Leigh Community Centre Business Plan towards a top quality, thriving community centre Prepared by Leigh-on-Sea Town Council 67 Elm Road, Leigh-on-Sea, Essex SS9 1SP - Tel: 01702 716288 [email protected] www.leighonseatowncouncil.gov.uk Leigh Community Centre Business Plan 2 nd May 2012 Version: Final Page 2 of 51 Leigh Community Centre Business Plan Contents 1. Introduction 2. Executive Summary 3. Aims and Objectives 4. Within the wider context 5. A staged approach 6. Financial Summary 7. SWOT Analysis 8. Marketing 9. Management and Governance Appendix 1. Review of Community and Leisure Facilities in Leigh-on-Sea Appendix 2. Community Related Polices of Southend Borough Council Appendix 3. Income Calculation Appendix 4. Leigh-on-Sea Town Council’s Core Strategy Appendix 5. Indicative Timeline Appendix 6. Public Consultation Appendix 7. Heads of Terms for a Lease and Management Agreement 2 nd May 2012 Version: Final Page 3 of 51 Leigh Community Centre Business Plan 2 nd May 2012 Version: Final Page 4 of 51 Leigh Community Centre Business Plan 1. Introduction Background 1.1. In their letter dated 25th November 2011, Southend-on-Sea Borough Council (SBC) notified Leigh-on-Sea Town Council (LTC) that they would be assuming management of the Community Centre on Elm Road in Leigh when Southend Adult Community College relocates to Belfairs High School in August 2012 and that they would be ‘working to secure alternative short to medium term management arrangements in advance of this’. 1.2. Recognising the great importance of Centre to the life of the local community, at the Leigh Town Council meeting on 14th December 2011 Members resolved that LTC ‘express an interest and enters into discussions with Southend BC to secure the continued community use of the building’. 1.3. A Community Centre Working Party (reporting to Finance and General Purposes Committee via the Strategy and Town Plan Sub-Committee) was set up to coordinate LTC’s approach and formulate options for future LTC involvement with the Centre. A second working party was also formed to produce a Community Centre consultation strategy. 1.4. The Community Centre Working Party considered three options: To have no direct involvement with the management of the Centre but to provide support to its operation wherever possible. To seek a joint management arrangement with a third party, for example, the St Clement’s Hall Trust, and administer the Centre in partnership. To assume full management control of the Centre whilst also seeking opportunities for joint working with other interested parties. 1.5. The Working Party considered that full management control of the Centre was the preferred option because LTC will be delivering significant added value to its tax payers, will be acting in accordance with the principles of the Council’s Core Strategy, will be carrying out its responsibilities towards the well-being of the local community and will be taking the lead role in the delivery of improvements, will have full financial control and financial responsibility will not be shared, and will be ensuring a successful and sustainable outcome for residents, businesses and visitors. 2 nd May 2012 Version: Final Page 5 of 51 Leigh Community Centre Business Plan 1.6. During March and April 2012 the Working Party were in discussion with SBC to determine mutually acceptable terms for leasing the building. As a result of these discussions, a Heads of Terms document was drawn up which outlined the conditions surrounding the lease and LTC’s occupancy of the building (see Appendix 7. Heads of Terms). 1.7. At the Council meeting held on 14th March 2012 it was agreed that, subject to a satisfactory assessment of the financial implications, LTC’s preferred option was that recommended by the Working Party, i.e. to undertake management of the Community Centre building and services. The Heads of Terms were subsequently agreed by the Council at their meeting held on 11th April 2012. 1.8. A public Consultation was undertaken during April 2012 to determine residents’ views on the LTC’s management of the Centre and their willingness to make a financial contribution and to join a ‘Friends’ of the Community Centre group (see Appendix 6. Public Consultation). 1.9. A cash flow projection covering the first years of operation was presented to LTC’s Finance and General Purposes Committee on 1st May 2012. In addition to scheduling the income and expenditure incurred in operating the Centre, the forecast also identified key sources of funding, both internal and external, which would resolve the anticipated short-term cash shortfall. The financial assessment was recommended to Council for consideration at its meeting on 9th May 2012. Purpose of the Business Plan 1.10. To support its recommendation and to inform any future discussion with SBC and other bodies, the Working Party has drawn up this Business Plan which: defines the overall aims and objectives for LTC’s management of the Centre, identifies how these objectives align with LTC’s and SBC’s core strategies and policies, outlines a staged approach for implementing LTC’s administration, provides an income and expenditure analysis (including a three year financial projection) and explores opportunities for funding, summarises other factors that may impact on the scheme in terms of strengths and weaknesses, opportunities and threats, describes the marketing strategy that will ensure sustainability and the delivery of increasing benefit not only to the residents of Leigh but to residents across the whole Borough, and outlines the roles and responsibilities for managing the Centre and the principles of good governance which LTC will bring to its administration. . 2 nd May 2012 Version: Final Page 6 of 51 Leigh Community Centre Business Plan 2. Executive Summary 2.1. The Leigh Community Centre (the Centre) is a major community asset located in the centre of Leigh-on-Sea. The Centre is owned by Southend-on-Sea Borough Council (SBC) and is currently occupied by the Southend Adult Community College (SACC). Occupancy by SACC will cease in August 2012 when its operation will be relocated to Belfairs High School, and it is hoped that SBC will make the Centre available for community use for a period of at least five years thereafter. 2.2. Leigh-on-Sea Town Council (LTC) is keen to assume responsibility for the management and operation of the Centre. LTC will strive to make optimum use of the facilities to enrich the lives of local residents, to foster social inclusion and to encourage participation in the life of the local community. In this way it will also hope to ensure like-for-like facilities in any future redevelopment of the site. 2.3. By assuming responsibility for the Centre, LTC will be acting in direct accord with the principles of its Core Strategy (see Appendix 4. Leigh-on-Sea Town Council’s Core Strategy) particularly as, through the Centre, LTC will be satisfying its vision for a town that “preserves and nurtures the cultural life of Leigh” and “encourages everyone within the community to work together to achieve continual improvement to the facilities and future prospects of the town”. Management of the Centre aligns with LTC’s strategic aim “to promote the wellbeing and quality of life of the residents of Leigh-on-Sea” and is also fully in line with its strategic objectives “to promote the provision of accessible social, recreational, educational and cultural facilities within the town for the benefit of Leigh’s residents and visitors” and “to seek to create a socially inclusive and caring community”. 2.4. Recognising the significant contributions to the success of the Centre that could be made, LTC will actively seek strategic partnerships and opportunities for joint working with other stakeholders and interested parties. LTC desires to work closely with the ‘third sector’ and will directly involve the wider community in the running of the Centre and in determining its overall direction. Being a statutory body, LTC will administer the Centre according to standards of good governance. 2 nd May 2012 Version: Final Page 7 of 51 Leigh Community Centre Business Plan 2.5. Leigh benefits from a wide-range of social, cultural, economic and educational activities, supports a unique historic inheritance and hosts thousands of visitors annually to its Old Town, its shops and its many bars and restaurants. Residents of Leigh-on-Sea have unsurprisingly therefore developed a strong sense of community identity and pride and these factors will stimulate sustainable support for the Centre. The size of the local population and its demographic profile clearly call for a community facility of the size and quality provided by the Centre. 2.6. The Centre is well-served by both public and private transport and is situated adjacent to a large public car park. Whilst being a landmark, historic building on the outside, the inside has been refurbished to a high, modern standard and has been well maintained. In the light of its current occupancy, it is expected that the premises meet all statutory requirements. 2.7. LTC’s recent survey (see Appendix 1. Review of Community and Leisure Facilities in Leigh-on-Sea) has identified a wide-ranging demand for community amenity facilities in the area. 2.8. During April 2012 LTC undertook a public consultation to determine the views of local residents concerning LTC’s assumption of the management of the Centre, the raising of a hypothecated Council Tax surcharge to support it and individuals’ readiness to join a ‘Friends’ support group. The results of the consultation showed an overwhelming endorsement of the Council’s plans and can be seen in Appendix 6. Public Consultation. 2 nd May 2012 Version: Final Page 8 of 51 Leigh Community Centre Business Plan 3. Aims and Objectives 3.1. The primary motivation behind LTC’s ambition to assume management of the Centre is its wish to provide a centrally located, top quality, thriving community centre which will improve the quality of life for the whole local community by seeking to promote the principles of personal development, healthy lifestyle, wellbeing, community engagement and empowerment and social inclusion and that this use should extend to the long term. 3.2. To achieve this aim LTC will operate the Centre as a multi-faceted resource. A cultural centre. The Centre will offer a variety of spaces that will enable Leigh’s many and diverse cultural activities to develop and strengthen. The Centre will provide a gallery area for local artists, a hall for music and drama performance (particularly for amateur dramatic, music and operatic groups), regular ceilidhs and folk dancing, rooms for creative workshops and a venue for events (for Leigh’s Folk Festival, Arts Trail and Music Festival for example), film shows, lectures and exhibitions. A social centre. The Centre will offer a welcoming, friendly and safe environment for social activities and social contact for all sections and all age 2 nd May 2012 Version: Final Page 9 of 51 Leigh Community Centre Business Plan groups within the local community. The coffee lounge/café will provide a focal point for these social activities as well as offering a welcoming venue to the casual visitor. It will serve as a meeting place for local residents and for community forums, a place where people will become inspired to try new things and discover how they can become more directly involved in the life of their community. A learning centre. The Centre already hosts sessions run by the Workers’ Educational Association and it is expected that these will continue. As well as being able to provide rooms and facilities for other learning organisations (the University of the Third Age for example), the Centre may also provide overspill capacity for the SACC itself. A health centre. The rooms available will support a wide range of fitness activities - dance exercise, Pilates, Yoga, etc. The hall has the potential to provide a range of health-related activities: forums run by local GPs and PCTs, blood donor and blood pressure testing sessions, complementary, preventative and family health programmes, etc. A leisure and recreational centre. Leigh is fortunate to host a variety of clubs and societies many of which are struggling to find appropriate and affordable premises in which to operate. The Centre will provide the means by which such socially important activity can thrive and develop and new groups can start up. An information centre. The Centre will act as a local information point providing details of local groups, activities and services. Its noticeboards will provide publicity for forthcoming events and meetings. Internet access will be available enabling individuals to carry out their own research as well as allowing access to the online services of SBC (planning enquiries, bill payment, problem notification, etc), the NHS and similar service providers. An advice centre. The Centre will provide the opportunity for organisations which offer advice and counselling services to hold regular drop-in sessions or one-off events for the benefit of local residents. This will obviate the need to undertake long and expensive journeys to other venues around the Borough. Organisations providing advice on benefit claims, career development, health matters, crime prevention and domestic security, parental support, personal 2 nd May 2012 Version: Final Page 10 of 51 Leigh Community Centre Business Plan finance and debt management are examples of this. Regular local councillor surgeries will also be held in the building. 3.3. As well as providing space for community groups etc, the Centre will also develop the commercial use of the premises; the cash surplus arising will be used to enhance the community aspects of the Centre. Community groups, however, will always have priority on the space available. It is expected that organisations currently hiring rooms through the SACC will continue to do so and those hiring rooms from LTC will relocate into the building. The marketing strategy will seek to attract business users to hire space in the Centre (for holding conferences, corporate training, pre-school child care, for example) and will promote the use of the hall for private receptions and functions. The Centre will offer space to small traders, e.g. for table-top and craft sales, auctions and antique fairs. The local Farmers’ Market will continue its regular attendance in the hall. 3.4. Voluntary organisations and charities will be encouraged to use the premises for fundraising events. Local churches and religious groups may also wish to make use of the facilities provided. 3.5. The Centre will provide accommodation for LTC itself which will relocate from its current offices and occupy the office space already available in the Centre. 3.6. In operating the Centre, LTC will seek to develop partnerships and opportunities for joint working with other local organisations and groups. Some examples of 2 nd May 2012 Version: Final Page 11 of 51 Leigh Community Centre Business Plan stakeholders with whom LTC may find opportunities for joint ventures are: the Citizens Advice Bureau, Leigh Churches Together, the Leigh-on-Sea Clements Hall Trust, Leigh Police, the Leigh Society, Southend Adult Community College, Southend Arts Council, Southend Borough Council, Southend’s Integrated Youth Support Service, the Southend Together Partnership and the YMCA. 3.7. LTC will be actively encouraging volunteers to take part in the running of the Centre, for example to help run the café. To promote community engagement and social inclusion, the Centre will also encourage those groups which make use of its facilities to enlist the service of volunteers. 3.8. It is the aspiration of LTC that the Centre will become progressively self-financing. Through careful management and pro-active marketing the space available has the capacity to generate an income stream sufficient to cover the running costs. 3.9. The Centre will be available seven days a week. LTC will seek to derive full utility from the premises, making maximum use of the facilities for the benefit of the local community. 2 nd May 2012 Version: Final Page 12 of 51 Leigh Community Centre Business Plan 4. Within the wider context 4.1. The Centre will complement and be consistent with the aims of the Borough’s “Community Plan 2010 – 2020” which are represented in the following diagram. 4.2. One of the means by which to “create a safer town, where people feel secure and confident to live” is by the provision of locally targeted services and resources. These can be delivered through a community centre where local people can access advice, training and support. 4.3. “To build strong, confident and proud communities who are empowered to take an active part in local decision making and have positive relationships with each other”. The Centre will assist in this empowering of the local community by providing greater access to LTC and the services it delivers to the people of Leigh. The Centre will become a place where local groups, voluntary organisations and statutory services can meet, interact and provide mutual support. Leigh is fortunate that it has a strong sense of community identity and this will be enhanced and developed through the Centre. 4.4. “To create a thriving and sustainable local economy which extends opportunity for local residents and promote prosperity throughout the borough”. The Centre will attract training service providers and provide advice services. The availability of good community facilities is an important factor in attracting to the area, and in retaining, wealth creators who bring with them finance, jobs and ability to the benefit of the Borough as a whole and particularly to its more deprived areas. 2 nd May 2012 Version: Final Page 13 of 51 Leigh Community Centre Business Plan 4.5. “To reduce inequalities in health and wellbeing across Southend and support all ages to lead independent lives and choose a healthy lifestyle”. The Centre will provide space for keep-fit activities and will encourage its use by the local NHS as a place for providing health advice and for hosting health related promotions. 4.6. SBC has a number of policies which positively support and encourage the provision of community facilities in the Borough and some of these have been itemised in Appendix 2. Community related policies. 4.7. Attention is drawn in particular to Section 8 of the Borough’s Core Strategy titled ‘Community Infrastructure’ which states: Southend must be a town for people and it is important that everyone feels they are included and can access the opportunities the town has to offer – development and new facilities should be designed, built and maintained on the principle that people come first. This will mean providing facilities within the communities they serve, ensuring that they are accessible by all modes of transport and ensuring that people with disabilities and mobility difficulties can gain access simply and easily…... The Council considers that this will mean protecting and upgrading the town’s existing facilities and promoting the development and provision of new facilities, both in association with new development and through maximising the potential of underused land and buildings as opportunities arise. Vibrancy and richness of experience are essential if the town is to see a step change in the quality of life it offers and the image it projects. This will mean maintaining and enhancing its cultural, leisure and recreational facilities. These strategic principles of SBC align directly with the aims and objectives that LTC has defined for the Centre. 4.8. In their leaflet “RS9 Village halls and Community Centres”, the Charities Commission that makes the opening comment “The Government recognises that village halls, community centres and other charities that provide space and facilities for community services and activities can make an enormous difference to the well being of their communities ”. They go further by describing them as "a vehicle for community involvement, they contribute to diversity; they develop new approaches to local problems…”. It is the aspiration of LTC that the Centre will not only provide recreational opportunities for residents but will have a significant impact on the well-being of the community as a whole. 2 nd May 2012 Version: Final Page 14 of 51 Leigh Community Centre Business Plan 5. A staged approach 5.1. The transformation of an essentially educational facility into a multi-purpose community centre will be brought about in four stages (see Appendix 5. Indicative Timeline for detailed breakdown of each stage). 5.2. Stage 1 – Resolution of Key Issues. There are certain key issues which must be resolved in the immediate term before LTC can enter into an agreement with SBC to assume management of the Centre: Key elements of the project need to be agreed between SBC and LTC. These will include the terms of the occupancy, the respective responsibilities regarding the maintenance and upkeep of the building, the position with regards the Connexions building to the rear of the site and an audit of the physical condition of the premises. An effective communications strategy will ensure that the local community is kept informed of developments and will encourage public participation. It will also seek to identify those groups and individuals who will be willing to work with LTC in delivering a successful outcome. A public consultation will be carried out to determine the wishes and aspirations of the local community and their willingness to contribute to the cost of providing the amenity (see Appendix 6. Public Consultation). A comprehensive financial assessment will be completed and a resolution to the funding shortfall in 2012-2013 year will be determined. The office space required for the LTC council function will be assessed and measures taken to prepare for the satisfactory relocation of staff from their current offices at 67 Elm Road. 5.3. Stage 2 – Centre Set-up. Once the immediate issues have been resolved and a management agreement entered into, then practical steps will be taken to ensure that the Centre will function appropriately. It is uncertain at this stage how much of the existing infrastructure, furniture, fixtures and fittings will be available to the new administration. Those necessary items not inherited from SBC will be identified and purchased. Alterations to the premises, including signage, will be undertaken as required. Staff will be needed to manage the Centre and ensure its successful operation. Job descriptions and employment contracts will be drawn up and suitable staff will be appointed; additional equipment - computers, software, furniture etc - will be purchased and installed. 2 nd May 2012 Version: Final Page 15 of 51 Leigh Community Centre Business Plan LTC will relocate to the offices in the Centre. Housekeeping activities will be undertaken. Accounting structures and methodologies will be implemented. Room-booking software will be installed and appropriate training given. Entertainment licences will be acquired. Health and safety requirements will be implemented. Service contracts will be implemented (ICT, rubbish removal, security, building maintenance, etc.) Existing users of the Centre and of the LTC meeting room will be notified. A priority for the new centre manager and LTC during this time will be to identify avenues for external funding and making approaches to them. Marketing the facilities available and enrolling new users will begin; the services of a marketing professional may be required to facilitate this. 5.4. Stage 3 – Launch. Once the staff and infrastructure are in place, the Centre will begin operations. There will be continuity of service for existing users of the building; new users will be accommodated as required. Initially the target is to achieve 25% utilization of the available space in the first year. Take-up will increase in line with the marketing strategy. A launch event will take place. 5.5. Stage 4 – Full Operation. Having operated the Centre for several months a clearer understanding of revenue streams and running costs will be available and the budget for 2013/2014 will be compiled accordingly. 2 nd May 2012 Version: Final Page 16 of 51 Leigh Community Centre Business Plan 6. Financial Summary 6.1. Income and Expenditure Forecast This forecast provides the estimated financial position following the first full year’s operation (NB this twelve month period will bridge two of LTC’s accounting years). For details on how the income and expenditure figures are sourced, see paragraph 6.5 Notes on the Financial Summary. Expenditure Business rates Utilities Gas Electricity Water Washroom services Rubbish removal Insurance Advertising Security Depreciation Building maintenance & repair Internal External Miscellaneous Contingencies Payroll Total gross expenditure £8,000 £3,000 £3,500 £1,000 £8,500 £7,500 £7,500 £2,400 £1,500 £9,000 £1,000 £500 £1,000 £16,000 £2,000 £9,500 £46,000 £104,400 Less: contribution from LTC budget £31,650 Total net expenditure £72,750 Existing Centre room hire Existing LTC room hire Additional new room hire Notional income from café Total Income £16,500 £2,800 £25,700 £1,000 £46,000 Income Income shortfall 2 nd May 2012 £26,750 Version: Final Page 17 of 51 Leigh Community Centre Business Plan 6.2. Set-up Costs There will be one-off costs associated with LTC’s occupancy of the premises, the employment of new staff and fitting out the rooms and hall. Relocation of LTC office Office conversion Professional services Staff recruitment Computer hardware (office & reception) Computer software (licences for 2 PCs) Furniture, fixtures and fittings Miscellaneous equipment £2,000 £5,000 £8,000 £1,000 £1,000 £1,500 £18,500 £5,070 £4,555 £28,125 6.3. Financial projection 2012-2015 The tables below show the anticipated financial outturn over the first three years of operation. The projection is taken from the Cash Flow Forecast which has the following assumptions: The income generated from room hire will derive from a utilization factor of just 25% in the first year and will increase by 10% per year thereafter. As LTC will be relocating into the Centre building, some expenditure currently paid from the office budget (e.g. rent, rates, light, heat & power, insurance etc) will consequently be redirected to the Community Centre. A Community Centre Fund will be established comprising LTC budget underspends from 2011-2012 and virements from annual LTC committee budgets, particularly where these relate to community related items. No contribution is assumed at this stage from either the Council Tax precept or external sources. 2 nd May 2012 Version: Final Page 18 of 51 Leigh Community Centre Business Plan Financial Projection 2012-2015 Annual Expenditure less: from LTC office budget add: Set-up costs Net Expenditure less: Income from room hire Operational shortfall less: from Community Centre Fund Net shortfall 2012/2013 £69,000 £7,395 £28,125 £89,730 £16,530 £73,200 £33,646 £39,554 2013/2014 £103,500 £29,748 2014/2015 £104,400 £31,650 £73,752 £47,620 £26,132 £10,250 £15,882 £72,750 £52,382 £20,368 £10,250 £10,118 Cumulative Expenditure less: from LTC office budget add: Set-up costs Net Expenditure less: Income from room hire Operational shortfall less: from Community Centre Fund Net shortfall 31.03.2013 31.03.2014 31.03.2015 £69,000 £172,500 £276,900 £7,395 £37,143 £68,793 £28,125 £28,125 £28,125 £89,730 £163,482 £236,232 £16,530 £64,150 £116,532 £73,200 £99,332 £119,700 £33,646 £43,896 £54,146 £39,554 £55,436 £65,554 6.4. Addressing the shortfall 6.4.1 External Sources. Securing funding for the Centre from external sources will be an important objective and all avenues for this will be followed. It is envisaged that opportunities for fundraising will be pursued through a ‘support your local community centre’, or similar, campaign. In addition to securing funds, such a campaign would also generate publicity for the Centre, promote community involvement and engender a strong sense of community ownership. It is also expected that targeted funds will be raised through the work of the Centre’s ‘Friends’ group (see Section 9 Management and Governance). Since the purpose of the Centre aligns with the Borough Council’s core policies, with its corporate priority of “supporting Southend to become active and alive with sport and culture” in 2012-2013, with its Community Plan 2010-2020 and also with the outcomes sought through its Community Commissioning Prospectus, the Centre will be seeking financial support 2 nd May 2012 Version: Final Page 19 of 51 Leigh Community Centre Business Plan from SBC. The objectives of the Centre fit closely with those of SBC’s InYear Grant scheme and therefore funding may, for example, be available from this source. The Centre may also qualify for funding through Section 106 Developer Contributions as outlined in the Borough’s Local Development Framework (SPD2). That the Centre will be providing facilities for residents and business from across the whole Borough will be a further influencing factor when seeking SBC’s support. The Centre will encourage contributions and sponsorship from businesses from across the Borough. Opportunities also exist for funding from those local, regional and national organisations that seek to support community enterprises. Awards for All, the Arts Council, the Essex Big Society Fund and O2 It’s Your Community are examples of these. 6.4.2 Council Tax Precept. A specific addition to the Council’s annual budget to meet the projected shortfall could be considered. Included in the consultation which LTC undertook during April 2012 to determine residents’ views, was a question on whether they would support a small, hypothecated surcharge (up to £5 per household) on their Council Tax bill. The emphatic endorsement of this proposal from those responding to the survey would suggest that this option would have general support. 6.4.3 Addressing the shortfall in 2012-2013. Meeting the costs associated with setting up the Centre will significantly increase the shortfall in 2012-2013 and this situation will require particular attention. Assuming responsibility for the Centre mid-way through the financial year causes particular difficulties due mainly to the fact that LTC’s budget for the year has already been agreed. It would not be cost-effective to raise additional income through the Council Tax precept as the cost of re-billing would be prohibitive. Whilst a large draw-down on LTC’s General Reserve would leave the Council exposed to the risk of being unable to meet unplanned but vital expenditure, a partial contribution from Reserves (with repayment in 20132014) could be considered. LTC could also agree to set up a Community Centre Fund into which some existing Council resources could be lodged. Committee budget underspends from 2011-2012 and some virements from individual committee budgets in 2012-2013 could transfer approximately £33,600 into such a fund. Monies from community related budgets (£10,250) could also be redirected to the Centre in following years; the expected success of the Centre will mean that these transfers would be repayable. 2 nd May 2012 Version: Final Page 20 of 51 Leigh Community Centre Business Plan The conditions which apply to councils when taking out a medium- to longterm loan would make such a financial arrangement unsuitable for this project. It would, however, be possible for LTC to enter into a short-term (less than 12 months) arrangement to meet the transitional cash flow shortfall in 2012-2013. Local businesses may be prepared to underwrite set-up costs. Recognising the exceptional nature of LTC’s budgetary situation in 2012-2013, SBC may also be prepared to make available a loan facility which could be drawn down as the need arises. Within the constraints that apply to local authorities, a short-term loan may provide the means to spread the funding requirement over future years. Repair and maintenance services and insurance could be supplied through SBC and recharged to LTC at the end of the financial year. This would have a beneficial impact on the Centre’s cash flow and reduce the requirement short-term borrowing. The set-up costs could be reconfigured. A staggered programme for the purchase of furniture and equipment would produce savings in 2012-2013. This would be practicable as the income stream assumes only a 25% utilization of the building and rooms therefore unoccupied. Second-hand furniture and equipment may be purchased instead of new. As its Civic Centre refurbishment programme continues, SBC may make available furniture it no longer requires. Professionals have already offered to provide their services on a pro bono basis. 2 nd May 2012 Version: Final Page 21 of 51 Leigh Community Centre Business Plan 6.5. Notes on the Financial Summary 6.5.1 Expenditure The figures for the major items of expenditure (business rates, utilities, washroom services, security and internal building maintenance) have been provided by the SACC. The Heads of Terms for the lease stipulate that expenditure relating to the external fabric of the building will be limited to £7,500 in any one year. The figures for insurance, rubbish removal, advertising and depreciation (the provision for replacing fixtures and fittings) are guideline estimates which will be refined as business planning progresses. Miscellaneous expenditure includes small items for the office, equipment hire, stationery, telecoms, tools, photocopying, postage etc and has also been extrapolated from LTC’s budget. As the Centre will be managed by LTC, then LTC’s existing office equipment (printers, computer server, network routers, etc) and telecoms services will be treated as shared resources. As LTC will be vacating its current premises and relocating to the Centre, the provision already included in its budget for 2012-2013 for premises (£28,150), community affairs (£2,000) and building maintenance (£1,500) will be used to off-set the running costs of the Centre. 6.5.2 Income The figure for existing Centre room hire is the income being received by the SACC from those organisations which currently use the premises. It is anticipated that this income stream will continue after August 2012. The figure for existing LTC room hire is the amount which LTC receives from those organisations which currently use its meeting room. It is anticipated that these organisations will relocate to the Centre. A notional income of £1,000 is assumed from the café. When forecasting the income from additional new room hire, the following have been assumed: The current pricing structure used by the SACC will continue. This offers rooms to community groups at approximately one third of the price at which it offers them to commercial concerns. The charge for use of rooms out of 2 nd May 2012 Version: Final Page 22 of 51 Leigh Community Centre Business Plan normal hours is set at double that for standard hours so as to cover the extra overtime payments to staff. The SACC hires out 5 small rooms, 2 large rooms and the hall and, although more space could be made available for hire, the same seven rooms have been used in the income calculations. The current SACC rates were last set in 2007 and an uplift of 10% has been assumed. This brings the community rate for a large room to £8.25 per hour and the commercial rate to £25.30. Existing users will continue to pay the current price for the remainder of 2012-2013. The actual rates charged will be determined by market factors at the time. [NB. During 2012-2013 SBC will be charging community groups £9.50 per hour for the use of a small (12 seater) room and commercial users £24.70.]. Although there are groups which hire the hall on a Sunday, for estimating purposes it has been assumed that the Centre will operate Monday through Saturday. It has also been assumed that 85% of usage will be by community users and 15% by commercial concerns. Based on these parameters, the maximum annual income from room and hall hire is calculated as being approximately £180,000. In order to provide an estimate for the income from additional room hire during the first year of operations, a take-up/utilization rate of 25% has been assumed and to this an annual growth of 10% has been applied. The expectation is that income will be higher than this as other halls in the area are registering a usage rate of 90%. The financial breakeven point will be achieved when 40% utilization is achieved. See Appendix 3. Income Calculation for the detailed calculations. 6.5.3 Set-up Costs The set-up costs include £7,000 to meet the expenditure associated with relocating the LTC office into the Centre – i.e. the cost of physical removal and office conversion. Provision of £8,000 has been made to meet the costs of professional consultants (legal, surveying, marketing, etc). Staff recruitment costs of £1,000 and computer hardware and software of £2,500 have been included. Some items of miscellaneous equipment (totalling £4,555) have been included in order to make the facilities suitable for certain activities, to keep the building clean and to stock the café with crockery, cutlery, utensils and linen. 2 nd May 2012 Version: Final Page 23 of 51 Leigh Community Centre Business Plan It is understood that most of the furniture and kitchen equipment will remain after the SACC has vacated the building. Second-hand office furniture is also expected to be made available by SBC as a result of their Civic Centre refurbishment programme. Some items may still need to be purchased and a provision of £5,070 has been made for these. 7 whiteboards and 7 projector screens will be required for the meeting rooms at a cost of approximately £770. To furnish the hall with 10 folding tables will cost approximately £600. The sum of £3,000 has been included for a sound system and stage lighting. To purchase 2 projectors will cost approximately £700. 2 nd May 2012 Version: Final Page 24 of 51 Leigh Community Centre Business Plan 7. SWOT Analysis 7.1. Strengths The Centre has a raised public profile and support within the community is considerable. Demand for shared space in the area is high. The premises are located in the centre of Leigh and there are good transport links and nearby parking The Centre has a good mix of space and has been well maintained. SBC would want the Centre to succeed. As a community body LTC attracts support and volunteers. Professional help and guidance has been offered on a pro bono basis and individuals with in-depth experience of similar enterprises are already involved. 7.2. Weaknesses Taking on the administration well into the financial year will present LTC with funding challenges. The duration that the Centre will be available is currently uncertain and may restrict ambitions. 7.3. Opportunities Running the Centre will enable LTC to appreciably increase the range of services which it provides to its tax payers and to the town. The Centre will become the major service within LTC’s service portfolio and will significantly heighten its public profile. Recognising the contribution that the Centre will make to the community, volunteers may take an active role in reducing running costs – keeping the premises clean and tidy, providing operational cover, etc Opportunities for external funding are high. The successful operation of the Centre will mean that LTC would be well placed for managing any community facility resulting from any possible redevelopment of the overall Elm Road site. 7.4. Threats Rate payers may prove unwilling to fund the Centre. Start-up costs may prove higher than anticipated. Increased usage may be more difficult to achieve. Centre may not attract sufficient income to cover its costs. 2 nd May 2012 Version: Final Page 25 of 51 Leigh Community Centre Business Plan 2 nd May 2012 Version: Final Page 26 of 51 Leigh Community Centre Business Plan 8. Marketing 8.1. The key features of the Centre highlighted in its marketing strategy will be: Accessibility. The Centre is close to bus stops on a number of routes across the Borough, is within walking distance of Leigh train station and is adjacent to a large public car park. The Centre meets disability requirements with its ramped access, disabled parking spaces, adapted toilets and internal lift. Variety of spaces. The Centre offers the largest amount of space for hire in the town and comprises rooms and areas of differing size which will meet the requirements of a wide range of activities. There are five small meeting rooms, two large rooms, a large hall and a coffee lounge/café area. Toilets are available on both floors of the building. Community pricing strategy. The Centre will operate on a non-profit making basis. As the prime purpose of the Centre is to provide amenities for the local community and encourage community involvement and social inclusion, the prices that the Centre charges to such groups will be low. It will, however, charge commercial organisations at market rates. Community focus. In accordance with its aims and objectives, the Centre will positively seek to encourage the use of its premises for community activities. In particular, the Centre will be as flexible and accommodating as possible to support start-up groups and those that promote social inclusion. 8.2. The recent research carried out by LTC (see Appendix 1. Review of Community and Leisure Facilities in Leigh-on-Sea) has identified that there is significant demand for community facilities in the area. 2 nd May 2012 Version: Final Page 27 of 51 Leigh Community Centre Business Plan 8.3. The services of a marketing professional may be purchased to kick-start the marketing strategy. 8.4. Full use will be made of a range of communication channels to ensure all potential users are aware of the facilities available. Promotion will be carried out through the local media and use will be made of a dedicated website and online social networking services. A register of local organisations will be maintained and publicity material will be regularly distributed via a mailing list. Use will be made of LTC’s public noticeboards which are located around the town and its newsletter, ‘Leigh Matters’, will include information on the Centre’s activities. 8.5. The marketing strategy will include an effective means of communicating and consultation with the local community to ensure that its needs and interests are understood and that services and facilities being provided by the Centre reflect the changing needs of local people. Statistical records will be maintained to monitor usage, improve performance and inform the marketing strategy. 8.6. With its Good for Leigh campaign LTC has an established vehicle for community engagement and this will integrate well with the activities of the Centre. 2 nd May 2012 Version: Final Page 28 of 51 Leigh Community Centre Business Plan 9. Management and Governance Management 9.1. The administration of the Centre will be under the direct management of LTC. 9.2. To administer the community facilities, LTC will employ a Centre manager who will report to the Town Clerk and have the following responsibilities: Managing the Centre and its staff; Marketing the Centre to raise its profile and income and developing local services and activities for example open days and ad hoc social events; Implementing the aims and objectives of the Business Plan; Assisting with the financial management of the Centre; Ensuring effective maintenance of the building; Ensuring the building is safe and secure at all times; Managing storage space and equipment use within the building ; Supporting volunteers and volunteer involvement with the Centre; Working with local partners to ensure activities at the Centre fit with others provided in the area and developing close working relationships with key local partners. 9.3. Reception It is envisaged that there will be a joint reception point for both LTC and the Centre services. 9.4. Volunteers A number of volunteers, both individual and through groups, are expected to participate in the running of the Centre; in particular it is anticipated that a local volunteer group will operate the café. The work of volunteers will be co-ordinated by the Centre manager. Governance 9.5. As a local authority LTC adheres to the principles of good governance: local public accountability, compliance with national standards, guidelines and good practice, transparency in operation, effectiveness in the management of risk, capability in its officers and members, and openness to scrutiny. In addition, LTC continues to achieve Quality Council status and has Power of Well-being accreditation. 2 nd May 2012 Version: Final Page 29 of 51 Leigh Community Centre Business Plan 9.6. The Centre will be within the jurisdiction of LTC’s Finance and General Purposes Committee which has responsibility for the Council’s finance, personnel, premises and community-wide activities. 9.7. To enable ready monitoring of its income and expenditure, the Centre will operate to its own budget and will have its own sets of accounts. 9.8. A Board or Steering Group (comprising members of the local community, LTC, partners and stakeholders) will be constituted and will meet regularly to discuss the operation of the Centre, responses to changed requirements and other initiatives and opportunities as they arise. The group will make recommendations for LTC’s Finance and General Purposes Committee’s consideration. 9.9. A ‘Friends’ group, with members drawn from the local community, will also assist in the running of the Centre, will act as a pool of expertise and will play a lead role in targeted fundraising initiatives. 9.10. LTC’s annual Town Meeting will be broadened to offer a forum on matters relating to the Centre. 9.11. After the Centre has become established and is operating effectively, alternative vehicles for the delivery of its services will be considered in order that maximum advantage, both administratively and financially, can be achieved for the people of Leigh. 2 nd May 2012 Version: Final Page 30 of 51 Leigh Community Centre Business Plan Appendix 1: Review of Community and Leisure Facilities in Leigh-on-Sea Review of Community and Leisure Facilities in Leigh-on-Sea Leigh-on-Sea Town Council See separate document Leigh Community Centre Business Plan Appendix 2: Community Related Polices of Southend Borough Council A. Saved Policies of Borough Local Plan Policy L5 - Entertainment and The Arts - SAVED The Borough Council will encourage the retention and development of existing entertainment, cultural and arts facilities and the provision of new ones in support of local arts organisations - in particular by the establishment of a central community arts centre. Permission will not normally be given for proposals involving the loss of such facilities unless it can clearly be shown that these can no longer be justified or that improved alternative provision is available. Policy U10 - Provision of Other Community Facilities - SAVED Proposals for those local community uses not subject to Policies U6, U8 or U9 will normally be supported by the Borough Council subject to: i. the need to meet the provisions of Policy E5, in order to safeguard the character and amenity of local residential streets, where permission will normally be limited to uses which are small-scale in nature and involve detached property; ii. adopted design and layout criteria being satisfactorily met in accordance with Policy C11 and H5. In particular, schemes should achieve a satisfactory means of access and off-street parking facilities, whilst proposals involving the conversion of all, or part of, a property originally constructed as a single family dwellinghouse should retain the external appearance of the property as a house; iii. the need to meet the provisions of Policy H3 relating to the retention of small family houses. Proposals involving the loss of existing community hall facilities will not normally be permitted unless alternative provision is made in a convenient and appropriate location, having regard to the above criteria, or there are over-riding environmental reasons for the development. B. Core Strategy Policies 8.10 Southend must be a town for people, and it is important that everyone feels they are included and can access the opportunities the town has to offer – development and new facilities should be designed, built and maintained on the principle that people come first. This will mean providing facilities within the communities they serve, ensuring that they are accessible by all modes of transport and ensuring that people with disabilities and mobility difficulties can gain access simply and easily. Residents, visitors and the business community should also be able to go about their daily lives protected from crime and free of the fear of crime. 8.11 The Council considers that this will mean protecting and upgrading the town’s existing facilities and promoting the development and provision of new facilities, both in association with new development and through maximising the potential of underused land and buildings as opportunities arise. 8.13 Vibrancy and richness of experience are essential if the town is to see a step change in the quality of life it offers and the image it projects. This will mean maintaining and enhancing its cultural, leisure and recreational facilities. Leigh Community Centre Business Plan Appendix 2: Community Related Polices of Southend Borough Council 8.14 The Council’s preferred approach to delivering an improved quality of life in the Borough is based on the following principles: ... II. promote new opportunities for sports, recreation, leisure and cultural facilities; ... V. promote the location of community services and facilities within the area they serve; ... VII. ensure that the use of land and buildings reflects people’s needs and are designed; and located in ways which contribute to including all sectors of society through ease of access; and VIII. promote development which contributes to the delivery of relevant service strategies. 8.15 Policy CP6 seeks to establish a strategic policy framework to deliver these principles. C. Policy CP6: Community infrastructure Development proposals must mitigate their impact on community infrastructure by contributing appropriately to services and facilities that would be adversely affected.... New development should demonstrate that it will not jeopardise the Borough’s ability to improve the education attainment, health and well being of local residents and visitors to Southend. This will be achieved by; ..... 2. supporting improvements to existing, and the provision of new, facilities to support the needs of education, skills and lifelong learning strategies ..... 3. safeguarding existing and providing for new leisure, cultural, recreation and community facilities, particularly: ...... 4. ensuring the needs of all residents and visitors, including the disabled and other vulnerable groups, are met; and ........ 2 nd May 2012 Version: Final Page 51 of 51 Leigh Community Centre Business Plan Appendix 3 - Income Calculation 1. Pricing Structure The current pricing structure used by the SACC will continue. This offers rooms to community groups at about one third of the price at which it offers them to commercial concerns. The charge for use of rooms out of normal hours is set at double that for standard hours so as to cover the extra overtime payments to staff. The SACC hires out 5 small rooms, 2 large rooms, the cafe and the hall and, although more space could be made available for hire, the same rooms have been assumed here. The current rates charged by SACC were set in 2007 and an uplift of 10% has been applied. Available rooms Small rooms Large rooms Café Hall 5 2 SACC Current hourly rates (2007 prices) Community Community Commerci groups out-of-hours al £5.20 £7.50 £7.50 £12.80 £10.40 £15.50 £15.50 £26.00 £15.50 £23.00 £26.00 £38.50 Hourly rates with 10% uplift Community Community Commercial groups out-of-hours £5.72 £8.25 £8.25 £14.08 £11.44 £17.05 £17.05 £28.60 £17.05 £25.30 £28.60 £42.35 commercial Comparative SBC hourly rates for use community use 12 seater rooms £9.50 £24.67 18 seater rooms £13.00 £37.83 28 seater rooms £21.00 £58.50 2. Calculation of number of hours for which rooms may be hired Although the Centre could operate every day, for estimating purposes a Monday to Saturday operation is assumed. There will be three sessions per room per day: one in the morning, one in the afternoon and one in the evening. Each session will be of two hours duration. Sessions held in the mornings and afternoons on Monday to Friday will be charged at the standard rate; those held in the evening and on Saturdays will be charged at the out-of-hours rate. The number of standard hours per room per year will therefore be 1000 hours (i.e 2 twohour sessions per day, 5 days per week, 50 weeks per year) The number of out-of-hours per room per year will be 800 hours (i.e. 1 two-hour session Monday to Friday and 3 two-hour sessions on Saturdays (16 hours in total) for 50 weeks per year) 3. Mix of user types The Centre will serve a mix of user types. It is assumed at this stage that 85% of the users will be community groups and 15% will be commercial concerns. Leigh Community Centre Business Plan Appendix 3 - Income Calculation 4. Calculation of maximum income Factors Standard hours per room Out-of-hours hours per room Community usage % Commercial usage % 1,000 800 85 15 small large cafe hall Hourly rates with 10% uplift Community Community Commercial groups out-of-hours £5.72 £11.44 £17.05 £8.25 £17.05 £25.30 £8.25 £17.05 £28.60 £14.08 £28.60 £42.35 Income per room type p.a. Room Type Small Large Hall Community usage Standard Out-of-hours £4,862 £7,013 £11,968 Maximum income from the Centre p.a. Number of Room Type rooms Small 5 Large 2 Hall 1 Maximum income £7,779 £11,594 £19,448 Total Income £86,224 £50,875 £42,851 £179,949 5. Calculation of income from new bookings Utilization assumed at 25% Less: rooms already hired: Existing SACC £16,500 Existing LTC £2,800 Income from new bookings say £44,987 £19,300 £25,687 £25,700 6. Income Estimate for first year Existing SACC room hire Existing LTC room hire Additional new room hire Notional income from café Total income £16,500 £2,800 £25,700 £1,000 £46,000 Commercial usage Standard Out-ofhours £2,558 £2,046 £3,795 £3,036 £6,353 £5,082 Total per room type £17,245 £25,438 £42,851 Leigh Community Centre Business Plan Appendix 4: Leigh-on-Sea Town Council’s Core Strategy Vision Statement “Leigh-on-Sea is an active and vibrant working town with a separate and distinctive identity to, but still an integral part of the larger urban community of Southend-on-Sea; a community where people support one another and can live, work, shop, visit and enjoy themselves in an environment that is constantly cared for and enhanced; and a town that: provides sustainable employment opportunities, transport, housing and business facilities; preserves and enhances the natural beauty, heritage and traditions of Leigh; preserves and nurtures the cultural life of Leigh; encourages everyone within the community to work together to achieve continual improvement to the facilities and future prospects of the town; and promotes thriving commercial areas which provide leisure and shopping facilities to meet the needs and wishes of residents and visitors.” Strategic Aim “To promote the well being and quality of life of the residents of Leigh-on-Sea” To achieve this we aim to: take part in an open dialogue with residents to better understand their needs, and in turn explain how we will address these needs within the resources and powers available to the Town Council; provide high standard, value for money services to help meet the needs and wishes of the residents; assistmeet and the encourage other bodies to provideand high standard, value for money services to help meet needs and wishes of residents visitors.” the needs and wishes of the residents; and promote the best interests of the town for the benefit of the local community Strategic Objectives The Town Council’s strategic objectives are based on the Council’s overall vision. The objectives are: 1. To promote the provision of accessible social, recreational, educational and cultural facilities within the town for the benefit of Leigh’s residents and visitors. 2. To encourage and support the economic and commercial vitality of the town. 3. To preserve Leigh’s unique character and heritage, protect its conservation areas and maintain and enhance its maritime environment. 4. To encourage harmony between developing commercial and residential requirements and existing amenities. 5. To consult with and take due regard of all comments received from other statutory bodies, voluntary organizations and individuals, to ensure an improving standard of service that meets with local needs. 6. To protect and enhance Leigh’s natural environment, its open spaces and public gardens. 7. To seek to improve sustainable transport infrastructure across the town. 8. To seek to create a socially inclusive and caring community. Leigh Community Centre - Business Plan Appendix 5: Indicative Timeline February 2012 March 2012 April 2012 May 2012 Stage 1: Resolution of key issues BP = Business Plan S&TP: BPv3 & CP drafted 22.02.12 S&TP: BPv3 & CP agreed S&TP: BPv4 drafted CP = Consultation Plan IP = Implementation Plan 01.03.12 S&TP: Recommendation in principle to F&GP 06.03.12 F&GP: Recommendation in principle to Council SBC: Draft terms notified and financial info supplied 14.03.12 Full Council: Resolution in principle 27.03.12 S&TP: Public consultation begins (one month) SBC: Negotiations on terms (rent, maintenance, responsibilities, furniture & equipment) S&TP: Identifying sources of funding begins S&TP: IP working party formed 28.03.12 S&TP: BPv5 (Funding 2012-2013) recommendation in principle to F&GP 03.04.12 F&GP: BPv5 (Funding 2012-2013) recommendation in principle to Council 11.04.12 S&TP outline building requirements quote for insurance quote for washroom service quote for rubbish removal quote for security service determine room rates Full Council: BPv5 (Funding 2012-2013) resolved in principle S&TP: Public consultation evaluated SBC: Terms agreed S&TP: Comprehensive financial assessment undertaken S&TP: BPvFinal drafted S&TP: Building surveyed LTC: Legal advice sought 01.05.12 01.05.12 S&TP: BPvFinal recommendation to F&GP F&GP: BPvFinal recommendation to Council 09.05.12 Full Council:BPvFinal resolved 10.05.12 Agreement signed Leigh Community Centre - Business Plan Appendix 5: Indicative Timeline May 2012 June 2012 July 2012 August 2012 September 2012 Stage 2: Centre set-up 10.05.12 Agreement signed S&TP: Identifying stakeholders begins S&TP: Enrolling volunteers begins S&TP: Identifying new users begins S&TP determine accounting methodology determine building conversion needs identify room bookings system draft Board terms of reference draft H&S procedures (from SACC?) draft staffing arrangements and JDs draft Budget S&TP: IP drawn up 30.05.12 Personnel: Staffing recommendation to F&GP S&TP: IP & Budget recommendation to F&GP 05.06.12 F&GP: IP, Budget & Personnel resolved 06.06.12 BP = Business Plan CP = Consultation Plan IP = Implementation Plan Personnel: Staff recruitment begins (2 months) S&TP: Alterations to building started when possible S&TP: Web microsite planned S&TP: Existing users notified S&TP: 'Friends' group established S&TP: Training needs established S&TP: Purchase orders placed LTC: Account methodology implemented S&TP room bookings system entertainment licences insurance service contracts IT equipment signage furniture & equipment LTC: Staff in post S&TP: Board inaugurated LTC: Office removal planned LTC: Staff training begins LTC: Contacts notified of change of address Manager: Lauch Event planned Manager: Promo media release Manager: Web microsite and Facebook page launched Manager: Marketing strategy begins Manager: Utilities notified 28.08.12 Stage 3: Launch LTC move-in day 01.09.12 Launch Event Leigh Community Centre – The Future What do you think? Please circle your answer: Q1: Are you in favour of Leigh-on-Sea Town Council taking over the management and development of Leigh Community Centre in Elm Road? Yes Leigh Community Centre in Elm Road is facing an uncertain future and there is a risk we may lose it. Southend-on-Sea Borough Council owns the building and leases it to Southend Adult Community College, which is moving into a new building in August. We all know that the Borough Council needs to cut spending next year. As part of this, the current leader of the Borough Council has stated publicly that there are no definite plans for the future of Leigh Community Centre and the Borough Council is looking at options. Your Leigh-on-Sea Town Council wishes to keep this iconic Leigh building open for the people of Leigh, by running it ourselves as a thriving and affordable community facility in the heart of our Town. The Town Council’s recent review of leisure facilities in Leigh found a high demand for community halls – especially given the recent loss of these facilities. We have received lots of ideas for running more youth and community groups, social clubs, art galleries, music, film and performance spaces at the Centre but, at end of the day, it will all come down to local money and local enthusiasm! No Your comments: Q2: As a Leigh-on-Sea Town Council taxpayer, are you prepared to pay up to an extra £5 per year (roughly 10 pence a week) on your household’s Council Tax to help fund the Town Council’s plans to develop Leigh Community Centre into a thriving local facility for the people of Leigh? Yes No Your comments: Q3: Are you interested in joining a “Friends of Leigh Community Centre” group to help support the Town Council’s plans for the future of Leigh Community Centre? Yes No Your comments: Your name Your postcode Your email address (optional) The Town Council needs to know what you think about this important issue, so please complete the following questionnaire and return it (as shown below) by 19th April. What we do with your information You may complete this survey online by going to www.leighonseatowncouncil.gov.uk or you may email your response to: [email protected] Under the Data Protection Act 1998 we have a legal duty to protect any information we collect from you. We will not pass on your details to any third parties. The information that you provide to us may be used to deliver email updates to you about Leigh Town Council’s plans for the Community Centre and other local initiatives. You will always be offered a straightforward way to unsubscribe to these emails. or please drop your completed questionnaire into a collection box at: I would like to be kept updated on matters relating to Leigh Town Council. yes / no Post Office and Sub-Post Offices in the Leigh Town Council area Leigh Primary Health Care Centre, London Road Leigh-on-Sea Town Council Office, Elm Road Leigh-on-Sea Town Council Leigh Library 67 Elm Road, Leigh-on-Sea, Essex SS9 1SP - Tel: 01702 716288 Leigh Heritage Centre in the Old Town Waitrose, London Road [email protected] www.leighonseatowncouncil.gov.uk Consultation Results Consultation Results LTC Community Centre Business Plan – Appendix 7 SBC Heads of Terms – Leigh Community Centre – SBC and LTC v.4 29-03-2012 Heads of Terms For a Lease and Management Agreement Leigh Community Centre, Elm Road, Leigh on Sea March 2012 SUBJECT TO CONTRACT Landlord Southend on Sea Borough Council Civic Centre, Victoria Avenue Southend on Sea, Essex. SS2 6ER Tenant Leigh on Sea Town Council 67 Elm Road, Leigh-on-Sea Essex, SS9 1SP the Premises All those land and buildings shown edged red on the attached plan and known as the Leigh Community Centre together with all physical boundaries and three (3) parking spaces. The Lease Term 5 years from and including 1st August 2012 and expiring on the 31st July 2017 (subject to Break Clauses below). Security of Tenure The lease shall be outside the protection of the Landlord & Tenant Act 1954. User the Rent and Rent Review (This enables the Council to obtain vacant possession in connection with the Break provision below) Not to use the Premises other than as a Community Resource and Community Activity centre* in accordance with the Community Centre Management Agreement containing the Tenant’s aims and objectives relating to the Premises. *For the avoidance of doubt Community Resource and Community Activity shall include the occupation by and functions of Leigh-on-Sea Town Council. The rent will be geared to the net profit associated with the centre. The rent shall be the lesser of £35,000 p.a. or 40% of the Net Profit arising from the operation of the Premises. Net Profit shall mean the gross income less the approved operating costs including an agreed level of staffing. The financial year for the purposes of this lease shall be 1st August to 31st July each year. For example, if the gross turnover is £150,000 and the operating costs are £100,000 for a particular year then the net profit will be £50,000. 40% of £50,000 is £20,000 (i.e. Page 1 of 8 LTC Community Centre Business Plan – Appendix 7 SBC Heads of Terms – Leigh Community Centre – SBC and LTC v.4 29-03-2012 less than £35,000) therefore the rent payable shall be £20,000 for that year. Rent will be payable annually in arrears with financial statements being prepared and issued to the Council for examination no later than the 1st November 2013 (for the period 1st August 2012 to 31st July 2013) and annually thereafter by the 1st November each year during the term. Break Clauses The lease will include an option for the Tenant to break the lease and deliver vacant possession of the Premises to the Landlord at any time during the term subject to the following conditions: 1. Any rent due rent being paid up to date. 2. Reasonable compliance with the lease provisions 3. Yielding up the Premises to the Landlord in no worse condition than at the grant of the lease (fair wear and tear excepted). The Lease will include an option for the Landlord to break the lease on 6 months written notice (served after the 1st August 2016) requiring the Tenant to surrender the Premises at any time after the 1st February 2017 if the Landlord requires the Premises for redevelopment or for its own use or any other purpose whatsoever. The Lease will contain an option for the Landlord to determine the lease on no less than one month’s notice given at any time in the event that: 1. The Tenant materially changes its aims and objectives relating to the Premises without first agreeing a variation to the Management Agreement. 2. The Tenant fails to demonstrate reasonable compliance with the Management Agreement. Alienation Assignment of the Lease will not be permitted. The hiring of the centre for community centres activities in accordance with the Community Centre Management Agreement is permitted (and expected) provided always that no hiring agreement shall constitute any form of tenancy. Costs Each party will bear its own costs in the preparation and grant of this lease. The Tenant shall be responsible for all outgoings including Non Domestic Rates and all utility and servicing costs from the commencement date. Page 2 of 8 LTC Community Centre Business Plan – Appendix 7 SBC Heads of Terms – Leigh Community Centre – SBC and LTC v.4 29-03-2012 Repair and maintenance The Tenant shall keep the interior parts of the Premises in no worse repair and condition (than at the commencement date) throughout the term. The Tenant shall ensure that the Premises and equipment, plant or service installations are serviced maintained responsibly and in accordance with manufacturers or statutory requirements (the Landlord supply this service at a cost if required). any and any can The Tenant shall not be liable for the costs of any maintenance works arising from any pre-existing condition in relation to the external parts of the Premises or any fault arising directly from such condition. The pre-existing condition of the building shall be determined by reference to the detailed condition survey of the Premises dated [ ] by [ ] and agreed between the parties hereto. Notwithstanding such agreement the Tenant shall take reasonable care to procure that the exterior parts of the Premises are maintained in good and tenantable repair. Provided always that where any individual item of external capital expenditure required (other than adaptations proposed by the tenant and approved by the Landlord including their removal) is above £2,000 then the Tenant shall notify the Landlord of the need for such work to be undertaken and the Landlord shall then review the request and undertake the work if, at the Landlord’s discretion, the work is required to be undertaken within the remaining term of the lease in order to protect the fabric of the building. Alternatively and if there is rent payable, the Landlord may agree (in writing) that the cost of the works may be deducted from the rent payable and completed by the Tenant. PROVIDED ALSO THAT the Tenant shall not be responsible for more than a cumulative total of £7500 of such external repairs under this clause in any one financial year. The principle of this clause is to limit the Tenant’s liability in respect of significant external works to the effect that whilst there is an expectation that repairs will be effected on a patching up basis, there is not an expectation that the Tenant will be responsible for the replacement or substantial refurbishment of substantial building elements. For example, while a broken down pipe would need to be repaired, there is no expectation that the entire surface water drainage system would be upgraded or renewed. The Tenant shall ensure that the Premises are Statutorily Compliant and indemnify the Landlord for all liabilities arising from the use and management of the Premises. Page 3 of 8 LTC Community Centre Business Plan – Appendix 7 SBC Heads of Terms – Leigh Community Centre – SBC and LTC v.4 29-03-2012 Alterations The Tenant will not alter, improve or make any additions to the interior or exterior of the Premises, including any hut, shed, store, caravan or temporary or moveable building, partition or structure without the previous written consent of the Landlord. Insurance The Landlord shall insure the Premises for the full reinstatement value and the Tenant will reimburse the full cost of the premium of such insurance and associated Insurance Premium Tax on an annual basis. Dispute Resolution In the event of a dispute, the matter of the dispute shall be resolved by an independent surveyor, accountant or solicitor as appropriate and in each case acting as an expert. The costs of any expert determination shall be split equally between the Landlord and the Tenant. The Management Agreement The purpose of the Management Agreement is to provide flexibility for the Tenant in the management of the Premises whilst at the same time providing commitment to the Landlord to manage and use the premises in such a way and for such purposes as the Landlord may reasonably endorse from time to time. The Management Agreement is the justification for the grant of the lease at a below market rent. Either the Landlord or the Tenant can instigate a review of the Management Agreement at any time during the lease on giving the other no less than 1 month’s notice. Variations to the Management Agreement must be agreed in writing. At the commencement of the lease, the Management Agreement shall require the Tenant to hold the Premises for the purposes of furthering its commitment to its aims and objectives in relation to the use of the Premises. Tenant’s current aims and Premises are set out below: objectives relating to the Please see also Leigh Town Council’s Leigh Community Centre Business Plan dated 15th March 2012 and attached to these Heads of Terms. The Management Agreement shall also provide that the Tenant must, within 28 days, supply to the Landlord on request a schedule of bookings, details of the income and expenditure at the Premises, full accounts (audited if available), the current schedule of fees and charges and the minutes of any Community Centre Management meetings. The Tenant shall endeavour to make the centre available for use by the community as often as possible including during Page 4 of 8 LTC Community Centre Business Plan – Appendix 7 SBC Heads of Terms – Leigh Community Centre – SBC and LTC v.4 29-03-2012 evenings and weekends and will actively seek to engage with the whole community. The Tenant will promote the use of the centre in support of the Council’s Safe, Clean, Healthy and Prosperous aims and its Corporate Priorities (at the time). As required by the Council’s Asset Management Plan, the Tenant will also be required to demonstrate that the arrangement facilitated by this agreement will satisfy several or all of the following criteria: a measurable improvement in delivering stronger and more sustainable communities improved (enhanced or better value) services, particularly to vulnerable sections of the community that the organisation(s) involved can show capacity, both pre- and post- transfer/disposal to manage the asset that deliverable and acceptable proposals, particularly financial provision, are in place for maintenance and management of the asset an entrepreneurial approach to business development and asset use (particularly relevant to the third sector) that the partners have a clear understanding of each other's objectives and agendas that partners have understood each other's constraints, whether legal, financial or policy driven that there is explicit trust between the relevant organisations, and this is institutional, i.e. not dependent on a small number of key individuals The Tenant will declare the lease and Management Agreement in any application to the Council for additional support or funding. Contact Details Landlord’s Contact Details: Alan Richards Group Manager - Asset Management Finance and Resources - Support Services Directorate Southend on Sea Borough Council Civic Centre, Victoria Avenue Southend on Sea, Essex. SS2 6ER Tel: 01702 215540 e-mail: [email protected] Landlord’s Solicitor: Peter Tremayne Legal and Democratic Services – Support Services Directorate Page 5 of 8 LTC Community Centre Business Plan – Appendix 7 SBC Heads of Terms – Leigh Community Centre – SBC and LTC v.4 29-03-2012 Address as above Tel: 01702 215165 Email: [email protected] Tenant’s Contact Details: Mr Paul Beckerson Town Clerk, Leigh on Sea Town Council 67 Elm Road, Leigh-on-Sea Essex, SS9 1SP Tel: 01702 716288 Email: [email protected] Tenant’s Solicitor TBC [Name] [Address and postcode] Tel: [xxxxxxxxx] Email: [xxxxxxxx] Plan attached. Page 6 of 8 144146 Leigh Community Centre, Elm Road, Leigh-on-Sea 25b 25a 7 22 20 130 105 E 120 4 ELM ROAD 8 Club 2c 2d 2b 116 95 114 50 13 126 124 1 to 20 35.4m 37.8m 106 Centre 32 22 12 67 69 94 22 2628 Youth 23 11 13 104d 32 83 House 104c 38 42 1 44 14 Hall 18 26 32 23 GLENDALE GARDENS VICTORIA DRIV 140 119 23 21 19 27 86 12 Surgery Car Park Police Sta Baryta Court 46 52 38 30 24 to 28 22 TCBs Baryta Court 16 School 2 14 10 6 4 6 Shelter Shelter 66 RECTORY GROVE Leigh Wesley 70 to 2 PO Leigh 53 1 to 8 76 57 59 El The © Crown copyright and database rights 2012 Ordnance Survey 100019680 62 46 50 44 3a 29 54 41 33 9 PC 5 3b 3 67b 65 69 6 67 1b 5 c6 95 3 61c 5b 5 34 57 55c 7a 49 45 37a 43 Scale WEST STREET 71 15 17 23 79 77 7 23 9 11 81 83 7 5 1 EL 24 2 M 8 30 34 40 3 1 37 25 23 21 31a 27 20 51 47 45 43 41 39 37 33 31 53 1:1,250 LTC Community Centre Business Plan – Appendix 7 SBC Heads of Terms – Leigh Community Centre – SBC and LTC v.4 29-03-2012 Annexe Business Plan dated 15th March 2011 Annexe Condition Survey. Page 8 of 8
© Copyright 2024