Express Lanes - Miami

Florida Department of
TRANSPORTATION
Citizens Transportation Advisory Committee (CTAC)
Dat Huynh, P.E. - FDOT District Six
(Elsa Riverol, P.E. – FDOT District Six)
EXPRESS LANES FUTURE PLANS UPDATE Express Lanes Network Map
In Operation (green)
• 95 Express Phase 1
Under Construction or Design Build
(purple)
• 95 Express Phase 2
• I-75
• SR 826 (North-South)
Design (red)
• HEFT (south of SR 836)
• 95 Express Phase 3
PD&E (light blue)
• SR 826 (East-West)
Florida Department of Transportation
95 Express – Phase 1
•
Project Phase: In Operation
Florida Department of Transportation
95 Express – Phase 1
Key Project Information:
•
•
Launched in December 2008
95 Express is a congestion management project that combined four
transportation techniques (tolling, transit, travel-demand
management and technology) to:
–
–
–
–
•
•
Improve mobility
Increase the operating efficiency of the existing highway
Offer more reliable trip options in southeast Florida
Provides commuters more options for traveling on I-95
Transit ridership has increased
Bus-rapid transit (95 Express Bus) service helps to reduce the
number of vehicles traveling during rush hours
– Seen increased 95 Express Bus ridership by an average of 170% since
pre‐95 Express
Florida Department of Transportation
95 Express – Phase 2
North of Golden Glades to Broward Boulevard in Broward County
• Project Phase: Under Construction
• Project Manager: Albert Salas, P.E.
• Expected Completion: October 2015 2015
• Key Project Information:
– Extend existing Express Lanes
– Began November 2011
– Estimated cost of $112 million
•
Major Work Items:
–
–
–
–
Converting HOV lane into two Express Lanes in each direction
Intelligent Transportation System (ITS) components,
bridge widening and
noise walls
Florida Department of Transportation
I-75 / SR 826 (Palmetto) Express Lanes
Florida Department of Transportation
I-75 / SR 826 (Palmetto) Express Lanes
I-75 / Palmetto Express – FDOT District Six (Miami‐Dade County) and FDOT District Four (Broward County) are working together to implement express lanes along 28 miles of the SR 826/Palmetto Expressway and I‐75 corridors Florida Department of Transportation
75 Express
•
•
Project Phase: Under Construction
Project Manager(s):
– Teresita Alvarez, P.E. (District Six),
– Paul Lampley, P.E. (District Four)
•
•
Expected Completion: Mid-2019
Key project components:
– Express lanes direct connections to I-595 Express, Palmetto Express, and
the Florida’s Turnpike (HEFT)
– Ingress and egress ramps to enter and exit the express lanes at various
locations throughout the corridor
– Accommodation of Bus Rapid Transit (partnership with County Transit
Agencies)
– Integrated ITS / Tolling systems
– Noise walls
– Emergency response provisions
Florida Department of Transportation
Palmetto Express
SR 826/Palmetto Expressway from W. Flagler Street to NW 154 Street
and along I-75 from the Palmetto Expressway to NW 170 Street in
Miami-Dade County.
• Project Phase: Under Construction
• Project Manager: Teresita Alvarez, P.E.
• Construction Timeline: April 2014 to fall 2017
• Key Project Information:
– Tolled express lanes along corridor with moderate widening of Palmetto
Expressway mainline
– Express lanes will be physically separated with plastic poles from local traffic
Florida Department of Transportation
Palmetto Expressway
Palmetto Expressway (SR 826) from I-75 to the Golden Glades
Interchange
• Project Phase: PD&E Study (Pending FHWA Approval)
• Project Manager: Dat Huynh, P.E.
• Project Funding: Funded for design in fiscal years 2017‐2019
Florida Department of Transportation
Palmetto Expressway
Florida Department of Transportation
826-836 Interchange Reconstruction Project
Just north of SW 8 Street to NW 25 Street on SR 826, just east of NW
87 Avenue to NW 57 Avenue on SR 836
• Project Phase: Under Construction
• Project Manager: Emmanuel Espinal, P.E.
• Expected Completion: Early 2016
Florida Department of Transportation
Florida’s Turnpike Widening
Turnpike Extension / SR 821 from
SW 184 Street/Eureka Drive to
south of SW 104 Street/Killian
Parkway
• Construction Timeline: March
2014 to early 2017
• Project Manager: Paul Naranjo,
P.E.
• Key Project Information:
– Express lanes will be added to
provide 12 lanes from Eureka
Drive to State Road 874/Don
Shula Expressway and eight
lanes from SR 874 to south of
Killian Parkway
Florida Department of Transportation
Florida’s Turnpike Widening
Turnpike Extension / SR 821
1. From south of SW 104 Street /
Killian Parkway to north of SW
72 Street / Sunset Drive
2. From north of Sunset Drive to
north of SW 40 Street / Bird
Road
3. From north of Bird Road to SR
836 / Dolphin Expressway
• Project Manager: Paul Naranjo,
P.E.
• Key Project Information:
– Widens from six to ten travel
lanes
– New lanes will be express lanes
for a total of two express lanes
and three general toll lanes in
each direction
Florida Department of Transportation
Florida’s Turnpike Widening
Turnpike / SR 821
1. From SR 836/Dolphin
Expressway to NW 74 Street
2. From NW 74 Street to NW 106
Street
3. From NW 106 Street to I-75
(Northbound)
• Project Manager: Mike
VanDerHeyden, P.E.
• Key Project Information:
– Widens from six to ten travel
lanes
– New lanes will be express lanes
for a total of two express lanes
and three general toll lanes in
each direction
Florida Department of Transportation
Florida Department of
TRANSPORTATION