LINTAS INDUSTRIAL PARK

LINTAS
INDUSTRIAL
SANDAKAN
PARK
Built-up Area : From 15,306 ft2 / 1,422 m2
Developer & Land Owner :
Borject Development
Sdn. Bhd. (Co. Number 622997-A)
Office:
089-673 533, 671 520, 672 533
E-mail:
[email protected]
!
Registered Office Address:
Level 2, Lot 51 & 52, Bandar
Tyng, Shopping Arcade, Mile 6,
Labuk Road, Sandakan, Sabah
Land Area: 37,735 ft2 / 3,505 m2
Expected Completion : End of March
Borject Development Sdn Bhd proudly presents Lintas Industrial
Park Showroom located at Mile 8, facing Jalan Lintas Sibuga (old Fook
Kim Road). This unique showroom is well planned and it is perfect
for Automobile Industry, Furniture Industries, Hypermarkets, and
Construction Retails. A golden investment opportunity you do not
want to miss.
!
Borject Development Sdn Bhd 隆重推出 Lintas Industrial Park 展厅位
于8英哩,⾯面向 Jalan Sibuga (old Fook Kim Road)。这个独特的展厅是精
⼼心策划的,它⾮非常适合汽车⾏行业,家具⾏行业,⼤大卖场,以及更多。是⼀一个
黄⾦金投资机会。
Price RM7,800,000.00!
!
!
2 Storey Semi-Detached Industrial (Past Project)
Site Map
2 Storey Industrial Terrace (Past Project)
3 Storey Commercial Shop/Office
Lintas Industrial Showroom
Ideal for:!
- Automobile Industry!
- Furniture Industry!
- Hypermarkets!
- Construction Retails!
!适合:!
-
汽⻋车产业 !
家具业 !
⼤大卖场 !
施⼯工与建筑零售业
STRUCTURE : Reinforced concrete framework
WALLS : Brickwork
WALL FINISHES : Cement plaster on brick wall
1.5 height wall tiles to toilet
ROOFING : Metal roofing sheet
CEILING : Ground Floor - Gypsum board suspended
Ceiling with aluminium frame
WINDOWS : Aluminium frame glass window
DOORS : Front & Rear facade - Roller shutter
Toilet - PVC door
Fire Escape - Timber door
FLOOR FINISHES: Toilet – Homogeneous tiles
All other floor to be cement render
PAINTING : All interior wall – emulsion paint
All exterior wall – weather resistant paint
FENCING :
1.2m HT. Chain link
ROAD & CARPARK :
150mm THK. Concrete with BRC A8
SANITARY INSTALLATIONS : Water closet, wash basin, sink
BUILDING HEIGHT:
Min. 7.6m (25’) for Showroom Area
Min. 9.1m (30’) for Workshop Area
ELECTRICAL : All electrical wiring to be
concealed with conduits to SESB standard
FOUNDATION DESIGN:
For extend Mezzanine floor use
*NOTE: This specification is subject to variations modifications and substitutions amendments if so required by the appropriate authorities and/or recommended by the Developer’s Architect.