266
Rs/Sq.mtr
44
44
b) Irrigation System
Rs/Sq.mtr
c) Fogging System
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Rs/Sq.mtr
25
25
94
358
25
25
94
360
Rs/Sq.mtr
98
98
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
Page | 116
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH3.25M models
Table No. 4.4 - The detail estimates and technical specifications of NHM-FTNH3.25M-4000 model
Model
Structural material
NHM-FTNH3.25M-4000
G.I. Pipes
4000 sq m
4096 sq m
40 m x 100 m
64 m x 64 m
Minimum 3.25 m
Size
Dimensions
Height
Sr.
No.
40 m x 100 m
4000
Amount
Quantity
(Rs)
64 m x 64 m
4096
Amount
Quantity
(Rs)
Rate
(Rs)
Unit
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
4452
289380
4418
287170
25
Sq.mtrs
4074
101850
4270
106750
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
879
35160
803
32120
43
Sq.mtrs
439
18877
402
17286
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
879
39555
919
41355
10
Mtrs.
1278
12780
1336
13360
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
1678
2517
1754
2631
15
Sq.mtrs
4000
60000
4096
61440
10
Sq.mtrs
4000
40000
4096
40960
3000
Nos.
1
3000
1
3000
A
Particulars
Cost of Material
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
Total Material Cost
B Foundation-civil material
C Labour Cost
1 Fabrication
2 Foundation
3 Installation
Total Labour cost
Total
D Service Tax on Labour cost
E Transport cost
603119
606072
5%
30155.95
30303.6
150
Nos.
257
633275
38550
636376
37050
35
130
35
Sq.mtrs
Nos.
Sq.mtrs
4000
257
4000
12.36%
2.00%
Grand total
F
G
140000
33410
140000
313410
985235
38737
19705
247
4096
247
4096
143360
32110
143360
318830
992256
39407
19845
1043677
1051508
Unit rate
a) Control Head – 500
Rs/Sq.mtr
261
257
Rs/Sq.mtr
38
38
b) Irrigation System
Rs/Sq.mtr
c) Fogging System
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Rs/Sq.mtr
25
25
88
349
25
25
88
345
Rs/Sq.mtr
89
89
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
Page | 117
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The detail estimates of NHM-FTNH3.25M models
Table No. 4.5 - The detail estimates and technical specifications of NHM-FTNH3.25M-4000 model
Model
Structural material
NHM-FTNH3.25M-4000
G.I. Pipes
4048 sq m
4060 sq m
46 m x 88 m
58 m x 70 m
Minimum 3.25 m
Size
Dimensions
Height
Sr.
No.
46 m x 88 m
4048
Amount
Quantity
(Rs)
58 m x 70 m
4060
Amount
Quantity
(Rs)
Rate
(Rs)
Unit
1 GI Pipes
2 Shade Net (Tapenet on roof)
65
Kgs.
4435
288275
4390
285350
25
Sq.mtrs
4165
104125
4221
105525
3 Insect Net (on sides)
4 Laminated woven film (apron)
40
Sq.mtrs
841
33640
803
32120
43
Sq.mtrs
421
18103
402
17286
5 Aluminium Profiles
6 Locking spring
45
Mtrs.
892
40140
905
40725
10
Mtrs.
1298
12980
1317
13170
7 Self drilling tapping Screws
8 Clamps & Accessories
1.5
Nos.
1703
2554.5
1728
2592
15
Sq.mtrs
4048
60720
4060
60900
10
Sq.mtrs
4048
40480
4060
40600
3000
Nos.
1
3000
1
3000
A
Particulars
Cost of Material
9 High Tensile Nuts & Bolts
10 UV stabilised FRP-Door
Sub Total
VAT
5%
Total Material Cost
B
C
1
2
3
D
E
Foundation-civil material
Labour Cost
Fabrication
Foundation
Installation
Total Labour cost
Total
Service Tax on Labour cost
Transport cost
G
601268
30200.88
30063.4
634218
631331
150
Nos.
252
37800
246
36900
35
130
35
Sq.mtrs
Nos.
Sq.mtrs
4048
252
4048
141680
32760
141680
316120
988138
39072
19763
4060
246
4060
142100
31980
142100
316180
984411
39080
19688
12.36%
2.00%
Grand total
F
604018
1046974
1043179
Unit rate
a) Control Head - 500
Rs/Sq.mtr
259
257
Rs/Sq.mtr
38
38
b) Irrigation System
Rs/Sq.mtr
c) Fogging System
Irrigation System
Total Unit Rate
Rs/Sq.mtr
Rs/Sq.mtr
25
25
88
347
25
25
88
345
Rs/Sq.mtr
89
89
Optional Items as per table no 8 Max
limit
Rs/Sq.mtr
Page | 118
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
ANNEX-4
Maximum rates per unit area of Polyhouse /ShadeNet house
The maximum rates per unit area of polyhouse of different types and modeles
+)½þÊ®úiÉMÉÞ½þ
¤ÉɤÉ
¨ÉÉìbä÷±ÉSÉÉ |ÉEòÉ®ú
BEÚòhÉ IÉäjÉ (SÉÉè.¨ÉÒ.)
¨ÉÉìbä÷±ÉxÉÖºÉÉ®ú ½þÊ®úiÉMÉÞ½þÉSÉÉ +ÉEòÉ®ú
(¯ÆûnùÒ x ±ÉÉƤÉÒ) (¨ÉÒ.)
|ÉÊiÉ SÉÉè.¨ÉÒ. JÉSÉÇ
(¯û.) (¨ÉÉ{ÉnÆùb÷)
NHM-OVPH–500
560
20x 28
935
1008
28x 36
884
1008
36x 28
895
(näùªÉ- 890)
2016
36 x 56
848
2080
52 x 40
824
3120
52 x 60
821
3120
60x 52
823
4080
60x 68
806
4000
100X 40
818
1008
28 x 36
1408
1008
36 x 28
1430
2016
36 x 56
1227
2080
52 x 40
1285
3120
52 x 60
1214
3120
60 x 52
1244
4080
68 x 60
1205
4000
100x 40
1173
NHM-OVPH–1000
हरितगह
ृ
(OVPH)
NHM-OVPH–2000
NHM-OVPH–3000
NHM-OVPH–4000
NHM-CCPH -1000
हरितगह
ृ
NHM-CCPH -2000
(CCPH)
NHM-CCPH -3000
NHM-CCPH -4000
Page | 119
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
The maximum rates per unit area of Shadenet house of different
types and modeles
¤É) शेडनेटहाऊस
¤ÉɤÉ
शेडनेटहाऊस
(Round
Type)
5मी.उं ची
शेडनेटहाऊस
(Round
Type)
4 मी. उं ची
¨ÉÉìbä÷±ÉSÉÉ |ÉEòÉ®ú
BEÚòhÉ IÉäjÉ (SÉÉè.¨ÉÒ.)
NHM-RTNH5M-500
NHM-RTNH5M-1000
504
1008
NHM-RTNH5M-2000
2016
NHM-RTNH5M-3000
NHM-RTNH4M-500
3024
3072
3024
4032
4080
4032
4056
504
NHM-RTNH4M-1000
1008
NHM-RTNH4M-2000
2016
NHM-RTNH5M-4000
NHM-RTNH4M-3000
NHM-RTNH4M-4000
NHM-FTNH4M-1000
शेडनेटहाऊस
(Flat Type)
4 मी. उं ची
NHM-FTNH4M-2000
NHM-FTNH4M-3000
NHM-FTNH4M-4000
शेडनेटहाऊस
(Flat
Type)३.२५
NHM-FTNH 3.25M-1000
NHM-FTNH3.25M -2000
NHM-FTN3000
मीटि उं ची
NHM-FTNH3.25M -4000
3024
3072
3024
4080
4032
4056
1040
1088
2048
2024
3016
3040
4000
4096
1012
2080
3016
3040
4000
4096
4048
4060
¨ÉÉìbä÷±ÉxÉÖºÉÉ®ú ¶Éäb÷xÉä]õ½þÉ>ðºÉ
+ÉEòÉ®ú
(¯ÆûnùÒ x ±ÉÉƤÉÒ) (¨ÉÒ.)
|ÉÊiÉ SÉÉè.¨ÉÒ. JÉSÉÇ
(¯û.) (¨ÉÉ{ÉnÆùb÷)
18 x28
36 x 28
36 x 56
42 x 48
42 x 72
48 x 64
54 x 56
48 x 84
60 x 68
72 x 56
78 x 52
18 x28
604
561
518
511
510
510
511
498
498
501
502
545
36 x 28
36 x 56
42 x 48
42 x 72
48 x 64
54 x 56
60 x 68
72 x 56
78 x 52
20 x 52
32 x34
32 x 64
44 x46
52 x 58
40 x 76
40 x 100
64 x 64
22 x 46
40 x 52
52 x 58
40 x 76
40 x 100
64 x 64
46 x 48
58 x 70
507
469
464
462
462
463
451
453
454
476
467
440
434
416
417
405
402
413
379
358
360
349
345
347
345
Page | 120
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
ANNEX-5
Application Cum Company Profile
for Registration for Polyhouseand Nethouse Scheme
for the Year 2015-16
1
Name of the Company for
manufacture/supplier
2
Date of commencement of
production/supply
3
Address of Registered Head
Office
4
Type of Organisation
5
Details of competent
authority
Proprietary / Partnership / Pvt. Limited / Public
Limited /Any other (Pl specify)_________________
Designation
Name
company:
(a) Details of
Chairman/CEO/MD or
the authorized
Person/Director from
the Board of Directors
for the private and
public ltd
(b) Details of all the
partners for
Partnership
firm/company
(such as
Chairman/CEO/
MD/Director/Par
tner/ Proprietor)
Mobile No.
1
2
3
4
(c)Details of Proprietor
for Proprietorship
firm/company
5
(use separate sheet if
required)
6
7
8
9
Page | 121
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
6
SSI Registration No.& Date of
issue
7
VAT TIN No.
8
Service Tax Registration No.
(If applicable)
9
PAN No.
10 Web site (If applicable)
11 Details of
Technical
Persons in
Service
Center
Name Designation Mobile
No
Qualification* Experience
1
2
3
4
5
(*-Proof of qualification is required)
12
Sr.
Contact Details
Office
No. (Head/
Regional /
Branch / any
other)
13
City and
address
Contact
Person
Telephone
No.
Fax
No.
E mail
ID
Jurisdiction
List of the districts for which
registration is required
Page | 122
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
14
15
Components for which registration is required
a) Open Vent Polyhouses
Yes/No
b) Climate controlled Polyhouses
Yes/No
c) Flat Top Net Houses
Yes/No
d) Round Top Net Houses
Yes/No
Information on R & D facilities available with the company. Provide details about
a)
Research Activities
b) Development activities including
1. Farmer’s Training
2. Seminars
3. Visit of farmers
If applicant manufacturers/supplier desire to
conduct farmer’s training at Agri. polyclinics,
the same may be indicated
16
List of dealers, district wise
(use separate sheet if required)
Sr.
No.
District
Detail address
with Phone
No.& Fax
Appointment CST/BST Jurisdiction
year
No.
Whether
dealer is
Exclusive/
Non
Exclusive
1
2
3
4
5
6
17
The details of farmer’s
complaints received regarding
manufacturing defects of
components, action taken to
redress them during the year
2012-13.
Page | 123
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Certificate and Undertaking
Certified that the above said information is true and correct and undersigned is aware that in case of any
discrepancy/false information, the registration is liable to be cancelled and a suitable legal action will be
taken against the company. Undersigned also agrees to execute guarantee and warranty of products and
materialssupplied to the cultivators, as per mentioned inTerms & Conditions.as well as the Performance
guarantee in the form of bank guarantee in the format(Annex-8)prescribed by the Commissionerate of
Agriculture / Maharashtra State Horticulture and Medicinal Plant Board.
The all Terms & Conditions are applicable & binding to me/us.
Undersigned shall execute an agreement withCommissionerate of Agriculture/Maharashtra State
Horticulture and Medicinal Plant Board within 15 days of registration for the year 2015-2016,failing which
the registration will stand terminated without any notice.
I/We also undertake to supply the materials as per specifications provided by MSHMPB/Department of
agriculture keep the batch wise record of all the components/items of polyhouse/nethousealong with the
details such as make, batch no./lot no. and mention in supply bill so that traceability of material supplied to
any farmer will be possible.
Place Date Signature of Competent Authority
Name/Designation (with seal)
Page | 124
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Annex-6
The make/brand name/s of different components of polyhouse/nethouse
Sr.No.
Name of the components
Make/brand*
(Note: * Manufacturer/supplier should enlist all the makes/brands of the components which they
provide/use)
Page | 125
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Annex-7
Price list of additional components (other than listed in Annex-2 if any) for poly house
and net house
Sr.
No.
Details of additional items
Rate
(Rs)
Unit
1
2
3
4
5
6
7
8
9
10
Page | 126
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Annex-8
To,
________________________________
________________________________
________________________________
BANK GUARANTEE
WHEREAS ______________________________________________,(hereinafter) called as CAO) have
approved M/s ___________________________________________ (hereinafter called firm) for the supplies
of Polyhouseand Nethouse (hereinafter called the said goods) under the Polyhouse and Nethouse
Scheme(hereinafter called the said scheme)
AND WHEREAS in pursuance and under the terms of the said approved of the firm, firm has agreed to
furnish in favour of the CAO the Bank Guarantee for a sum of Rs.1,00,000.00 (Rupees one lakh only) for
the due performance of his/her its obligation to the CAO under the terms and conditions of the G.R. of Govt.
of Maharashtra performance as per the terms and conditions of G.R. and circular as when Govt. and Deptt.
have issued.
We, ________________________________________ (hereafter called the bank) hereby irrevocably and
un-conditionally undertake and guarantee payment to CAO forthwith on demand being made by CAO in
writing without dumur any and all monies anywise payable by firm, as may be specified in the notice of the
demand made by the CAO to the bank upto an aggregate a sum of Rs. 1,00,000/- (Rupees one lakh only) and
the bank hereby agree and undertake to the CAO that
1. The firm will have to give complete material to the farmers as mentioned in the bill invoice in
quantity and quality as per specification. (with prescribed guarantee of materials), alongwith
installation of Polyhouse and /or shadenet house work .
2. In consideration interalia of the firm paying to the guarantor the guarantee charges and executing
requisites documents in favour of the bank and which have been done prior to the execution
hereof and the request of the firm, the Bank hereby agree with CAO THAT in the event of any
default and / or defaults being committed by the firm in payment to the firm of the said Rs.
1,00,000/- (Rupees one lakh only) and or any part thereof the Bank hereby irrevocably
unconditionally and or without any demur and not withstanding any intimation and or direction
by the firm to the contrary guarantee and convenients to pay to the CAO IN PUNE the said sum
Rs. 1,00,000/- (Rupees one lakh only) and or any part thereof as the case may be.
3. The CAO shall be entitle to act under the terms hereof as if the Bank was the Principal Deptor to
the CAO for payment of any amount upto the said sum of Rs. 1,00,000/- (Rupees one lakh only)
guarantee by the Bank aforesaid to the CAO.
4. The guarantee is additional and without prejudice to any security of obligations which CAO may
now of hereafter have from the firm and or any other person in respect of the said indebtness and
or liabilities and or obligations hereby guaranteed and all rights and remedies in respect thereof
are hereby reserved by the CAO in its favour.
Page | 127
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
5. The guarantee contained herein is irrevocable and unconditional shall be continuing guarantee
and shall remain in force for a period of 36 months with effect from the date of guarantee. On the
CAO serving on the bank notice of claim under this guarantee before the expiry of the said
period, the same shall be enforeceable against the bank not withstanding the fact that the same is
payable after expiry of the said period.
6. The guarantee shall be continuing guarantee and shall not be considered as wholly or partially
satisfies or exhaust by any payments from time to time made by the Bank or the distributor or
any settlements of the accounts between the CAO and the firm.
7. The bank shall make the payment to the firm at the time or from time to time a sum not
exceeding in aggregate the said sum of Rs. 1,00,000/- (Rupees one lakh only) unconditionally
and without any demur and irrespective of any instructions or directions given by the firm to the
bank to without payment thereof or any ground whatsoever. The bank obligations of the bank in
terms hereof shall not be anywise affected or suspended by reason of dispute (if any) having been
raised by the firm (whether of not pending before any Arbitrator Office, Tribunal or Court) or
any denial of liability by the firm stopping or preventing or purporating to stop or prevent any
payment by the Bank of CAO in terms thereof.
8. The bank hereby further agrees with declares and undertake to CAO that his guarantee is and
shall always be unconditional irrevocable and absolute till guaranteed amount hereunder have
been paid in full to the CAO irrespective of any dispute of difference as to any liability of the
firm under the said G.R. or invalidity, enforceability, illegality or otherwise of any terms,
conditions or provision for the said G.R. between the firm and the CAO or otherwise.
9. This guarantee shall be determined of affected by the liquidation or winding up, dissolution of
change of constitution or insolvency of the firm or change in the constitution of either the firm or
bank but shall in respect and for all purposes be binding and operative until satisfactory
performance of all the obligations by the firm towards CAO.
10. Notwithstanding anything contained herein :
a) Our liability under this guarantee shall not exceed Rs. 1,00,000/- (Rupees one lakh only).
b) The guarantee shall be valid up to ________________________.
c) We are liable to pay the guaranteed amount or any part thereof under this guarantee only and
only if you serve upon us a written claim of demand on or before _____________ (inclusive
of claim period of three months).
Place :
Date :
(Note: Bank Guarantee for a sum of Rs.50,000.00 (Rs. Fifty thousands only) for the manufacturers/suppliers
registered in Maharashtra State as small scale unit)
Page | 128
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Annex-9
Format of information board to be provided at each Service Center
Specifications: Information board should be of size 5’ x 4’. The board should be preferably made from the
iron/steel sheet with iron/steel angle of sufficient strength for mounting and fixed in foundation.
Place: The board should be installed at each Service Station of Supplies/Manufacturer at the eye level for
the height of normal person.
Color: The background color should be blue and colors of letters should be white.
Format
Authorized Service Center
of
(Name of registered manufacturer/supplier)
for
Providing service for Polyhouse and Nethouses
Contact Person: (Name of an agricultural engineer)
Mobile:
Landline:
Fax:
Email:
Page | 129
E:\2014-15\guideline\GUIDELINE 2014-15 PC.
Annex-10
Format of Registers to be maintained at each Service Center
Register should be maintained at the Service Center and be made available to the concerned offices from
Department of Agriculture/ Maharashtra State Horticulture and Medicinal Plant Board (MSHMPB)/State
NHM, Maharashtra State and farmers/cultivators.
There should be separate page for each farmers/cultivator to whom the polyhouse/nethouse has been
supplied by the manufacturer/supplier in following format.
Name of the farmer/cultivator:
Address of farmers/cultivator:
Landline
Mobile:
Email:
The location where polyhouse/nethouse is provided:
The details of polyhouse and nethouse provided
1.
2.
3.
4.
5.
Size:
Type:
Total Price:
Date of completion:
Other items supplied:
Page | 130
E:\2014-15\guideline\GUIDELINE 2014-15 PC.