OCIP Presented by: Sharlene Horn Vice President How to Initiate and Manage an OCIP June 22 and 25, 2004 License #0451271 Agenda • Definitions • History of OCIP’s • How to Initiate an OCIP • Overview of OCIP Management • Administration Expectations © License #0451271 OCIP Program Definitions • WRAP-UP: program that provides same insurance for all parties for a specific project – OCIP: Owner Controlled Insurance Program – CCIP: Contractor-Controlled Insurance Program – SEWUP: Keenan’s rolling OCIP for CA Schools © License #0451271 1 OCIP History • Most common method of providing insurance for construction projects in Europe and the United States • 1940’s – Introduced to United States on defense plants • 1950’s applied to non-defense capital programs such as New York City’s public housing © License #0451271 OCIP School / Public Entity • 1999 – Legislation changed to allow Public Schools to use OCIP’s • California Codes – California Governmental Codes – Sections 4420-4422 • Specifically 4420.5 © License #0451271 Initiate Your OCIP • Select/consult OCIP specialty broker • Decide on coverages – Primary/optional coverages • Obtain quote from OCIP broker – Applications required for Builders Risk/Pollution © License #0451271 2 Shop for the Right OCIP Three Types Available: I. Project Specific (Construction value greater than $100 Million) II. Deductible Program / JPA III. Guaranteed Cost Program / JPA © License #0451271 Ready to Proceed with OCIP • Obtain OCIP contract language from Broker – Insert OCIP language in bid documents • Keep Broker in the loop – Pre Bid Meetings – Bid Openings – Pre-Construction © License #0451271 Pre-Bid Meetings • Provide OCIP information to potential contractors – Review lines of insurance provided and those excluded – Advise names of carriers – Review limits – Off-site certificates requirements – Review Insurance Qualification • Pre-Bid Handbook © License #0451271 3 Proceed with OCIP • Know/ Meet your OCIP Administrator • Manage your expectations • Understand OCIP paper flow: – – – – – – Enrollments Certificates (OCIP & Off-Site) Policies Monthly Payroll Claims Reporting Closure © License #0451271 Pre-Construction Meetings • Provide OCIP enrollment information to awarded contractors and review: – – – – – – Project Insurance Manual Enrollment forms in detail Off-site certificates Procedures for subcontracts awarded Monthly payroll reporting procedures Claims reporting guidelines © License #0451271 OCIP Success: Communication • Effective and Continual Communication/Coordination – – – – – © OCIP Team Account Executives District (Representative) Construction Manager/General Contractor Subcontractors License #0451271 4 OCIP Loss Control Features • Loss Control Services – Pre-Construction Loss Control Compliance Review – On-Site Inspections – Participate in Tool-Box Meetings – Safety Training Materials © License #0451271 OCIP Claims’ Management Features • Claims Management – Manage Claims Reported to Carriers – Conduct File Reviews – Monitor Carrier Reserves – Facilitate Timely Claim Processing – Mediate Disputed Claims © License #0451271 Administration in Context Contractor Selection – – – Prepare bid documents Attend pre-bid meetings Evaluate insurance deducts Contract Award – Enrollment W W W WC policy issuance Insurance certificate issuance RMIS data entry Contractor Performs Work – – – – © Mobilization Payroll tracking Claim oversight Performance reports Financial reports – Contractor orientation – Insurer notification W W W Claim procedures Administration Safety requirements Contractor Completes Work – – – Payroll audit/reconciliation Insurer/TPA notification Verify unit statistical filing License #0451271 5 OCIP Information Features • Risk Management Information System On-Line Management System – Single source for all insurance information • Census Data • Rates by Class Codes • Contractor Enrollment • Premium Calculation Comparisons • Payroll Summaries • WC/GL Claims Detail (Real Time) • Frequency/Severity Injury Reports © License #0451271 Risk Management Information System • Set parameters for OCIP reporting: – Monthly – Quarterly – Closeout • Expectations of OCIP information system: – – – – – Contractors/Contracts Insurance and Policy Data Project Cost Comparison Claims Data/All lines Accident/Safety Data © License #0451271 System Data Base Structure Information & Reports Contract Data Policy Certificate Data Contract Cost Worksheets Contract Claims Data Accident / Safety Data Contractor Data Insurance Premium Data Contractor Closeout Worksheets Contractor Claims Data Injury Codes Payroll Data Workers’ Comp Class Codes & Rates Total Project Costs Reserve Analysis Accident Codes Administration Data General Liability Rates © Body Part Codes License #0451271 6 OCIP - Who’s Doing It? • Beaumont USD (3) • Palm Springs USD (4) • Coachella USD (2) • Pasadena USD (4) • Lancaster USD (2) • Pittsburg USD • Las Virgenes USD • Pleasanton USD (5) • Lawndale USD (2) • Rio Hondo CCD • Lemoore UHSD • Ripon USD • Lynwood USD • San Francisco CCD (4) • Montebello USD (6) • San Gabriel USD (2) • Newport Mesa • Santa Ana USD © License #0451271 OCIP- Who’s Doing It cont. • Santa Monica USD (6) • Waterford USD (2) • Ukiah USD • Pajaro Valley USD (2) • Victor Valley USD • Antelope Valley USD • Coast CCD • Long Beach CCD © License #0451271 Keenan’s OCIP - SEWUP • Statewide Educational Wrap Up Program • Joint Powers Authority (JPA) – Provides OCIP to member school districts – OCIP for new construction and modernization projects – Guaranteed Cost Program © License #0451271 7 SEWUP:Current projects • 61 current on-going projects • Total construction value over $600,000,000 • Construction value range from $25,000 to $30,000,000 • Anticipate $1 billion in construction: value fiscal year-June 30, 2004 © License #0451271 Questions & Answers © License #0451271 8
© Copyright 2024