Tiden. Vi reduserer effekten av den!

Tiden. Vi reduserer effekten av den!
Jan Erik Salomonsen MainTech AS
Hvordan redusere drift og
vedlikeholdskostnader innen vindkraft
MainTech konferansen 2014
Agenda
– Kort presentasjon av MainTech
• Erfaringer med vedlikeholdsstyring vindkraft
– Potensial for reduserte drift og vedlikeholdskostnader
Jan Erik Salomonsen
M.Sc., EFNMS Certified European Expert in Maintenance
Management, Certified Vibration analyst; ISO18436.2 Cat II.
Position: Principal Engineer at MainTech AS
www.maintech.no/ansatte
Field Experience 24+ years
Materials and corrosion, inspection, condition
monitoring and subsea technology
MainTech’s erfaringer
• MainTech er en uavhengig tjenesteleverandør og
har erfaring med vindkraft siden 2004:
• MainTech sitt fokus i prosjekter med operatører:
– Innkjøp / kontraktsforhandlinger
• Ivareta driftsfase under innkjøp / design
– Kodifisering (EBL / RDS-PP)
– FV-Program
– Analysere
– Forbedre
Erfaringsbakgrunn innen vind
• NTE (Vestas) 2004
– Kodifisering EBL, registrering i VH-system, RCM analyse
• Scanwind / GE Wind Energy 2005-The end
– VH-manual / FMEA / Utvikling / FV-program / Lede revisjon
• TrønderEnergi (Enercon) 2006 - 2007
– Kontraktsforhandlinger / kodifisering / registrering VH-system
• Statoil – Sheringham Shoal (Siemens) 2009
– Kodifisering RDS-PP / (FMEA)
• Statkraft Smøla, Hitra og Kjøllefjord (Siemens) 2010-2011
– Kodifisering RDS-PP / RCM analyser / FV-program
• Sarepta - Teknisk Due Diligence innkjøp av turbiner P.T.
• Deltager i Windcluster Mid-Norway
MainTech’s kompetanse
•
Materialteknologi
•
•
•
•
Inspeksjon
•
•
•
•
RCM
Jobbpakking
Styringssystemer ERP og CMMS
Analyser
Alle disipliner representert i PT 41 ansatte:
•
•
•
•
•
•
Risiko basert inspeksjonsplanlegging
Strukturinspeksjon offshore og onshore
Kunnskap om de fleste NDE metoder
Vedlikeholdsstyring (9 EFNMS sertifiserte som Europeisk Vedlikeholdsekspert)
•
•
•
•
•
Katodisk beskyttelse beregninger og verifikasjon (Nordsee Ost, Aasgard, Aker Verdal)
Malingssystemer
Materialvalg Metalliske materialer, kompositter, plaster og elastomerer påvirkning nedbryting og bestandighet
Maskinteknikk
Instrumentering automasjon
Kjemiteknikk
Elektroteknikk
Logistikk
Lang erfaring innen offshore- og landbasert energiproduksjon
www.maintech.no
Potensial
• D&V kostnader tilsvarer 20 til 25% av energikostnaden for
vind kraft systemer (EWEA 2009)
• Dagens norske onshore vindparker har en D&V kostnad på
12 til 22 øre/kWh (2011)
• PÅSTAND:
Det er mulig å drive nye parker med en D&V kostnad på
5 til 8,5 øre/kWh (tilsvarende vannkraft)!
Potensial
• For en 100MW park utgjør forskjellen en
økt inntjening på typisk 18 mill. per år.
Hvordan?
• Valg av teknisk løsning
• Bedre vedlikeholdsstyring
• Bedre diagnostikk
– basert på tilstandskontroll i kombinasjon med
logistikk og reservedelshold
• Tilgang på kran!
Valg av teknisk løsning - Pålitelighet
• I en vindturbin er stort sett alle komponenter
pålitelighetsmessig i serie med hverandre (ingen
redundans)
• Det betyr at det stilles store krav til den enkelte
komponents pålitelighet
• Dersom en komponent svikter vil turbinen stå stille!
Vedlikeholdsvennlighet
Inspeksjonsvennlighet
Pålitelighet
Vedlikeholdsevne
Driftssikkerhet
Driftssikkerhet (Dependability)
Konstruert Driftssikkerhet
Ledet Driftssikkerhet
Designet og bygd driftssikkerhet er
startpunktet til ledet driftssikkerhet
Prosedyrer, arbeidsprosesser og
opplært personell må være på
plass før oppstart, for å sikre at
driften blir verdensklasse!
Et dårlig planlagt, designet eller bygd
anlegg vil aldri kunne oppnå
verdensklasse driftssikkerhet!
Vi må sikre at vårt startpunkt for drift
blir optimalisert ved å grundig
kontrollere design, konfigurasjon,
kvalitet og byggeaktiviteter.
Konstruert
Ledet
Driftssikkerhetsfaktorer
Driftssikkerhet
Systemets
Pålitelighet
• Hvor godt komponentene er
konstruert
• Robust system arrangement
• Hvor påkjent systemet er
Systemets
Vedlikeholdsvennlighet
• Vedlikehold er tatt hensyn til i
utstyrskonstruksjonen
• Tilgjengelig teknisk
dokumentasjon
• Tilkomst og plass
• Hjelpeutstyr
• Modularisering/Standardisering
• Arbeidsmiljø
Organisasjonens
Vedlikeholdsevne
•
•
•
•
•
•
•
Vedlikeholdsstrategi/politikk
Vedlikeholdsorganisasjon
Vedlikeholdssystem
Lokasjon
Tilgang på riktig kompetanse
Reservedelshold
Tilgjengelighet på hjelpeutstyr
Driftssikkerhetsfaktorer
De røde er de vi også kan
påvirke i prosjekteringen!
Driftssikkerhet
Systemets
Pålitelighet
• Hvor godt komponentene er
konstruert
• Robust system arrangement
• Hvor påkjent systemet er
Systemets
Vedlikeholdsvennlighet
• Vedlikehold er tatt hensyn til i
utstyrskonstruksjonen
• Tilgjengelig teknisk
dokumentasjon
• Tilkomst og plass
• Hjelpeutstyr
• Modularisering/Standardisering
• Arbeidsmiljø
Organisasjonens
Vedlikeholdsevne
•
•
•
•
•
•
•
Vedlikeholdsstrategi/politikk
Vedlikeholdsorganisasjon
Vedlikeholdssystem
Lokasjon
Tilgang på riktig kompetanse
Reservedelshold
Tilgjengelighet på hjelpeutstyr
Tilgjengelighet
Aop.max
MTBM
MTTR
MTPM
MLDT
𝐴𝐴𝑜𝑜𝑜𝑜 .𝑚𝑚𝑚𝑚𝑚𝑚 =
𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀
1
𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀 + 𝑛𝑛 + 𝑛𝑛 (𝑛𝑛1 ∙ 𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀 + 𝑛𝑛2 ∙ 𝑀𝑀𝑇𝑇𝑃𝑃𝑃𝑃) + 𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀
1
2
= Maksimal operasjonell tilgjengelighet
= Middeltid mellom vedlikehold
(Mean Time Between Maintenance)
= Midlere reparasjonstid
(Mean Time To Repair) Σ(PKV+KV)
= Midlere tid for preventivt VH
(Mean Time for Preventive Maintenance)
= Midlere logistikk tid
(Mean Logistic Delay Time)
- Av formelen fremgår det at tilgjengeligheten forbedres dersom antall
velikeholdsaksjoner reduseres
- Et skift fra korrektive til prediktive og preventive vedlikeholdsoppgaver vil øke
tilgjengeligheten da disse er av totalt kortere varighet.
•
Ressursbruk
- Maksimal operasjonell tilgjengelighet er den tilgjengelighet som oppnås når
både korrektive og forebyggende tiltak regnes med
Ar
Prediktivt
Preventivt
Med 30% produksjonstid gir det muligheter for “opportunity” maintenance, dvs.
Vedlikeholdstiden skal ikke utføres i god produksjonstid.
g
nin
ast
bel
ds
bei
Korrektivt
Kvantitativt mål = tilgjengelighet (Availability)
• Tilgjengelighet uttrykkes som:
A
MTBF
MTTR
MLDT
A=
MTBF
MTBF + MTTR + MLDT
= System tilgjengelighet
= Middeltid mellom feil (Mean Time Between Failures)
= Midlere reparasjonstid (Mean Time To Repair)
= Midlere logistikk tid (Mean Logistic Delay Time)
• Formelen inkluderer tre viktige variabler som påvirker tilgjengeligheten:
– Pålitelighets oppnåelse (Reliability performance) (MTBF)
Hvor godt systemet er designet, laget drevet og vedlikeholdt
– Vedlikeholdsvennlighets oppnåelse (Maintainability performance) (MTTR)
Hvor enkelt det er å reparere systemet og hvor raskt og godt
vedlikeholdsorganisasjonen utfører reparasjoner
– Vedlikeholdsevne oppnåelse (Maintenance support performance) (MLDT)
Ledetid for reservedelser og reparasjonsutstyr, lagerholds filosofi
• For å sikre den påkrevde tilgjengeligheten må vi vurdere og forbedre disse tre
faktorene.
Primært fokus på kostnadsdrivere
Kran!
Valg av teknisk løsning
• Blad:
–
–
–
–
–
–
Integral cast (Siemens)
Karbonfiber spar + epoxy (Vestas mfl.)
Aeroelastisk design (Siemens mfl.)
Tykke og korte (Enercon)
Doble rader med bolter (Enercon)
Coating system!!!!
Blad - degradering over tid
• Nedbryting av Gelcoat
–
–
–
–
Trinn
Trinn
Trinn
Trinn
1
2
3
4
–
–
–
–
matt overflate
avsetning av støv (chalking)
Hårlinje sprekker
Stedvis blistering og avflassing
Blad – Påkjenninger og inspeksjon
Blad – utmatting fra IEC 61400-23
Blad – utmatting (IEC 61400-23)
•
10 millioner lastvekslinger = design kriterie som korresponderer med
ca 20 år bruk av en landbasrt vind turbin, tillatt spenning kan da eks.
Være ca 30% av den initielle ultimate. Dette er imidlertid sterkt
materialavhengig:
•
Karbon fiber i epoxy kan typisk motstå 50% av sin ultimate last I 10
millioner lastvekslinger, mens en lavere kvalitet glassfiber I vinylester
kan typisk klare 20% av sin initielle bruddlast.
•
[NB! Landbaserte turbiner har 15 -30% produksjonstid]
Blad - utmatting
Mest utsatte områder er trailing edge og foran på leading edge
Denne kunnskapen kan tas inn i inspeksjonsplanleggingen
Blad - utmatting
• Siemens 3,6-107 Rpm 5 – 13 glassfiber i epoxy
•
Ved 50% tilgjengelighet (Hywind 2011) og 13rpm gir dette inntil 3.4 mill. dynamiske
flexinger per år, eller behov for 65 millioner lastvekslinger på 20 år.
•
Avhengig av robustheten i design og relevante S-N kurver vil man da måtte påregne
en utmattingslevetid på bladene på ?? År
Blad - utmatting
• Bruk av Palmgren-Miner i tilstandsstyring
– Sensor input:
• RPM
• Last
• Driftstid ved last
• Vindhastighet, pitch, tip-clearance
• (Distribuerte bragg sensorer)
• (Strekklapper)
– Tilbakeberegning – spenning/n
– Beregne akkumulert utmatting P-M
– Beregne tid til utskiftning
Blad - Bolter
•
Hyppig ettertrekking
gir herding og
utmatting!
Hub – Bladlager
• Grease smurte rullelager
– Doble kulelager
– Motstående rullelager
• Problematikk
– Fretting ved stillstand
– Greasetilførsel
• Løsning
– Herding eller belegg
– Automatisk grease system
Hub – Pitch system
• To hovedteknologier
– Hydraulisk (tradisjonell dansk)
• Hydraulisk trykk fra HPU i nacelle via swivel
– Elektrisk (nyere)
• Individuelle motordrevne gir per blad
Drivverk og generator
Tradisjonell hovedaksel med to lager, tretrinns girkasse,
kobling og DFID generator
Drivverk og generator
• Direktedrevet
Drivverk og generator
• Direktedrevet Permanent Magnet
generator
Drivverk og generator
• Hybrid
Drivverk og generator
• Hybrid
Drivverk og generator
• DD vs. Gir
– DD gir 20% lavere D&V kost (Vattenfall offshore)
• Gjennomprøvd/testet teknologi
– Problem at utviklingen gir stadig ny teknologi
Hovedlager
• Konsiske
• Preloaded 3 row
• Sferisk + sylindrisk
Hovedlager - L10 tall
•
L10 indikerer lagerets beregnede levetid og angir det antall driftstimer der 10% av en gruppe lager
viser tegn til utmatting – altså 90% pålitelighet.
•
Dimensjonerende feilmekanisme er “subsurface fatigue spalling”
Hovedlager – Andre feilmekanismer
•
Andre feilmekanismer:
•
Scoring: Can occur when the end of the roller contacts an improperly lubricated flange or if a high
rib contact stress or improper contact geometry exists.
•
Scuffing: Can occur when there are insufficient traction forces between the roller and the raceways
resulting in gross sliding at the contact. As the heat generation increases, the surfaces adhere and
cause transfer of the material.
•
Micropitting:Generally small pits on the surface that are generally due to increased stresses that
occur when lubricant films are thin compared to the surface texture resulting from the finishing
process.
•
Structural issues: Can be related to sections of the inner or outer raceways that may be used as
structural members to transmit the load instead of using a housing or shaft to transfer the load.
Brinelling and false brinelling: Results from permanent deformation or yielding in the part. False
brinelling is commonly seen when the rollers are not rotating and oscillate back and forth along the
direction of the rotational axis of the roller.
Yaw bearing
Yaw bearing – slewing ring
SCADA og kodifisering
• IEC 61400-25 serien for felles SCADA data
– OPC XML DA
– IEC 60870-5-104
– DNP3
• RDS-PP kodifisering av komponenter
• Nødvendig å ha data tilgjengelig fra
SCADA systemet for å oppnå egen kontroll
på historikk og CMMS system!
Opportunity Pit-stop maintenance
• Pit stop filosofi
•
•
•
•
•
•
•
•
•
God vedlikeholdsstyring med basis i RCM/RBI
Veldefinerte og beskrevne oppgaver
Klare ansvarsforhold i teamet
Forberedt jobbpakking med gode leksjoner
Logistikk er organisert og prøvet på forhånd
Reservedeler ligger pakket og klar for jobbene
– Pokajoke kits
Mannskap er godt trent på forhånd i utførelsen av oppgavene
Jobbene pakkes og legges klar til Opportunity og tas når annet korrektivt
vedlikehold trigger besøk på turbinene.
Oppdatering, erfaringsoverføring og «nullstilling» av tilstand i CMMS
MainTech’s erfaringer
RCM av en kundes vindparker ga meget gode resultater:
•
•
•
•
•
•
•
•
•
•
•
Kunden ble «herre i eget hus» med kontroll over data/historikk og mulighet til egen kompetanseoppbygging
Systematisk dokumentert og auditerbar gjennomgang
Innføring av en tilstandsparameter 1-4 for gradvis degradering (Markov state)
Egenutviklet vedlikeholdsprogram basert på egne erfaringer
Sporbart og etterprøvbart – grunnlag for kontinuerlig forbedring og optimalisering
Høyere andel av tilstandskontroll og periodisert utskiftning (43%)
Utvidede serviceintervaller 12 til 18 måneder på en rekke aktiviteter
– Filterskift
– Sentralsmøre systemer
Utvidede intervaller på ettertrekking av bolter
Redusert antall funksjonstester - kun funksjonskritiske komponenter
– Halvering av antall funksjonstester - Hydraulikksystemer
– Halvering av antall funksjonstester - Elektriske systemer
Bedre jobbpakking og logistikk for vedlikeholdsjobber og runder
Forslag til fysiske endringer av turbinene
Det store bildet
• Strømprisen er lavest
om sommeren, det
blåser mindre og det er
da det også er mulig å
drive vedlikehold
• = mye VH aktivitet om
sommeren og VH har
da liten innvirkning på
årsproduksjon og krevd
tilgjengelighet.
Tilgjengelighet
En optimal mix av vedlikeholdskostnader oppnås når det er mulig å balansere korrektive
oppgaver med preventive og prediktive.
Ressursbruk
•
Ar
Prediktivt
Preventivt
g
nin
ast
bel
ds
bei
Korrektivt
Maintenance strategy - component level
Before failure
Maintenance
After failure
Determined on:
Preventive
• Criticality / redundancy
Corrective
• Consequences at failure
• Can failure be predicted?
Counter based
Condition Based (PdM)
• Calendar based
• Inspection
• Operating hours
• Condition Monitoring
Failure
Planned
corrective
Z(t)
Feilkarakteristikk
t
UAL
1968
Bromberg
1973
MSP
1982
SUBMEPP
2001
4%
3%
3%
2%
2%
1%
17 %
10 %
5%
4%
3%
17 %
7%
11 %
6%
9%
14 %
15 %
42 %
56 %
68 %
66 %
29 %
6%
Hvilke komponenter er egnet for TK?

Kun 8 - 29 % har aldringsforløp – sviktintensiteten øker med alderen


Komponenten må ha en kritisk systemfunksjon
Komponenten må ha et målbart degraderingsforløp som sikrer nok tid til å
måle utvikling og utføre vedlikehold før svikt inntrer
 For øvrige komponenter 71 – 92 % er sviktinteniteten enten
konstant, tilfeldig eller tidlig

For disse komponentene vil ikke planlagt utskiftning eller tilstandskontroll ha
noen effekt på påliteligheten.
- Man bør imidlertid foreta målinger og verifikasjon på at driftsparametere
holder seg innenfor et gitt driftsvindu “Integrity Operating Window” (IOW)
for å sikre optimale driftsforhold.
P-F Intervallet
P
Condition
Sensitivity
Inspections
F
Action
Time
RCM metoden
•Tegninger
(en-linjeskjema)
• Kodeplan/
utstyrslister
• Personkunnskap
FUNKSJONSANALYSE
Funksjonsbeskrivelse
• Funksjonshierarki
• Funksjonsanalyse
• Historikk
•Personkunnskap
FMECA
Kritisk/ukritisk ?
•FMECA
•Kritikalitet
•Personkunnskap
TILORDNING
AV
VEDLIKEHOLDSAKTIVITETER
OG
RESERVEDELER
•Vedlikeholdsstrategi
(aktivitet/intervall)
•Reservedelsbehov
•Ressursbehov
• Vedlikeholdsstrategi på
komponentnivå
•Personkunnskap
JOBBGRUPPERING
•Vedlikeholdspakker
•(på utstyrsnivå)
•Inspeksjonsrunder
RCM metoden - Funksjonsanalyse
Eksempel:
Gruppe: MDX11 – Hydraulic pitch blade A
Utstyr: MM001- Pitch cylinder
Funksjon:
Holde tett og overføre kraft
Funksjonsfeil:
Feilmode 1:
Feilmode 2:
Holder ikke tett
Lekkasje forbi stempel
Pakningsbrudd eksternt
NB! ”En funksjon kan ha flere funksjonsfeil”
RCM metoden
RCM av en gitt turbintype
Utfordring:
• Hvordan kan vi så øke preventiv vedlikeholsdandel
ytterligere?
• Svar:
–
–
Ved å utvide RCM analysen med en Feilmode og Symptom Analyse (FMSA)
Deretter ta i bruk nye tilgjengelige metoder for tilstandskontroll og diagnostikk
RCM metoden + FMSA
+FMSA
Knowledge based system - Kontekst
Ekspert systemer og kunstig intelligens:
• Enkelte ganger er prosessen for kompleks til at en enkel signal analyse er
tilstrekkelig til å gi en pålitelig feildeteksjon. Dvs. Ulike svikt
kombinasjoner påvirker systemet på forskjellig vis.
•
I slike tilfeller er det mulig å klassifisere feil ut fra kombinasjonen av signal
ved å bruke kvalitativ prosessforståelse for å vurdere relasjonen mellom
ulike målte signaler og de gjeldende driftsbetingelser.
FMSA Failure Mode Symptoms Analysis
• Hjertesvikt (feilmode)
•
Basert på symptomene danner
legen seg en hypotese og utreder
indikatorene på feilmodet (og
evt. Andre feilmoder eks.
influensa) = tar tempen.
•
Basert på samsvar (og ikke
samsvar eks. feber) mellom
generelle statistiske
akseptkriterier og målte verdier
stilles diagnose med prognose på
rest levetid.
Symptomer svikt (fault)
–
–
–
–
–
–
–
–
•
•
Tretthet
Kortpustethet, tung pust ved anstrengelser
eller om natten i liggende stilling.
Nattlig hoste, dårlig matlyst, hovne ben,
vektøkning på grunn av vannansamlinger og
hjertebank.
Smerter i rygg, kjeve, nakke og bryst,
«Stråling» i armer
Influensalignende plager/sykdomsfølelse
Kvalme/brekninger/kaldsvette
Fordøyelsesplager
Tilbakevendende press i brystet
Direkte årsak / Indikator
–
–
–
Alder
Høyt blodtrykk
Diabetes
-Teller
– Puls, blodtrykk, lytte
- Insulinmåling
FMSA Failure Mode Symptoms Analysis
Hydraulisk pumpe leverer
ikke nok trykk og volum:
•
Anomalitet / symptomer svikt
–
–
–
–
–
•
Aktuator går tregt
Temperatur øker
Trykktap i system
Støynivå
Synkende oljenivå
-
Tidstrend
Temperaturtrend
Trykktrend
Støytrend
Nivåtrend
Direkte årsak / Indikator
–
–
–
–
–
•
•
Forhåndsdefinerte mulige symptomer
for aktuelt feilmode
Analyse trigges av:
–
–
•
TK rutinen sjekker aktivt indikatorene
på symptomene
eller en «anomalitet» flagges via
målinger/alarmer
Basert på samsvar (og ikke samsvar)
mellom indikatorer og satte
driftsvindu stilles diagnose med
prognose på rest levetid
Desto flere symptomer som
samsvarer, desto sikrere diagnose
Driftstid- slitasje - Teller – tid / omdreininger
- Oljeprøve partikkelmåling
- Trykkmåling
•
- Vibrasjonsanalyse
Vann i olje
- Oljeprøve
Kavitasjon
- Støy/Vibrasjonsmåling
Ekstern lekkasje - Visuell inspeksjon
Intern lekkasje - Regel: Treg aktuator og trykktap og ikke
ekstern lekkasje og ikke synkende oljenivå
FMSA metodikk – ISO 13379-1
DET = Detectabilty (1-5) SEV = Severity (1-4)
DGN = Diagnosability (1-5)
PGN = Prognosability (1-5)
MPN = Monitoring Priority Number (Max 500)
FMSA systematikk
•
•
•
•
•
•
•
•
•
Listing the components involved
Listing the possible failure modes for each component;
Listing the effects of each failure mode;
Listing the causes of each failure mode;
Listing the symptoms produced by each failure mode;
Listing the most appropriate monitoring technique;
Listing the estimated frequency of monitoring;
Ranking each failure mode by detection, severity, diagnosis confidence and prognosis
confidence resulting in a monitoring priority number (MPN);
Listing the most appropriate correlation techniques
–
•
{Regelsamsvar med andre symptomer eller målinger}
Listing the frequency of monitoring for the correlation techniques.
FMECA
Kombinert FMECA
og FMSA i ett
verktøy
>MS-Excel
Inspeksjon - systematikk
• Overflate
Fremtiden er her
Statoil’s supplier Siemens has
developed a gearless turbine that
represents a major step forward in
the simplification of the technology
– and which promises to reduce
maintenance by 20%.
Man må unngå å begrense seg selv
8 år etter - Siemens 3 MW:
•
•
•
50% færre deler
12% redusert vekt
18% mer produksjon
I forhold til 2,3 MW
”As far as the laws of mathematics refer to reality, they are
not certain; and as far as they are certain, they do not refer
to reality. . . ”
Albert Einstein (1879 - 1955)
Riktig kompetanse = riktig diagnose
•
Wind turbine destroyed after 'octopus UFO' seen in
sky.
•
An octopus-shaped UFO was reported flying through the
air hours before a wind turbine was destroyed in
mysterious circumstances.
However:
•
•
The bolts securing the blade to the turbine's hub "exhibited classic signs of
fatigue failure".
Though the bolts themselves had shown no flaws, it appears that a
component part on either side had "induced stress in the bolts beyond their
design limits".