Why Reeling Works Contents I. The Reeled Installation Process II II. Why Reeling Works III. Reeling in Asia-Pacific Title of presentation in Header and Footer 2 I. The Reeled Installation Process 3 Pipeline Spoolbase Spoolbase Fabrication Production Line Rigid Pipeline Spooling Operations 6 Rigid Pipeline Lay Operations 7 Apache II 2008 Subsea Seminar – Offshore Engineering Division 8 Deep Blue 9 Deep Energy 10 Technip Reel Lay Fleet Vessel Apache II Deep Blue Deep Energy Pipe Diameter 4” to 16” 4” to 18” 4” to 20”* PIP C Capability bilit 10”/16” 12”/17” 12”/18” Payload 2,000te 5,600te 5,600te Top Tension 197 te 550 te 450 te Main Reel Diameter 16.5m 19.5m 21m Piggyback System Yes No Yes 100te 400te 150te 2 x Work Class (optional) 2 x Work Class 2 x Work Class 13 knots 10 knots 20 knots II II III Craneage ROV Transit Speed DP Class * Specific assessment required for >18” Title of presentation in Header and Footer 11 Reeled Pipeline Products ►Track Record • Carbon steel - seamless, HFI, UOE • • • • • • • – Corrosion and wet insulation coatings 13%Cr, duplex and super duplex Metallurgically bonded clad pipe Plastic lined water injection pipelines Steel catenary risers (SCR) Pipe-in-pipe (PIP) Direct electrically heated pipe (DEH) Free standing hybrid riser (FSHR) >6,000km 460km 5 projects 260km 30 risers 29 pipelines and risers 7 projects 5 risers ►Other Qualified Projects • Electrically heated PIP • Plastic lined pipelines for hydrocarbon transport • Plastic lined water injection SCR Title of presentation in Header and Footer 12 II. Why Reeling Works 13 The Reeling Process Moment B A E Curvature C F D Title of presentation in Header and Footer 14 Why Reeling Works ►Technical • Line p pipe p steel is ductile • Pipeline girth welds overmatch strength of pipe • Pipe thickness is sufficient to prevent buckling • Reeling is a forming process ►Commercial • Welding operations onshore • High offshore lay rates • 98.5% welds off vessel critical path – Pi Pipe-in-pipe i i systems t – High chrome or clad steels Title of presentation in Header and Footer 15 I. Reeling in Asia-Pacific 16 Asiaflex Products Title of presentation in Header and Footer 17 Asiaflex Spoolbase Asiaflex Spoolbase A Regional Hub Conclusions ►Proven installation method ►Wid variety ►Wide i t off pipeline i li products d t installable i t ll bl ►Driving down the cost of developments • Corrosion resistant alloys • Pipe-in-pipe systems • Long small diameter pipelines ►Operations from a central hub at Asiaflex • High payload and high speed • Rigid Ri id and d fl flexible ibl pipe i and d umbilicals bili l from f same llocation ti Title of presentation in Header and Footer 21
© Copyright 2024