Legend - Transportation Bond Election 2015

Overall Transportation AN
Plan Project Identifier:
Roadway Project
Location:
Project Description:
DB Wood Dr - SH 29 To Oak Ridge Dr
Issue Addressed:
Mobility, Bottleneck, Economic Development
Reconstruction of DB Wood Dr from SH 29 to Oak Ridge Dr.
DB Wood Rd. is a north/south minor arterial which provides congestion relief from Williams Dr. for traffic from the
western portion of Georgetown to SH 29. This project will widen DB Wood Rd. from a 2-lane to a 4-lane divided facility
from SH 29 to Oak Ridge Dr..
Proposed Roadway:
Right of Way
Acquisition:
Widening to 5 Lanes
No
Anticipated 2035
8,600 Vehicles
Average Daily Traffic:
Functional
Classification:
Minor Arterial
Anticipated Start Date: 2021
Anticipated End Date: 2024
Begin Project
K
OA R
E
RID G
D
Legend
Build
Design
Planning
WOLF RANC H
PKWY
Y
RSIT
NIVE
WU
AVE
Printing Date: April 06, 2015
Path: G:\0573.009.000\07.00 CADD\GIS\Project Sheets_With_Paragraph.mxd
EST
THW
SOU PASS
BY
K
D B RD
OD
WO
Georgetown
29
V
U
End Project