The management agenda How to implement change projects Skills © Learning and Skills Improvement Service (LSIS) 2009 Contents Foreword Welcome to World Class Skills Introduction to the programme Consultancy E-learning Agenda Seminar outline Change in the FE sector Change and change management Why do people resist change? Change approach The case for change Mobilising change Communication and stakeholder engagement Allocating change roles Project management Change recommendations Plan of action Contacts Resources Courses Appendices 2 4 6 8 9 10 11 12 14 19 21 24 30 32 38 44 48 52 53 54 56 57 2 The management agenda Foreword The further education sector understands the need to improve skills levels if business is to compete and succeed in global markets. Further education providers recognise too the key role they have to play in innovation, training and support for employers. We are keen to learn from the many examples of effective practice in the sector to build provider capacity to deliver high quality, flexible provision that responds to employers’ needs. The Learning and Skills Improvement Service’s (LSIS) World Class Skills programme (WCS) provides a range of products and services that are alert to the needs of individual providers as they seek to improve the responsiveness and quality of their offer to employers. How to implement change projects 3 Fully funded, it provides a free-of-charge range of interactive workshops, seminars, consultancies and structured support to take forward reform and development through thematic development projects. This publication is one of a group of resources that have been developed to support interactive workshops and seminars offered through the programme. We believe it brings together useful information to support providers as they gear up their business with and for employers. Roger McClure Chief Executive, LSIS 4 The management agenda Welcome to World Class Skills The Leitch Review of Skills: Prosperity for all in the Global Economy, World Class Skills (2006) investigated the UK’s long-term skills needs and predicted that even if targets current at the time of the report were met, the UK’s skills base would still lag behind many of its key comparators. That’s why the government has committed to ensuring that the workforce in England has world-class skills by 2020. This will call for an enormous shift in attitudes and aspirations within workplaces, schools, colleges, universities and society itself. It will require every individual to think about updating their skills and qualifications to ensure that they are giving employers what they really need. How to implement change projects It will require employers to play an active role in helping to reform vocational qualifications to ensure that they are relevant and responsive to changes in the global economy. In support of these reforms, the Learning and Skills Improvement Service (LSIS), working closely with national partners, was asked by the government to lead the development of a single, integrated improvement strategy to support the drive for excellence in the further education system that would succeed in the new demand-led environment. In the twenty-first century, our natural resource is our people – and their potential is both untapped and vast. Skills will unlock that potential. The prize for our country will be enormous – higher productivity, the creation of wealth and social justice. Lord Leitch, Leitch Review of Skills, 2006 5 6 The management agenda Introduction to the programme The World Class Skills – developing responsive provision is an LSIS programme providing support for improvement activities for LSC-funded providers in enhancing their employer-facing provision. This will support organisations in developing provision to meet employers’ skills needs and the aspirations of the Leitch Review of Skills. KPMG and its consortium partners are delivering this major support programme. Together they can bring significant expertise to you and your organisation. KPMG has an in-depth understanding of the wider education and skills sector that can help further education colleges and independent training providers deliver improved outcomes for learners and employees, as well as achieve their organisational goals. They can also draw in the sector’s most innovative and effective practice to share with you. Programme benefits Involvement in the programme will help LSC-funded providers of education and training to: • develop and extend effective employer relationships • ensure that growth and quality go hand in hand • create fit-for-purpose organisational structures • gain relevant accreditation, for example, Training Quality Standard (TQS) and Framework for Excellence • access high-level support through a range of focused events • network with peers and share effective practice. Programme overview The programme is designed to support the Train to Gain Plan for Growth, the changes to demand-led funding, the rolling out of the TQS accreditation, National Skills Academies and the development of specialist networks. How to implement change projects 7 The focus of the programme is to work with providers and other stakeholders to be more responsive to the needs of employers and increase the capacity of the FE system to provide high quality, flexible training and support for employers and their employees in order that they can contribute to UK productivity and competitiveness in a global economy. The programme comprises both seminars and workshops. Seminars provide a high-level introduction and overview of the topic. Workshops are designed for smaller groups: the sessions are more interactive and practical in nature, giving participants the opportunity to work with a range of proven tools and techniques. There will be an opportunity for providers to apply for individualised consultancy support to work within their organisation in an intensive way to focus on the development of employer-responsive provision. Resources HMSO (Her Majesty’s Stationery Office) (2007) World Class Skills: Implementing the Leitch Review of Skills in England. Norwich: HMSO. Available online at: www.dcsf.gov.uk/skillsstrategy/uploads/documents/World%20Class%20Skills%20FINAL.pdf Lord Leitch (2006) Leitch Review of Skills: Prosperity for all in the Global Economy, World Class Skills. London: HMSO. Available online at: www.dcsf.gov.uk/furthereducation/uploads/documents/2006-12%20LeitchReview1.pdf QIA (Quality Improvement Agency) (2006) Pursuing Excellence: An Outline Improvement Strategy for Consultation. Coventry: QIA. Learning and Skills Council: www.lsc.gov.uk Learning and Skills Improvement Service: www.lsis.org.uk World Class Skills: www.excellencegateway.org.uk/wcs 8 The management agenda Consultancy As part of the World Class Skills programme, there are a limited number of one-to-one consultancies available. Consultancy support may allow your organisation to explore in greater depth some of the issues you have identified in attending a seminar or workshop. For example, having attended the workshop on ‘Building employer-responsive skills in your organisation’ and the seminar on ‘Legal advice on employment terms and conditions’ you may feel that your organisation would benefit from individual support in reviewing current and future staffing profiles and how to ensure these are aligned to increase employer-responsive provision. This consultancy support is fully subsidised by LSIS. It is a unique opportunity to gain professional consultancy to support organisational development in enhancing your employer-responsive provision. It will, of course, also require time commitment from staff in your organisation in order to bring about real change and development for the organisation. In order for these benefits to be maximised it is essential that this consultancy is supported from the top, both conceptually and with commitment and input to the process from the head of the organisation. Other members of the senior management team will also need to engage with the consultancy process, depending on the nature of this consultancy. For each consultancy, a KPMG consultant will be assigned to your organisation to support you through the process of completing the diagnostic questionnaire and associated development plan, A Framework to Measure and Improve Employer Responsiveness. This development plan will be confidential to your organisation. If you have already completed this diagnostic questionnaire they will support you in updating this and validating its currency. They will then work with you to identify how additional consultancy support may help you to progress in implementing your development plan. They will take a flexible approach to ensure that this consultancy plan is customised to meet your needs but, as an indication, it may cover areas such as implementing effective labour market information (LMI) and/or customer relationship management (CRM) systems; organisational design for performance; implementing and maintaining change; or achieving the Training Quality Standard. If you would like further information please contact [email protected] How to implement change projects 9 E-learning Alongside the workshops and seminars, a suite of five online training modules is being developed. The topics are as follows: • Building employer-responsive skills in your organisation • Funding and finance for maximising business • Identifying bottom-line benefits • Sales and gaining repeat business • Targeting SMEs for training. E-learning is an alternative way for providers to interact with the programme and share knowledge within their organisation. Each module will take between 40 minutes and an hour to complete, and will include interactive material such as multiple-choice questions, quizzes, games, scenarios and case studies. The modules will be accessed from www.excellencegateway.org.uk/wcs If you would like further information please contact Adam Caldwell [email protected] 10 The management agenda Agenda Coffee and registration Welcome, introductions and objectives Change in the FE sector Change and change management (including coffee) Change approach 09.30 10.00 10.10 10.50 11.50 Lunch 12.30 Mobilising the change 13.30 Break 14.30 Communication and stakeholder engagement Allocating change roles Closing session 14.40 15.15 15.50 How to implement change projects 11 Seminar outline Aim To give you a greater understanding of change processes and associated behaviours. Objective To ensure you are better equipped to implement a successful organisational change. Benefits Better understanding of change management theory for all management staff. Simple and effective ways of dealing with barriers to change. Tools and techniques to support the implementation and ongoing management of change projects. Increased levels of staff retention and satisfaction. Simply … a more employer-responsive business. ● ● ● ● ● 12 The management agenda Change in the FE sector There has always been considerable change in the FE sector. Although change has been constant the difference now is the rate, scale and depth of change. Organisations who anticipate and embrace change constructively and creatively are the ones most likely to develop rather than decline. Recently this change has included a focus and recognition on the importance of employer investment in workforce development and the contribution this makes to economic productivity. The term ‘employer responsive’ is now commonly used and responding to the needs of employers is acknowledged as a central purpose of post-16 education and training. Indeed with decline in the traditional FE population an organisation that can improve its employer responsiveness and maintain its other strengths will be a stronger and more stable organisation. Resources Foster, A. (2005) Realising the Potential: A Review of the Future Role of Further Education Colleges. Annesley: DfES Publications. Available online at: www.dcsf.gov.uk/furthereducation/uploads/documents/REALISING06.pdf LCS (Learning and Skills Council): www.lsc.gov.uk Lord Leitch (2006) Leitch Review of Skills: Prosperity for all in the Global Economy, World Class Skills. London: HMSO. Available online at: www.dcsf.gov.uk/furthereducation/uploads/documents/2006-12%20LeitchReview1.pdf How to implement change projects 13 What does employer responsiveness mean to you? Exercise Consider the following four questions with relation to your own experience of change and employer responsiveness: 1 Thinking about your previous experiences of change programmes, what worked well? What didn’t work well? 2 What does ‘employer responsive’ mean for your organisation? How does it look and operate in practice? What are you currently well designed to achieve? What problems do you face? 3 What could make this change programme different from those tried in the past? 14 The management agenda Change and change management The nature of change in organisations There are two views about how change occurs in organisations. The first sees change as a continuous factor, with organisations transforming on a regular basis with the environment changing around them. The second sees change as a process of punctuated steps. The latter is more likely to exist in industries where changes to the competitive conditions are not as frequent and it is possible to remain competitive for a period of time without making any significant changes to the way an organisation operates. In addition there are a number of recognised change paths which are illustrated in the following diagram. The most popular change path is Reconstruction followed by Evolution (eg the shutdown of some departments, head count loss, followed by a series of changes to do with culture). The change path chosen will depend on the context and circumstances of the organisation. Exercise Consider which path would be most appropriate for your organisation and why. End result Transformation Realignment Evolution Transformational change implemented gradually through different stages and interrelated initiatives. Likely to be planned, proactive change undertaken in response to anticipation of the need for future change. Adaptation Less fundamental change implemented slowly through staged initiatives. Revolution Transformational change that occurs via simultaneous initiatives on many fronts, and often in a relatively short space of time. More likely be forced and reactive, due to the changing competitive conditions the organisation is facing. Reconstruction Reconfiguring the business. Often forced and reactive due to changing competitive context. Incremental Nature Big Bang How to implement change projects 15 What is change management? Change management is the process of ensuring that the people most affected by proposed organisational changes are ready, willing and able to make the operational and behavioural changes required to deliver success. Change management isn’t: an event HR activities such as recruitment, performance management, talent management, improving HR services and processes purely qualitative soft and fuzzy project management easy to do well! ● ● ● ● ● ● Notes 16 The management agenda Why do we need change management? Without change management, change projects are more likely to fail, or to lead to problems in an organisation. According to research by KPMG, 60 per cent of projects fail to deliver the expected business case. The following table illustrates the 10 most common reasons why change programmes fail. Any one of these problems can derail a programme, but some change programmes can face more than one at a time, greatly reducing the likelihood of a successful outcome. Any of these reactions to change is likely to have an effect on the customer experience and could turn employers away from the organisation. Careful change management will forestall many of these problems or will help the organisation to react positively and effectively to counter them when they do arise. Project takes too long. Organisation loses sight of reason and benefits of change … Inertia Lack of clarity around target position. Projects ‘do their own thing’ … Confusion Organisation cannot support its people well when delivering under pressure … Corruption It’s sometimes too easy to do the simple things and then stop … Diffusion The organisation is not clear when it has succeeded, or how near it is … Uncertainty The change is not managed as a project, with clear leadership … Misdirection The project team is not given sufficient or credible resources to succeed … Frustration The organisation is just not ready to deliver the change … Exhaustion There is lingering resistance to the change (for whatever reason) … Resentment How to implement change projects Exercise Which of these issues have you encountered, or would you expect to encounter, in a change programme in your organisation? 17 18 The management agenda Furthermore, after an organisation makes changes, there is often a performance dip while the new organisation gets used to the new systems and ways of working. Change management can help to minimise this dip in performance and its duration. It is important to remember, however, that performance almost always falls during and immediately after projects. This dip is caused by business not being as usual and in some cases it never recovers, even to pre-project levels. There is therefore a pressing need to get the skill sets restored. Change management will not solve every issue, but it is a valuable tool that can be applied to assist in minimising the downside and maximising the benefits. Business performance dip Business performance Implementation Stabilise and support Minimise Benefit realisation Maximise Time Notes 19 How to implement change projects Why do people resist change? Recognising the phases of change Much has been written on the stages that an individual goes through as part of the change process. Elizabeth Kubler-Ross’s work based on the reactions of people going through the grief process is one of the most used studies. A similar curve passing through Denial, Resistance, Exploration and Commitment below illustrates common reactions to change. The phases of change Denial Commitment • Focused on outcomes/impact • Disbelief • Apathy • Clear understanding of what to do next • Numbness • Activity but no progress Integration • High job satisfaction (managers and staff) • Looking ahead to further change Denial Understanding • Condent of ability to adapt to change Shock • Excited/energised • Anger • Depression Frustration Experimentation • Stubbornness • Blaming • Over preparation (planning rather than action) • Too many ideas/options • Absenteeism • Confusion about priorities Acceptance Resistance • Too much uncoordinated independent action Exploration For a number of reasons, people in organisations can often find change both daunting and difficult. If an individual undergoing change does not progress up the commitment curve it is usually because they have developed a resistance to change. The following figure offers an amalgamation of various factors in personal resistance gleaned from both academic research and experience. 20 The management agenda Resistance to change Loss of control Fear of the unknown History Expected or unexpected change Increased workload Fear of complexity Force of habit Ego Self doubt Resources Kubler-Ross, E. (1973) On Death and Dying. London and New York: Routledge. Kubler-Ross, E. (2005) On Grief and Grieving: Finding the Meaning of Grief through the Five Stages of Loss. New York: Simon & Schuster. 21 How to implement change projects Change approach Change framework Preparation is crucial in the successful implementation of any change programme. The Change Framework is a useful tool in the planning and assessment of requirements for change. The framework shows the different stages involved in change management – from ‘Mobilising the change’ to ‘Managing the process’, and is a good way to assess whether your change management design has covered all the key components. The change framework Design and analyse the change • Assess the current organisational situation • Define the desired organisational state (vision) • Determine how to get there Managing the process • Designing the project • Tracking benefits • Monitoring progress • Resources • Risk Mobilising the change • Compelling change story • Vision for the future • Case for change The change content Benefit case Engaging people • Stakeholders • Resistance • Commitment • Sustaining change • Communication Allocating change roles • Leading the change • Managing the project • Supporting key roles • Roles and responsibilities 22 The management agenda Notes How can we use this in our organisation? Have elements of this been covered previously? It is important at the mobilising stage to build a convincing case for change – the compelling change story. This can be made of ‘pushes’ (reasons for change related to the current situation) and ‘pulls’ (reasons for change related to the future situation). It is vital to make clear the reasons for the change (the push) and the implications of not changing, while balancing these with an inspiring vision of the future after the change is implemented (the pull). How to implement change projects 23 Change equation A further tool that may be useful in capturing the process of change and identifying the factors that need to be in place for successful change to happen is the equation developed in 1987 by Beckhard and Harris. It is deceptively simple but extremely useful. It can be brought into play at any stage in the change process to analyse how things are going. Potential problems it can highlight include: staff are not experiencing dissatisfaction with status quo the proposed end state has not been communicated to key people the proposed end state is not desirable to the change implementers the tasks being given to those implementing the change are too complicated or ill defined. ● ● ● ● There are three vital components which need to be in place for change to take place. For individuals to feel that the problems and pain of change are outweighed by the advantages of the need to change it is necessary for people to be: dissatisfied with the status quo convinced the proposed changes are a viable way of resolving current problems convinced that the proposed changes are achievable. ● ● ● The formula is expressed thus: (A x B x D) C= X When C = Change A = level of dissatisfaction with the status quo B = desirability of proposed change D = practicality (risk of disruption of changing) X = personal cost of changing This equation is particularly helpful when considering mobilisation and ties in with issues of determining readiness for change. Mobilising individuals is about getting individuals to recognise that change is necessary and that they have to let go of the past; that proposed changes are desirable because they will solve the problems the organisation is facing and that they are achievable. Resource Beckhard, R.F. and Harris, R.T. (1987) Organizational Transitions: Managing Complex Change. Reading MA: Addison-Wesley. 24 The management agenda The case for change The case for change has to be clearly stated at the start of any change project. It should comprise a highly compelling justification of why the organisation must change, developed by describing the company’s current situation and placing it in the context of the new business realities. It should include SMART (specific, measurable, attainable, realistic, time-bound) targets/benefits, the identification of which will enable you to track the success of the change and must address the following questions: Why is the change needed? What are the drivers? How immediate is the need? When will the change occur? What will the change involve? What benefits will it bring? ● ● ● ● ● ● The case for change must also include a vision incorporating the goals and objectives of the change – what successful change will look like. For an example of a case for change see page 58 in the Appendices. Assessing your current position and where you want to go A number of methods can be used to assess the current organisational situation and to identify the forces that may require an organisation to change. Organisations should be aware of their current strengths and focus on those, as well as on areas to improve and change. Some tools to help to do this are identified below: How to implement change projects 25 Force field analysis Force field analysis was developed by Kurt Lewin (1951) and is widely used to inform decision-making, particularly in planning and implementing change management programmes in organisations. It is a powerful method for gaining a comprehensive overview of the different forces acting on a potential policy issue and for assessing their sources and strengths. The first step is to agree the area of change to be discussed. This might be written as a desired policy goal or objective. All the forces in support of the change are then listed in a column to the left (driving the change forward) while all forces working against the change are listed in a column to the right (holding it back). The driving and restraining forces should be sorted around common themes and should then be scored according to their ‘magnitude’, ranging from one (weak) to five (strong). The score may well not balance on either side and can help see where there might be resistance to change. Throughout the process rich debate and dialogue should emerge, which is an important part of the exercise, and key issues should be allowed time for discussion as this often leads to ideas regarding solutions and ways forward. Resource Lewin, K. (1951) Field Theory in Social Science. New York: Harper & Row. SWOT analysis SWOT is an acronym for strengths, weaknesses, opportunities and threats. SWOT analysis is primarily a tool utilised for strategy development taking into account the operating environment of any business, both internally and externally. Environmental factors internal to an organisation can normally be categorised as strengths and weaknesses, while external environmental factors can be categorised as opportunities and threats. In the light of employer responsiveness, SWOT analysis is a helpful method of utilising the team’s different perspectives in the organisation to collectively consider current provision. The team can clearly see the strengths and opportunities to retain/build on and the threats and weaknesses to mitigate/action plan against. 26 The management agenda Customer feedback There is no one standard procedure of capturing customer feedback or requirements. This can be achieved through a variety of ways including interviews, focus groups, observations and/or surveys. It is easy to presume that we know what employers want, but unless we ask them, we risk changing the organisation for no benefit. This can be an excellent way to ensure those staff who are not bought into the change process face some hard facts and is more telling than producing a report full of numbers for dissemination. Process mapping An organisational process map documents currently defined processes. This overview provides an organisational perspective of such processes and can be helpful in documenting and communicating the scope of a change programme. The known processes at a high level should be mapped in the form of arrows to show how one flows into another. Defining processes provides a clear understanding of the business and the relationships between processes. It can show us which processes are key to employer engagement, which support it and which are unnecessary. Benefits management The fundamental reason for beginning a change programme is to realise benefits through change. The change may be to do things differently, to do different things, or to do things that will influence others to change. Change programmes will produce outcomes, but change alone will not produce measured improvements (benefits). Realising benefits requires active management throughout the change process. The identification, monitoring and measurement of benefits are fundamental parts of achieving success. Notes How to implement change projects 27 The objectives of benefits management are to: ensure benefits are identified and defined clearly and linked to strategic outcomes ensure individuals in business areas own the identified benefits and their realisation. It is critical that sponsors are responsible for ‘adding value’ through the process proactively manage the process of benefit realisation, including benefit measurement keep benefits within realistic boundaries of scope and value, to identify their wider impact use the benefits to direct the programme and provide a focus for delivering change, to realise benefits in line with overall business direction and strategy ensure benefits realisation is tracked and recorded and ensure achievements are properly identified and recognised provide alignment and clear links between the programme, its vision and desired outcomes and the strategic objectives of the organisation(s) involved. ● ● ● ● ● ● ● Benefits can be defined in many different ways dependent on the change programme. Examples are cost reduction (cashable and non-cashable), time saved, cost avoidance, improved quality, improved compliance or reduced risk. In summary, effective benefits realisation: leads to demonstrable delivery of project benefits facilitates the communication of tangible delivery to stakeholders reduces the risk of failure allows for effective feedback of lessons learned to improve future project delivery. ● ● ● ● Readiness for change Change readiness assessments help to provide an understanding of the organisation's potential to undergo organisational change. The benefits include an increased potential for success of the change efforts, the ability to identify and manage where resistance to change exists, or where pockets of such resistance are collected, and to assist in bringing support to the project. This assessment identifies: strengths or weaknesses of previous change efforts that need to be addressed areas within the organisation that have experienced or are undergoing significant change areas within the organisation that have little or no experience with change how the employer-responsive programme is similar to (or different from) previous changes in terms of its nature, scope and urgency. ● ● ● ● 28 The management agenda A change readiness assessment should be performed at the beginning of a project to ensure resistance to the initiative is identified upfront. A series of interviews should be carried out with the senior management team (SMT) and key managers to explore their feelings about change, their level of commitment and their perception of resistance to change at all levels within the organisation. Focus groups or surveys can be run with members of staff to identify and explore the reasons behind the successes and/or failures of past change initiatives. Potential questions Factor Questions Perceived choice • It is perceived that people will ‘get away’ with not changing • Sanctions for not changing are small • Leadership is not perceived to be totally behind the change • Benefit of the change to the business is perceived to be low 1 2 3 4 5 1 1 2 2 3 3 4 4 5 5 1 2 3 4 5 • People have been consulted over the final design • People have been heavily involved in creating the final design • People perceive their voice has been heard during the design phase • People have had a chance to test and pilot the change 1 1 2 2 3 3 4 4 5 5 1 2 3 4 5 1 2 3 4 5 • Change requires people to learn new skills • Change requires people to unlearn old skills • New approach is totally new to the business therefore there are no or few role models • Change will require significant time to master 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 1 2 3 4 5 Involvement Perceived difficulty Disagree Agree Interpretation of the results The result of the change readiness checklist is taken into consideration in the preparation of your project plan, ie what type of communication, frequency of communication etc is necessary. The change readiness assessment can also be input to the stakeholder management document. The findings should be analysed and include comments on: key potential problem areas and issues the location of groups with high change tolerance ways to ensure previous implementation problems do not occur, or are minimised mechanisms for involvement and engagement. ● ● ● ● How to implement change projects 29 Whilst the change readiness assessment will allow you to analyse the organisation’s readiness to change and areas to improve, a lack of readiness for change should not be confused with resistance. If people have been prepared for change and understand what is expected from them, they are less likely to exhibit resistance. Useful questions to ask of the results: ● ● ● ● ● Is this what you would have expected? Are there areas which surprise you or the rest of the team? What could have caused the positive/negative responses? Is this merely ratifying what you already know? What can be done to rectify some of the issues? Impact of change An impact assessment is a process and outcome that takes the change (future state or ‘to be’ picture) and breaks it down into separate changes so that the impact upon the organisation and stakeholders can be understood and hence managed. The five key steps to conducting an impact assessment are: Step 1 – Unpack the ‘to be’ picture into specific changes. Step 2 – Identify stakeholders affected by the change. Step 3 – Assess the impact of each change for each stakeholder. Step 4 – Determine significance of the impact of each separate change. Step 5 – Design change interventions. For an example of an impact assessment, see the Appendices, page 59. 30 The management agenda Mobilising change Building on the case made for change and the ‘compelling change story’ of the change framework already discussed, we now examine further the importance of inspiring and motivating staff and stakeholders to embrace change within an organisation. Vision As you embark upon a change programme it is crucial that you have in place a vision that describes the effect of the proposed changes in the context of the organisational environment you wish to create. Throughout the change process each individual within the organisation needs to be, not just aware of the vision, but committed to its realisation. Writing a vision statement The criteria to keep in mind when writing a vision statement are: Be specific to your organisation. Encompass the organisation’s values. Describe what you want to see in the future. Be positive and inspiring. Do not assume that the system will have the same framework (constraints) as it does today. Be open to dramatic modifications to the current organisation, methodology, teaching techniques, facilities, etc. ● ● ● ● ● ● Exercise In the space provided write a vision for employer responsiveness for your organisation. Imagine it is five years from today and you have created your desired organisational state. Now it is your job to describe it, as if you were able to see it realistically around you. (You may want to consider the checklist opposite.) How to implement change projects Checklist Does it convey a picture of what the future will look like? Does it appeal to the long-term interests of members, employees, customers, partners and other stakeholders? Does it comprise realistic, attainable goals? Is it clear enough to provide guidance in decision making? Is it general enough to allow individual initiatives and alternative responses in light of changing conditions? Is it easy to communicate; can it be clearly explained in five minutes? Is it ambitious enough to force people out of comfortable routines? Source: Kotter (1996) See also the vision expressed in the case for change example in the Appendices on page 58. 31 32 The management agenda Communication and stakeholder engagement For any change project to be successful and for the changes to be sustainable it is necessary that the case for change and the forward vision be effectively communicated and consensus gained at all levels throughout the organisation. Communication: do’s and don’ts: ● ● ● ● ● ● ● ● ● ● Listen and pay attention to others Encourage participation Share information Don’t agree too quickly Don’t bargain or trade support Don’t vote Treat differences as a strength Create a solution that can be supported Avoid arguing blindly for your own views Seek a win–win solution Communications timetable As the main method of increasing the buy-in and support of stakeholders, communications may be the most important tool in helping an organisation become more employer responsive. A timetable which lays out when to contact which stakeholders is therefore essential. It is especially useful when communications will be coming from more than one source within an organisation. A timetable such as that below is also useful as, at a glance, it allows you to identify any groups who are being under- or over-communicated with, and whether there is an absence or excess of communication in any particular period of the year. Audience All employees Board All employees Trade union Customers Senior management team Senior management team Employees Employees Board Selection of employees Programme steering committee Communications channel Email letter Executive updates Company magazine Trade union update Customer newsletters Senior management forum Senior manager email from CEO Intranet update Line manager cascades Programme update CEO roadshow Programme steering committee meeting Programme milestones wk 4 wk 5 wk 2 wk 1 wk 3 w/b w/b w/b w/b 15/5 22/5 29/5 5/6 w/b 8/5 wk 6 wk 7 wk 8 wk 9 w/b w/b w/b w/b 12/6 19/6 26/6 3/7 wk 10 wk 11 wk 12 wk 13 wk 14 w/b w/b w/b w/b w/b 10/7 17/7 24/7 31/7 7/8 wk 15 wk 16 wk 17 wk 18 w/b w/b w/b w/b 14/8 21/8 28/8 4/9 wk 19 wk 20 wk 21 w/b w/b w/b 11/9 18/9 25/9 How to implement change projects 33 34 The management agenda Stakeholder analysis Crucial to the success of any change project is the identification and management of the stakeholders at all levels in the organisation. The template reproduced here provides a useful and commonly used tool for initial stakeholder analysis. Such a tool is of great importance for an organisation seeking to improve its employer responsiveness. There will be a large number of diverse stakeholders who must be managed effectively if the programme is to succeed. These stakeholders will range from the obvious, such as learners and teaching staff, to the less obvious, such as the local press. There are many aspects to consider when analysing stakeholders. The table below covers all the information that one needs to know about stakeholders to the change. As well as basic information such as the name and role of a stakeholder, we can also list information on their expectations, or things that particularly interest or excite them (‘hot buttons’). It is also important to list actions taken to engage/manage the stakeholder. This table should be updated after such interventions, or at regular intervals, to track any changes in commitment levels towards the change project. The information on ‘Influence’ and ‘Current commitment level’ is essential and can be used to create a stakeholder map (see page 36). Some stakeholders will have greater influence on the success of the programme than others. Levels of commitment to the change may also vary greatly. Increasing commitment levels is key, with the urgency of this dependent on the stakeholder’s influence. Once this analysis has been done, the stakeholder map is the best way of keeping this under control. Stakeholder information Change role Stakeholder name General aspects Expectations Hot buttons Job title Division name and location Population Manager How to implement change projects 35 Notes Assessment related aspects Impact (N, L, M, H) Influence (N, L, M, H) Attitude (1-9) Actions Issues and concerns Current Target Information commitment commitment level level Interventions Responsibility to manage 36 The management agenda The stakeholder map The stakeholder map is a quick guide to the current situation. It shows, at a glance, a stakeholder’s support for the programme and their influence on it. It can be produced automatically by the stakeholder analysis, focusing on a stakeholder’s support for the programme and influence on its success. Example of a stakeholder map Support for programme Low – Unconvinced 1 2 Medium – On the fence 3 4 5 Staff governor High – Champion 6 7 8 SMT 9 Principal High Miss Orange Mr Green Mrs White Mrs Blue Medium Mr Pink Head of Theology Mr Red Low Influence on workstream success In this example, we should worry about those in the far-left, especially those towards the top of the diagram. Here the main worry would be the staff governor, who has great influence, but is not behind the programme. All those in the dark blue area (high support) are of no concern, although it is important to ensure they remain ‘champions’ of the programme. We may look to choose change agents from this area. How to implement change projects The actions to be taken for those in the middle section will depend on their influence on the programme. In the example below, it would be important to increase the support of the SMT, whereas the Head of Theology would be much less of a priority. Exercise Consider ways in which you might convert stakeholders showing low or medium support for change to champions of the project. 37 38 The management agenda Allocating change roles Motivation is the art of getting people to do what you want them to do because they want to do it. Dwight D. Eisenhower Allocating change roles Making sure that everyone involved in the project is properly motivated and has a clearly defined role is the biggest lever you can pull in a change project. If you only have time to focus on one thing, this is it! The change network The network below shows the different types of change roles and responsibilities. It is particularly valuable to use this as the basis for all discussions about the roles that members of the extended change team need to play. The use of the different roles allows individuals to be aware of their roles and responsibilities during the change process. For example, an SMT member not responsible for the employer agenda is still a reinforcing sponsor and therefore needs to recognise that they are an important role model for the change. In addition this allows employees to ‘own the change’ and therefore they are more likely to adopt it. Notes 39 How to implement change projects Authorising sponsor first initiates/legitimises the change. Reinforcing sponsors • Promote and support the change • Have authority to allocate resources and enforce change. Influencers have strong influencing ability, not necessarily related to level of authority. Change agents are facilitators of change. These are often people from the business who work with support from the sponsors to build support and commitment for change and minimize resistance at a local level. Change targets are individuals who either directly or indirectly impacted by the changes from the project. These are the groups of individuals identified in impact assessments and are the focus of many of the change management activities. The roles and responsibilities of the various stakeholders are set out in more detail on page 60 of the Appendices. When allocating and monitoring the performance of the various roles within a change project it is important that: ● ● ● ● the key change roles of sponsor, agent, influencer and target are clearly identified, and that their responsibilities are clear appropriate people have filled the roles and are performing to their best level, supported by required training and coaching structural links between the roles have been designed project managers are clear about which change role they have. 40 The management agenda The roles of sponsor, influencer and change agent As the success or failure of a change project lies in the hands of the individuals charged with implementing each stage, it is worth considering these key roles in more detail. The sponsor While not an exhaustive list, the key skills and behaviours of the ideal sponsor are set out in the following: Characteristics of a successful sponsor Key activities Ultimately accountable Legitimises change Makes key decisions Initiates or reinforces change Characteristics Demonstrates commitment Holds meetings (public and private) Allocates resources Takes accountability for critical tasks Risks Must be consistent in word and deed Must have real power to implement Too few sponsors to reach audience will leave a gap in commitment Characteristic Description Power Has the power to legitimise change, including power over the resources which make it happen Pain Is dissatisfied with the future state Scope and vision A clear understanding of what must occur Sensitivity Understands and acknowledges the personal adjustments that must occur Public support Willing to publicly support the change Private support Advocates the change in private conversations Persistence Continues even when the going gets tough or other priorities emerge Reinforcement Prepared to reward or impose sanction in order to support the future state Tracking Actively tracks and measures progress towards stated goals Willing to sacrifice Willing to follow through with uncomfortable sacrifices in order to reach end goal Sponsors must have the organisational power to sponsor a change. They must be willing and able to control resources and to deploy staff as necessary to legitimise change. They must also be prepared to provide consequences for not changing. They must also have the authority to support or veto decisions and approaches How to implement change projects 41 ‘Destructive’ or cynical sponsors do an enormous amount of damage and must be isolated or removed by the authorising or initiating sponsor if change is to succeed in their area. In most cases it would be far too much to expect a single authorising sponsor’s control to include to all sanctioning and allocation decisions, or for them to be able to influence the day-to-day behaviour of individuals in all parts of the organisation. Particularly where an entire, large organisation is affected by change it is necessary then to identify multiple leaders who have the authority to sanction change, and develop them to form part of the overall change network. These sponsors may not have been responsible for the original sanctioning of the change, but their support and leadership becomes crucial as the change effort builds momentum and resources are required across the organisation to make it happen. In large organisations, it will also be necessary to develop local reinforcing sponsors. These sponsors have power to ensure people comply in their area (or geography). They will also act as role models for future behaviours. Local reinforcing sponsors are too often forgotten in the desire to implement an organisationally inspired change. The result can be isolated local leaders, who should be developed as reinforcing sponsors, but instead are acting neutrally, or worse, at cross purposes to the wider change agenda. Change targets will tend to take their cue from the local sponsor because their influence is so much more immediate than the authorising sponsor. Failure to develop local reinforcing sponsors can lead to change that is not successfully adopted in some local areas. It is crucial to remember that reinforcing sponsors are change targets also. Do not try to engage them as sponsors (this applies particularly for local sponsors) until their commitment to the change is sufficient that they can express that commitment to change targets and other key players. Notes 42 The management agenda The influencer It is vital that those with both formal and informal influence in the organisation are brought on board as quickly as possible. A well networked communicator can potentially bring a great influence to bear at many levels and foster a broad support for the change throughout the organisation. As with sponsors, however, influencers must be carefully monitored, as a negative or uncommitted attitude can have a disastrous effect on team morale and ultimately on the outcome of the project. The key skills and behaviours that should be developed here are set out below. Characteristics of a successful influencer Key activities Delivers informal communication Influences others, to build broad support Participates in consultation or design mechanisms Characteristics Credible Connected to those being impacted by change Networker Seen as having a personal stake in the outcome of the change Willing to model new behaviours Risks Can be very influential, but tends to operate informally so can be difficult to monitor and control Characteristic Description Credibility Seen to be honest and open in their views about change Previous relationships Has a relationship (current or past) with the target group Relevance Impacted by or connected to the outcomes of the change Willingness to invest Interested and willing to invest own time in learning about the change Networked Has a strong network of relationships Relationship building Is prepared to establish useful relationships to enable change to happen Behaviour modelling Models future state behaviour Lateral communication Will communicate with colleagues about the change 43 How to implement change projects The change agent The main focus of the change agent is to support the sponsors. They must demonstrate both the will and the capacity to work either individually or in groups to implement the various parts of the change project. They should also be able to gauge the success of these actions and their impact on those around them as they proceed. The essential skills and behaviours are again set out below: Characteristics of a successful change agent Key activities Supports sponsors Communication Monitoring change target needs Local implementation planning Characteristics Credible Influential Questioning Willing to model behaviour Comfortable with ambiguity Risks Agents must not attempt to take on sponsor roles, as they do not have the organisational sanctioning power. Technical skills Description Understand solution Understands the future solution, and is confident discussing it with others Project management Has capability to project manage pieces of work, sometimes large and complex Facilitation Works with groups of people to facilitate involvement and communication events Assessment and analysis Collects and interprets data, in particular about how people are feeling about the change Change planning Has ability to contribute to or lead detailed implementation planning for a business area Interpersonal skills Description Negotiation Can clarify expectations around role with sponsors, and discuss actions and resolutions if there are issues Adaptability Manages own levels of resilience and adaptability, conserving or increasing levels when needed Influence Has influence on individuals whom they have no organisational power over Empathy Has the ability to understand someone else’s perspective, and how individuals reframe change from their own perspective 44 The management agenda Project management This section provides some further tools to help in the management of the change project. These will assist in plotting and monitoring the progress of the project. Change plan A change plan is an essential document to ensure that change is carried out effectively and on time – see the following example. Similar to a project plan, it details and allocates timings to key activities related to change management. For example, the communications timetable will be included here, as will detail on developing a change network. Whilst both of these would be on a regular project plan, they would not be listed in the same detail as in a change plan. Notes 45 How to implement change projects Example of a change plan Sept Oct Nov Dec Jan Change strategy Develop change plan Update change plan Leadership Identify change network Orient network members Change leadership workshop Develop individual plans Change network away days Ongoing coaching Communication Communication plan acceptance Launch Intranet site Exec roadshow Communication review Organisational alignment Review new structure Agree structure Communicate structure Transition to new Employer relations Review of current relations Employer input meetings Design courses Test courses with employers Measurement Change acceptance survey Focus group session Risk log A risk log is a vital tool for any change project. It helps to identify possible threats to the project’s successful completion. By rating the impact and probability of a particular risk, it also helps us to prioritise and feeds into an action plan. Essentially, a risk log that is used correctly should reduce the likelihood of problems arising and increase the chances of a successful outcome to the change programme. Feb Mar Apr CRM system may not be installed by September Staff may not have skills required to manage change 2 3 If not managed correctly, the change programme will fail Information may be lacking, leading to ineffective contact with employers May prevent a successful, lasting change Impact description Situation static, but skills audit will reveal extent of risk. Responses to invitation to tender. Announcement of change programme. Trigger 12/06/08 08/06/08 08/06/08 Date Rating (1–4) of strength of impact risk would have Resistance to change from staff 1 Risk title Effect that the risk would have on the project Example of a risk log 4 1 4 25% 75% 50% Probability 1.00 0.75 2.00 Risk value Likelihood of risk occurring Impact Skills audit of staff to be performed to determine whether external assistance required A back-up system will be prepared using BDU until system installed Louise Brown, HR Director Jack Jones, IT Manager Jane Smith, Director for Employers Assignment Active Active Active Status Person responsible for this risk Stakeholder analysis and communications plan. Staff to be consulted in change programme Action steps How the risk will be dealt with Transference Control and mitigate Control and mitigate Strategy Impact x Probability useful for ranking 46 The management agenda 47 How to implement change projects RACI analysis RACI (responsible, accountable, consulted, informed) charting techniques can be useful for charting organisational roles and responsibilities in a consistent manner – see the following example. The technique can be used either on its own or to supplement other diagnostics. The charts produced can document either a new organisational structure or an existing one. The categorisation of individuals’ roles as applied to this model is as follows: Responsibility ‘R’ – the individual(s) who actually completes the task. This party is responsible for action or implementation. The degree of responsibility for each role in a shared activity is determined by the accountable party. Accountability ‘A’ – the individual who is ultimately responsible. Includes yes or no and veto power. Consult ‘C’ – the individual(s) to be consulted prior to a final decision or action. This incorporates two-way communication. Inform ‘I’ – the individual(s) who needs to be informed after a decision or action is taken. This incorporates one-way communication. ● ● ● ● Example of a RACI analysis Activity Design of new organisation Staff governor Principal Vice-principal Head of marketing Head of HR Head of learning Head of IT C A R I I I AR I I Hiring of new teaching staff C CRM implementation I C I I C A I I I Curriculum changes C I A C C R Communications I R Stakeholder 48 The management agenda Change recommendations In this final section we highlight two useful summaries of the critical factors which can determine the potential degree of success in managing a change project. CIPD components of change Linking all the change agendas within an organisation coherently, rather than completing changes in isolation, is vital to ensure that change effectiveness is maximised. The Chartered Institute of Personnel and Development (CIPD) has conducted extensive research into the process of change management and has identified seven areas of activity that make successful change happen – ‘the seven c's of change’: Choosing a team It is important to ensure the right people are involved in the team. Different people might be required in different roles at different phases of a change initiative. For example, the team that sets the initial vision might look quite different from the team responsible for implementing the detailed change plan. Crafting the vision and the path Organisations that are embarking on change need to have a clear vision of where their organisation wants to get to, and also a clear path mapped out showing how they are going to get there. Connecting organisation-wide change In any change initiative there will be lots of interconnected changes happening. Processes need to be in place to recognise these linkages and also to keep track of them as the change project progresses. Consulting stakeholders Stakeholder consultation is an important part of implementing successful change, yet can easily be overlooked due to time and resource issues. Different stakeholders are likely to have different responses to a particular change, so it is important to think through how stakeholders will react and to anticipate any problems these reactions might bring and how you will deal with them. ● ● ● ● How to implement change projects ● ● ● 49 Communicating Regular, consistent and well-targeted communications are critical to the success of any reorganisation, both to internal and external stakeholders. This can be done by exploiting existing channels of communication and by developing new ones. Coping with change During times of organisational change, in addition to coping with the change, the organisation also needs to continue functioning and meeting its day-to-day responsibilities. This dual responsibility can be an enormous stress for many people. The way that individuals respond to change has been well researched in the change cycle/curve of immobilisation, denial, anger, bargaining, depression, testing. Capturing learning It is important to ensure that organisations can build the capability to successfully reorganise on a regular basis. HR professionals can play a key role in developing processes to import and capture learning. Source: www.cipd.co.uk Notes 50 The management agenda Kotter’s eight-stage process for managing change John P. Kotter, a professor at Harvard Business School, developed his analysis of change management and leadership in the influential book, Leading Change (1996). In it he outlines the eight key stages for effecting successful change. In the following table the stages are set out alongside a summary of the actions required to successfully accomplish each stage and the common pitfalls to watch out for. Stage Actions needed Establish a sense of urgency ● ● Form a powerful guiding coalition ● ● Create a vision ● ● Communicate the vision ● ● Empower others to act on the vision ● ● Plan for and create short-term wins ● ● Consolidate improvements and produce more change ● ● ● Institutionalise new approaches ● ● Source: Kotter (1996) Pitfalls Examine market and competitive realities for potential crises and untapped opportunities Convince at least 75% of your managers that the status quo is more dangerous than the unknown ● Assemble a group with shared commitment and enough power to lead the change effort Encourage them to work as a team outside the normal hierarchy ● Create a vision to direct the change effort Develop strategies for realising that vision ● Presenting a vision that’s too complicated or vague to be communicated in five minutes Use every vehicle possible to communicate the new vision and strategies for achieving it Teach new behaviours by the example of the guiding coalition ● Under-communicating the vision Behaving in ways antithetical to the vision Remove or alter systems or structures undermining the vision Encourage risk taking and non-traditional ideas, activities and actions ● Failing to remove powerful individuals who resist the change effort Define and engineer visible performance improvements Recognise and reward employees contributing to those improvements ● Leaving short-term successes up to chance Failing to score successes early enough (12–24 months into the change effort) Use increased credibility from early wins to change systems, structures, and policies undermining the vision Hire, promote, and develop employees who can implement the vision Reinvigorate the change process with new projects and change agents ● Articulate connections between new behaviours and corporate success. Create leadership development and succession plans consistent with the new approach ● ● ● ● ● ● ● Underestimating the difficulty of driving people from their comfort zones Becoming paralysed by risks No prior experience in teamwork at the top Relegating team leadership to an HR, quality, or strategic-planning executive rather than a senior line manager Declaring victory too soon – with the first performance improvement Allowing resistors to convince ‘troops’ that the war has been won Not creating new social norms and shared values consistent with changes Promoting people into leadership positions who don’t personify the new approach How to implement change projects Notes 51 52 The management agenda Plan of action What are the top three actions I need to carry out back in the organisation? What are the timescales I need to set myself? What resources do I need to support me in these actions? How will I measure the success of these actions? How to implement change projects Contacts Name Job title Organisation Email Telephone Name Job title Organisation Email Telephone Name Job title Organisation Email Telephone Name Job title Organisation Email Telephone Notes 53 54 The management agenda Resources Publications Advisory, Conciliation and Arbitration Service (Acas) (1999) Towards Better Employment Relations Using the Acas Advisory Service. London: Acas. Baker, D. (2007) Strategic Change Management in Public Sector Organisations: a Guide for Public Sector and Not-for-Profit Organisations. Oxford: Chandos Publishing. Balogun, J. and Hope Hailey, V. (1999) Exploring Strategic Change. Harlow: Prentice Hall. Beckhard, R.F. and Harris, R.T. (1987) Organizational Transitions: Managing Complex Change. Reading MA: Addison-Wesley. Foster, A (2005) Realising the Potential: A Review of the Future Role of Further Education Colleges. Annesley: DfES Publications. Available online at: www.dcsf.gov.uk/furthereducation/uploads/documents/REALISING06.pdf HMSO (2007) World Class Skills: Implementing the Leitch Review of Skills in England. Norwich: HMSO. Available online at: www.dcsf.gov.uk/skillsstrategy/ uploads/documents/World%20Class%20Skills%20FINAL.pdf Kotter, J.P. (1995) ‘Leading Change: Why Transformation Efforts Fail’, Harvard Business Review, March–April. Kotter, J.P. (1996) Leading Change. Boston, MA: Harvard Business School Press. Kotter, J.P. and Cohen, D.S. (2002) The Heart of Change, Real-Life Stories of How People Change their Organizations. Boston, MA: Harvard University Press. Kubler-Ross, E. (1973) On Death and Dying. London and New York: Routledge. Kubler-Ross, E. (2005) On Grief and Grieving: Finding the Meaning of Grief through the Five Stages of Loss. New York: Simon & Schuster. Lewin, K. (1951) Field Theory in Social Science. New York: Harper & Row. How to implement change projects Lord Leitch (2006) Leitch Review of Skills: Prosperity for all in the Global Economy, World Class Skills. London: HMSO. Available online at: www.dcsf.gov.uk/furthereducation/uploads/documents/ 2006-12%20LeitchReview1.pdf Websites Advisory, Conciliation and Arbitration Service: www.acas.org.uk Chartered Institute of Personnel and Development: www.cipd.co.uk Learning and Skills Council: www.lsc.gov.uk Learning and Skills Improvement Service: www.lsis.org.uk Train to Gain: www.traintogain.gov.uk World Class Skills: www.excellencegateway.org.uk/wcs 55 56 The management agenda Courses Visit the World Class Skills website for listings of all seminars and workshops within the programme: www.excellencegateway.org.uk/wcs Courses that may be of special interest are: Assessing your level of responsiveness Being a successful change leader Building employer-responsive skills in your organisation Developing your vision for employer responsiveness Identifying key skills and behaviours for engaging employers How to implement change projects Legal advice on employment, terms and conditions Managing your organisation’s performance Structuring your organisation to support employer responsiveness Using HR to support employer responsiveness. ● ● ● ● ● ● ● ● ● ● PDFs of all the courses are available to download. E-learning Visit the World Class Skills website for all e-learning courses within the programme: www.excellencegateway.org.uk/wcs Courses that may be of special interest are: Building employer-responsive skills in your organisation Funding and finance for maximising business Targeting SMEs for training. ● ● ● Appendices Example of case for change Example of impact assessment Change roles and responsibilities 58 59 60 58 The management agenda Example of case for change Our organisation, Organisation A, has launched its employer-responsive change programme. This has been developed both to meet the need of local employers to deliver training to their employees and to ensure the organisation diversifies its funding streams in order to guarantee a more financially stable organisation over time. Over 80 per cent of our graduating students find employment within the region and therefore it is vital that we engage with local and national employers to continue to meet our learners’ needs. Financial forecasts showed the consequences of not responding to this agenda and therefore this change programme commences from the next term, with this term used to consult and to plan appropriately. We are changing to be: a provider of choice to local employers profitable award winning for meeting the needs for local employers. ● ● ● Our vision: as a result of successful implementation of the change programme to become more employer responsive, we will: 1 Increase the number of Train to Gain starts from 200 to 600 by X. 2 Identify our top 10 current employers in revenue and our top 10 employers by growth opportunity and ensure that we are meeting their needs/ exploring further avenues in terms of employer responsiveness. In particular we will introduce cross selling outside of the current curriculum areas they are working with. We will ensure this increases revenue from our key accounts by 40 per cent by the end of the financial year. 3 Ensure employers can access the organisation 24 hours a day with a response time of two working days. 4 Identify existing staff and recruit new staff to deliver on site and in flexible hours to meet employers’ needs. 59 How to implement change projects Example of impact assessment Impact area Use of new technology Use of new business processes or procedures, eg • Workflow • Sign-off • Forms Change in skills, eg • Leadership • Technical (ie content) • Personal (eg competencies) Changes to personal or business objectives Impact on bonus/broader remuneration Change in line manager Change in team or department Interface with new people or groups of people Change of location Change of country/culture Other Current Future What will help? 60 The management agenda Change roles and responsibilities Role Responsibility Authorising sponsor Is ultimately responsible for the success of the change. Initiates and promotes vision for change. Gives the project legitimacy. Must have the necessary seniority. Must want the change and be seen to want the change. May not play a day-to-day part but must be available to provide support and backing when needed. Sustaining sponsor Promotes and supports change. Is responsible for allocation of resources and rewards. Provides day-to-day management backing for specific activity, Must want the change and be seen to want the change, Must be actively involved, Must have clear, agreed and measurable targets. Influencer A stakeholder who has strong influencing abilities, not necessarily related to level of authority. Is seen to support the change. Is respected (in the appropriate places). Can lead the way in adopting the changed situation/approach. Change agent Is a facilitator of change. Helps sponsors and project team stay aligned, and keeps sponsor on board. Change target Is someone who will have to change. Is probably already too busy. May not be aware of the change that is needed. May not want it anyway… Any stakeholders affected by the change. WCSWB014 World Class
© Copyright 2024