Why Reeling Works

Why Reeling
Works
Contents
I.
The Reeled Installation Process
II
II.
Why Reeling Works
III. Reeling in Asia-Pacific
Title of presentation in Header and Footer
2
I.
The Reeled Installation Process
3
Pipeline Spoolbase
Spoolbase Fabrication
Production Line
Rigid Pipeline Spooling Operations
6
Rigid Pipeline Lay Operations
7
Apache II
2008 Subsea Seminar – Offshore Engineering Division
8
Deep Blue
9
Deep Energy
10
Technip Reel Lay Fleet
Vessel
Apache II
Deep Blue
Deep Energy
Pipe Diameter
4” to 16”
4” to 18”
4” to 20”*
PIP C
Capability
bilit
10”/16”
12”/17”
12”/18”
Payload
2,000te
5,600te
5,600te
Top Tension
197 te
550 te
450 te
Main Reel Diameter
16.5m
19.5m
21m
Piggyback System
Yes
No
Yes
100te
400te
150te
2 x Work Class
(optional)
2 x Work Class
2 x Work Class
13 knots
10 knots
20 knots
II
II
III
Craneage
ROV
Transit Speed
DP Class
* Specific assessment required for >18”
Title of presentation in Header and Footer
11
Reeled Pipeline Products
►Track Record
• Carbon steel - seamless, HFI, UOE
•
•
•
•
•
•
•
– Corrosion and wet insulation coatings
13%Cr, duplex and super duplex
Metallurgically bonded clad pipe
Plastic lined water injection pipelines
Steel catenary risers (SCR)
Pipe-in-pipe (PIP)
Direct electrically heated pipe (DEH)
Free standing hybrid riser (FSHR)
>6,000km
460km
5 projects
260km
30 risers
29 pipelines and risers
7 projects
5 risers
►Other Qualified Projects
• Electrically heated PIP
• Plastic lined pipelines for hydrocarbon transport
• Plastic lined water injection SCR
Title of presentation in Header and Footer
12
II. Why Reeling Works
13
The Reeling Process
Moment
B
A
E
Curvature
C
F
D
Title of presentation in Header and Footer
14
Why Reeling Works
►Technical
• Line p
pipe
p steel is ductile
• Pipeline girth welds overmatch strength of pipe
• Pipe thickness is sufficient to prevent buckling
• Reeling is a forming process
►Commercial
• Welding operations onshore
• High offshore lay rates
• 98.5% welds off vessel critical path
– Pi
Pipe-in-pipe
i i systems
t
– High chrome or clad steels
Title of presentation in Header and Footer
15
I.
Reeling in Asia-Pacific
16
Asiaflex Products
Title of presentation in Header and Footer
17
Asiaflex Spoolbase
Asiaflex Spoolbase
A Regional Hub
Conclusions
►Proven installation method
►Wid variety
►Wide
i t off pipeline
i li products
d t installable
i t ll bl
►Driving down the cost of developments
• Corrosion resistant alloys
• Pipe-in-pipe systems
• Long small diameter pipelines
►Operations from a central hub at Asiaflex
• High payload and high speed
• Rigid
Ri id and
d fl
flexible
ibl pipe
i and
d umbilicals
bili l from
f
same llocation
ti
Title of presentation in Header and Footer
21