Government of India OUTCOME BUDGET of Ministry of Power 2015 - 16 Government of India OUTCOME BUDGET OF MINISTRY OF POWER 2015-16 C O N T E N T S Page No. CHAPTER – I Introduction 1 CHAPTER-II Outcome Budget 2015-16 CHAPTER-III Major initiatives/Reforms & Policy Measures 141 CHAPTER-IV Review of Performance and Highlights of Schemes & Projects 158 CHAPTER-V Financial Reviews 246 CHAPTER-VI Review of Performance of Statutory and Autonomous Bodies under the Administrative Control of the Ministry of Power 256 iii 20 iv OUTCOME BUDGET EXECUTIVE SUMMARY The Plan Outlay of the Ministry of Power for the year 2015-16 is Rs.61404.47 crore which includes Internal Extra Budgetary Resources (IEBR) of CPSUs amounting to Rs. 54,604.73 crore and Gross Budgetary Support (GBS) of Rs.6799.74. The Non Plan outlay of the Ministry of Power for the year 2015-16 is Rs.134.76 crore. The salient features of the performance during 2014-15 and projected Outcomes of 2015-16 are as under. I. Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY): : (a) The DDUGJY is a new scheme introduced in 2014-15. This new scheme which subsumes the erstwhile Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Scheme envisages separation of agricultural and non-agricultural feeders and strengthening and augmentation of sub- transmission & distribution infrastructure. The outlay for 2015-16 is Rs.4500 crore b) RE Component of DDUGJY (Erstwhile RGGVY): The outlay for 2014-15 was Rs.5144.09 Crore which was reduced to Rs.2886.38 crore at RE stage against an amount of Rs.2817.72 crore has been released by !"#" $ !"#%'!!'!"#" *$+'!!" ;!%% electricity connections were given to 4.34 Lakh BPL households. < ";!' "'; !"#" =* !"#% '!! >' !"#" $ '!! % ! electricity connections to 221.17 Lakhs BPL households. < $ !"#" '!! "!% '!"#" !!!"#%'!! !"" ?@ BPL households. This will facilitate rural development, Employment generation and Poverty alleviation. II. Integrated Power Development Scheme (IPDS)/Re-structured Accelerated Power Development and Reforms Programme(R-APDRP): Integrated Power Development Scheme (IPDS) is a new scheme formulated with an objective to facilitate State Power Utilities to reduce the level of AT&C losses to 15%. Project execution under the scheme is to be taken up in two parts. Part-A includes the projects for establishment of baseline data and IT applications for energy accounting / auditing and IT based consumer service centres. Part-B includes regular distribution strengthening projects. The scheme v envisages assistance on the term of GIA of 60% of the project cost. The erstwhile R-APDRP which is loan assistance scheme upfront has been subsumed under IPDS. Under R-APDRP, Part-A (IT enabled system) projects worth Rs.5480.30 crore for 1412 towns, 72 Part-A (SCADA) projects worth Rs.1556.23 crore and 1259 Part-B projects worth Rs.32215.80 crore have been sanctioned till 31.12.2014. The outlay for 2014-15 (Budget Estimate) for R-APDRP was Rs.1261.04 crore (Rs.1116.54 crore as loan including Rs. 90 crore for SCSP & Rs.115 crore for North East Region and Rs.144.50 crore as grant). The erstwhile R-APDRP has been subsumed in Integrated Power Development Scheme (IPDS). The outlay for 2015-16 for IPDS/R-APDRP is Rs.600.00 crore of which Rs.200 crore (Grant-in-Aid Assistance) has been earmarked for the IPDS and Rs.400 crore (loan assistance) has been earmarked for erstwhile R-APDRP. III. Generation- The Central Sector electricity generation is planned and implemented through the various organizations. The details along with the highlights are given as under: A. NTPC Ltd The installed capacity of NTPC and its subsidiaries / Joint Ventures as on 31.01.2015 is 43,143 MW. The Plan outlay for 2014-15 was Rs.22,400 crore and has been utilized for Barh-II, Koldam, Mauda-I, Tapovan-Vishnugad, Bongaigaon, Lara etc.. A capital outlay of Rs 23,000 crore during 2015-16 is envisaged and would result in commissioning of 2145 MW i.e. 800 MW from Kudgi, 500 MW from Vindhyachal, 400 MW from Koldam HEPP, 250 MW from Bongaigaon and 195 MW from Muzaffarpur (Joint Venture with BSEB). The outlay will also result in substantial physical progress of the projects scheduled to be commissioned in the XII / XIII plan period. B. NHPC Ltd NHPC’s total installed capacity including that of NHDC (Joint Venture Company with Govt. of Madhya Pradesh) is 6507 MW through 20 projects. During XII Plan, till date, NHPC has added 1212 MW viz. 231 MW Chamera-III in H.P, 44 MW of Chutak in J&K, 132 MW of Teesta Low Dam, 45 MW of Nimoo Bazgo, 240 MW of Uri-II & 520 MW Parbati-III in H.P. Further, NHPC is endeavoring to commission 490 MW Hydro Capacity from 160 MW of TLDP-IV in W.B. and 330 MW Kishanganga in J&K by the end of XII Plan. As such, by the end of XII Plan, NHPC total Installed Capacity is likely to reach at 6997 MW, including 1520 MW through NHDC. The Plan Outlay BE 2014-15 of Rs. 3224.26 crores comprising IEBR of Rs. 2745.36 crores and GBS Rs. 478.80 crores was mainly for ongoing schemes viz. Parbati-II, Teesta Low Dam-IV, Subansiri Lower, Uri-II, Parbati-III and Kishanganga Project and new proposed projects viz. Kotli Bhel IA, Dibang, Teesta-IV & Tawang I & II. vi Total plan outlay of BE 2015-16 of Rs.4179.89 crores comprising IEBR of Rs.3979.89 crores & GBS in the form of Sub-debt of Rs. 200.00 crores for three projects Nimoo Bazgo, Chutak and Kishanganga. The outlay is mainly for presently ongoing schemes viz. Parbati-II, Uri-II, Teesta Low Dam IV, Subansiri Lower, Parbati-III, Kishanganga HE Projects etc and new proposed projects viz. Kotli Bhel IA etc. In addition, provision is also kept for survey & investigation woks of future schemes and residual works/ balance payments of schemes completed/likely to be completed by Mar’15 (Dulhasti, Dhauliganga, Sewa-II, Chamera-III, Chutak, TLDP-III, Nimoo Bazgo, Uri-II and Parbati-III). C. NEEPCO For the year 2014-15, an outlay of Rs 1464.34 crore (excluding DONER Grant of Rs 164.03 crore against Tuirial HEP, Mizoram) was approved comprising NBS of Rs 142.10 Crs and IEBR of Rs 1322.24 crore. The major portion of this fund allocation was meant for construction of the ongoing projects viz. Kameng HEP (600 MW), Pare HEP (110 MW), Tuirial HEP (60 MW), Tripura Gas Based Project (101 MW) and Agartala Gas Turbine Plant – CC Extension Project (51 MW). For the year 2015-16, NEEPCO has proposed an outlay of Rs.1291.75 crore (including Rs.75.00 crore NBS). The major portion of this proposed allocation is meant for Kameng HEP (600 MW), Pare HEP (110 MW), Tuirial HEP (60 MW), Tripura Gas Based Project (101 MW) and Agartala Gas Turbine Plant – CC Extension Project (51 MW). The Corporation has already inked the Share Holders’ Agreements with resourceful private players of the country for setting up a handful of attractive power projects in the country including in the renewable sector viz. one 50 MW Solar Power Project in Madhya Pradesh, one 100 MW Wind Power Project in Gujarat, 120 MW Dibbin HEP in Arunachal Pradesh. D. THDC India Ltd For the year 2014-15, the outlay of Rs.796.72 crore has been made. During the current FY 2014-15, THDCIL has generated 3252 MU (2313 MU from Tehri HPP + 939 MUfrom Koteshwar HEP) of energy upto 30.12.2014. The company has a Net Worth of Rs. 7331.24 crore as on 31.03.2014 against a Net Worth of Rs. 6771.49 crore as on 31.03.2013. For the year 2015-16, outlay of Rs.1580.31 crore (including NBS of Rs.30.00 crore) is mainly for execution of Tehri PSP (1000 MW), VPHEP (444 MW), Dhukwan SHP (24 MW) and balance works of Koteshwar HEP (400 MW). E. SJVN Ltd The approved outlay in respect of SJVN for 2014-15 is Rs. 1091.93 crore comprising of World Bank Loan of Rs. 114.00 crore, Internal Resources of Rs. 977.93. The RE 2014-15 has been proposed as Rs. 720.22 crore (World Bank loan of Rs. 78.82 crore, Internal Resources of Rs. 425.22 crore and SBI Loan of Rs. 216.18 crore). This is mainly for (i) balance payments of Rampur HEP (412 MW) (ii) balance payments of Khirvire vii Wind Power Project (47.6 MW) and pre-construction works of (iii) Luhri HEP (601 MW) (iv) Devsari HEP (252 MW) (v) Jakhol Sankri HEP (51 MW) (vi) Naitwar Mori HEP (60 MW) (vii) Arun – III HEP, Nepal (900 MW) (viii) Dhaulasidh HEP (66 MW) (ix) Wangchhu HEP (570 MW) (x) Kholongchhu HEP (600 MW) (xi) Doimukh HEP (80 MW) (xii) Buxar Thermal Power Project (1320 MW) (xiii) Deocha Pachami Coal Block (xiv) Cross Border Power Transmission Company (xv) Solar Power Projects(xvi) Arun-III Transmission Line ['\ " \ ]#"^!%_;!%`!%\ " of Guest House Building at Shimla and (xviii) Research and Development For the year 2015-16, the proposed outlay is Rs. 1175 crore. This is mainly for (i) balance payments of Rampur HEP (412 MW) and Khirvire Wind Power Project (47.6 MW) and pre-construction activities of (ii) Luhri HEP (601 MW) (iii) Devsari HEP (252 MW) (iv) Jakhol Sankri HEP (51 MW) (v) Naitwar Mori HEP (60 MW) (vi) Arun – III HEP, Nepal (900 MW) (vii) Dhaulasidh HEP (66 MW) (viii) Wangchhu HEP (570 MW) (ix) Kholongchhu HEP (600 MW) (x) Doimukh HEP (80 MW) (xi) Buxar Thermal Power Project (1320 MW) (xii) Deocha Pachami Coal Block (xiii) Cross Border Power Transmission Company (xiv) Solar Power Projects(xv) Arun-III Transmission Line (xvi) Construction of Guest House Building at Shimla and (xvii) Research and Development against which funds have been proposed out of the above outlay. F. DVC The Plan Outlay for 2014-15 was Rs.3964.99 crore. During 2014-15, KTPS U# II was put under commercial operation on 14.06.2014. Projects targeted for completion in 2014-15 were 132 KV Biada Sub-Station with Bays at CTPS and associated lines; 220 KV MTPSKLNS S/C LILO at Burnpur; 220 KV D/C Gola-Ranchi Line; 400 KV RTPS-Ranchi line; 220KV MTPS-Gola-Ramgarh line (Gola-Ramgarh portion completed); 220KV KodermaGiridih line; R & A works at different Sub-Station and Transmission Lines. The outlay of Rs.3682.93 crore during 2015-16 would result in commercial operation of |#!% }"!@~!!? % <_> >$%^<_ (1x 500 MW). IV. Transmission Power Grid Corporation of India Ltd. POWERGRID made a capital investment of about Rs. 15,576 crore (upto 31st December 2014) during FY 2014-15 against the targeted outlay of Rs.20,000 crore. During FY 201415 (upto 31st December 2014), POWERGRID has commissioned about 6,783 ckt.km. of transmission line and achieved about 13656 MVA of transformation capacity addition. The outlay of Rs. 20,000 crore during FY 2015-16 would inter-alia result in 10,142 ckt. km. of stringing and about 27,490 MVA of transformation capacity addition. viii V. In the 12th Plan, it is proposed to take forward all of the schemes so as to continue to "' ' % ! #"! % "!' "' under these schemes. New schemes are also being proposed to: fast-forward the %" #"; ' "' ' #" ; !% % "#% ; % % ""! %! ; #"!" !""% " ; led DSM programmes. During the year 2014-15, BEE was provided with a provision of `139.55 (BE) crores. An outlay of Rs.50.00 crore has been kept for the year 2015-16 including Rs.2 crore for World Bank Project. VI. NPTI The outlay for the year 2014-15 was Rs.60.52 crore under Plan and Rs.6.40 crore under Non-Plan. The existing infrastructure would be upgraded by utilizing the fund provided by Ministry of Power so that trainees/students can be abreast with the latest technology in the world class environment with the estimated expenditure of Rs 40.00 crore under Plan and Rs.6.40 crore under non-plan during 2015-16. VII. CPRI The approved outlay in respect of CPRI for the year 2014-15 was Rs.295.53 crores for four major projects under 12th Plan namely (i) Augmentation Projects, (ii) Modernisation Projects, (iii) Establishment Projects and (iv) Research & Development projects of CPRI under 12th Plan. Since only two projects namely Augmentation Projects and Research & Development projects of CPRI were under implementation, the Revised Estimate for #[%+*=\< }";! % Project and Establishment Projects were approved on 5th January 2015, and would commence after the release of 1st installment of Grants-in-aid, expected in March 2015. The Annual Plan of CPRI for the year 2015-16 is Rs.125.00 crores. This includes four projects which have been approved and are under implementation namely (i) Augmentation Projects, (ii) Modernisation Projects, (iii) Establishment Projects and (iv) Research & Development projects of CPRI under 12th Plan. VIII. Monitoring Mechanism The Ministry of Power has adopted a robust monitoring system for the capacity addition programme so as to see that the projects are executed in time. Following measures have been taken for timely commissioning of ongoing power projects: i. Central Electricity Authority (CEA) is performing the duties of monitoring of the power projects in pursuance of Section 73 (f) of Electricity Act, 2003. The progress " }" ; % " ! ' " ix with the developers and critical study of monthly progress reports. Chairperson, CEA holds review meeting with the developers and other stakeholders to sort out the critical issues ii. The Power Projects Monitoring Panel (PPMP) had been set up by the Ministry of Power to independently follow up and monitor the progress of the Power Projects iii. %" ' !% ! ; ; ^? Group under the chairmanship of Secretary (Power) and Secretary(Heavy Industry) iv. Rigorous monitoring of projects at different levels including the PMO and the Cabinet Secretariat. v. Intensive monitoring is done by the Ministry of Power to review the critical milestones "% " }" !% ; manufacturers and Quarterly Performance Reviews are also organized separately for each CPSU to review the status of the Central Sector projects. vi. ;";#!'! ' !% ; ! " % !'! _~ ! % % !'! Secretary (P) on half-yearly basis for periodical monitoring of utilization of funds under various schemes of the Ministry of Power has been put in place. IX. Public Information System Detailed Demands for Grants and Outcome Budget is posted on the website www.powermin.nic.in of the Ministry of Power after laying in Lok Sabha/Rajya Sabha for information. x Chapter – I Introduction The Ministry of Power started functioning independently with effect from 2nd July, 1992. Earlier it was known as the Ministry of Energy comprising the Departments of Power, Coal and Non-Conventional Energy Sources. Electricity is a concurrent subject at entry number 38 in the List III of the Seventh Schedule of the Constitution of India. The Ministry of Power is primarily responsible for the development of electrical energy in the country. The Ministry is concerned with perspective planning, policy formulation, processing of projects for investment decisions, monitoring of the implementation of power projects, training and manpower development and the administration and enactment of legislation in regard to thermal, hydro power generation, transmission and distribution. The Ministry has developed its website www.powermin.nic.in. The main items of work dealt with by the Ministry of Power are as given below: General Policy in the electric power sector and issues relating to energy policy and coordination thereof. (Details of short, medium and long-term policies in terms of formulation, acceptance, implementation and review of such policies, cutting across " ! %" %" All matters relating to hydro-electric power (except small/mini/micro hydel projects of %! ""%;! %; % ; @ Research, development and technical assistance relating to hydro-electric and thermal ; ; @%% ;_< %; !"""$ \ ' " ; %!!\ "*= *=%^@ ^ ; ^ % '%% } " *$$ *$$ All matters relating to Central Electricity Authority, Central Electricity Regulatory \ ;; %!!<! !"" !!"#" Power schemes and issues relating to power supply/development schemes/programmes/ %"!%%%% _% < Matters relating to the following Undertakings/Organizations: 1 a. ; %!!\ b. ^@^;^ %[";! c. `<\?;% d. `\?;% e. !!"#" \ ?;% f. ` !"" \ ?;% g. |\>? h. ~"\ ?;% i. <% '! ;\ j. _!}!%`;?;% k. \! "> l. ` ! <> m. ^ #"" !!;" "" ' %#"" Sector. Shri Piyush Goyal _>%%" " ; 27th Shri Pradeep Kumar Sinha assumed charge as Secretary in the Ministry of Power with effect from the 1st July, 2013. The Ministry has two Special Secretaries, six Joint Secretaries, including the Financial Adviser, and one Economic Adviser. Shri R.N.Choubey,_"!_" ' @! ;" "!%_^ %"> !\ \ ' #"" ^ #"" ! }" <;! ` ! <;! \ ; % !! \ >%% %" % ~! _! ""!% '! ; % ; ;; ~"\ !!"#" }'|%|;%@ }! !"#" \ ;%_%;%` !!""% Shri Devendra Chaudhry,_"!_" ' @! %; !;]#"!?!"|'"<>\!!> ; <" ! % ;"!%\_;!`\_`?`\]<\^@^- 2 ;^ %' ;; % }" !"! }" !%\ % <""!%\>%`<>!! <[!%` %! #" _;@%>? _; ! <; |%\ >%?;% _;] \ ]_]\]|%> ! <!! " @; [ _"%" ;"%' Ministry of Power is as under: %; !; ]#"! ? !" |'" <> \!! > ; <" ! > !\ \ ' #""^ #""%;%_%; <;!`<\?%; %!!\ ! }">%% %">~!_!%!"_" >% '! ;_"; ~"\ !!"#" !!"#" \ %!%|; }` !!""~%~"!"!%_;|% ' % ;"!%\_;!`\_`?`\]<\^@ ^;^ %' ;; % }" ' >!~"^%\ ! ' <; |%\ >%?;% _;] \ ]_]\]|%> !] ;""!%%; !""" ` ! !"" !" < !" \\\<? % %! ^%% "; "; ' !"! }" !%\ % < ""!%\>%`<>!!<[!%` %! #" _;@%>? _; ! <"!"" ]#"%%\ !! "" to the Financial Adviser in the Ministry of Power. Matters relating to reservations for SC/ ST, Physically Handicapped and Ex-Servicemen in the Ministry including PSUs under its ad;'" !%!_"%; ! ? ]#" _\_<%" \ %? #" ]^\ The various organizations in the Ministry are as under: a) STATUTORY BODIES (Non-Commercial): Appellate Tribunal for Electricity (APTEL), New Delhi !!<! !""'% #" %%+! 3 ! % %}%" #" " ;; under the Electricity Act, 2003. The Tribunal also has original jurisdiction to hear petitions under Section 121 of the Act. Delhi is the headquarters of the Tribunal. Under ' !;%`!|! ^ %"$<? is the Appellate Tribunal for the purpose of that Act. Ministry of Petroleum and Natural Gas has also appointed one Technical Member in APTEL under the provision of the said Act. The Appellate Tribunal consists of a Chairperson, one Judicial Member and three <""!;"!%<""!;`|'^"" % by the Chairperson includes at least one Judicial Member and one Technical Member. Circuit benches of APTEL at Chennai, Mumbai and Kolkata have been constituted vide ` #" %% Central Electricity Regulatory Commission (CERC), New Delhi < \! !"" ! \ ;; \\ %% body with quasi-judicial powers, was originally constituted on 25 July 1998 under the erstwhile Electricity Regulatory Commissions Act, 1998 and has been continued under the Electricity Act, 2003. The Commission consists of a Chairperson and four ;"!%\ \!!"" [ #" Member. The main functions of CERC include regulation of tariff of generating companies owned or controlled by the Central Government or if such generating companies enter into or otherwise have a composite scheme for generation and sale of electricity in more than one State, regulation and determination of tariff of inter-State transmission of electricity, issuing licenses to persons to function as transmission licensee and electricity traders with respect to their inter-State operations, adjudicating upon disputes involving generating companies or transmission licensee, specifying Grid Code having regard to |%_%% "% "%%" !" % !! '" !" % #[ % ; _ trading of electricity, if considered, necessary. Central Electricity Authority <\!!"" \ !!" % % _" !% !"" _! " *= % " % % Section 70 of the Electricity Act, 2003. It was established as a part- time body in the year 1951 and made a full- time body in the year 1975. " + !""" !!" ; ;"!%\ ; ; =!! be full-time members to be appointed by the Central Government. CEA is headed by a Chairperson who as the Chief Executive of the Authority oversees !! %'! ; _" " < [ $ \ ;! ! % <;! |% ] " ;" Commercial and Power System, each headed by a Member of the Authority. Under each ;""!%' "%% #" @ \ 4 Engineer. At present, there are twenty nine Divisions in CEA headquarter at New Delhi. >%% \ % #"'#' !>" ] >] ! _' ] _] % #' ! \ ;; ! "% ' " < \ is responsible for overall power sector planning, technical coordination, according concurrence to hydro-electric schemes and timely completion of projects, specifying of technical standards, safety requirements, Grid Standards as well as conditions for installation of meters applicable to the electricity sector of the whole country. CEA advises the Central Government on the National Electricity Policy. It also advises the \!_| ';!!!""! \ ;; !! technical matters relating to generation, transmission and distribution of electricity. It also has the mandate to collect, record and makes public data related to all segments of the electricity sector, carry out investigations and promote research. Functions of CEA : The functions and duties of the Authority are delineated under _" + !""" ^% \ %" ' functions as well under Section 3, 8, 53, 55 and 177 of the Electricity Act, 2003. As per section 73 of the Electricity Act, 2003, the Central Electricity Authority shall perform such functions and duties as the Central Government may prescribe or direct, and in particular to advise the Central Government on the matters relating to the national electricity policy, formulate short-term and perspective plans for development of the electricity system and coordinate the activities of the planning agencies for the optimal utilization of resources to sub serve the interests of the national economy and to '%!!% %!!"" !!" ; specify the technical standards for construction of electrical plants, electric lines and " "' % " specify the safety requirements for construction, operation and maintenance of !""!!%!""! % "|%_%% %;" ; ! specify the conditions for installation of meters for transmission and supply of !"" promote and assist in the timely completion of schemes and projects for improving %;!""; ; ; %'"@!! %!""% 5 advise Central Government on any matter on which its advice is sought or make recommendation to that Government on any matter if, in the opinion of the Authority, the recommendation would help in improving the generation, transmission, trading, % %! !"" collect and record the data concerning the generation, transmission, trading, distribution and utilization of electricity and carry out studies relating to cost, #""" ;'%"!@; } make public from time to time the information secured under this Act, and provide !" %' @ promote research in matters affecting the generation, transmission, distribution and % !"" ! carry out, or cause to be carried out, any investigation for the purpose of generating ; %!"" ; advise any State Government, licensees or the generating companies on such matters which shall enable them to operate and maintain the electricity system under their ownership or control in an improved manner and where necessary, in coordination with any other Government, licensee or the generating company '" ! !""; advise the Appropriate Government and the Appropriate Commission on all technical ;! ; %% !""% discharge such other functions as may be provided under this Act. In addition to above functions and duties, CEA has to perform the following functions in terms of the under mentioned sections of the Electricity Act, 2003:Section 3 -National Electricity Policy and Plan The Central Government shall, from time to time, prepare the National Electricity Policy and tariff policy, in consultation with the State Governments and the Authority for development of the power system based on optimal utilization of resources such as coal, natural gas, nuclear substances or materials, hydro and renewable sources of energy, The Central Government shall publish the National Electricity Policy and tariff policy from time to time. The Central Government may, from, time to time, in consultation with the State Governments and the Authority, review or revise the National Electricity Policy % " 6 The Authority shall prepare a National Electricity Plan in accordance with the ` !!"" !"% "! "#' ]> ! ` ! !"" ! !! publish the draft National Electricity Plan and invite suggestions and objections thereon from licensees, generating companies and the public within such time as ;"% ]>~< !! ! '! \!| '; revise the plan incorporating therein directions, if any, given by the Central | ';! '!%"! The Authority may review or revise the National Electricity Plan in accordance with the National Electricity Policy. Section 8 – Hydro Electric Generation Any generating company intending to set up a hydro-generating station shall prepare and submit to the Authority for its concurrence, a scheme estimated to ' !'"![%["%";;#[%\! | '; ;; ; #" . The Authority shall, before concurring in any scheme submitted to it under sub" "!% The proposed river-works will prejudice the prospects for the best ultimate development of the river or its tributaries for power generation, consistent ; %@ ' %" ! other public purposes, and for this purpose the Authority shall satisfy itself, after consultation with the State Government, the Central Government, or such other agencies as it may deem appropriate, that an adequate study has been ;% ;;! " %;% ' @ The proposed scheme meets, the norms regarding dam design and safety. Where a multi-purpose scheme for the development of any river in any region is in operation, the State Government and the generating company shall co-ordinate their activities with the activities of the person responsible for such scheme in so far as they are inter-related. Section 53 - Provision Relating to Safety and Electricity Supply The Authority may in consultation with the State Governments, specify suitable measures for7 protecting the public (including the person engaged in the generation, transmission % % ;% ; ; or distribution or trading of electricity, or use of electricity supplied or installation, ;" !""! !""!! eliminating or reducing the risks of personal injury to any person, or damage to " " " prohibiting the supply or transmission of electricity except by means of a system "" ; "#" ;"#% % ' ""#% ; \ ;; %!""! Inspector, of accidents and failures of supplies or transmission of electricity; keeping by a generating company or licensee the maps, plant and sections relating ! ; !"" inspection of maps, plans and sections by any person authorized by it or by Electrical >" ; "#% specifying action to be taken in relation to any electric line or electrical plant, or any electrical appliance under the control of a consumer for the purpose of eliminating or reducing the risk of personal injury or damage to property or interference with its Section 55 (2): Use, etc., of meters For proper accounting and audit in the generation, transmission and distribution or trading of electricity, the Authority may direct the installation of meters, by a generating company or licensee at such stages of generation, transmission or distribution or trading of electricity and at such locations of generation, transmission or distribution or trading, as it may deem necessary. Section 177- Powers of Authority to make regulations < ; #" ;@! " "% rules generally to carry out the provisions of this Act. >"!% }%" ! " % " " ! ; '% !! !! ; mainly: |%_%%%" !;! %!""!%" 8 " !! % ;%" % ! "% " % " * " + the technical standards for construction of electrical plants and electric lines %" "' %%"! " + ;%;"%;"_| ';% !"!!" ; %" + ;" ;"#% !!! ;% %"!!}" " % of previous publication. \"%% ';} "#""! ! energy, nuclear energy is the thrust areas to ensure sustainable development. The aim #"" !" " " % ;@ function and unlock the estimated energy saving potential of around 20%, the enactment \ ' " ^ #""^ %` ! "%#""%" <^!% st March 2002, with the mission to develop appropriate policies and strategies with a thrust on self-regulation and market principles. The prime objective of these measures is to stimulate reduction of energy intensity of Indian economy. > % ! }"' ! %" %" ^ include: ¾ To be the policy advisor to the Central and State Governments. ¾ < " % !" % ;; #"" % conservation with the involvement of stakeholders. ¾ To plan, manage and implement energy conservation programmes as envisaged in the EC Act. ¾ To assume leadership and provide policy framework and direction to national energy #""%" ' % ;; ¾ < %; #""%!';";'%\" '!" ¾ To establish systems and procedures to measure, monitor and verify energy 9 #""%" ' % ;; ¾ To leverage multi-lateral, bi-lateral and private sector support in implementation of ;;% }" #" %" ' b) STATUTORY BODIES (Commercial) Damodar Valley Corporation (DVC) ; %!!\ #;} ;! %''!! }" " " "'% ! < !! < "; [" !+*=" !;>@%! \" ;;% ; %% % providing electricity to the core industries, like Steel, Coal, Railways and other industries/ " ; "'_!""^ % ;% national priorities, power generation with associated transmission and bulk activities % ; % !! \ ] }"' \ ' received due attention and services as part of its overall responsibilities and commitment. ; %!!\ ! " '% @;@ \\ ;;%%! [ _ %; %!!<!!% \"$+ " ; <;!$["!% }"?% ^_\?%!+ !\ %= _ "!% "%\<; !" ; $\" ! $\" !%*=\" !\! Dams, a barrage and a network of canals that play an effective role in water management. Bhakra Beas Management Board (BBMB), Chandigarh ^@ ^ ; ^ % ^^^ " % % _" +* Punjab Re-oranization Act, 1966 for the administration, maintenance and operation ^@`! }"" ;]" *$+<| '; >% %^ }" @ " ;! ;^\ " ^ %^\^ ^^_" = "%^@;^ %;% ^@^;^ %^^^" ;*+$^@^ ;^ % ! %; %;" ^@`! }"^_!}?@ }"% ;"!% % @ ; ! % % < ^ % ! ! ! ; ^@`! % ^ }" _ } %}%! ! %^@^ Power Houses to power utilities in-charge of distribution of power in the participating _^^^! '%%!%""!%" !"'" ' #!% % !"" %> }" 10 c) PUBLIC SECTOR UNDERTAKINGS NTPC Limited NTPC was setup in 1975 as a central sector generating company for the development of thermal power. The corporation has grown rapidly to become the largest thermal power generating company in India. However, in addition to attaining large size, the operations of the company have also become diverse and are now not limited to thermal !\ ;%'#% % %" !;" In order to embody its diverse operations, the company has been rechristened as NTPC limited. As on 31.01.2015, the authorized share capital of NTPC is Rs 10,000 crore and %"!=" <" % '+" !% '+!%% %= ! %[$" !% % % % `<\"!%% %!!%"" Power Grid Corporation of India Limited (POWERGRID) |% \ >% ?;% ]|> " % Government of India enterprise on 23rd October, 1989 under the Companies Act, 1956 with an authorized share capital of Rs.5,000 crore. The authorized share capital was !"% " +=%%"! Rs.5231.59 crore. As on 31st";]|> =+ ckt.km. of transmission lines and 188 sub-stations having transformation capacity of *+*< !; "" ` !% "% !!st";<; ; availability is maintained consistently more than 99% by deploying the best Operation and Maintenance practices at par with international utilities. NHPC Limited NHPC Ltd. was incorporated in 1975 under Companies Act 1956. NHPC is a schedule “A” Enterprise of the Government of India with an authorized share capital of Rs.15,000 " % % "! + " `\ ! organization for hydro power development in India, with capabilities to undertake all the activities from conceptualization to commissioning of hydro projects. <; }"' `\ ! ; % %%#" development of power in all aspects through Conventional and Non-Conventional Sources in India and abroad including planning, investigation, research, design and preparation of PFR and DPRs, construction, generation, operation and maintenance of power stations and projects, transmission, distribution, trading and sale of power generated at Stations. < !!!%"" `\ %"!% `\ 11 \ ; | ' % % $+ }" < \ ! % " " % }" installed capacity of 3290 MW. North Eastern Electric Power Corporation (NEEPCO) ` !"" \ ?%`\]" %*+$% the Indian Companies Act, 1956 as a wholly owned Government of India Enterprise under the Ministry of Power to plan, promote, investigate, survey, design, construct, generate, operate and maintain Hydro and Thermal Power Stations. NEEPCO has an authorized share capital of Rs.5000 crore with installed capacity of 1130 MW comprising 755 MW of % + ;! <\ !;!; nos. of hydro and 2 nos. of gas based thermal power projects aggregating 922 MW in the NER for commissioning within 12th~'!>!" ! Corporation is all set for setting up two Grid Interactive Solar Power Plants of 5 MW and 2 MW in Tripura and Assam respectively, within the 12th~'!<\ is relentlessly working for its future growth by setting up more projects in the country, particularly in NER, in the hydro, thermal and renewable sector. Of late NEEPCO is ! ; % }"" The Corporation has already inked the Share Holders’ Agreements with resourceful private players of the country for setting up a handful of attractive power projects in the country including in the renewable sector viz. one 50 MW Solar Power Project in Madhya Pradesh, one 100 MW Wind Power Project in Gujarat, 120 MW Dibbin HEP in Arunachal Pradesh. ! !"#" \ ?;% \ " % *$* facilitate the development of power infrastructure in the rural India. The authorized Share Capital of the Corporation is Rs.1200 crore and the Paid up Capital as on 31st Dec %*=+*" <; }"' \ ; % #" }" ;% >% _; >; '; | ; %"!% " ' ! " " ' ' ;" % " ; ! !%!"#" % !% @!\ the nodal agency for the implementation of the newly created Deen Dayal Upadhyaya |; }%!|| ;;";% the former. Power Finance Corporation (PFC) ~" \ ?;% ~\ ` ^@ ~"! \ ; which was incorporated on 16 July, 1986 as part of Government of India’s initiative " % }" >% }"' '% #"! "%" '; % "%" ~\ 12 %"! " %"! " PFC’s priorities include not only accelerating the pace of existing business of funding generation, transmission and distribution projects, but also to exploit the new opportunities available in the sector. PFC has developed various strategic business units, focusing %;" ' !!% ; % % }" " ; !% ; % % }"!% ;;"%! %"%! ~\ !! %%~\\ !?;%~\\? '% " !" " ~\ | ?;% ~\|? [% #" ["!'! ! % " ' ! " % ~\ \!%' _'"~\\_ '%#"!%' '" PFC , is the nodal agency for implementation of the newly created Integrated Power Development Scheme and the erstwhile RAPDRP Scheme which has since been ;% >_ %'! ! }" % >%% Transmission Projects, based on tariff based competitive bidding process. d) JOINT VENTURE CORPORATIONS THDC India Limited <\>%?;% | ' >%%| ' %< Equity is shared between Govt. of India and Govt of Uttar Pradesh in the ratio of 3:1. < \ ; " % ! == %'! ; < % \ ;![ % % }" ^ '!! < %"! \ " %%\! \ ; +" <\>?;! }" having 15 projects totaling to an installed capacity of 6211 MW under operation/ various %'! ; @% % ^ > %% number of Projects are in the business development stage. < < % \ ;![ " ; < ; %<_<\ ""!! " ;; %<;_>% %%>!"'!<_%" " %"%!% " ;; %>>>th!%!@ % !"" }" '!@%@%%" " < }" %% !%^@< }""%!% " ;; %>>>th Plan. @_%" " %"%!% " ;; %>>>th Plan. SJVN Limited _` ?;% % %;' " ! | ' >% 13 " % *==} ' | '; >%|]>% | '; ;"!%|]" + plan, investigate, organize, execute, operate and maintain hydro electric power projects in the Satluj river basin in the state of Himachal Pradesh and at any other place. < %"! _`+" <` Jhakri Hydro Power Station NJHPS (the largest underground hydro electric power }"# }"["%_`!! "" ;; % =" ;; }"" %'! ; % !"" " %%%_`! a bench mark by commissioning all the six units within a span of six months. Further, _` ""!! " ;; % !! [ ; % _ ;"!%";$>%% '_`! " ;; %$%!""| +$'% }" e) AUTONOMOUS BODIES: National Power Training Institute (NPTI) ` ! <>`<>>_]*>_] set up by the Government of India under the Ministry of Power to function as an apex % !!'! %'! ; ; " " > " #" ! "% ~%% `<> !!>% !>! "%^%`!`'! <;!`%^!|;%` >%% `<>! _;<>_<> ?< \?<\^!@\ %'"%;% _%\_~%%`<>% <\`! Two more new Institutes are being set up at Aeappuza, Kerala and Shivpuri M.P. under >>!_"; NPTI has infrastructural facilities for conducting both short term and long term Diplomo and Degree courses on technical as well as management subjects covering the needs <;!% %`"! !<; ;% #!% %!!%" `<>; %"% ![#!% <%; "'! ; Power Sector. The Institute is currently conducting 8 courses and also provides long term and short term training programmes. OBJECTIVE 1. < " ` !] #!% > ] %" _ % 14 >> !! " !""! _; "!% <; Transmission and Distribution. 2. To act as an apex body for initiating and coordinating training programs in the Power sector of the country. 3. To establish and run Training Institute for Engineers, Operators, Technicians and other personnel of the Power sector. Central Power Research Institute (CPRI) < \! " > \> !% | '; >% 1960 and was re-organised into an autonomous society in 1978 to function as a National "] % '` !<%\#" "#" % ;" '!! ; adequate quality for the use under conditions prevalent in Indian Power Systems. The affairs of the society are managed by Governing Council with Secretary to the Government of India, Ministry of Power as its President. The Governing Council has representation from various Ministries of Government of India, Power Utilities Manufacturers, Academic Institutions etc. <>%]#";} ! ^! <> ^ !%% %` % !@| CPRI has built up expertise in the areas of transmission and distribution systems, Short Circuit testing, Insulation materials, power quality, energy metering, energy auditing, transmission line %" %" ' % ;_\ ; Protocol testing of substation equipment and Energy meter, transformer oil reclamation and testing, diagnostic, condition monitoring and estimation of remaining life of equipment, new ;! ;!" ! ! "" !% !%#!% Training: CPRI has expertise in the area of simulation, diagnostics, system analysis and testing. CPRI laboratories have modern equipment needed for power system simulation, short circuit % " ;;!_;"!#" "\> experienced faculty in different subjects concerned to power sector with practical experience in their respective areas of interest, as well as extensive experience in presenting courses/ seminars. The Institute organizes regularly Training programs, Symposium, Workshops, Seminars/ Conferences etc. Programmes and Schemes Implemented by the units/organizations of the Ministry : The Schemes and Programmes being implemented can broadly be grouped into two umbrella ";;!!%!!"#" ;;% _" ;<_";% _` $!!%#;!!"; and the others fall under the second umbrella scheme. 1. Secretariat: Provision is made for expenditure on establishment matters for the 15 Secretariat of the Ministry of Power, under various schemes. 2. Central Electricity Authority:< \! !"" \ organization is responsible for overall power sector planning, coordination, according concurrence to hydro-electric schemes, promote and assist the timely completion of projects, specifying of technical standards, safety requirements, Grid Standards as well as conditions for installation of meters applicable to the Power Sector of the country. CEA advises the Central Governments on the National Electricity Policy and formulates short term Prospective Plans for development of the electricity system. It also has the mandate to collect, record and make public, data related to all segments of the electricity sector, carry out investigations and promote research. 3. Research & Development: \! " > ^! ' ` ! ? !% " #!% !""! % ! " %% '! %"#" !""! equipment and components. 4. Training: National Power Training Institute is engaged in imparting training in various aspects of power sector including operation and maintenance of power stations. 5. Central Electricity Regulatory Commission: Under the provision of the ERC Act, 1998, the Central Government had constituted the Central Electricity Regulatory Commission \\< \! \ ;; " % % !"" Act, 2003, which has come into force with effect from 10th June, 2003. 6. Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY):- Government of India has !"% "; %! % |; } | }"' < "! % "! % "! " ;}%" ! "!! "!!" ; _%; _<; " !%"!!"#" <" @" '%%"; ~% \ ' ;" % % grid distribtion network, HT/LT lines, Augmentation of sub-stations and Metering at all !'! % "; | ' >% '% #"! ; grant to the Discoms for implementation of the scheme. All Discoms including Private _" " ;!! '!#"! %";< ! |" ""!%% " ;| ' >%<!||;%| ! !"#" " ; % || ! =* !"#% '!! ' !"#% $ '!! ' '! !"#% % !"" " " + ^? !% ' '%% %*$=" '!%%>%% $= projects sanctioned in 10thth!+ }"'" %%|| during 12th~'!" '!"#" $='!!%*> villages with a sanctioned cost of Rs 23607.39 crore. 7. Funds for Evaluation Studies and Consultancy: This provision is for conducting evaluation studies of various projects/programmes/ schemes. 16 8. Appellate Tribunal for Electricity: Under the provisions of Electricity Act, 2003, the Central Government has set up the Appellate Tribunal for Electricity. It hears appeals % %}%" #" \ ;; % Electricity Act, 2003. Under the provisions of the Petroleum and Natural Gas Regulatory ^ %"$<?!!<! " 9. Joint Electricity Regulatory Commission (JERC) for Goa & UTs: The Central | '; !"" ! \ ;; \ | and all Union Territories except Delhi, under the provisions of the Electricity Act 2003. Expenditure of the Joint Commission shall be borne by the Central Government and the Government of Goa in the ratio of 6:1. 10. Comprehensive Award Scheme: Comprehensive Award Scheme is to inculcate " ;'% ; '!'! #"%" ;" #!% " " %;" ;!% ; }" implementation of distribution reforms, rural distribution franchisees, environment ;" " ;; %'! ; % " % _!% % \#" are given away by the Ministry of Power to the generating stations, transmission and distribution utilities as well as rural distribution franchisees for recognizing meritorious performance in operation, project management and environmental protection. 11. Energy Conservation: The funds would be utilized for carrying out awareness creation on Energy Conservation through print, electronic and other media for general public. Continuation of EC awards and paintings competition on Energy Conservation. The fund !%! !% ;!;` ! "%#"" `% "! "%;@ #"" unlock investments. ! ~% !% '%% ^ ;!; ' #"" ' !% ! " ;;"! !%_%%?!!";%_%;"! Municipalities, SME’s and large industries including the initiation of the process for development of Energy Consumption norms for industrial sub sectors, capacity building _" ;"<'| ';!!"#"" consumption and reduce the rate of growth of energy consumption. 13. Integrated Power Development Scheme (IPDS) : The objective of this new scheme [+ ! " ;%" <\! % '%"" to all households. The scheme has three major components namely improvement of ; %% ;;><!; distribution sector. Under erstwhile R-APDRP scheme, which has since been subsumed under IPDS, there are two major components. Part-A includes projects for establishment of information technology based energy accounting and audit system leading to #! '#!!<\! !'! }"^' distribution network strengthening investments leading to reduction in loss level. 17 14. Assistance to Forum of Regulator for Capacity building and Consultancy: The Central Government has approved a plan assistance of Rs.15.0 crore to Forum of Regulators for capacity building and availing consultancy. The assistance will be spread '~'! %;[;;[% " particular year. 15. Financial Support for Debt Restructuring of DISCOM: - The scheme has been formulated and approved by Govt. to enable the turnaround of the State DISCOMs and ensure their long term viability. The scheme contains measures to be taken by the state >_\]%_| ' "'#"! %"% with support through a Transitional Finance Mechanism by Central Govt. 16. National Electricity Fund (Interest Subsidy Scheme): The National Electricity ~%`~ '%% ! %% \ ;>_\]_ !"%'_" ; ' % @ " '%||% }" the pre condition for eligibility are linked to certain reform measures taken by States and the amount of interest subsidy is linked to the progress achieved in reforms linked ; < %! " `~ ! !"#" \ ?% < ;!; _"; !% ! %" <\ ! %" of gap between average cost of supply and average revenue on subsidy received ; ' % #" ;!! investment in Distribution Sector. This Scheme will facilitate Central Govt. intervention, and catalyst for revamping and restructuring the State Sector Distribution Scheme. 17. 220kV transmission line from Srinagar to Leh via Kargil: The Cabinet Committee " ;" ; !% '% ! " " @<; _; ;!_ ?' !!$$|\>? %$$|\>?" " ; !!%? ;;; 18. Power System Improvement Project in North Eastern Region except Sikkim and Arunachal Pradesh: !% ^@ !! % [ ` ' ; Meghalaya, Mizoram, Tripura and Nagaland, the aforesaid new project (on advice % ! \ ;; }" ' ^ % '"! %%_@@;["!%% ;; !%^@#"< >_<; }" _@@;"!%' been segregated for implementation through budgetary support from Government of India. 19. Strengthening of Transmission System in the States of Arunachal Pradesh & Sikkim: A comprehensive scheme for strengthening of transmission, sub-transmission and distribution system in the entire NER including Sikkim has been conceptualized. 20. Power System Development Fund (PSDF) (be met from receipts under Public Accounts)_~ _"; '% \ ! ~"! 18 < "; ' [ % % ; infrastructure by part funding through Grants. The Scheme would not require any net budgetary support from MOP as the expenditure on the projects would be funded from the receipts accruing from the regulatory charges levied by Central Electricity Regulatory \ ;; \\ 21. Power System Operation Corporation Ltd. (POSOCO) The Cabinet Committee on " ;";!% '% ! Setting up of POSOCO as an Independent Government Company under Ministry of Power. 22. Green Energy Corridor: The scheme is proposed for maximization of renewable energy generation and integration with the main grid without compromising on the security and stability of power system. 23. Smart Grid The scheme of Smart Grid is one of the schemes included in the 12th Plan with an outlay of Rs. 1000 crore. The scheme envisages setting up of an institutional mechanism by launching “National Smart Grid Mission” which would serve the need of an electrical grid with automation, communication and IT systems that can monitor ; " ; % " ! "!; ! %;" !; 24. Power Sector Support to NCT of Delhi : Delhi’s transmission system lacks adequate capacity/redundancy, resulting in frequent outages/power cuts in the National Capital. Accordingly, Ministry of Power provided special support of Rs.200 crore to the Delhi Govt. for strengthening of the transmission system. 25. Investment in Public Enterprises: Provision under the scheme is towards capital investment in the generation/transmission projects taken upon in the Central Sectors \_!@`<\?;%`\?;%`\]<\>%?%_` ?;%%]|><!\!]!**+" " ; >^ $+" %|^_" %$ 19 Chapter-II Outcome Budget 2015-16 Outcome focused budgeting has been introduced as a tool to improve the quality and "" ! | ';[% ;;]" ;^%" ; integral part of budgetary process since 2005-06.This is to ensure that we get better value for money we spend. ; $+" '% ! $ per details given below: Annual Plan 2015-16 (Rs. in crore) Sl. No. Organisation/ Schemes Internal Resources Bonds/ Debentures 1 2 4 5 A. ECB/ Supplier Credit 6 Others Total (IEBR) Total (GBS) Total Plan Outlay 7 8 9 10 PSUs 1 NTPC *+* 7870.26 5685.95 0.00 23000.00 0.00 23000.00 2 NHPC 2120.55 =* 0.00 0.00 3979.89 200.00 +*=* 3 PGCIL 13000.00 3000.00 0.00 20000.00 0.00 20000.00 4 \ 0.00 1000.00 0.00 2682.93 3682.93 0.00 3682.93 5 THDC 0.00 509.83 587.23 1550.31 30.00 1580.31 6 _`? 977.93 0.00 83.07 1175.00 0.00 1175.00 7 NEEPCO 155.61 818.10 =* 0.00 1216.60 75.00 1291.60 0.00 TOTAL (A) 17151.13 B. MOP Umbrella Programmes 1. Deen Dayal Upadhyay Gramin Jyoti Yojana 2. Power Sector Reforms 0.00 24547.70 9552.67 3353.23 54604.73 305.00 54909.73 0 0 0 0 4500 4500 a. Integrated Power Development Scheme 0 0 0 0 0 600 600 b. Transfer to Power System Development Fund 0 0 0 0 0 300 300 20 Sl. No. Organisation/ Schemes Internal Resources Bonds/ Debentures 1 2 4 5 ECB/ Supplier Credit 6 Others Total (IEBR) Total (GBS) Total Plan Outlay 7 8 9 10 c. Power System Improvement Project in NE Region (except Sikkim "! % 0 0 0 0 0 250 250 d. 220 Kv Transmission Line from Srinagar to Leh via Kargil 0 0 0 0 0 250 250 e. Strenthening of Transmission System in the States of Arunachal % Sikkim 0 0 0 0 0 150 150 f. Central Power Research >\> 0 0 0 0 0 125 125 g. Financial Debt Restructuring of DISCOMs 0 0 0 0 0 + + h. Energy Conservation 0 0 0 0 0 60 60 i. ^ #"" 0 0 0 0 0 50 50 j. National Power Training Institute `<> 0 0 0 0 0 k. Central Electricity Authority 0 0 0 0 0 30 30 l. Smart Grid 0 0 0 0 0 m. National Electricity Fund `~> Subsidy Scheme 0 0 0 0 0 20 20 n. Other MoP Schemes 0 0 0 0 0 Total (B) 0 0 0 0 0 6494.74 6494.74 17151.13 24547.70 9552.67 3353.23 54604.73 6799.74 61404.47 Total (A)+(B) 21 Non Plan 2015-16 " Sl. No. Organisation/Schemes Non Plan Budget 1. MOP Secretariat + 2. Central Electricity Authority +* 3 CERC Fund CERC Fund 5 `<> ~% 6. Appellate Tribunal for Electricity 7. _ _\ <| ["!| ?;; ' 6.33 8. ^%<;! _ '[ 1.00 9. \!_ \ 1.00 - $ 10.15 Total 134.76 The outcomes for each of the above schemes in detail have been given in the table annexed !! "^ % (1) Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY): Government of India has '%";%!%|; }|< ! }' |% |;; %@ } || "; " launched by Govt. of India in April 2005 for providing access to electricity to all households ;%%|_";\ ; <|!!' !! " ; _ "!% "!%"!}%" ! "!! "!!" ;!% _%; ; % " !"!%; % ;%" ; ! !"#" " ;! !% % % ! || th and 13th Plans. 22 Under the new scheme, 60% of the Project cost will be extended by Govt. of India as Grant in respect of States other than special category (85% for the Special Category States !! ` _ "!% _@@; ;"! % @% ;; _"! \ _ !! " % sources by the State Govt./State Power Utility and the balance 30% (10% for Special \ _ ; % ? " _ | ' _ !%% ! " _"!\ _ conversion of 50% of loan component will be provided by Govt. of India on achievement "%;! ";!" ;! %" <\! release of revenue subsidy by State Govt. % " ; | ! || ! * ! >!>+ >!>>%+ >>! }"'" % [" < }"" '!"#" ?@!"#%'!!% '%!""" " +\ ^? household families. % }"%| |%! ";' been issued on 23rd";%`%; ";` _ !%#! % "!% }" are to be submitted by State Power utilities by April 2015. <%!! " " ~$< ~ $ "'!"#" '!!% !"" !@^? households. Under the new components of the scheme, projects costing Rs.8853 crore has been sanctioned by Monitoring Committee. The details are at Annexure-I (2) Power Sector Reforms (i) Integrated Power Development Scheme (IPDS) : IPDS became operational with CCEA approving it on 20th` ';>% '! ;_"; >_";!!' !! " ; _ ; %% @ (ii) % ;%" ; (iii) IT enablement of distribution sector and strengthening of distribution network for completion of the targets laid down under erstwhile R-APDRP for 12th and 13th Plans. The erstwhile scheme of R-APDRP has got subsumed into IPDS alongwith its outlay. Projects costing Rs.3268.33 crore have been sanctioned by the Monitoring Committee. <#"! ~"!$% 23 (Rs. in crore) S. N. Name of Schemes Amount allocated in FY 2015-16 1 >_|` ` 2 >_|` 3 ? ` ` 4 ? _\_ 53.89 5. ? ` 16.00 191.00 9.00 330.11 600.00 The details are at Annexure-II. Power System Development Fund (PSDF) : A Plan Outlay of Rs.300.00 crore for 2015-16 has been kept for PSDF. PSDF is to be utilized for funding of proposals related to safe operation of Grid like installation of protection system, renovation % ; % ; % % ; !' congestion etc. The details are at Annexure-III. Power System Improvement Project in NE Region (except Sikkim & Arunachal Pradesh) : The scheme is conceived for the development of Intra-state transmission and distribution in Arunachal Pradesh and Sikkim and is being implemented Power |% \ >% |\>? \! <; ! country, under Central Sector Plan Scheme of Ministry of Power. The scheme is '% " ;; %=; ";=! ! of Rs.250.00 crore has been kept for Power System Improvement Project in NE ["_@@;"!% (iv) 220 KV transmission line from Srinagar to Leh via Kargil. To improve power supply in the Leh-Kargil region and connect the Ladakh Region to the National Grid, the Govt is constructing a transmission system from Srinagar to Leh. This would %'!! ?%@ ~ ' $=" ;%%;!% |% Corporation of India Limited, implementation agency of this project. Also A Plan ! " $@ " " ; line from Srinagar to Leh via Kargil. (v) Strengthening of transmission system in the States of Arunachal Pradesh and Sikkim : The scheme is conceived for strengthening of the Intra State Transmission and Distribution System for six States (Assam, Manipur, Meghalaya, ;<%`!%<";;!;% |% \ >%|\>?\!<; ! " under Central Sector Plan Scheme of Ministry of Power with the assistance of World ^@! %% ["" ; 24 of capacity building for Rs.89 crore for which GoI will bear entirely. The scheme is '% " ;; %=; ";=! ! of Rs.150.00 crore for 2015-16 is kept for strengthening of transmission system in the States of Arunachal Pradesh and Sikkim. <%! '"; '%<; _"; Annexure IV. 'Research & Testing by CPRI : \! ">\>` !?'!? !% "#!% %" %% '! % "#" !""! ; % " ; The plan outlay for CPRI is Rs.125.00 crore. The details are at Annexure V. ' Financial Support for Debt Restructuring of DISCOMs A Scheme for Financial Restructuring of the Discoms has been formulated and '%| '; >%@'#"!! ! " !%;"%#"" @ _" ;<"; contains immediate/continuing and short term measures required to be taken in a time bound manner by the Discoms and State Governments. <_"; ~"!" _]%" ; #% Ministry of Power after CCEA’s approval with effect from 05-10-2012. The Scheme was available to all participating State Owned Discoms having accumulated losses %"%#"!#" !! < ! + " %~"!$"_"'!# under the Scheme upon achieving certain milestones envisaged under the scheme. The details are at Annexure-VI. 'Energy Conservation - The Plan Outlay for Energy Conservation for 201516 is Rs. 60.00 crore. The funds would be utilized for carrying out the Energy Conservation related activities i.e. National Level Awareness Campaign, National Energy Conservation Awards and National Level Painting Competition for Children. National Action Plan on Climate Change contains 8 National Missions representing multi-project, long term and integrated strategies for achieving key goals in the context of climate change. One of the Missions is National Mission for Enhanced #"" ` " % ] ^ #""^ ;""'%<%";<@ < ; #""<#""~"! ; ~%~; @ #"" ;"'! ;~ various components of the Mission. The details are at Annexure-VII. [ <!]! ^ $ 25 " "!%" < ; #""%>>! %% "' %"" ; ^% '! ;;"; ' !% ! \ ;;"! ^!% _%% ?! !" ;% _% ; "! "! _ % ? >% % \" ^!% _ < details are at Annexure VIII. [ Training and skill improvement by NPTI : ; " '%%%!_";%$" %` !. The details are at Annexure IX. [ Central Electricity Authority< ! " ! % +* " % ` ! ~"! $ < \! Electricity Authority coordinates the activities of the various agencies in relation to control and utilization of national power resources. It is also responsible for carrying out the survey and studies, collection and recording of data concerning generation, distribution, utilization and development of power resources. The details are at Annexure X. [ Smart Grid The scheme of Smart Grid is one of the schemes included in the 12th ! ! " ! " @ for 2015-16. The scheme envisages setting up of an institutional mechanism by launching “National Smart Grid Mission” which would serve the need of an electrical % ; " ;;" %><;"; ; " ; %" ! or curtailment of loads matching generation on real time basis. The details are at Annexure XI. [ National Electricity Fund (Interest Subsidy Scheme) Government of India '% ` ! !"" ~% > _% _"; '%% =$$" ! %; % }"; " '%%~ _ ! !"%'" improve the distribution network. `~_\ ;;%~~ '% ! " ; " '%`~~% the compliance of the eligibility parameters as per NEF guidelines, eligible Discoms !!!! '!# % %;@ from the lenders. The Plan Outlay for 2015-16 kept for the scheme is Rs.20.00 crore. The details are at Annexure XII. ['Other Schemes: There is a provision of Rs.1.00 crore under Assistance to Forum of Regulators for 26 \"^!%(Annexure-XIII). Rs.1.00 crore under Comprehensive Award Scheme (Annexure-XIV)" %MoP Sectt.%!"; +" %` !";(Annexure-XV) and Rs.0.30 crore under Funds for Evaluation Studies (Annexure-XVI). An amount of Rs.6.33 crore has been kept under the scheme JERC for Union Territories Goa & UTs except Delhi%` !|?;; ' % ' crore has also been kept under the scheme APTEL (Non Plan) (Annexure XVII and XVIII). A token amount of Rs.1 crore each has been kept for Power System ] \ ;]_]\]%|\ % "'' at Annexure-XIX. (3) Generation The generation in the central sector is implemented through the various organizations as under: (i) NTPC Limited The outlay of Rs 23,000 crores during 2015-16 is expected to result in commissioning = ; % ; %"! ; !%; ; ^ % * ; ^_^< !!!! !!"! }""%!% " ;; %>>>>>! %<%! are at Annexure-XX. (ii) NHPC Limited <!]!^ $" " ;>^ +$ " %|^_+==" ;! ";'>> <? ;>_? >>>>>% }" % % }"' !^!><><>>> The report of Working Group on Power Sector for the 12th Plan envisages NHPC to %%%>>!`\!@! %%+%th Plan. Till %`\%%%'\;>>> \@ <? ; `; ^ >> 520 MW of Parbati-III. < ! +*=*" " " |^_%*+*=* " >^@ "'!%%$""!% claims/residual works of projects already commissioned namely Dulhasti, Uri>> >>> <?>>> \;>>> \@ % `; ^ }" \ " "' }" ' >> < ? ;> Kishanganga HEP which are in full swing now. However, due to ongoing protests by various pressure groups in Assam against the construction of Subansiri Lower 27 HE Project, there is total stoppage of works since Dec’2011. Earlier, there was !! @>>%<?> }"% ; " " % % #"! "" \ " \\"'!< @ }"!@ !^!><> %<>>> }"! ["% $}" to availability of pending statutory clearances and Govt. sanction afterwards. The details are at Annexure - XXI. (iii) North Eastern Electric Power Corporation (NEEPCO) ~ `\] ! =+*=" ["!%]` | $ \ <! ; '% " ; `^_ \%>^ *==" <;} % allocation was meant for construction of the ongoing projects viz. Kameng HEP $<!$<|^% }" %! | < ! \\ [ }" already mentioned above, all these 5 projects are scheduled for commissioning within 12th!<!"!! " % _ ! }" | !! \ ! ^% }" _' >' _";% ' % _"; ! _ `\] % ! ~$" ; `^_ + " % >^ $$ " % * " % "'% ; `< ! ! ~$$*" The major portion of this proposed allocation has been meant for construction of }"';$<! $<|^% }"!|<!\\ [ }" % _ ! }" <|^ !% mentioned above, all these 6 projects are scheduled for commissioning within 12th !<!"!! " %_ ! }" ?@%"'!;| !!\ !^% }" _'>' _"; ' % _"; ! _ % _";<%!Annexure - XXII. (iv) THDC India Limited ~ ! =$$=" "!%|^_%>^ made. A provision of Rs.50.08 crore has been made for execution of various balance @ % @' !" }" ' of Rs. 566.86 crore has been made for execution of various works of Tehri PSP }" ' =" ;% [" ' @ %!@ ' +=" 28 has been made for mobiliztion advance, Machinery advance to contractor and other ;"!! @ @_ ' " been made for the New Projects. For the year 2015-16, the outlay of Rs.1580.31 crore has been made (including " |^_ ' $= \ ;% [" of various balance works (Road works, Diversion tunnel, substation and internal }" % " }" ' +$ " ;% [" ' @ < _ }" ' $ " ;% [" ' @ %!@ ' =+" ;% for mobiliztion advance, Machinery advance to contractor and other miscellaneous @ @_ ' **" ;% the New Projects. The details are at Annexure – XXIII. (v) SJVN Limited ~ $ ! + " " ; _^> ? == " >! " *= " < ;! !" ; ; % ' % }" +$%" " "' ?$' '@ !_@'` $' >>> `! * ' !% $$ ' " +[ ! "$[ ;@=[ ^[<;! }" [ " "; \ ! ^! "@ [ \ ^ % <; \ ;['_ ! }"['>>> <; ?['\ " | ^!%_;!%[' Research and Development against which funds have been proposed out of the above outlay. The details are at Annexure-XXIV. (vi) Damodar Valley Corporation (DVC) <!]! +$**" <_>> %" ;;"! $ }"% " ;! ^%__ ^\<_% "%! <_ ?`_ _\ ?>?] ^ \ | !" ? <_" ! <_| !; ! | !; " ;!% %;|%! @%__ % Transmission Lines. The outlay of Rs.3682.93 crore during 2015-16 would result in commercial operation |#!% }" !@ ~!! ? % <_ > > $ % ^<_[<%! Annexure-XXV. 29 (d) Transmission Network by POWERGRID ~ ! \ >^ ]|> #! %!'! ""@;%` ;" ' been targeted. The details are at Annexure-XXVI. 30 31 2 | 1 _ agriculture and non-agriculture feeders _ and augmentation of sub-transmis % infrastructure feeders, distribution transformer " ; energy auditing and reduction of <\! ' '% access to electricity to villages and households 3 Crore 6 After sanction of projects, contracts for execution of projects are to be awarded by States Discoms / Power Deptts. within 6 months. The '% projects shall be free electricity completed within connections to ; ; !@^? date of award. Hhs Note : Project deliverables in respect of feeder separation, system streghtening and metering are expected to commence ;~$ 17. !"#" 17500 villages (including !"#% villages 5 Will facilitate overall rural development, employment generation and poverty alleviation. 7 ;'!!es covered under the scheme are located ' !'%#"! terrain, poor road connectivity and proximity to naxal affected areas ! clearances (Forest / !" " issues / delay in providing land for sub-stations by states %\ "! between Implementing Agencies (DIS\]%<@ contractors Further, there can be delay in the programme due to unexpected events, natural calamaties etc. 8 Name of Objective/Outcome Outlay 2015-16 #!- Processes/Timelines Projected Out- Remarks/risk Factors Scheme/ liverables/Physcomes NonPlan Complemen- ical Outputs Programme Plan ^% tary Extra$ ^% ^% Resources 1 Sr. No. OUTCOME BUDGET 2015-16 DEENDAYAL UPADHYAYA GRAM JYOTI YOJANA (DDUGJY) Annexure-I 32 1 S. No. Integrated Power Development Scheme (IPDS/ R-APDRP Name of scheme/ programme Nonplan budget NIL Objective/ outcome Attainment of Reliable %'#able baseline data of energy ' %<\ Loss reduction on sustained basis R-APDRP a. Rs.330.11 crore -loan ¡` b. Rs. 53.89 crore - loan _\_ c. Rs. 16 crore - loan ` Rs. 600Crore (i>_ a. Rs.191 crore grant (non` b. Rs. 9 crore.- grant ` Plan budget NIL Complimentary extra budgetary resources Outlay 2015-16 IPDS/R-APDRP 1. Part A completion of 350 Go-Live Towns ^ completion of 200 towns 3. Estatblishment of SCADA Control Centres in 25 towns \ ;prehensive capacity building under R-APDRP including facilitating of Post GoLive activities ;days. "#$ deliverables physical outputs from date of sanction for Part-A >< Part-A(S\ ^ Further, Five years <\ loss monitoring by TPIEAEA with # starting an year after establishment of >< system Process timelines After implementa >< in the project area, state power utilities should be able to achieve reliable '#!!%" ! "<\? "@ contain them through technical ;!terventions. Imple; ^ shall enable reduc <\! through technical interventions. The " ^ <\! %"tion to below 15% in project areas. Implementation of SCADA shall reduce power inter ; ' quality of power supply. Projected outcomes The success of the scheme will depend on smooth ;! implementation of the projects under ^ by State Utilities in accordance with R-APDRP guidelines for reduction <\ losses on sustainable basis. Remarks/ risk factors OUTCOME BUDGET 2015-16 Integrated Power Development Scheme (IPDS)/Restructured Accelerated Power Development and Reforms Programme (R-APDRP) Annexure-II 33 2 1 PSDF Name of scheme/ programme/ project Sl no Power System Devel ; ~% _~ has been constituted with the approval of Cabinet. This Fund is to be utilized for funding of proposals related to safe operation of Grid like installation of protection system, renovation and mod transmission and distribution system for relieving congestion etc. 3 Objective/outcome 4 (ii) 4 (i) 300.00 Plan Budget Non Plan Budget 4 4 (iii) Complementary Extra Budgetary Resources Outlay 2015-16 Quanti#$ Physical Outputs 5 Outcome Budget 2015-16 Power System Development Fund (PSDF) Enhanced grid discipline/ security Projected Outcomes 6 Processes/Timelines 7 The scheme #!% in the month of ]" Therefore, only 5 proposals could be approved during 15. There are several proposals in pipeline. Remarks/Risk factor 8 " Annexure - III 34 _ <; _; ; ! _ ?'!!$$ % $$ " nection system for Drass, Kargil, !%? Comprehensive Scheme for strengthening of Transmission and Distribution _; ` _@@;"!%_@@; NER Power System Improvement Project in six North Eastern States ex"!%"!%_@@; (i) Non-EAP component (ii) EAP component < ! II III 2. Name of the Scheme/Programme I 1. S. No. Objective/Outcome 200 50 250 150.00 Nil Nil 250.00 C o m ple-mentary Ex^%getary Resources P l a n ^% Non Plan ^% Nil Outlay 2015-16 OUTCOME BUDGET 2015-16 Transmission Schemes 5. #able Deliverables/ Physical Outputs 6. Projected O u t comes 48 months 48 months 42 months 7. Processes/ Timelines 8. Remarks/ Risk Factors " Annexure - IV 35 2 1 Participation of CPRI as Fifth Equity Partner \ ; National High Power Test Laboratory Pvt. ?%`<? Augmentation of test facilities for optimization = @ \ % = @ \ transmission system 1 2. XI Plan On going approved projects Name of Scheme/ Programme Sl. No. - - - To augment test facilities for conducting optimization % transmission system of 800 @\=@ DC rating - - Complementary Extra ^%ary Resources Plan ^% Non Plan ^% - Outlay 2015-16 Objective was to become a the NHPTL Company for establishing High Power Test facilities 3 Objective/ Outcome 5 #! Deliver-ables/ Physical Outputs Outcome Budget 2015-16 Central Power Research Institute 6 Projected Outcomes Commissioning of AC test system 7 Process/ Timelines The project duration extension approved by MoP upto March 2015. Project is likely to take few more months for completion. ^!" uity amount of Rs.9,12,50,000/released from MoP on 5th Sep; paid to NHPTL. 8 Remarks/ Risk Factors Rs. in Crores Annexure - V 36 2 Augmentation ! Diagnostic Relay, ? test facilities and infrastructure protection 1 3. 1. Augmentation Projects of CPRI % >> ! *\ 3 Objective/ Outcome Upgradation of ! facilities at ^! % ^ !% establish EMI/ \? facilities XII Plan approved Project Name of Scheme/ Programme Sl. No. - - $ Plan ^% Non Plan ^% - - - Complementary Extra ^%ary Resources Outlay 2015-16 Tender-ing and placing of order, Delivery of some major equipment’s, Initia-tion of civil works. 5 #! Deliver-ables/ Physical Outputs Tender-ing and placing of order, Delivery of some major equipment’s, Initia-tion of civil works. 6 Projected Outcomes April 2015 to March 2016 Constru-ction ^ % Wall at CPRI, ^! \\ Guest house expan-sion Contin-uation of construction of EMI/ EMC lab. Comple-tion of Wake Simula-tion lab. 7 Process/ Timelines Project approved on 25th February The project duration extension sought upto proved by Governing Council at it’s meeting held on 5th December 2013. The project requires approximately 20 months from the date of commencement of civil works by CPWD. 8 Remarks/ Risk Factors 37 3 Objective/ Outcome 1. ! To help address \ challenges in power/electricity, including reli!#"" safety and environment ! =\ Modernisation projects of CPRI % >> ! $\ 2. Establishment projects of CPRI % >> ! $\ 2 1 3. Name of Scheme/ Programme Sl. No. - - 6.00 58.16 21.68 Plan ^% Non Plan ^% - - - - Complementary Extra ^%ary Resources Outlay 2015-16 Implementation of the projects approved by RC Committee Tender-ing and placing of order, Delivery of some major equipment’s, Initiation of civil works. Tender-ing and placing of order, Delivery of some major equipment’s, Initiation of civil works. 5 #! Deliver-ables/ Physical Outputs Tender-ing and placing of order, Delivery of some major equipment’s, Initiation of civil works. Tender-ing and placing of order, Delivery of some major equipment’s, Initiation of civil works. 6 Projected Outcomes Implementation of the projects appro-ved by RC Committee April 2015 to March 2016 April 2015 to March 2016 7 Process/ Timelines Project approved on 5th January 2015 by Ministry of Power. Project approved on 5th January 2015 by Ministry of Power. 8 Remarks/ Risk Factors 38 Project proposals are invited from academia, power utilities, industries as well as research institutes and are approved by an expert committee on research scheme on power NPP projects are taken for undertaking projects iden#%% National Perspective Plan as approved by _\ 2. Research Scheme on _ \ 3. National Perspective !` \ TOTAL 3 2 1 Objective/ Outcome Name of Scheme/ Programme Sl. No. - 125.00 17.00 8.00 Plan ^% Non Plan ^% - - - Complementary Extra ^%ary Resources Outlay 2015-16 Implementation of the projects approved by _\ Implementation of the projects approved by EC on RSoP 5 #! Deliver-ables/ Physical Outputs 6 Projected Outcomes Implementation of the projects approved by _\ Impleme-ntation of the projects approved by EC on RSoP. 7 Process/ Timelines 8 Remarks/ Risk Factors 39 2. %" <\? Financial Support for Debt Restructuring of State Owned Discoms (Transitional Finance "; 1. 1 Name of Scheme / Programme S. No. To ensure the #"! viability of State Owned Discoms 3. 4. + 5. NonPlan Objective / Plan Budget outcome Budget 6. Complimentary Extra Budgetary Resources Outlay 2015-16 ~!#!!; m a n d a t o r y conditions under Part C of the Scheme 8. Process/ timelines Reduction in Gap \_ The benchmark of and consequently <\ ! !% accumulated losses be the base year 2010-11 on the audited accounts of Discoms by CAG %" <\ losses beyond the }" "#% under RAPDRP with base year 2010-11 7. "# deliverables/ Physical Outputs OUTCOME BUDGET 2015-16 Financial Support for Debt Restructuring of DISCOMs The incentive is in addition to the grant/ #% and is available for three years starting ; 9. Remarks/ risk factor " Annexure - VI 40 2. 1. \! Reimbursement Support Name of Scheme / Programme S. No. 3. 4. 5. NonPlan Objective / Plan Budget outcome Budget 6. Complimentary Extra Budgetary Resources Outlay 2015-16 7. "# deliverables/ Physical Outputs 8. Process/ timelines Capital Reimbursement Support would be given by Govt. of India }" !#!!; mandatory conditions and State Government taking over the entire 50% of the Short Term Liability (Corresponding to the accumulated as on 31-03-2012 in respect of Haryana, Rajasthan, Tamil Nadu and Uttar Pradesh and 31-03-2013 in respect ^@%% Andhra Pradesh and <!. 9. Remarks/ risk factor 41 1 1 Sl. No. - Awareness campaign on energy conservation through print, electronic and other media for general public. - To spread the message of energy conservation %#"" through the media. Publicity 28.20 5 · Creation of data base and its analysis EC Award participating units. - Compilation and dissemination of best-practices in industry and building sector. - Continuation of EC Awards on energy conservation. "#%'#*$ Physical Outputs - Continuation of paintings competition on energy conservation. 4 28.20 Outlay 2015-16 - To inculcate in children the relevance of energy #""% conservation. 3 - To recognize the efforts of industrial and other establishment consumers to adopt energy conservation measures which may become models for others to emulate. Objective/ Outcome _" ! State and National Level Painting Competition for School Children 2 - Energy Conservation Scheme ` ! Energy Conservation Day/Awards Name of Scheme/ Programme OUTCOME BUDGET 2015-16 ENERGY CONSERVATION - Awareness creation in general public. - Organization of painting competition for school children all over the country. 6 - National Awards to industry and other establishments, such as buildings #" ! !^] Railways, State Designated Agencies and electricity distribution companies for achieving energy savings. Projected Outcome 7 Progressively from April 2015 to March 2016. The Award function is scheduled th December, 2015. Process/ Timelines 8 Remarks (Rs in crores) Annexure - VII 42 1 Sl. No. National Mission on Enhanced En#"" ` 2 '_% \"^!%ing Programme Name of Scheme/ Programme NMEEE is one of the 8 missions under National Action Plan on Climate Change. The provision is for operationalisation of the NMEEE 3 - Capacity ^!% Students Objective/ Outcome 28.80 4 31.80 Outlay 2015-16 '! ; #" " !;! - Capacity building of designated consumers, accredited energy auditors and state designated " ;% manual - Development of trading platform - Preliminary Assessment Re ^ "'; <>$$<] -Truing up of Energy Saving Targets 5 - Development of materials on energy conservation for School/ ITI/Diploma Engg. College Curriculum. - Training of School teachers/ lecturers on the new modules/ curriculum. - Debates at Degree College level, ITI, Diploma Engineering \ !!!'!" ; at school level. - Establishment/ Strengthening of energy clubs in schools. - Developments of tip sheets/ brochures on Energy Conservation. Perform, Achieve and Trade (Industries) "#%'#*$ Physical Outputs - Trading platform on power exchange. - Preliminary Assessment Report -True Achievement - New Designated consumers for inclusion in PAT-2 cycle -Workshops ! Perform, Achieve and Trade (Industries) 6 - Students capacity building. Projected Outcome Progressively from April, 2015 to March, 2016. 7 Process/ Timelines 8 Remarks 43 Name of Scheme/ Programme 2 Sl. No. 1 3 Objective/ Outcome 4 Outlay 2015-16 FEEED (PRGFEE and VCFEE) <= Financing Platform) - Operationalization of PRGFEE programme ] ! \~ programme - To organize training workshops for scheduled commercial banks and awareness work " " #"! institutions and ESCOs - To initiate business plan com ; #ciency business - To develop risk assessment guidelines and guidelines for #"#"" }ects 5 - Issuance of ESCerts >%#" \ existing sectors >%#" " PAT-2 cycle \"@'#" %ed consumers ^!% < ` #" < "#%'#*$ Physical Outputs FEEED (PRGFEE and VCFEE) and <= ciency Financing Platform) - Commitment of guarantees for PRGFEE - Number of investments made by \~ - Capacity building workshops for Financial institutions ?" ^ness Plan competition - Development risk assessment guidelines and guidelines #" #"" }" - Number of DCs ""@'#% -Targets for PAT-2 cycle - Statutory order - New sectors 6 Projected Outcome 7 Process/ Timelines 8 Remarks 44 1 Sl. No. Total _#" Equipment Programme _ 2 ^"?; }^? Name of Scheme/ Programme - To accelerate demand for super #"pliances like ceiling fans/ Refrigerator/ agricultural pumps etc. 3 - To promote #" quality CFLs as replacement for incandescent bulbs in households. Objective/ Outcome 60.00 2.00 4 1.00 60.00 Outlay 2015-16 Contracting Fan Man"%; '#" " Empanelment of Testing facility Finalization of SEA Label and Media plan Release of Advertisement and media campaign - Testing at manufactures’ base for type test and random testing at retailer level - Maintain the institutional structure of Coordinating and Manag\ - Provide technical assistance ; %'#" individual projects. - Inclusion of new projects under the registered PoA. (Depend ;@" - Continuous engagements with the State Electricity Distribution Companies. ~"! ||; implementation of LED projects. %'#" savings achieved for the implementation of LED projects under ||"; 5 "#%'#*$ Physical Outputs -Test reports -number of ad released "gaged and Manufactures contracted -Number of test Labs -SEA Label and outreach material 6 - Issuance of CERs for 2nd Monitoring Period for }"%^? PoA. - Monitoring and #" 'ings achieved for the implementation of LED projects %|| Scheme. Projected Outcome Progressively from April, 2015 to March, 2016. 7 Progressively from April, 2015 to March, 2016. Process/ Timelines 8 Remarks 45 2 Name of Scheme/ Programme 1 Standards, Codes & Labelling for Appliances, Buildings & Energy Research Centre BEE Schemes 1 Sl. No. Standard ?!! Scheme _? - Enhance Credibility of the on-going _? gram - Achieve energy saving in line with national policy through end-use #cient products - Increase the visibility of the program among different stakeholders 3 Objective/ Outcome 0.00 Outlay 201516 3.30 - New Product labeling: Inclusion of 2 new products %_?"; - Inclusion of three products in mandatory labeling program. - Continuation of awareness campaign. - Up gradation of Standard for 1 appliance. Enhancement of check-testing activities by Independent agencies and SDAs. - Strengthening of test laboratories. 5 #!!'! Physical Outputs Outcome Budget 2015-16 1. Launch of voluntary program for inverter AC and LED bulbs. ` #" energy performance standards " ! < %rect cool refrigerator and geyser under mandatory _? ; 3. Includes training program for retailers, awareness campaign through radio and other media segments. \"@ of all products as per the sampling plan. 6 Projected Outcomes Progressively from April, 2015 to March, 2016. 7 Processes/ Timelines Targetted saving of 3.3 ^ and in terms of avoided generation capacity is 500 MW 8 Remarks/ Risk Factor (Rs. in crores) Annexure - VIII 46 1 Sl. No. 2 Name of Scheme/ Programme Energy Conserva ^!%ing Code \^\ To reduce energy consumption in commercial buildings. 3 Objective/ Outcome 3.30 Outlay 201516 Implementation of ECBC in commercial buildings. Adoption of ECBC ;%; #" % \^\ maining states. %#" _"%! _ !% bye-laws for states. Administration & Enforcement of ECBC Implementation !; \^\ \!! _ - Development of Test Stan%% ;; ! % \ " ; nents. 5 #!!'! Physical Outputs - Minimum energy performance standards for building components. Updation \^\ - Development of benchmarking/ database for commercial buildings. - Adoption of \^\ maining states. \ Pool of Master Trainers. 5. Review of fund utilization of test laboratories to which government grant has been extended. 6. Upgradation of standard for direct cool refrigerator. 7. Development of operations ;! _? scheme. 6 Projected Outcomes Progressively from April, 2015 to March, 2016. 7 Processes/ Timelines 8 Remarks/ Risk Factor 47 1 Sl. No. 2 Name of Scheme/ Programme 3 Objective/ Outcome Outlay 201516 6 ^!% capacities of states to support implemen \^\ - Dissemination of information on \^\ % \ studies through demo projects. - IGEAs in public buildings. - Expansion of existing Star Rating Scheme for hospital and hotel building category. \% \^\ professional examination. - Directory of #" building material. - Support for creation of building material testing laboratories. \ "% \^\ expert professional. - Training programme for architects/ engineers / design professionals/Code compli" #"! \ ! [perts. '! ; \^\ professional examination %"#" - Development of Energy #"|%! ! %!^!% ; ;% "!;" zone. - Introduction of a voluntary star label for residential building Facilitation of ECBC Demonstration projects. - Preparation of technical "#" - Establishment of feasibility studies. \ \^\ Cells in state PWDs En>* buildings Projected Outcomes 5 #!!'! Physical Outputs 7 Processes/ Timelines 8 Remarks/ Risk Factor 48 1 Sl. No. 2 Name of Scheme/ Programme 3 Objective/ Outcome Outlay 201516 >;" assessment of savings _\^\ implementation buildings. Demonstrative proj" [ ^!% - Continuation of existing ESCO accreditation process. - EE Implementation in Pub!"^!% _\] route. - Performance enhancement of commercial building based on Star Rating. - Assistance to states for Energy Assessment and EE Implementation. - Expansion and Up-gradation and Operation of existing Star Rating Scheme. Awareness campaign through Print and Electronic Media & Impact assessment - Development of awareness and outreach programme. 5 #!!'! Physical Outputs 6 Projected Outcomes 7 Processes/ Timelines 8 Remarks/ Risk Factor 49 2 Strengthening of SDAs for Energy Ef#"" 2 Name of Scheme/ Programme 1 Sl. No. SDA Strengthening Programme ¢ \ ; with the SDAs through regional meetings and National Workshops. ¢ ; #"! support to SDAs for the following activities: - Implementation of en #"" ; to showcase the potential #"" demonstration projects. - LED village campaign. - Institutionalization of enforcement machinery at the state level programmes. - Manpower support to the SDAs. - Workshops / training programs involving energy professionals. - Analysis and survey of the impact of energy conservation activities by the SDAs. - Publicity/awareness on en#"" - Maintenance and updatation of internet platform and other database created. ¢ '% %! garding timely utilization of #"! '%% 10.23 - To empower the SDAs as partners ^ state level to implement EC Act. 21.23 5 #!!'! Physical Outputs Outlay 201516 3 Objective/ Outcome ¢ ? !! Campaigns. ¢ %; tion projects. ¢ !" awareness campaigns on energy #"" @shops / training programmes, database up gradation etc. will be conducted in 30 SDAs. ¢ !; of enforcement machinery in 30 SDAs including providing manpower support. ¢ !' meetings involving all the SDAs to review the "! % #nancial progress. ¢ ` ! !'! meeting involving all the SDAs to review the "! % #nancial progress. 6 Projected Outcomes Progressively from April, 2015 to March, 2016. 7 Processes/ Timelines 8 Remarks/ Risk Factor 50 3 1 Sl. No. Demand Side Management _riculture, "! _ 2 Name of Scheme/ Programme Energy Ef Small and Medium Enterprises (SME) HRD Programme Contribution to State Energy Conservation Fund _\~ Ta r g e t e d energy consumption reduction of SMEs. 3.00 3.00 + 1. Initiate the implementation of demonstration projects in the 5 Energy Intensive SME sectors. 1. Energy Audit Instrument Support for Energy Auditors. 2. Theory cum Practices oriented training programmes for operators on energy ef#"" ! " and power plants, Preparation of materials in English and its translation in local languages (including print #" ! in furnaces and boilers. ¢ \ _\~ the states and matching contribution by the state governments to the SECF. ¢ \ % _ implement various energy conservation activities and utilization of fund under SECF. ¢; crores as contribution to SECF. 8.00 SECF is a statutory requirement and under EC Act. It is also one of the deliverables of SDAs ECAP. Human Resource Development and capacity building for Energy #"" 5 #!!'! Physical Outputs Outlay 201516 3 Objective/ Outcome 1. 20 demonstration projects of at least 10 technologies in 5 SME sectors. Progressively from April, 2015 to March, 2016. Progressively from April, 2015 to March, 2016. Progressively from April, 2015 to March, 2016. ¢ !; of SECF in 30 states. ¢ " " tribution in 20 states. 1. At least 5 auditor in each state and 15 states to be targeted. 7 Processes/ Timelines 6 Projected Outcomes 8 Remarks/ Risk Factor 51 1 Sl. No. 2 Name of Scheme/ Programme Agriculture DSM - To reduce the overall power consumption, improving efficiencies of ground water ex" reducing the subsidy burden of the states. 3 Objective/ Outcome 5.00 Outlay 201516 1. Integrating AgDSM scheme with existing GOI schemes. 2. Implementa states. ;% #cations. 2. Hiring of an agency to carry out PAN India benchmarking of the energy consumptions in energy intensive clusters. Com! %#"tion of such clusters in the country. 2. Conducting 5 stakeholder @ #' sectors in association with Cluster associations and the SDAs. 2. Conduct stakeholder workshops in sectors where technologies have been implemented. 3. Initiate the PAN India energy benchmarking study for energy intensive SME clusters. 1. Initiate the activities to facilitate the state governments to implement the ;% #" new agriculture connections. 2. Facilitate DISCOMs to review the DPRs and implement pilot projects in 2 states. 3. Stakeholder consultation/ workshops to be organized. 4. Consultation session with PHED to identify the pilot project and initiate preparation of feasibility report. 6 Projected Outcomes 5 #!!'! Physical Outputs Progressively from April, 2015 to March, 2016. 7 Processes/ Timelines 8 Remarks/ Risk Factor 52 1 Sl. No. 2 Name of Scheme/ Programme Capacity building of DISCOMS Municipal DSM - capacity building of the DISCOMs to imp lement DSM in their respective areas - To reduce energy cost ; ' e n e r g y overall incurred by the municipalities. 3 Objective/ Outcome 1. Establishment of DSM Cell by selected DISCOMs. 2. DISCOM-wise formulation of training module and organizing training for >_\] #"! 1. Creation of about 500 Master < #cials of DISCOMs on DSM and En#"" 1. Capacity !% #"! ?^% technical experts deputed. 2. Selection ?^ implementation of demo projects. 3. Implementation of demonstration }"$?^ 4. Conducting investment grade audits in %ies and development of bankable DPRs. 5. Preparation of DPR for pilot project in Sewage Water treatment Plant. 1. Investment Grade % water bodies 2. Up-gradation of MuDSM portal for the online analysis and portal data Management. 3. _ ! ?^ to undertake implementation of pilot projects identi#% 4. Capacity building of ?^ #"! 5. Engagement of technical staffs to shortlist%?^ 6. >%#" ?^ ;!; pilot project in Sewage Water treatment Plant. 2.00 + 6 Projected Outcomes 5 #!!'! Physical Outputs Outlay 201516 Progressively from April, 2015 to March, 2016. Progressively from April, 2015 to March, 2016. 7 Processes/ Timelines 8 Remarks/ Risk Factor 53 Total 2 Name of Scheme/ Programme 1 ^|~ ^_ project EAP Scheme 1 Sl. No. ^|~ ^_ project - To increase demand for energy ef#"" vestment in MSMEs and to build their capacity to access commercial #" 3 Objective/ Outcome 2.00 48.00 Outlay 201516 2.00 48.00 1. Media creative’s include documentaries, technical exhibitions, promotional features in news paper/ technical maga" 2. Web portal and helpline to !% 3. Knowledge ; Sharing a. KM Strategy b. Policy/ Technical papers ` c. Case studies/ success stories (approx 2 per "! 2. Load survey of all selected DISCOMs and preparation of their DSM Action Plans 3. Adoption of DSM regulation by all selected DISCOMs. 3. Providing consultant to each DISCOM for load survey and preparation of DSM action plan. ¢'! ; % Creative’s for generating awareness and outreach #"" ¢'! ; based Knowledge Portal and Help line ¢; "no-economically feasible #"" ! gies 6 Projected Outcomes 5 #!!'! Physical Outputs Progressively from April, 2015 to March, 2016. 7 Processes/ Timelines 8 Remarks/ Risk Factor 54 1 Sl. No. Total 2 Name of Scheme/ Programme 3 Objective/ Outcome 50.00 Outlay 201516 50.00 5 #!!'! Physical Outputs ; of 2-3 energy #"" ! 5. Feasibility study for developing a Motor ef#"" centre. 6 Projected Outcomes 7 Processes/ Timelines 8 Remarks/ Risk Factor 55 % dation of Training Facili\ ]#" Faridabad 1 $ $ Renovation, Modernization and Augmentation of training infrastructure of Nines Institute of NPTI Setting up of National Power Training Institute at Shivipuri. M.P Setting up of Hydro Institute of National Power Training Institute at Itanagar, Arunachal Pradesh. Non-Plan for Pension Total 2 3 5 NonPlan Setting up of National Power Training Institute at Alappuzha, Kerala 3 Objective/ outcome 1 B-New Scheme 2 Name of scheme 1 Sl. no 0.00 6.00 15.20 12.00 6.80 Plan Complementary [^% Resources Outlay2015-16 Work is under progress 6 Training activities will be increased after completion of the scheme. Training activities will be increased after completion of the scheme. Training activities will be increased after completion of the scheme. 8 2016-17 land has been %#%!! ment to NPTI is still awaited 2016-17 2016-17 2015-16 7 ProRemarks/ risk cesses/ factors timelines \ Scheme is 2017-18 Scheme is yet yet to be to be approved. approved Training activities will Work is be increased after com- under pletion of the scheme. progress Training activities will be increased after completion of the scheme. 5 #!%!'- Projectd bles/ physical outputs outcomes OUTCOME BUDGET 2015-16 NATIONAL POWER TRAINING INSTITUTE Annexure - IX 56 Name of Scheme / Programme 2 Technical Control ! Monitoring Sl. No. 1 1. 4(ii) 4(iii) - - Non-Plan Plan CEBR Budget Budget 4(i) 4 Outlay 2015-16 Review of power $= sector performance, long; term planning, assessment of ; ;terials, long-term system planning studies including management studies of RPCs, concurrence to hydro power development schemes, monitoring construction of generation ; projects, monitoring of rural !"#" and distribution planning, etc. 3 Objective / Outcome = % }" = the year 2015-16, a hydro capacity !@! " ;;sioned. <;! "" $ is likely to be commissioned during 2015-16 " !!" !" Daily generation report. Monthly review of power sector performance. Monthly status reports on construction of various hydro and thermal projects. All India Electricity Statistics: General '! Growth of Electricity Sector in India ! Review of Performance of hydro pow ! Review of Performance of thermal ! '<" " ;"!% concurrence to hydro-electric projects. 5 "#%'#*$=?*cal Outputs OUTCOME BUDGET 2015-16 CENTRAL ELECTRICITY AUTHORITY 7 Processes / Timelines %" Contingap between uous %;%- process ply of power in optimum time. '!! of statistics for public / inferences for planning and policy / decision making for the Indian Electricity Sector. " ;"! cost of generation of electricity. '""!% pace of capacity addition to reduce demand and supply of power. 6 Projected Outcomes - 8 Remarks / Risk Factors (Rs. in lakhs) Annexure - X 57 2096.00 0.66 Contribution To keep the ento Internagineers of CEA !^ % abreast of global technological developments in power sector. To provide technical sup Engineering of power projects to power utilities and adoption of state-of-the-art technologies. 4(ii) 4(iii) - - - - - - Non-Plan Plan CEBR Budget Budget 4(i) 4 Consultancy 2. 3 Outlay 2015-16 ApprenticeImparting voca20.00 ship Training tional training to for Engineers Graduate / Di! ; !% " !% the Apprenticeship Act, 1961. 2 1 Objective / Outcome 3. Name of Scheme / Programme Sl. No. Continuation of collective membership of CEA with CIGRE, Paris. Training of 36 degree / diploma holders and 10 D/Man At present 9 Nos. of consultancy projects are in hand. 5 "#%'#*$=?*cal Outputs 7 Processes / Timelines Updating of knowledge of CEA engineers in power system. Availability of trained technical manpower in the country - - 8 Remarks / Risk Factors The ContinCIGRE uous memberprocess ship fee for the calendar year will be paid in March 2015 Continuous process ContinIt helps in uous dissemination process of technology inputs to power utilities and creation of knowledge source and adoption of state-of-the-art technologies. 6 Projected Outcomes 58 Name of Scheme / Programme 2 _% Training Electronic Data Pro" Support System Sl. No. 1 5. 6. 4(ii) - - 56.00 90.00 Operation and maintenance of computer systems provided in CEA and its #" Maintenance of Information Management System >_> 4(iii) - - Non-Plan Plan CEBR Budget Budget 4(i) 4 Outlay 2015-16 To improve performance of Engineers / functionaries. 3 Objective / Outcome Maintenance of IT facilities #!""!% maintenance of IMS Phase-I Training of 1200 mandays to CEA employees. 5 "#%'#*$=?*cal Outputs Proper data management leading to "%#ciency Continuous process 8 Remarks / Risk Factors - 7 Processes / Timelines ContinIncrease in uous productivity process as a result of enhancement in knowledge and skill of CEA engineers. 6 Projected Outcomes 59 53.20 Statutory inspec- ++$ tion of HT installations of Central Sector and UTs. To provide subsidized canteen facilities to the employees of CEA 4(ii) 4(iii) Outlay 2015-16 - - - - - - Non-Plan Plan CEBR Budget Budget 4(i) 4 9.00 The scheme is related to operation and maintenance of National Electric Power System Information \`_>\ at New Delhi for collecting vital power system operational data from different Regional Power Committees \ CEA / Ministry of Power. 3 Objective / Outcome £'!¤[¥¥¥["@;¥['% Administration of Electricity Laws 9. National Load Despatch Center `_>\ 7. Departmental Canteen 2 1 8. Name of Scheme / Programme Sl. No. 6 Projected Outcomes Inspection of electrical installations ! $'!£ !; #! Assured safety of electrical installations and personnel. Employees satisfaction contributing to increased productivity Facilitation of \ !!" ! "%!tem operational data from different ! \ ;;\ able operation of the Integrated Regional Grids. 5 "#%'#*$=?*cal Outputs Continuous process Continuous process Continuous process 7 Processes / Timelines - - - 8 Remarks / Risk Factors 60 2 1 10. All India Load Survey Scheme Name of Scheme / Programme Sl. No. To assess demand of Power over a period of time 3 Objective / Outcome 4(ii) 4(iii) 237.30 - - Non-Plan Plan CEBR Budget Budget 4(i) 4 Outlay 2015-16 Collection of Annual Power Survey Data from about 170 power utilities % $% having electricity demand of one MW and above. 5 "#%'#*$=?*cal Outputs 7 Processes / Timelines Continuous process for bringing out Annual General Review and Growth of Elec- Growth of tricity Sector in Electricity >% ;*+ Sector to 2015 will be in India under printing. ;*+ onwards. Collection of %" for GR-2016 is in progress. General Review 2015 containing data for the would be under printing. 6 Projected Outcomes 8 Remarks / Risk Factors 61 597.50 Regional Co- The country has been demarcated ordination #' planning and operation of the power system. Regional Power Commit\!^' !!#' for facilitating integrated operation of power system in the region for optimal utilization of the available power resources through functioning of various sub-committees such as Technical Coordination Sub-Committee, Operation Coordination Sub-Committee, Commercial Sub-Committee, Protection Sub-Committee and System Studies Sub-Committee, etc. The scheme is meant for funding the operations of the Regional Power \ ;;\ 4(ii) 4(iii) - - Non-Plan Plan CEBR Budget Budget 4(i) 4 11. 3 2 Outlay 2015-16 1 Objective / Outcome Name of Scheme / Programme Sl. No. Facilitation of coordinated operation of regional power grids in the country 5 "# Deliverables / Physical Outputs 7 Processes / Timelines ContinFacilitation of secured and re- uous liable operation process of the Regional Grids. 6 Projected Outcomes - 8 Remarks / Risk Factors 62 4(ii) 4(iii) The objective of the proposal is to provide proper infrastructure support ; #"!% quarters for the Secretariats of the SRPC / NERPC resulting in in"%% of the regional grid. 123.00 - - - Non-Plan Plan CEBR Budget Budget 4(i) 4 13. Strengthening of Regional Electricity ^ %` known as Regional Power Com; 3 Outlay 2015-16 == The real time operation of all the regional grids is being carried out by RLDCs. Operation planning and coordination functions which facilitate the integrated operation of the power system continue to be with the ! \ ;;\ RLDCs and RPCs have to operate in close coordination in achieving the # "%% operation of the Regional power system. 2 1 Objective / Outcome 12. Regional Load Despatching Centres Name of Scheme / Programme Sl. No. Construction of ]#"!% _ for NERPC, Shillong and RIO, Shillong. (Completion of _"; Facilitation of coordinated operation of regional power grids in the country. 5 "# Deliverables / Physical Outputs 7 Processes / Timelines Remaining work likely to be completed during 2015-16. 80% Civil works --of phase-II quarters, 70% sanitation work and 10% electrical wiring completed. ContinFacilitation of secured and re- uous liable operation process of the Regional Grids. 6 Projected Outcomes --- - 8 Remarks / Risk Factors 63 2 1 Computerization of PTCC process Name of Scheme / Programme Sl. No. 4(ii) 4(iii) Outlay 2015-16 10.00 - Non-Plan Plan CEBR Budget Budget 4(i) 4 Computerisation of process- ing of the PTCC cases for route approval 3 Objective / Outcome Collection of legacy Data of ^_`?! and all Power utilities. Tender for selection of System Integrator to % Evaluation of bids received for System Integra _> Selection of LI bidder for SI. Hardware / Software installation by the System Integrator. 5 "# Deliverables / Physical Outputs Collection of Legacy Data is continuous process. Deliverable are linked with concurrence for fresh bidding to be received from MoP. 6 Projected Outcomes Deliverable linked with concurrence for fresh bidding to be received from MoP. 7 Processes / Timelines On re-tendering cost is likely to increase (L2 bidder quoted \ 8 Remarks / Risk Factors 64 2 1 15. Upgradation of IT facilities \ Phase-II Name of Scheme / Programme Sl. No. Procurement of Planning Model software. Strengthening / upgradation of existing IT infrastructures. ^!%%%"% center for higher availability. Setting up of Disaster Recovery Data Center as a standby of primary Data Centre. 4(ii) Outlay 2015-16 *+= Non-Plan Plan Budget Budget 4(i) 4 Comprehensive and more intensive IT based system for monitoring of execution of power projects. 3 Objective / Outcome - CEBR 4(iii) Augmentation of IMS in CEA including setting up of DRDC, ^>!ligence System and Upgradation of existing data center. 5 "# Deliverables / Physical Outputs 7 Scheduled to be completed in 13th Plan period Development of including sound and upto AMC for date central5 years ized database subject to system for approval Power Sector from the of the country. competent authority. Higher availability of IT facilities in CEA. #"; itoring of execution of power projects. 6 Projected Out- Processes / comes Timelines Scheme yet to be approved 8 Remarks / Risk Factors 65 16. Technical Assistance by !%^@ to support CEA for appointment of Consultants for address^ to Energy #"" \ ! Fired generating units in India 2 1 3. Review of experi" ;! projects. 2. Review of institutional capacity and Strengthening of Institutional capacity at CEA 1. Implementation Support Consultant >_\[ Contract. 3 Name of Objective / Outcome Scheme / Programme Sl. No. - 107.12 - 4(iii) CEBR 4(ii) Non-Plan Plan Budget Budget 4(i) 4 Outlay 2015-16 3. Submission of Final Reports on the study by WAPCOS. 2. Final Report on the study 1. Review of reports submitted by KPMG 5 "# Deliverables / Physical Outputs and guidelines would be help!% cost effective implantation of #" "; in Thermal Power Stations in India. 6 1. Timely comple ! projects. The study is expected to be completed by March 2. Timely Receipt of comments from The study is Task Force Memexpected to bers on guidelines be complet- / Reports. ed by July 2015. The progress of the scheme will depend on the following: - 8 Remarks / Risk Factors ISC tenure is likely to end by June 2015. 7 Projected Out- Processes / comes Timelines 66 4(ii) Outlay 2015-16 The objectives of the scheme is to monitor the implementation of the Financial "!~ State DISCOMs through Third #" % purpose of recommendation of granting incentives to the State DISCOMs, as provided in the scheme. 135.10 1150.00 Non-Plan Plan Budget Budget 4(i) 4 18. ~<% #" DISCOMs 3 The study aims to carry out basin-wise review of the hydro potential within the " "!%%#" of New Schemes, wherever possible. Review of hydro potential would help in planning and development of various projects, evacuation arrangement and Environmental Impact Assessment which would enable an optimal harnessing of hydro potential in each river basin. 2 1 Objective / Outcome 17. ^ Reassessment of Hydro-Electric Potential in the country Name of Scheme / Programme Sl. No. - - CEBR 4(iii) The Deliverables are: Third '#" of achievements of the mandatory conditions by the state DISCOMs for the % order to decide whether they qualify for Govt. incentives. Award of work to executing agency and start of work. 5 "# Deliverables / Physical Outputs The scheme #% with the intention of revival of the state owned DISCOMs. The scheme shall # state owned DISCOMs to turn around and become #"!! viable. Award of work to executing agency and Data collection / Analysis by the agency. 6 Projected Outcomes The approval of Ministry of Power for award of work is awaited. 8 Remarks / Risk Factors The timelines Unapare completion proved '#" Scheme of achievements for the within one month of selection of consultant for the year 2013%" 2015 for the Work will be awarded to executing agency after approval of Ministry of Power 7 Processes / Timelines 67 2 1 20. 19th Electricity Demand Forecast of India 4(ii) Outlay 2015-16 Forecast Electricity -Demand Projection for each District/ Circle , State, Union Territory, Region and All India in detail upto end of 13th Plan and project perspective electricity demand for thth Plan 110.00 100.00 Non-Plan Plan Budget Budget 4(i) 4 19. Comprehen- >%|- eration planning sive Planmodel software. ning Model Software tender document for Generation expansion planning model. ">;!; software. %< 3 Name of Objective / Outcome Scheme / Programme Sl. No. -- - CEBR 4(iii) Collection of at least 50% past !""% Future development Plans of States/ UTs affecting Electricity Demand % contract for software ; of consultant 5 "# Deliverables / Physical Outputs Assist in 19th Electricity Demand Forecast of India with increased accuracy. Procurement of comprehensive planning model software will facilitate CEA towards preparation of National Electricity Plan. 6 Projected Outcomes 8 Remarks / Risk Factors Continuous process for bringing out Electric Power Survey of India Report once in 5 years. Data base created is an essential input for formulation of National Electricity Plan ' x Scheme yet to be approved. x Availability of Funds. x Selection of " ;#; with specialists. x Availability of IT enabled econometric forecasting tools. x Availability of Past Data with states x Availability of required manpower. Appointment of Unapproved consultant and Scheme award of contract for software during 2015-16. 7 Processes / Timelines 68 2 1 21. National Reliability Council for Electricity Name of Scheme / Programme Sl. No. TOTAL 4(ii) Outlay 2015-16 7941.00 3000.00 170.00 Non-Plan Plan Budget Budget 4(i) 4 < " ;<<\<\ -each Transmission corridor in the Grid on a monthly basis. Carry out the audit of the entire grid w.r.t. angular stability analysis, voltage stability and frequency stability on a three yearly basis, also taking into consideration the increased penetration of intermittent renewable sources of energy like wind and solar power. Suggest Special Protection Schemes of the Grid for grid security alongwith protection coordination on All India basis. Up gradation of knowledge in the #!% %!! ; of acquiring knowledge of best practices, through interaction with other reliability bodies in USA, Europe and Japan through capacity building. Any other matter related to Reliability of the Grid. 3 Objective / Outcome -- - CEBR 4(iii) 6 dation of knowledge #!% grid reliability theory. Increased Reliability of the Grid. Optimum utilization of the transmission system and of intermitted type of renewable source |%!- of energy like wind and solar '!tion of system power, without compromising protection the reliability of schemes of the grid. entire Grid. \!"! of TTC, ATC and TRM on a monthly basis through consultant. 5 ^ 16 _ 2015-16 expected completion 2016-17. Timeline for Col. 5: ! basis 7 -- 8 "# Projected Out- Processes / ReDeliverables comes Timelines marks / Physical / Risk Outputs Factors 69 Objective/Outcome Outlay 2015-16 % Grand Total Smart Grid Smart Grid Pilot Pilot Projects Projects in Distribution Sector were approved by Steering Committee in its 26th,28th 31st meeting held on =$= *+<! projects are being undertaken to test the latest Smart Grid Technologies in Indian conditions with an aim of integrating the consumer, operations and asset management domains of Distribution Sector to #""% enhanced reliability. Name of Scheme/ Programme S. No. Disbursement of Rs 93 Crores to utilities along with IIT Kanpur for SG pilots and to POWERGRID for SG Knowledge centre. ] ¥_| pilots,7 pilots are expected to be awarded soon hence disbursal of Rs.93 crores proposed for these 7 SG pilots. $ #!!'- Projected Outerables/ Physical comes Outputs OUTCOME BUDGET 2015-16 Smart Grid The projects were approved by Steering Committee in its 26th,28thst meeting held on 03.08.12, $= *+ + Process/ Timelines The disbursal of funds to utilities shall depend upon the placement of award for System Integrator by utilities and subsequent execution of projects. = Remarks/ Risk Factors (Rs. in crore) Annexure - XI 70 2. National Electricity Fund (Interest Subsidy _"; 1. 1 Name of Scheme / Programme S. No. 1. To mitigate the funding gap and to promote capital investment in the distribution sector(Public and Pri' ! providing interest subsidy, linked with reform measures, on loans taken by public and private power utilities for various capital works under distribution projects. 2. To provide interest subsidy and other charges aggregating =$$ \ % loans availed by the distribution utilities in both Public and Private sector. 3. Objective / outcome NonPlan ^% 20.00 !^%get Complimentary Extra ^% Resources ]! 2. Put up the interest subsidy claim proposal to steering committee for consideration. 3. Release of approved interest subsidy to discoms/lenders 1. Evaluation of pre-eligibility con% !!ty parameters for discoms. 5. #! deliverables/ Physical Outputs OUTCOME BUDGET 2015-16 National Electricity Fund (NEF) Interest Subsidy Scheme 7. The outlay proposed % ~ $ shall vary depending upon the actual disbursement availed from the lenders by the Discoms during ~ !! ; of the interest subsidy under NEF is linked with achievement of various reforms/ performance parameters by DISCOMS "#% `~ Guidelines. So the proposed outlay shall mainly depend upon the performance of the Discoms. 6. Remarks/ risk factor 2015-16 Process/ timelines " Annexure - XII 71 3 Capacity building by way of training / reorientation of personnel of Regulatory Commission and availing consultancy. 2 Assistance to Forum of Regulators for Capacity ^!%% Consultancy 1 Objective / Outcome Name of Scheme/ Programme/ Project Sl. No 1.00 Plan Complementary Non^% [^% Plan Resources ^% Outlay 2014-15 Study reports !!#!% for suitable actions by the Regulatory Commissions Regulatory Commissions will have trained personnel. 5 "# Deliverables/ Physical Outputs Studies to serve as inputs for decision making for the Regulatory Commissions will be commissioned. #" electricity regulatory commissions will be trained. 6 Projected outcomes 7 Processes/ Timelines OUTCOME BUDGET 2015-16 Assistance to Forum of Regulators for Capacity Building and Consultancy 8 Remarks/ Risk Factor (Rs. in crore) Annexure - XIII 72 3 To inculcate competitive spirit and to motivate higher level of #"%" ;ic operation in the #!% " " operation and maintenance of thermal/ hydro/ transmission projects, implementation of distribution reforms, rural distribution franchisees, environment performance, community development and safety records. However, the expected returns cannot be #% 2 Comprehen-sive A w a r d Scheme for power sector 1 Objective/Outcome Name of Scheme/ Programme/ Project Sl No - 1.00 Plan ^% Non Plan ^% - Complementary [^%getary Resources Outlay 2015-16 Improvement in performance of generation, transmission distribution and environment management 5 #! Physical Outputs Outcome Budget 2015-16 Comprehensive Award Scheme To contribute in achieving reliable affordable and quality power supply to all 6 Projected Outcomes - 7 Processes/Timelines - 8 Remarks/ Risk factor (Rs. in crore) Annexure – XIV 73 3 < ; the salary and other incidental expenses for support services. 2 (a) MOP Secretariat (Main):- Salary and other establishment expenditure including overtime allowance, medical treatment, domestic travel expenses, foreign travel expenses, publications, other administrative expenditure, advertising and publicity profession services and subsidies. 1 Objective/ Outcome Name of Scheme/ Programme Sl. No. Plan ^% NonPlan ^% + Complementary [^%getary Resources Outlay 2015-16 < expenditure is incurred on salary and other support services and hence outputs are not measurable i n quantitative/ qualitative terms. 5 #! Deliverables/ Physical Outputs Outcome Budget 2015-16 MOP Secretariat 6 Processes/ Timelines % provisions, salary and other establishment expenses are met !! #"! M/o Power. These are basically support services to facilitate personnel involved in framing overall policies and their implementation. Through various publications and publicity campaigns, the programmes, policy initiatives of the Ministry are disseminated to the general public in an effective manner. 7 Projected Outcomes : Date of completion of the project 8 Remarks/ Risk Factor " Annexure XV 74 Name of Scheme/ Programme 2 ]#"[ ! \ ; ]#" ; Sl. No. 1 Total A Plan scheme with duration #' + was initiated with a aim to acquire infrastructural facilities to improve the functional #"" he Ministry like purchase " ; other IT related peripherals, implementation of e-governance ; mode project, maintenance of infrastructural facility acquired during 11th Plan. 3 Objective/ Outcome 30.47 Plan ^% NonPlan ^% 1.24 Complementary [^%getary Resources Outlay 2015-16 5 #! Deliverables/ Physical Outputs 6 Processes/ Timelines The Scheme will be completed by 31.3.2017 Implementation of e-governance #" ; made project development of centralized data base system. Availability of data in electronic version. 7 Projected Outcomes : Date of completion of the project 8 Remarks/ Risk Factor 75 1 Sr. No. - Evaluation of the projects sanctioned under Restructured Accelerated Power Development and Reforms Programme and other schemes/ programmes of Ministry of Power Funds for Evaluation _% Consultancy Total 3 N o n Plan ^% 2 Name of Objective/Outcome Scheme/ Programme 0.30 0.30 Plan ^% Complementary Extra^% Resources Outlay 2015-16 6 Processes/ Timelines The evaluation of . R-APDRP/other schemes and programmes will bring out whether the programme is being implemented properly, desired results being achieved or not and suggesting changes in the programme for achieving the desired results. 5 #! Deliverables/ Physical Outputs Outcome Budget 2015-16 Funds for Evaluation Studies Evaluation of schemes/ programmes will be completed on need basis. 7 Projected Outcomes 8 Remarks/risk Factors (Rs. in crore) Annexure-XVI 76 1 Sl. No 3 To meet the statutory requirement for setting up Joint Electricity Regulatory Co mmission as per the Electricity Act 2003 Joint Electricity Regulatory Commission for State of | < Objective / Outcome 2 Name of Scheme/ Programme 4(i) 4(ii) 4(iii) 6.33 NIL NIL N o n - P l a n ComplemenP l a n Budget tary Extra Budget Budgetary Resources 4 Outlay 2015-16 The Commission would regulate Tariff for supply of electricity in the state of Goa <_ [" Delhi resulting #"" improvements. 5 #! Deliverable/ Physical Outputs 7 retail tariff orders are expected to be issued for control period financial year 201516 to 201718 by the Commission, subject to #! ! < petitions. 6 Projected Outcomes OUTCOME BUDGET 2015-16 JOINT ELECTRICITY REGULATORY COMMISSION FOR GOA & UTs Tariff order is to be issued within 120 days of receipt of ARR petition. 7 Process/ Timelines 8 Remarks / Risk Factor (Rs. in crore) Annexure - XVII 77 To facilitate expeditious resolution of disputes in the power sector at the appellate level Appellate Tribunal for Electricity Further, the Tribunal will also function as Appellate authority for under Petroleum and Natural Gas Regulatory ^ %" 3 2 1 Objective/ Outcome Name of Scheme/ Program Sl. No. 10.15 0 0 N o n - P l a n CompleP l a n Budget mentary exBudget tra-budgetary Resources Outlay 2015-16 The above details are inclusive of cases under the Petroleum and Natural Gas Regulatory ^ %" These are likely to be disposed off along with fresh appeals/ IAs/ Pe #!%% 2015-16. Apart from this, 279 IAs/ Petitions etc. are also pending for disposal/ admission. Total number of ap! % #! disposals as on 1st January, 2015 is 353. 5 "#%'ables/ Physical outputs N.A. 6 Projected Outcome OUTCOME BUDGET 2015-16 APPELLATE TRIBUNAL FOR ELECTRICITY Spread throughout the year 7 Processes/ Timelines Some cases are pending due to the complexities and lengthy nature of issues etc. 8 Remarks/ Risk Factors " Annexure-XVIII 78 Power System Operation Company ]_]\] 2 1 1. Name of Scheme/ Programme Sl. No. Total Setting up of Power System Operation Corporation (POS]\] Independent Government Company 3 Objective/ Outcome 1.00 < @ 1.00 Plan ^% NonPlan ^%get Complementary extra-budgetary Resources Outlay 2015-16 5 #! Deliverables/ Physical outputs This will facilitate implementation of %%! Power System Operation in the country as envisaged under the Electricity Act 2003 and the National Electricity Policy, 2005. 6 Projected Outcome Outcome Budget 2015-16 Power System Operation Company (POSOCO) CCEA approved the scheme on Further action is in process. 7 Processes/ Timelines 8 Remarks/ Risk Factors (Rs. in crore) Annexure - XIX 79 I 1. S. No. Green Energy Corridor 2. Total Setting up of Renewable Energy Management \\ as part of State Load Despatch \_?\ the Renewable Energy rich States 3. Name of the Objective/ OutScheme/ Pro- come gramme !^%get Non Plan ^% 1.00 1.00 Comple-mentary [^%getary Resources Outlay 2015-16 Setting up of REMC desk within the SLDC in the Renewable Energy rich States to forecast and schedule the renewable energy along with state of the art communication infrastructure 5. #! Deliverables/ Physical Outputs OUTCOME BUDGET 2015-16 Green Energy Corridor Large scale integration of the renewable energy in the Indian national grid. 6. Projected Outcomes To be setup in phased manner in the during 2015-16 and 2016-17 7. Processes/ Timelines The forecasting technique is presently not available in the country and hence it is expected that the requisite expertise could be help with the help of technical assistance through GIZ, Germany 8. Remarks/ Risk Factors (Rs. in crore) 80 ^ sam ^>>^ 5 ^>^ 2 < 'gad, Uttarakhand Koldam, HP 3 Ongoing Schemes i 2 Additon of 1320 MW of generation Capacity Additon of 750 MW of generation Capacity Addition of 520 MW of generation capacity Addition of 1980 MW of generation Capacity Addition of 800 MW of generation capacity 3 Name of Scheme Objective/ Out/ Programme/ come Project 1 1 Sl. No. *+$ =+ 818.53 =* Non-Plan !^%- Complemen^% get tary Extra ^% Resources Outlay 2015-16 Addition of 520 MW of generation capacity Addition of 1980 MW of generation Capacity Addition of 800 MW of generation capacity 6 - Additon of 1320 MW of generation Capacity \;% Additon of 750 MW of <|"@\ generation completion Capacity \ ;; excavation completion and 300 m liner erection \ ;! ^ Raft and Piers up to 3m height along with re-diversion of river along the original course \ ;;"; ?]! \ ;; \ ;; 5 "#%'- Projected bles/Physical Milestones Outcomes OUTCOME BUDGET 2015-2016 NTPC Limited - Mar’16 Dec’15 Nov’15 Feb’16 Feb’16 Feb’16 Jun’15 Jun’15 7 8 Process- Rees / marks Timelines Annexure -XX 81 Mauda II , Maharashtra Solapur , Maharashtra %"! MP 9 10 Kudgi, Karnataka 7 8 Singraulli Small hydro, UP 2 Additon of 500 MW of generation Capacity Additon of 1320 MW of generation Capacity Additon of 1320 MW of generation Capacity %% MW of generation Capacity Additon of 8 MW of generation Capacity 3 Name of Scheme Objective/ Out/ Programme/ come Project 6 1 Sl. No. 658.69 1760.05 1251.12 3127.61 10.98 Non-Plan !^%- Complemen^% get tary Extra ^% Resources Outlay 2015-16 Additon of 1320 MW of generation Capacity Additon of 1320 MW of generation Capacity Jul’15 Jul’15 Oct’15 <| ^ \ ;; Jun’15 Jun’15 Dec’15 Nov’15 May’15 Jan’16 Dec’15 Jun’15 <|]!" ;! Additon of 500 MW of Readiness of Coal feeding generation Capacity ; ^@ Completion of Steam ^! % \<^ <|^ [ <|" _ <|^ [ ^ !% < <|" Mar’16 \ ;; Aug’15 Jul’15 May’15 - 7 Sep’15 Additon of generation Capacity Additon of 8 MW of generation Capacity 6 8 Process- Rees / marks Timelines <|" ^ !? ^ !% <|^ [ - 5 "#%'- Projected bles/Physical Milestones Outcomes 82 Gadarwara, MP "> Singraulli Solar, UP Additon of 15 MW of generation Capacity North Karanpura, Jharkhand Darlipalli, Orissa 13 15 16 17 Additon of 1600 MW of generation Capacity Additon of 1980 MW of generation Capacity Additon of 500 MW of generation Capacity Additon of 1600 MW of generation Capacity Lara , Chattisgarh Additon of 1600 MW of generation Capacity 12 Additon of 171 MW of generation Capacity 3 Lata Tapovan, Uttarakhand 2 Name of Scheme Objective/ Out/ Programme/ come Project 11 1 Sl. No. 1239.36 980.59 ** 592.82 +== == + Non-Plan !^%- Complemen^% get tary Extra ^% Resources Outlay 2015-16 Additon of 1600 MW of generation Capacity Additon of 171 MW of generation Capacity 6 Start of Chimney shell Casting ^ !" _ ^ !"tion - $^ !" _ Additon of 1600 MW of generation Capacity Additon of 1980 MW of generation Capacity Additon of 15 MW of generation Capacity Additon of 500 MW of generation Capacity Additon of Chimney shell completion 1600 MW of generation ^ !% Capacity <|" _ ^ !% <|"@\ Chimney Shell Casting Completion <|" - 5 "#%'- Projected bles/Physical Milestones Outcomes Sep’15 Jul’15 Feb’16 - Nov’15 Mar’16 Dec’15 Sep’15 Dec’15 Nov’15 Oct’15 Sep’15 - 7 8 Process- Rees / marks Timelines 83 Rammam, West ^! 19 New Projects ^ Khargone, MP ^! Gajmara, Odisha ii 1 2 3 Subtotal (i) Ongoing projects Tanda-II, UP 2 Addition of 1600 MW of generation Capacity Addition of 1320 MW of generation Capacity Addition of 1320 MW of generation Capacity %% $ MW of generation Capacity Addition of 120 MW of generation Capacity Addition of 1320 MW of generation Capacity 3 Name of Scheme Objective/ Out/ Programme/ come Project 18 1 Sl. No. 20.00 100.00 105.00 50.00 16460.76 30.00 10.00 Non-Plan !^%- Complemen^% get tary Extra ^% Resources Outlay 2015-16 6 - - - - Commencement of exca' ^ Addition of 1600 MW of generation Capacity Addition of 1320 MW of generation Capacity Addition of 1320 MW of generation Capacity Addition of $ generation Capacity Addition of 120 MW of generation Capacity Commencement of Addition of structural erection work of 1320 MW of Power house generation Capacity ^ !" 5 "#%'- Projected bles/Physical Milestones Outcomes - - - - May’15 Feb’16 Dec’15 7 8 Process- Rees / marks Timelines 84 Pudimadaka, AP 7 +$ 23000.00 Other Miscellaneous Schemes Grand Total ( i. to v) v ==+ Renovation and Modernisation $+ Coal Mining Subtotal (ii) New Projects iii 944.43 Other New Projects 9 iv Renewable Energy Schemes 200.00 50.00 110.00 65.00 Non-Plan !^%- Complemen^% get tary Extra ^% Resources Outlay 2015-16 8 %% MW of generation Capacity Addition of 1320 MW of generation Capacity Talcher TPS-III, Odisha 6 3 ^- Addition of 1320 gal MW of generation Capacity 2 Name of Scheme Objective/ Out/ Programme/ come Project 5 1 Sl. No. - - - - - - - - 5 Addition of generation Capacity Addition of 1320 MW of generation Capacity Addition of 1320 MW of generation Capacity 6 "#%'- Projected bles/Physical Milestones Outcomes - - - - - - - - 7 8 Process- Rees / marks Timelines 85 Uri-II Parbati H. E. Project stage -III 9 10 Chutak 6 `; ^ Chamera-III 5 8 Dulhasti 1 Teesta Low Dam Project-III Commissioned Schemes A 7 3 2 1 Addition of 520 MW capacity %% capacity %% capacity Addition of 132 MW Capacity %% Capacity Addition of 231 MW Capacity Addition of 390 MW Capacity Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 0.00 0.00 60.00 60.00 9.00 9.00 30.00 1.25 5 60.00 60.00 9.00 9.00 30.00 1.25 6 Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed ]<\]^|<$ NHPC Limited 8 Projected Outcomes Mar’16 Mar’16 Mar’16 Mar’16 Commissioned in Commissioned in ~ Commissioned in Oct’ 2013 Commissioned in Mar’ 2013 Commissioned in Jan’2013 Commissioned in Jun’2012 Mar’16 Mar’16 Commissioned in March 2007 10 Remarks/ Risk factors Mar’16 9 Process/ Time lines Annexure - XXI 86 Teesta Low ; }"> 1 Parbati H. E. Project stage -II Scheme Under Construction ^ 2 3 2 1 Addition of 800 MW capacity Addition of 160MW capacity Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 696.28 322.16 5 696.28 322.16 6 Mar’16 Commissioning of Unit-I 100% Mar, ‘16 Feb, ‘16 Oct, ‘15 Completion of Exca- 658m vation in Pancha feeder Tunnel Completion of Exca- 563m vation of Jiwa Feeder Tunnel Assembly of Stator, Ro- 100% ! Oct, ‘15 Jan’16 Erection Testing and 100% commissioning of all Draft tube gate Anticipated Project Completion,Mar-19 Jan’16 Lowering of stator, ro- 100% ^> H y d r o - m e c h a n i c a l 100% Works in Dam Structure (erection of Radi! ! | Dec’15 Apr’15 [!^\ "- 100% !!_!^!"="; Unit Axis alignment 100% %^ [ >>> Jul’15 Concreting in pow- 100% %; ^!" "; Apr’15 9 Process/ Time lines Jun’15 Anticipated Project Completion Jul’2016 8 Projected Outcomes Concreting in Genera- 100% ^! >^!"+"; Concreting in RCC 100% Dam upto EL183.0M ^!" = "; 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed 10 Remarks/ Risk factors 87 Addition of 330 MW Capacity Subansiri Lower Addition of 2000 MW H. E. Project capacity 3 Kishanganga 3 2 1 Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 200.00 5 $* =+ $* 8 Projected Outcomes 9 Process/ Time lines 36000 cum Cum 3500 m 30 m 230 m 100% 100% Completion of CFRD embankment upto dam top Overt Lining of HRT ^ % the year Completion of surge shaft lining " ^"@#!! PS Liner Lower Limb during the year ^ [ Stator/ rotor erection and lowering of Unit-II ["' \ certing in Power House Area Completion of Spillway concreting Mar-16 2700 RM 6300 m3 =$ m3 Drilling for grouting Feb’16 Mar’16 Mar’16 Jun’15 Mar’16 Nov’15 Nov’15 Mar-16 Mar-16 Overt lining in HRT %!" Tunnels Anticipated Project Completion date Nov.’2016 6250 m3 Anticipated Mar-16 =+$ Project m3 Completion shall be Under ground excava- $ Mar-16 acessed tion work m3 after reInvert lining in HRT =$; sumption of Mar-16 %!" $+= work. Tunnels m3 7 =+ ;["' Concreting 6 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed Agitation of land ~% " is pending with State Cabinet for approval and Law % !; Kashmir valley. Subject to the resumption of construction activities of Subansiri Lower Project, in full swing, from Apr’15. 10 Remarks/ Risk factors 88 !^! _>^ !^! Stage- II 3 !^! Stage-1A 2 1 Addition of 530 MW capacity Addition of 320 MW capacity Addition of 195 MW capacity 3 2 1 C. Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 0.00 0.00 0.00 25.72 5 25.72 6 Nominal amount kept !; Ancillary works. Nominal amount kept !; Ancillary works. - 7 - Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed - 8 Projected Outcomes Mar’16 Mar’16 Mar’16 9 Process/ Time lines Environment Clearance is availablefor ^>> }" ' ! ^! >^ ' ;! Clearance accorded by MoEF was later withdrawn by MoEF. In this context NHPC #!% "'! peal before Hon’ble Supreme Court. Appeal was heard on many times. Provision kept for expenditure on _" [penses etc for maintaining a state of readiness for start of construction works of the project. No Provision for major @ "ture development has been kept as per the direction of Hon’ble Supreme Court to stop all construction activities till further orders. 10 Remarks/ Risk factors 89 3 2 Dibang 1 Addition of 3000 MW capacity Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 0.00 $ 5 $ 6 5.0 Crs 2.5 Crs 51.38 Ha (9.35 \ Study from Foreign Consultant for Dam design etc. Survey of Reservoir area Acquisition of Colony land in Chimiri Construction of Colony Roads at Chimiri Developed land with fencing Colony land Mar-16 Mar-16 Jul-15 Reservoir Jan-16 area survey completion %; ; %% FAC has recommended for approval of Forest Clearance to Dibang Multipurpose Project subject to compliance of FRA 2006. Also, Expert Appraisal Committee \;!% $* recommended for approval of Environment Clearance as per minutes of the 77th meeting. 10 Rs. 1.0 Crs and Rs. 5.0 Crs was kept for Hydraulic Model Studies %\ !tancy charges respec'! ^ but the same could not be carried out due to Pending Project clearances. 9 Remarks/ Risk factors Sep-15 Process/ Time lines Sep-15 Foreign consultant’s report Hydraulic Physical Studies 8 Projected Outcomes 2.00 KM Roads in \ the Chimiri Colony Development of Land 51.38 (like fencing of Chimiri Ha Project Colony / Area (15 " ?" 1.0 Crs Hydrological Model Studies 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed 90 Tawang- I <> 5 6 3 2 1 Addition of 600 MW capacity Addition of 520 MW capacity Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 0.00 0.00 $ 118.80 5 $ 118.80 6 100% 75% Land acquisition for project components(~ !% Land acquisition for project compo'!% Mar’16 Completion of access road to Power House Teli road strenthening 13 Km Mar’16 Construction of colony 2.5 Km% Completion road of access road to colony. Dec-15 May-15 Dec-15 Jun-15 Dec-15 9 Process/ Time lines Mar’16 Achievement is subject to successful Gram Sabha under Forest Right Act. and CCEA clearance 8 Projected Outcomes Completion of investigation @ tests in Surge Shaft drift. Drifting of Surge Shaft 320 Mtr ^ ; Hiring of consultant for 75% Township planning of Project at Thimching Compliance to condi- 100% tions of Stg-I Forest Clearance 100% Completion of model studies 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed Subject to availabili ?% !tion of resistance by '!! ; Subject to availability of Land Subject to availabili ?% !tion of resistance by '!! ; Subject to approval of Competent Authority. Subject to passing of new Land Acquisition Act by State Govt. and commencement of related activities for award of compensation. _}" >^ proval and authorisation from NHPC ^ % 10 Remarks/ Risk factors 91 7 Tawang-II Addition of 800 MW capacity 3 1 2 Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 0.00 90.13 5 90.13 6 100% 100% * Sqm Constructions of other access paths ^!"?%"sition for the project components Construction of site accomodations Construction of colony 1 Km ^ %!! Model Studies 100% ; ` Compensatory Afforestation 100% Construction completed Sqm Construction of Site Accomodations % ! "! logical Studies Final Payment 7.7 km Road to Adits, CFA etc. Continuos process Mar’16 Dec’15 Mar’16 All these ac- June’15 tivities are subjected to final notifica- Mar’16 tion by GoAP and handing over of lanad. To facilitate Sept’15 the investigation works Subject to availability of Land Subject to Forest Clearance Subject to availability of Land Subject to sanction of Funds by Corpo]#" ?% acquisition Subject to sanction of Funds by Corpo]#" Mar’16 Mar’16 10 Subject to NOC by villagers 9 Remarks/ Risk factors Mar’16 Process/ Time lines The studies Sept’15 are associated as suggested by CEA Construction completed Completion of entire access road 2.5 Km % ^_ Acquisition process up to section 6 8 Projected Outcomes Land acquisition for the project components 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed 92 3 2 _>%]_"; ^ 1 D. 1 Addition of 1020 MW capacity Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 0.00 38.93 5 38.93 6 13 Km 9 Process/ Time lines ; 100% 100% AIA/EMP Studies Construction Material and testing 2000 m Mar’16 Mar’16 Mar’16 Mar’16 Mar’16 Completion Oct’15 of access road to Power < Access road Dec’15 to Power House <> ^_ <>> 8 Projected Outcomes Drifting Drilling Widening of Sa- 9.5 Km% jo-Kungba Kunba road Approach roads to various Adits Teli Mukto road strengthening and Widening 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed The Drilling work is under progress for 03 Nos. packages at various sites of Project. The work has also been awarded for 03 Nos. packages of Drift works at Dam Site, surge shaft area etc. Limited working season, accessibility by mule track only for 26 kms, Environmental Clearance not available for left bank due to presence of Kistawar High Altitude National Park ` " investigations are in progress on right bank only and Law ]% the major constraints in the works. Subject to availability of Land Subject to availabili ?% !'ing of resistance by Lamas and villagers Subject to date of handing over of %^] 10 Remarks/ Risk factors 93 3 2 Other New Schemes Dhauliganga Intermediate Goriganga-IIIA Other Projects _";% ?\? >< Loktak Down;$$ < ! }" \? Pakal Dul (1000 $ ^ ^ Chamkharch>++ %_ ! }"`\] Wind Power Project (132 1 E. 1 2 F. 1 1 2 3 " 1 G 1 Addition of 132MW capacity Addition of 330 MW capacity Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects 0 0 0 0 0 0 0 0 350.00 10.00 10.00 10.00 = 3.00 2.00 5 350.00 10.00 10.00 10.00 = 3.00 2.00 6 Provision for advance/bills %#! Wind Farm throgh EPC contract. Also provision kept for Consultant payments for 82 MW wind Farm proposed in Kerala. Provision for NHPC Equity contri " ; Provision for NHPC Equity contri " ; Provision for NHPC Equity contri " ; Provision for NHPC Equity contri " ; Provision for NHPC Equity contri " ; Lum-sum provision kept Lum-sum provision kept 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed 8 Projected Outcomes March’16 March’16 March’16 March’16 March’16 March’16 March’16 March’16 9 Process/ Time lines 10 Remarks/ Risk factors 94 Solar Power Addition of 50 MW }" capacity ]\<__]?<? Thermal Salka Project uity investment NHPC and Chhattisgarh State Power Holding Company Limit%\_\? Pirpainti Project uity investment `\+ %^_ Power Generation Company ?;%^_|\?$ Solar Equity invest; between NHPC and UPNEDA 2 H H 1 2 H 1 0 0 0 0 3 2 1 5 * 1.00 1.00 200.00 * 1.00 1.00 200.00 6 8 Projected Outcomes Provision for NHPC Equity contri- Equity " ; investment Provision for NHPC Equity contri- Equity " ; investment Provision for NHPC Equity contri- Equity " ; investment Payment for successful bidders as advance/Payment against @!! 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects March’16 March’16 March’16 March’16 9 Process/ Time lines 10 Remarks/ Risk factors 95 1.59 3979.9 3 2 Equity invest; between NHPC, NEEPCO and GOAP for execution of Siang upper Stage-I $ Siang Upper Stage- II (3750 @%\ Total 1 I J 15.00 0 200.0 5 4179.89 1.59 15.00 6 8 Projected Outcomes Provision for NHPC Equity contri- Equity " ; investment 7 Targets Physical Activity Total Sub Debt >^ #!%!'!cal Output Annual Plan 2015-16 Proposed Objective/ Outcome Sl. Name of No. Schemes / programmes / Projects March’16 9 Process/ Time lines 10 Remarks/ Risk factors 96 26.63 Nil Kameng HEP $ Ar.P. 1 Generation of Hydro Power 572.78 Plan Complemen^% tary Extra^% Resources NonPlan ^%get 2 1 3 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes Feb’ 16 -- --- -- -- -- ^" ;;\ " \;!'¤$ Cum against total quantity ¤+*\; Package-II: Overt Lining at HRT Face III (Cumulative Tar¤; Excavation of Tenga Dam (Cumulative Tar¤"; Concreting of Tenga Dam (CummulativeTar¤+"; Package-III: Dec-15 Dec-15 Feb’ 16 March’ 16 -- Overt Lining HRT Face-II <¤; 7 -- 6 Project- Process / ed Out- Timelines come (MOU | % Package-I: 5 #!!'! Physical outputs ]<\]^|<$ NEEPCO Limited ^ " ;!% Work under progress Progress of boring is going on in controlled manner due to poor geology. Project Works are under progress 8 \ Remarks/ Risk Factors Annexure - XXII 97 Plan Complemen^% tary Extra^% Resources NonPlan ^%get 3 1 2 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes --- "@ Installation of Spiral Cas_ Jun-15 Oct-15 -- "@> Dec-15 -- -- ^!\ " EL236.7m - Unit - 2 Oct-15 " % -- ^!\ " EL236.7m - Unit - 1 Aug-15 Jan-16 -- Extension of EOT Crane ^; Erection of Steel Liner of -Penstock \;;!'¤ -- Feb-16 \ ;! _'"^ - !' "!% # <!" Channel: Nov-15 -- Completion of open ex"' !' "!%" ^! "@ 7 Oct-15 6 Work under progress 8 Project- Process / Remarks/ Risk Factors ed Out- Timelines come (MOU | % <?~">> -\;!'¤; >'%]'! 5 #!!'! Physical outputs 98 Pare H.E. Project, (110 Tuirial HEP $ Mizoram 2 3 Generation of Hydro Power Generation of Hydro Power Nil Nil 1.07 + 226.21 + Plan Complemen^% tary Extra^% Resources NonPlan ^%get 3 1 2 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes -- Trial and Final Assembly of Guide Appts including Runner-Unit I -- -- Concreting in Spillway(Cumulative 90000 Cum against total quantity of *\; -- ?]<>>;_!! Commissioning of the Project Erection of Equipments -\;;!'<¤ ` ^ >lator-250 nos,CT-35 nos, \^ ^* \^ > ! %| > ! $ -- -- " > "@> Jul-15 -- " > > Dec-15 31-Mar-16 Jul-15 Jan-16 Aug-15 Sep-15 Extension of EOT Crane to - 7 Nov-15 6 Project Works are under Progress. Construction activities are going on in full swing. … … … … 8 Project- Process / Remarks/ Risk Factors ed Out- Timelines come (MOU | % -- Installation of Spiral Cas_ 5 #!!'! Physical outputs 99 Tripura Gas ^% Project Generation of Thermal Power Nil Nil $= Plan Complemen^% tary Extra^% Resources NonPlan ^%get 3 1 2 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes 6 --- ?]<!" ""! @ \ ;! Switchyard -- -- Erection of Crest Radial gate - 90% completion Commissioning of the Prject -- |<¤ _<¤ Jul-15 Mar-16 Dec-15 Tail Race Channel Excava- -tion-100% completion ?]<>% ""! @ Oct-15 -- \ \^; Service bay Lot-III: Power House and Switchyard Mar-16 7 … 8 Project- Process / Remarks/ Risk Factors ed Out- Timelines come (MOU | % ; #!! "!% -U/S Coffer Dam (Cumulative ¤ = !@ \; ! *!@\; 5 #!!'! Physical outputs 100 Garo Hills \ !^% Power Project Meghalaya 8 Generation of Thermal Power Grid Interactive Generation Solar Power of Solar }" Power Lanka, Assam 7 Generation of Solar Power Nil Nil Nil Nil Nil Nil Grid Interactive Solar Power Proj" <|^< 6 10.00 11.22 7.89 Plan Complemen^% tary Extra^% Resources NonPlan ^%get 2 1 3 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes -- 6 \ !?@>! headway -- March’ 16 Nov’ 15 May’ 15 7 NEEPCO proposed to set up the 500 MW Coal ^% }" vicinity of Simsang / West \ !#!%`galbibra, Garo Hills District of Meghalaya. The MOA for development of this Project in Meghalaya was signed on 17th March, 2011 with the Government of Meghalaya. However, progress of works for development of the project could not be carried out as Coal Linkage for `>^ % As per the DPR, the Solar Power Project using Polycrystalline technology is found to be feasible. Land area measuring 30 "%#% within the boundary of the <|^ at Tripura. Meanwhile, the LOI for the EPC Contract of the project has % ^? on 09/10/2013. 8 Project- Process / Remarks/ Risk Factors ed Out- Timelines come (MOU | % Issue of LOI for EPC Con- -tract and initial headway towards implementation of the project Commissioning of the Project 5 #!!'! Physical outputs 101 Plan Complemen^% tary Extra^% Resources NonPlan ^%get 3 1 2 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes 5 #!!'! Physical outputs 6 7 }" #nalized. As Meghalaya falls under the Sixth Schedule of the Constitution, the project was initiated, keeping in view that the coal availability will be met from _; \ !#!% Coal India Limited in Garo Hills District of Meghalaya. However, the Government of Meghalaya has not renewed the lease of the said \ !#!% \ !>%?;ited and therefore coal linkages for the project have to be met from other source. Accordingly, Expression of Interest for lease of land of coal bearing areas in Garo Hills District of Meghalaya % However, even after several extension of the last date of receipt of offer, till 10.08.2012, no responses could be received. As a result, process for visit of CEA’s Site Selection Committee could not proceed and the same caused delay in process for land acquisition for the project leading to non-utilization of the allocated fund for the year < \ is continuing its endeavour to set up coal linkage for the project. 8 Project- Process / Remarks/ Risk Factors ed Out- Timelines come (MOU | % 102 ' Modernisation of Kopili Power Station 10 11 Development of power projects Renovation %sation Preparation of DPR etc. Nil Nil Nil Nil Nil 51.79 20.00 55.80 Survey and Investigation 9 Nil Plan Complemen^% tary Extra^% Resources NonPlan ^%get 2 1 3 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes Share of equity ' %tion _'>' @ _>"; 5 #!!'! Physical outputs -- -- -- 6 Mar-16 Mar-16 Mar-16 7 _>"' preparation of 3750 MW Siang Upper Stage-II HEP which is to be devel %`\ and State Govt. are under progress. Equity is % for 120 MW Dibbin HEP. ^% ; are in process for some more hydro/thermal/RE projects in respect of which equity shall be infused into the respective " ; Rehabilitation works of distress hydraulic structures to be taken up as per suggestions given by M/s WAPCOS. _> "' = Mawphu Stage-II HEP, 55 MW Killing HEP for DPR preparation are under progress apart from the @ _> activities in respect of the other projects in pipeline. 8 Project- Process / Remarks/ Risk Factors ed Out- Timelines come (MOU | % 103 Generation of Solar Power 75.00 1216.60 Preparation of DPR and subsequent execution 5 #!!'! Physical outputs -- 6 Mar-16 7 %#! 8 Project- Process / Remarks/ Risk Factors ed Out- Timelines come (MOU | % £££ `| *\ "% ';" % "'% ; ` ££>" '! \ ;$%"'%%% !`^_ **\!! " %$ £_!` !|<!\\[ }""%!% " ;; %%" listed above. Grand total (MOP ) Nil Nil Grid Interactive Solar Power Proj" KHEP, Assam 12 18.02 Plan Complemen^% tary Extra^% Resources NonPlan ^%get 2 1 3 Outlay ^$ Sl. Name of the Objective / No. Scheme / Pro- Outcome grammes 104 Koteshwar (4X100) 1 2 Hydro Power Generation 3 Objective/ Outcome TEHRI PSP (1000 MW) Hydro Power Generation VISHNUGAD PIPALKOTI HEP (4X111MW) 2 1 1 Name of Schemes/ Programme Sl. No. 764.04 413.62 64.84 4 Annual Plan (2015-16) Proposed Sept’15 Sept’15 Oct’15 \ ;!^"["' "; ___<< Complete Flooring including Earth mat in _'"^"!%\!% %" % \ |!!\ " Mar’16 River Diversion \ ;!^"["' "; ___< Mar’16 Complete Excavation of Adit 1 to HRT May’15 Oct’15 Complete Excavation of Adit to Power < ? \ ;!["' ! _"! "@$ Jul’15 Completion of Excavation of Access Tunnel to intake Jun’15 May’15 Complete Excavation of Lower Adit to De!\; ? Complete Crown Slashing of Top chamber ___< Jun’15 6 Processes/ Timelines Completion of Excavation of Diversion Tunnel 5 "#%'#*$=?* Outputs OUTCOME BUDGET 2015-16 THDC INDIA LIMITED Project already commissioned. Amount kept for balance essential works. 7 Remarks/ Current Status (Rs. in crore) Annexure -XXIII 105 NEW PROJECTS 4 DPR Preparation Work TEC, Stage - III activities. ~! ; %! Signing of Implementation agreement, drifting work _> @ '!!; $ '!;<;@= '^@= '!}|__ + [;!__ Consultancy works, FR Preparation Work - Jul’15 Award of contract for HM Works of @% !"" }"= FR Preparation Work May’15 Mar’16 6 Processes/ Timelines Award of contract for EM Works of @% !"" }"= Complete Erection of EOT Crane 1 in _'""!%#[ ;%ments and laying of rails 5 "#%'#*$=?* Outputs ^ @^! 18.55 38.27 4 Annual Plan (2015-16) Proposed FR Preparation Work Hydro Power Generation Hydro Power Generation 3 Objective/ Outcome % ; ! DHUKWAN HEP (3X8MW) 2 1 3 Name of Schemes/ Programme Sl. No. `^?" ;mended the proposal in its 31st meeting held on Subject to Signing of Implementation agreement and Subject to Drifting permission from MOEF. Projects affected due to Honb’le Supreme Court. Order 13th aug13 directing ~ _ Uttrakhand not to \ FC for any new hydroelectric projects in the state of Uttrakhand until further orders. 7 Remarks/ Current Status 106 TOTAL Total New Projects Wind/Slar Power Generation [%_ ! 3 Thermal Power Generation 2 1 Objective/ Outcome [}_< $$ Name of Schemes/ Programme Sl. No. 1580.31 299.54 50.20 230.79 4 Annual Plan (2015-16) Proposed Acceptance of Micrositing Report and subsequent supply of equipment. Rerouting of NH- 91 cost of Railway and water corridores and land acquisition cost . 5 "#%'#*$=?* Outputs 6 Processes/ Timelines Tender for 50MW Wind Power under process. Reply to querries, raised by IFD (Internal Finance ;%vision. Ministry of Power has been submitted + " >^ clearance. 7 Remarks/ Current Status 107 2 Luhri Hydro Electric Project ( 601 21.50 IEDC + Sub-Total Hydraulic Model studies + ^!">"! Works : Compensation in view of likely damages to private property due to blasting during construction of project, construction of residential and non-residential buildings 55.85 Construction of LHEP ^!"; claim settlement for Civil Works, Electro Mechanical Works, HM Works Complementary Ex^% Resources Plan ^% Investigation studies and getting various clearances. ^!"ments, claim settlement for Civil Works, Electro Mechanical Works, HM Works and infrastructure works Rampur HEP #!!'! Projected OutPhysical Outcomes comes 300.00 Non Plan ^% Outlay 2015-16 Sub-Total ^!" works of RHEP 1 Rampur Hydro Electric }" Objective / Outcome Sl. Name of No. Scheme / Programme ]<\]^|<$ _`??;% Continuous process Running payments upto March, 2016 Running payments upto March, 2016 Process/ Timelines Remarks " Annexure XXIV 108 Devsari HEP Sub-Total Construction of DHEP Sub-Total Construction of DSHEP 3 Dhaulasidh $$ Objective / Outcome Sl. Name of No. Scheme / Programme Non Plan ^% 19.80 12.52 7.28 20.00 7.77 12.23 Plan ^% Complementary Ex^% Resources Outlay 2015-16 IEDC Shifting of existing power lines of UPCL Acquisition of private and forest land IEDC Civil works Acquisition of private land, commencement of pre-construction activities. Acquisition of private land Acquisition of private land, commencement of pre-construcConstruction of approach tion activities and Civil works road to dam site #!!'! Projected OutPhysical Outcomes comes Continuous process Running payments upto March, 2016 Running payments upto March, 2016 Continuous process Running payments upto March, 2016 Running payments upto November, 2015 Running payments upto February, 2016 Process/ Timelines Remarks 109 Jakhol Sankari HEP Arun-IIIHEP * 6 7 Naitwar Mori $; Sl. Name of No. Scheme / Programme 9.93 Sub-Total 5.35 Acquisition of land and commencement of Pre-construction activites and Establishment expenses IEDC + IEDC Construction of approach road, construction of abutments for bridges and buildings Acquisition of land, commencement of pre-construction activities. Survey and Investigation Works and commencement of pre-construction activities. Diversion of forest land, commencement of Mobilization advance and pre-construction activities. commencement of Civil works Diversion of forest land _'>' work, Consultancy for DPR, bid documents and drawings, EIA/EMP Complementary Ex^% Resources #!!'! Projected OutPhysical Outcomes comes 0.88 20.00 $ $ Plan ^% 9.93 Non Plan ^% Outlay 2015-16 Construction of Arun-III HEP Sub-Total Construction of JSHEP Sub-Total Construction of MNHEP Objective / Outcome Running payments upto March, 2016 Continuous process Running payments upto March, 2016 Continuous process Running payments upto March, 2016 Running payments upto March, 2016 Running payments upto March, 2016 Process/ Timelines Remarks 110 ^[<mal Power Project (1320 Kholongchhu HEP (600 9 10 Construction of Wangchu HEP Wangchhu HEP (570 8 Sub-Total 381.39 21.19 360.20 Construction ^[ Thermal Power Project 33.00 Continuous process 31.01.16 Completion of topographical survey and other site investigation IEDC 30.09.15 Submission of revised ^< ] 15.03.16 Running payments upto March, 2016 Continuous process Running payments upto March, 2016 Continuous process Running payments upto March, 2016 31.12.15 Acquisition of land, commencement of pre-construction activities. Commencement of pre-construction activities. Formation of " ;mencement of pre-construction activities. Process/ Timelines Award of work for preparation of DPR for Railway Siding/Infrastructure \ ;! ^% Wire Fencing of Project land Land acquisition IEDC Pre-construction activites " IEDC 2.90 3.75 Getting requisite clearances and Preparation of EIA and EMP reports Complementary Ex^% Resources #!!'! Projected OutPhysical Outcomes comes 0.85 Plan ^% 33.00 Non Plan ^% Outlay 2015-16 Sub-Total Construction of Kholongchu HEP Sub Total Objective / Outcome Sl. Name of No. Scheme / Programme Remarks 111 Doimukh = \ ^ der Power Transmission Company 13 0.20 Sub-Total Wind Farm Projects 12 Sub-Total + Sub-Total Equity contribution + 5.00 5.00 Construction of Doimukh HEP Sub-Total Setting up of Wind Farm 0.20 Development of Deocha Pachami \ !^! "@ Deocha Pachami Coal ^! "@ Plan ^% 11 Non Plan ^% Complementary Ex^% Resources Outlay 2015-16 Objective / Outcome Sl. Name of No. Scheme / Programme Process/ Timelines Infusion of equity in CPTC Preparation of EIA/EMP report Preparation of Detailed Project Report including site investigation and surveys ^!"; Khirvire Wind Power Project and Award for Wind Resource Assessment Study at Kharaghoda, Gujarat Commencement of works of Transmission line project Submission of Detailed Project Report and EIA/ EMP report Running payments upto March, 2016 28.02.16 15.03.16 Running pay^!"ments upto ments for Khirvire Wind Power March, 2016 Project and Wind Resource Assessment Study at Kharaghoda, Gujarat Running payFormation of Infusion of equity of _`\ ; ments upto extraction of coal March, 2016 development from Deocha Pachami Coal ^! "@ #!!'! Projected OutPhysical Outcomes comes Remarks 112 Construction of Guest ^!%ing at Shimla 18 Arun-III Trans- Construction mission of Arun-III tranmission line 16 17 311.35 Sub-Total 5.00 5.00 1175.00 Sub-Total Total 30.00 Sub-Total 30.00 + + Construction works Sub-Total 311.35 Equity contribution and development of Solar Power Project Solar Power Projects Plan ^% 15 Non Plan ^% Complementary Ex^% Resources Outlay 2015-16 Objective / Outcome Sl. Name of No. Scheme / Programme 31.12.15 Process/ Timelines "' Construction of Guest ^!%_;! Survey and investigation works, Environment Examination studies "' Construction of Guest House ^!% Shimla Survey and investigation works and commencement of preconstruction activities Running payments upto March, 2016 Running payments upto March, 2016 Running payments upto March, 2016 Award for Solar Resource Solar Resource 30.09.15 Assessment Study at Assessment Kharaghoda, Gujarat Study at Kharaghoda, Gujarat Award of 5 MW Charanka Commencement Solar Power Project(Gu- of works of 5 MW Charanka } Solar Power Project #!!'! Projected OutPhysical Outcomes comes Remarks 113 2 Capacity addition of Chandrapura <_[ 500 MW +=[ }<_ Capacity addition of +=[ 1000 MW Koderma Stage- Capacity addition of >[ 1000 MW 2 3 3 1 A. A1] DVC’s own Thermal Power Projects 1 Sl. Name of Objective/Outcome No. Scheme/ Project 4 (i) 445.95 477.71 25.32 4 (ii) 4 (iii) 6 Projected Outcomes Unit-2: Completion of balance EPC works Unit-1: Completion of balance EPC works To Complete balance @ \ Non-EPC like Rail Infrastructure, New addlitional Wagon <!< " Contract Closing Part completion of balance work Part completion of balance work. To Complete balance Completion @\` of balance EPC work Weir work, work Initial spares, Service Tax payment, SIP, work under contingency etc. including Contract Closing 5 NonPlan Compleme "# Plan Budget -ntary Extra Deliverables /Physical Budget (Rs. Cr.) budgetary Outputs Resources B.E. 2015-16 OUTCOME BUDGET 2015-16 Damodar Valley Corporation 03/2016 03/2016 03/2016 03/2016 7 8 Processes Remarks/ / Timelines Risk Factor (Rupes in crore) Annexure - XXIV 114 5 1 Capacity addition of 1000 MW 3 Raghunathpur Capacity addition of <_> 1200 MW [$ Durgapur Steel <_ [ 2 Sl. Name of Objective/Outcome No. Scheme/ Project 4 (i) 853.11 254.83 4 (ii) 4 (iii) 07/2015 08/2015 09/2015 10/2015 Commissioning of Skid mounted pump \] \] Completion of 2nd Ash Pond 05/2015 03/2016 03/2016 03/2016 07/2015 Commercial operation declaration of both the units Completion of balance work Completion of laying of Cross Country Water Pipe line in balance land and completion of Transmission line Completon of Water Pipe line in possesed land Possession of balance land in Water Corridor Part Completion of balance activities of Non-EPC (Railway >¥< 2] Initiate Contract closing activities \ ;! of balance EPC work 03/2016 Initiate Contract closing activities 7 8 Processes Remarks/ / Timelines Risk Factor 03/2016 6 Projected Outcomes Part Completion of balance activities of Non-EPC (balance land " ¥! >¥< ¥ 5 NonPlan Compleme "# Plan Budget -ntary Extra Deliverables /Physical Budget (Rs. Cr.) budgetary Outputs Resources B.E. 2015-16 115 Capacity addition of 500 MW during 12th plan 3 Objective/ Outcome Raghunathpur Capacity addition <_>> of 1320 MW [$$ during 12th plan ^ @ ª<_ [ 6 7 2 1 Sl. Name of Project No. 4 (i) 1260.01 638.42 4 (ii) 4 (iii) NonPlan Complem Plan Budget -entary Extra Budget (Rs. Cr.) budgetary Resources B.E. 2015-16 02/2016 03/2016 Completion of NDCT COD 11/2015 Interconnectiing conveyor route ^<_^ ^<_ 07/2015 7 Processes / Timelines 07/2015 Commercial operation declaration 6 Projected Outcomes Coal Synchronisation ~!!? % Readiness of NDCT 5 "# Deliverables / Milestones / Outcomes (Targets) \[; various options such as possibility of getting joint venture partner or entirely hiving off the project as per MOP, GOI QPR MOM, as such activities to #!% #! or other suitable venture. 8 Remarks/Risk Factor 116 B. Investigation / Feas. Studies / DPR etc. for future projects, if any. 8 15.00 3972.19 16.84 4 (ii) Total: B : 4 (i) 4 (iii) NonPlan Complem Plan Budget -entary Extra Budget (Rs. Cr.) budgetary Resources B.E. 2015-16 15.00 Preliminary Study/ DPR / Reports, if any along with development of Coal block, ; Canals and LT Distribution 3 Objective/ Outcome ^<_ Capacity addition of 1050 MW to MPL Total: A : 2 1 Sl. Name of Project No. Further equity requisition is pending for other additional work e.g. Railway >" Disposal System etc. For project wing Rs. 1 Cr. has been kept for pre-project activities of new projects, if any incl. KTPS Ph-II. 5 "# Deliverables / Milestones / Outcomes (Targets) 03/2016 Fund provision for preliminary study of new projects, if proposed. 03/2016 7 Processes / Timelines 6 Projected Outcomes 8 Remarks/Risk Factor 117 D. 2.02 1] Power Line Carrier Communication ?\\ Speech and data communication ^<_ ^| ! Jamshedpur - Gola, "| !' \<_^% Ramgarh - Jindal, '^} ` };% '}^` };% '\<_^_?[ <__<_[ Parulia - DSTPS, [ "| 2.02 Communication schemes 271.72 Total T& D schemes < "!< power 77.96 4 (ii) < 4 (i) 193.76 T& D schemes C. 3 4 (iii) Procurement, " commissioning Please Refer to %[< Please Refer to %[< 5 NonPlan Complementary "# Plan Budget Extra budgetary Deliverables / Budget (Rs. Cr.) Resources Milestones / Outcomes (Targets) B.E. 2015-16 TSC Schemes: < 2 1 Sl. Name of Project Objective/Outcome No. 7 " commissioning to match with < ress. 8 Processes Remarks/Risk / Factor Timelines Speech, data 03/2016 communication and protection of High Tension line. 6 Projected Outcomes 118 1 Data communication Speech and data communication 5] Leased line for new Power House 6] OPGW for Transmission lines/ UGFO for Sub stations 7] Establishment Carrier Aided of Carrier Protection of High Protection where Tension lines Indoor PLCC equipment have already been replaced Data communication «?_ `` @ connectivity Procurement, " commissioning Protection of 03/2016 High Tension line Procedural delay Procedural delay 03/2016 Data and "gration of upcoming substations with ERLDC. Commissioning Integration of Generation and other electrical data for Tilaiya HPS 8 «#%? % " Communication ";?\ 7 Procedural delay 6 Speech com- 03/2016 munication 5 Procurement, " commissioning 4 (iii) Speech communication for up-coming stations. 4 (ii) Processes Remarks/Risk / Factor Timelines « frequency communication ~ 4 (i) Projected Outcomes 3 NonPlan Complementary "# Plan Budget Extra budgetary Deliverables / Budget (Rs. Cr.) Resources Milestones / Outcomes (Targets) B.E. 2015-16 2 Sl. Name of Project Objective/Outcome No. 119 3 Scheduled R ^<_ ª^" Hydel Station 6 ^!" @ Pollution Fly Ash Disposal norms com_ ^<_ª^ pliance 5 Projected Outcomes 03/2016 03/2016 03/2016 7 Misc. Spill Over Works G. [1] Mejia TPS [ $[ Pollution: Sub Total R&M : For Environmental compliance ?\ !" Refurb. 2.00 1.50 For settlement of ^!"!! balance RA bills and payment Contract Closing. 03/2016 03/2016 Procedural delay 8 Processes Remarks/ / Risk Timelines Factor 03/2016 4 (iii) "# Deliverables / Milestones / Outcomes (Targets) Consultancy [ > 49.48 49.48 4 (ii) Plan Complem Budget entary Extra (Rs. Cr.) budgetary Resources 03/2016 ?\ !" Refurb. MHS U-2 ( > 4 (i) Non-Plan Budget B.E. 2015-16 ] Improved perfor>>>>>\<_ mance <_ ?\ !" Refurb. _ > PHS U-1 ( Phase ?\ !" > Refurb. R&M Schemes 2 F. E. 1 Sl. Name of Project Objective/Outcome No. 120 SLDC scheme Equity participation BPSCL Equity participation: MAMC Equity particiEquity contribution pation: DVTDPL <? J. K. L. M. Equity contribution to MAMC Equity contribution ^_\? Establishment _?\\ Towers Kolkata 4482.93 * 0.10 2.00 15.00 0.80 1.00 150.13 Equity contribution to be made as per shareholders agreement. Equity contribution to be made as per shareholders agreement. Equity contribution to be made as per shareholders agreement. Commissioning Setting up of New Infrastructure at MTPS and Procurement of Eqipments, consumables and other incidental expenditure. _" Data communication Procurement, erec- Sustained " ;; - generation ;} ! with stable Machineries for ex- transmission !%;! % hydel power stations network. including transmis % system for improve; distribution. 03/2016 03/2016 03/2016 3/1/2016 03/2016 03/2016 Depends upon demand being raised Company during the ~ 16 time to time. Procedural delay * includes contribution from participating Govt. as per Section 30 of DVC Act but not included in IEBR approved by Ministry of Finance. Grand Total in Rs. Cr. : A to M R&D Centre I. To serve the re; \ power stations and <; Distribution system Refurbishment/ To improve perExtension/ formance of Improvement Generating units with improved infrastructural transmis % network. H. 121 Grand Total < Main Works of < 1 2 2 }" scheduled time frame < "!< power 3 Name of Scheme / Objective / Outcome Programme 1 Sl. No. 5 #!!'! 271.72 77.96 " @%__ Transmission lines «!__|>_ and Interconnecting lines. «%| '%! "% In different stage of progress. Under tendering stage. «%?>?]; bays Projects at initiation level Project Sanctioned for S/S portion. «^%__|>_% interconnecting lines Pre-tendering stage. «}^__"!%ing installation of ATR alongwith controlling bays and interconnecting lines \ "#!ised. 7 Remarks Pre-tendering stage. 03/2016 6 Process / Timelines \ «| !__ 193.76 «_<__%" necting lines Annual Plan 2015-16 % _; ]!]" ;<$ Damodar Valley Corporation Transmission & Distribution Appendix-T&D-3 122 Transmisison system for development of pooling Stations in ` ^!% < ;^ North East - NR/WR Inter-con" _; Transmission System associated !!|^% }"%^ <;! Power Station Transmission System associated %>>>%"!> <; _; ^>> Transmission System for RAPP 7 = TS for Meja TPS Transmission System associated with Kudankulam Atomic Power Project 2 3 5 6 7 8 A. ONGOING SCHEMES Name of the Projects/Scheme/ Programme 1 S. No. 69.72 10.58 19.61 =$ $ 108.85 807.97 * Annual Paln ^$ Proposed Outlay Power Evacuation Power Evacuation Power Evacuation Power Evacuation Power Evacuation Power Evacuation Power Evacuation System strengthening Objective/ Outcomes - - - - - 30 * Stringing \ - - - - 1 - 2 - Transformer Erection ` #!!'bles FINAL ]<\]^|<$ Power Grid Corporation of India Ltd. - - Mar-16 - Apr-15 Mar-16 Sep-15 Mar-16 Process/ Timelines Compensation issue yet to be resolved, work to start after it Project likely to be completed by Mar-15 Severe ROW problem in Nagaland, ghalaya affecting progress. Remarks >\ Annexure XXVI 123 Transmission System Associated With Kakrapar APP Transmission System Associated ?_<_>[= Transmission System Associated with Mundra UMPP Transmission System for Krish;<^ Transmission system for Phase I generation Projects in Orissa -Part A Transmission system for Phase I generation Projects in Orissa ^ 15 16 17 18 Sub-station Extension works associated with Transmission System required for evacuation of power from Kudgi TPS (3x800 > `<\?;% 11 13 Transmission System Associated _ !_<£$$ 10 Transmission System Associated %_>>£$$ Generation Project Transmission System Associated 9 12 Name of the Projects/Scheme/ Programme S. No. 81.20 += 121.08 157.51 137.08 93.10 System strengthening System strengthening Power Evacuation Power Evacuation Power Evacuation Power Evacuation Power Evacuation Power Evacuation 0.00 712.96 Power Evacuation Power Evacuation Objective/ Outcomes 13.61 22.29 Annual Paln ^$ Proposed Outlay *= - - 328 20 210 831 - - - Stringing \ - 1 - - - - - - - - Transformer Erection ` #!!'bles FINAL Dec-15 Apr-15 - Mar-16 Mar-16 Mar-16 Mar-16 - - - Process/ Timelines Project likely to be completed in Mar15 Award placed in ]" Award placed in Outlay kept for preliminary/infrastrucal works at Substation Work held up since last 5 years due to severe RoW in Karnataka portion Remarks 124 Name of the Projects/Scheme/ Programme Transmission System for Phase-I generation Projects in Orissa -Part C Transmission system for @%>^_\? }ects - Part A1 Transmission system for @%>^_\? }ects - Part A2 Transmission system for @%>^_\? }"^ Transmission System for transfer of power from different projects ;_@@; ` Transmission system for transfer of Power from generation Projects in Sikkim to NR/WR- DPR -I ^ Transmission System for IPP generation projects in Madhya %\ Establishment of Pooling Stations at Champa and Raigarh <; >| }"\ TS strengh. in western part of WR for IPP Generation Projects \ S. No. 19 20 21 22 23 25 26 27 System strengthening 70.80 100.80 117.36 86.39 28.71 Power Evacuation Power Evacuation Power Evacuation System strengthening System strengthening System strengthening System strengthening System strengthening 72.50 373.18 Objective/ Outcomes Annual Paln ^$ Proposed Outlay 56 - 367 863 223 165 101 Stringing \ - 3 2 - 2 2 2 - - Transformer Erection ` #!!'bles FINAL Dec’15 Jun’15 - Dec-15 Sep-15 Sep-15 Sep-15 Sep-15 Sep-15 Process/ Timelines St-I forest clearance awaited. One contract under re-tendering Remarks 125 Name of the Projects/Scheme/ Programme System Strengthening in North/ West part of WR for IPP Projects in Chhattisgarh DPR -5 System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh DPR -6 System strengthening in Wardha-Aurangabad corridor for IPP Projects in Chhattisgarh DPR -7 `\" " for IPP Projects in Chhattisgarh DPR -9 Common system associated with Coastal Energen Private Limited %>%^ % Limited LTOA Generation Proj"<" Common system associated with Coastal Energen Private Limited %>%^ % Limited LTOA Generation Proj"<" ^ Common TS associated with \ `\\ }"_@@!; Common TS associated with \ `\\ }"_@@!;^ Common TS associated with \ `\\ }"_@@!;\ S. No. 28 29 30 31 32 33 35 36 * 899.79 337.67 Power Evacuation Power Evacuation Power Evacuation Power Evacuation 381.35 Power Evacuation ** Power Evacuation System strengthening +$ 9.82 Power Evacuation Power Evacuation Objective/ Outcomes + * Annual Paln ^$ Proposed Outlay - 200 - - 819 - 678 179 Stringing \ - - - - - 2 - - - Transformer Erection ` #!!'bles FINAL - Mar-16 Mar-16 - - Mar-16 - Dec-15 Mar-16 Process/ Timelines Outlays kept for balance work Outlays kept for preparatory work of Foundation, Tower erection Project likely to be " ;!% 15 Pole-I likely to be commissioned in 2015-16 Project likely to be " ;!% 15 Forest clearance awaited. Forest clearance awaited. Remarks 126 Name of the Projects/Scheme/ Programme Common Transmission Scheme associated with ISGS Projects in Nagapattinam/Cuddalore area of <;!`% Transmission System for Connectivity of Thermal Powertech Limited Transmission system for Connectivity of Essar Power Gujarat Limited Common Transmission System Associated with Generation Projects in Nagapattinam/ Cuddalore <;!`% Transmission system associated with Contingency plan for '" ;>?~_ $ Eastern Region System _>>>__>>> Eastern Region Strengthening _";__ _!^;' Sub-stations of ER ' _>\<"tors for ER Eastern Region Strengthening _";>>>__>>> Northen Region System _>`__> S. No. 37 38 39 $ + 25.59 21.58 1.02 $ ++ 79.73 51.30 System strengthening System strengthening System strengthening System strengthening System strengthening 0.00 7.92 System strengthening Objective/ Outcomes 22.67 Annual Paln ^$ Proposed Outlay - - - - 156 - - - - - Stringing \ - - - - - 2 - - - - - Transformer Erection ` #!!'bles FINAL - - - - Mar-16 Mar-16 - - - - - Process/ Timelines Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Award placed in Kishenganj land acquistion awaited Outlay kept for preliminary/infrastrucal works Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Remarks 127 Name of the Projects/Scheme/ Programme Northen Region System _>`__> Northen Region System _>`__> Northen Region System _>>>`__ >>> Northen Region System _>`__> `__> `__>> `__>>> System Strengthening in Northern region for Sasan and Mundra UMPP Northern Region Transmission System Strengthening Spare ICTs in NR S. No. = * 50 51 52 53 55 56 57 10.00 * 9.59 63.50 106.19 112.53 19.58 67.36 * Annual Paln ^$ Proposed Outlay System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening Objective/ Outcomes - - - 151 - - 152 151 60 $ Stringing \ - - - - - - 1 - - - Transformer Erection ` #!!'bles FINAL - - - Sep-15 - - Mar-16 Sep-15 Mar-16 Dec-15 Process/ Timelines Outlays kept for balance work Outlays kept forpreparatory works. Severe ROW problem in Western U.P. Outlays kept for balance work Severe ROW issues. Project likely to be " ;!% 15.Outlays kept for balance work Project likely to be " ;!% 15.Outlays kept for balance work Severe ROW in western U.P. `^?"!" for wildlife awaited Forest clearance awaited. Remarks 128 Name of the Projects/Scheme/ Programme System Strengthening in NR Augmentation of Transformers in Northern Region-Part-A >`<|>]`?__< STRENGTHENING SCHEME FOR NORTHERN REGION AND _<`|>]`<^ Southern Region System _>>___>> Southern Region System _>>>___>>> Southern Region System _>___> ___>>>?> ___>>>>>>^ | ___>> Provision of Spare ICTs and Reactors in SR S. No. 58 59 60 61 62 63 $ 65 66 0.00 = 30.57 77.55 8.72 =+ 12.65 33.70 Annual Paln ^$ Proposed Outlay System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening Objective/ Outcomes - * - - 122 - - - - Stringing \ - - - - - - - - - Transformer Erection ` #!!'bles FINAL - Sep-15 - - Dec-15 - - - - Process/ Timelines Severe ROW issues.Project likely to be completed in ]! kept for balance work Severe ROW issues.Project likely to be completed in ]! kept for balance work Severe ROW problem in Karnataka end. Severe ROW problem. Outlay kept for preliminary/infrastrucal works Outlays kept for balance work Outlays kept for balance work Remarks 129 Name of the Projects/Scheme/ Programme Western Region System ___ Western Region System _>>>__>>> TS for establishment of @|>_% UT DD ?^" ' at POWERGRID sub-stations associated with SS Common for ` ?^" ' associated with SS for WR Augmentation of Transformer %^ Installation of Reactors in West Installation of Reactors in West >> Installation Of Transformer And Procurement Of Spare Converter < ;^%'%" ^"@< ^"@_ Inter-Regional System Strengthening Scheme For Northern Region And Western Region Part A S. No. 67 68 69 70 71 72 73 + 75 76 339.25 = $ == 1.65 13.33 System strengthening = - - - - - - 15.63 - - Stringing \ - - - - - - - - - 2 Transformer Erection ` #!!'bles FINAL - System strengthening System strengthening Objective/ Outcomes 16.96 1.90 Annual Paln ^$ Proposed Outlay Mar-16 - - - - - - - - - Process/ Timelines Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Remarks 130 System strengthening in South >>___>> Eastern Region Strengthening _";>__> Eastern Region Strengthening _";>>__>> Eastern Region Strengthening _";>>>__>>> 83 = 85 86 Eastern Region Strengthening _";__ 80 Northern Region Strengthening _";>>`__>> Sub-station works associated `__>> 79 82 Northern Region Strengthening _";`__ 78 Northern Region Strengthening _";`__ (earlier envisaged as Singrauli-III <_ Provision of Spare ICTs and Reactors in NER 77 81 Name of the Projects/Scheme/ Programme S. No. 153.77 ++ * 182.26 83.96 $= 16.85 228.97 0.00 Annual Paln ^$ Proposed Outlay System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening System strengthening Objective/ Outcomes - - - 50 295 - - - 216 - Stringing \ - - 2 - - - - - - Transformer Erection ` #!!'bles FINAL - - Feb-16 Mar-16 Mar-16 - - - Mar-16 - Process/ Timelines Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Awrd under progress for few packages. Rest placed Project likely to complete in Jan’15. Outlays kept for balnce works. Outlay kept for preliminary/infrastrucal works Award placed in Nov’13 Remarks 131 Name of the Projects/Scheme/ Programme _"\ ; > Northern Region >!! ]^" Icts In Western Region Transmission System Strengthening In Western Region - Northern Region For Transmission Corridor For Ipps In Chhattisgarh System Strengthening in South Sub station extension works associated with Transmission System for connectivity for NCC Power Projects Ltd. Substation works associated with System Strengthening in Southern Region for Import of power from Eastern Region Augmentation of transformation capacity in northern regionpart-b National Transmission Asset Management Centre POWERGRID ERP Project Implementation of AMR in NR S. No. 87 88 89 90 91 92 93 * 95 96 0.00 = 55.00 90.59 298.97 90.07 127.59 - - - - - - - - =**= - Stringing \ - - - - - - 7 - - - Transformer Erection ` #!!'bles FINAL - System strengthening Objective/ Outcomes 121.78 182.78 Annual Paln ^$ Proposed Outlay - - - - - - Mar-16 - - - Process/ Timelines Outlays kept for balance work Outlays kept for balance work Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Remarks 132 Name of the Projects/Scheme/ Programme Replacement of Porcelain insulators by Polymer insulators in NR > #" _>>\ ;![ !% _>\]? Fibre optic communication system in lieu of existing ULDC microwave links in NR Fibre Optic Communication System in lieu of existing ULDC Micro wave Links in ER Fibre Optic Communication System in lieu of existing ULDC Micro wave Links in SR Fibre Optic Communication System in lieu of existing ULDC Micro wave Links in NER Upgradation/Expansion of SCADA/EMS system of SLDC of NR Upgradation/Expansion of SCADA/EMS system of SLDC of `?\>> Upgradation/Expansion of SCADA/EMS system of SLDC of WR Upgradation/Expansion of SCADA/EMS system of SLDC of ER S. No. 97 98 99 100 101 102 103 105 106 107 108 5.82 20.35 0.00 $+ + ** 0.00 0.00 12.56 0.00 0.00 Annual Paln ^$ Proposed Outlay Objective/ Outcomes - - - - - - - - - - - - Stringing \ - - - - - - - - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - - - - - Process/ Timelines Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Remarks 133 Name of the Projects/Scheme/ Programme Establishment of Fiber Optic Communication System in WR under master communication plan Establishment of Fiber Optic Communication System in NR Fibre Optic Communication System for Central Sector Sub-sta |_ _ Fiber Optic Communication System in ER under expansion of Wideband communication network in ER Procurement of Telecom Equipment, Operation Support Sys;]__[!_; "!%! "|_\ _!\__;"!% ^% ; Telecom Network for NTAMC. |%>> !%; Power Grid Equity (Teesta Urja ?% Power Grid Equity (Jaypee Pow%?;% National High Power Test Laboratory Private Limited S. No. 109 110 111 112 113 115 116 117 0.91 0.00 20.88 8.87 0.00 - - - - - - *$ - - Stringing \ - - - - - - - - - Transformer Erection ` #!!'bles FINAL - Objective/ Outcomes 0.00 $$ Annual Paln ^$ Proposed Outlay - - - - - - - - - Process/ Timelines Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Remarks 134 #""_'" Limited ^|%\ ;?;% !^% Nigam Pvt. Limited >;!; #%! Time Dynamic State Measure;<_> Upgradation/Expansion of SCADA/EMS system of SLDC of NER 118 119 120 121 122 Interconnecting lines from North Karanpura STPP to the pooling stations at Ranchi and Gaya ASSOCIATED TRANSMISSION __<><<>_ <`_>__>]`__< __]\><><+ =^ Transmission System associated with Darliparlli TPS <`_>__>]`__< __]\><><>`\?]\< 1 2 3 5 ^`_\_ Sub Total Ongoing Schemes Name of the Projects/Scheme/ Programme S. No. + 100.89 39.66 173.79 91.22 $=++ 27.11 2.50 12.00 115.50 1.31 Annual Paln ^$ Proposed Outlay Power Evacuation Power Evacuation Power Evacuation Power Evacuation Objective/ Outcomes - - - - - - - - - - Stringing \ - - - - - 35 - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - - - Process/ Timelines Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlays kept for balance work Remarks 135 Name of the Projects/Scheme/ Programme Associated Transmission system `>><_$$ ^ <`_>__>]`__<~] KISHENGANGA HEP POWERGRID scope in Transmission system for Phase-II Generation Projects in Odisha Transmission System associated <! Jharkhand Transmission system associated with Orissa UMPP Substation Extension works associated with Eastern Region Strength";>__> Substation Extension works associated with Eastern Re _";>> __>> Eastern Region Strengthening _";>__> Dynamic Compensation (Stat" ;`!?"@ System Strengthening in South > S. No. 6 7 8 9 10 11 12 13 15 3.31 $ 3.97 10.25 1.32 0.07 1.32 70.11 76.68 Annual Paln ^$ Proposed Outlay System strengthening System strengthening Power Evacuation Power Evacuation Power Evacuation Power Evacuation Objective/ Outcomes - - - - - - - - - - Stringing \ - - - - - - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - - - Process/ Timelines Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Remarks 136 Name of the Projects/Scheme/ Programme INSTALLATION OF STATCOMs IN WESTERN REGION ER-II Headquarters Northern Region Strengthening _";>`__> ^" ` >> System strengthening in South >>> Substation works associated %%; Pooling station %%%+$@!@ System Strengthening associated with mundra UMPP\ ' @ ^^ NERSS-III S. No. 16 17 18 19 20 21 22 23 25 56.19 7.00 *+ 931.09 *=+ 17.75 $ 7.79 393.35 Annual Paln ^$ Proposed Outlay System strengthening System strengthening System strengthening System strengthening Objective/ Outcomes - - - - - - - - - - Stringing \ - - - - - - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - - - Process/ Timelines Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works /Supply/ Foundation/Tower erection Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Remarks 137 35.20 + ' @^ `__> Augmentation of transformation ""_@ Transmission System Associated |`<_ Torrent Power Limited Substation works asssociated `__>>^ POWERGRID RINL Structures Ltd POWERGRID NALCO Conductors Ltd. ; ]GRID Insulator FO NR Expansion __> Supply of CLR Insulators Sambhar Ultra Solar Power Plant ?%| <; |%$ Sub Total New Schemes 27 28 29 30 31 32 33 35 36 37 0.00 81.17 + 9.90 21.88 33.05 3.31 =+ 7.83 ' @^ `__> 26 Annual Paln ^$ Proposed Outlay Name of the Projects/Scheme/ Programme S. No. System strengthening Objective/ Outcomes 0 - - - - - - - - - - - - Stringing \ 0 - - - - - - - - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - - - - - Process/ Timelines Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Remarks 138 Transmission System for Start \ ^ Projects Transmission System for Farakka Stage-III Eastern Region System _>>__>> POWERGRID Sub-station works associated with Transmission Scheme for enabling import of NER/ER surplus power by NR !; @ GIS Pooling Station Near CHAMERA-II Southern Region System ____ <!" ;^` @ Immediate evacuation system for Nabinagar TPS <; _; ^ `__+$@ `\% around Part-II `__+$@ `\% around Part-III Eastern Region System _>__> >%^!%" " >% 2 3 5 6 7 8 9 10 11 12 13 C. Completed Schemes Name of the Projects/Scheme/ Programme 1 S. No. 6.30 10.15 3.85 + 0.08 112.00 3.70 0.30 0.07 0.01 Annual Paln ^$ Proposed Outlay System strengthening System strengthening Objective/ Outcomes - - - - - - - - - - - - - Stringing \ - - - - - - - - - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - - - - - - Process/ Timelines Project completed in Aug-13 Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Remarks 139 Name of the Projects/Scheme/ Programme Establishment of Pooling Sta %pur for IPP Generation Projects \ Transmission System for Parbati-III Northen Region System _`__ Eastern Region System _>__> \ ^ Transmission System Associated with Sasan UMPP Supplementry Transmission _; "%\ ^ Common system associated with ISGS projects in Krishnapatnam Area of Andhra Pradesh Integration of Pooling Stations in Chhattisgarh with central part of WR for IPP Generation Projects \ S. No. 15 16 17 18 19 20 21 22 9.06 61.08 3.39 5.65 9.79 1.15 16.26 7.70 30.29 Annual Paln ^$ Proposed Outlay Power Evacuation Power Evacuation Power Evacuation Power Evacuation Power Evacuation System strengthening System strengthening Power Evacuation Power Evacuation Objective/ Outcomes - - - - - - - - - Stringing \ - - - - - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - - Process/ Timelines Project completed ]"]! kept for balance payments Project completed ` ' Project completed ` ' Outlays kept for balance work Project completed in Dec’13. Outlays kept for balance works. Project completed in Oct-13 Project completed Remarks 140 6.30 623.81 20000 Supplementary TS of upcoming IPP in Chhattisgarh Transmisison System for connec' ^ ?;% Augmentation of Transformation \"` Sub Total New Schemes Total 29 30 $$ 2.20 28 = 2.55 Transmission System for Krishnapatnam UMPP -PART C1 Transmission System for Rampur 25 6.38 27 Northen Region System _`__ 299.68 Supplementary Transmission _; !!<_ ___> 23 Annual Paln ^$ Proposed Outlay 26 Name of the Projects/Scheme/ Programme S. No. Power Evacuation System strengthening Power Evacuation Power Evacuation Power Evacuation System strengthening System strengthening Objective/ Outcomes 0 - - - - - - - - Stringing \ 35 0 - - - - - - - - Transformer Erection ` #!!'bles FINAL - - - - - - - - Process/ Timelines Outlays kept for balance work Outlays kept for balance work Outlays kept for balance work Project completed ]" Project completed ]! kept for balance works. Project completed ` ']! kept for payments of conductor diverted for commissioning. Remarks Chapter-III Major Initiatives/Reforms & Policy Measures Power sector is important not only because it impacts the quality of life of population but also the growth and development of other sectors such as industry, agriculture, transport, health and education. Government of India has taken a number of policy initiatives which are expected to increase investment in power sector and attract private investors as well. Some of the major initiatives are as given below: A) Power Generation Sector (i) Accelerated capacity Addition Programme: <| ';" ! @ %!#!!" ;;;;% ` !!"" !"` ;%;% %!; @% \"%% *$"'% %>! $+#[%!\ ;; %%<;!< ~ >> ! "" %% ==+ #[% Planning Commission. Capacity addition of 20622.8 MW has been achieved against the target of 17956.3 MW for the year 2012-13. A Capacity addition of 17825.01MW "'% = <""%% += "" $" ;; %!!<";!' \"%% % ! = " constitutes 56.5 per cent of the target envisaged in the 12th Plan. (ii) Ultra Mega Power Projects The Government of India had launched an initiative for the development of coal%! }"""" < objective behind the initiative is to ensure cheaper tariffs utilizing economies of scale, catering to the need of a number of States and to mitigate the risk relating to tie up of land, fuel, water and other statutory clearances etc. The projects are awarded to the successful developers on the basis of tariff based competitive bidding route employing Super Critical Technology. To tie-up for necessary inputs and clearances such as provision of site, fuel through captive mining blocks, water and in- principle ' ;% "!" }""#"!!" ;_ !! %% ~"\ ~\?% %! " }" < _ ! ' "!" etc. are subsequently transferred to the successful developer. 141 ]!! %#% \ ' _ % UMPPs. These included four pithead sites in the States of Chhattisgarh, Jharkhand, %%%]%%#'" !_ %% Gujarat, Karnataka, Maharashtra and Tamil Nadu. Subsequently, some more states like Jharkhand, Tamil Nadu, Gujarat, Odisha and Andhra Pradesh etc. also requested for setting up of additional UMPPs in the "'^! % _!" underway. Four Ultra Mega Power Projects i.e. Sasan in Madhya Pradesh, Mundra in Gujarat, Krishnapatnam in Andhra Pradesh and Tilaiya in Jharkhand have already been % %#%%'! % }"% %'! ;%[=!!" ;; %% !""~' _[$$'" ;; %% one unit has been synchronised so far. Other awarded UMPPs are expected to come in 12th Plan (except last unit of Tilaiya UMPP, which is likely to come in 13th ! !#" % ! ;!^%!]%%\<;!`%% withdrawn. Afresh bid for both projects would be issued in 2015-16. \% % the captive coal blocks of the UMPP are in inviolate areas. RfQ for the project to % '%_^ ! "!" " !! "@!! "% Chhattisgarh UMPP or allocation of new coal blocks. % %#% % @%^} \%!<! ^%@" " ! ! " % `!%' !%" !%! " '%#% %% !]% @^@%#% ^ `%% %'!!@%#% \%| ' of Karnataka. The sites in Tamil Nadu and Gujarat for their second UMPPs and a site in Uttar Pradesh are being examined by CEA/PFC. Efforts are being made for selection of sites for remaining UMPPs. (iii) Mega Power Policy (a) * @? # *Z @ *: Ministry of %@ \ ! \ ! " ' " ! !@ !% #" _% ?@ \ ;; ? <; ®_?\?<« \ ! ; %%+$%%"%%? "? !@% to the old plant shall be automatically transferred to the new plant of nearest 142 supercritical capacity. If the capacity of the new supercritical plant is higher than the old plant, additional coal may be accorded priority subject to the availability " ! ;\ !>%?;%\>?! capacity of new supercritical plant has to be retired. Old plants can be clubbed together to achieve this minimum benchmark of 50% of proposed-supercritical capacity. (b) Expeditious resolution of issues relating to MoEF for thermal power projects: i. Due to persistent efforts made by MoP, Ministry of Environment and ~ ~; %#%%! %' !% '%]%%= """#" availability of non-forest land for compensatory afforestation from Chief Secretaries of States/UTs which have total forest land more than 33% of area instead of 50% area in order to permit taking up compensatory afforestation on degraded forest land to extent of twice the forest land being diverted for non-forest use. This will prevent time and cost overrun in timely commissioning of thermal power projects. ii. To quickly ramp-up coal production for enhancing power production in !" ~'%]%%*%"%%" one time capacity expansion proposals of existing coal mining projects with production capacity exceeding 20 MTPA, the Environment Assessment \ ;; \ ; % %!" " % [; !" hearing subject to the ceiling of additional production up to 6 MTPA if the transportation of additional production of coal is proposed by means of a conveyor and or rail transport. The above dispensation would be subject to " " ;!"' ;!"!"% as judged by the EAC. (c) Signing of Fuel Supply Agreements (FSAs) : <\\ ;; " ;"\\;!% %%%"' \ !\ !>%?;%\>? sign FSAs for a total capacity of 78000 MW, including tapering linkage which are likely to be commissioned by March, 2015. So far, CIL has signed FSAs for 161 Units for a capacity of 73,815 MW. (d) Project Monitoring Group in Cabinet Secretariat: Any Ministry/Department or any private entrepreneur can submit/upload their stalled investment projects involving the investment of Rs. 1000 Crore or more or a project that is considered to be critical, in the PMG portal of Cabinet Secretariat. Ministry of Power is taking up such stalled projects, for further monitoring by PMG in Cabinet Secretariat. Due to persistent efforts and follow up by Ministry of Power with concerned Ministries/ State Government, as on 01.01.2015, issues pertaining 143 to 99 projects having investment of more than Rs. four lakh crores have been resolved through PMG/CCI. (e) Automatic approval for FDI: ;" '! ^> ;% generation, transmission, and distribution in power sector without any upper ceiling on the quantum of investment. (iv) Faster Clearance for the Power Projects a) Implementation of North Karanpura Super Thermal Power Project by NTPC Govt. has accorded approval for setting up of the North Karanpura Super <;! !`_<$$`<\@%`<\ !"% % ^? "; % \ " \ }" = \ ;; ? " \]? \>? " ;;%% " ?]? " +*< ! % " !"! !" !!@ < <;%!%_?\?<;!% the committee decided that LOA quantity of 7.093 MTPA was worked out as per common norm / policy. The committee further decided that it shall be examined separately. NTPC has taken up the matter with CCL for early issuance of LOA. CCL is yet to issue LOA. Fuel transportation through waterways NTPC explored possibilities of coal transportation, particularly imported coal ' ! > # @% imported coal to Farakka station has started through National Waterways-1 which runs from Haldia to Allahabad in November 2013. b) Hydro Projects Worth 2500 MW accorded clearance Hydro projects worth 2500 MW across various states have been accorded clearance by the FAC of MoEF. The project include Tawang-II H.E. Project (800 "!%<>_@@; ["% `\%?++;"!% ["% _` < ` ! ^ % !% ? "" %% !% ! "!" %!@ @% ["%<\ "!"_^ % !%?<"!"'% for a long time. 144 (v) New Hydro policy India has an estimated hydro generating potential of about 1,50,000 MW of which =$+ %'! % !! | '; @ several initiatives to promote development of hydro power. In order to realize the full hydro potential, Govt. on 31.03.2008 has approved a New Hydro Policy. The new policy seeks to provide a level playing for public and private sectors, and also to balance the competing demands of various stake holder involved in the development of hydro power project. It extended the same dispensation to private sector hydro projects as is available to PSUs under the Tariff Policy of 2006 till }" !%#[%! the same manner as for PSU Projects under Section 62 of the Electricity Act 2003. In order to enable the project developers to recover such costs, the developer will !! % !! ;"! ^ \\\'" ;;%%" " !; % the year 2011. Accordingly, based on the aforesaid recommendations, the MoP '% ! ` %%=+ %% " exemption from tariff based competitive bidding for public as well as private sector #' % B) Power Transmission Sector (i) National Grid Generation capacities and demand points are unevenly distributed across the country due to various natural and historical factors. Furthermore, demand for % ; [ ' ! ""% % % seasonal variations. An integrated power transmission grid helps in evening out supply-demand mismatches. The existing inter-regional transmission capacity of ` !%% !!st"; (ii) Private sector participation in Transmission Promotion of competition in the electricity industry in India is one of the key " ; !"" " % % Guidelines for Encouraging Competition in Development of Transmission Projects %<^%\ ;'^%%|%! <; _'"$ ^ |%!;!% "% "! competition in the transmission sector through wide participation in providing transmission services and tariff determination through a process of tariff based competitive bidding. As envisaged in the Guidelines, Ministry of Power had constituted an Empowered \ ;;%"; ; _; ;\> ;\ ;\;;^% '\ ;; 145 representatives from the Ministry of Power, the Planning Commission, the CTU and two experts from the power sector (Empowered Committee is being re-constituted " ! \ ;; !"% `><> < Committee makes recommendations for development of inter-state transmission lines by the Private Sector on tariff based competitive bidding route. The Ministry of ! %_%%^%% ";_^ <; " ' !#" !%<; _'";<_ The Ministry of Power has appointed Power Finance Corporation Consulting Ltd. ~\\?%!!"#" \ <; }"\ ;?% \<\? ^% " \ % ^\ $ ; schemes are under implementation by the Transmission service providers selected through competitive bidding. In addition, bidding process for 7 transmission schemes is under progress. (iii) Leh-Kargil Transmission Line To improve power supply in the Leh-Kargil region and connect the Ladakh Region to the National Grid, the Govt is constructing a transmission system from Srinagar to Leh. This would ensure year-round availability of power to the Ladakh region. ~ ' $= " ;% % ; released to Power Grid Corporation of India Limited, implementation agency of this project. (iv) Comprehensive Scheme for strengthening of Transmission and Distribution in Arunachal Pradesh and Sikkim The scheme is conceived for the development of Intra-state transmission and distribution in Arunachal Pradesh and Sikkim and is being implemented through |%\ >%|\>?"\!<; ! the country, under Central Sector Plan Scheme of Ministry of Power. The scheme is '% " ;; %=; ";= (v) NER Power System Improvement Project for six North East States (viz. Assam, Manipur, Meghalaya, Mizoram, Nagaland and Tripura) for strengthening of intra-State transmission and Distribution network The scheme is conceived for strengthening of the Intra State Transmission and Distribution System for six States (Assam, Manipur, Meghalaya, Mizoram, Tripura %`!%<";;!;% |%\ >% |\>? \!<; ! " % \! _" !_"; " !%^@! % the budget of Ministry of Power on 50:50 basis except the component of capacity building for Rs.89 crore for which GoI will bear entirely. The scheme is envisaged to " ;; %=; ";= 146 (vi) Power Sector Support to Govt of NCT of Delhi In order to strengthen the intra-State Transmission system in Delhi, Ministry of Power has sanctioned the three transmission lines/sub-stations for implementation by Power Grid Corporation of India Limited on behalf of Delhi Transmission Limited. These lines/sub-stations are expected to be completed by May, 2015. C) Distribution Sector (i) Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY): Government of India has approved a new scheme "Deendayal Upadhyaya Gram }|'%]%%%"<!}'|% |;; %@ } || "; " !"% | ' of India in April 2005 for providing access to electricity to all households has been ;%%|_";!!"#" \ ; Under the new scheme, 60% of the Project cost will be extended by Govt. of India as Grant in respect of States other than special category (85% for the Special \ _ !! ` _ "!% _@@; ;"! %@%;; _"!\ _!! contributed through own sources by the State Govt./State Power Utility and the !" _"!\ _;% ? own sources by the State Govt./State Power Utility. Additional grant upto 15% (5% " _"!\ _" ' ! " ; !! provided by Govt. of India on achievement of prescribed milestones such as timely " ;! %" <\! ! '%_ Govt. < !! " ; ' "% % | "; "' ' }"' _ "!% "!% "!" ; the judicious rostering of supply to agricultural and uninterrupted quality power supply to non-agricultural consumers. _ % ; _ <; infrastrucuture in rural areas, including metering of Distribution Transformers/ feeders/consumers and !!"#" <!}'|%|;;%@ } || "; " !"% | ' >% ! providing access to electricity to all households has been subsumed under |_";" ; < ! ||"; %!!!"% %%| 147 (ii) Integrated Power Development Scheme (IPDS)/Restructured-APDRP: \\ '% >% '! ; _"; >_ ! ! $ " " "!% % " ; | '; >% < }"' "; ; % % @ ; % % ;" ; ' _ ! ! % >< !; % " % distribution network being undertaken under R-APDRP. <";!!;!;%#'%!" >_\]_%_| ';%!!"![+!!% adequate power supply in the urban areas. The scheme will also help in reduction <\ ! !; >< !% "" % ; improvement in billed energy based on metered consumption and improvement in " !!" #"" Funding pattern : | '; >% $= "!" _ " ; "!" _ ? ;~> "!" _ Additional grant equivalent to 50% of loan component (i.e. 15%, 5% for special " _!!! '%%}" ;! ~"\ ~\!!` %!" ! of the scheme. All Discoms including private sector Discoms and State Power ;!! #"!"%"; <"% '%"!" "; 31.07.2008 with total outlay of Rs.51,577 crore. The focus of the programme is on "! %; ! ;" ; <\ ! %" < "; " ; ^ ";%%"% !; ><!%; "'!!'#!!% system in all towns with population greater than 30,000as per 2001 census (10,000 _"!\ _'% ! " '%% programme. ! ' \" ^!% ! ! % development of franchises through Part-C of the scheme. Few pilot projects adopting innovations are also envisaged under Part-C. 148 %><!%; }" =" +_\ }" $" %*^ }" =" '" %!! The R-APDRP has now been subsumed in Integrated Power Development Scheme >_ < " ;;; }" !% " % !! ; from the funds available in the combined new scheme. (iii) Power System Development Fund (PSDF) scheme _~ _"; '% \ ! ~"! The scheme envisages strengthening of existing distribution and transmission infrastructure by part funding through Grants. The Scheme would not require any net budgetary support from MOP as the expenditure on the projects would be funded from the receipts accruing from the regulatory charges levied by Central Electricity ! \ ;; \\ (iv) National Electricity Fund (Interest Subsidy) Scheme Government of India has approved setting up of National Electricity Fund (Interest _% _"; '% % =$$ " loan disbursements against the distribution projects amounting to Rs. 25,000 crore '%%~ _ ! !" and private sector, to improve the distribution network. Under the scheme, interest subsidy is to be provided on loan taken by public and private power utilities in distribution sector for non- Rajiv Gandhi Grameen %@ } || % "% ""!% '! ; ; ;;";<" % eligibility are linked with reform measures taken by the states and the amount of interest subsidy is linked to progress achieved in reforms linked parameters (i.e. <\! %" %" '|"~ '!% %`~>_%";'" %_"! \ ~ "%_%_ _"!\ ~ "% _!!"#" \ ?%\%%% Nodal Agency to operationalize the programme under the guidance of Steering Committee constituted for the scheme. `~_\ ;;%~~ '% ! " ; " '%`~ D) Distribution Sector Reform Scheme for Financial Restructuring of State Owned Discoms : A scheme for Financial Restructuring of State Owned Discoms was formulated and 149 approved by the Government keeping in view of the declining operational performance % #"! ! _ " ; % ! % _ Discoms and ensure their long term viability, which have accumulated huge losses and unsustainable debt. The scheme contains measures to be taken by the State Discoms %_| '; "'#"! %"% support through a Transitional Finance Mechanism by Central Government. <_"; ~"!" _]%" ; #% Ministry of Power vide OM dated 05-10-2012 after CCEA approval and was effective from the date of issue. The Scheme was available to all participating State Owned " ;'"";!%! %"%#"!#" !! Salient features of the Scheme are as under: % ;!!_<? " @ '_| ';<!!#" '% % % Discoms to participating lenders, duly backed by State Govt. guarantee. Takeover of this liability by State Govt. from Discoms in the next 2-5 years by way of special securities and repayment and Interest payment to be done by State Govt. till the date of takeover. "!"_ <;? "%!! % '% moratorium on principal and the best possible terms for this restructuring to ensure viability of this effort. " < ""%!; ! "" ;% " " % measurable action by the Discoms/States to improve the operational performance of the distribution utilities. % ~ ; %! " ;;_% Central levels respectively have been formed. \! | ' !% '% "' ! '! %% !'% ""!%<\! %" %! }" "#%%%"!;; principal repayment by the State Govt. on the liability taken over by the State Govt. under the scheme. The objective of the proposed scheme was to enable the State Governments and the " ; "' #"! % % " ; in the State power sector which will be enabled by the lenders agreeing to restructure/ "%![ ;%^"%"%! % short term debt and securing the commitment of the State Government in the discharge of debt service obligation, the Discoms would be nursed back to health. Government >% !#";"; !%' 150 "'!#!!; ;% " % <["% " ; ; implementation of the scheme would be: '%" ; !%"_@ ' % debt, ^ #"!%"!% " _ '%" ;;"! " % " ; ' \ ! _| '; % ' % " ;; '#"" ' ""!<\! %" >_\] %% !"' from Central Govt. ' ! ! " '" '" ' |%!!; \_% ' ;!#! %% >_\]"" The Scheme of FRP is being implemented in Tamil Nadu, Rajasthan, Uttar Pradesh, @%^%%% [ 1. Energy Conservation Schemes (MOP) Energy conservation awareness, awards and painting competition The main objectives of the scheme are as follows: \ %%!\%" \ ;! %%; ""%%!%" " \ \%%" ; " ' % " " ' !" "% media for general public. _%\"^!%'! ; ;! \ ' training of school teachers, debates at degree college level and development of tip sheets. 151 ! \^** ? < %^ #""^' entrusted with the task of preparing the implementation plan for the NMEEE % "! "%;@ #"" ! "@';< +=!@! "' ;!! !'! !'" !% !; %" ! ["%' %%""%% '$ " '% ! `>>! `! !! ' "%#"" %% ;; #""%< Perform, Achieve and Trade (PAT): A market based mechanism to " " "' ; '; #"" energy-intensive large industries and to save 15 mtoe by year 2018-19. <% '"#" !%"! "+= %\ ;\=%!" '%#% % #% ;% " ""! <"; "!!;!;%% %;% 6.686 MTOE, has been targeted in 3 years from these energy intensive industries. ^_`* ^` Accelerating the #"!"%%" '' measures to make the products more affordable and to avoid capacity addition of 1250 MW. " <= <= Creation of platform to ; #" #"" }"!!" " future energy savings. % <@_ %' < % < ' @ %'! #"! ; ; #"""!% ''#"!;% !";!@ ! @ | ~% #"" |~ % \!~% #""\~!" "; #"" % % '" !% ;% _% ;_" 1.2 Bachat Lamp Yojana > ! ^" ?; } "; !! scheme by continued engagement with the state electricity distribution " ;%;!% ;! #" ^? ;; "' !; \~?!; 152 %;;%"^?;% % '!% %"! \ }""'\£ ! ^ !! ! " "! ! !"#" \ \ % ? ! % || _";<""!_ !% '%%^ #!""! "#" !@ "; ? ! % "; ^ !%! '% %#" '"'% under the scheme. < }"%' %%| \" !%||"; is about 556 MW with the budget approval of Rs.22.50 crore. £_}" ;@" !{ [ = SEEP also forms a part of MTEE initiative under NMEEE. SEEP is a program %% ""!% ;@ ; #" !" '% #"! ;! ''! ""! ' _ "!; ! #""!'!" !! ; #";@' '%; % "' ;" ;"#"_%!! the same at a discounted price. ~ >>!^ %_ \!~' ! that appliances like ceiling fans which has an average life of over 15 years are being deployed in the economy in huge volumes (of the tune of 30-35 ;!! !! < ' % #"" ! "@% " ; ! this program aims to stimulate technological upgradation and their accelerated introduction by manufacturers through an incentive mechanism which would ; ' ;" ;" " #" % !! competitive price in a highly price sensitive fans market. The targeted energy saving is 0.54 BU in the year 2016-17. Financial support approved for the proposed activities is Rs.100 crores. 2. *?* The schemes envisage realization savings through strengthening of the schemes in industrial, commercial, residential and agriculture sectors as well as expanding and reaching out to new areas. The proposed schemes in 12th Plan are: 153 1.1 Standards, Codes & Labelling for Appliances, Buildings & Energy *? 1.1.1 Standards & Labeling Scheme > " [ !" _? !! "!% ! new equipment and appliances in the programme in 12th plan. Fuel " ; %% #%!! "!!" '%% the plan. 1.1.2 Energy Conservation Building Codes For new commercial complexes and existing buildings, 75 % of new commercial buildings constructed during the plan would be compliant \^\ _;!! [ !% !% %" " ; % # !!!{ *?* EFC Committee advised to take support through the National Clean ~%`\~% % " "" %! ;; '% ;|^_ ! [?[%|* 1.2.1 SDA Strengthening Scheme (SDA) The thrust of the SDA program during the plan will be on strengthening the 35 SDAs which would enable them to implement various programs %"'%^ _;!' 1.2.2 Contribution to State Energy Conservation Fund (SECF) Set up for implementation of various energy conservation activities. 1.2.3 HRD Programme "' !% ; "!! #"" % sustainability together. 1.3 Demand Side Management (Agriculture, Municipal & SME) !{! [^**[^ ! _!! " %" "#" " #"" and technology up-gradation through facilitation of implementation of 154 DPRs and innovative Financial Schemes for adoption of EE Technologies in the SMEs. 1.3.2 Agriculture DSM Agriculture demand side scheme would be strengthening further. The objective of the Agriculture Demand Side Management scheme is to "! '; " % #" pumps and implement few pilot projects, which in result may act as a "! ;;@ #"; 1.3.3 Municipal DSM Municipal demand side scheme would be strengthening further. The " }"' }" ; ' '!!#"" ?^ " " !% !% ! ' !"" " ; !" %" ' ?^ 1.3.4 Capacity Building of DISCOMS Capacity building of DISCOMs programme would help DISCOMs for carrying out load management programme, energy conservation programme, development of DSM action plan and implementation of DSM activities in their respective areas. The objective is to implement ;%_%;_ ;;"' reducing peak electricity demand so that utility can delay building further capacity. 1.4 EAP Scheme (Ongoing) <; }"' "; "%;% #"" ';_% !%"" """ ;;"!#" (F) Electricity Act and Policy i) Amendment in Electricity Act, 2003 The Union Cabinet has approved the proposal for amendment in Electricity Act, 2003 on 10th";" %!"";%;^!! ~ !"" ;%; ^!! %"% ? @ _ *<;%;!" ; !" " " ; !"!!" "; !" ]! ]% !" |%_%_" < !"" ;%; ^!! % !; Committee on Energy for examination. 155 ii) Amendment proposed in Tariff Policy: < < !" #% \! | '; % " Electricity Act, 2003 on 6th January, 2006 and has been amended on 31st March, 2008, 20th January, 2011 and 8th July, 2011. ^% " ;;% @ | % " ;; "'% thereafter from various stakeholders, suitable amendments have been proposed in the Tariff Policy. The draft Cabinet Note was circulated for inter-ministerial " ! " ;; ] " ;; "'% from Ministries/Departments the draft Cabinet Note and instructions of Cabinet _"'%%\` %#! ;! consultation. iii) Short Term Power Trading and Power Exchanges: a) Electricity Transacted through Trading Licensees < \! !"" ! \ ;; \\ Inter-State Trading Licenses. The Commission has so far granted 71 inter-state %!" "+["] %!" ' %@ % !"" < ' !; price and trading margin of the electricity traded by these licensed inter-state traders are as under: Period Volume of Electricity Average Price of Electricity Traded transacted (Billion Units) through Licensees (Rs./KWh) 2009-10 26.72 5.26 2010-11 27.70 +* 2011-12 = = 2012-13 36.12 35.11 * " 26.50 b) Electricity Transacted through Power Exchanges There are two power exchanges operating in the country namely the Indian ["?%>`!% [">%?%>? Mumbai. These are electronic platforms where price discovery happens through ; " ;' %% < " ! ; " 156 the demand and supply in the short term. The various products traded in the exchanges are day ahead contracts, weekly contracts, renewable energy "#"%" "%%%" "" " exchanges have also provided an impetus to open access. More than 2000 open access consumers are using the power exchange for purchase of power regularly now. These open access consumers set is constituted by captive power plants, industrial consumers, independent power producers, ISGS/CGS, private distribution licensees, state utilities etc. Volume and Price of Electricity Transacted through Power Exchanges (IEX & PXIL) Year Price of Electricity Transacted Volume of Electricity through Power Exchanges (Rs./ transacted (Billion Units) KWh) 2009-10 7.19 *$ 2010-11 15.52 + 2011-12 3.57 2012-13 3.67 30.67 2.90 " 3.70 157 Chapter-IV Review of Performance & Highlights of Schemes & Projects This Chapter gives the review and highlights of the various projects and schemes of the Ministry of Power under the following headings: Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) : The new Flagship Scheme !%|; }|which subsumes erstwhile Rajiv |%|;%@ }|| Integrated Power Development Scheme (IPDS) : This is the new scheme which subsumes the erstwhile Re-structured Accelerated Power Development and Reforms Pro;; Generation & capacity addition Transmission *'} $ Other schemes < ;" ";% }";!;%\>`<>^%\ '\>_!% ;"! ;"; are as under: Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) : Deen Dayal Upadhyaya |; }|";!!' !! " ; _ "!% "!%"!}%" ! "!! "!!" ;!% _%; ; % " !"!%; % ;%" ; !!"#" " ;! !%% %!|| th and 13th Plans. <"; ||!!;%";!!"#" " ; °" ; ± ' 158 Under the new scheme, 60% of the Project cost will be extended by Govt. of India as Grant in respect of States other than special category (85% for the Special Category _!!` _"!%_@@;;"!%@%;; _"!\ _!!" % own sources by the State Govt./State Power Utility and the balance 30% (10% for Spe"!\ _;% ? "_| ' _ !%% ! " _"!\ _ conversion of 50% of loan component will be provided by Govt. of India on achievement "%;! ";!" ;! %" <\! release of revenue subsidy by State Govt. The new scheme besides the subsumed " ; !||!!'; " ; ;!~%_ for Agricultural and strengthening of sub-transmission and distribution infrastructure in rural areas. <";!'"';%!;%"; !"#" =* !"#% '!! >' !"#" $ '!!%! !""" " +?@^? !% !"#" $!"#%'!!' !"#" *$+!!!"#"%'!!%! !""" " !@^?" " '" ;!%%" ; scheme, projects costing Rs.8853 crore has been sanctioned by Monitoring Committee. The details are at Annexure-I (2) Integrated Power Development Scheme (IPDS) : Integrated Power Development _";>_";!!' !! " ; _ ; %% @ % ;%" ; >< !; % " % % @ completion of the targets laid down under erstwhile R-APDRP for 12th and 13th Plans. The scheme of R-APDRP will get subsumed in this scheme as a separate component relating to IT enablement of distribution sector and strengthening of distribution network. The objective of the R-APDRP programme is to facilitate State Power Utilities to reduce !'! <\! < ;; ;} " ; includes projects for establishment of Information Technology based energy accounting %%;!% #! '#!!<\! !'! }"^'% @';!% to reduction in loss level. The programme size is Rs.51,577 crore. The outlay for Part-A ><!%;%_\" % ^" <"'; ";' Annexure-II. 159 %><!%; }" =" + _\ }" $ " % * ^ }" = " ' " % !! }" " Rs.3268.33 crore have been sanctioned by the Monitoring Committee. (3) Generation & capacity addition 3.1 XII-Plan Targets and Achievements Sector-wise Details (Figures in MW) Sector Target for XII Plan Target for 2014-15 Commissioned (Up to 31.12.2014) Central State Private 26,182 15,530 $= 6,980.0 5,696.0 2,299.3 2,676.1 6,635.0 Total 88,537 17,830.3 $£ £"!%"!""" ;; % < ''< !! \SUs are as under:Sl. No. CPSU Generation Target (MU) Generation upto 31.12.2014 (MU) 1. NTPC Ltd. 235577 179861.56 2. NHPC Ltd. 20770 19086.33 3. NEEPCO $* 3537.00 _`?% 7800 7383.71 5. THDC India Ltd. 3952 < @ " ; '²' ! spect of NTPC Ltd., NHPC Ltd., NEEPCO, THDC India Ltd. and SJVN Ltd. are given at Annexure-III, IV, V, VI and VII respectively. (4) Transmission ]|>%~ st";" ;; % $+=""@; ; !% $$ ; "" addition. 160 +""@;% ;" ` % ~]|>"'% *+""@;%+` former erections. The details are at Annexure-VIII. ~ *'} 5.1 Energy Conservation Awards 2014 One of the voluntary innovative schemes, initiated by the Government of India, Ministry of Power, to promote energy conservation has been the Energy Conservation %^" %\ ' %"; of Power. These annual awards recognize innovation and achievements in energy conservation by the Industries, buildings, hotels, hospitals, railways, state designated agencies, ' ;" ^!!%!";"!%;! power station and also raise awareness that energy conservation plays a big part in India’s response to reducing global warming through energy savings. The Awards ' #;";**""!% ‘National Energy Conservation Day’ throughout the country. The responses among the industrial and commercial units have become very encouraging as is evident from the increasing participation level (from 123 in 1999 The Award Scheme has motivated the participating units to undertake serious '%' ;<" \% have collectively invested ` 9091 crores in energy conservation measures, and achieved a monetary savings of `=+" !<"' also saved electrical energy of 5197 Million kWh, which is equivalent to the energy generated form a 751 MW thermal power station. In other words, these participating units have avoided the installation of power generating capacity equivalent to 751 ;! " !% '% to meet the power demand of these units 5.2 Painting Competition on Energy Conservation 2014 %^ #""'%@` !\; \ ' %";\ ; Energy Conservation at School and State level was executed. In order to strengthen the campaign, higher classes of 7th, 8th and 9th standards were also included ; %%% ["! th, 5th and 6th Standards. The ` !\ ; \ ' %"cess. Across the country, about 60.17 lakhs students from all over the country have participated. This participation was about 33% higher than that in the previous year. 161 5.3 \^** ? \^ Major Achievements: x _"#" \ ; < += \ ; = %! " '%% #% th March, 2012. The scheme became mandatory from 1st April, 2012. x The total national target of energy saving to the tune of 6.686 million tons of oil equivalent has been kept in the 1st PAT cycle which is expected to be achieved x _" _"#"~ ;! ;! _" "#" ` ;! ~" ;!; %'#" process has been prepared. x " "#" ; =" '%'! %` ;! % "uments with examples for easy application of normalization factors by DCs have been developed for 8 sectors. x %'#" " ! !!=" '%'! %%%#! x Process of accreditation of Energy Auditors who will be engaged to execute the " \ ;"%% +*""%%% !%^ x < #" @ ""!! %!! ' the country to disseminate the rules as well as the methodology of the PAT scheme. x 16 nos of workshops were conducted to educate and inform DCs about the " "#" ;% ;! " x Several rounds of visits were made to representative DCs of sector for capacity building of manpower engaged with energy management. x % ~ % ^ <\ >% ?% _>^>_^\^@<\!%>~\>?% ; #" #"" }" x %_#"; ;"!'%#% #!" % % x Ministry of Power has approved rules for Partial Risk Guarantee Fund for Ener#""|~%\!~% #""\~!%'%~\ <!!! |~ %\~''% #" 162 x >|~_' \ ;;" %%%\~ ^ % < \~<" % x In PRGFEE, two meetings of Supervisory Committee have been held and rules |~''% #" <% " Implementing Agency for PRGFEE has been completed where bid from the consortium of REC, RECPDCL and EESL has been received. x %\~^ % < \~<" % <\~!''% #" <% " ~% \~% x Under EEFP, two conferences for the stakeholders were organized in Pune and Chandigarh with the support of SDAs in Maharashtra and Punjab. Two capacity building workshops were also organized in Delhi and Mumbai. Training ; %! #"! ' %'! % ^ @! ª_"" }"#"%>%%% _>^>%!!!%' 5.4 Bachat Lamp Yojana (BLY) %^? ;; %#" " ' "'% # % ; }" has been completed. Energy Saving Achieved ~ \% 5197 Million Units have been achieved through National Energy Conservation Awards, which is equivalent to 751 MW of avoided electricity generation. ~!~ [?* 5.5.1 Standards & Labeling Scheme x Upgradation of standard for room air conditioner and frost free refrig ; x Upgradation of standard for LPG stoves, electric water heater and " ! < x ` #" !" ; %% x Technical committee meetings conducted for inverter air conditioner. Draft Schedule is under preparation. 163 5.5.2 5.5.3 x Labeling program launched for DG sets, DG pump sets and inverters. x %" !< !<%'! % !" "! _? ;; x #" %%! ;@" ! < !"" % %" " ! ;% labeled appliance is sent to MoP for approval. x RfP issued for empanelment of laboratories for check testing. x \! ! _#" !" ! ;_% ; ""!!" ;!% Energy Conservation Building Codes (ECBC) (2014-15) x % \^\ + <""! " ;; \^\ " % ;%; x _ @ #%\^\ x < _" % % \^\ ;; \^\ !!%`><\<;%%%>>>< Hyderabad. x Initiated the process of performance enhancement of Shram Shakti ^' ;" "; }" } ^' completed. x #"|%! ! %!^!% developed and released. x Star rating scheme was developed for hospital buildings. x ' \^\ ;; ' conducted at Dehradun, Gurgaon, Lucknow, Patna, Odisha, Raipur, %%;_`@% x % ;@ % % % ! #" building material was developed. *? *[* EFC Committee advised to take support through the National Clean Ener~%`\~% % " "" %! ;; '% ;|^_ 164 5.5.4 [?[%|* 5.5.4.1. SDA Strengthening Scheme (SDA) x Three national level workshop involving all the SDAs held at New Delhi, Jaipur and Ahmedabad x 2 regional, meetings conducted in Guwahati and Goa x EFC memo for the scheme approved. x !; _; x The following achievements are reported by the SDAs: _""!" ;; ?!!\; Successful commissioning of 15 demonstration projects. 30 Workshops/training programmes will be organized by the SDAs for the EMs, EAs and other stake holders. !" "; #"" workshops / training programmes, database up gradation etc. conducted by al SDAs. 5.5.4.2. Contribution to SECF 5.5.5 x ;;;%' #%_\~ x State Govt. of Goa, Gujarat, Maharashtra, Jharkhand, Madhya Pradesh and Puducherry has provided the matching contribution of Rs. 2 crores to SECF. Demand Side Management (Agriculture, Municipal & SME) 5.5.5.1 [^**[^ ! x ;!; " ^` ! ;; #""_" ;!% !!#'" "';!!%^ x " !<[!"!%?%~ "!" ;!%? >% " " "'?%~ %!<[!"! x >" % " @ %!<[!"!ter with USAID on 12th 165 x ;!; ! "! '" '% ^"@ "! through open advertisement process completed. x Short listing process of applications received from units in Ludhiana ~ "!'% %'; ;!;ing 20 technology demonstration projects is being carried out by com; _>?% " ^ x Letter of support for carrying out technology demonstration projects "'%^ ;_ %[ " " through MSME-DI Thrissur to initiate implementation of technology %; }" "_ %"! 5.5.5.2 Agriculture DSM x ? ;>_\] "!!! ' ;% #" %;% '!# #"!" % ;!;!!; x Five states i.e. Karnataka, Andhra Pradesh, Uttrakhand, Uttar Pradesh and Chhattisgarh submit their willingness to participate in AgDSM scheme. x ;!% #"! >_\] %";!; %%>! % x Assignment for revalidation of two existing DPRs prepared at A.P and Rajasthan DISCOMs is completed. Implementation of pilot project is under consideration in A.P. x < !*#";!"%%; % #_ ! }" ;!;% _ ! ~ ;!% #" 2209 pumpsets replaced was submitted and second year testing of pumpsets is being carried out at project site in Solapur, Maharashtra. x Contract between Chamundeshwari Electricity Supply Co. Ltd (DIS\] @ % _? % ;!; AgDSM DPR prepared in Mandya District of Karnataka. x ~ ;!; ! #"" }"!"! and Rural Drinking water pumping systems, ten states namely Guja@%%^!;"! Pradesh, Chhattisgarh, Mizoram and Punjab submitted proposals. 166 x Funds are released to six states for carrying out feasibility study and ;!; #%; }"!"!%!@ing water pumping systems. x ! ;!; #"cy projects in Public Health and Rural Drinking water pumping systems for selected projects is in progress. 5.5.5.3 Municipal DSM x One day interactive meeting cum workshops were held in 13 states ;!; % >! ? "!^ %?^ x ~%!% $_ ;!; ! }"gagement of technical experts. x State level steering committees are formed in 11 states to facilitate the implementation of DPRs. x Letters were sent to 60 ULbs to select 20 water bodies for carrying out Investment Grade Energy Audits. x < ' !"% ?^ ;!; %%>! % 5.5.5.4 Capacity building of DISCOMS x 30 DISCOMs have been selected based on the criteria developed by ^ x MoU has been signed with 30 selected DISCOMs. x DSM cell has been established in 26 DISCOMs under this programme. x Two DSM experts provided to each DISCOM for providing manpower support. x Load research activity is ongoing in all DISCOMs. x Creation of Master Trainers: Training needs Assessment has been completed for training needs of each DISCOM. x 5 more new DISCOMs are added under this programme. x _! #%_ 167 5.5.6 EAP Schemes - BEE-GEF-WB-MSME Project x As part of Awareness and Outreach efforts, the major activities performed are as follows: ~'""! @ "!'% %'! ; Five equipment based documentaries covering boilers in chemical, Induction furnaces in Foundries, Fuel switch option in forging "|%\ ; Development of posters to address awareness and behavioural issues }"`? x SMS campaign to inform and motivate MSMEs for Energy #"" !%; Inter-cluster Knowledge exchange programme '! ; "% x Demonstration of Rotary vacuum dryer as an EE option for Hot air Trey Dryers in Chemical industry in under implementation. x On- site Training programmes for Foundry and Forging cluster. x Study to “Evaluate and demonstrate the Economic Losses due % ?< % ^ "" Rewinding in MSMEs”. x Deliberation with agencies for demonstration of EE technologies Chemical and Forging clusters. x ! ;; "\;"!` %~ %"!` x 3 Hands-on Training programmes at Centre of Excellence for Training #""\ (6) Other Schemes : 6.1 Capacity Building & Programmes Assessment: <"; ;; }"%" ! #168 !%!'!"! %"'; in respect of Ministry of Power Secretariat and the Central Electricity Authority are indicated at Annexure-IX and Annexure - X respectively. 6.2 Comprehensive Award Scheme Details in respect of Comprehensive Award Scheme are provided in Annexure-XI. 6.3 !" <; _";<; ? ;_nagar to Leh via Kargil, Improvement of Power System Project in six North Eastern _ ["!%"! % _@@; % _ <; _;_ "!%_@@;% _" _ `\< !'Annexure-XII. 169 170 RE Component of | (erstwhile || 2 1 1 Name of Scheme/ Programme Sr. No. Electrifying all villages and providing access to electricity to all rural households. 3 Objective/ Outcome NonPlan ^%get * Crore (Revised to Rs. 2886.38 \ !^% ]! Complementary Ex^%getary Resources '%ing free electricity connections to 15 lakhs ^? !"#" of 15000 villages 5 #! Deliverables/Physical Outputs !"#" $ !"#% '!! ' !"#" *$+ !! !"#"% '!! and release of electricity con" !@ ^? " nections have been completed. Rs. 2817. 72 crore subsidy has been released by MoP. ";;!' achievement is 1.09 Un-elec#% '!! ' !"#" !@ !! !"#"%'!!%! of electricity connections to \ ^? " " < % * crore is being revised to Rs.2886.38 crore. ! * ! > ! > + > ! >> % + >> ! projects have been sanctioned for execution. These }" " ' !"#" ?@ !"#% '!! ' !"#" of 6.02 lakh partially electri#% '!! % '% !"" " " \ ^? !% ;! The projects are being implemented throughout the country. Statutory clearances like Forest, Railway, dif#"! !! rain, etc. are impeding the programme. Will facilitate overall rural development, employment generation and poverty alleviation The cumula' ^ Nirman targets upto March, 2012 is to electrify One lakh un-electri#% '!! and provide free connections to 1.75 " ^? households. This target has been achieved by November, 2011 Further, there can be delay in the programme due to unexpected events, natural calamaties,etc. 8 "'; 8 Remarks/risk Factors 7 Projected Outcomes " 6 Processes/ Timelines !%|; }|!|| "'; Annexure-I 171 1 Restructured accelerated Power Development and Reforms Programme [Sl. No. 2 of MoP Schemes] now subsumed in IPDS Name Of Scheme/ Programme NonPlan Budget NIL Attainment of Reliable 'able baseline data of energy & revenue and AT&C Loss reduction on sustained basis Objective/ Outcome Rs. 144.50 Cr is allocated under Part-C Rs. 1261.04 Crore [Rs.1116.54 Crore as Loan to PFC for APDRP] NIL Plan Budget Complime ntary Extra Budgetary Resources Outlay 2014-15 Utilize Rs.144.50 Cr. As Grant under Part-C (iii)Disburse Rs.836 crore under R-APDRP Part-B (ii)Disburse Rs.119 crore under R-APDRP PartA(SCADA) (i)Disburse Rs.161.54 Crore under R-APDRP Part-A(IT) Disburse budget allocation of Rs.1116.54 crore as per details provided below: "#$ Deliverables Physical Outputs Implementation of projects sanctioned under Part-A & Part-B of R-APDRP . After implementation of Part-A(IT) in the project area, state power utilities should be able to achieve reliable & veri##* data & hence locate AT&C Loss pockets & further contain them through technical & managerial interventions. Implementation of Part-B shall enable reduction of AT&C losses through technical interventions. The focus of Part-B is AT&C loss recuction to below 15% in project areas. Projected Outcomes 5 Years from date of sanction for Part-A (IT), PartA(SCADA) & Part-B. Further, Five years of AT&C loss monitoring by TPIEA-EA @?* starting an year after establishment of PartA(IT) system Process Timelines Integrated Power Development Scheme (erstwhile R-APDRP) Achievements upto 31.12.2014 The success of the scheme will depend on smooth & timely implementation of the projects under Part-A & Part-B by State Utilities in accordance with R-APDRP guidelines for reduction in AT&C losses on sustainable basis. Remarks/ Risk Factors Utilization of Rs.2.29 Cr. made under Part-C Disbursement of Rs.505.98 crore made as per details provided below: -Rs.209.17 Crore made under PartA(IT) -Rs. 8.69 crore under PartA(SCADA) & -Rs. 288.12 crore under Part-B It is likely that entire RE of Rs.595.26 Cr.shall be disbursed in FY 14-15. Disbursement of Rs.85.04 Crore made under PartA(IT) Disbursement of Rs. 110.85 Cr. Made under PartA(SCADA) Disbursement of Rs. 699.51 Cr. Made under Part-B. Achievements Upto 31-12-2014 Annexure-II 172 2 Ongoing Schemes Koldam ^> < 'gad Mauda -I ^ ^>> Rihand III %"!> Singraulli Small hydro 1 i 1 2 3 5 6 7 8 9 Sl. Name of Scheme / No. Programme/Project Additon of 1000 MW of generation Capacity Additon of 1320 MW of generation Capacity Additon of 750 MW of generation Capacity Additon of 1000 MW of generation Capacity Addition of 520 MW of generation capacity Addition of 1980 MW of generation Capacity Addition of 800 MW of generation capacity 3 Objective Outcome 15.70 388.23 $*= 788.20 230.92 + 801.55 = 5 10.27 Commissioning + - 161.02 - - - - * = Readiness of \ !< 725.08 ^ !! up $ - 02/15 01/15 03/15 6 $+ Readiness of Ash Water Pump House ++ - ^" "ing 20000 cum 557.72 Unit-2 TG box up = Commissioning of 2 units $ = $ 7 !^% Act Exp #!!'- Processes Achievements ^ " erables/Physical /Timelines " ! Milestones Outlay 2014-15 NTPC Limited Achievements upto 31.12.2014 Commissioned in Commissioned in Commissioned in Achieved in Jan-15 Now ant in Apr -15 Expected by Mar-15 8 Remarks (Rs. in crore) Annexure-III 173 Kudgi, Karnataka %"! M.P 13 Mauda II , Maharashtra 11 12 Solapur , Maharashtra 2 10 1 Sl. Name of Scheme / No. Programme/Project Additon of 500 MW generation Capacity %% generation Capacity Additon of 1320 MW of generation Capacity Additon of 1320 MW of generation Capacity 3 Objective Outcome 809.68 1555.16 1553.72 5 _ " denser erection % \; shell concreting completion 01/15 + $ \; Shell completion = <|" start + \ ;! of ceiling girder erection 02/15 Completion of chimney shell + 02/15 \ % erection start 2595.11 <|" start 02/15 \;~! Can completion 996.39 <|" start 02/15 6 <|"@ casting 1236.15 <"tion start = * $ $ + 7 !^% Act Exp #!!'- Processes Achievements " ! ^ " erables/Physical /Timelines Milestones Outlay 2014-15 Now ant. in May -15 Achieved in Jan-15 Achieved in Jan-15 8 Remarks 174 Lara , Chattisgarh Unchahar Solar Ramagundam Solar 17 18 |% 15 16 Lata Tapovan 2 1 Sl. Name of Scheme / No. Programme/Project Additon of 1600 MW of generation Capacity 3 Objective Outcome 7.03 6.50 + 926.58 150.07 5 8.98 - - - - \ ;;"ment of TG Raft concreting \ ;! of ceiling girder erection + Commencement <| Concreting 02/15 ^ !"tion start 1329.59 \ ;;"; ^ ! erection * 01/15 6 773.28 ^ !"tion Start 8.63 Main Access Tunnel to Power House completion $ + $ 7 !^% Act Exp #!!'- Processes Achievements " ! ^ " erables/Physical /Timelines Milestones Outlay 2014-15 Commissioned in Commissioned in Work stopped since % to Hon’ble Supreme Court order 8 Remarks 175 Faridabad Solar Rajgarh Solar "> Singraulli Solar 20 21 22 23 New Projects Darlipalli , Orissa Tanda II , U.P Renewable Energy Schemes ^ North Karanpura, Jharkhand Khargone ^! ii 1 2 3 5 6 7 _ !] ing projects Talcher Solar 2 19 1 Sl. Name of Scheme / No. Programme/Project Additon of 1320 MW generation Capacity Additon of 1600 MW of generation Capacity 3 Objective Outcome 110.00 385.00 750.00 10.00 5.00 + 100.00 $=$= 30.00 * 100.25 5.00 $ - - - - - 5 55.52 ** - - Commencement of site enabling works U1 =$ - 0.00 - *= Commencement of site enabling works U1 * Commencement of site enabling works U1 + 58.62 82.26 7.59 - - = - - = - - - - - 6 = 7 !^% Act Exp #!!'- Processes Achievements " ! ^ " erables/Physical /Timelines Milestones Outlay 2014-15 Commissioned in Commissioned in Commissioned in 8 Remarks 176 Other New Projects 9 Renovation and Modernisation Other Miscellaneous Schemes iv v Grand Total ( i. to v) Coal Mining iii _ !` Projects Rammam, West ^! 2 8 1 Sl. Name of Scheme / No. Programme/Project 3 Objective Outcome 22400.00 1383.85 1870.72 2037.19 177.19 25.00 5 13448.88 883.65 852.61 926.38 15.10 - - - - 1.10 Main Civil Packages (Part <¥ % - 6 7 !^% Act Exp #!!'- Processes Achievements " ! ^ " erables/Physical /Timelines Milestones Outlay 2014-15 8 Remarks 177 * + Addition of 132 MW Capacity Addition of "" Addition of 520 MW capacity Teesta Low Dam Project-III Uri-II Parbati H. E. Project stage -III 8 9 112.82 7 * %% MW capacity `; ^ 6 13.89 %% MW Capacity Chutak 5 67.31 Addition of 231 MW Capacity Chamera-III 0.00 Addition of 120 MW Capacity 0.00 Addition of 280 MW Capacity Sewa-II Dhauliganga 2 $ 4 IEBR Addition of 390 MW Capacity 3 Sub Debt Annual Plan 2014-15 Proposed 3 Dulhasti Commissioned Schemes A 1 2 Objective/ Outcome 1 Name of Sl. Schemes / No. programmes / Projects Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. March’15 Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 7 Payment of liabilities and balance minor works. 6 Process/ Timelines Mar’15 Targets Projected Outcomes Payment of liabilities and balance minor works. Payment of liabilities and balance minor works. 5 Physical Activity "#'#*$=?* Output NHPC LIMITED Achievements upto 31.12.2014 - 8 Remarks/ Risk factors Annexure - IV 178 Teesta Low Dam }"> 1 Addition of 800 MW capacity Addition of 2000 MW capacity Parbati H. E. Project stage -II Subansiri Lower H. E. Project 2 3 Addition of 160MW capacity Scheme Under Construction B 3 2 Objective/ Outcome 1 Name of Sl. Schemes / No. programmes / Projects Sub Debt 988.58 699.80 151.99 4 IEBR Annual Plan 2014-15 Proposed 100% \ ;; 217 m *; 2271 m 2539 m Under ground excavation work %_< ^"_<< Invert lining in HRT ]'!<_< Concerting in Power House Area _! 91829 Cum 106 m $< Completion ;! _ Supply and Injection of \; ; Underground works 362 m 6500 Cum Completion of excavation of Jiwa Feeder Tunnel from Sainj Side. Power House concreting <| ?+$!! Completion 100% \ ;; Hydro - mechanical works in Dam Structure (erection %!_ ! | 100% 25% Placement of RCC \ ;; 100% Targets Erection of Draft Tube Gate 5 Physical Activity "#'#*$=?* Output Anticipated Project Completion by Jun-18 Anticipated Project Completion, July 2018 Anticipated Project Completion Apr’2015 6 Projected Outcomes Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 ` ' Feb’15 Mar’15 Mar’2015 Jan’2015 Dec’2015 ` ' 7 Process/ Timelines All the civil works are stopped by the contractor since 20.03.2013 due to #"!"" 8 Remarks/ Risk factors 179 New Schemes !^!_ 1A 1 Kishanganga C. 2 1 Name of Sl. Schemes / No. programmes / Projects Addition of 195 MW capacity 231.69 $*= Addition of 330 MW Capacity IEBR 4 Sub Debt 3 Objective/ Outcome Annual Plan 2014-15 Proposed _ 80m 180m _ Jan.’15 Completion of Excavation <<^ Surge Shaft Lining during the year Erection of Steel Liner in Pressure Shaft Upper Limb during the year Extension of EOT Crane in Unit-1 Erection of Pit Liner in Unit-1 Erection of Pit Liner in Unit-2 -Establishment etc . '" ! @ -Part payment for RR plan Works, ^!% " ;;" @ < ; < Const.equp. Advance -Payment for Mob. Advance, 2200m2 Targets Construction of Cut off Wall during the year 5 Physical Activity "#'#*$=?* Output Obtaining CCEA sanction for start of Major works. Anticipated Project Completion date Nov.’2016 6 Projected Outcomes Mar.’15 Jan.’15 _ Mar.’15 Mar.’15 _ Mar.’15 7 Process/ Timelines >^ " ;;%ed with rider the construction may be start only after clearance from Hon. Supreme Court. The Expert ^ %;% its report to MOE F $< case was heard in the Supreme Court = % it is listed for hear + Agitation of land ~ militancy and Law % ; Kashmir valley 8 Remarks/ Risk factors 180 !^!_>> !^!_> ^ 2 3 2 1 Name of Sl. Schemes / No. programmes / Projects Addition of 530 MW capacity Addition of 320 MW capacity 3 Objective/ Outcome Sub Debt 0.75 0.51 4 IEBR Annual Plan 2014-15 Proposed Nominal amount kept for !;"!! works. Nominal amount kept for !;"!! works. 5 Physical Activity Targets "#'#*$=?* Output 6 Projected Outcomes Mar.’15 Mar.’15 7 Process/ Timelines Environment Clearance is avail! ^>> project. However ! ^! >^ Environmental Clearance accorded by MoEF was later withdrawn by MoEF. In this context NHPC has #!% "'! ! before Hon’ble Supreme Court. Appeal was heard on many times during year2011. Forest clearance proposals of Kotli ^!_>^% ! ^! _ >> HE Projects have not been recommended by FAC on #%ings of the studies conducted by WII, Dehradun. MOEF has declined permission for diversion of Forest land ^^ % ^>> }" NHPC has taken up the issue of reconsideration of Forest clearance of these projects. 8 Remarks/ Risk factors 181 <> Dibang 5 2 1 Name of Sl. Schemes / No. programmes / Projects Addition of 520 MW capacity 98.05 31.05 Addition of 3000 MW capacity IEBR 4 Sub Debt 3 Objective/ Outcome Annual Plan 2014-15 Proposed 100% 100% "!; of Communication system and other miscellaneos/ ancillary works \ ;! > works Infrastructure Works Achievement is subject to CCEA clearance Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 7 _'" " boundary of Land to be Acquired Enviornment and forest clearance are being pursued and as such the project is poised before CCEA for Govt. sanction. All these activities are subject to the Enviornment and Forest clearance at the earliest. 6 Process/ Timelines Mar’15 Targets Projected Outcomes Geo Technical Investigation Works Additional Investigation and Infrastructure Works ; ` Land Acquisition 5 Physical Activity "#'#*$=?* Output MOEF has accorded the Stage-I forest clearance on 26.02.2013. MOEF has granted Environmental Clearance vide let%%* The Environment Clearance proposal of Dibang Project has been reconsidered by EAC during its meeting held $ meeting was also held with IGF, MoEF wherein he assured that the proposal of Dibang Project may be included in the next FAC meeting. FAC has discussed the proposal in its meeting on * 8 Remarks/ Risk factors 182 Tawang-II Tawang- I 6 7 2 1 Name of Sl. Schemes / No. programmes / Projects Addition of 800 MW capacity 9.85 12.71 Addition of 600 MW capacity IEBR 4 Sub Debt 3 Objective/ Outcome Annual Plan 2014-15 Proposed Achievement is subject to CCEA clearance. ³$@; \ " ing of road to Power House ` \ ; Afforestation 100% PQ Tender Advt. for LOT @ ?]< @?]<$ @ 100% Construction of boundary !!_"" ; % " Mar’15 Mar’15 Mar’15 Mar’15 Mar’15 7 Ha Mar’15 Land Acquisition of Project Component etc. 2.5 km % ^_ Mar’15 Mar’15 ³@; \ " ing of road to Power House Mar’15 Mar’15 100% 100% PQ Tender Advt. for LOT @ ?]< @ ?]< $ @ Achievement is subject to Forest Clearances and CCEA clearance. % ! "! ! "! Studies 100% Construction of boundary !!_"" ; % " Mar’15 Mar’15 7 Process/ Timelines Mar’15 8 Ha Land Acquisition of Project Component etc. 6 Projected Outcomes ` \ ; Afforestation 100% Targets % ! "! ! "! Studies 5 Physical Activity "#'#*$=?* Output MOEF has accorded Environment Clearance to Tawang-II (800 % <>$ HEP vide letters dated 10.06.11. CEA has accorded concurrence to Tawang-II HEP = Mega Power Status vide OM dated 22.09.2011 and to Tawang I $ with Mega Power Status vide OM dated 10.10.2011. MoEF vide letter %%= accorded Forest "!" _> to Tawang-II Project 8 Remarks/ Risk factors 183 = +* Addition of 1020 MW capacity Preparation of FR / DPR of new projects Other new schemes E. 4 IEBR ^ S&I and Other Schemes D. 3 Sub Debt Annual Plan 2014-15 Proposed 1 2 Objective/ Outcome 1 Name of Sl. Schemes / No. programmes / Projects Drifting Drilling 5 Physical Activity 600m 1600m Targets "#'#*$=?* Output 6 Projected Outcomes Mar’15 Mar’15 Mar’15 7 Process/ Timelines Four packages for core drilling works have been put to tender. Out of which package-I, "@>>"@>' awarded and work has been started in Package-I. The award of third package is under process. For Establishment portable Explosive Magazine, NOC has been issued by the District %; application for issuance/ renewed of the license submitted to Explosive Authority Faridabad/ Chandigarh. 8 Remarks/ Risk factors 184 @% CDM G. Total Loktak Downstream 1 Addition of 66 MW capacity Schemes under Joint Venture F. 3 2 Objective/ Outcome 1 Name of Sl. Schemes / No. programmes / Projects 2745.46 0.10 0.00 4 IEBR $ 478.80 Sub Debt Annual Plan 2014-15 Proposed !;!; works 5 Physical Activity Targets "#'#*$=?* Output 6 Projected Outcomes 7 Process/ Timelines 8 Remarks/ Risk factors 185 4 800.00 3 Generation of Hydro Power 2 Kameng HEP (600 MW), A.P. 1 Outlay 2014-15 1 Objective / Outcome Name of the Scheme / Programmes Sl. No. ^ <~" >>>\;!'¤ ; ! ¤ ; ` ' Jan-15 ^" ;; Concreting \;!'¤ Cum against total ¤+* \; Package-II: _ ` ' 6 Process / Timelines Concrete Lining of HRT,Face-I \;!'¤ +=; ^ <~">> \;!'¤=; Package-I: 5 "# Deliverable 7 Remarks ~">>>! ;" ;!% *! @ crew is continuing boring work beyond this length towards Face-II. Dam concreting isin progress. Cumulative ";¤*=$ Cum. Overtlining has been started w.e.f. 28.09.13.Work is in progress. Cumulative ";¤$$; Progress of boring is slow due to poor geology. Face-II comprises of foliated fractured Quartzite with multiple set of joints. New machinaries are to be deployed in the place of old machinaries to get optimum progress. Work is in Progress with heading and benching method . Cumulative Progress ";¤++; Project Works are under progress NEEPCO Ltd. Achievements upto 31.12.2014 ¤ 209.5 m 2nd ¤$; % ¤= ;< ! ¤ 668.3 m ¤$ Cum 2nd ¤*=+ Cum 3rd Qtr ¤*$=\; < ! ¤=+= Cum ¤; % ¤$ m % ¤* < ! ¤$; 1st Qtr Progress ¤+; % ¤ 111.25 m 3rd ¤; < ! ¤+; 8 Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) ( Rs in Crs) Annexure - V 186 Name of the Scheme / Programmes 2 Sl. No. 1 3 Objective / Outcome 4 Outlay 2014-15 " " Overt Lining HRT ~">\;!'¤ $=; Concreting of Tenga Dam (Cumulative <¤"; Feb-15 Construction of Pedestals and Anchor ^! "@ % ["!%^* Extension of EOT \^; Unit-2 " Completion of open excavation of Surface "@["!' House and Anchor ^! "@ Power House & Tail Race Channel: Jan-15 Overt Lining HRT ~">>\;!' ¤*; Package-III: 6 Process / Timelines 5 "# Deliverable @" ;!% +* …. Cumulative Progress an on December ¤=$\; Cumulative Progress an on December ¤*; Work is in progress. Cumulative Progress ";¤$"; Work is in progress. Cumulative Progress ";¤=*$; 7 Remarks Work completed on +* … 1st Qtr Progress ¤*=\; % ¤ % ¤ < ! ¤*= Cum ¤; % ¤ 592.5 m 3rd ¤*; < ! ¤$$ Cum ¤ 9605 Cum 2nd Qtr ¤=\; % ¤ \;< ! ¤ 17600 Cum ¤ 609.8 m 2nd ¤; % ¤= ;< ! ¤ 690.3 Cum 8 Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) 187 Name of the Scheme / Programmes 2 Sl. No. 1 3 Objective / Outcome 4 Outlay 2014-15 Jan-15 Feb-15 Construction of Civil Foundation (Equipment, Tower "®\;!' <¤ ! Foundation work for Switchyard as per '!! ` ' " Mar-15 6 Process / Timelines Extension of EoT Crane Upto Unit - II Package-V & VI: Erection of steel liner "@"! _\;!'¤ + Completion of balance Fabrication of Steel Liner \;!'¤ < Fabrication & Erection of Steel liner: Package-IV Extension of EOT \^; Unit-3 5 "# Deliverable Work under progress.Cumulative Progress ";¤+*` \ ;!% … Work under progress.Cumulative Progress ";¤*++; Work under progress.Cumulative Progress ";¤$< … 7 Remarks … … Completed on 1st Qtr Progress ¤=++; % ¤ 89.77 m % ¤ +$;< ! ¤=$=; 1st Qtr Progress ¤$*< % ¤ +=< % ¤ 556.12 MT Total ¤*< 8 Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) 188 2 1 Pare H.E. 2 Project, (110 MW), A.P Name of the Scheme / Programmes Sl. No. Generation of Hydro Power 3 Objective / Outcome 225.88 4 Outlay 2014-15 " Erection of Tower Structure (Cumulative <¤" structure on 300 nos. of foundation as per '!! Erection of Spiral Case in Unit - I " ]" ! _ ` ' Feb-15 Dam: Concreting of Dam (Cumulative 1,25,000 Cum against ! ¤ "; HRT: Completion of concrete lining \;!'¤==; Power House ^! concreting of Unit-I Power House^! concreting of Unit-II Tailrace Channel:Completion of excavation of Tailrace Channel Tailrace Channel:Concreting " ;! Package-I (Civil Works) 6 Process / Timelines 5 "# Deliverable … … … … Overt lining of 255 m has been completed "; Dam concreting has been started on =";!' ";¤+\; @" ;!% =* Work under progress.Cumulative Progress ";¤` 7 Remarks … … … Overt lining of 255 m has been completed "; Dam concreting has been started on =";!' progress upto December ¤+\; Work completed on =* 1st Qtr Progress ¤` % ¤ 113Nos. 3rd ¤` < ! ¤= Nos. 8 Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) 189 Tuirial HEP (60 MW), Mizoram 2 1 3 Name of the Scheme / Programmes Sl. No. Generation of Hydro Power 3 Objective / Outcome 270.00 4 Outlay 2014-15 LOT - II (Dam & Spillway) Erection of all equipment in Switchyard Works completed " Erection of Turbine Assembly Unit- II Package-IV (Switchyard & Transformer Works): ` ' Erection of Turbine Assembly Unit- I Project Works are under Progress. … Works completed … … … _ " > Unit- II … … … … " > Unit- I … 1st Qtr Progress ¤+$; % ¤ 19.9 m 3rd ¤+; < ! ¤++; 8 … " Erection of Surge shaft gate Work under progress.Cumulative Progress ";¤*; 7 Remarks Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) Package-III (EM Works): ]" 6 Process / Timelines Completion of Erection of Steel liner \;!'¤; Package-II (HM Works): 5 "# Deliverable 190 Name of the Scheme / Programmes 2 Sl. No. 1 3 Objective / Outcome " Jan-15 Spillway Concreting \;!'¤+ "; ;#!! \;!'¤?@ Cum against total Qty $*$?@\; 105.97 " Power House Concreting \;!'¤= "; Power Water Way concreting complete including Intake LOT - IV (Hydro Mechanical Works) " Power House Excavation - (100% " ;! LOT - III (Power House & Switchyard) 6 Process / Timelines 5 "# Deliverable 4 Outlay 2014-15 1st Qtr Progress ¤\; % ¤ ... 3rd Qtr ¤=\; < ! ¤+=$= Cum 1st Qtr Progress ¤=*\; % ¤=+= Cum 3rd Qtr Progress ¤+\;< ! ¤=+\; 8 … … … ? \; *;%\ ; =;" ;!% \*; 100.10m is on hold and will come under Lot-III. Intake structure work is also com!% Due to slope failures during the period from Dec’12 to May 2013 there was total stoppage of work in the PH area. Following the visit of POE restoration works with Piling works with 600 mm / 100 mm Dia followed by re-building of the slopes using Geogrid is in progress. Excavation work in the Power Hose site is also going on simultaneously. Work under progress.Cumulative Progress ";¤$*\; Work under progress.Cumulative Progress ";¤*\;\; 7 Remarks Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) 191 157.86 33.76 35.00 Generation of Thermal Power Agartala Gas Turbine Plant - Generation CC Extension of Thermal Project (46 Power MW) Generation of Solar Power Generation of Solar Power Tripura Gas Based Power Project (101 MW ) Grid Interactive Solar Power Project (5 MW), TGBP, Tripura Grid Interactive Solar Power Project (2 MW), Lanka, Assam 4 5 6 7 5.00 4 3 2 Outlay 2014-15 1 Objective / Outcome Name of the Scheme / Programmes Sl. No. Issue of LOI for EPC Contract and initial headway towards implementation of the project Commissioning of the Project Commissioning of the Project Commissioning of the Prject " Switchyard March’ 15 ]" March’ 15 ` ' " Feb-15 Fabrication of Penstock - Completion LOT - V (Electro Mechanical Works) 6 Process / Timelines 5 "# Deliverable … 1st Qtr Progress ¤$+< 2nd Qtr Progress ¤=< % ¤ < ! ¤== MT 8 `>^ % `>^ % Anticipated commissioning schedule is Nov’ Anticipated commission15 ing schedule is Nov’ 15 Anticipated date of commissioning of the Project is May’ 15 As per the DPR, the Solar Power Project using Polycrystalline technology is found to be feasible. Land area measuring 30 acres %#% % <|^ < ! ?]> \ \ " }" % ^? * All the works are going on smoothly for commissioning of the Project by March’ 15 The Project is all set for commissioning by the revised commissioning schedule of June ‘1 5 / August 15 … Work under progress.Cumulative Progress ";¤$=< 7 Remarks Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) 192 8 2 1 Garo Hills Coal Based Power Project (500 MW), Meghalaya Name of the Scheme / Programmes Sl. No. Generation of Thermal Power 3 Objective / Outcome 10.00 4 Outlay 2014-15 \ !?@>! headway 5 "# Deliverable March’ 15 6 Process / Timelines 8 NEEPCO proposed to set up the 500 MW \ ! ^% }" '" _; \ !#!% at Nangalbibra, Garo Hills District of Meghalaya. The MOA for development of this Project in Meghalaya was signed on 17th March, 2011 with the Government of Meghalaya. However, progress of works for development of the project could not be carried out as Coal Linkage for the project is #!% ! !! der the Sixth Schedule of the Constitution, the project was initiated, keeping in view that the coal availability will be met from the _;\ !#!% \ !>%?;% Garo Hills District of Meghalaya. However, the Government of Meghalaya has not re- Coal linkage is yet to be % ! % \ !#!% established. Coal India Limited and therefore coal linkages for the project have to be met from other source. Accordingly, Expression of Interest for lease of land of coal bearing areas in Garo Hills District of Meghalaya was % '' several extension of the last date of receipt of offer, till 10.08.2012, no responses could be received. As a result, process for visit of CEA’s Site Selection Committee could not proceed and the same caused delay in process for land acquisition for the project leading to non-utilization of the allocated fund for < \ " tinuing its endeavour to set up coal linkage for the project. 7 Remarks Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) 193 1628.37 164.03 1464.34 Less DoNER Grant = Grand Total (MOP’s ) 10.00 80.87 4 Outlay 2014-15 Grand total (MOP + DoNER): Renovation & Modernisation 9 10 Preparation of DPR etc. Survey and Investigation Renovation & Modernisation of Kopili Power Station 3 2 1 Objective / Outcome Name of the Scheme / Programmes Sl. No. _> @ + Mawphu HEP St-II, 3750 MW Siang Upper St-II HEP, 55 MW Killing HEP are in progress for preparation of DPR. Rs. 50 crs. Paid to Govt. of Arunachal Pradesh towards upfront premium of Siang Upper St-II HEP. 8 Achievement up to 3rd Qtr 2014-15 (April 2014 to December 2014) <; !>>>;" which were commissioned in the year 1988, indicated signs of ageing after operation for more than 20 years. It was envisaged that the replacement of worn out/deteriorated or obsolete equipment with improved version of materials and equipment would ensure safe, reliable and economic generation and higher availability of the machines especially during peak hours of the NER Grid. Works completed. "" %! ! ! >>>!! !% % "% % other associated systems of Kopili HEP has been taken up by NEEPCO at an estimated cost of Rs. 50.22 Crs. in two phases. "' " ;!%"; ==+\ >%\>> _> @ +_>> 3750 MW Siang Upper St-II HEP, 55 MW Killing HEP along with some other pipeline projects for preparation of DPR. 7 Remarks ( GBS = 142.10 Crs ( 60 (Kameng) + 81.03 (Pare) + 1.07 (Tuirial: Sub Loan = 1 Cr, Bal equity = 0.07 Cr)) Mar-15 Mar-15 _'>' @ _> schemes ' % + 6 Process / Timelines 5 "# Deliverable 194 Name of Schemes/ Programme 2 Koteshwar (4X100) Vishnugad Pipalkoti Hep (4X111MW) TEHRI PSP (1000 MW) Sl. No. 1 1 2 3 Hydro Power Generation Hydro Power Generation 3 Objective/ Outcome 566.86 148.31 50.08 4 Annual Plan (2014-15) Proposed (RBE) Achieved on = Construction of crane ;_'"^ Power House _ Achieved on Surge Shaft- HRT-3 : " Raise Climber installation ! _["' After completion of Crown slashing of PAC on = ^"" !% not commence Achieved on * 7 Acheivement w.r.t. Col(5) as on 31.12.2014 Achieved on + Jan’15 _ 6 Processes/ Timelines __< Raise Climber installation ! _["' Penstock Assembly \;\ Excavation Complete ^" Award of EPC Contract "@ 5 "# Deliverables/Physical Outputs THDC India Ltd. Achievements upto 31.12.2014 ^"\!! start after excavation of two benches in ^\^"^\ requires treatment of drainage gallery. The treatment is in progress Project already commissioned. Amount kept for miscellaneous/ pending works. For balance works LOA has been awarded to M/s Patel Engg. on = 8 Remarks (Rs. in crore) Annexure -VI 195 5 DPR Preparation Work TEC, Stage - III activities. '!;<;@= FR Preparation Work FR Preparation Work Achieved on ]" Achieved on $= _ "! "@_ Unit-5: Raise Climber !! ! _ Excavation Award of Contract for Civil Works of Dhukwan SHEP In Progress 7 Acheivement w.r.t. Col(5) as on 31.12.2014 Mar’ 15 6 Processes/ Timelines ["' Reinforcement of Machine Hall upto 582 m _'"^?'! 5 "# Deliverables/Physical Outputs '!!; $ 13.99 17.48 4 Annual Plan (2014-15) Proposed (RBE) Consultancy works, FR Preparation Work Hydro Power Generation Hydro Power Generation 3 Objective/ Outcome ^ @^! % ; ! NEW PROJECTS DHUKWAN HEP (3X8MW) 2 1 4 Name of Schemes/ Programme Sl. No. Projects affected due to Honb’le Supreme Court. Order 13th aug-13 %"' ~ _ of Uttrakhand not to grant \~\ hydroelectric projects in the state of Uttrakhand until further orders. Casting of Crane ^;_'"^ %^" El 590 Complete. Reinforcement and Shuttering for Crane beam in Unit area is under progress. 8 Remarks 196 2 1 TOTAL ;!__ _> @ Signing of Implementation agreement, drifting work Design and Consultancy works. 5 "# Deliverables/Physical Outputs '!}| __+ 796.72 4 Annual Plan (2014-15) Proposed (RBE) Design and Consultancy works. 3 Objective/ Outcome '^@= '_@ ! }"$ Name of Schemes/ Programme Sl. No. 6 Processes/ Timelines 7 Acheivement w.r.t. Col(5) as on 31.12.2014 _}" `^? clearance. Subject to Signing of Implementation agreement and Subject to Drifting permission from MOEF. Implementation agreement has been %| > | ^ %! Revised construction methology and equipments planning has been submitted to CEA/ \\ \ @ have been submitted \ ~ ^ }" %#"! funding for Sankosh and Equity component _#" ^@^ #" has been closed for the time being. 8 Remarks 197 Name of Scheme / Programme Rampur Hydro Electric Proj" Sl. No. 1 Sub-Total Construction of RHEP Objective / Outcome Non Plan Budget 211.93/286.52 +$ 20/26.00 +=$ +**+ Plan Budget/ Actual Complementary Extra Budgetary Resources Outcome Budget 2014-15 IEDC Interest During Construction Continuous process Continuous process Continuous process $ \ ;; Infrastructural Works _ _ \ ;; $ \ ;; Process/ Timelines _ $ "#%'#* SJVN Limited Achievements upto 31.12.2014 In progress Completed 58% complete. Completed on == Completed on =+ Completed on =$ Completed on = Completed on $ Completed on Achievement as on 31.12.2014 Remarks (Rs. in crores) Annexure-VII 198 3 2 Sl. No. Objective / Outcome Dhaulasidh $$ Sub-Total Construction of DSHEP Sub-Total Luhri Hydro Construction of Electric Project LHEP $ Name of Scheme / Programme Non Plan Budget 43/4.13 6.25/3.01 36.75/1.12 37/10.99 20.73/9.95 16.27/1.05 Plan Budget/ Actual Complementary Extra Budgetary Resources Outcome Budget 2014-15 Running payments upto March, 2015 Civil works Continuous process March, 2015 CAT Plan approved on 01.10.13. CAT Plan IEDC Running payments upto March, 2015 Infrastructural Works In progress The work will be taken up after Forest Clearance, acquisition of private land and >^ '! The work will be taken up after availability of forest land. March, 2015 Award process is pending for want of framing of rules of Land Acquisition Act 2013 by the State Govt. In progress Acquisition of private land Continuous process Running pay- The work will be ments upto taken up after acMarch, 2015 quisition of land. Construction of 3 no of adits IEDC Running pay- Stage I Forest ments upto Clearance accordMarch, 2015 ed on 27.02.13 and Stage II Forest Clearance is awaited from MOEF. Diversion of Forest land Completed Achievement as on 31.12.2014 Running payments upto March, 2015 Process/ Timelines Geological explorations "#%'#* Remarks 199 Naitwar Mori $ Devsari HEP 5. Name of Scheme / Programme Sl. No. Sub-Total Construction of NMHEP Sub-Total Construction of DHEP Objective / Outcome Non Plan Budget 20/2.26 = = 22/3.46 11.86/0.07 Plan Budget/ Actual Complementary Extra Budgetary Resources Outcome Budget 2014-15 Running payments upto March, 2015 Infrastructural Works Continuous process March, 2015 Excavation of MAT IEDC March, 2015 31.01.15 Issuance of NIT for residential buildings. \ " % >" `>< #" building. IEDC Continuous process March, 2015 Regarding acquisition of private land Acquisition of private land and diversion of forest land Running pay- The works will be ments upto part of Main PackMarch, 2015 age of Civil Works. Infrastructural Works In progress Infrastructure works have been included in the Main Package. TEC of the project has been accorded on March 02, 2010. >^; project has been submitted to MOP in May, 2013. Environment and Forest Clearance are awaited from MoEF. Preconstruction work can be taken up after acquisition of private land, Environment and Forest Clearance %>^ '! In progress Completed March, 2015 Geotechnical studies and testing Completed Achievement as on 31.12.2014 Running payments upto March, 2015 Process/ Timelines _'>' @ "#%'#* Remarks 200 Name of Scheme / Programme Jakhol Sankari Arun-IIIHEP * Sl. No. 6 7 Sub-Total Construction of Arun-III HEP Sub-Total Construction of JSHEP Objective / Outcome Non Plan Budget 10/5.83 8.7/5,51 1.30/0.32 IEDC Payment to NEA for Generation license Development of QC lab IEDC 3.63/1.186 8/1.19 _'>' @ and development of Infrastructure mainly comprising of approach roads/paths and buildings, environment and ecology expenses etc. Complementary Extra Budgetary Resources "#%'#* + Plan Budget/ Actual Outcome Budget 2014-15 In progress DPR has been prepared. Environment and `^?\!" awaited. Achievement as on 31.12.2014 Continuous process In progress TEC for the project has been obtained from CEA on June March, 2015 *% DPR has also been cleared by Government of Nepal. Project Development Agreement project has been signed with the Government of Nepal on Novem March, 2015 Continuous process Running payments upto March, 2015 Process/ Timelines Remarks 201 Name of Scheme / Programme Wangchhu + Kholongchhu $ Sl. No. 8 9 Sub-Total Construction of Kholongchu HEP Sub Total Construction of Wangchu HEP Objective / Outcome Non Plan Budget 33/1.13 3.30 29.70/1.13 32/3.16 * 27.91/3.16 Plan Budget/ Actual Complementary Extra Budgetary Resources Outcome Budget 2014-15 Process/ Timelines Achievement as on 31.12.2014 IEDC Construction of Adits Preparation of bid drawing %^] \<!%! Infrastructural Works IEDC In progress Continuous process In progress DPR approved | ^ 23.05.13.CCEA approval for the project has been obtained on Running payments =%>ter-Governmental upto Agreement has March, 2015 been between |]>%| ^ Running signed on payments ! upto Further, MoU for March, 2015 preconstruction activities has Running been signed on payments ! upto and SHA has March, 2015 been signed on *< works shall be taken up after ; Running payments upto March, 2015 Continuous process Running pay- The works will ments upto be taken up after March, 2015 receipt of CCEA approval and " !%% Running pay- signing of Share compensation ments upto Holder AgreeMarch, 2015 ment. Infrastructural Works "#%'#* Remarks 202 Name of Scheme / Programme ^[<;! Power Project Sl. No. 10 Construction of ^[<;! Power Project Objective / Outcome Non Plan Budget +$ Plan Budget/ Actual Complementary Extra Budgetary Resources Outcome Budget 2014-15 >%#" !% !way Siding Process/ Timelines Private land acquisition from state Government "#%'#* FSR for railway siding has been prepared based %#% rail alignment and FSR has been submitted to Eastern Railway approval. The land required for railway siding /rail infrastrcuture has also been identi#%" sultation with M/s RITES consultant for preparation of FSR. Proceeding of land acquisition act has been completed by ^| '^ | ' $* has raised a demand note of *" against the acquisition of land of the project. which can be reelased after the approval of MOP, GOI. Achievement as on 31.12.2014 Remarks 203 11 Sl. No. Deocha Pacha;\ !^! "@ Name of Scheme / Programme 1/0.00 Sub-Total 436/8.37 5.28/5.11 Plan Budget/ Actual 1/0.00 Non Plan Budget Complementary Extra Budgetary Resources Outcome Budget 2014-15 Development of Deocha Pacha;\ !^! "@ Sub-Total Objective / Outcome Equity contribution in pro % IEDC Running payments upto March, 2015 Continuous process Running payments upto March, 2015 31.01.15 `>< ; #"!% Consultancy service for updationof DPR 15.03.15 Process/ Timelines Award of main boundary wall work "#%'#* Equity contribution shall be released after ; In progress Work awarded to M/s NTPC on % work is under progress. Estimate has been technically sanctioned on +< case for inviting NIT has been submitted for approval of Competent Authority. Award is subject to availability of land. Estimate has been prepared and submitted to \ ]#" * '! ; observation have been raised by Corporate Civil Design and same have been replied % is subject to availability of land. Achievement as on 31.12.2014 Remarks 204 Doimukh \ ^ der Power Transmission Company 13 16 Sub-Total Arun-III Transmission Sub-Total Construction of Arun-III tranmission line Sub-Total 4/1.61 $ 20/4.93 * 6/0.00 6/0.00 3/2.23 Sub-Total Equity contribution 3/2.23 Construction of Doimukh HEP 88/59.87 Sub-Total Plan Budget/ Actual 88/59.87 Non Plan Budget Complementary Extra Budgetary Resources Outcome Budget 2014-15 Setting up of Wind Farm Objective / Outcome 1000 MW Equity contribuUltra Solar tion and develPower Project opment of Solar } Power Project and 5 MW Charanka Solar Power Project |} Wind Farm Projects 12 15 Name of Scheme / Programme Sl. No. Survey and investigation works, Environment Examination studies Equity contribution for 1000 MW Ultra Solar Power Pro}"}%%'!opment of 5 MW Charanka _ ! }"|} Towards Equity contribution _` Payment of upfront money to GoAP and investigation works. Payment for Khirvire Wind Power Project and new Wind Power Project "#%'#* Running payments upto March, 2015 Running payments upto March, 2015 Running payments upto March, 2015 Running payments upto March, 2015 Running payments upto March, 2015 Process/ Timelines Detailed Project the transmission line has been prepared. Equity contribution shall be released after ; Equity contribution shall be released after the receipt of request ; MOA for the execution of the project has been signed on August Payments shall be released after settlement of LD cases. Achievement as on 31.12.2014 Remarks 205 Construction of ]#"^!% at Shimla and New Delhi 17 18 5.00 1091.93 Total 5.00 Sub-Total 112/37.26 Sub-Total Plan Budget/ Actual 112/37.26 Non Plan Budget Complementary Extra Budgetary Resources Outcome Budget 2014-15 Construction works Objective / Outcome "' \ " #"!% at Shimla and New Delhi "#%'#* Running payments upto March, 2015 Running payments upto March, 2015 Process/ Timelines "' are in progress and payment shall be made after completion of activities. Super strucutre has been erected %# works are under progress. Achievement as on 31.12.2014 [% " "%!!"; !^%; **" Name of Scheme / Programme Sl. No. Remarks 206 100 97 TS strengh. in western part of WR FOR IPP Generation Projects in Chhattisgarh Transmission System For Phase-I Gen }"]\ 4 5 6 Mar’15 " $ Common system associated with ISGS projects in Krishnapatnam Area of Andhra Pradesh 1 ]" Mar’15 Transmission System for Krishnapat;<^ 1 Jun’15 6 3 5 Transformer Erection (No) `\>" " > }"\* 250 510 Stringing (Ckm) Process/ Timelines 2 1 2 I North East - NR/WR Inter- connector ? _; Name of The Projects / Schemes / Programme S. No. "#%'ables 98 66 * 35 171 $ 7 1 TransformStringing er Erec(ckm) tion (no.) Achievements during Quarter - III (upto Dec’14) Power Grid Corporation of India Ltd. Achievements upto 31.12.2014 375 360 560 201 1359 Stringing (ckm) 8 0 2 2 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Involved Wildlife Sanctuary, clearance awaited. Implementation affected due to non-availibility of forest clearance. Critical RoW problem being encountered. Completion now anticipat%]" Implementation affected due to delay in land acquisation at Champa (Acquired in Efforts being made to " ;!\!@ and associated AC !" 9 Remarks (Rs. in Crore) Annexure-VIII 207 55 216 209 200 595 679 2 Establishment of Pooling Stations at \;%<; IPP Generation Projects in Chhattisgarh Transmission system for Phase-I generation projects in Jharkhand and. West ^!^ Transmission System associated with %>>>%"!> Transmission System for Phase - I Generation Projects in Jharkhand and West ^! Transmission system for Phase I gener }"]^ Southern Region System Strengthenig >>>___>>> Common system associated with Coastal Energen Private Limited abd >%^ %?;% LTOA Generation Projects in Tuticorin ^ I 7 8 9 10 11 12 13 Stringing (Ckm) Name of The Projects / Schemes / Programme S. No. 5 2 Transformer Erection (No) "#%'ables Mar’15 ` ' " Mar’15 Mar’15 Mar’15 Mar’15 6 Process/ Timelines 32 2 190 112 72 69 Stringing (ckm) 7 Transformer Erection (no.) Achievements during Quarter - III (upto Dec’14) 92 789 502 201 377 173 76 Stringing (ckm) 8 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Project under progress. Project being expedited. Implementation affceted due to non-availibility of forest clearance. Critical Implementation affceted due to non-availibility of forest clearance. Critical Involved Wildlife Sanctuary clearance "!" awaited. Land acquisation delayed for %"!_ Land acquisation delayed for Kanpur S/stn. Land acquisation delayed for Champa S/stn. (acquired in 9 Remarks 208 25 50 266 Southern Region System Strengthenig >___> Transmisison system for development of pooling Stations in Northern part of ^!%< ;^ Transmission System Associated with Mundra UMPP Transmission System associated with !!|^% }" %^ <;! _ <_ ;% System Strengthening in North/ West part of WR for IPP Projects in Chhattis <; _; ^>> 14 15 16 17 18 19 297 100 2 I Stringing (Ckm) Name of The Projects / Schemes / Programme S. No. 5 2 Transformer Erection (No) "#%'ables Mar’15 Mar’15 Mar.’15 Mar’15 ` ' 6 Process/ Timelines 55 26 135 12 1 235 Stringing (ckm) 7 Transformer Erection (no.) Achievements during Quarter - III (upto Dec’14) 160 30 210 1 689 Stringing (ckm) 8 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Forest clearance awaited. Diffucult working " % ` Security issues affecting implementation. Severe ROW problem in Assam/Manipur/ Nagaland portion. Contract terminated due to poor performance by contractor. Fresh tender being taken up for one package of Wardha-Aurangabad line. Land acquisation delayed for Alipurduar \ Project under progress. 9 Remarks 209 Mar’15 26 3 Transmission System for Transfer of power from Generation Projects in _@@; `^ 25 100 Sep’13 Transmission System Associated with Sasan UMPP 24 209 Transmission system for Phase I generation Projects in Orissa -Part A 23 390 Integration of Pooling Stations in Chhattisgarh with central part of WR for IPP Generation Projects in Chhattisgarh Jan’15 50 System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh $ 22 " 21 1 Transmission System for IPP gener }"%% Chhattisgarh 6 5 Transformer Erection (No) 20 2 I Stringing (Ckm) Process/ Timelines Establishment of Pooling Stations at % > Generation Projects in Chhattisgarh Name of The Projects / Schemes / Programme S. No. "#%'ables 31 62 50 23 Stringing (ckm) 7 1 Transformer Erection (no.) Achievements during Quarter - III (upto Dec’14) * 215 + 38 25 0 Stringing (ckm) 8 8 0 2 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Implementation affected due to delay in land acquisation for Kishanganj s/s "% Project completed Implementation affected due to delay in forest clearance and severe RoW problems Implementation affected due to delay in forest clearance. Awaited Forest clearance awaited. Project completed through contingency arrangement due to delay in land acquisa % % 9 Remarks 210 10 317 Common TS associated with East \ `\\ }"?<] Generation Projects in Srikakulam Area ^ Southern Region System Strengthenig >>>___>>> 31 32 33 1 _ Mar’15 Mar’15 50 Common System associated with East Coast Energy Private Limited and NCC, Power Projects Limited LTOA Generation Projects in Srikakulam Area-Part-A 1 Mar’15 1 + Northen Region System Strengthen>`__> 30 Feb’15 System strengthening in Wardha-Aurangabad corridor for IPP Projects in \+ 28 Mar’15 6 29 100 Southern Region System Strengthenig >>___>> 27 5 Transformer Erection (No) Process/ Timelines \ ^\ ;; "; +$@ ! % @ `\ ;; _¥`¥ %; }^ @ ¥>; ` ;% ;` _'%\ ;; "; for network for WR 20 2 I Stringing (Ckm) Name of The Projects / Schemes / Programme S. No. "#%'ables $ 70 69 Stringing (ckm) 7 Transformer Erection (no.) Achievements during Quarter - III (upto Dec’14) 0 0 297 135 139 Stringing (ckm) 8 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Comletion delayed due to ROW problem in Karnataka. Forest clearance awaited. Forest clearance awaited. Implementation affected due to delay in land acquisation for ^!!"% " Completion matching with readiness of Kudgi S/S. (Land "%~ 9 Remarks 211 111 65 21 Transmission System for Phase - I Generation Projects in Jharkhand and West ^! Southern Region System Strengthening >___> Transmission system for establishment @|>__ wada in UT DD 40 41 42 2 50 Transmisssion System for connectivity of Essar Power Gujarat Limited 39 1 ` ' 25 Northen Region System Strengthen>`__> 38 Mar’15 _ Northern Region Transmission System Strengthening 37 Mar’15 1 36 5 21 128 2 * 57 6 171 50 Northen Region System Strengthen>`__> 23 36 Mar’15 3 130 Stringing (ckm) Eastern Region System Strengthen>>>__>>> 7 Transformer Erection (no.) 35 6 Stringing (ckm) 0 5 Transformer Erection (No) 8 2 0 0 0 0 2 0 1 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Transmission System for Krishnapatnam UMPP -PART C2 2 I Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) 34 Name of The Projects / Schemes / Programme S. No. "#%'ables Project under progress. Implementation affected due to non-availibility of forest clearance. awaited Comletion delayed due to severe ROW problem. Implementation affected due to delay in S/stn. land acquisation (Land under " Outlay kept for preliminary/infrastrucal works 9 Remarks 212 10 Northen Region System Strengthen>`__> 44 Mar’15 +$@; \! ` ern Grid- Part-III Transmission System associated with %_>>[$$ Transmission system for establishment @|>__ ! UT DNH Inter-Regional System Strengthening _"; ` 49 50 51 52 Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh 48 0 16 0 0 207 Transmisison System for connectivity of ^ ?;% 47 0 0 39 = Stringing (ckm) National Transmission Asset Management Centre 16 7 = 7 Transformer Erection (no.) 46 May’13 Mar.’15 " 6 Stringing (ckm) 8 0 0 0 0 2 0 0 0 1 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) +$@; \! ` ern Grid- Part-II 5 Transformer Erection (No) Process/ Timelines Achievements during Quarter - III (upto Dec’14) 45 100 + System Strengthening in Northen region for Sasan and Mundra UMPPs 2 I Stringing (Ckm) 43 Name of The Projects / Schemes / Programme S. No. "#%'ables Project completed Project completed Implementation affceted due to Wild life encountered in Peer Panjal area. Clearance awaited. Contract terminated due to poor performance by contractor. Contract revived. Work commenced. 9 Remarks 213 Mar’15 Mar’15 Mar’15 Augmentation of transformation capacity in Northern Region and Eastern Region Northen Region System Strengthen>>>`__>>> Northen Region System Strengthen>>>`__>>> Eastern Region System Strengthen__ 59 60 61 62 63 ]" Augmentation of Transformers in Northern Region - Part A 58 0 20 0 0 0 2 Mar’15 Northen Region System Strengthen`__ 57 3 0 Implementation of Enterprise Resource !]|> 56 3 0 Fibre Optic Communication System in ! [#%? %" \ ;;" ?\" ' Links in NR 2 0 Fibre Optic Communication System in lieu of existing ULDC Micro wave Links in SR _ 55 2 0 17 Stringing (ckm) Northen Region System Strengthen`__ 7 Transformer Erection (no.) 54 6 Stringing (ckm) 0 5 Transformer Erection (No) 8 0 0 0 1 3 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Establishment of Fibre Optic Communication System in WR under Master Communication Plan 2 I Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) 53 Name of The Projects / Schemes / Programme S. No. "#%'ables Implementation affceted due to Severe ROW problem in westrn UP. Project completed in 9 Remarks 214 0 0 0 Mar’15 +$@; \! ` ern Grid- Part-I Fibre Optic Communication System in ! [#%? %" \ ;;" ?\" ' Links in Eastern Region Supplementry Transmission System as "%\ ^@ ?^" ' "%__\ ;; ` |%>> !%; Supplementary Transmission System !!<_ >!! " >> Common system associated with Coastal Energen Private Limited abd >%^ %?;% LTOA Generation Projects in Tuticorin Western Region System Strengthening>>__>> 66 67 68 69 70 71 72 73 74 15 0 <; _; ^ 65 1 May’13 9 7 0 9 0 0 198 0 0 Stringing (ckm) ; < ; % ^ `' %^[ % %>% 6 Transformer Erection (no.) 64 5 Stringing (ckm) 2 Transformer Erection (No) I Stringing (Ckm) Process/ Timelines 8 0 0 0 0 0 0 0 0 0 0 1 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Name of The Projects / Schemes / Programme Achievements during Quarter - III (upto Dec’14) S. No. "#%'ables Outlay kept for balance payments Delay due to court case Outlay kept for balance payments 9 Remarks 215 0 0 0 0 0 0 8 Northen Region System Strengthen`__ Northen Region System Strengthen>>>`__>>> Northern Region System Strengthening >>`__>> Installation of Reactors in WR ?^%" ]|> Sub-station for Raichur - Sholapur Transmission Line for Synchronous interconnection between SR and WR Transmission System for Krishnapatnam UMPP -PART A |%<}?% ?^" ' "ated with SS Common for WR ^|%\ ;?;% Northen Region System Strengthen>>`__>> Western Region System Strengthening __ 76 77 78 79 80 81 82 83 84 85 86 70 0 8 7 0 0 0 0 Stringing (ckm) 75 6 Transformer Erection (no.) Common Transmission Scheme Asso"% >_|_ }" ; Area of Andhra Pradesh - Part -A (Ear! 5 Stringing (ckm) 2 Transformer Erection (No) I Stringing (Ckm) Process/ Timelines 8 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Name of The Projects / Schemes / Programme Achievements during Quarter - III (upto Dec’14) S. No. "#%'ables Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Scheme under review in view of CERC direction. 9 Remarks 216 0 0 !^%`;'?% ' ^" ` Region ____ 88 89 90 0 0 Mar’15 Aug’13 Western Region System Strengthen>>>__>>> Transmission system Associated with Meja TPS Interconnection between Electrical Grids >%%^!%>% POWERGRID Sub-station works associated with Transmission Scheme for enabling import of NER/ER surplus power by NR ?" ' <_der Pvt. Sec.Line for Raichur-Sholapur _%^ 93 94 95 96 97 13 Oct’13 Transmission System for Parbati-III HEP 92 0 0 13 0 Mar’15 Transmission System Associated with 2 0 0 91 May’13 7 Stringing (ckm) ?" ^~ <_%'_" ` 6 Transformer Erection (no.) 87 5 Stringing (ckm) 2 Transformer Erection (No) I Stringing (Ckm) Process/ Timelines 8 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Name of The Projects / Schemes / Programme Achievements during Quarter - III (upto Dec’14) S. No. "#%'ables Outlay kept for balance payments Implementation affected due to severe ROW problem. Completion delay due to severe ROW problem. Critical. Outlay kept for preliminary/infrastrucal works 9 Remarks 217 Mar’15 Oct’13 Aug’13 Mar’15 2 2 _?`<<`_>__>]` __<__]\><><>_|_ PROJECTS IN KRISHNAPATNAM AREA OF ANDHRA PRADESH Western Region System Strengthening __`; Transmission System for transfer of power from different projects from Sik@; ` _!^;' Sub-stations of ER Eastern Region System Strengthening-I __> Eastern Region System Strengthening >__> Transmisssion System for connectivity of Thermal Powertech Corporation India Ltd. <; _; += ^ Northen Region System Strengthen>>`__>> 99 100 101 102 103 104 105 106 107 10 6 Southern Region System Strengthening >>___>>®!@« 6 98 5 2 Transformer Erection (No) I Stringing (Ckm) Process/ Timelines Name of The Projects / Schemes / Programme S. No. "#%'ables Stringing (ckm) 7 Transformer Erection (no.) Achievements during Quarter - III (upto Dec’14) 0 0 0 0 0 0 0 1 0 0 Stringing (ckm) 8 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Implementation affected due to delay in land acquisation for Kishanganj s/s "% Implementation affceted due to severe ROW problem. Implementation affceted due to severe ROW problem. Critical 9 Remarks 218 0 0 0 0 Mar’15 ]" Mar1’5 Northen Region System Strengthen>`__> Common TS associated with IPPs in Nagapattinam/ Cuddalore Eastern Region System Strengthen>>>__>>> < ; \"@ "@ ^<^ ^% Transmission System for Krishnapatnam UMPP -PART C1 Strengthening Scheme in NR <`_>__>]`__<__]\><><>> Provision of Spare ICTs and Reactors for Northern Region Transmission System Associated with Koteshwar HEP Western Region System Strengthening >__> 109 110 111 112 113 114 115 116 117 118 119 69 1 Mar’15 Transmission System associated with Kudankulam Atomic Power Project $ Dec’13 Mar’15 6 7 5 0 0 0 8 0 2 Stringing (ckm) Transmission System for Rampur HEP 6 Transformer Erection (no.) 108 5 Stringing (ckm) 2 Transformer Erection (No) I Stringing (Ckm) Process/ Timelines 8 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Name of The Projects / Schemes / Programme Achievements during Quarter - III (upto Dec’14) S. No. "#%'ables Outlay kept for balance payments Outlay kept for balance payments Outlay kept for preliminary/infrastrucal works Implementation affceted due to Severe ROW problem in westrn UP. Implementation affceted due to severe ROW problem. Works stanstill. 9 Remarks 219 0 0 0 0 7 0 0 0 0 Southern Region System Strengthenig ___ Transmission System for TALA (Power% Northern Region System Strengthen>> Fibre Optic Communication System in ! [#%? %" \ ;;" ?\" ' Links in North Eastern Region Transmission System for Sholapur STPP Transmission System for URI-II HEP Northen Region System Strengthen>`__> ER-II Headquarters Northen Region System Strengthen>>>`__>>> 123 124 125 126 127 128 129 130 131 7 0 0 _>>\ ;![ !% 0 Stringing (ckm) 122 7 Transformer Erection (no.) Provision of Spare ICTs for ER 6 Stringing (ckm) 121 5 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) TS ASSOC. WITH LARA STPS-I TR. __< 2 I Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) 120 Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for preliminary/infrastrucal works Outlay kept for balance payments Outlay kept for balance payments Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for balance payments Outlay kept for preliminary/infrastrucal works 9 Remarks 220 0 0 0 0 0 0 0 0 0 0 0 0 0 %^[ <_ Northen Region System Strengthen>>>`__>>> Southern Region System Strengthenig >___> Immediate evacuation system for Nabinagar TPS Northern Region Strengthening Scheme >`__> Power Transmission Company Nepal Limited [ % ?\ System Strengthening in South Western ` |%^! $_!; Northen Region System Strengthen`__ National High Power Test Laboratory Private Limited _>\]? Southern Region System Strengthening >>>___>>> 134 135 136 137 138 139 140 141 142 143 144 145 Stringing (ckm) Transmission System for power evacuation from CHAMERA-III HEP 7 Transformer Erection (no.) 133 6 Stringing (ckm) 0 5 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) 132 2 I Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) \ ^ % <; Company Limited Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments 9 Remarks 221 0 0 0 0 0 0 0 0 0 !; @|>_ !ing Station Near CHAMERA-II ' _>\<" Southern Region. System Strengthening in Roorkee Area Transmission System Associated with $ Common Transmission Scheme Asso"%>_|_ }"; %%^ __ System Strengthening Scheme in Uttaranchal Spare Inter Connecting Transformers >\< ` Northern Region Strengthening Scheme `__ Western Region System Strengthening >__> 149 150 151 152 153 154 155 156 157 158 52 0 Western Region System Strengthenig >__> 148 52 0 Northern Region Strengthening Scheme >>`__>> 147 7 Stringing (ckm) 0 6 Transformer Erection (no.) 146 5 Stringing (ckm) 2 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) ' _>\<" Western Region. Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) I Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for balance payments Outlay kept for balance payments Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments 9 Remarks 222 0 0 0 0 0 0 0 0 0 0 0 0 0 Augmentation of transformation and reactive capacity in er POWERGRID RINL Structures Ltd North East Transmission company Limited Power Grid Equity (Karcham Wangtoo <; }" <" % Strengthening of North West Transmission Corridor ; @< mation Capacity at Raebareli (POWER|>£< ; Eastern Region System Strengthen>>__>> System Strengthening in South Western of Northen Grid - Part A (earlier RAPP $_!; Transmission System for Farakka Stage-III Northen Region System Strengthen>>`__>> Northen Region System Strengthen>`__> 161 162 163 164 165 166 167 168 169 170 171 172 Stringing (ckm) Capacity Enhancement in East-West Corridor in Northern Region 7 Transformer Erection (no.) 160 6 Stringing (ckm) 0 5 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) 159 2 I Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) Transmission System for Kalpakkam ~^ Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments 9 Remarks 223 0 0 0 ]|>>! #""_'"?;% Transmission System Associated with NLC-II Expansion Project Transmission System for Korba -III 175 176 177 178 0 0 0 0 0 0 0 0 Southern Region System Strengthen>___> Rihand Dadri convertor transformer IIND Spare Converter Transformer for Transmission System for Mauda ATS Northen Region System Strengthen>>`__>> Transmission System associated with SEWA-II HEP Transmission System for Koldam % Transmission System Associated with Kahalgaon -II, Phase -I Interconnection of lines from North karanpura STPP to Pooling station at "| 179 180 181 182 183 184 185 186 187 0 0 0 0 POWERGRID NALCO Conductors Ltd 7 Stringing (ckm) 174 6 Transformer Erection (no.) 173 5 Stringing (ckm) 2 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Strengthening of East West Transmission Corridor Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) I Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for preliminary/infrastrucal works Outlay kept for balance payments Outlay kept for balance payments 9 Remarks 224 0 0 0 0 0 0 0 0 0 0 Substation Works Associated with __> Establishment of Fibre optic communication system in NR Fibre optic communication system in %[ ^\ @ Eastern Region Fibre optic communication system for cen!" _ >!! ^" @}__ Transmission System Associated with Simhadri-II System Strengthening in NER (MISS>`|?>` Nabinagar - II _<`|<`>`|> Transmission System associated with Talliya UMPP _;_>> _ !|%___>> 190 191 192 193 194 195 196 197 198 199 200 0 0 Stringing (ckm) Substation Works Associated with __>> 7 Transformer Erection (no.) 189 6 Stringing (ckm) 0 5 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Transmission System associated with Tehri PSP 2 I Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) 188 Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for balance payments Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for balance payments Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works 9 Remarks 225 0 0 0 0 Transmission System associated with _!>>><_ <`_>__>]`__<__]\><><+=^ _;_>!lation of statcoms Substation Extension for Transmission ; "%%"! }" `<\ }">= =\]<|? Statecom in NR ]^>?_ >!! ]>"" > NAGAPATTINAM A1b 206 207 208 209 210 211 212 213 214 0 0 0 0 0 0 0 >!! _" % _ ! 204 _\` 0 Upgradation/expansion of scada/ems system of SLDC of WR 203 205 0 Inter Region System Styrengthening _"; `^ 202 7 Stringing (ckm) 2 6 Transformer Erection (no.) 201 5 Stringing (ckm) 2 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) _!^;" #tion / Shifting of terminationg lines at @_ Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) I Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works 9 Remarks 226 0 0 _<`|<`>`|> Transimmison System Associated with Darlipalli TPS NERSS-2 Part A " ` 216 217 218 219 0 0 0 0 0 Dynamic Compensation at N’Garh `__ TS associated with Kishenganga HEP Augmentation of Talcher II Transmission System Transmission System for Krishnapatnam UMPP -PART C3 - SR1 Transmission System for Start up power \ ^ }" Provision of spare ICTs and Reactors in NER 221 222 223 224 225 226 227 0 0 <\"`^ 0 0 0 0 220 7 Stringing (ckm) _"\ ; _\` 6 Transformer Erection (no.) 215 5 Stringing (ckm) 2 Transformer Erection (No) I Stringing (Ckm) Process/ Timelines 8 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Name of The Projects / Schemes / Programme Achievements during Quarter - III (upto Dec’14) S. No. "#%'ables Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works Outlay kept for preliminary/infrastrucal works 9 Remarks 227 0 0 0 0 0 0 Upgradation/expansion of scada/ems ; _?\ `?\>> Interconnection of lines from North Karanpura STPP to Pooling station at "| Common System associated with East Coast Energy Private Limited and NCC Power Projects Limited LTOA Generation Projects in Srikakulam Area - Part C Augmentation of Transformation Capacity in Northern Capacity (for 2016-17 " % ^ Augmentation of Transformation Capac^%!__> ?^%" ' POWERGRID associated with Krishnapatnam UMPP Synchronous Intercon" _^ Other New Schemes 233 234 235 236 237 238 239 0 0 _<^?>_`<]~?\>`` 0 Procurement and Installation of Specail _%\ !!" '"\` 231 232 0 Implementation of Automatic Meter Reading from Special Energy Meters _` 230 0 Stringing (ckm) 0 7 Transformer Erection (no.) > #" 6 Stringing (ckm) 229 5 Transformer Erection (No) 8 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) 228 2 I Stringing (Ckm) Process/ Timelines Achievements during Quarter - III (upto Dec’14) >!! £@ < ;>]|> Substation Name of The Projects / Schemes / Programme S. No. "#%'ables Outlay kept for balance payments 9 Remarks 228 0 0 0 0 0 0 0 0 0 0 0 0 Upgradation/expansion of scada/ems system of SLDC of ER >;!; #%!<;;"_;<_ Implementation of Grid Security Expert _;|__ Implementation of Fibre Optic Communication System for GSES Transmission System Associated with < Transmission system for South West Interconnection ( Project elements of subject scheme has been merged in ___>> `; \%%! }" Transmission System Associated with Kahalgaon -II , Phase -II % <!" !\ ^ ! Northen Region System Strengthen>`__> Transmission System for Karcham _;^ %%!! Northern Region System Strengthening _";>`__> Augmentation of Transformation Capacity ]|;` 242 243 244 245 246 247 248 249 250 251 252 253 Stringing (ckm) 0 7 Transformer Erection (no.) Upgradation/expansion of scada/ems system of SLDC of NER 6 Stringing (ckm) 241 5 Transformer Erection (No) 0 Stringing (Ckm) Process/ Timelines 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) Other New Schemes-Equity 2 Name of The Projects / Schemes / Programme Achievements during Quarter - III (upto Dec’14) 240 I S. No. "#%'ables Outlay kept for balance payments 9 Remarks 229 _;_> _;_>>>__>>> 260 261 262 7 0 Transmission System Associated with Sipat-II, STPP 259 3191 0 Transmission System Associated with SIPAT-I STPS 258 34 0 Western Region System Strengthenign >>__>> 257 GRAND TOTAL 0 Supplementry Transmission System associated with Sipat Stage-II project 256 9307 0 0 0 Transmission System associated with \`<\<`^<_` \>?>?]]~\!; _;% Stringing (ckm) 0 7 Transformer Erection (no.) II nd Spare Converter Transformer for Talcher Kolar 6 Stringing (ckm) 255 5 Transformer Erection (No) 0 7000 Stringing (Ckm) Process/ Timelines 8 27 0 0 0 0 0 0 0 0 0 Transformer Erection (no.) Commulative Achievements upto Quarter - III (upto Dec’14) <!" ;^` @ 2 Name of The Projects / Schemes / Programme Achievements during Quarter - III (upto Dec’14) 254 I S. No. "#%'ables Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments Outlay kept for balance payments 9 Remarks 230 3. !"; % #' years (2012-2017 % a aim to acquire infrastructural facilities to improve the " !#"" of the Ministry like purchase of com >< related peripherals, implementation of '" e-mission mode project, maintenance of infrastructural facility acquired during 11th Plan. 2. ]#"[ ! 1. Objective/ Outcome: Sanctioned cost/ Cumulative expenditure from beginning till 31.3.2012 Name of Scheme/ Programme/Projects Sr. No. 0.75 (Comput #" ; _______ !^% Complementa[^%getary Resources Non-Plan ^% ]! 5. Quan#! Deliverables/ Physical Outputs MoP Secretariat Achievements upto 31.12.2014 _____ ! 6. Processes/ Timelines Proposed plan Scheme will be completed by 31.3.2017 Implementation of e-governance #" mission made project development of centralized data base system. Availability of data in electronic version. Following are the major # the scheme is fully implemented 7 Projected Outcomes: Date of completion of the project The target laid down in the scheme for 20142015 have been fully achieved 8. Achievement / Comments 9 Remarks (Rs. In Crores) Annexure - IX 231 < ; ; #" 2.63 expenses i.e. RE i. Payment of telephone bills #" ; items iii. Purchase of stationary items. iv. Requirements of Central Registry Section ' " ;able. vi. Maintenance and purchase of petrol for staff cars etc. vii. AMC of items i.e. electric, telephone, furniture etc ] Secretariat ]#" Expenses "]_"- "< %'! infrastructure in the Minor work Ministry 3. 2. 1. Plan ^% NonPlan ^% >\ ]! Objective/ Outcome Sr. Name of No. Scheme/ Programme/ Projects _______ _______ Complementa[^%getary Resources To develop infrastructure in the Ministry < meet the requirement #"[penses i.e. Payment of telephone bills, stationary items, Maintenance of #"ment, petrol for staff car and other Electric items etc. 5. #able Deliverables/ Physical Outputs _____ _____ ! 6. Processes/ Timelines Smooth functioning of the Ministry Smooth functioning #" 7 Projected Outcomes: Date of completion of the project NIL NIL 8. Remarks/ Risk Factor Target have been achieved Target have been achieved "%!! 9 Achievement (Rs. in crores) 232 Name of Scheme / Programme 2 Technical Con !! Monitoring ` ! Sl. No. 1 1. Review of power sector performance, long-term ; planning, assessment of manpow;! long-term system planning studies including management studies of RPCs, concurrence to hydro power development schemes, monitoring construction transmission projects, monitoring of !!"#" and distribution planning, etc. 3 Scope & Objective 5 % "" = grammed. $mal units aggregating to *== " !!" publication of: Daily generation report. Monthly review of power sector performance. Monthly status reports on construction of various hydro and thermal projects. All India Electricity Statistics: General Review ! Growth of Electricity _" >%! Review of Performance of hydro power stations ! Review of Performance of thermal power stations ! '<" " ;" appraisal and concurrence to hydro-electric projects. 3330.10 (3281.79 after 10% mandatory " 7 Reasons for variation " !!"%!% Daily generation report. Monthly review of power sector performance. Monthly status reports on construction of various hydro and thermal projects. All India Electricity Statistics: Gen!'! Growth of Electricity Sector in In%! Review of Performance of hydro ! Review of Performance of thermal ! ;! *== were monitored, out of which 15 units aggregating to 6888.3 MW were commissioned. In addition to that, 13 units aggregating to 7026.1 MW of additional units, which are not included in current year target were also commissioned. (Totaling to 28 units aggregating to * " ;; % + A Hydro capacity of 336 MW is -----. " ;; % 6 Physical Targets set Achievement during the year during the year 2014-15 2014-15 (upto 31st December 2014) 4 Approved outlay 2014-2015 CENTRAL ELECTRICITY AUTHORITY Achievements upto 31.12.2014 Continuous process 8 Remarks (Rs. in lakhs) Annexure - X 233 To keep engineers of CEA abreast of global technological developments in power sector. 56.00 Training of 1200 man days to CEA employ10% manees. % " Training of 551 mandays provided to 65 employees. The Collective Membership renewal is under process. |%%! ; !% Inadequate '%% - response % " ;!% training and 9 are under training. " !"% training. Training of 10 degree / diploma holders, 35 vocational and 11 D/ Man Shortage of funds --- ------ Consultancy services provided to 19 projects in and outside India. At present 19 Nos. of consultancy projects are in hand. 7 6 Reasons for variation 5 Physical Targets set Achievement during the during the year 2014- year 2014-15 (upto 31st 15 December 2014) Collective Member0.60 ship of CIGRE Paris. 10% manda " 6.00 10% manda " Imparting vocational training to Graduate / Diploma holders under the Apprenticeship Act, 1961. _%<- To improve ` ! performance of Engineers / functionaries. Apprenticeship Training for Engineers (Non! 3. 2087.00 (2073.80 after 10% mandatory " 4 Approved outlay 2014-2015 To provide technical sup Engineering of power projects to power utilities and adoption of state-of-the-art technologies. 5. \ sultancy (Non! 2. 3 Contribution to International ^ % ` ! 2 1 Scope & Objective Name of Scheme / Programme Sl. No. Continuous process Continuous process Continuous process Continuous process 8 Remarks 234 National Load Despatch Cen`_>\ ` ! Electronic Data " Support System ` ! 6. 7. 2 1 100.00 (90.00 after 10% mandatory " 4 Operation and maintenance of computer systems under the NEPSIC scheme in CEA and its sub-of#" Operation and maintenance of computer systems provided in \ #"%% year of maintenance of IMS Phase-I which is a continuous process since January 2011. 5 Approved out- Physical Tarlay 2014-2015 gets set during the year 201415 The scheme is re- 9.00 lated to operation (8.10 after 10% and maintenance ;% " of National Electric Power System Information \ `_>\ at New Delhi for collection of vital power system operational data from different Regional Power Committees \ CEA / Ministry of Power. Maintenance of Information Management System >_> Operation and maintenance of computer systems provided in CEA and its #" 3 Name of Scope & ObjecScheme / Pro- tive gramme Sl. No. Procurement of Computer Systems / peripheral devices provided in CEA and its #""% out and procurement of consumables for their continuous operation was done. Maintenance of Computer systems / softwares / peripheral devices in CEA were carried out and procurement of computer ; consumables for their continuous operation and maintenance of IMS Phase-I which is a continuous process were done which involves total expenditure of about `79.81 lakhs. 6 ___ 8 Remarks One tender having anContinuous ticipated expenditure of process about Rs.7.00 lakhs got cancelled, which will be re-tendering in January 2015 after the approval of competent authority. A few procurement actions initiated in time for completion before Decem" !% completed due to factors beyond control. ^!! ;" >_ > lakhs is pending and is yet to be paid. ^!! \ " ;ers / peripherals for one quarter will be raised by the concerned contractor 7 Achievement during Reasons for variation the year 2014-15 (upto 31st December 2014) 235 Departmental Canteen ` ! Administration of Electricity Laws ` ! All India Load Survey To assess de210.79 _";` ! mand of Power (208.91 after 10% over a period of ;% " time 9. 10. 6 Achievement during the year 2014-15 (upto 31st December 2014) \ !!" % scrutiny for GR-2015 is in progress. Growth of Electricity Sector in India from *+ % printing. |!' containing data for the year 2012-13 is under printing. Collection of Annual Power Survey Data from about 170 power utilities and $ % having electricity demand of one MW and above. NIL NIL NIL Continuous process Report of All India Electric Power Survey by Econometric Model 18th_ !>proved by Authority for publishing. All India Electric Power Survey by Econometric Model NIL Continuous process 8 Remarks Continuous process -- 7 Reasons for variation Inspection of Electrical ---Installations totaling to *'! £ Welfare measure The canteen is functioning as a welfare measure to the staff. 5 Physical Targets set during the year 201415 252.39 Inspection of *+ Electrical Instal" lations totaling to '!£ £'!¤[¥¥¥["@;¥['% Statutory inspection of Electrical Installations of Central Sector and UTs. To provide sub- $ sidized canteen *+ facilities to the ;% " employees of CEA 4 8. 3 2 Approved outlay 2014-2015 1 Scope & Objective Name of Scheme / Programme Sl. No. 236 11. Regional Coordi ` ! The country has been %;"% #' Regions for the purpose of planning and operation of the power system. Regional Power \ ;;\ !^ have been set up in !!#' facilitating integrated operation of power system in that region for the optimal utilization of the available power resources through functioning of various sub-committees such as Technical Coordination Sub-Committee, Operation Coordination Sub-Committee, Commercial Sub-committee, Protection Sub-Committee and System Studies Sub-Committee etc. The scheme is meant for funding the operations of the Regional Power \ ;;\ 550.50 (537.25 after 10% mandato" Facilitation of coordinated operation of regional power grids in the country Facilitation of secured and reliable operation of the Regional Grids. -- Continuous process 237 Regional Load Despatching Centres ` ! Strengthening of Regional Electric^ %` known as Regional Power Commit! 12. 13. 100.00 Construction of one ! "@ <>< >>><>> Water supply and electric power supply #"!% %! ]! "@ <> > 807.32 (779.39 after 10% mandato" The real time operation of the regional grids is being carried out by the respective RLDCs. Operation planning and coordination functions which facilitate the integrated operation of the power system continue to be with the Regional Power Committees \?\% RPCs have to operate in close coordination in achieving the bene# "% integrated operation of the Regional Power System. Facilitation of secured and reliable operation of the Regional Grids. To complete at least 50% construction of >><>$ ` <>>>$` <>>$` \'! @ >> = +%!""! " ;!% < " ;! #" ]#"!%" ;!%"!%building including water !|!"" !|!"" supply. supply. Facilitation of coordinated operation of regional power grids in the country Continuous process Ministry of Power / Ministry of Finance reduced the approved Outlay to Rs.23.00 lakhs at RE stage. Also, expenditure could not be incurred, as approval for continuation of the scheme during 12th~' Plan is pending in Ministry of Power. -- --- 238 Computerization of PTCC process Computerisation of processing of the PTCC cases for route approval 1107.51 Fresh biding to select new System Integrator _>;@" ! Due diligence steps are in process. --- Initially, the selected SI got blacklisted in September 2012 and the matter remained subjudice till 25-092013. Approval of MoP for RCE of `2195.20 lakhs was received on December 2013. The original bidder requested CEA to issue LOA to one of its newly created subsidiaries after demerging its business. As the new entity does not comply with the RFP requirements. CEA recommended MoP to revoke the LOI and start rebidding process for selection of system integrator _>\ "" this regard from MoP is awaited. The letter of Award to selected SI was delayed due to: - 239 16. 15. Technical Assistance by World ^@ CEA for appointment of Consultants for addressing ^ #"" Coal Fired generating units in India Upgradation of IT "!\ >>! (Un-approved) 3. Review of Experi" ;! projects. 2. Review of Institutional Capacity and Strengthening of Institutional capacity at CEA. 1. Implementation Sup- = \ !>_\ 739.65 Comprehensive and more intensive IT based system for monitoring of execution of power projects. Setting up of Disaster Recovery Data Center as a standby of primary Data Centre. ^!%%%" Data Center for higher availability. Strengthening / Upgradation of existing IT infrastructures. Procurement of Planning Model software. 3. Submission of draft reports on Review of >;!; Experience from Pilot >' TPS in India. Submission of draft reports on Review of Experience in Strength ]"" in TPS in India. 2. Draft Report on Capacity Strengthening Plan for CEA to be submitted by KPMG. Technical and Management Training of CEA #" % by KPMG. 1. Preparation and sub; ^ ! Status Report, Monthly and Quarterly progress reports. Subject to the approval of the Scheme, preparation of Tender Document by the consultant and issue of NIT for the project. Selection of implementing vender. Placement of order followed by: Procurement of PCs, Laptops, UPS, Printers "; % Conferencing equipment. Procurement of equipment for Disaster Recovery Data Centre. Procurement of redundancy equipment for Primary Data Centre. 3. The consultant has submitted the draft report on Review >;!; [" ;! Interventions in TPS in India in "; The consultant has submitted the draft report on Review of Experience in Strengthening of ]""<_>% ! 2. Draft Report on Capacity Strengthening Plan for CEA submitted by KPMG. Technical Training of CEA #" %| ` ';%;< \ #" are to be organized by KPMG during Jan / Feb 2015. _;%^ ! Status Report, Monthly and Quarterly progress reports. The Scheme is yet to be approved. - Nil - The Scheme is yet to be approved. -- 240 ^' Hydro-Electric Potential in the country 17 . 4 Approved outlay 2014-2015 The study aims to carry 2520.00 out basin-wise review of the hydro potential within the country in"!%%#" New Schemes, wherever possible. Review of hydro potential would help in planning and development of various projects, evacuation arrangement and Environmental Impact Assessment which would enable an optimal harnessing of hydro potential in each river basin. 3 Scope & Objective ~<%#- The objectives of the cation of DISCOMs scheme is to monitor the implementation of the Financial Restruc!~ of State DISCOMs through Third Party #" % the purpose of recommendation of granting incentives to the State DISCOMs, as provided in the scheme. 2 1 18. Name of Scheme / Programme Sl. No. !'#" Mandatory conditions of state DISCOMs for the _" scheme is under approval in the Ministry of Power, this target would be shifted to the year 2015-16 Terms of Reference of the "; #!% and work to be awarded to executing agency. 5 Physical Targets set during the year 2014-15 NIL ToR of the scheme has #!%% under consideration of Ministry of Power. 6 Achievement during the year 2014-15 (upto 31st December 2014) -- 7 Reasons for variation The Scheme is yet to be approved. 8 Remarks 241 1 S.N. Comprehensive Award Scheme for power sector 2 1.00 Plan ^% 4 - Complementary [^% Resources Outlay 2014-15 Non Plan ^% To inculcate competitive spirit and to motivate higher level of #"%" ;" #!% of construction operation and maintenance of thermal/hydro/ transmission projects, implementation of distribution reforms, rural distribution franchisees, environment performance, community development and safety records. However, the expected returns cannot be #% 3 Name of Objective/Outcome Scheme/ Programme/ Project Improvement in performance of generation, transmission distribution and environment management 5 Quan#! Physical Outputs Comprehensive Award Scheme Achievements upto 31.12.2014 7 The awards 15 are to be given in a function to be held in March, 2015 To contribute in achieving reliable affordable and quality power supply to all Processes/Timelines 6 Projected Outcomes The award Distribution Function for the year proposed to be held in March 2015. 8 Remarks/ achievement upto December, (Rs. in crore) Annexure - XI 242 I 1. Strengthening of <; System from Alusteng _ ?' !! $$ % $$ interconnection system for Drass, Kargil, Khalsti and Leh sub-stations in 2. S.No. Name of the Scheme/ O b j e c t i v e / Programme Outcome Nil 268.14 - N o n P l a n Complementary P l a n ^% ^% E x t r a ^ % Resources ]! NITs for all the ten packages were released by PGCIL ~ " #' "@ have been awarded after opening the % '! #! % recommendation for balance packages is in progress. Foundation laying ceremony was presided over by Hon’ble PM on = ? Survey for the route alignment for ! ^ ! ! !!! Leh sectionof the line was completed. 5. #! Deliverables/ Physical Outputs Transmission Schemes Achievements upto 31.12.2014 6. 7. Processes/ Timelines ' @ ! ? Aug, 2017 _\ ! $$@ ? ? || [\ ! associated Sub-station @!? @!_\ July, 2017 ! $$@ ! ! || [\ ! % associated Sub-station @! Aug, 2017 @ ! ! _\ ! $$@ ! ! || \ ! associated Sub-station @!! @ ! July, 2017 _\ ! $$@ || \ ! and associated Sub-station @! Projected Outcomes 8. Remarks/ R i s k Factors (Rs. in crore) Annexure - XII 243 II 1. Strengthening of Transmission System in the States of "!% Sikkim. 2. S.No. Name of the Scheme/ O b j e c t i v e / Programme Outcome Nil 175.18 - N o n P l a n CompleP l a n ^% mentary ^% E x t r a ^ % Resources ]! Projected Outcomes 6. 7. Processes/ Timelines NITs for four packages Intra-State transmission Dec., 2018 have been issued projects for Arunachal " Pradesh and Sikkim total 23 packages for Arunachal Pradesh project and all the packages are scheduled to be awarded between June and October, 2015 after opening of bids. As for the Sikkim project, NITs for four packages have been % " out of total 8 packages and all the packages are scheduled to be awarded between June and July, 2015 after opening of bids 5. #! Deliverables/ Physical Outputs 8. Remarks/ R i s k Factors 244 III 1. Improvement of Power System Improvement Project in six North Eastern States excluding Arunachal Pradesh and Sikkim 2. S.No. Name of the Scheme/ O b j e c t i v e / Programme Outcome Nil 200 N o n P l a n CompleP l a n ^% mentary ^% E x t r a ^ % Resources ]! As for Meghalaya and Nagaland, NITs for total seven packages each are scheduled to be opened between January and May, 2015 and works would be awarded between July to November, 2015 after opening of bids. As for Manipur, NITs for total six packages are scheduled to be opened in February and May, 2015 and works would be awarded by June and August, 2015 after opening of bids. NITs for two packages have been issued " total 12 packages for Assam project and all the packages are scheduled to be awarded between June and October, 2015 after opening of bids. 5. #! Deliverables/ Physical Outputs 6. 7. Processes/ Timelines Work is under progress for Dec., 2018 implementation of IntraState transmission projects for six North Eastern States Projected Outcomes 8. Remarks/ R i s k Factors 245 Iv 1. Power Sector Support to NCT of Delhi 2. S.No. Name of the Scheme/ O b j e c t i v e / Programme Outcome 200 - N o n P l a n CompleP l a n ^% mentary ^% E x t r a ^ % Resources ]! Work is progress Projected Outcomes 6. 7. Processes/ Timelines @\}|¥]! <; ! <?_ re-conductoring of D/C Geeta Colony -Wazirabad under _ !"; May, 2015 [ >\< ^; ! As for Tripura, NITs for three packages have been issued " total 11 packages and all the packages are scheduled to be awarded between June and October, 2015 after opening of bids. As for Mizoram, NITs ! #' "@ are scheduled to be opened in February and May, 2015 and works would be awarded betweenAugust and November, 2015 after opening of bids. 5. #! Deliverables/ Physical Outputs 8. Remarks/ R i s k Factors Chapter - V Financial Reviews Details of Annual Plan outlay 2015-16 : An amount of ` $+" is the approved outlay by the Ministry of Finance for the year 2015-16 comprising of `**+" >^%`$+**+" |^_ The details are as under : Sl. No. Organisation/ Schemes Internal Resources Bonds/ Debentures ECB/ Supplier Credit Others Total (IEBR) Total (GBS) Total Plan Outlay 1 2 4 5 6 7 8 9 10 A. PSUs 1 NTPC *+* 7870.26 5685.95 0.00 23000.00 0.00 23000.00 2 NHPC 2120.55 =* 0.00 0.00 3979.89 200.00 +*=* 3 PGCIL 13000.00 3000.00 0.00 20000.00 0.00 20000.00 4 \ 0.00 1000.00 0.00 2682.93 3682.93 0.00 3682.93 5 THDC 0.00 509.83 587.23 1550.31 30.00 1580.31 6 _`? 977.93 0.00 83.07 1175.00 0.00 1175.00 7 NEEPCO 155.61 818.10 =* 0.00 1216.60 75.00 1291.60 0.00 TOTAL (A) 17151.13 B. MOP Umbrella Programmes 1 Deen Dayal Upadhyay Gramin Jyoti Yojana 2 Power Sector Reforms 0.00 24547.70 9552.67 3353.23 54604.73 305.00 54909.73 0 0 0 0 4500 4500 a. Integrated Power Development Scheme 0 0 0 0 0 600 600 b. Transfer to Power System Development Fund 0 0 0 0 0 300 300 c. Power System Improvement Project in NE Region (except Sikkim "! % 0 0 0 0 0 250 250 246 Sl. No. 1 Organisation/ Schemes Internal Resources Bonds/ Debentures ECB/ Supplier Credit Others Total (IEBR) Total (GBS) Total Plan Outlay 2 4 5 6 7 8 9 10 d. 220 Kv Transmission Line from Srinagar to Leh via Kargil 0 0 0 0 0 250 250 e. Strenthening of Transmission System in the States of Arunachal % Sikkim 0 0 0 0 0 150 150 f. Central Power Research >\> 0 0 0 0 0 125 125 g. Financial Debt Restructuring of DISCOMs 0 0 0 0 0 + + h. Energy Conservation 0 0 0 0 0 60 60 i. ^ #"" 0 0 0 0 0 50 50 j. National Power Training Institute `<> 0 0 0 0 0 k. Central Electricity Authority 0 0 0 0 0 30 30 l. Smart Grid 0 0 0 0 0 m. National Electricity Fund `~> Subsidy Scheme 0 0 0 0 0 20 20 n. Other MoP Schemes 0 0 0 0 0 Total (B) 0 0 0 0 0 6494.74 6494.74 17151.13 24547.70 9552.67 3353.23 54604.73 6799.74 61404.47 Total (A)+(B) 247 The CPSU-wise and scheme-wise break-up of 12th Plan are as under: (Rs. In crore) Sl No. Activity/ Organization A Investment in PSUs IEBR 1 NTPC Ltd Estimates 2 NHPC 219612.50 0.00 219612.50 ++ 0.00 ++ Estimates + 2056.91 29368.95 $* 1335.36 8280.60 Estimates \ 5 THDC India Ltd 0.00 Achievements 60815.00 0.00 60815.00 Estimates *$ 0.00 *$ Achievements 7635.37 0.00 7635.37 Estimates 6781.86 516.20 7298.06 Achievements 1021.38 + 1196.62 0.00 6 _`? Estimates Achievements =* 0.00 =* 7 NEEPCO Estimates 5866.79 $= 6272.97 Achievements 3615.26 261.71 3876.97 Estimates 386516.84 2979.29 389496.13 Achievements 139485.04 1772.31 141257.35 0.00 *+ *+ Achievement 0.00 $= $= 2 Restructured Accelerated Power Development Reforms Estimates ;; Achievement 0.00 10830.00 10830.00 0.00 2392.32 2392.32 3 ` !!""~%`~ Estimates 0.00 3601.00 3601.00 Achievement 0.00 0.00 0.00 Strenthening of Transmission System in the States of "!%_@@; Estimates 0.00 Achievement 0.00 100.00 100.00 5 Feeder Separation Scheme Estimates 0.00 2500.00 2500.00 Achievement 0.00 0.00 0.00 Estimates 0.00 1696.00 1696.00 Achievement 0.00 69.58 69.58 7 220 Kv Transmission Line from Srinagar to Leh via Kargil Estimates 0.00 1628.00 1628.00 Achievement 0.00 8 \! ">\> Estimates 0.00 1368.90 1368.90 Achievement 0.00 =+ =+ Estimates 0.00 1000.00 1000.00 Achievement 0.00 0.00 0.00 Estimates 0.00 $+ $+ Achievement 0.00 + + Estimates 0.00 51299.71 51299.71 Total (A) B Total Achievements Achievements 3 POWERGRID GBS MoP Schemes (other than CPSUs) 1 }'|%|;%@ }|| Estimates 6 Energy Conservation 9 Financial Debt Restructuring of DISCOMs 10 Other MoP Schemes Total(B) Achievement Total GBS (A) + (B) 0.00 9920.43 9920.43 Estimates 386516.84 54279.00 440795.84 Achievement 139485.04 11692.74 151177.78 Achievement is as on 31.01.2015 248 249 THDC _`? 5 6 Rajeev Gandhi Grameen %@ } || Restructured Accelerated Power Development Reforms Programme National Electricity Fund `~ Strenthening of Transmission System in the States of "! % Sikkim Energy Conservation 1 2 3 5 B. MOP Schemes (other than CPSUs Total-A \ 8 Power Grid 3 NEEPCO NHPC 2 7 NTPC A. Investment in CPSUs* 1 Schemes/ Organiztions 1 Sl No 3 RE 2012-13 2967.83 1180.36 796.00 362.35 =* 200.00 72.00 * 55.00 1.00 0.00 1500.00 * 53296.87 50481.83 1271.79 796.00 565.39 5571.69 20000.00 20000.00 *+ 20995.00 20995.00 2 BE 2012-13 5 BE 2013-14 6 RE 2013-14 ** 3058.12 1989.61 *$= 579.86 == 1661.77 *$= 331.96 3515.97 37.00 0.00 0.00 * $*+* $ 1.00 151.92 575.00 16.00 1.00 10.00 700.00 3137.65 49155.38 51263.96 49731.90 1062.62 = 291.17 3366.65 20360.00 20000.00 20000.00 3307.26 19925.53 20200.00 20200.00 4 Actual 2012-13 %% >>! 8 BE 2014-15 9 RE 2014-15 $ +$ 1087.98 1091.93 856.68 +$** 1595.08 720.22 ++* 2286.73 16.00 0.00 0.00 $=+ 2938.52 107.65 175.18 50.69 $ * + 100.00 1.00 595.26 2886.38 54195.55 51425.04 50321.98 1558.19 $ 23158.00 20000.00 20000.00 3219.03 +*+ 7 Actual 2013-14 16.58 100 0 509.13 2817.72 37906.50 1256.16 =* 501.12 $* 17297.00 + 15381.93 10 Actuals upto 31.01.15 (`>" <"![%'²'^%;'%;%>>% >>!" PSUs and schemes under the administrative control of Ministry of Power: 250 0.00 0.00 0.00 Power System Improvement Project in NE Region ["_@@;"! % Central Electricity Authority Scheme for Power System Development to be met from PSDF Power Sector Support to NCT of Delhi Deen Daya Upadhyaya |; } Integrated Power '! ;_";>_ 11 12 +$ 0.00 0.00 5.09 9127.63 £<#"!%|^_%>^ Total-B Other MoP Schemes 0.00 Financial Debt Restructuring of DISCOMs 10 13 19.08 National Power Training >`<> 9 265.00 Central Power Research >\> 8 4214.18 $ 0.00 0.00 0.00 0.00 6.53 0.00 0.00 5.09 80.00 10.00 200.00 220 Kv Transmission Line from Srinagar to Leh via Kargil 7 58.00 3 RE 2012-13 200.00 2 BE 2012-13 ^ 1 Schemes/ Organiztions 6 Sl No 2.98 0.00 0.00 0.00 0.00 0.00 0.00 5.00 $ 0.00 2066.10 4 Actual 2012-13 8065.45 $+ 0.00 0.00 0.00 0.00 37.20 0.00 1500.00 11.00 298.73 226.00 * 5 BE 2013-14 4230.99 0.00 0.00 0.00 0.00 5.35 62.35 6.00 20.00 $ 77.60 6 RE 2013-14 3760.71 1.86 0.00 0.00 0.00 0.00 2.12 0.00 0.00 3.63 17.76 $ 66.72 7 Actual 2013-14 8955.59 8.50 100.00 500.00 200.00 1.00 $* 200.00 60.52 295.53 $= 139.55 8 BE 2014-15 5160.30 5.90 100.00 500.00 200.00 200.00 15.28 150.00 1.00 12.70 79.82 $= 10.00 9 RE 2014-15 0 4092.51 0 0 200 0 0 100 0 8.89 70.62 $= 10 Actuals upto 31.01.15 Reasons for reduction in CPSUs and MoP schemes are given below: CPSUs 1. NHPC Ltd. < ; %" " '% ^ provisions are: Stoppage of work at Subansiri Lower due to ongoing protest by various pressure groups in Assam against the construction of Subansiri Lower H.E. Project since 16.12.2011. % !" @ <<^^"@ >> }"" !% #!%"!" '%" ]<%!"< @ <^%% =% <%!"< @ ^ hence less provision kept. " !' "!"" !^! }" <>>><>" !% ;!!% Due to Non Availability of Wild Life Clearance, poor accessibility, and security ' " ^%"% <; !!#"!%! %;! "" "%!%" ;; `;; ^ \@\;>>> >>>>><? ;>>><? ;>% ' ;%;% }"% >>!~% ' in Assam against the construction of Subansiri Lower HE Project, there is stoppage of works in Subansiri Lower HE Project since Dec’2011. Also, there was slow progress of @>>%<?> }"% ; " " %%#"!"" \ " \\"'!< @ }"!@ !^!><>%<>>> }"["% start in the year 2015-16 subject to availability of pending statutory clearances and Govt. " %~% ?@_%%! }" '!! % >%'! _| '%%!_> works for FR/DPR preparation of projects namely Chungar Chal, Garba Tawaghat and ; !?;<!! }" ! %"%%>! 2. THDCIL VPHEP (4x111 MV): > ^ ' % \'! @ % !@ %!%% %!" _>> "!"% issuance of G.O. by GoUK.The 2nd mobilization advace (approx ` =\" 251 "%!%%]" "%%!%~$% %! % \'! @%% !! ` \ ! %'" @" !%~ !% !%% Jan'15. Dhukwan SHEP (24MW): \'! @ @_"!% %%!" !% awarded due to delay in clearance of forest land by GOUP. It could be awarded on 30th ]" %!"'%" %% % ~$ New Projects: >}_<<$$; ` \@%^!%% !; !! "% }"%~$ ` 250Cr. As award of contract for development of 50 MW Wind Power project is expected during Aug'15, a provision of ` \;% ;%~$ 3. Damodar Valley Corporation %" ' '%^ <_>>!!"'!! %% % '!! resources. 2. Renewable Energy Projects : Solar Power Projects presently postponed due to #"!" % !" ""! _<_%!" ;! !" @% land acquisition problem etc. ] !;?%" %~ \!" !;" < 5. Equity contribution to MAMC : Execution of shareholders agreement is lying at ^?<!%%%"!" ; "|]> <" !! 4. SJVNL:<%" % !! }" _`? Devsari HE Project (252 MW) :Provisions were made keeping in view that all the "!" !! % % ' ' ; Forest clearances were held in abeyance owing to direction from Hon’ble Supreme Court. Luhri Hydro Electric Project (601 MW) :The decrease in the provision made in the ^;! <\ ;\ 252 JakholSankri HE Project (51 MW) :Provisions made for the project have been reduced as the TEC for the project is still awaited. ' Naitwar Mori HE Project (60 MW): Provisions were made keeping in view that all "!"!! %% '' ; ~ "!"!!%%"" %! ' ;%' reduced. ' Dhaulasidh HE Project (66 MW) : ' '%"% >^ approval. ' Wangchhu HE Project (570 MW): Provisions have been reduced for want of CCEA approval and signing of Share Holder Agreement. ' Kholongchhu HE Project (600MW): Provisions have been reduced as pre " " "'"@ ; @ | \ ; ^ 'Buxar Thermal Power Project (1320 MW) :Provisions were made keeping in view !! "!"!! %%%!%" "!!" ;!% '>^ " " "'% approval. Accordingly, provisions made have been reduced. [ Wind Power Project : Provisions have been kept for balance payments of the Khirvire Wind Power Project which shall be released after settlement of LD cases. Accordingly provisions have been reduced. [ * [? \@ %? * House Building at Shimla: Incessant rains during monsoon slowed down the progress accordingly provisions have been reduced. MOP Schemes 1. RGGVY: < !!%; %%~<% ' *" %"% ==$=" "=++ crore has already been released by MoP. The main reasons for short fall in achievement of physical parameters are: x General Elections in 1st x <;'!!%%#"! x The leftover villages are majorly affected due to delay in obtaining statutory "!"" %!"!"?! %] issues, non-availability of adequate upstream network etc. 253 x 2. %!> }""! "! " @"!%^? !%%"% _ ! " #[% ;? ^?" ;? ^? !% !! '!;% " " '%%%|| "%!! ^? !%" ;"!!@ %; !!"" consumption charges. Once a line is energized, many households take un-authorized connections. x !% >!>> }"%%^ ; =; %""!! % }" >!>> }" Uttar Pradesh. x ;" " " ! '%!% ; states. R-APDRP The Outlay for R-APDRP was reduced as per the trend of expenditure and low utilization of funds in initial quarters. The release of funds under R-APDRP in various tranches is subject to the achievement of certain milestones and further the Steering Committee has ! [%%" ;! % >< }" " may be attributed to initial slow utilization of funds. PFC’s claims for actual expenditure could not be released due to the various reasons including some unresolved issues on Nodal Agency Fee/Reimbursement of actual expenditure. 3. National Electricity Fund (NEF) : ` "#!%"!;" ' ;% " !% !% 4. Energy Conservation The reduction in RE stage is mainly due to delay in approval of NMEEE Scheme proposed in 12th!<\` _"; '% $= ~! <^ *" %}" '! !! %"; >> ! "! _"; %' ! \ ;; all the earlier proposed 10 schemes of 12th Plan was restructured into 3 schemes and accordingly fresh EFC proposals were submitted. Out of the 3 schemes, the scheme ;% _%% \ % ?!! !" ^!% #"" 254 "\ '%; !%% _%% \ %?!! !"!!; ;_%%?!!~" part of the Energy Conservation Fund. In view of this, the above budget of Rs.139.55 " '% " '%; 6. Central Power Research Institute (CPRI) Approval for 12th Plan projects namely Modernisation Project and Establishment of new test facilities project were received late during January 2015 and the project will commence after grant is released in 1st quarter of 2015-16. 7. 8. National Power Training Institute : The reduction is RE was due to following: x The Project work of Setting up of National Power Training Institute under NPTI at Alappuzha, Kerala Renovation, Modernization and Augmentation of training infrastructure of Nine Institutes of NPTI, Setting up of National Power Training Institute at Shiv puri have been awarded to M/s Power Grid as Project Management Consultant. Installation of Simulator has been awarded to NTPC ltd. x 10% payment has been made to Power Grid for two scheme during the year 2013 x `>< #!%["";_ %" !% !%% x 10% payment for installation of Simulators has been released to NTPC ltd during ~%;% "'% x <\'! @ % % "!" ]#"~%%%\%% x 800 MW Supercritical Training Simulator installation has been awarded to NTPC !%\% @%% ^? @% ^? %;%%% @ x Land for Shiv Puri has not been allotted till date. Matter is under consideration with Ministry of Power. Hence no fund could be utilized x The Scheme for Setting up of Hydro Institute of National Power Training Institute at Itanagar has been submitted to Ministry of Power for approval. Land has not been allotted for the Institute. The matter is under consideration with Ministry of Power. Hence no fund could be utilized Financial Restructuring of DISCOMs ` "#!% "!;" ' ;% " !% !% 255 Chapter-VI Review of Performance of Statutory and Autonomous Bodies under the Administrative Control of the Ministry of Power The following autonomous bodies and statutory bodies are under the administrative control of the Ministry of Power: Autonomous Bodies Statutory Bodies \! ">\> ` ! <>`<> Non-Commercial Commercial Appellate Tribunal for Electricity ; %!!\ <? \ Central Electricity Regulatory ^@^; \ ;; \\ ^ %^^^ ^ #"" ^ Salient performance highlights of the above mentioned organizations are as follows: 1. Central Power Research Institute (CPRI) : The Central Power Research Institute, set up in 1960 by the Govt. of India, became autonomous in the year 1978 as a society under Ministry of Power. The Institute has been established to serve as a nodal center for applied research in electrical power engi% " %% %"#" equipment as well as to assist the electrical industry in product development and quality assurance. The Institute also undertakes research programmes on subjects of interest #!% !""! % " !" !;% ! and industries. Facilities / expertise of the Institute have been extensively used by the industries and utilities both for product development and for product testing. The CPRI continued to play a vital role in quality assurance to ensure reliability of power ; % "#" "" %" ` ! % >tional standards. The laboratories of CPRI are accredited as per latest ISO/IEC 17025 %%` !""% ^ % <\! ? `^? and several International Accreditations have been obtained for various testing activi<%\ !"'" >"#% >_]* 2008. 256 Implementation of Capital Schemes: (A) Ongoing Project continued from XI Plan x " \>~\ ;`<? x ; ! "! ?"! %>" " ;!;%^! ^ !%% ` % !@ x ; !<~"! !' ^! x Augmentation of Impulse, Temperature Rise Test, Diagnostic Test Facilities at RTL, Noida x ; ; !"!<? !@+\ x ; !"!_<_^ !*\ x Establishment of Comprehensive EMI/EMC Test (Radiated Immunit Radiated ; "! x ; % < "! x Establishing facilities for testing LED lighting system x Additional test bay for Short Circuit testing of transformers at SC Lab x CPRI Infrastructure protection against security threat by construction of boundry !! ! % ^! %% ^ ! % [ CCAR building x ; < "! ; = @ \ = @ \ <; ;?\>%% x Modernisation of Short Circuit Test Facilities and Augmentation of Transformer Test Facilities Power (B) XII Plan Projects approved x \" ; % % }" \> % >> Plan x "'! ;_"; \>%>>! x RSoP Schemes, National Perspective Plan Projects <%! "'; " \>%;} schemes are given in Annexure-I. 257 2. National Power Training Institute (NPTI) : 2.1 Training output ! ' !'! ; % ;% ";> `<>"" <! ; ; %% trainee-weeks were decided as 17,500 and 1,20,000 respectively Sl. No. Performance Parameters MOU with Ministry of Power (Target for Excellent No. of Trainees in Regular Programs 17,500 ` <@< 1,20,000 '>!@ $= ` ![%!@ 3952.00 1. 2. 3. Actually Achieved up to "; 12,873 *= *+$= 3173.29 The details for NPTI are at Annexure-II. 3. Appellate Tribunal for Electricity (APTEL) The Appellate Tribunal for Electricity established by the Central Government under Section 110 of the Electricity Act, 2003 has been made operational w.e.f. 21st July, ; !+= $$+==*$ $% have been registered. Of which, 1982 have already been disposed of by the Tribunal. Apart from the above appeals, 3809 other IAs, Petitions etc. have been received in the Tribunal, out of which 3530 have been disposed of by the Tribunal. The details are at Annexure-IV. 4. Central Electricity Regulatory Commission (CERC) Physical performance and Achievements during 2014-15 (upto 31st December, 2014) (a) Legal Proceedings: + % % % "; (b) Central Electricity Regulatory Commission (Power Market) (First Amendment) *{!!! <\!!""! \ ;; @! 258 #% ! @! '%ed for ownership and governance of the power exchange including the constitution ^ % % !% ^ % ' ! ! !#" % %!#" ;" ^ % ["'% transparent corporate governance of the Power Exchange, the Commission through \!!""! \ ;; @~;%; ! '%% !#" %%!#" ;" ^ % ["<;%;! further provides that if any shareholder of the Power Exchange suffers from any of %!#" " !% ;!!%% ; %" ^ % [" " Central Electricity Regulatory Commission (Power System Development Fund) Reg*!!! <\!!""! \ ;; #%\\\!!""! \ ;; _;'! ;~%! '% #" ` ` ?=\\%%*$^ % regulations are as under: 1. Provision for creation of "Power System Development Fund" or "PSDF" which shall have the following credited thereto, a. Congestion charges standing to the credit of the "Congestion Charge "" b. Congestion amount arising from the difference in the market prices of % c. Deviation Settlement Charges standing to the credit of the "Regional ' !"" ~%#!!; "!; d. RLDC reactive energy charges standing to the credit of Reactive Energy \"" "" %"|%\ % e. Additional Transmission Charges arising out of the explicit auction process _<]%'"^!!" "" %"\\] "" ; ! = % ;%; _" "; #%\!\ ;; ; time to time 2. The agencies which are authorized to collect Congestion charges, Congestion amount, Deviation Settlement charges, Reactive energy charges under the "' ! % " " ; #% 259 Commission from time to time, shall transfer to the credit of the Fund and shall be maintained and operated through the Public Account of India 3. PSDF shall be utilized for the following purposes: a. Transmission systems of strategic importance based on operational feedback by Load Despatch Centers for relieving congestion in inter-State ; ;>_<_%_<; _;" are incidental to the ISTS. b. Installation of shunt capacitors, series compensators and other reactive energy generates including reactive energy absorption and dynamic "' !@"" ; _\%"" " ; _<<\] ; ';' ! #!|% c. Installation of special protection schemes, pilot and demonstrative projects, standard protection schemes and for setting right the discrepancies %#% " % ! % ' % % ; ; !' congestion. e. Any other scheme/ project in furtherance of the above objectives such as technical studies, capacity building, installation of Phaser Measurement " (d) Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related *<?|**!!! The fourth amendment to the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in Inter-State <; %!%;! *;% "! the upcoming generators to avail the Start-up power i.e the power required for running the Auxiliary equipment for commissioning activities including testing and full load testing before the COD, from the ISTS under Deviation settlement mechanism. For the purpose of availing Start-up power from the grid, the generator is required to obtain the prior permission of the concerned Regional Load Despatch Centre, by making an application. Drawal of Start-up power has been allowed for a max;; % ; ["%% #" % $; % #" < amendment are as follows: ! _ !!}" ; ; " and the generator shall have to open a Revolving and Irrevocable Letter of 260 \% % _"%!% ^@ '! ; ; charges prior to drawal of Start-up power. \ "% !? %"\%% of keeping grid security in view while granting permission for drawal of start up power and of stopping such drawal in case of default in payment or if it is established that Start-up has been used for construction activity. (e) Tariff based Competitive-bidding Guidelines for Transmission Service (as ?##{!{!~ 29.09.2014. In pursuance of the "Tariff based Competitive-bidding Guidelines for Transmission _'" ;%% ]" = % | '; >%\! _%% !~ %_"%!+ _%%<; _'";<_% "; \! !"" ! \ ;; \\ % following escalation rates and discount rate, every six months, for the purpose of bid evaluation and payment. !"! "!!; " %'! " " ; !'!% ; " % '! ! "!!; " ; <\ ;; " ! #" %%+%" #" %%** "! %%" rate for the purpose of bid evaluation and payment applicable for the period from (f) CERC (Appointment of Consultants) (Second Amendment) Regulations, 2014 {!!!! <\!!""! \ ;; #%\!!""! \ ;; ; \ !_" %;%;! '%` #" ` ?+!_*\\%%* ;% \! !"" ! \ ;; ; \ ! !tions, 2008. % '! !! ;%; "!! were made. <" % ; " ![%% ;[;; of four years. 261 <; ! >%'%!\ !'% <%" _\ !"#%! " eligibility criteria, remuneration payable etc. ' " " ! ;; % ; | ' PSU / Autonomous / Statutory bodies was created. The eligibility criteria and ; ! " " !! "#% (g) Guidelines for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensees – Annual Escalation Rate for the period #@!!{!{!~!!! > " \! $ ' ] ` #" %% * ;%% ; ; ; "Guidelines for Determination of Tariff by Bidding Process for procurement of Power by Distribution Licensees", the \\ #' "! " % ;'[; %'! %;<\!$' %! updated as on 21.7.2010. is as under: 1. Escalation rate for domestic coal. (Separately for evaluation and payment) 2. Escalation rate for domestic gas. (Separately for evaluation and payment) 3. Escalation rates for different escalahle sub-components of energy charge for plants based on imported coal. (Separately for evaluation and payment) 4. Escalation rates for inland transportation charges for coal (Separately for evaluation and payment) 5. Escalation rates for inland transportation charges for gas (Separately for evaluation and payment) 6. Escalation rate for different escalahle sub-components of energy charge for plants based on imported gas. (Separately for evaluation and payment) !#$$$ $ % !# $ $$& captive fuel source. 9. Discount rate to be used for bid evaluation. '* +:$ ;&< 11. Escalation for normative transmission charges (For the purpose of evaluation)" 262 <]'% ! %%*%*%%lines for Case 2 and Case 1 respectively. As per these new guidelines, the CERC is not required to notify the escalation factors and other parameters for the purpose of evaluation. Accordingly, the Commission issued an Order (in Petition No.002/ _%%% =>?$$&$& applicable for the six months commencing 1.4.2014 and onwards shall he discontinued in accordance with the provisions discussed in Para 3 to 7 of this order." ' % % ] |%! %% * ;%% ; ; ; \\ !! " "! purpose of payment. ' <\ ;; " ! #" %%+% " #" %% "! " % ; ;!"! % ; The details are at Annexure-IV. ~! ~! `??'* ???#? Standards & Labeling (S&L) ' ; ! % ; %" #%% mandatory program since January 2010. Up gradation of standards for Split ACs, Frost Free Refrigerators, electric wa" ! <%?| ' 15 products were launched in voluntary labeling program. Inverter, DG sets and DG pump sets are recently launched. ~!#""` ; "' #% #" % '! ;@" ! <!""%"" ! ;% !" ` !%" !< ; _%%%?!! !men conducted in about 37 cities. National Energy Conservation Awards given to manufacturers of 8 product categories since 2009. 263 % ! _?"; Energy Conservation Building Code (ECBC) Rajasthan, Odisha, Uttarakhand, Punjab, Andhra Pradesh, Karnataka, and < %" ' #% ! " ! |} % \ <;! `% ^ ;"! %%%%^!'!%;%%\^\ their state. + _\] ' ;!!% ^ ' % evaluation process. <""! \^\%; !% '%% MoUD has circulated the sustainable habitat parameters to all states for includ#"";!!!%! ; \^\` !^!%\ %" ;!% #"|%! ! %!^!%%'! %%!% \ ; % "!;" Star rating scheme was developed for hospital buildings. State Designated Agencies (SDA) ; $" %% _~ till date for demonstration projects, workshops / training programme, publicity / awareness campaign, analysis of energy savings accrued etc. Further, during ~+*"%% !!_ !!%!'! including manpower support. Evaluation/Impact Assessment study of the scheme during the 11th plan is completed. State Energy Conservation Fund (SECF) Evaluation/Impact Assessment study of the scheme during the 11th plan is completed. Small and Medium Enterprises (SMEs) Energy use and technology gap assessment studies in more than 1250 small and medium enterprises followed by awareness workshops for disseminations of results. + !% }" #" 264 technologies resulted in implementation of more than 650 EE projects in various clusters. The reported saving from these clusters was about 5000 toe during >! Agriculture DSM Five states i.e. Karnataka, Andhra Pradesh, Uttrakhand, Uttar Pradesh and Chhattisgarh submit their willingness to participate in AgDSM scheme. ~ ;!; ! #"" }"!"!%ral Drinking water pumping systems, ten states namely Gujarat, Jharkhand, %^!;"!%\ Mizoram and Punjab submitted proposals. Assignment for revalidation of two existing DPRs prepared at A.P and Rajasthan DISCOMs is completed. Implementation of pilot project is under consideration in A.P. < !*#";!"%%;% #_! }";!;%_ !~ ;!% #" *;!"%mitted and second year testing of pumpsets is being carried out at project site in Solapur, Maharashtra. \ "\;%!""_!\ ?%>_\]nataka and M/s EESL is signed for implementation of AgDSM DPR prepared in Mandya District of Karnataka. Municipal DSM One day interactive meeting cum workshops were held in 13 states for im!; % >! ? "!^ % ?^ State level steering committees are formed in 11 states to facilitate the implementation of DPRs. < ' !"% ?^ ;!; % %>! % Capacity building of DISCOMS >_\]'!"%% "%'! %^ MoU has been signed with 30 selected DISCOMs. DSM cell has been established in 26 DISCOMs under this programme. 265 _! #%_ BEE-GEF-World Bank MSME Project ! "' %; " " ;"! "um dryer in place of Hot air Trey Dryers in Chemical units at Ankleshwar. Marketing and Outreach Efforts: x %\"^!% @ %" "! x <""![ "!'!! #"" ! x Awareness and outreach through radio/ newspapers / technical exhibitions/ posters etc. !%;_ x }"! "% ; x ;% ";` "! ; x _"" % #" ; %@ forging, foundry cluster, have been developed for each cluster: Technical Assistance to Energy Professionals: x 220 energy professionals have been trained at Centre of Excellence for < #""\ x ! = " "#" ;; " %"% }" clusters wherein around 500 energy professionals were trained. Work for development of Knowledge Portal has been initiated 5.2 MOP Schemes : National Energy Conservation Awards <\ ' %" ""!!!% th"; ^"% ! _>%%\ \ !%`%! This year 1010 participating units collectively invested Rs.9091 crores in energy " ' ; "'% ; ' =+ " ' 266 year. These units have avoided the installation of power generating capacity equivalent to 751 MW Thermal Power Station in comparison to 711 MW IN 2013. Painting Competition on Energy Conservation for School Children " ; " ' _" !_` !?'! was conducted successfully. The Competition is aimed at motivating the children towards energy conservation and offers them a chance to explore their creativity. $+!@% *%% $_<"% nationwide competition held on energy conservation. NMEEE $$=$;!! !'!'< +=%\ ;\' #%%<";" "'% _" _"#"~ ;! ;! _" "#" ` ;! ~" ;!; %'#" " has been prepared. % '#" " ! !! = " ' %'! % %%#! Process of accreditation of Energy Auditors who will be engaged to execute the " \ ;"%% +*""%%% !%^ In PRGFEE, two meetings of Supervisory Committee have been held and rules of |~''% #" <% " >;!menting Agency for PRGFEE has been completed where bid from the consortium of REC, RECPDCL and EESL has been received. %\~^ % < \~<" %< \~ ! ' '% #" < % " ~% \~% Under EEFP, two conferences for the stakeholders were organized in Pune and Chandigarh with the support of SDAs in Maharashtra and Punjab. Two capacity building workshops were also organized in Delhi and Mumbai. Training modules #"! '%'! %^ @! ª_"" }"#"%>%%% _>^>%!! published very soon. 267 BLY ^% #" ^=\#%; %" \%%` ~; @\ ' \!;\ `~\\\ ^ " \ }" ;!; % %'! %" %^? ;; <!" ^ #""%\ ' Annexure – V & VI respectively. 5. Damodar Valley Corporation (DVC) >> <_%"!%" ;;"! $<!!%"" \ %$+" ; <;!$["!% }"%%!+ < %! ;" \'Annexure-VII. 6. Bhakra Beas Management Board (BBMB), Chandigarh ;^^^ *=\ =+< *+< !'!! ^^^ ^@ ? ^@ *+= ^@ ^@ **= |!$$ !$=*+% **< '!!'!! ^^^ *$=< %^^^ '"% ^^^ '" ; +""@! ;! %$$@; !% <'!! ; ;% 98.28%. 7. The achievements with reference to the Plan schemes Forum of Regulators are given at Annexures-VIII % !""! \ ;; | <["! are at Annexure IX respectively. 268 269 3 To augment test facilities for conducting ; % transmission systems = @ \ = @\ Augmentation of test facilities for optimiza =@\\ transmission system 1. Objective/ Outcome Ongoing Spill over Schemes 2 Name of Scheme/ Programme A. 1 Sl. No. - - Plan ^% get - Complementary [^%getary Resources ]! Non Plan ^% get Spill over XI Plan/ approved XII Plan Schemes - 5 #! Deliver-ables/ Physical Outputs Commissioning of AC test system 6 Project-ed Outcomes CENTRAL POWER RESEARCH INSTITUTE Achievements upto 31.12.2014 - 7 Process/ Timelines 8 Remarks/ Risk Factors Extension of project duration up to March 2015, approved by Ministry of Power. An amount of Rs. 33.33 Cr. has been spent so far. The DC test system has been successfully commissioned during Sept. 2013. The indoor laboratory construction is in progress. After closing/termination of two civil/structural contracts, action is initiated for getting all the balance works done through fresh award of contract. The NIT ; % @ to be awarded after the materials to be provided to the contractor are ready. 9 Achievement upto (Rs in Cr) Annexure – I 270 Participation of CPRI as an equity partner \ ; M/s. NHPTL Augmentation of ! " ! tion, LED test facilities and infrastructure protection 2. 3. Upgradation of High ! "! ^! % ^ pal units and establish >\ ? facilities Objective was to be" ; partner in the NHPTL Company for establishing High Power Test facilities - - 9.125 - - - - - The project duration extension sought upto '% by Governing Council at it’s meeting held on 5th December 2013. ; >; control have been received excepting chamber absorber parts. \ " ! ? _<_^ ! LED Test laboratory building, construction of Laboratory building at Regional Testing Laboratory at Noida %% !< ^ _ Circuit Laboratory, CPRI, ^! " ;!% Construction of Wake Simulation Laboratory completed. ^!% [ work of CCAR and Guest \> ^! and EMI/ EMC laboratory \> ^! various stages of progress. Construction of compound wall #" " ! ^! %% have been completed. ] \"tioned for this project, an amount of Rs. 23.90 Crs. is paid to NHPTL so far. MoU was entered into be\>`<? ] ! years from the date of commissioning of the project. 271 XII Plan approved project Augmentation Projects of CPRI under >>!]! *\ B. 1. - 66.81 - Tendering and placing of order, Delivery of some major equipments, initiation of civil works Tendering and placing of order April March 2015 Project approved by MoP on 25th February Rs. 105.90 Cr. Regarding civil work, MoU \ % ^_`? been signed to entrust the civil work to them. Drawings ' #!% % handed over to CPWD 3. Augmentation of Energy Meter & Calibration Laboratory- Rs.6 crore worth equipment tenders were ordered. Another Rs.5 Cr worth equipment, the recommendation to be made after evaluation. 2. Upgradation of Real Time Digital SimulatorDiscussion with prospec' '% #! "#" " ;!ed. Procurement is to be initiated. 1. Upgradation of High Voltage/ Ultra High Voltage Test Facilities- Two equipments namely Impulse Current Generator , >;! ! | are under advanced procurement stage Seven project components are in various stages of progress as follows:- Project approved on 25th ~ Construction of EMI/EMC laboratory got delayed due to contractor problems and contract is terminated in October 2013. Floating of revised NIT for carrying out pending works, however due to exorbitant quote, the tender is rejected. Now, it is handed over to CPWD as deposit work. ; \ has been spent so far. 272 2. Modernisation Projects at CPRI under >>!]! $\ - ** - NIT and placing order NIT and placing order April March 2015 Project approved on 5th January 2015 by Ministry of Power. 7. Augmentation & Modernisation of Diagnostics, Cables, Capacitors, Temperature Rise, Environmental Test Facilities <%' % for all major items to be procured. Evalution of major equipments are in progress. Civil works shall be carried out by CPWD. Drawings ' #!% % handed over to CPWD 6. Augmentation, Modernization & Capacity Addition of Battery, Ingress Protection and Illumination test facilities - Order has been placed for dust ";^!""! testers of different ratings have been procured. Civil works shall be carried out by CPWD. Drawings ' #!% % handed over to CPWD. 5. Establishment of test facility for (i) Solar Based Grid Tied Inverter Systems (upto 500kVA and (ii) Solar PV modules (upto 500Wp)= Lakhs worth 8 major items to be procured , tenders are under evaluation. 4. Augmentation of Protocol & Meter Testing Laboratory- Items to be pro"% # advanced stage. Construction work shall be carried out by CPWD. Drawings ' #!% % handed over to CPWD 273 To help address challenges in power/ electricity, including !!#"" safety and environment Project proposals are invited from academia, power utilities, industries as well as research institutes and are approved by an expert committee on research scheme on power NPP projects are taken for undertaking }"%#%der National Perspective Plan as approved _\ 2. Research Scheme _ 3. National Perspec'!` Plan R & D (Rs. 80.00 Crs.) 2. ! Establishment of new test facilities at \>%>>! (out lay Rs.356.10 " 3. 5.00 5.00 - - 105.70 - - - - - - Implementation of the projects approved _\ Implementation of the projects approved by EC on RSoP Implementation of the projects approved by RC Commit-tee Tender-ing and placing of order Tender-ing and placing of order Project approved by MoP on 11th June Two Projects have been taken up for implementation Nine Projects have been taken up for implementation Project approved by MoP on 11th June Implementation of the projects approved by EC on RSoP Implementation of the projects approved by _\ Ten Projects have been taken up for implementation. Project approved by MoP on 11th June Project approved on 5th January 2015 by Ministry of Power. Implementation of the projects approved by RC Commit-tee. April March 2015 274 1 SL No $ Total 60.52 1.60 Setting up of Hydro Institute of National Power Training Institute at Itanagar $ 8.90 Setting up of National Power Training Institute at Shivipuri. M.P Non-Plan ( Pension ~% 37.37 3.00 Plan Renovation, Modernization and Augmentation of training infrastructure of Nines Institute of NPTI 3 NonPlan Complementary [^% Resources ]! 9.65 2 Objective/ Outcome Setting up of National Power Training Institute at Alappuzha, Kerala B-New Scheme % gradation of Training Facilities at Corporate ]#"~%% Name of Scheme 5 2016-17 2016-17 2016-17 2015-16 Processes/ Timelines Training activities will 2017-18 be increased after Scheme completion of the is to be scheme. sanctioned Training activities will be increased after completion of the scheme. Training activities will be increased after Scheme completion of the Sancscheme. tioned Training activities will be increased after completion of the scheme. 6 Projectd Outcomes Training activities will Work is be increased after under completion of the progress scheme. #!!'erables/ Physical Outputs NATIONAL POWER TRAINING INSTITUTE Achievements upto 31.12.2014 7 Scheme is yet to be approved. land has been %#%!! ment to NPTI is still awaited. 8 Remarks/ Risk Factors \ Annexure -II 275 2 1 Appellate Tribunal for Electricity Name of Scheme/ Program Sl. No. Rs.521.55 lakhs Expenditure from Sanctioned Cost: Not applicable Sanctioned Cost/ Cumulative expenditure from 1.4.2014 31.12.2014 Further, the Tribunal will also function as Appellate Tribunal under Petroleum and Natural Gas Regulatory ^ %" 9.79 NonPlan Budget (Rs./ lakh) To facilitate expeditious resolution of disputes in the power sector at the appellate level Objective/ Outcome 0.00 Plan Budget 0.00 Complementary extrabudgetary Resources Outlay 2014-15 The above details are inclusive of cases under the Petroleum and Natural Gas ! ^ % Act. These were likely to be disposed off along with fresh appeals being #!%% 15. Apart from this, 335 IAs/ Petitions etc are also pending for disposal/ admission. Total number of appeals pending #!% ! as on 1st ! 381. 5 "# Deliverables/ Physical outputs Appellate Tribunal for Electricity Achievements upto 31.12.2014 7 Spread through-out the year 6 Processes/ Timelines N.A. Projected Outcomes Remarks/ risk factor Following are disposed of during 1.4.2014 to 31.12.2014: ! Other IAs, " Achievements (Rs.in crore) Annexure - III 276 Name of Scheme/ Programme 2 Central Electricity Regulatory Commission S. No. 1 1 3 Objective/ Outcome Nil Complemen-tary ExtraBudgetary Resources Plan Budget Non- Plan Budget (Fig. in lakh) Against ^ Rs.40.30 crore for expenditure of Rs. 23.36 crore has been incurred upto 4(iii) 4(ii) 4 4(i) Outlay 2014-15 320 Petitions are likely to be disposed during the The petitions include the tariff petitions for the Tariff %* applications for grant of ; trading licenses, adoption of tariff arrived through the process of competitive bidding, miscellaneous cases involving grid disciplines and monitoring the functioning of the Power Exchanges and adjudication matters. 5 "# deliverables/ physical outputs Passing of tariff orders will result in #; the 5 years Tariff Period for which <; conditions of Tariff have been "#% CERC. 6 Projected Outcomes Central Electricity Regulatory Commission Achievement upto 31.12.2014 The procedures of framing Regulation as also of passing orders by CERC are already laid down in detail in the Conduct ^ Regulations. These procedures would be followed while disposing of the petitions and other issues highlighted in column-5. The targets as indicated in column-5 are expected to be achieved during 15. 7 Processes/ Timeline As per the past trend, it is expected that the targets set will be achieved. However, the possible constrains which have the potential of slippages on time line include the complexities involved in some cases. 8 Remarks/ Risk Factors 157 Petitions were disposed off during the period from April "; 9 Achievement upto 31.12.2014 Annexure - IV 277 This would promote effective utilization of assets across the country and accelerated development of the new transmission capacities. This is aimed at ensuring secure and reliable operation of the grid. Enforcement of Grid discipline. Implementation of National Transmission Tariff framework ^% management/ load-generation balance. Introduction of Ancillary Services With effect from 1st July 2011 the sharing of transmission charges and losses have been implemented in the country under the PoC regime as per the Sharing of Inter State Transmission Charges and Losses regulation 2010. Two amendments have Final CERC (Deviation Settlement Mechanism and Related Mech;!tion 2013 issued $ brought into effect from + Final amendment to IEGC regulations issued on $ brought into effect from + This is an ongoing process. Staff paper on the subject is being prepared. 278 Staff paper on transmission planning, connectivity, Long term Access, Medium term open Access and other related matters published on **viting comments of the stakeholders. been issued in November 2011 and March 2012. Orders for determination of Point of Con" \ rates have been issued in June 2011, March 2012, November 2012, March 2013, June 2013, September 2013, December 2013, " % Further amendments have been proposed in the Regulations. 279 This is aimed at promoting investment in Renewable Energy segment and enabling compliance of Renewable Purchase Obligation ] Regulation of tariff of Public Sector utilities u/s 79 of the Electricity Act , 2013 for the next #' This will enable the Commission to manage the data base/ information more effectively for decision making. Implementation of Renewable Energy Cer#"\ framework. Terms and condition of tariff * Implementation of regulatory Information Management _;>_ in CERC. The phase 1 of RIMS has been implemented. Design and development of RIMS phase II modules has been almost completed. Design Architecture under vetting. Phase II module user acceptance test is under progress. Tariff module is also under review by user department. Regulations on Terms and condition of tariff for *' #% During the period from 105 RE Generators/ Projects have been accredited and 137 generators/projects have been registered for REC and 3 trading session were held in power exchange for sale/purchase of REC. 280 1 Standards, Codes & Labelling for Appliances, Buildings & Energy Research Centre BEE Schemes #"cy Research Centre for Energy Consuming Sectors ^ Outlay ~ vative technolo" '! ; 0.00 8.70 - Enhance 30.03 Credibility of the _? program - Achieve energy saving in line with national policy through end-use #" products - Increase the visibility of the program among different stakeholders Energy Conser- To reduce energy ' ^!% consumption \ %\^\ in commercial buildings. _%%?belling Scheme _? 3 1 2 Objective/ Outcome Sl. Name of Scheme/ ProNo. gramme 0.00 1.50 0.00 2014-15 - Implementation of ECBC in commercial buildings. % \^\_ - Administration & Enforcement of ECBC Implementation - Facilitation of ECBC Demonstration projects. <""! \^\ ; ^!% vided. >* buildings - Awareness campaign through Print and Electronic Media & Impact assessment - New Product labeling: Inclusion %"%_? scheme. - Inclusion of two product in mandatory labeling program - Continuation of awareness campaign. - Enhancement of check-testing activities by Independent agencies and SDAs - Strengthening of test laboratories. - Launch of labeling program of passenger cars 5 Quantifable Deliverables/ Physical Outputs Achievements upto 31.12.2014 - EFC Committee advised to take support ` !\!~%`\~ instead of budgetary resources of MoP. Accord!;; '% ;|^_ - Developed Star rating scheme hospital buildings. '! %#"|%! ! %!^!% _%'" ` #" % \^\ - Assam amended the codes. \%\^\"!!_ \% ! < \^\ - Two new appliance i.e. Diesel generators and inverter have been launched #" "! !" have been prepared and sent to Ministry of Power for approval. - Awareness campaign launched for energy #"!" - Check testing conducted for air conditioner and frost free refrigerator and 7 models have #% " ;!" - Proposal invited from labs for empanelment and selected labs are approved by Management Advisory Committee - 1st meeting for star labeling of cars have been " %"%!%%! phase. 6 Achievements upto 31.12.2014 The funding for the scheme has been shifted from GBS to Energy Conservation Fund maintained by BEE. Remarks/ Risk Factor \ Annexure - V 281 2 Contribution to State Energy Conservation ~%_\~ Strengthen- SDA Strengthing of SDAs ening Profor Energy gramme #"" SECF is a statutory requirement and under EC Act. It is also one of the deliverables of SDAs ECAP. 10.00 - To empower the 35.08 SDAs as partners ^ level to implement EC Act. 0.00 ¢\ _\~ states and matching contribution by the state governments to the SECF. ¢\ %_ ;plement various energy conservation activities and utilization of fund under SECF. ¢; crores as contribution to SECF. ¢\ ; the SDAs through regional meetings and National Workshops. ¢; #cial support to SDAs for the following activities: - Implementation of energy #""; " ! #"" through demonstration projects. - LED village campaign. - Institutionalization of enforcement machinery at the state level programmes. - Manpower support to the SDAs. - Workshops / training programs involving energy professionals. - Analysis and survey of the impact of energy conservation activities by the SDAs. - Publicity/awareness on energy #"" - Maintenance and updatation of internet platform and other database created. ¢ '%%!% ;!! #"!port provided. ¢_ !%!ed for constitution of SECF. Matching contribution by State Government of Uttarakhand. ¢_ '%%%! ;!; various energy conservation activities and utilization of fund under SECF. National Workshop at Ahmedabad conducted ' !'!!_! % training program on PAT was conducted during the National Workshop at Ahmedabad. ] *" " % ~ % '%#"!" to SDAs, Rs 19.65 crores was disbursed to all SDAs and further, Rs 1.85 crores was released as 2nd installment to SDAs of Punjab, Maharashtra, Arunachal Pradesh, Goa, Uttar Pradesh and Gujarat. Following achievements are reported : _""!" ;; ?!! Campaigns. Successful commissioning of 15 demonstration projects. !""; #"" @ ;; database up gradation etc. will be conducted in 30 SDAs. Hiring of manpower completed in 18 states for supporting establishment of enforcement machinery. All SDAs conducted workshops and training ; ; #"" Guidelines towards utilization of funds was provided to all SDAs. 282 3 Demand Side Management _riculture, "! _ 10.95 Human Resource 6.00 Development and capacity building #ciency Energy Targeted energy consumption reTechnology duction of SMEs. Up-gradation in Small and Medium Enterprises (SME) HRD Programme 0.00 0.00 1. Initiate the implementation of demonstration projects in the 5 Energy Intensive SME sectors . 2. Conduct stakeholder workshops in sectors where technologies have been implemented. 3. Initiate the PAN india energy benchmarking study for energy intensive SME clusters . 1. Development of materials on Energy Conservation for School/ ITI / Diploma Engg. College curriculum 2. Debates at Degree College level, ITI, Diploma Engineer\ !! !"" 3.Establishment/ Strengthening of energy clubs in schools '! ; chures on Energy Conservation. 5. Development and printing of question banks. $'! ; " "#" best practice guide. 7. Energy Audit Instrument Support for Energy Auditors =\"!% "# experts, building and industry on ISO 50001 and Energy Management Systems. - Empanelment of agencies to support ^` ! ;; #"" _" ;!% !!#'" "';!!%^ " ! <[!"!%?%~ "! completed. LoI issued to the agency for carry "'?%~ %! <[!"! - Inception and outreach workshop was orga%!<[!"!_> 12th - Empanelment of local service providers for ^"@"! %'tisement process completed. - Short listing process of applications received ;?%~ "!'% through open advertisement for implementing 20 technology demonstration projects is being carried out by committee of MSME-DI Ludhi " ^ - Letter of support for carrying out technology demonstration projects has been received ^ ;_ %[ " Kochi through MSME-DI Thrissur to initiate implementation of technology demonstration }" "_ %"! 1. Agency hired for developing module for NCERT books. 2. All SDAs requested for submitting a proposal involving all activities under this scheme. 283 Total 137.55 - capacity + building of the DISCOMs to implement DSM in their respective areas - To reduce ener- 6.29 " ; ' energy overall incurred by the municipalities. Municipal DSM Capacity building of DISCOMS - To reduce the 17.03 overall power consumption, im '#"cies of ground water extraction %" subsidy burden of the states. Agriculture DSM 9.00 0.00 1.00 2.00 Signing of Memorandum of %% !; _\!! Distribution Companies.. Hiring of Organization/ for Train << < DISCOM-wise formulation of ; %!%%#" #"! Training of Consultants and >_\] #"! Organizing interactive meeting cum workshop in four states for DPR implementation. Investment Grade Energy Audit % Up-gradation of MuDSM portal for the online analysis and portal data Management. _ ! ?^ %@ implementation of pilot projects %#% \"!% ?^ #"! Initiate the activities to facilitate the state governments to imple;;% #" for new agriculture connections. Facilitate DISCOMs to review the DPRs and implement pilot projects in 2 states. Stakeholder consultation/ workshops to be organized. Consultation session with PHED to identify the pilot project and initiate preparation of feasibility report. - 35 DISCOMs have been selected based on "%'! %^ - MoU has been signed with 30 selected DISCOMs. - DSM cell has been established in 26 DISCOMs under this programme. - Two DSM experts provided to each DISCOM for providing manpower support. - Load research activity is ongoing in all DISCOMs. - Assessment to create Master Trainers completed. _! #%_ - One day interactive meeting cum workshops were held in 13 states for implementation of % >! ? "!^ %?^ - Funds were released to 6 SDA for implemen ! }"; ""! experts. - State level steering committees are formed in 11 states to facilitate the implementation of DPRs. - Letters were sent to 60 ULbs to select 20 water bodies for carrying out Investment Grade Energy Audits. < '!"%?^ ;!; %%> plan period. - Five states i.e. Karnataka, Andhra Pradesh, Uttrakhand, Uttar Pradesh and Chhattisgarh submit their willingness to participate in AgDSM scheme. - Implementation of pilot project is under consideration in A.P. ~ ;!; ! #"" projects in Public Health and Rural Drinking water pumping systems, ten states has submitted the proposals and the preparation feasibility report for selected projects are in progress. - Funds are released to six states for carrying out feasibility study and implementation of #%; }"!"!%! Drinking water pumping systems. 284 1 Total ^|~ ^_ project EAP Scheme ^|~^ MSME project - To increase demand for energy #""'ment in MSMEs and to build their capacity to access commercial #" 139.55 2.00 10.00 1.00 ¢'! ; %\ative’s for generating awareness and outreach on energy #"" ¢< ! !!#'"! ¢'! ; % Knowledge Portal and Help line ¢; " " ;"!!!#" technologies ¢'! ; \% ¢< ;;\< Chennai for MSME units - As part of Awareness and Outreach efforts, the major activities performed are as follows: Five technical workshops for facilitating the '% %'! ; Five equipment based documentaries covering boilers in chemical, Induction furnaces in Foundries, Fuel switch option in forging fur"|%\ ; }"`? !%; % !% !< !!!line is under advance stage of activation. Demonstration of Rotary vacuum dryer as an EE option for Hot air Trey Dryers in Chemical industry in under implementation. On- site Training programmes for Foundry and Forging cluster. Study to “Evaluate and demonstrate the Economic Losses due to Rewinding of LT % ^"" Rewinding in MSMEs”. 285 2 - Energy Conservation Scheme ` ! Energy Conservation Day/Awards 1 1 - To inculcate in children the relevance of energy #""%" 'tion. - To recognize the efforts of industrial and other establishment consumers to adopt energy conservation measures which may become models for others to emulate. 3 Objective/ Outcome - To spread the message Publicity of energy conservation %#"" media. _" !_ and National Level Painting Competition for School Children Name of Scheme/ Programme Sl. No. 26.50 BE 4(i) Outlay 15 16.58 RE 4(ii) 2014- - Continuation of paintings competition on energy conservation. · Creation of data base and its analysis EC Award participating units. - Compilation and dissemination of best-practices in industry and building sector. - Continuation of EC Awards on energy conservation. 5 - Awareness creation in general public. - Painting competition on energy " ' _" !_ ` !?'!" %"% successfully. $+!@% th to 9th %% $_< participated in nationwide competition held on energy conservation. - The Energy Conservation Award " ""!!!% th ";^wan, which was inaugurated by Hon’ble Minister of State (Indepen%\ \ !% New and Renewable Energy. - This year 1010 participating units collectively invested Rs.9091 crores in energy conservation ;"'%; ' =+" ' year. These units have avoided the installation of power generating capacity equivalent to 751 MW Thermal Power Station in comparison to 711 MW IN 2013. 6 8 Remarks (Rs in Crores) "#%'#*$=?*- Achievements upto 31.12.2014 ical Outputs Energy Conservation Achievements upto 31.12.2014 Annexure-VI 286 National Mission on Enhanced #"" ` NMEEE is one of the 8 missions announced by PM as a part of National Action Plan on Climate Change. The provision is for operationalisation of the NMEEE '_% \"^!% \"^!% Students Programme 60.35 28.80 Perform, Achieve and Trade (Industries) ¢~! Form-1 from designated consum+=` ¢_' %% ~ ; ¢?" ;ing records of ESCerts, which !!%;% Depository. ¢! ;! '#" %""@'#"tion for different stakeholders ¢~! < Cycle-2. ¢~! " " Development of Energy Management System for 8 sectors ¢~! %! ¢` #" < \ 2nd PAT cycle ¢'! ; <%! ; for ESCerts - Development of materials on energy conservation for School/ ITI/Diploma Engg. College Curriculum. - Training of School teachers/ lecturers on the new modules/ curriculum. - Debates at Degree College level, ITI, Diploma Engineering College !'!" ; " ! level. - Establishment/ Strengthening of energy clubs in schools. - Developments of tip sheets/ brochures on Energy Conservation. - Signing of MoU with CERC for setting up institutional framework for trading platform is under process - Draft trading rules prepared and are under approval process - Agency hired for development of depository Perform, Achieve and Trade (Industries) - 12 Sectoral workshops conducted to demonstrate PAT mechanism for all 8 sectors. - Applications submitted by Accredited Energy auditors for empanelment as Accredited Energy %#; #" % ""@'#" - Agency (National Productivity \ "!!"% %#" \ cluded in the next cycle for targets. - Requested all SDAs to submit - Awareness campaign on energy conservation through print, proposals. electronic and other media for general public. 287 ^"?; }^? - To promote energy #"! CFLs as replacement for incandescent bulbs in households. 6.80 1.00 - Maintain the institutional structure of Coordinating and Manag\ - Provide technical assistance ; %'#" individual projects - Continuous engagements with the State Electricity Distribution Companies @ ^? - Inclusion of new projects under the registered PoA. (Depend upon ;@" - Continuous engagements with the State Electricity Distribution Companies ~"! ||; implementation of LED projects - Formulating guidelines and processes for bulk procurement of LED bulbs for distribution of ?! ^? !% %||"; %'#" savings achieved for the implementation of LED projects under ||"; FEEED (PRGF and VCFEE) <= Financing Platform) - Operationalization of PRGFEE programme ] ! \~ programme - To organize capacity building @ #"! and awareness workshops - To initiate business plan compe ; #"" business - To develop standard perfor;"" " " ! and risk assessment guidelines for #"" }" ^% #" ^= \#%; %" \%%` Framework Convention on Climate \`~\\\ ^" in turn transfers the CERs to the project implementers for trading with buyers on developed coun%^? ;; - In PRGFEE, a Supervisory Committee has been constituted %%\~^ % < \~< been constituted. >|~\~! ''% #" - REC selected as implementing agency for PRGFEE. < % \~ trust has been constituted. FEEED (PRGF and VCFEE) and <= <ing Platform) 288 Total _#" Equipment Pro;;_ - To accelerate demand #"!ances like ceiling fans/ Refrigerator/agricultural pumps etc. 107.65 40.72 2.00 ¢! " " fan manufacturers and measure;%'#" " ¢;!; "! #" ¢~! _?!% Media plan ¢\ "!#%;"turers ¢ ¢> %\; ¢< ¢< - SEEP Program Document has #!% <""!"#" ' #!% - Testing capacity has been assessed. "; #" "% - Draft SEEP label prepared. 289 Chandrapura TPS Extn. +=[ Mejia TPS Phase-II: [ %;_> [ 1 2 3 A1] DVC’s own Thermal Power Projects 2 1 A. Name of Project Sl. No. 220.52 240.28 43.61 4(i) Outlay BE 2014-15 (Rs. Cr.) 4(ii) 5 03/2015 03/2015 03/2015 03/2015 Unit-2: Completion of balance works Part Completion of balance activities of ` \< ¥ %¥~ !% %'! ;¥| ^!¥!> Initiate Contract closing activities 03/2015 55.65 Unit-1: Completion of balance works 14.93 To Complete balance works \ "\! 03/2015 6 "#%'#* Processes /Milestones /Outcomes / Timelines (Targets) 0.00 To Complete balance works \ "\! Expenditure upto 31.12.14 (Provisional) Damodar Valley Corporation Achievements upto 31.12.2014 Completion of balance activities after COD To Complete balance works \ " Closing To Complete balance works \ " Closing 7 Projected Outcome Contract closing activities initiated. Some of the NonEPC work completed and balance under progress. Railway Infrastructure work almost compleetd and Township under progress. COD declared $ Completion of balance work under progress. Completion of balance work under progress. Completion of balance work under progress. Contract closing has been initiated. Work under progress at different fronts including Contract closing activities initiated. 8 Achievement w.r.t. Col (5) 9 Remark (` Rs. in Crs.) Annexure - VII 290 _!<_ [ Raghunathpur TPS Ph-I: [$ 5 395.00 194.42 03/2015 Part Completion of balance activities of Non-EPC !>¥< ¥ % 03/2015 + = * 01/2015 «\ ;! balance activities of Main Plant Pkg. Unit-2«<|]! completion «<| ^| «^ !! «_;^! completion 5] Synchronisation Common Systems: 01/2015 = 3] COD 2] Full load = 03/2015 2] Initiate Contract closing activities 515.08 Unit-1: 1] Readiness of AHP Wet System 03/2015 35.31 \ ;! balance work Achievement of COD of % completion of some of the balance work after COD Completion of balance activities after COD Completion of balance activities under progress. Oil synchronisation \ ! _]+ ~!!! % == "'% Now COD of Unit-1 % _ respectively. Delay due to Equity crunch, land acquisition !;! % problem etc. Completion of nonEPC work under progress. Railway Infrastructure work almost compleetd and Township under progress. \] declared on 05.03.2013 ^!" @ Main Plant package under progress. 291 7 6 A2] DVC’s Joint Venture Power Projects Raghunathpur TPS Ph-II: [$$ ^ @ ª<_[ 1190.95 873.80 + 03/2015 % ^ ! foundation _ ^ !" Civil work start for TG deck 03/2015 7] Part completion of CHP Contingency route 34.37 ^<|!'!! completion 01/2015 6] Oil Synchronisation * «^ !? * = «<| ^| «_;^! completion $ 03/2015 «<|]! completion 352.44 «<|^ [ Part readiness of Intake ^%!>" Water Pipe line, Ash Pond etc. Achieveing different milestone towards completion of project. Achieveing different milestone towards completion of project. All the activities are presently slowed down due to non availability of fund. Now targeted in July’2015 through manual bunkering _;^! !! start in end Feb’15 and completed in Mar’15 ^ !! achieved on =* <| ^| will be targetted in Feb’15 ]!% progress and to be completed in this month i.e. Feb’15. Work under progress at different fronts including Railway Infrastructure and Township. Constraint- land '!!%! Order problem 292 Renewable Energy Projects: Solar Power Projects B. D. 6.84 3.79 1] Power Line Carrier \ ;;" ?\\ 315.20 Total T& D schemes Communication schemes 60.60 254.60 112.50 20.29 25.00 < TSC Schemes: < T& D schemes A3] Investigation / Feas. Studies / DPR etc. for future projects, if any. 9 C. ^<_ [Equity contribution @ACH&+IJKMN proposed Joint Venture of RKU+IWNXY$ $Z\]%*%W 8 0.80 106.21 106.21 0.00 ";" Commissioning. Please Refer to Appendix< Please Refer to Appendix< [" \ ;! 15MW Solar Power project. 0.00 Provision for expenditure towards pre-project activities of new projects, if any incl. KTPS Ph-II and FR/DPR/other studies for Solar project alongwith fund requirement for Coal ^! "@;\!% LT Distribution Network in Jharkhand 0.00 Further equity requisition is pending for other additional work e.g. !>" Disposal System etc. 03/2015 03/2015 03/2015 03/2015 Speech Communication Implementation of Solar Power Project Preliminary study for new projects Purchase Order awarded. Project presently postponed due #"! condition Non availability of resources, activities may be taken up subsequently. Erection commissioning to match with T progress 293 E. 0.02 0.02 0.06 «?_`` @ connectivity 5] Leased line for new Power House 6] OPGW for Transmission lines/ UGFO for Sub stations Sub Total R&M : \ !"[ > ]>>>>> \<_<_ _> _> _> R&M Schemes 9.48 2.19 0.74 «#%? %" \ ;;" "; ?\ 7] Establishment of Carrier Protection where Indoor PLCC equipment have already been replaced 0.02 «" " ;;" ~ 0.00 Conmmissioning " \ ;; " \ ;; " \ ;; Integration Obtaining frequency "!"" Commissiioning. 03/2015 03/2015 03/2015 03/2015 03/2015 03/2015 Protection of High Tension Lines. Data Communication Data Communication Data Communication _" Speech Communication ……….. ……….. ……….. ……….. ……….. Online application for frequency clearance to be done shortly. Procedural delay Procedural delay Procedural delay Procedural delay Procedural delay Procedural delay 294 Misc. Spill Over Works G. Equity participation: MAMC Equity participation: DVTDPL M. N. Grand Total in Rs. Cr. A to N Equity participation NHPTL L. : SLDC scheme J. Equity participation BPSCL R&D Centre I. K. Refurbishment/Extension/ Improvement H. ®«}<_ 5-6 Pollution: F. 3964.99 0.10 26.00 9.13 20.00 0.36 1.00 234.25 20.00 6.26 1114.79 0.00 Equity participation to <? 0.00 Equity payment as per shareholders agreement. 0.00 0.00 0.00 Commissioning 0.00 0.00 0.00 For settlement of balance RA bills and Contract Closing. 0.00 Dry Ash Disposal Sys. for ^<_ª^; various works relating to environmental compliance <_<_! 03/2015 03/2015 03/2015 Speech Communication Settlement of balance payment towards RA bills Pollution compliance Tourism infrastucture Plan for Maithon submitted to Ministry of Tourism. Clearance pending. Execution of shareholders agreement is lying ^?< !%% Pending clearance from Ministry of Defence GOI (The " !! \! % No demad for equity " ; company. Notice Inviting <% % for renovation / refurbishment of SLDC room Work under progress. Work under progress. Procedural delay 295 Main Works of < 2 1 1 Name of Scheme / Programme Sl. No. To facili < of power 3 $ Objective Annual Plan / Outcome % 6 Process / Timelines Pre-tendering stage. Project Sanctioned $«}^__% interconnecting lines +«^%__|>_ and interconnecting lines 106.21 Pre-tendering stage. «| !__ Revised sanction under process. Under tendering stage. ?%%#% « %| '% ! "% « % ?>?] ; with bays « __ and interconnecting lines Projects at initiation level £\ £\ 9 Remarks ' Sub setting 127/216 nos. £\ Erection 72. 2nd stage forest clearance awaited Sub-Station: Equipment erection in advance stage. Line : Sub setting 3/3 nos. Erection 1 Sub setting 57/79 nos. 8 Remarks \ " #!ised shortly. 7 Expenditure ' « _<_ _ % connecting lines «\| !"! «^>__ 03/2015 CTPS and associated lines «<_?`__\?>?] 03/2015 ^%!; 5 #!!'! Statement of Outlays & Outcomes/Targets (2014-15) ( As per the outcome budget 2014-15) and Actual Achievement upto 31.12.2014 \ ; %!!\ <; Appendix-T&D-2 296 Grand Total < 2 1 2 Name of Scheme / Programme Sl. No. 315.20 projects w i t h i n 60.60 scheduled time frame 3 Objective Annual Plan / Outcome % 106.21 «\ %;|% " @%__ 03/2015 Transmission lines £ [ U n d e r Consideration Sub setting 311/323 nos, £\ Erection 310, Stringing 98/212 CKM. 2nd stage forest clearance in progress. « \ <_| ! 12/2012 Ramgarh In different stage of progress. Sub setting 670/681 nos, £\ " $ _ *$ \ ~ clearance obtained. 01/2012 _*$ £\ " + \ ~ clearance obtained. 9 Remarks ' « \ <_" 12/2011 | Continuation of oldworks, supposed to be completed by >%#" !% der process. 8 Remarks «;__%terconnecting lines 7 Expenditure ' ?% %#% " under process. 6 Process / Timelines « __ % interconnecting lines 5 #!!'! 297 2 1 Assistance to Forum of Regulators for Consultancy and Capacity ^!% Name of Scheme/ Programme/ Project Sl. No Sanctioned cost: Rs.15 crore over #' Sanctioned cost/ Cumulative expenditure Capacity building by way of training /reorientation of personnel of regulatory commissions and availing consultancy. 3 Objective / Outcome 1.00 NonPlan ^% Plan ^% Complementary [^%getary Resources Outlay 2014-15 x #" staff of electricity regulatory commissions will be trained in a year. x Studies to serve as inputs for decision making for the Regulatory Commissions 5 "# Deliverables/ Physical Outputs 6 Processes/ Timelines 7 Remarks/ Risk Factor Assistance to Forum of Regulators for Capacity Building and Consultancy Achievements upto 31.12.2014 Study on Review of Renewable Energy \#"\ Mechanism undertaken, which is yet to be completed. Study on Impact Assessment of Plan Assistance to FOR during 11th Plan Period completed. 8 Achievement upto 31st December, 2014 (Rs. in crore) Annexure - VIII 298 2 1 Joint Electricity Regulatory Commission | UTs Scheme/ Programme/ Projects Sl. No Cumulative Expenditure till * Crores. Sanctioned cost/ Cumulative expenditure till 31.12.2014 3 To meet the Statutory Requirement for setting up Joint Electricity Regulatory Commission Objective/ Outcome: Complementary [^%getary Resources Plan ^% (Amount !" NIL Non-Plan ^% (Amount !" 5.50 NIL Outlay 2014-15 The Commission would regulate tariff for supply of electricity in the state of Goa and UTs except Delhi. 5 "able Deliverables/ Physical Outputs This will be a permanent institution 6 Projected Outcome Joint Electricity Regulatory Commission for Goa & UTs Achievements upto 31.12.2014 The Joint Electricity Regulatory Commission is fully operational. 7 Processes/ Timelines 8 Remarks/ Risk Factor conducted at the Commission's head quarter %!" hearings in the areas under the jurisdiction of the Commission. Commission has framed JERC ! <! < Commission framed JERC (Demand Side ; Regulations <\ ;mission is also in the process of #!\ _ ! Grid Connected Ground Mounted and Solar Rooftop and Meter! 9 Achievements upto 31st December, 2014 " Annexure-IX Printed at: Paramount Publishing House #9818848709
© Copyright 2024