gurney lane mountain bike trails Trail expansion area: Spring 2015 Additional single-track trails planned. Designed and built by Wilderness Property Management (Steve Ovitt) with assistance from SUNY Adirondack Intern Ed Fero. recreation.queensbury.net 2 Gurney Lane Recreation Area 5 152.3 Total Acres 10 miles/15 km of trails for year-round enjoyment 5.7 km of single track and 9.7 km of double track 87 2 1 5 Gurney Lane Mountain Bike Trails P Existing Double Track Trails for Hiking, Biking and Walking (white trails) Parking Areas Gurney Lane Mountain Bike Trails Trail Length (mi) 1 “Deal With It” (DWI) .33 mi Length (km) .53 km 2 Erratic .62mi 1 km 3 Excalibur .31 mi .50 km 4 HP .53 mi .86 km 5 Rogue .64 mi 1.03 km 6 TNT .12 mi .20 km 7 Tumblr .25 mi .40 km 8 Twitter .69 mi 1.12 km 3.5 mi 5.7 km Total Trail Length: 5 * Trail colors on this map do not necessarily correspond with active trail tags located in the field. Each trail has a corresponding Name, Trail Number and Trail Rating. 9 3 2 7 8 8 P P P P Buckbee Road/Gurney Lane Trail Access ee ckb P 4 4 d Roa Bu Connection Point — Rush Pond Trails Parking — Corner of West Mountain Road and Gurney Lane The Rush Pond Trail is 2.6 miles long through the Rush Pond wetland area. This stoned double-track trail connects Gurney Lane Recreation Area to the north and the Queensbury School/Aviation Road (and adjacent watershed properties) developments to the south. Along the way there is a matrix of unmarked single-track trails to explore. N l P Gu rn 4 ey La ne Ro ad Connection Point — Rush Pond Trails Queensbury 6 1 Note: Trail totals listed are for the newly built single-track trails. An additional 6 miles or 9.7 km are also available in the form of the double-track trails delineated by the white on this map. Each of these double-track trails are marked with their own colored trail tags. A separate detailed map is avalable at the pool house lobby. GURNEY LANE | 6 1 Trail Access P Warren County Municipal annex http://recreation.queensbury.net
© Copyright 2024