Industry- Academia Workshop on “S,H&E management in Oil Refinery & Pipeline Transportation” “OISD Standards on Design & Ind Operation Safety” 18.4.2015 Dy. General Manager (H,S &E)) Pipelines Head Office , Noida PLHO,HSE 1 18.4.2015 Presentation Outline 1. Recent Incident in Pipeline 2. Regulations 3. About OISD 4. OISD Standard – 117 /116 PLHO,HSE 5. OISD Standard - 118 6. OISD Standard - 141 2 18.4.2015 PLHO,HSE 3 18.4.2015 PLHO,HSE 4 18.4.2015 Indian Regulatory System- Pipelines Offshore Pipelines: Single Points Mooring System and connected Pipelines from / to onshore. Pipelines from Field to platforms / onshore location. On shore Pipeline system: On land pipelines from the boundary limit of installations including installations with or without storage facilities. PLHO,HSE 5 18.4.2015 Regulatory Frame Work – Offshore Pipelines Oilfields (Regulation and Development) Act,1948 (ORDA) Petroleum and Natural Gas Rules, 1959 (PNG Rules) Petroleum and Natural Gas (Safety in Offshore Operations) Rules, 2008 MoP& NG assisted by Director General Hydrocarbons (DGH). PLHO,HSE OISD 6 18.4.2015 1. Petroleum & Minerals Pipelines (Acquisition of Right of User in Land) Amendment Act’2011 (P&MP) 2. The Petroleum Act, 1934 The Petroleum Rules (Amendment), 2011 3. The Explosives Act,1884 Static & Mobile Pressure Vessels (Unfired) Rules, 1981 Gas Cylinder Rules, 2003 For 2 & 3- Chief Controller of Explosives, Petroleum & Explosives and Safety Organisation (PESO) is empowered to ensure compliance with the provisions of these Rules. 4. The Electricity Act, 1910 Electricity Rules, 1976- compliance by CEA 5. Petroleum & Natural Gas Regulatory Act,2006 Compliance enforcement by PNGRB PLHO,HSE 7 18.4.2015 PLHO,HSE Factories Act’1948. DG, Factory Advisory & Labour Institute Chief Inspector of Factories Contract Labour Act’1970. State Lab. Commissioner The Environment (Protection) Act, 1986 The Environment (Protection) Rules, 1986 Manufacturing, Storage & Import of Hazardous Chemical Rules(MSIHC), 1989 Hazardous Waste (Management and Handling) Rules, 1989 The Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996 Respective State Pollution Control Boards are empowered to ensure compliance with the provisions of these Rules. 8 18.4.2015 PLHO,HSE 9 18.4.2015 OISD Standards PLHO,HSE OISD has so far developed and issued 117 standards for implementations by the industry. This include 5 new standards approved in recent safety council meeting of MoP&NG on 9.12.2014 (234,235,236 ,237 and 244) Out of 117, more than 30 Standards are related to pipelines. Out of the 117 Standards, 11 Standards are Statutory in nature Out of the 11 statutory Standards, 6 standards form part of Petroleum Rule 2002 (Amended in 2011): OISD-std-105,116,117,118,141 and 156 5 Standards are included in Gas Cylinder Rules OISD-Std-144, 150, 169, 179 & 210 10 18.4.2015 OISD Standards 116 : Fire protections facilities for Petroleum Refineries and Gas Processing Plants. 117: Fire protections facilities for Petroleum Depots, Terminal, Pipeline Installations and Lube Oil Insulations 118 : Layout for Oil and Gas Installation. 141 : Design & Const. & Inspection requirements for liquid hydrocarbon pipelines . 156 : Fire protection for Port Terminals 192 : Safety Practices during construction 207 : Contractor Safety 214 : LPG Pipelines 226 : Natural Gas Transmission Pipelines and City Gas Distribution Networks. PLHO,HSE 11 18.4.2015 OISD Standards 105 : Work Permit system 119-122: Pumps, compressors, prime movers 129 : Inspection of Storage Tanks 130 : Inspection of Pipes, valves and fittings 135 : Inspection of loading and unloading Hoses. 139 : Offshore Pipelines & SPMs 140 : Inspection of Jetty Pipelines. 144 : LPG Installations 149 : Safety In Electrical System. 150 :Design & Safety Requirement for LPG mounded storage 169 PLHO,HSE : Guideline for small LPG botling plan 12 18.4.2015 OISD Standards 179 : Safety requirement on compression, storage, handling and refueling of Natural Gas for use in automotive sector. 188 : Corrosion Monitoring of offshore & onshore pipelines 195 : Gas Compressor stations & Terminal. 210 : Storage, handling and refueling of LPG for automotive use. 233 : Non Piggable Pipeline 244 : Storage and handling of Petroleum products at Depots and terminals including standalone crude oil storage facilities. PLHO,HSE 13 18.4.2015 OISD –STD-116 : Fire protections facilities for Petroleum Refineries and Gas Processing Plants. OISD –STD-117 : Fire protections facilities for Petroleum Depots, Terminal, Pipeline Installations and Lube Oil Installations. PLHO,HSE 14 18.4.2015 OISD-Std-117 Latest revised in July 2012 Minimum requirement of fire protection facilities Fire water system, foam system, clean agent system, first aid, CO2, DCP, fire detection, alarm and communication Fire water system design- 2 major fire in case storage is more than 30,000 kl(A+B+C), no requirement if storage is less than 1000 kl except AFS and Pipeline installation Fixed water spray system not required in case total storage is less than 5000 kl and tank dia is upto 9 m Rim seal fire protection system for all class ‘A’ floating roof tanks Cooling rate is 3 LPM / 1 LPM / m2 of tank shell area. Pipeline pump station 10.2 LPM / m2 plus 144 kl/hr PLHO,HSE 15 18.4.2015 OISD –STD-118 Layout for Oil & Gas Installation PLHO,HSE 16 18.4.2015 OISD-Std-118 Latest revised in July 2008 Minimum requirement of layout within the plant boundary for refineries, Oil & gas production and processing plants, LPG facilities, Petroleum storage, pipeline installation, Marketing depots and terminals, Aviation storage facilities Control room should be located in non hazardous area Minimum separation distance specified and given in Table form In a dyke aggregate capacity for group of tanks (fixed roof) should not be more than 60,000 KL In a dyke aggregate capacity for group of tanks (floating roof) should not be more than 1,20,000 KL PLHO,HSE 17 18.4.2015 OISD –STD-141 : Design, Construction and inspection requirements for Cross country Liquid Hydrocarbon Pipelines. Standard is Statutory as per Petroleum Rule ‘2002. PLHO,HSE 18 18.4.2015 DOES NOT COVER WELL FLOW PIPELINES. PLHO,HSE 19 18.4.2015 Design Factor (i) (ii) Main Pipelines: : 0.72 Road Xing Crossings : 0.72 # without casing (iii) Rail : 0.60 (iv) Pipelines on bridges : 0.50 (v) River Crossings (Vi) Stations piping . : 0.72 : 0.72 # # At these locations, pipes of heavier wall thickness shall be used. Min. Pipe Dia – 4” NB / Wall thickness- 0.219” (5.5 mm) Max . D / t Ratio : 100. PLHO,HSE 20 18.4.2015 S. No From / To 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Booster/Mainl Pump shed x 16 x 16 30 30 30 16 30 30 x x x x 2 3 SL / SR Receiver Filtrs / Meter / Sampling point / Sump Tanks CRoom UPS / SCADATelecom/ Office building Fire Pump House/ Fire water storage tanks. Compound wall Elect Substation,/ Switch Yard / Transformers MC / PC Centre/VFD 16 x x 16 30 16 16 16 30 16 x x x x x x 16 30 16 30 16 30 16 x x x x 16 16 16 x 16 16 x x 30 x 16 16 16 16 30 30 30 16 x 12 x 16 60 x x 30 30 30 30 16 16 16 12 x x 6 16 x 5 16 16 16 30 16 30 x x x x x # # 16 30 30 30 16 16 16 x 16 6 x x # # 16 16 30 30 30 30 30 30 60 16 # # x # x 30 30 x 30 16 16 x x x # # # x 16 16 16 16 x x x x x x x x x x x x 16 16 16 16 x 30 30 30 5 16 16 16 16 30 30 30 16 16 30 30 x 30 30 x 16 16 16 16 x x x x x x x x x x x x x x x x 4 5 6 7 8 9 10 11 12 13 14 # * API Oil Water Separators (open type) Service Building(Stores / Amenities) Station Block Valves Metering System Sump tank (U/G) API Separator (closed type) x - Safety distances as per OISD-STD-118. For other station facilities not covered in the above shall be governed by OISD- STD- 118. X - Any distance suitable for constructional and operation convenience. - At pipeline’s loop line terminal location, distance between scraper barrel and compound wall shall not be less than 5 meter. PLHO,HSE 21 18.4.2015 SCADA including leak detection system for pipeline length of 50 km and above or pipeline having line fill 5000 kl and above (CL 5.3.5) 3 m + 0.6 m CC high compound wall for all installation. CCTV camera / Intrusion alarm. Max. spacing between SV station- 50 km Pigging facilities for 10 km and above . Safety Instrumentation system for Pump, Motor & Engines. Clause 6.2.5.1 Low suction / High Discharge Pressure Tripping of Pump at No flow / less than MCF High Casing temp/ bearing temp Emergency Exit gate at all Station. PLHO,HSE 22 18.4.2015 • PSV setting – Operating pressure + 10% or MAOP+ 2 Kg/cm2. • Corrosion Control Requirements • Cathdic Protection system. • Requirement of Electrical bonding. • Pressure limiting device TRVs / SRVs • Dedicated communication system. PLHO,HSE 23 18.4.2015 Storage Tanks at delivery terminals . High, High-High level alarm in PLC The audio visual alarm at local panel and the pipeline control room. Pipeline delivery MOV / ROVs shall close on actuation of High-High level alarm. Low Pressure Protection System PLHO,HSE 24 18.4.2015 • No dwelling with 15 m of pipeline. • No blasting activity allowed within 15 m of pipeline. • 15 m from edge of highway when laid parallel to highway. • 5 Mtr. Horizontal Sep. Distance between HT cable and pipeline. 3 Mtr for Transmission Tower footings. • Pipeline laid through populated area shall have higher wall thickness. In high consequence area opr pr. not more than 40% SMYS. PLHO,HSE 25 18.4.2015 S.N. Locations Minimum Cover (m) i) Agricultural, limited or no human activity, Industrial, commercial and residential area 1.2 1.0(Rocky) ii) Minor Water Crossing iii) HDD Below scour 2.5 iv) HDD – Canal below bed 4.0 v) Major river crossings (below scour ) 2.5 vi) River with rocky bed (below scour ) 1.0 vii) Marshy Land / Creek area 1.5 viii) Cased/Uncased road crossing 1.2 ix) Railway crossing 1.7 1.5 1.0 (Rocky) • Pipe Cut piece of not less than 2 m not permitted. • Allowed dent size in pipe – 5 mm (for 12”) and 2 % for more than 12” OD • Hydro testing - 1.25 x Design Pr for 24 Hrs. • Station piping – 1.25 x Design Pr. For 4 Hrs. • Acceptable criteria for Pr testing • Leak Test for station piping. • EGP for Pipeline after Hyd. Testing. • Preservation of pipeline in case commissioning delayed beyond 6 months. • Post Commissioning Coating surveys. PLHO,HSE 27 18.4.2015 • Line Patrolling – 2 times a week, 1 in a year by officers. • Pigging – Crude Oil – 1 in qtr, ATF- 1 in Year, Other – 1 in 6 months. • IPS – 1 in 10 Years. • Coating Survey – 1 in 5 Years. • Non Piggable Pipeline – Hydro testing – 1 in 5 years for 24 hrs. • UT measurement – Sour crude / product line – every 3 years. Sweet Crude / product- every 4 years. PLHO,HSE 28 18.4.2015 THANK YOU PLHO,HSE 29 18.4.2015
© Copyright 2025