BIDS MUST BE SEALED AND ADDRESSED TO: AGENCY: Southwestern Wisconsin Community Action Program ADDRESS: 208 US Hwy 18 West, Montfort, WI 53569 THIS IS NOT AN ORDER REQUEST FOR BID Water Heater Materials and Installation Bid envelope must be sealed and plainly marked in lower corner with due date and Request for Bid #181003. Late bids will be rejected. Bids MUST be date and time stamped by the soliciting purchasing office on or before the date and time the bid is due. Bids dated and time stamped in another office will be rejected. Receipt of a bid by the mail system does not constitute receipt of bid by the purchasing office. Any bid which is inadvertently opened as a result of not being properly and clearly marked is subject to rejection. Bids must be submitted separately, i.e. not included with sample packages or other bids. Bid openings are public unless otherwise specified. Records will be available for public inspection after issuance of the notice of intent to award or the award of the contract. Bidder should contact the person below for an appointment to view the bid record. Bids shall be firm for acceptance for 60 days from date of bid opening, unless otherwise noted. The attached terms and conditions apply to any subsequent award. Bids MUST be in this office no later than Tuesday, September 1, 2009 4:00pm Name (Contact for further information) BIDDER ( NAME AND ADDRESS) Phyllis Novinskie Phone (608)943-6909 Fax (608)943-6929 ext223 Date Monday, August 10, 2009 Email: [email protected] Quote Price and Delivery FOB 208 US Hwy 18 West, Montfort, WI 53569 Fax bids are not accepted. Description See sections 4- 6 and Attachment(s) for description of bid items. (1) ACKNOWLEDGEMENT OF ANY ADDENDA and/or REVISIONS: In signing this section, we stipulate that this bid is predicated upon the terms and conditions of this RFB and any addenda or revisions thereof. ____________________________________________________________________ ____________ Name of Authorized Company Representative - Signature and Title Date (2) DEBARMENT AND SUSPENSION Signature below acknowledges vendor identified on application has not been suspended, debarred, declared ineligible, or voluntarily excluded from eligibility by any Federal department or agency. ____________________________________________________________________ ____________ Name of Authorized Company Representative - Signature and Title Date Note: Signature also required at the bottom of this page. Payment Terms Delivery Time We claim minority bidder preference [Wis. Stats. s. 16.75(3m)]. Under Wisconsin Statutes, a 5% preference may be granted to CERTIFIED Minority Business Enterprises. Bidder must be certified by the Wisconsin Department of Commerce. If you have questions concerning the certification process, contact the Wisconsin Department of Commerce, 5th Floor, 201 W. Washington Ave., Madison, Wisconsin 53702, (608) 267-9550. __________________________________________________________________________________________________________________________________ In signing this bid we also certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a bid; that this bid has been independently arrived at without collusion with any other bidder, competitor or potential competitor; that this bid has not been knowingly disclosed prior to the opening of bids to any other bidder or competitor; that the above statement is accurate under penalty of perjury. We will comply with all terms, conditions and specifications required by the Agency and the Wisconsin Department of Administration in this Request for Bid and all terms of our bid. Name of Authorized Company Representative (Type or Print) Signature of Above Title Date 1 Phone ( ) Fax ( ) WISCONSIN WEATHERIZATION ASSISTANCE PROGRAM REQUEST FOR BIDS (RFB) # 181003 FOR: WATER HEATER MATERIALS AND INSTALLATION TABLE OF CONTENTS 0.0 SUMMARY OF REQUEST FOR BID 0.1 CHECKLIST FOR BIDDERS 1.0 INTRODUCTION AND PURPOSE 2.0 BID PROCEDURE AND INSTRUCTIONS 3.0 BID ACCEPTANCE, EVALUATION AND AWARD 4.0 TECHNICAL PERFORMANCE REQUIREMENTS 5.0 VENDOR PERFORMANCE REQUIREMENTS 6.0 SUPPORT REQUIREMENTS 7.0 COST INFORMATION 8.0 REQUIRED FORMS 9.0 TERMS AND CONDITIONS (Appendices A – C, revised July 15, 2009) - 10.0 SPECIAL, STANDARD AND SUPPLEMENTAL TERMS AND CONDITIONS List of Attachments to this RFB: • ATTACHMENT 1 - Part 1: Weatherization Standards for Materials • ATTACHMENT 1 - Part 2: Technical Specifications (includes any requirements identified from the Wisconsin Weatherization Field Guide and/or Wisconsin Weatherization Program Manual). • ATTACHMENT 2 – Cost Sheets for Vendor Bids – bidder must complete • ATTACHMENT 3 – Vendor Reference – bidder must complete • ATTACHMENT 4 – Vendor Information – bidder must complete • ATTACHMENT 5 – sample forms - Any forms identified as required. • ATTACHMENT 6 - Residential Davis Bacon prevailing wage rate(s) - when applicable. • Appendices A – C • Appendix D – Supplemental Terms and Conditions - American Recovery and Reinvestment Act of 2009 Standard Terms and Conditions for Contractors & 1st Tier Subcontractors • Appendix E – Supplemental Terms and Conditions - Davis Bacon 29 CFR Section 5.5 - Contract Provisions & Related Matters 2 0.0 SUMMARY OF REQUEST FOR BID #181003 – WATER HEATER MATERIALS AND INSTALLATION A. PROCURING AGENCIES: Southwestern Wisconsin Community Action Program (Agency) a local administrative and executive weatherization service agency, works in conjunction with the State of Wisconsin’s Weatherization Assistance Program and intends to use the results of this bidding process to award a contract to a Vendor for Water Heater Materials and Installation. The Agency provides these services in the following area: Grant, Iowa, Lafayette and Richland Counties. B. SCOPE: The Agency intends to utilize this bid for all purchases for the time period (quantities as estimated in Attachment 2) from September 15, 2009 to September 14, 2010. The contract may be renewed up to 2 times not to exceed a total contract period of 3 years by mutual consent between the Agency and Vendor and prior approval from DOA. However, the Agency may bid out single jobs, or procure commodities, on an as-needed basis when deemed in the best interest of the Agency and the state. C. CALENDAR OF EVENTS: Listed below are important deadlines for this RFB. In the event the Agency finds it necessary to change any of these dates and times, it will do so by issuing an addendum to the RFB. Event Date Time Agency issues RFB Monday, August 10, 2009 8:00 am Questions are due Tuesday, August 18, 2009 4:00 pm Bidders’ meeting Tuesday, August 25, 2009 1:00 pm Bids due from Vendors Tuesday, September 1, 2009 4:00 pm Bid opening Tuesday, September 1, 2009 4:05 pm D. QUESTIONS: Any questions concerning this RFB must be submitted in writing to Southwest CAP (contact information listed below) on or before Tuesday, August 18, 2009, 4:00 pm (See Section 2.6.) E. BIDDERS’ MEETING: A bidders’ meeting will be held on Tuesday, August 25, 2009, 1:00 pm at Southwest CAP, 208 US Hwy 18 West, Montfort, WI 53569. The bidders’ meeting is a public informational meeting for potential bidders to receive a response to questions. Bidders are required to attend this meeting. F. DUE DATE FOR BIDS: Bidders must submit one original copy of all materials required for acceptance of their RFB by Tuesday, September 1, 2009, 4:00 pm to name/address listed below. G. BID OPENING: Bids will be opened on Tuesday, September 1, 2009, 4:05 pm at the address listed below. Names of the bidders may be read aloud at that time. H. METHOD OF AWARD: The award will be based upon either the total price, by line or by category subtotal from the lowest responsive, responsible bidder, whichever is in the best interest of the agency and the state. Bids will be awarded on a per county basis except for Grant County, which the agency has divided up in to North and South Sections. The area that the agency is considering as North Grant County is everything North of County Highway A including the City of Bloomington and South Grant County is everything South of County Highway A including the City of Lancaster. NOTE THAT bidders must provide all required documents and specifications and must bid on all items in order to be considered responsive: nonresponsive bids will be rejected. I. ARRA REPORTING: See Appendix D for reporting requirements (and section 5.2). Requirements include reporting information to the Agency (by agency deadlines, and in the format, identified by the Weatherization Agency) related to the number of "jobs created and retained" due to American Recovery & Reinvestment Act (ARRA) funding received. J. Other ARRA Requirements: See Appendix D. K. Prevailing wage: If this contract is subject to Davis Bacon prevailing wage requirements, the wage determinations must be attached and the contractor and subcontractors must comply with 29 CFR Part 5 (also see Appendix E). AGENCY COMMON CARRIER ADDRESS Attn: Phyllis Novinskie Southwest CAP 208 US Hwy 18 West Montfort, WI 53569 AGENCY USPS ADDRESS Attn: Phyllis Novinskie Southwest CAP 208 US Hwy 18 West Montfort, WI 53569 Phone: 608-943-6909 ext. 223 FAX: 608-943-6929 TTY: 711-943-6909 Email: [email protected] 3 0.1 CHECKLIST FOR BIDDERS (To Be Completed by Bidders and Returned with Bid) ___ Note: The Bidders Meeting will be Tuesday, August 25, 2009, 1:00 pm at Southwest CAP, 208 US Hwy 18 West, Montfort, WI 53569. Bidders are required to attend this meeting. ___ Bid meets the requirements and conditions set forth. ___ ** Receipt of addenda acknowledged (if applicable) ___ ** Submit signed cover page with bid (all areas must be completed) ___ ** Bid Cost Sheets (Attachment 2) provided ___ ** Data specifications sheets for each appliance on which you are bidding. ___ ** Vendor Information form (supplied with this bid package) ___ ** Vendor Reference form (supplied with this bid package) ___ * Provide written statement of what volume (quantity) of work vendor can handle and meet the bid requirements (see cost sheet) ___ Certificates for insurance and any required licenses must be provided by winning vendor within 5 working days following the Notice of Intent to Award. ___ **Provide the vendor’s DUNS number, if vendor has one (not required) or, if the vendor doesn't have one, then the name and zip code of vendor’s headquarters (ARRA Sec. 1512). Provide this information here: ___ All bids must be packaged, sealed and show the following information on the outside of the package: - Vendor's Name and Address Request for Bid Title Request for Bid Number Bid Due Date __________________________________________________________________________________ **These items are required with the submitted bid package. Failure to submit any of the above mentioned items will cause your bid to be considered non responsive. 4 1. INTRODUCTION AND PURPOSE: 1.1. PURPOSE OF THE REQUEST FOR BIDS: The purpose of this document is to provide interested parties with information to enable them to prepare and submit a bid. 1.2. REASONABLE ACCOMMODATIONS: The Agency will provide reasonable accommodations, including the provision of informational material in an alternative format, for qualified individuals with disabilities upon request. If you think you need accommodations at a bid opening/vendor conference, contact the Agency Representative. 1.3. CANCELLATION AND TERMINATION: The Agency reserves the right to cancel the resulting contract/ agreement, for any reason, by giving written notice to Contractor of such cancellation and specifying the effective date thereof, at least ten (10) days before the effective date of such cancellation. Contractor shall, in the event of such cancellation, be entitled to receive compensation for any work accepted hereunder in accordance with the Agency's order(s). Contractor may also be compensated for partially completed work in the event of such cancellation. The compensation for such partially completed work shall be no more than the percentage of completion of each work effort, as determined in the sole discretion of the Agency, times the corresponding payment for completion of such work as set forth in the Agency’s order(s). For information on breach of contract and effects of cancellation and termination or other expiration on the contract/agreement, see Appendix B. 2. BID PROCEDURES AND INSTRUCTIONS: 2.1. METHOD OF BID: Vendors must submit one original copy of all materials required for acceptance of their bid by the deadline shown in the Summary. An authorized Agency Representative must receive and date/time-stamp all bids prior to the Agency’s bid opening time. Bids not so stamped will be considered late. LATE BIDS WILL NOT BE ACCEPTED OR OPENED. (If the bid arrives after the due date and time, the purchasing office will stamp or write on the bid envelope the date and time of receipt and retain it in the bid file unopened, or return it unopened to the bidder. It cannot be accepted, but a record will be kept in the bid file of its late receipt and its disposition.) All bids must be packaged, sealed, and show the following information on the outside of the package: - Vendor's Name and Address Request for Bid Title Request for Bid Number Bid Due Date 2.2. CALENDAR OF EVENTS: In the event that the Agency finds it necessary to change any of these dates and times it will do so by issuing an addendum to this RFB. 2.3. FORMAT OF BID: Vendors responding to this RFB must comply with the following format requirements: a) SIGNED REQUEST FOR BID SHEET: Include here the signed Request for Bid sheet (page 1 of this RFB package) included with the bid and those certifications required for submittal of a bid. Bids submitted in response to this RFB must be signed by the person in the vendor's organization who is responsible for the decision as to the prices being offered in the bid or by a person who has been authorized in writing to act as agent for the person responsible for the decision on prices. By submitting a signed bid, the vendor's signatories certify that in connection with this procurement: (a) the vendor's organization or an agent of the vendor's organization has arrived at the prices in its bid without consultation, communication or agreement with any other respondent or with any competitor for the purpose of restricting competition, (b) the prices quoted in the bid have not been knowingly disclosed by the vendor's organization or by any agent of the vendor's organization and will not be knowingly disclosed by same, directly or indirectly, to any other respondent or to any competitor, and (c) no attempt has been made or will be made by the vendor's organization or by any agent of the vendor's organization to induce any other person or firm to submit or not to submit a bid for the purpose of restricting competition. b) Agency’s Terms and Conditions: These standard and supplemental terms and conditions shall govern this bid and subsequent award. Vendors must accept these terms and conditions or submit point-by-point exceptions along with proposed alternative or additional language for each point, including any vendor contracts. Submission of any standard vendor contracts as a substitute for language in the 5 terms and conditions is not a sufficient response to this requirement and may result in rejection of the vendor's proposal. The Agency reserves the right to negotiate contractual terms and conditions other than those in the Agency Contract when it is in the best interest of the Agency to do so. c) ADDITIONAL INFORMATION: Include here the completed Vendor Information and Vendor Reference forms and any other forms required in the bid. Include all additional information that will be essential to an understanding of the bid. This might include diagrams, excerpts from manuals, or other explanatory documentation that would clarify and/or substantiate the bid document. d) COST INFORMATION: Provide cost information on the Request for Bid sheet or the cost sheets included in this RFB. All costs for furnishing the product(s) and/or service(s) included in the bid in accordance with the terms and conditions in this RFB must be included. e) DUNS#: As part of their bid package (see page 4, Checklist for Bidders), the vendor is required to report to the Agency their DUNS# or name and zip code of vendor’s headquarters due to American Recovery & Reinvestment Act (ARRA) funding received. There may be additional reporting or invoicing requirements that will be identified by the Agency. 2.4. MULTIPLE BIDS: Multiple bids from a vendor will be permissible; however each bid must conform fully to the requirements for bid submission. Each such bid must be separately submitted and labeled as Bid #1, Bid #2, etc. on each page included in the response. a) NOTE: If multiple bids are submitted and a vendor's multiple bids are the lowest-priced bids (e.g., low bid #1, 2nd lowest bid #2, 3rd lowest bid #3, 4th lowest bid is from a different vendor), the vendor with multiple bids must honor the prices of their lowest bid. b) If the Agency intends to award multiple bids (see Method of Award in 0.0 Summary of RFB, section 2.4.a), above, applies. The vendor must honor their lowest bid price and their succeeding lowest-price bids will be rejected for the purposes of awarding to multiple vendors. 2.5. INCURRING COSTS: Neither the Agency or the State of Wisconsin is liable for any cost incurred by a vendor in the process of responding to this RFB. 2.6. QUESTIONS: Any questions concerning this RFB must be submitted in writing on or before the date listed in the Summary. Vendors are expected to raise any questions, exceptions or additions they have concerning the RFB document at this point in the RFB process. If a Vendor discovers any significant ambiguity, error, conflict, discrepancy, omission or other deficiency in this RFB, the Vendor should immediately notify the Agency Representative of such error and request modification or clarification of the RFB document. In the event that it becomes necessary to provide additional clarifying data or information, or to revise any part of this RFB, an addendum will be made available either electronically or hard copy. From the date of release of this RFB until a Letter of Intent is issued, all contacts with the Agency personnel regarding this RFB shall be made through the Agency’s Representative. Violation of this condition may be considered sufficient cause for rejection of a proposal, irrespective of any other considerations. Each bid shall stipulate that it is predicated upon the terms and conditions of this RFB and any addenda or revisions thereof. 2.7. NEWS RELEASES: News releases pertaining to the RFB or to the acceptance, rejection, or evaluation of bids shall not be made without the prior written approval of the Agency and the State of Wisconsin. 2.8. BIDDERS MEETING: A public informational meeting for potential bidders will be held to respond to questions. The Agency requires all bidders to attend this meeting. Winning bidders will be required to attend a contract signing and information meeting prior to being awarded the contract. 3. BID ACCEPTANCE, EVALUATION AND AWARD: 3.1. BID OPENING: Bids will be opened on the date specified in the Summary. Names of the bidders may be read aloud at that time. 3.2. BID ACCEPTANCE: Bids which do not comply with instructions or are unable to comply with specifications contained in this RFB may be rejected by the Agency. The Agency may request reports on a vendor's financial 6 stability and if financial stability is not substantiated may reject a vendor's bid. The Agency retains the right to accept or reject any or all bids, or accept or reject any part of a bid deemed to be in the best interest of the Agency. The Agency shall be the sole judge as to compliance with the instructions contained in this RFB. 3.3. BID EVALUATION: Bids will be evaluated by the Agency's purchasing agent and program manager to verify that they meet all specified requirements in this RFB. This verification may include requesting reports on the vendor's financial stability, conducting demonstrations of the vendor's proposed products(s) and/or service(s), and reviewing results of past awards to the vendor by the Agency of Wisconsin. Bids from certified Minority Business Enterprises may be provided up to a five percent (5%) bid preference in accordance with Wis. Stats. s. 16.75(3m). 3.4. NOTIFICATION OF INTENT TO AWARD: Any vendors who respond to this RFB with a bid will be notified in writing of the Agency's intent to award the contract(s) as a result of this RFB. After notification of the intent to award is made, copies of bids will be available for public inspection (under the supervision of the Agency’s staff) between the hours of 8:30 am to 3:30 pm. Vendors should schedule reviews with the authorized Agency Representative to ensure that space is available for the review. 3.5. APPEALS PROCESS: The appeals procedure applies to only those requests for bids that are greater than $25,000. Notices of intent to protest and protests must be made in writing. Protestors should make their protests as specific as possible and should identify statutes, Wisconsin Administrative Code provisions and/or Department of Energy regulations that are alleged to have been violated. The written notice of intent to protest the intent to award a contract must be filed with: COMMON CARRIER ADDRESS Attn: Walter Orzechowski Southwest CAP 149 N Iowa St Dodgeville, WI 53533 USPS ADDRESS Attn: Walter Orzechowski Southwest CAP 149 N Iowa St Dodgeville, WI 53533 Phone 608-935-2326 FAX 608-935-2876 E-mail: [email protected] and received in his/her office no later than five (5) working days after the notices of intent to award are issued. The written protest must be received in his/her office no later than ten (10) working days after the notices of intent to award are issued. The decision of the Chief Executive of the procuring agency may be appealed to the Wisconsin Division of Energy within five (5) working days of issuance, with a copy of such appeal filed with the procuring agency, provided the appeal alleges a violation of a Wisconsin statute, a provision of the Wisconsin Weatherization Program Manual or a Department of Energy regulation. All avenues of appeal with the Agency must be exhausted before any appeal can be made to the Division. Any appeal must be submitted in writing to the Division Administrator, Division of Energy Services, Department of Administration (PO Box 7868, Madison WI 53707; phone 608-266-7601). 4. TECHNICAL PERFORMANCE REQUIREMENTS 4.1. All materials and installation purchased through the Request for Bid (RFB) must meet standards and specifications identified in Attachment 1 - Part 1: Water Heater Materials and Installation Standards for Materials and Attachment 1 - Part 2: Technical Specifications and any requirements identified from the Wisconsin Weatherization Field Guide and/or Wisconsin Weatherization Program Manual. 4.2. All proposed equipment must be capable of performing all operations in accordance with manufacturer's advertised data sheets and technical publications. 4.3. When product is required to be Energy Star-qualified, it must meet the current Energy Star standard. For the current information on Energy Star-qualified products and standards, see http://www.energystar.gov/. 4.4. All items bid should be American made when feasible. 4.5. All items bid shall be manufacturer's current production products and materials must be first quality. Items that are used, demonstrators, obsolete, or that have been discontinued are unacceptable. Southwest CAP will not accept any damaged or defective material or pay fees for such removal or accept a limit on time for notice of such damages. 7 4.6. See Appendix C for ‘Brand Name or Equal’ requirements that apply when exchanges are made by bidders. 5. VENDOR PERFORMANCE REQUIREMENTS: 5.1. Failure to comply with any of the specifications/special conditions will be sufficient reason for termination of agreement with the Vendor. a) First infraction: Vendor(s) will be notified in writing of possible suspension. Second infraction: The Vendor agreement will be terminated and Vendor will be removed from the state wide weatherization agency bidder’s list for a period of 2 to 5 years. b) If services provided as a part of this contract are subject to Davis Bacon requirements and the vendor fails to comply, federal debarment action may occur. 5.2. Work performed under this contract is funded with American Reinvestment and Recovery Act (ARRA) funding and is subject to reporting and other requirements. The Agency will provide the Vendor with specific guidance on reporting requirements and timing of such reporting, which may include breaking out the invoice by labor and materials, and will include information relating to materials/other suppliers and first-tier subcontractors. See Appendix D for full reporting and other requirements. 5.3. This contract is subject to Davis Bacon prevailing wage requirements: _X__YES / ___ NO a) All laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the United States Secretary of Labor. b) See ATTACHMENT 6 for prevailing wage rates. c) See Appendix E - Supplemental Terms & Conditions - Prevailing Wage (Davis-Bacon) for applicable requirements including reporting requirements and other conditions with which the vendor must comply. d) The Weatherization Agency will identify the required weekly reporting format required to be used by the vendor. WORK FLOW: 5.4. 5.5. a) Vendor must complete the required work within forty five (45) days of receipt of the Agency’s job order unless other arrangements have been made for unusual situations. b) All call-backs must be remedied within ten (10) working days of notification. c) Note that Vendors must identify in writing, as part of this bid, what volume (quantity) of work they are able to handle and meet the bid requirements. If during the first 45 days of the contract (first measurement), a vendor is not able to meet the volume they identified and the vendor cannot provide adequate justification for this non-performance, their contract will be terminated. PERMITS, INSURANCE and OTHER REQUIREMENTS: a) Vendor is responsible for obtaining any required state or local licenses and permits to perform work identified in this RFB in Grant, Iowa, Lafayette and Richland Counties. b) See Appendix B – Standard Terms and Conditions, Section 21, for Vendor insurance responsibilities. Certificates of insurance must be provided to Agency within five (5) working days of Notice of Intent to Award. c) Vendor must provide licensed plumber certification. d) The vendor must complete all work subject to such requirements in a lead safe work manner and meet new requirements beginning April 22, 2010. For requirements, see Appendix C, Sections 7 and 8. Note that new, more stringent requirements, will take effect in 2010 due to an Environmental Protection Agency rule requiring certification, etc. e) Vendor must participate in any training required by the Agency. f) 5.6. FORMS: Vendor is required to fill out all required forms and return to the Agency attached to the invoice. Required forms for this work are identified below and samples are provided in Attachment 5. Any change in material of equal or superior quality or installation standards must be specifically approved in writing by the Agency. Any deviation or exceptions to the terms, conditions and/or specifications must be 8 submitted in writing and approved by the Agency with a signed change order. No minimum fee is allowed on change orders. 5.7. A sticker identifying the responsible contractor’s name, phone number and date of installation must be clearly visible on each new appliance, except for refrigerators, freezers, ranges and AC (leave information with customer). 5.8. All installation and warranty information must be left with the installed appliance. 5.9. CUSTOMER EDUCATION: The proper operation of all appliances must be reviewed with the customer upon completion of the installation. 6. SUPPORT and OTHER REQUIREMENTS: All requirements in this section are mandatory. 6.1. Vendor shall provide a one (1) year service contract on material and labor on all work, as identified in Appendix B (20), and in addition provide the manufacturer's standard warranties on all items. 6.2. Vendors must furnish all warranty repairs or provide alternate source of local warranty repair at no extra cost to the Agency. 6.3. Vendor will correct or have corrected any substandard work as requested by the Agency. Such work shall be at no extra cost to the Agency. 6.4. Vendor is required to fill out all required forms and return to the Agency attached to the invoice. Required forms are Lien Wavier and the Installation Checklist. See Attachment 5. 6.5. WORK ORDER and JOB COMPLETION: a) Vendor may have the option to be able to receive work orders via e-mail. b) Invoices should be sent within 15 days after completion of the work order. 6.6. INVOICES, REQUIRED DOCUMENTATION, AND PAYMENT: a) The Invoice should include totals for each line item on the work order. b) The Vendor agrees they will not, under any circumstances, seek payment from the owner or occupant of the premises improved. The Vendor further agrees that the only recourse for payment is the weatherization agency (Appendix C, section 10). c) Vendors must provide signed lien waivers with the invoice, including signed waivers from any material suppliers and/or subcontractors. If a lien waiver is not received with the invoice, the vendor will not be receiving payment until one is received. This applies whenever a specific property (or properties) to be improved is identified to the Vendor and any of their suppliers and/or subcontractors. d) Installation checklist and Lien Waiver must be included with the invoice. e) Vendor must supply the agency issuing the work order with a copy of any/all documentation regarding problems or issues regarding job site performance and/or client issues. f) Vendor will allow thirty (30) days from billing date for payment from the agency. Any callbacks ordered after inspection(s) will be completed before issuance of payment. 7. COST INFORMATION Bidders are to submit pricing on the cost sheet provided. 7.1. Pricing. a) Vendors must fully complete the supplied cost sheets. (Attachment 2) b) Bidders are to submit pricing on the form provided. 7.2. The vendor must submit one fixed price per unit for the entire contract period. If contract is renewed, the vendor must hold the fixed price per unit during the renewal period. NOTE there is the ability to change this ‘fixed price’ under the following conditions (from Appendix B – Terms and Conditions, 6.2): Prices established in continuing agreements and term contracts may be lowered due to general market conditions, but prices shall not be subject to increase for ninety (90) calendar days from the date of award. 9 Any increase proposed shall be submitted to the Agency in thirty (30) calendar days before the proposed effective date of the price increase, and shall be limited to fully documented cost increases to the contractor which are demonstrated to be industry wide. The conditions under which price increases may be granted shall be expressed in bid/proposal documents and contracts or agreements. 7.3. Per Appendix B – Terms and Conditions, 6.2, vendors that experience industry-price increases should contact the agency, and provide: a) Date of anticipated/actual price increases and amount(s). Note that the 30 calendar-day requirement (noted above) may be adjusted (shortened) if price increases are sudden and significant, as determined by the agency. However, prices must be fixed for a minimum of ninety (90) calendar days (noted above). b) Written request to adjust fixed prices. 8. REQUIRED FORMS The following forms must be completed and submitted with the bid in accordance with the instructions given in Section 2.3. Blank forms are attached following the appendices. Also see Bidder Checklist in section 0.1 Request for Bid sheet (cover) + Bidder Checklist Vendor Information form Vendor Reference form Cost Sheet (Attachment 2) 9. TERMS AND CONDITIONS The Agency reserves the right to incorporate standard Agency contract provisions into any contract negotiated with any bid submitted responding to this RFB. Failure of the successful bidder to accept these obligations in a contractual agreement may result in cancellation of the award. Terms and conditions include: Appendix A – Special Terms and Conditions Appendix B – Standard Terms and Conditions (Revised 5/28/09) Appendix C – Supplemental Terms and Conditions (Revised 7/15/09) Appendix D – Supplemental Terms and Conditions - American Recovery and Reinvestment Act of 2009 Standard Terms and Conditions for Contractors & 1st Tier Subcontractors Appendix E – Supplemental Terms and Conditions - Davis Bacon 29 CFR Section 5.5 - Contract Provisions & Related Matters. 10 Standards for Conformance - directed to vendors/contractors A. General Materials shall be installed in a professional and lead-safe manner that insures the effectiveness of the materials. Materials shall be installed to meet or exceed manufacture specifications, as directed by the weatherization agency. All materials and labor must carry a one-year warranty from the date of the final inspection. All work must meet applicable codes and regulations and Standards for Conformance identified in Section D. 11.4.1 Thermal Insulating Materials for Walls, Floors, Ceilings, Attics and Roofs Pre-formed pipe insulation ASTM1 C547-00 1 ASTM indicates American Society for Testing and Materials 11.4.11 Replacement Water Heaters – (Standards for Conformance) Electric (resistance) water heaters 10 CFR1 430 and UL2 174. Minimum .94 EF is required for nonmobile home replacement units. Minimum .90 EF, rated for mobile homes, is required for mobile home replacement units Heat Pump water heaters UL 1995, Second edition, 1995. Electrical components to be listed by UL Gas Water Heaters Minimum .61 EF is required for non-mobile home replacement units. Minimum .59 EF rated for replacement in mobile homes, is required for mobile home replacement units.3 10 CFR 430 and ANSI4 Z21.10.1-1998 Rated ≤75 kBtu/hr Rated ≥75 kBtu/hr ANSI Z21.10.3-1998 UL 732, Fifth Edition, Revised 2/3/05 Oil water heaters 1 CFR indicates Code of Federal Regulations UL indicates Underwriters Laboratories 3 Wisconsin Weatherization Specifications 4 ANSI indicates American National Standards Institute 2 11 Water Heater Technical Specifications - directed to vendors/contractors 1. Technical Specifications 1.1. The replacement electric water heater for non-mobile homes must have a minimum efficiency of .94 Ef. 1.2. The replacement electric water heater for mobile homes must have a minimum efficiency of .90 Ef. 1.3. The replacement gas water heater for non-mobile homes must have a minimum efficiency of .61 Ef. 1.4. The replacement gas water heater for mobile homes must have a minimum efficiency of .59 Ef. 1.5. Replacement mobile home water heaters must be rated for mobile home use. 1.6. Water heaters installed are required to be Energy Star-qualified. 2. Installation Specifications 2.1. Contractor will be responsible for installing unit to meet all codes (including local) and to manufacturer’s specifications. 2.2. Natural Gas – Specific Installation Standards a) The installation will be in compliance with the International Fuel Gas Code. b) All gas piping will be bonded or grounded according to the International Electric Code. c) Any gas utilization equipment connected to a piping system will have a new accessible, approved manual shutoff valve installed upstream on any connector and within 6 feet of the equipment it serves. A union or flanged connection will be provided downstream from this valve to permit removal of controls. The manual shutoff valve must be able to be hand operated. 2.3. Electric – Specific Installation Standards – Wiring will be in compliance with Wisconsin State Electrical Code which includes (but is not limited to) the following terms: a) Wiring will be #10 copper, 2-wire plus ground type NM, NMC or BX. Type NB and NMC may be installed in conduit. b) When an Electric Water heater is installed, the water heater will be the only load on the circuit. The circuit will be properly switched and protected. In no case will the protection device (fuse or circuit breaker) exceed 30 amperes. c) All splices will take place within an approved enclosure. 2.4. All water heater replacements must include all items for a “normal” installation, according to manufacturer’s specifications. Contractor will be responsible for inspection/assessment of jobs to determine if the job is within scope of “normal” installation. A “normal” installation including but not limited to the following: a) Up to 20 feet or more of water, gas and vent piping. 12 b) All conversion water heaters (electric to gas) and all power vented models must have an electrical outlet within six (6) feet of the water heater. Extension cords to plug in the water heater are not acceptable. c) For gas water heater installs, a new gas shut off valve must be installed within six (6) feet of the water heater. d) Inspect for and repair all detectable gas leaks from water heater to meter. e) Set water heater temperature at 120° F at install. f) All newly installed water heaters must be placed on minimum 2” blocks. g) In mobile homes, floor must be repaired if deteriorated. h) All water leaks within six (6) feet from the water heater must be repaired. i) Galvanic isolators must be used. No steel to copper connections. j) The pressure relief valve extension pipe shall be made of CPVC or galvanized pipe and extend to within 6 inches of the floor or as required by local code. k) Vendor shall insulate the first six (6) feet of the hot and cold waterlines or up to but not beyond any obstruction that would cause a thermal break after installing the new water heater with Armaflex or similar pipe wrap (at least R-2). Use a material with an inside dimension suited to the outside dimension of the pipe. Cover corners, fittings and unions to the same thickness. Maintain a clearance of 3” from flues and burners. (Non-flammable pipe insulation is exempt.) Tape or otherwise seal longitudinal seams. Seal ends and butt joints. 2.5. Make old units non-functional, remove and properly dispose of units and debris. 2.6. Affix a tag to the water heater identifying who the customer should call for service. The tag should be prominently displayed and include the service provider’s name, address, telephone number and date of install. 3. Warranty and Customer Education 3.1. All manufacturer documents including installation information and warranties shall be left with the unit upon completion of installation. 3.2. Operating instructions should be reviewed with the customer. 13 Bid/Proposal # 181003 Water Heater Installation AGENCY NAME VENDOR REFERENCE FOR VENDOR: Provide company name, address, contact person, telephone number, and appropriate information on the product(s) and/or service(s) used for four (4) or more installations with requirements similar to those included in this solicitation document. If vendor is proposing any arrangement involving a third party, the named references should also be involved in a similar arrangement. Company Name Address (include Zip + 4) Contact Person Phone No. Product(s) and/or Service(s) Used Company Name Address (include Zip + 4) Contact Person Phone No. Product(s) and/or Service(s) Used Company Name Address (include Zip + 4) Contact Person Phone No Product(s) and/or Service(s) Used Company Name Address (include Zip + 4) Contact Person Phone No. Product(s) and/or Service(s) Used 14 Bid/Proposal # 181003 Water Heater Installation AGENCY NAME VENDOR INFORMATION 1. BIDDING / PROPOSING COMPANY NAME FAX Phone Toll Free Phone Address City 2. State Zip + 4 Name the person we may contact in the event there are questions about your bid / proposal. Name Title Phone Toll Free Phone FAX Address City 3. State Zip + 4 All vendors that are awarded over $25,000 on this contract will be required to submit affirmative action information to the State of Wisconsin. Please name the person in your company that the state may contact about this plan. Name Title Phone Toll Free Phone FAX Address City 4. State Zip + 4 Mailing address where Agency purchase orders are to be mailed and person Southwest CAP may contact concerning orders and billings. Name Title Phone Toll Free Phone FAX Address City State 15 Zip + 4 16 Water Heater Installation Checklist Southwest CAP Weatherization Customer: Please initial the following items when the Water Heater is installed- ______________ New Water Heater installed free of water leaks and dents. ______________ Installers cleaned up after themselves. ______________ The Water Heater is level and on blocks. ______________ Old Water Heater removed from premises. ______________ Water temperature set at 120° F. ______________ Owner’s manual and warranty information received. ______________ Maintenance and care for the water heater explained. ______________ Vendor contact information received. I,_______________________________________accept the installation of a new Water Heater and it meets the eight criteria listed above. Do not sign this document if any of these requirements are not met. ____________________________________ Sign __________________ Date LIEN WAIVER Southwest CAP 208 US Hwy18 West Montfort, WI 53569 Customer: Property Location: That I, the undersigned contractor, being duly sworn, do depose and say that I was contracted to install, alter or repair the Water Heater the above property. That the Water Heater installation or repair on the subject property has been fully and satisfactory completed in accordance with the work contract. 17 The Contractor agrees that they will not, under any circumstances, seek payment from the owner or occupant of the premises improved. The Contractor shall not file, suffer or permit any lien or other encumbrance of record as a claim against the site listed above of a weatherization project in recognition that the only recourse for payment is from the weatherization agency. The Contractor shall advise each subcontractor and material supplier in writing that the owner of property receiving weatherization services has no obligation to pay for weatherization services and shall require any such subcontractors and suppliers to seek payment for such services only from the Contractor and to take no action to attempt to collect any payment from the owners of the property serviced under this contract. Listed below are the laborers and subcontractors included in this work, who shall not seek payment from the owner or occupant of the premises improved and that the only recourse for payment is contractor. Name of Laborer and Subcontractor: By Signature That I, the undersigned contractor, hereby waive any lien or right to a lien against the described property and warrant to save harmless the said Property Owner or Occupant from any liens that are now in existence, or may hereafter arise by reason of said improvements. Contractor (firm name) _______________________________________ Contractor (signature) ________________________________ Date 18 Attachment 6 – Grant County General Decision Number: WI080015 02/08/2008 WI15 Superseded General Decision Number: WI20070015 State: Wisconsin Construction Type: Residential County: Grant County in Wisconsin. RESIDENTIAL CONSTRUCTION PROJECTS (Consisting of single family homes and apartments up to and including 4 stories) Modification Number 0 Publication Date 02/08/2008 SUWI1990-007 01/24/1990 Rates Fringes Bricklayer.....................$ 10.00 Carpenter......................$ 12.96 2.75 Cement Mason...................$ 11.05 Electrician....................$ 7.88 Ironworker.....................$ 14.08 2.85 Laborer........................$ 9.52 Pipefitter.....................$ 8.50 1.37 Power equipment operators:.....$ 14.57 Sheet metal worker.............$ 8.50 1.37 ---------------------------------------------------------------WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * * * an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling Attachment 6 – Grant County 19 On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION Attachment 6 – Richland County General Decision Number: WI080026 07/24/2009 WI26 20 Superseded General Decision Number: WI20070026 State: Wisconsin Construction Type: Residential Counties: Crawford, Richland and Vernon Counties in Wisconsin. RESIDENTIAL CONSTRUCTION PROJECTS (Consisting of single family homes and apartments up to and including 4 stories) Modification Number 0 1 2 * Publication Date 02/08/2008 07/25/2008 07/24/2009 SUWI1987-001 02/01/1987 Rates CARPENTER........................$ 7.25 CEMENT MASON/CONCRETE FINISHER...$ 8.00 ELECTRICIAN......................$ 7.25 LABORER..........................$ 7.25 Fringes PAINTER..........................$ 13.34 2.12 PLUMBER/PIPEFITTER...............$ 1.37 8.50 Sheet Metal Worker...............$ 7.25 ---------------------------------------------------------------WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: Attachment 6 – Richland County * * * an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter 21 * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION Attachment 6 – Iowa and Lafayette Counties General Decision Number: WI080020 07/10/2009 WI20 Superseded General Decision Number: WI20070020 State: Wisconsin 22 Construction Type: Residential Counties: Columbia, Dodge, Florence, Fond Du Lac, Green, Green Lake, Iowa, Lafayette, Marinette, Marquette, Menominee, Oconto, Sauk, Shawano, Waupaca and Waushara Counties in Wisconsin. RESIDENTIAL CONSTRUCTION PROJECTS (Consisting of single family homes and apartments up to and including 4 stories) Modification Number 0 1 2 3 4 5 6 7 8 9 10 11 12 Publication Date 02/08/2008 06/13/2008 07/11/2008 07/25/2008 08/08/2008 08/29/2008 09/12/2008 10/03/2008 11/07/2008 12/19/2008 05/29/2009 07/03/2009 07/10/2009 CARP0252-003 06/01/2008 FLORENCE (Except area bordering Michigan State Line), FOND DU LAC, GREEN LAKE, MARINETTE (Except N.E. corner), MARQUETTE, MENOMINEE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA COUNTIES Rates Fringes CARPENTER (Excluding Drywall Hanging).........................$ 19.96 10.26 ---------------------------------------------------------------CARP1146-005 06/01/2001 MARINETTE COUNTY (Northeast part) Rates Fringes CARPENTER (Excluding Drywall Hanging).........................$ 16.96 7.97 ---------------------------------------------------------------CARP1510-008 05/01/2008 FLORENCE COUNTY (Area bordering Michigan) Rates Fringes Attachment 6 – Iowa and Lafayette Counties CARPENTER (Excluding Drywall Hanging).........................$ 20.17 9.33 ---------------------------------------------------------------ELEC0158-004 06/02/2008 MARINETTE (Wausaukee and area South thereof), OCONTO, MENOMINEE (East of a line 6 miles Werst of the West boundary of Oconto County), AND SHAWANO (Except N.W. corner) COUNTIES 23 Rates Fringes ELECTRICIAN......................$ 17.80 10.8%+6.09 ---------------------------------------------------------------* ELEC0159-004 06/01/2008 COLUMBIA, DODGE, FOND DU LAC (Township of Waupun), GREEN LAKE (Except Townships of Crystal Lake, Neshoka, Newton, and Springfield), AND SAUK COUNTIES Rates Fringes ELECTRICIAN......................$ 21.75 3%+10.47 ---------------------------------------------------------------* ELEC0219-005 06/01/2009 FLORENCE (Townships of Aurora, Commonwealth, Fern, Florence, and Homestead), AND MARINETTE (Township of Niagara) COUNTIES Rates Fringes Electricians: Electrical contracts over $90,000.....................$ 28.39 3.75%+14.95 Electrical contracts under $90,000.....................$ 26.19 3.75%+14.95 ---------------------------------------------------------------ELEC0388-003 06/03/2007 MARINETTE (Area North of the Town of Wausaukee including Townships of Ambert, Athelstane, and Silver Cliff, except Niagara) West of a line 6 miles West of the West boundary of Oconto County), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), AND SHAWANO (N.W. Corner including townships of Aniwa and Hutchins) COUNTIES Rates Fringes ELECTRICIAN......................$ 16.87 7.23 ---------------------------------------------------------------ELEC0494-007 06/01/2008 FOND DU LAC COUNTY (Except Township of Waupun) Rates Fringes ELECTRICIAN......................$ 23.23 3%+8.69 ---------------------------------------------------------------Attachment 6 – Iowa and Lafayette Counties ELEC0577-004 06/01/2008 GREEN LAKE (Northern part including the Townships of Berlin St Marie, and Seneca), MARQUETTE (Northern part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), WAUPACA, AND WAUSHARA COUNTIES Rates Fringes 24 ELECTRICIAN......................$ 17.80 11.3%+7.04 ---------------------------------------------------------------ELEC0890-004 06/01/2008 GREEN AND LAFAYETTE COUNTIES Rates Fringes ELECTRICIAN......................$ 21.20 19.55%+6.97 ---------------------------------------------------------------PLUM0075-005 06/01/2009 DODGE (Watertown), GREEN, AND LAFAYETTE COUNTIES Rates Fringes PLUMBER..........................$ 35.53 14.96 ---------------------------------------------------------------PLUM0075-010 06/01/2008 COLUMBIA, IOWA, MARQUETTE, AND SAUK COUNTIES Rates Fringes PLUMBER..........................$ 34.78 12.76 ---------------------------------------------------------------PLUM0400-004 06/02/2008 DODGE (except Watertown), FOND DU LAC, GREEN, GREEN LAKE, LAFAYETTE, MARINETTE (except Niagara), MENOMINEE, OCONTO, SHAWANO, AND WAUPACA COUNTIES Rates Fringes PLUMBER..........................$ 28.43 13.56 ---------------------------------------------------------------PLUM0434-003 11/30/2008 FLORENCE COUNTY Rates Fringes PLUMBER..........................$ 27.08 13.63 ---------------------------------------------------------------PLUM0506-008 06/01/2000 Attachment 6 – Iowa and Lafayette Counties MARINETTE COUNTY (Niagara only) Rates Fringes PLUMBER (1) Work on Single-Family Homes; and Jobs where combined plumbing and HVAC bid is $50,000 or less......$ 17.48 10.00 (2) All other work..........$ 24.03 10.00 ---------------------------------------------------------------SUWI1993-004 09/01/1993 25 Rates Fringes BRICKLAYER.......................$ 11.50 CEMENT MASON/CONCRETE FINISHER...$ 9.15 3.05 Laborer, Unskilled...............$ 14.56 ---------------------------------------------------------------WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * * * * an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal Attachment 6 – Iowa and Lafayette Counties process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: 26 Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
© Copyright 2024