Millennium Mine Site Induction Fact Sheet To ensure your Booking Request can be confirmed, you and / or your company are required to complete the following process and documentation. MILLENNIUM MINE INDUCTION BOOKING PROCESS - ONLINE BOOKINGS (no manual bookings accepted) 1. Lodge an induction application to [email protected] 2. After authorisation you will receive a link to direct you to the Pegasus Safety portal. 3. Register your company and the individual who is to undertake the induction and upload FOUR documents and a photo. Follow the instructions as provided. 4. After successful verification of these documents, the inductee will receive a link and log on ID and password via email. 5. The inductee then needs to complete the elements in the Online Induction Millennium – Contractor or Employee as appropriate. 6. Once they have completed 100% of the online component (it will say 100% complete) they can then apply for a date to attend the site component of the induction. They do not need to bring the documentation uploaded with them. 7. On completion of both components they will receive an access card at site allowing them access to the mine. 8. The card must be used to gain entry to the mine and on departure. If they do not log out they will be called to ensure they are no longer on site no matter the time of the day or night. 9. Those contractors that are currently inducted but do not have a card need to apply for one through the HST department. They will need to supply a passport photo of head and shoulders against a neutral background without hat or glasses. The contact is the same as the inductions email above. DOCUMENT REQUIREMENTS DESCRIPTOR Drivers Licence (provide on a separate piece of paper) Government body Drivers Licence, all states accepted. Colour copy, both front and back to be uploaded. Standard 11 Mining Induction Card and certificate to be supplied. Coal Board Medical Certificate Must be less than 5 years old. Drug and Alcohol Test No more than 7 days old. REQUIREMENTS NOTES Cost $25 (+GST) per Contractor Payment Options Approved account holders may use a P/O, otherwise credit card payments online are the only accepted method. Documentation Submission Documents to be scanned one per page, clear,legible and in colour. Please note -This is an completely online booking process. If any or all of the required documents are not uploaded for verification, or payment not made, you will unable to proceed with the booking. If you require any assistance with the process please do not hesitate to contact us on the details below. Document Name: Millennium Mine Site Specific sheet | Authorised by: Chief Operating Officer | Document Owner: Induction Supervisor Original Issue: 12/05/2014 | Current Version: V1 | Review Date: 12/05/2015 T 6571 8801 | F 6571 8890 | E [email protected]
© Copyright 2024