40AI03ee EuroNOK ® and EuroNOK ® FRW sampling shaft Instructions for installation, operation and maintenance Reliable solutions Tanks and separators 5/2013 EuroNOK and EuroNOK FRW sampling shaft 40AI03ee Contents 1 EURONOK AND EURONOK FRW SAMPLING SHAFT .................................................................. 3 1.1 1.2 1.3 2 GENERAL ........................................................................................................................................ 3 IMPORTANT TO KNOW ABOUT SAMPLING SHAFT .................................................................................. 4 HANDLING OF THE TANK ................................................................................................................... 5 TECHICAL DETAILS ......................................................................................................................... 6 2.1 OPERATION ..................................................................................................................................... 6 2.2 CONSTRUCTION OF SAMPLING SHAFT ................................................................................................ 6 2.2.1. Construction of EuroNOK (PE) .......................................................................................... 6 2.2.2. Construction of EuroNOK FRW (PE) ................................................................................. 6 2.2.3. Construction of EuroNOK (GRP) ....................................................................................... 7 2.2.4. Construction of EuroNOK FRW (GRP) .............................................................................. 7 2.3 COMPONENTS AND ACCESSORIES ..................................................................................................... 7 2.3.1. Maintenance shaft .............................................................................................................. 7 2.3.2. Cast iron cover and frame .................................................................................................. 7 2.3.3. Closing valve ...................................................................................................................... 8 3 INSTRUCTIONS FOR MOUNTING IN THE GROUND ..................................................................... 8 3.1 3.2 3.3 3.4 4 MAINTENANCE ............................................................................................................................... 14 4.1 4.2 5 INSTALLATION OF THE PE-MODEL ..................................................................................................... 8 INSTALLATION OF THE GRP-MODEL ................................................................................................ 10 FROST INSULATION ........................................................................................................................ 12 FIGURATIVE INSTALLATION INSTRUCTIONS ....................................................................................... 13 CHECK-UP MAINTENANCE ............................................................................................................... 14 CONSTRUCTION MAINTENANCE ....................................................................................................... 14 EXAMPLE OF SERVICE LOG ........................................................................................................ 14 WAVIN-LABKO OY 2(16) EuroNOK and EuroNOK FRW sampling shaft 1 1.1 40AI03ee EURONOK AND EURONOK FRW SAMPLING SHAFT General These instructions cover the installation, operation and maintenance of EuroNOK and EuroNOK FRW sampling shafts. Sampling shaft is designed to follow the oil separator system. Quality of the purified water can be controlled by means of the sampling shaft. EuroNOK includes a closing valve, which allows closing of the sewer if needed. Installation depth of EuroNOK sampling shaft can be adjusted with appropriate EuroHUK maintenance shaft. According to EN 858 standard (System for light liquids), the oil separator system includes EuroHEK® sand and sludge separator, EuroPEK® I-class oil separator, and EuroNOK® sampling shaft. Separate instructions include installation, operation and maintenance of EuroHEK sand and sludge separator and EuroPEK oil separator. EuroNOK® sampling shaft is chosen according the size of the outlet of the oil separator (DN 110, 160, 200, 250, 315, 400 or 500). EuroNOK EuroNOK FRW Sampling shaft without bypass Sampling shaft with bypass D110…D400 D400…D500 D110…D315 D400…D500 PE GRP PE GRP Sampling shafts DN110…DN400 are made of polyethylene (PE) and DN400…DN500 are made of glass reinforced plastic (GRP). Installation depth of the sampling shaft is 0.9-3.3 m measured from the bottom of inlet pipe to the ground level. Installation depth depends on which sampling shaft model is in case. Installation depths are described model by model in chapter 2.2. Maintenance shaft EuroHUK is chosen according to the installation depth. In cases where sampling shaft needs to be installed to exceptional depth, please contact Wavin-Labko via phone +358 20 1285 210 or email [email protected]. WAVIN-LABKO OY 3(16) EuroNOK and EuroNOK FRW sampling shaft 1.2 40AI03ee Important to know about sampling shaft To ensure the best possible operation of the sampling shaft, read carefully through these instructions of operation, installation and maintenance. During the installation, pay special attention on the details mentioned below to guarantee safe working conditions and separator function. Handle the sampling shaft with care. Do not drag, roll or drop it. Fasten the shaft carefully for the transportation to avoid any damage. Inspect the shaft immediately after the transport to the installation site for any damage that might have occurred during the transport. Anchor the shaft to prevent it from floating; this is the buoyancy-effect caused by the groundwater or the rainwater that pours into the excavation. For filling the installation pit it is recommended to use sieved gravel of grain size 3-16 mm. During filling of the mounting pit it is forbidden to drive with excavator closer to shaft than 1.5 m measured from the edges and ends of the tank. Fill separators with water immediately after installation and emptying. To ensure reliable and proper functioning of the separator, certain inspection and maintenance operations must be carried out. Regular maintenance plays a key role in the best possible purifying efficiency. Mark the location of the sampling shaft e.g. to property’s maintenance manual (e.g. map or the description of the location). Entering to the shaft is allowed only if all the local safety regulations are obeyed (e.g. measuring oxygen content, using of safety equipment etc.). Smoking and open fire are strictly forbidden. To avoid accidents, the shaft lid must always be closed! It is always the property owner who is responsible for preventing anything from falling into the shaft (children, animals, etc.)! WAVIN-LABKO OY 4(16) EuroNOK and EuroNOK FRW sampling shaft 1.3 40AI03ee Handling of the tank Handle the tank with care. The tank can’t be dragged, rolled or dropped. Fasten the tank properly for the transportation. Lift the tank with belts only from lifting eye bolts or circulate belts properly around the tank if forklift truck can’t be used. Avoid sudden moves when lifting the tank to ensure belts won’t slip. Inspect the well immediately after transporting it to the installation site for any damage that might have occurred during the transportation. Figure 1. Handling of the tank. WAVIN-LABKO OY 5(16) EuroNOK and EuroNOK FRW sampling shaft 2 2.1 40AI03ee TECHICAL DETAILS Operation Sampling shaft is designed to follow the oil separator system. In the bottom of sampling shaft is a water storage space, from where the water sample is taken. In the sampling shaft is a manually operated closing valve for the possibility to close down the sewer if needed. Operation of the closing valve is demonstrated in chapter 2.3.3. On page 8. 2.2 Construction of sampling shaft 2.2.1. Construction of EuroNOK (PE) 1 Tank, PE-MD 2 Inlet sewer, PE-HD 3 Outlet sewer, PE-HD 4 Closing valve 5 Handle for adjusting the closing valve, SS 6 EuroHUK 600 maintenance shaft, PE-MD 7 Ventilation outlet, PE 8 Cast iron cover Ø600 (Standard EN124) h 900…2500 mm (DN110…DN315) Figure 2. Construction of EuroNOK DN110 - DN315 sampling shaft (PE). 2.2.2. Construction of EuroNOK FRW (PE) 1 Tank, PE-MD 2 Inlet sewer (bypass), PE-HD 3 Outlet sewer, PE-HD 4 Inlet sewer (separator line), PE-HD 5 Closing valve 6 Handle for adjusting the closing valve, SS 7 EuroHUK 600 maintenance shaft, PE-MD 8 Ventilation outlet, PE 9 Cast iron cover Ø600 (Standard EN124) h 900…2500 mm (DN200/160 - 200/200) 1300…2900 mm (DN250/200 – 315/315) Figure 3. Construction of EuroNOK FRW DN200/160 - DN315/315 sampling shaft (PE). WAVIN-LABKO OY 6(16) EuroNOK and EuroNOK FRW sampling shaft 40AI03ee 2.2.3. Construction of EuroNOK (GRP) 1 Tank, GRP 2 Inlet sewer 3 Outlet sewer 4 Closing valve 5 Handle for adjusting the closing valve, SS 6 EuroHUK 800 maintenance shaft, PE-MD 7 Ventilation outlet, PE 8 Cast iron cover Ø800 (Standard EN124) 1300…2900 mm (DN400) h 1700…3300 mm (DN500) Figure 4. Construction of EuroNOK DN400 and DN500 sampling shaft (GRP). 2.2.4. Construction of EuroNOK FRW (GRP) 1 Tank, GRP 2 Inlet sewer (bypass) 3 Outlet sewer 4 Inlet sewer (separator line) 5 Closing valve 6 Handle for adjusting the closing valve, SS 7 EuroHUK 800 maintenance shaft, PE-MD 8 Ventilation outlet, PE 9 Cast iron cover Ø800 (Standard EN124) h 900…2500 mm (DN400/315 - 400/400) 1300…2900 mm (DN500/500 – 500/500) Figure 5.Construction of EuroNOK FRW DN400/315 - DN500/500 sampling shaft (GRP). 2.3 Components and accessories 2.3.1. Maintenance shaft Sampling shaft includes EuroHUK maintenance shaft as accessory. Maintenance shaft is chosen according to the installation depth. Gasket enables a water-tight installation of the maintenance shaft. 2.3.2. Cast iron cover and frame The cast iron cover and frame assembly are available for sampling shaft as accessory. Cover and frame are selected according to the traffic load at the site (1.5, 25 or 40 t). WAVIN-LABKO OY 7(16) EuroNOK and EuroNOK FRW sampling shaft 40AI03ee 2.3.3. Closing valve The closing valve of the sampling shaft is hand-operated. Handle for adjusting the closing valve is extended with a separate part so that the valve can be closed from the ground surface without entering the shaft. If ordered separately, valve can be delivered with electric motor equipment. Note! Motor-operated equipment is available only for nonhazardous circumstances (can’t be installed in explosive space). In EuroNOK PE sampling shafts closing valve is fixed to inlet sewer and in EuroNOK FRW PE/GRP and EuroNOK GRP sampling shafts to outlet sewer. Closing valve open Closing valve closed Figure 6. Open/closed positions of the closing valve. 3 3.1 INSTRUCTIONS FOR MOUNTING IN THE GROUND Installation of the PE-model These instructions are suitable for EuroNOK PE DN110…DN400 and EuroNOK PE FRW DN200/160…DN315/315 sampling shafts. 1) Compact a horizontally leveled, 30 cm thick layer of sieved gravel to the bottom of the pit. For filling the pit it is recommended to use sieved gravel of grain size 3-16 mm. 2a) Sampling shaft anchors to the ground by itself if it is installed right and the ground allows water to infiltrate easily. In this case separate anchoring is not needed. If soil type does not allow anchoring by itself, the shaft should be anchored to prevent the buoyant force of water from moving the shaft. If separate anchoring isn’t performed, lift the shaft on to top of the sieved gravel layer and pour about 30 cm layer of water to the shaft to stabilize it. 2b) Anchoring slab: An anchoring slab should be cast, if the ground water level in the area is higher than the bottom of the shaft the water infiltration to the ground is weak and the rain water may gather into the mounting pit the bearing capacity of the ground is weak If needed, cast reinforced anchoring slab on the sieved gravel layer and 4 pcs min. Ø10 mm stainless steel lugs to slab to anchor the shaft. Determine the positions of the stainless steel lugs before casting the concrete slab. Lift the shaft on the concrete slab and pour about 30 cm layer of water to the shaft to stabilize it. Install the sampling shaft to a vertical position. Use 2 pcs non-stretching polyester belts (width 25 mm, weight capacity 2000 kg) for anchoring the sampling shaft. Slip belts behind lifting eye bolts around the collar of the sampling shaft in a way that both belts go around half a round. Fasten the heads of both belts to the lugs of the slab (see Figure 7). WAVIN-LABKO OY 8(16) EuroNOK and EuroNOK FRW sampling shaft 40AI03ee 1. Concrete slab K30-2. Steel reinforcement A500HW T8 #200 2. Stainless steel lugs T10 3. Non-stretching anchoring belts Figure 7. Anchoring the shaft to prevent the buoyant force of water in the ground (if necessary). 3) Install inlet and outlet sewers to the sampling shaft. Install a rubber gasket onto the bottom edge of the maintenance shaft. Set the EuroHUK maintenance shaft in a vertical position into the installation frame. Lock the retaining latches (see Figure 8). Install the ventilation pipe onto the ventilation outlet of the maintenance shaft (if needed). Fill the shaft with water to the level of the outlet sewer. Continue filling and compacting the pit in 30 cm layers. Avoid using heavy machinery when compacting layers on top of the shaft and on inlet and outlet sewers. Continue filling the pit until the ground level is reached. Figure 8. Locking EuroHUK maintenance shaft. 4) After filling the pit, cut the maintenance shaft to right height. Note that the cover and frame will give about 100 - 150 mm extra height to the maintenance shaft. After cutting the maintenance shaft to right height, install the frame of the cover and frame assembly on the maintenance shaft. The frame must lean on the surrounding compacted layers of sieved WAVIN-LABKO OY 9(16) EuroNOK and EuroNOK FRW sampling shaft 40AI03ee gravel or a load compensation plate and the asphalt layer instead of leaning against the maintenance shaft. In an area of heavy and medium weight traffic, a load compensation plate and a layer of asphalt must be laid to equalize the wheel loads (see Figure 9). A Tank B EuroHUK maintenance shaft C Asphalt D Traffic load compensation plate – Concrete: K30-2 – Steel reinforcement: A500HW T10 #150 E T10 Ring F Cast iron cover and frame Figure 9. Structure of the load compensation slab. 3.2 Installation of the GRP-model These instructions are suitable for EuroNOK DN400…DN500 and EuroNOK FRW DN400/315…DN500/500 sampling shafts. 1) Compact a horizontally leveled, 30 cm sieved gravel layer to the bottom of the pit. For filling the pit it is recommended to use sieved gravel of grain size 3-16 mm. The shaft should be anchored to prevent the buoyant force of water from moving the shaft. Recommended choice for anchor is square shaped reinforced concrete slab. An anchoring slab should be cast, if the ground water level in the area is higher than the bottom of the shaft the water infiltration to the ground is weak and the rain water may gather into the mounting pit the bearing capacity of the ground is weak Size of each side of the concrete slab must be shaft diameter + 1000 mm and thickness must be at least 150 mm. Anchoring is done using special fasteners, threaded studs and KEMLA 10 hammer-in capsules. 2) Cast horizontal reinforced anchoring slab or place already casted concrete slab on the sieved gravel layer. Use e.g. concrete K30-2 and A500HW T8 #200 reinforcement for casting the slab. The anchoring slab must be square shaped. Remove the transportation subsidy and place the shaft to the middle of the anchoring slab (Figure 10). Pour 30 cm layer of clean water to the shaft to stabilize it. WAVIN-LABKO OY 10(16) EuroNOK and EuroNOK FRW sampling shaft 40AI03ee Figure 10. Principle of anchored GRP sampling shaft. Mark fasteners’ places to the concrete slab. Drill 100 mm deep Ø12 mm hole to the dry slab for each fastener (Figure 10 and Figure 11). Holes drilled with diamond drill must be coarsened. Keep the mounting pit dry until the anchoring is ready. Figure 11. Attaching anchoring parts to the concrete slab. Brush, vacuum or blow the holes clean with care. Install hammer-in capsules KEMLA 10 to the holes. Hammer threaded bar to bottom of the hole and twist it a couple of times. This way hammer-in capsule’s mass spreads to whole anchoring area. Hammer-in capsules’ mass hardening and loading time depends on temperature. Temperature More than + 20 oC + 10 oC + 0 oC Below – 5 oC Hardening time 10 minutes 20 minutes 1 hour 5 hours Ready to use 2 hours 4 hours 10 hours 25 hours Install fastener to its place after the hardening time and screw the nut to a 150 Nm moment. 3) Start filling the pit with sieved gravel in 30 cm layers. For filling the pit it is recommended to use sieved gravel of grain size 3-16 mm. Compact layers around the shaft with care. Keep filling the pit to the level of inlet and outlet sewers. Install inlet and outlet sewers. WAVIN-LABKO OY 11(16) EuroNOK and EuroNOK FRW sampling shaft 40AI03ee Install a rubber gasket onto the bottom edge of the maintenance shaft (Figure 12). Set the EuroHUK maintenance shaft in a vertical position into the installation frame. Lock the retaining latches (Figure 12). Install the ventilation pipe onto the ventilation outlet of the maintenance shaft (as needed). Fill the shaft with clean water to the level of the outlet sewer. Continue filling the pit until the ground level is reached. Avoid using heavy machinery when compacting layers on top of the shaft and on inlet and outlet sewers. 1. Retaining latch 2. Rubber gasket 3. Maintenance shaft installation sleeve 4. EuroHUK 600 maintenance shaft Figure 12. Locking EuroHUK maintenance shaft. 4) 3.3 After cutting the maintenance shaft to right height, install the frame of the cover and frame assembly, see part 4) on page 9. Frost insulation Sampling shaft must be installed in a way it won’t freeze. The required frost insulation depends on the installation depth of the sewers and local circumstances. However, it is recommended to always construct frost protection in area where frost may exist. Frost insulation should be done with insulation plates. Dimensioning of the plate’s thickness and width is case-specific. WAVIN-LABKO OY 12(16) EuroNOK and EuroNOK FRW sampling shaft 3.4 40AI03ee Figurative installation instructions WAVIN-LABKO OY 13(16) EuroNOK and EuroNOK FRW sampling shaft 4 40AI03ee MAINTENANCE Special attention should be given to the maintenance of the sampling shaft to ensure its effective operation throughout the life span of the system. The need for maintenance depends on the location and purpose of the system. If the separator system is used to process waste waters produced at vehicle washing sites or for other purposes where the separator system is exposed to a degree of solid matter load, its operation should be monitored and maintenance procedures performed more often than e.g. in systems which process rain waters gathered from asphalted areas. It is recommended to keep a service log of all draining and maintenance operations. All maintenance operations and error situations concerning the sampling shaft should be entered in this log. An example of service log is demonstrated in chapter 5. 4.1 Check-up maintenance The possible solids gathered on the bottom of the shaft must be cleaned. The sampling shaft should be emptied thoroughly at least once in six months and the dirt on the walls must be cleaned with water. At the same time it is recommended to oil the moving parts of valve with waterproof vaseline. Check the operation of the valve by closing/opening it. 4.2 Construction maintenance Empty the sampling shaft for inspection at least every five years. Clean the inside constructions with e.g. tap water using a high pressure washer. Drain the cleaning water completely from the sampling shaft with the suction hose of the container truck before checking the shaft. Check the tightness of the sampling shaft, condition of the body, inner surfaces of the shaft and condition of inner structures. 5 EXAMPLE OF SERVICE LOG Date Emptying, inspection, observation, procedure Performer 05.06.99 Installed the sampling shaft. D. Sludger 04.04.00 Sampling shaft emptied, valve oiled M. P. Tyer 29.10.00 Sampling shaft emptied M. P. Tyer 02.03.01 Sampling shaft emptied, valve oiled M. P. Tyer 22.09.01 Sampling shaft emptied, valve oiled M. P. Tyer 15.03.02 Sampling shaft emptied M. P. Tyer 16.09.02 Sampling shaft emptied, valve oiled, condition of the tank checked D. Sludger / M. O.K. P. Tyer WAVIN-LABKO OY 14(16) EuroNOK and EuroNOK FRW sampling shaft 40AI03ee NOTES: WAVIN-LABKO OY 15(16) Wavin-Labko Oy www.wavin-labko.fi Labkotie 1 FI-36240 Kangasala Finland Tel. +358 20 1285 200 Fax. +358 20 1285 530 E-mail: [email protected]
© Copyright 2024