Florida Department of TRANSPORTATION Citizens Transportation Advisory Committee (CTAC) Dat Huynh, P.E. - FDOT District Six (Elsa Riverol, P.E. – FDOT District Six) EXPRESS LANES FUTURE PLANS UPDATE Express Lanes Network Map In Operation (green) • 95 Express Phase 1 Under Construction or Design Build (purple) • 95 Express Phase 2 • I-75 • SR 826 (North-South) Design (red) • HEFT (south of SR 836) • 95 Express Phase 3 PD&E (light blue) • SR 826 (East-West) Florida Department of Transportation 95 Express – Phase 1 • Project Phase: In Operation Florida Department of Transportation 95 Express – Phase 1 Key Project Information: • • Launched in December 2008 95 Express is a congestion management project that combined four transportation techniques (tolling, transit, travel-demand management and technology) to: – – – – • • Improve mobility Increase the operating efficiency of the existing highway Offer more reliable trip options in southeast Florida Provides commuters more options for traveling on I-95 Transit ridership has increased Bus-rapid transit (95 Express Bus) service helps to reduce the number of vehicles traveling during rush hours – Seen increased 95 Express Bus ridership by an average of 170% since pre‐95 Express Florida Department of Transportation 95 Express – Phase 2 North of Golden Glades to Broward Boulevard in Broward County • Project Phase: Under Construction • Project Manager: Albert Salas, P.E. • Expected Completion: October 2015 2015 • Key Project Information: – Extend existing Express Lanes – Began November 2011 – Estimated cost of $112 million • Major Work Items: – – – – Converting HOV lane into two Express Lanes in each direction Intelligent Transportation System (ITS) components, bridge widening and noise walls Florida Department of Transportation I-75 / SR 826 (Palmetto) Express Lanes Florida Department of Transportation I-75 / SR 826 (Palmetto) Express Lanes I-75 / Palmetto Express – FDOT District Six (Miami‐Dade County) and FDOT District Four (Broward County) are working together to implement express lanes along 28 miles of the SR 826/Palmetto Expressway and I‐75 corridors Florida Department of Transportation 75 Express • • Project Phase: Under Construction Project Manager(s): – Teresita Alvarez, P.E. (District Six), – Paul Lampley, P.E. (District Four) • • Expected Completion: Mid-2019 Key project components: – Express lanes direct connections to I-595 Express, Palmetto Express, and the Florida’s Turnpike (HEFT) – Ingress and egress ramps to enter and exit the express lanes at various locations throughout the corridor – Accommodation of Bus Rapid Transit (partnership with County Transit Agencies) – Integrated ITS / Tolling systems – Noise walls – Emergency response provisions Florida Department of Transportation Palmetto Express SR 826/Palmetto Expressway from W. Flagler Street to NW 154 Street and along I-75 from the Palmetto Expressway to NW 170 Street in Miami-Dade County. • Project Phase: Under Construction • Project Manager: Teresita Alvarez, P.E. • Construction Timeline: April 2014 to fall 2017 • Key Project Information: – Tolled express lanes along corridor with moderate widening of Palmetto Expressway mainline – Express lanes will be physically separated with plastic poles from local traffic Florida Department of Transportation Palmetto Expressway Palmetto Expressway (SR 826) from I-75 to the Golden Glades Interchange • Project Phase: PD&E Study (Pending FHWA Approval) • Project Manager: Dat Huynh, P.E. • Project Funding: Funded for design in fiscal years 2017‐2019 Florida Department of Transportation Palmetto Expressway Florida Department of Transportation 826-836 Interchange Reconstruction Project Just north of SW 8 Street to NW 25 Street on SR 826, just east of NW 87 Avenue to NW 57 Avenue on SR 836 • Project Phase: Under Construction • Project Manager: Emmanuel Espinal, P.E. • Expected Completion: Early 2016 Florida Department of Transportation Florida’s Turnpike Widening Turnpike Extension / SR 821 from SW 184 Street/Eureka Drive to south of SW 104 Street/Killian Parkway • Construction Timeline: March 2014 to early 2017 • Project Manager: Paul Naranjo, P.E. • Key Project Information: – Express lanes will be added to provide 12 lanes from Eureka Drive to State Road 874/Don Shula Expressway and eight lanes from SR 874 to south of Killian Parkway Florida Department of Transportation Florida’s Turnpike Widening Turnpike Extension / SR 821 1. From south of SW 104 Street / Killian Parkway to north of SW 72 Street / Sunset Drive 2. From north of Sunset Drive to north of SW 40 Street / Bird Road 3. From north of Bird Road to SR 836 / Dolphin Expressway • Project Manager: Paul Naranjo, P.E. • Key Project Information: – Widens from six to ten travel lanes – New lanes will be express lanes for a total of two express lanes and three general toll lanes in each direction Florida Department of Transportation Florida’s Turnpike Widening Turnpike / SR 821 1. From SR 836/Dolphin Expressway to NW 74 Street 2. From NW 74 Street to NW 106 Street 3. From NW 106 Street to I-75 (Northbound) • Project Manager: Mike VanDerHeyden, P.E. • Key Project Information: – Widens from six to ten travel lanes – New lanes will be express lanes for a total of two express lanes and three general toll lanes in each direction Florida Department of Transportation Florida Department of TRANSPORTATION
© Copyright 2024