HOW TO DESIGN & CONSTRUCT A COMMERCIALLY VIABLE KARTING VENUE Ben Willshire

PROFESSIONAL MOTORSPORT WORLD EXPO 2013
WEDNESDAY 13TH NOVEMBER 2013
HOW TO DESIGN & CONSTRUCT A COMMERCIALLY
VIABLE KARTING VENUE
Ben Willshire
www.apexcircuitdesign.com
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
“I wouldn’t be in Formula 1 if I hadn't come
through this series [Formula Kart Stars]”
Lewis Hamilton
IMPORTANCE OF KARTING
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
PRIMRING KART CIRCUIT| RUSSIA
DUBAI KARTDROME| UAE
BAHRAIN INTERNATIONAL KART CIRCUIT| BAHRAIN
AL FORSAN RESORT ABU DHABI|UAE
APEX CIRCUIT DESIGN - RECENT KARTING EXPERIENCE
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
WHY A KARTING CIRCUIT?
Social
Opportunity
Why a Kart Circuit?
Direct kart
Talent
circuit
Development
benefits
Wider
Commercial
destination
Opportunity
benefits
WHY KARTING?
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 1: DEFINE A BRIEF FOR YOUR REVENUE GENERATING KART CIRCUIT
•Land area of around 50,000sqm - 80,000sqm for a 1200m CIK Grade B or A karting circuit & paddock
•A 2 storey 1000sqm building will be adequate for workshops, kart storage, changing facilities, briefing
rooms, viewing areas and race control functions.
•Close enough to other leisure activities or populations to attract 365 day footfall
•Gentle changes in topography (+/- 5m) across the site to design an exciting circuit
•Ideal to have road frontage exposure to maximise the commercial opportunities
•Provide easy access from a good road network
•The track should be Flexible for all users whilst conforming to CIK guidelines. This means including layouts
for adults, children and competition racers.
TYPICAL BRIEF FOR A REVENUE GENERATING KART CIRCUIT
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 1: DEFINE A BRIEF - WHAT TYPE OF KART CIRCUIT?
OVERVIEW OF CIK CIRCUIT GRADES
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 1: DEFINE A BRIEF – THINK ABOUT REVENUE GENERATION AROUND THE CIRCUIT
High-Ropes-C ourse.gif
REVENUE GENERATORS
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 1: DEFINE A BRIEF – THINK ABOUT REVENUE GENERATION WITHIN THE CIRCUIT
REVENUE GENERATORS
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 2: PLAN YOUR ROUTE
CLIENT BRIEFING TO APEX
CLIENT, LOCAL
ENGINEERING &
ARCHITECTURAL TEAM
TENDER LOCAL BUILDERS
SITE VISIT & CONCEPT
SKETCHES
DETAILED DRAWINGS &
SPECIFICATIONS
COMMERCIAL STRESS TEST
TRACK SIMULATIONS
DETAILED DESIGN
CONSTRUCTIONN
DESIGNER REVIEW &
COMMENTING
DESINGER SUPPORT
Work closely with a local team to combine motorsport expertise with local knowledge
Planning your project = reduction in costs = drives commercial viability
TYPICAL DESIGN PROCESS
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 3: DESIGN - INITIAL CONCEPT DESIGNS
CASE STUDY
CONCEPT
DESIGN
- VIVA BAHRAIN KART CIRCUIT
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 3: DESIGN – CONCEPT DESIGN TRACK SIMULATION
Or perhaps drive the circuit before it is built?
N KART CIRCUIT
SIMULATION
TOOLS
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
PART 3: DESIGN - TESTING THE COMMERCIAL VIABILITY
•
Develop a concept plan for the track and surrounding
land
•
Develop an Construction Cost estimate
•
Ascertain sale or lease values for the surrounding land
•
Develop a cash flow model to include revenue and
operational costs
•
What is the likely Operational Capacity?
•
What can I earn from Circuit Hire Income?
•
What will my overheads be?
•
Staff Wages
•
Kart & Track Maintenance, Tyres, Fuel
•
Calculate target WACC range
•
Calculate base case project IRR% and pay back period
•
Fine tune the design brief to reflect the financial model
•
Present investment opportunities to stakeholders
COMMERCIAL VIABILITY
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 3: DESIGN – DETAILED DESIGN & TENDER
DETAILED DESIGN
RT CIRCUIT
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
STEP 3: CONSTRUCTION MONITORING & CIK INSPECTIONS
CASE STUDY - VIVA
CONSTRUCTION
MONITORING
BAHRAIN KART CIRCUIT
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
KEY POINTS TO REMEMBER:
•Plan, Plan and Plan – Define a Brief & Design Process
•Conduct a Financial Feasibility Study early into the design process to avoid abortive design work
•Commit to detailed design once a Robust Commercial model is in place and identify a target IRR
•Gain input from experienced operational staff on how to maximise revenue
•Design a Flexible & Safe Circuit
•Use Simulators to your advantage to avoid remedial works on site
•Ensure a collaboration between an expert design team and experienced local engineers and builders
•HAVE FUN!
CASE STUDY - VIVA BAHRAIN KART CIRCUIT
SUMMARY
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.
THANK YOU
www.apexcircuitdesign.com
PMW EXPO 2013
APEX CIRCUIT DESIGN
LTD.