AGENDA
MUNICIPAL SERVICES COMMITTEE
October 28, 2014
MEMBERS
Margaret McAustin, Chair, District 2
Bill Bogaard, Mayor
Terry Tornek, District 7
STAFF
Phyllis Currie, General Manager
Valerie Flores, Recording Secretary
MISSION STATEMENT
The City of Pasadena is dedicated to delivering exemplary municipal services,
responsive to our entire community and consistent
with our history, culture and unique character.
Public meeting begins at 4:00 p.m.
Agendas and supporting documents are available on the Internet at
http://www.cityofpasadena.net/commissions
Materials related to an item on this Agenda submitted to the Municipal Services Committee after
distribution of the agenda packet are available for public inspection in the City Clerk’s Office at 100 N.
Garfield Avenue, Room S-228,
Pasadena, during normal business hours.
REGULAR MEETING OF THE
MUNICIPAL SERVICES COMMITTEE
Tuesday, October 28, 2014, 4:00 P.M.
100 North Garfield Avenue, Pasadena, Council Chambers
AGENDA
1. CALL TO ORDER/ROLL CALL
2. PUBLIC COMMENTS ON MATTERS NOT ON THE AGENDA
3. APPROVAL OF MINUTES – September 23, 2014 – Regular Meeting*
4. NEW BUSINESS
A. Authorization to enter into a Master Inter-Utility Agreement between the City of Pasadena and
Southern California Gas Company*
B. Authorization to enter into a Contract with Southern California Gas Company in the amount of
$1,417,400 for the Natural Gas Pipeline/Meter Upgrade for the Glenarm Repowering Project*
5. INFORMATION ITEMS
A. Bicycle Transportation Plan* (Transportation)
B. Water Conservation Update
C. GT-5 Repowering Project Update*
6. ADJOURNMENT
* Attachment
NEXT REGULAR MEETING
November 11, 2014
Margaret McAustin, Chair
Municipal Service Committee
POSTING STATEMENT:
I HEREBY CERTIFY that this Agenda, in its entirety, was posted on the Council Chamber Bulletin Board S249, the bulletin board in the rotunda area at City Hall, 100 North
Garfield Avenue, the City Clerk’s Office, and a copy was distributed to the Central Library for posting on the 23rd day of October, 2014 by 4:00 p.m.
Sharon Stovall
DISTRIBUTION:
MSC Committee Members
City Council
City Manager
City Attorney
Central Library
City Clerk
Director of Public Works
Public Information Officer
General Manager
Director of Planning and Permitting
Los Angeles Times
La Opiñion
Pasadena Weekly
Pasadena Star-News
Neighborhood Connections
Pasadena Journal
In compliance with the Disabilities Act of 1990, listening assistive devices are available from the City Clerk’s Office with a 24-hour advance notice. Please call (626) 7447062 or (626) 744-4785 to request use of a listening device. Language translation services are available for this meeting by calling (626) 744-4386 at least 24 hours in
advance. Habra servicio de interpretactión disponible para éstas juntas llamando al (626) 744-4386 por lo menos con 24 horas de anticipactión. Items on the agenda may
not be called in the order listed.
CITY OF PASADENA
REGULAR MEETING OF THE CITY COUNCIL
MUNICIPAL SERVICES COMMITTEE
SEPTEMBER 23, 2014
COUNCIL CHAMBERS
100 N. GARFIELD AVENUE (2ND FLOOR)
OPENING
The Chair called the regular meeting of the Municipal Services Committee to
order 4:00 p.m.
ROLL CALL:
Councilmember Margaret McAustin, Chair
Mayor Bill Bogaard (Arrived at 4:03 pm)
Councilmember Terry Tornek
Staff:
Michael Beck, City Manager
Julie Gutierrez, Assistant City Manager
Lisa Hosey, Deputy City Attorney
Phyllis Currie, General Manager, Water and Power
Siobhan Foster, Director of Public Works
Leesa Nayudu, Resource Planning Manager, Water and Power
Art Silva, Power Production Superintendent
Gurcharan Bawa, Assistant General Manager, Water and Power
Valerie Flores, Recording Secretary
PUBLIC COMMENT
No one appeared for public comment.
APPROVAL OF MINUTES
It was moved by Councilmember Tornek, seconded by the Chair, to approve
the minutes of June 24, 2014 (regular meeting), and July 22, 2014 (regular
meeting), August 12, 2014 (regular meeting), September 9, 2014 (regular
meeting) as submitted. (Motion unanimously carried) (Absent: Mayor
Bogaard)
INFORMATION ITEM
Mayor Bogaard
(Arrived at 4:03 p.m.)
RECEIVE AND FILE THE DRAFT ZERO WASTE STRATEGIC PLAN FOR
FUTURE DISCUSSION AT THE SPECIAL MSC MEETING ON OCTOBER
7, 2014
Siobhan Foster, Director of Public Works submitted the Draft Zero Waste
Strategic Plan to the Committee as an information item.
On the order of the Chair, and by consensus of the Committee, the
information was received and filed.
Morey Wolfson, Pasadena resident, spoke of issues related to polystyrene
and asked that the initiative be considered separate from the Zero Waste
Plan due to the proposed implementation schedule outlined in the Zero
Waste Strategic Plan.
NEW BUSINESS
AB 2514 Energy Storage System Procurement Targets and Policies
Leesa Nayudu, Resource Planning Manager, Water and Power, provided a
PowerPoint presentation summarizing the agenda report and responded to
questions.
It was moved by Councilmember Tornek, and seconded by Mayor Bogaard,
to approve staff’s recommendation, and forward the item to the City Council
for consideration. (Motion unanimously carried) (Absent: None)
01
9/23/2014
INFORMATION ITEMS
GT-5 REPOWERING PROJECT UPDATE
Art Silva, Power Production Superintendent, provided a PowerPoint
presentation summarizing the agenda report and responded to questions.
Antonio Watson, Project Manager, provided an update of the Local
Participation Plan and responded to questions.
Following brief discussion, on the order of the Chair, and by consensus of
the Committee, the information was received and filed.
NEW BUSINESS
APPROVE A PROJECT CONTINGENCY AMOUNT OF $2,500,000 FOR
EXISTING CONTRACTS RELATED TO THE LOCAL GENERATION
REPOWERING PROJECT-PHASE II (“CIP 3194”) AND AUTHORIZE THE
CITY MANAGER TO AMEND AND/OR APPROVE CHANGE ORDERS
FOR SUCH CONTRACTS IN AMOUNTS NOT TO EXCEED THE
PROJECT CONTINGENCY AMOUNTS; INCREASE THE BUDGET BY
$5,000,000;
APPROVE
AN
ADDITIONAL
$5,000,000
OF
APPROPRIATION TO CIP 3194 FOR FISCAL YEAR 2015; AND
TRANSFER $5,000,000 FROM THE CURRENTLY APPROVED LIGHT
AND POWER FUND CAPITAL IMPROVEMENT PROJECTS TO CIP 3194
Phyllis Currie, General Manager, Water and Power, introduced the agenda
item, provided a synopsis of the staff recommendations and responded to
questions.
Gurcharan Bawa, Assistant General Manager, Water and Power, provided a
PowerPoint presentation summarizing the agenda report and responded to
questions.
Councilmember Tornek expressed concerns with allocating a substantial
amount of funds for a contingency for unforeseen expenses and stated he
does not support staff’s recommendation.
The Chair spoke in favor of the staff recommendation, stating that staff has
committed to providing monthly reports to the Municipal Services Committee
including information on any future or anticipated expenditures from the
Project’s contingency fund.
Following discussion, it was moved by the Chair, seconded by Mayor
Bogaard, to approve staff’s recommendation, and forward the item to the
City Council for consideration.
AYES: Councilmember McAustin, Mayor Bogaard
NOES: Councilmember Tornek
(Motion Passed)
ADJOURNMENT
On the order of the Chair, the regular meeting of the Municipal Services
Committee was adjourned at 5:43 p.m.
_________________________
MARGARET McAUSTIN, Chair
Municipal Services Committee
ATTEST:
____________________
Valerie Flores
Recording Secretary
02
9/23/2014
4.A
4.B
5.A
MEMORANDUM - CITY OF PASADENA
DEPARTMENT of TRANSPORTATION
DATE:
October 28, 2014
TO:
Municipal Services Committee
FROM:
Frederick C. Dock, Director
SUBJECT: ACTION PLAN FOR PROTECTED BIKEWAYS
BACKGROUND:
In July 2013 the Municipal Services Committee (Committee) received a presentation on
the Draft Bicycle Transportation Plan. Following public input and discussion the
Committee directed staff to seek input from the cycling community to develop a “bolder”
approach to the proposed Bikeway facilities to be included in the Draft Bicycle
Transportation Plan.
In December 2013 staff updated the Committee that a large working group of
representatives from the cycling community, business districts and homeowners
associations convened a workshop to discuss how the draft plan could be modified to
meet the direction of the Municipal Services Committee and community concerns.
Staff engaged an analysis of Bicycle Stress Level Mapping to better communicate
conditions on streets for bicycling in the City of Pasadena. The stress level map was
used as a visual means for focusing discussion on corridors. The integration of the
stress level map and the draft bike plan illustrated the limited efficiency of bike routes
that do not provide space for cyclists on the street. The following corridors were
identified by the working group for new protected routes:
o North/South: El Molino, Wilson, Sierra Bonita, and Craig
o East/West: Washington, Orange Grove, Villa, Union, Green, Colorado and
Del Mar.
February 2014 a Request for Proposals was advertised and KOA Corporation was hired
to conduct a Bikeway Analysis and Feasibility Study on the identified routes.
June 2014 KOA Corporation completed its analysis. The analysis includes all physical
changes needed to implement the protected bikeways along with any negative affects to
available parking and congestion. The analysis also includes all construction costs for
the proposed bikeways. July 2014 staff updated the Municipal Services Committee on
the findings of the bikeway study and that of the working group’s recommendations.
Public Outreach
In June 2014 staff held a workshop for the working group where KOA presented their
findings and the working group ranked the corridors for protected bikeways.
In August 2014 staff held an open house to present the findings to the general public
and gain their input. On October 2, 2014 staff held an additional open house focused
Municipal Services Committee
October 28, 2014
Page 2 of 3
on the business community to present the findings and gain input. On October 23, 2014
staff will present the Action Plan to the Transportation Advisory Commission.
Action Plan for Protected Bikeways
Based upon the findings of the Bikeway Feasibility Study and input received through
public outreach staff developed the following prioritized action plan for project
implementation. This priority list will assist staff in developing grant applications and
securing funding to construct these projects:
1. Cordova Street – Road Diet and Class II Bike Lanes (Arroyo Parkway to Hill
Street). Metro grant funding secured. To be completed by 2017.
2. Union Street - Two-way Cycle Track (Arroyo Parkway to Hill Street)
3. Colorado Boulevard (East) - Buffered Bike Lane (Holliston Avenue to Madre
Street)
a. Holliston Avenue (Greenway - Union Street to Cordova Street)
4. Greenways
a. Wilson Avenue
b. Villa Street
c. Craig Avenue
d. Sierra Bonita Avenue
e. El Molino Avenue
5. Orange Grove Boulevard - Buffered Bike Lane
6. Washington Boulevard - Buffered Bike Lane (Lincoln to El Molino Avenues)
While Green Street and Del Mar Boulevard were identified by the community as
candidate corridors for protected bike facilities the staff recommendation for the
prioritized implementation does not include Green Street because of its proximity to
Cordova Street (which serves the same purpose) and the potential impact a Cycle
Track would have to on-street parking. Del Mar Boulevard was eliminated because it
received the lowest ranking and any bikeway improvements would include a road diet to
Del Mar Boulevard which is designated as a mobility corridor in the City’s General Plan.
Municipal Services Committee
October 28, 2014
Page 3 of 3
NEXT STEPS:
Staff will incorporate the recommend action plan into a revised Draft Bicycle
Transportation Plan. In conjunction with the proposed protected bikeways and
greenways, staff will use the Bicycle Stress Level Map to develop a network of
comfortable streets for cycling that will be added to the Plan and that can be
implemented at a relatively low cost. A public outreach campaign will be continued
during this process to gain additional input and support.
Staff will then return to the Municipal Services Committee in spring 2015 with the
revised Draft Bicycle Transportation Plan for consideration by City Council.
Prepared by:
Approved by:
Richard W. Dilluvio
Senior Transportation Planner
Frederick C. Dock, PE AICP
Director of Transportation
Attachments:
1. 6/24/2014 KOA Corporation’s Pasadena Bikeway Analysis and Feasibility
Study Working Group Presentation.
2. Map of Proposed Bikeways
Attachment 1
Pasadena Bikeway Analysis and Feasibility
Study Working Group Presentation
City of Pasadena
June 24, 2014
BACKGROUND
Pasadena Draft Bicycle
Transportation Plan
Pasadena General Plan Update
Pasadena Bikeway Analysis &
Feasibility Study
2
CORRIDOR CONCERNS
 Bicycle Transportation Plan proposed Class II bike lanes on
east-west corridors and enhanced Class III bike routes on
north-south-corridors.
 This project investigates the feasibility of providing higher
level bike facilities.
Source: KOA
Source: Internet
3
PASADENA BIKEWAY ANALYSIS AND
FEASIBILITY STUDY OBJECTIVES
 Determine feasibility of installing cycle tracks or
buffered bike lanes on east/west corridors and bicycle
boulevards on north/south corridors. Identify any
significant obstacles or issues;
 Calculate impact of the proposed bike facilities on
intersection and segment Level-of-Service;
 Develop conceptual cross-sections; and
 Estimate construction and yearly maintenance cost of
the proposed bicycle facilities.
4
PASADENA BIKEWAY ANALYSIS AND FEASIBILITY STUDY MAP
 7 East-West Corridors
 4 North-South Corridors
 Total 38 miles in length
5
PROJECT PROCESS
•
•
•
•
•
•
•
Review Documents
Feasibility Analysis and Data
Assembling
Alternative Development
East-West Corridors
North-South Corridors
City Reviews
Working Group Presentation
Municipal Services Committee
Presentation
General Public
6
TYPICAL BIKEWAY CLASSIFICATION
CLASS I
CLASS II
CLASS III
7
CURRENT CITY WIDE BIKE MAP
8
Bike Boulevard
• Shared roads with
some preferential
treatment for
bicycles
• Traffic calming
• Quieter and more
attractive
Long Beach Vista Street Bike Boulevard
Pasadena
Pasadena
9
Green Street, Seattle
Cycle Track
(Protected Bikeway)
Source: KOA
Long Beach 3rd and Broadway Cycle Track
Cycle tracks are bikeways
located in roadway right-of-way
but separated from vehicle lanes
by physical barriers
Source: KOA
Temple City Rosemead Boulevard
Cycle Track
CONTRAFLOW AND TWO WAY CYCLE TRACK
Contraflow Cycle Track
Two-Way Cycle Track
Source: Internet
Source: Internet
Boulder, Colorado
Source: Internet
Brooklyn, NY
Source: Internet
Madison, Wisconsin
Seattle, Washington
11
BUFFERED BIKE LANE
Source: Internet
Buffered Bike Lane in New York
Source: KOA
Buffered Bike Lane in Pasadena
Source: Internet
Source: KOA
Buffered Bike Lane in Australia
Buffered Bike Lane along South Marongo, Pasadena
12
EAST - WEST CORRIDORS
- BUFFERED BIKE LANE
- CYCLE TRACK
13
Washington Blvd from
Lincoln Ave to Hill Ave (2.2 Mile)
Existing
Cycle Track
Daily
Peak
Hour Vehicular
Hours
Volume Capacity Traffic Over
Parking Parking
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Cost
Both
358
N/A
N/A
1,455
3,200
4
0
Sides
Both
152
206 $761,000
1,455
1,600
2
*0*
Sides
Buffered Bike
Lane
1,455
3,200
4
0
None
0
358
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
14
$153,000
Washington Blvd from
Hill Ave to Allen Ave (0.5 Mile)
Existing
Cycle Track
Buffered Bike
Lane
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
Cost
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
89
N/A
N/A
1,520
3,200
4
0
Sides
Both
45
44 $157,000
1,520
1,600
2
*0*
Sides
Both
89
0
$38,000
1,520
1,600
2
*0*
Sides
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
15
Washington Blvd from
Altadena Dr to Sierra Madre Blvd
(0.8 Mile)
Existing
Cycle Track
Buffered Bike
Lane
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
Cost
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
118
N/A
N/A
1,010
3,200
4
0
Sides
Both
73
45 $190,000
1,010
1,600
2
*0*
Sides
Both
118
0
$56,000
1,010
1,600
2
*0*
Sides
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
16
Orange Grove Blvd from
Columbia St to Green St (1.4 Mile)
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
Sides
390
N/A
1,310
3,200
4
0
(Non
Peak)
Existing
Buffered Bike
Lane
1,310
1,600
2
*0*
None
0
390
*Parking Allowed Except During Peak Hours
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
17
Cost
N/A
$90,000
Orange Grove Blvd from
Green St to Wilson Ave (2.5 Mile)
Existing
Cycle Track
Buffered Bike
Lane
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
Cost
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
248
N/A
N/A
1,310
3,200
4
0
Sides
Both
62
186 $1,779,000
1,310
1,600
2
*0*
Sides
Both
248
0
$217,000
1,310
1,600
2
*0*
Sides
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
18
Orange Grove Blvd from
Wilson Ave to Sierra Madre Blvd (2.0 Mile)
Existing
Cycle Track
Buffered Bike
Lane
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
Cost
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
1,310
3,200
4
0
515
N/A
N/A
Sides
Both
268
247 $888,000
1,310
1,600
2
0
Sides
Both
515
0
$200,000
1,310
1,600
2
0
Sides
19
Orange Grove Blvd from
Sierra Madre Blvd to
Sierra Madre Villa Ave (0.7 Mile)
Existing
Buffered Bike
Lane
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
159
N/A
1,310
3,200
4
0
Sides
1,310
20
1,600
2
0
None
0
159
Cost
N/A
$70,000
Villa St from
Lincoln Ave to Los Robles Ave (0.7 Mile)
Existing
Peak
Daily
Hour Vehicular
Hours
Volume Capacity Traffic Over
Parking Parking
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
North
550
1,600
2
0
Side
105
N/A
Cannot install buffered bike
lane or cycle track on either
side of Villa Street
21
Cost
N/A
Villa St from
Los Robles Ave to Altadena Dr (2.5 Mile)
Existing
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
730
1,600
2
0
Sides
602
N/A
Buffered Bike
Lane
730
22
1,600
2
0
None
0
602
Cost
N/A
$300,000
Union St from
St John Ave to Garfield Ave (0.7 Mile)
Peak
Daily
Hour Vehicular
Hours
Volume Capacity Traffic Over
Parking Parking
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Cost
Existing
750
1,600
2
0
Varies
70
N/A
N/A
Buffered Bike
Lane
750
800
1
*0*
Varies
46
24
$59,000
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
23
Union St from
Garfield Ave to Lake Ave (0.7 Mile)
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
101
N/A
710
2,400
3
0
Sides
Existing
Cost
N/A
Contraflow
Cycle Track
and w/ Flow
Shared Lane
710
1,600
2
0
South
Side
74
27
$390,000
2 Way Cycle
Track
710
1,600
2
0
Both
Sides
74
27
$985,000
24
Union St from
Lake Ave to Hill Ave (0.6 Mile)
Existing
Contraflow
Cycle Track
2 Way Cycle
Track
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
Cost
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
143
N/A
N/A
750
2,400
3
0
Sides
Both
105
38 $248,000
750
1,600
2
0
Sides
Both
124
19 $595,000
750
1,600
2
0
Sides
25
Green St from
Pasadena Ave to Los Robles Ave (0.7 Mile)
Existing
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
79
N/A
1,250
2,400
3
0
Sides
Contraflow
Cycle Track
and w/ Flow
Shared Lane
2 Way Cycle
Track
26
Cost
N/A
1,250
1,600
2
0
North
Side
51
28
$455,000
1,250
1,600
2
0
Both
Sides
51
28
$1,157,000
Green St from
Los Robles Ave to Lake Ave (0.5 Mile)
Existing
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
101
N/A
1,040
2,400
3
0
Sides
Contraflow
Cycle Track
and w/ Flow
Shared Lane
2 Way Cycle
Track
27
Cost
N/A
1,040
1,600
2
0
North
Side
82
19
$329,000
1,040
1,600
2
0
Both
Sides
82
19
$856,000
Green St from
Lake Ave to Hill Ave (0.6 Mile)
Existing
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
141
N/A
800
2,400
3
0
Sides
Contraflow
Cycle Track
and w/ Flow
Shared Lane
2 Way Cycle
Track
28
Cost
N/A
800
1,600
2
0
North
Side
117
24
$317,000
800
1,600
2
0
Both
Sides
117
24
$665,000
Colorado Blvd from
Orange Grove Blvd to Arroyo Pkwy (0.7 Mile)
Existing
Buffered Bike
Lane
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
Cost
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
161
N/A
N/A
1,520
3,200
4
0
Sides
Both
161
0
$93,000
1,520
1,600
2
0
Sides
29
Colorado Blvd from
Arroyo Pkwy to Sycamore Ave (4.0 Mile)
Existing
Buffered Bike
Lane
Daily
Peak
Hours
Hour Vehicular
Parking Parking
Volume Capacity Traffic Over
Cost
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Both
720
N/A
N/A
2,050
3,200
4
0
Sides
Both
720
0
$504,000
2,050
1,600
2
6
Sides
30
Del Mar Blvd from
St John Ave to Lake Ave (1.3 Mile)
(Mobility Corridor per 2004 GP)
Existing
Cycle Track
Peak
Daily
Hour Vehicular
Hours
Volume Capacity Traffic Over
Parking Parking
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Cost
Both
124
N/A
N/A
1,820
3,200
4
0
Sides
Both
31
93
$468,000
1,820
1,600
2
2*
Sides
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
31
Del Mar Blvd from
Lake Ave to Halstead St. (3.1 Mile)
(Mobility Corridor per 2004 GP)
Existing
Cycle Track
Peak
Daily
Hour Vehicular
Hours
Volume Capacity Traffic Over
Parking Parking
(Veh) (Veh/Hr) Lanes Capacity Parking Spaces Loss
Cost
Both
498
N/A
N/A
2,180
3,200
4
0
Sides
Both
208
290 $983,000
2,180
1,600
2
5*
Sides
* Thru traffic will be blocked by left turns.
(No two-way left turn lane)
32
EAST – WEST CORRIDOR CONSTRUCTION COST ESTIMATES
Corridor
Washington
Orange Grove
Villa
Union
Green
Del Mar
Colorado
Buffered Bike 2 - Way Cycle
Lane
Track
from
To
Cycle Track
Lincoln
Hill
Altadena
Columbia
Green
Wilson
Sierra Madre
Lincoln
Los Robles
St. John
Garfield
Lake
Pasadena
Los Robles
Lake
St. John
Lake
Orange Grove
Arroyo
Hill
Allen
Sierra Madre
Green
Wilson
Sierra Madre
Sierra Madre Villa
Los Robles
Altadena
Garfield
Lake
Hill
Los Robles
Lake
Hill
Lake
Halstead
Arroyo
Sycamore
$761,000
$157,000
$190,000
N/A
$1,779,000
$888,000
N/A
N/A
N/A
N/A
$390,000 1
$248,000
$455,000 1
$329,000 1
$317,000 1
$468,000
$983,000
N/A
N/A
$153,000
$76,000
$56,000
$90,000
$217,000
$200,000
$70,000
N/A
$300,000
$59,000
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$93,000
$504,000
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$985,000
$595,000
$1,157,000
$856,000
$665,000
N/A
N/A
N/A
N/A
$8,927,000
$1,818,000
$4,258,000
Total
1 Contraflow Cycle Track w/ Buffered Bike Lane
33
NORTH-SOUTH CORRIDORS
- Bike Boulevard
Recommended treatments subject to future analysis
34
North-South Bicycle Boulevards
Bicycle Boulevards are recommended to:
• Provide bike preferential treatment for at least
one location,
• Minimize the number of stop signs facing
bicyclists,
• Slow the speeds or reduce the volume of
motor vehicles, and
• Ease the passage of cyclists through barriers
such as busy streets or physical obstructions.
The result is a more complete street.
35
PASADENA BIKEWAY ANALYSIS AND FEASIBILITY STUDY MAP
 7 East-West Corridors
 4 North-South Corridors
 Total 38 miles in length
36
El Molino Ave Bike Blvd north of I-210
1. Atchison St: Remove N-S stop signs,
install median island chokers .
1
2. Elizabeth St.: Remove N-S stop signs,
install median island chokers.
2
3. Washington Blvd.: Insert a southbound
bike lane, similar to the Marengo Bike
Boulevard.
3
4. Claremont St.: Remove N-S stop signs.
5. Orange Grove Blvd.: Install choker and
allow only bicycles northbound in a
contra-flow bike lane, similar to Marengo
treatment. Install northbound bike box
(requires FHWA and CTCDC approval.)
6. I-210: Install Class II bike lanes on bridge.
Provide for bike detection at signals at
Maple St and Corson St.
37
4
5
6
Source: Google Maps
El Molino Ave Bike Blvd north of I-210
Median traffic calmer
Fletcher Avenue, South
Pasadena
Source: Google Streetview
One way street with
contra-flow bike lane
and with-flow
curbside parking
Marengo Avenue at
Washington Boulevard
Source: KOA
38
El Molino Ave Bike Blvd south of I-210
1. Locust St to Green St.: Prohibit parking on west
side. Install Class II bike lanes. Install bike
detection at signals.
2. Cordova St.: Right turn only except bikes,
southbound.
1
2
3. Del Mar Blvd.: Install bike detection.
4. California Blvd.: Right turn only except bikes,
northbound.
3
5. Cornell Road: Remove N-S stop signs, install
median traffic calming islands.
4
6. Alpine St.: Install roundabout.
5
7. Pinehurst Dr.: Install traffic circle, remove N-S
stop signs.
8. Woodland Rd.: Convert the two roadways into
one-way roads. Install a contraflow southbound
bike lane on the northbound roadway. Install
stop signs for southbound motorists.
9. Bonita Dr.: Install traffic circle, remove N-S stop.
39
6
.
7
8
9
Source: Google Maps
El Molino Ave Bike Blvd south of I-210
Vista Street bike boulevard,
Long Beach
Source: KOA
Right turn only except
bikes
Roundabout
Vista Street bike boulevard,
Long Beach
Source: KOA
Traffic circle
Vista Street bike boulevard,
Long Beach
Source: KOA
40
Wilson Ave Bike Blvd
1
1. Washington Blvd.: Install median island on
Washington Blvd to serve as refuge for
peds and cyclists. South leg of Wilson
Ave. becomes right-in-right-out.
2
2. Orange Grove Blvd.: Install right-in-rightout signal.
3. I-210: Install Class II bike lanes on bridge.
Install bike detection at Maple St. and
Corson St.
3
4. Locust St. to Colorado Blvd.: Prohibit
parking on west side, install Class II bike
lanes.
4
5. Colorado Blvd., Cordova St., and Del Mar
Blvd.: Install bike detection.
5
6. San Pascual St. : Install roundabout.
6
7. California Blvd.: Remove pedestrian push
buttons on all corners.
7
41
Source: Google Maps
Wilson Ave Bike Blvd
Right-in-right-out with
median refuge island at
Washington Blvd &
Orange Grove Blvd.
Santa Monica Blvd. in West
Hollywood
Source: Google Streetview
42
Sierra Bonita Ave Bike Blvd
1
1. Washington Blvd.: Convert to one-way
northbound with southbound Class II bike
lane, similar to Marengo Bike Boulevard.
2. Mountain St.: Install roundabout.
2
3. Paloma St.: Install roundabout.
4. Orange Grove Blvd.: Install median refuge for
pedestrians and cyclists..
3
4
5
5. Las Lunas Street: Install traffic circle and move
N-S stop signs to face E-W.
6. I-210: Install Class II bike lanes beneath bridge.
Install bike detection at Maple St. and Corson
St.
6
7
7. Walnut St.: Install bike detection.
8. North of Colorado Blvd.: Install median island
with removable bollards that allow only
northbound bicyclists.
43
8
Source: Google Maps
Sierra Bonita Ave Bike Blvd
Allow only bikes
northbound north of
Colorado Blvd.
Isla Vista, CA
Source: Google Streetview
44
Craig Ave Bike Blvd
1.
1. Orange Grove Blvd.: Install median
island on Orange Grove Blvd. to
serve as median refuge for
pedestrians and cyclists. Craig
Avenue would have only right-inright-out access.
2.
3.
2. Villa St.: Install roundabout.
3. Install Class II bike lanes beneath I210 bridge. Install bike detection at
Maple St. and Corson St.
4.
4. Foothill Blvd.: install bike detection.
5.
5. Walnut St.: Install roundabout.
6. South of Colorado Blvd: Install
median island with removal
bollards that allow only
southbound bicyclists.
7. Del Mar Blvd.: Install bike
detection.
6.
7.
45
Source: Google Maps
NORTH – SOUTH CORRIDOR CONSTRUCTION COST
ESTIMATES
Corridor
Construction Cost
El Molino Ave.
$400,000
Wilson Ave.
$377,000
Sierra Bonita Ave.
$392,000
Craig Ave.
$354,000
Total
$1,523,000
46
Attachment 2
5.C
PASADENA W ATER AND POW ER
MEMORANDUM
October 28, 2014
To:
Municipal Services Committee
From:
Phyllis, Currie
General Manager
Subject: Glenarm Repowering Project Status Report
This item is for information only.
The attached report provides an update to the Municipal Services Committee (“MSC”) on the current
activities and status of the Glenarm (“GT-5”) Repowering Project as part of staff efforts to ensure the
project stays on schedule and within the budget. The status report lists current activities, major
issues, concerns, project pictures, schedule, financial summary, health and safety record, local
workforce utilization, and Pasadena First Buy Local activities.
Pasadena Water and Power generally provides status reports to the MSC on the second meeting
each month. The report format continues to evolve and improve based on the feedback from the
MSC, public, and staff.
ATTACHMENTS:
Attachment 1 - Glenarm Repower Project Status Report
Attachment 1 - Exhibit 1 - Financial Summary
Attachment 2 - Execution of the Local Participation Plan (Plan) for the Glenarm Repowering Project
Attachmen
A
t 1 – Glena
arm Repow
wering Proj
oject Status
s Report
S
Status
s Repo
ort
Octo
ober 2
2014
Glena
G arm Repow
R
werin
ng Prrojec
ct
Combi
C
ined Cycle
C
Power
P
Plant ((GT-5))
Rendeering of GT-5
•
•
•
•
•
•
Greate
er reliability of Po
ower
Most advanced
d technollogy
Most effficient in
n its classs
Least e
emission
ns in its cclass
Help in
ntegrate ssolar and
d wind p
power
Preservve historric buildin
ngs on ssite
Glenarm Plant Mid-1950s
Mud Mat & Tunnel Closu
ures
City of Pasadena Water and Power Department
Glenarm GT5 Repowering Project Status Report
October 2014
The project continues to move forward towards a May/June 2016 Commercial Operation date. The
following major activities have occurred since the last update.
•
•
•
Budget
o City Council approved increasing the project budget to $136.9 million on September 30,
2014.
.
Balance of the Plant contract (“BOP”) – Contractor: ARB, Inc.
o Demolition activities have been nearly completed; quantities of concrete, asphalt and
contaminated soil in excess of the contract were discovered on the site.
o Excavation, backfill and compaction at the site continued.
o Tunnels into the Glenarm Building have been sealed.
o Mud mats for the Cooling Tower and Gas Turbine foundations were formed and poured
o Change Order #1 - A request has been submitted by ARB for the amount of $400,222 for
additional demolition costs for concrete, soil, asphalt and asbestos in excess of the
specified bid quantities. Staff is reviewing the change order request.
o Change Order #2 – A request has been submitted by ARB for a credit in the amount of
$216,000 to the City for the deletion of breakers from the original electrical scope. Staff is
reviewing the change order request.
o Change Order #3 – A request has been submitted by ARB for a credit in the amount of
$3,000 to the City for GE to modify the base of the GSU transformer mounting base. The
change order will offset change order #5 with GE.
o Change Order #4 – A request has been submitted by ARB for the amount of $29,000 to
utilize P22 for small bore drain piping. Staff is reviewing the change order.
o Six invoices in the total amount of $7,150,337 have been received.
Power Island Contract (“PIE”) – Contractor: General Electric
o Procurement and manufacturing are proceeding on schedule.
o The combustion turbine engine acceptance test was performed at the factory in Cincinnati,
OH. The engine performance was satisfactory. PWP staff witnessed the test runs. The
engine will be transported to Houston, TX for completion of assembly.
o Gas Turbine Generator factory acceptance test is scheduled to occur on October 22, 2014
in The Czech Republic.
o Invoice # 8 in the approximate amount of $5.6 million has been received
o Invoice # 9 due at the Gas Turbine Generator Test milestone in the approximate amount of
$5.6 million is expected this month.
o Change order # 4 - Change the steam turbine enclosure delivery date, incorporate the plant
general arrangement drawing into the contract, identify the control panel delivery location,
and adjust the plant auxiliary load performance guarantee by 186 kW due to the absence of
Variable Frequency Drives for the boiler feed pumps and 52 kW for the use of glycol
instead of Dynalene® in the plant chill water loop is still pending. The change order does
not change the contract amount.
o Change Order # 5 – GE will modify the GSU transformer mounting base to allow for
welding. Cost will be $3,000 but will be offset by a credit from ARB
•
Site Operations
o City staff removed a water line from the project area.
•
Other Project Activities
o State Street Cul-de-Sac closure is pending approval by Public Works; the required courtesy
notices have been mailed.
o A project design review was held on October 22-23 with representatives from the City, the
BOP and the PIE.
•
Major Potential Issues
On Going Issues
o Natural gas supply for GT-5 - Updated
Southern California Gas Company (“Gas Company”) determined that the two of the three
proposed connections will not be designated as a special services request and issued two
Cost Work Authorizations (CWA). Staff is making a recommendation to upsize the piping
and meter at the existing Glenarm Station. The estimated cost for the recommended
Glenarm Upgrade option is $1,288,545.
o GE’s sound engineer has indicated there may be a need to install sound walls around the
generator step-up transformer. The preliminary estimate for the sound wall including
installation is $150,000.
o Gas Compressor Fire Protection
The gas compressor sound attenuation enclosure has been redesigned to have 3 walls and
a partial roof. Pasadena Fire Department has indicated they will require a fire protection
system for the enclosures. The cost implications and potential change orders for work
beyond the contract are not finalized yet.
o California Clean Energy Committee filed an appeal and petitioned for a stay order for the
GT-5 Repowering project. The judge denied the petition for the stay order. The appeal is in
progress.
o EIR consultant is claiming approx. $100,000 in costs in excess of the contracted amount.
Staff has not made final determination yet.
o Eighty-six percent of the $3 million dollar Owner’s Engineer contract amount is expended,
Owner’s Engineer has provided a detailed task and cost estimate for their expected
remaining involvement. Staff will contain the scope of work to remain within the contracted
amount.
•
Schedule
o ARB has submitted a schedule with a target for May 16, 2016 for Substantial Completion.
•
Safety
o ARB has worked approximately 4,700 man-hours on the site with no reportable incidents or
injuries.
EXHIBIT - 1: Financial Summary
EXHIBIT - 1: Financial Summary
Glenarm Repowering Project (GT-5) Status Report For MSC on October 28, 2014
Glenarm Repowering Project (GT-5) Status Report For MSC on October 28, 2014
Table 2 - Repowering Project Payments
Table 3 - Repowering Project Contingency
Updated: October 22, 2014
Reporting Through September 21, 2014
Description
Remaining
Commitments
With
Contingencies
Payments
Updated: October 22, 2014
O
P
Q
Total Awarded,
Potential Changes
& Project
Contingency
Applied minus
Savings realized
(L - M)
Spent through
9/21/14
R
Contract Contingency
S
% Of Total
Amount Spent
Awarded and
Between Last Report
Approved Contract
Period (8/19/14)
Amount
and 9/21/14
(O ÷ E)
Pending
Invoices
Reporting Through September 21, 2014
Major Contracts
PIE Contract - GE Packaged Power
Contracted
Major Contracts
$
61,870,529
$
25,160,239
$
2,795,582
40.7%
$
5,591,164
PIE Contract - GE Packaged Power
Used
T
U
$
1,376,000
$
0
Project Contingency ($2.5 million)
Remaining
(T - U)
Approved Committed Change Orders V
W
$
1,376,000
Used
X
$
Contract + Project Contingency
Remaining
(W - X)
Contracted
and Alloted
(T + W)
Y
Z
0
Used
(U + X)
Remaining
(Z - AA)
AA
$
AB
0
PM/CM Contract - PROU
$
3,304,000
$
275,932
$
0
8.4%
$
251,525
PM/CM Contract - PROU
$
300,000
$
0
$
300,000
$
0
$
0
Air Permit -Worley Parsons
$
330,500
$
307,172
$
0
92.9%
$
0
Air Permit -Worley Parsons
$
20,000
$
0
$
20,000
$
0
$
0
CEQA/EIR - PCR Services
$
333,107
$
227,737
$
0
97.7%
$
0
CEQA/EIR - PCR Services
$
21,110
$
15,740
$
5,370
$
0
$
15,740
BOP Contract - ARB
$
55,661,973
$
6,774,772
$
974,248
12.2%
$
375,565
BOP Contract - ARB
$
0
$
0
OE Contract - Power Engineers
$
3,000,000
$
2,591,317
$
0
86.4%
$
85,325
OE Contract - Power Engineers
$
0
$
0
$
2,500,000
$
0
$
15,740
$
127,000,109
$
35,337,168
$
3,769,831
28.4%
$
916,440
$
0
Subtotal: Major Contracts
Subtotal: Major Contracts
$
6,303,579
59.0%
$
16,944
0.0%
$
0
Other Contracts and Miscellaneous
PWP & Other Dept. PO's
$
931,339
Art Funding
$
302,088
Local Hire/Buy Local - CBA
$
83,479
$
8,480
$
0
10.0%
$
720
AQMD Fees
$
87,790
$
87,790
$
0
100.0%
$
0
PWP Staff/Costs
$
1,892,400
$
1,195,411
$
10,156
63.2%
$
0
Subtotal: Other Contracts and Miscellaneous
$
3,297,095
$
2,208,120
$
10,156
56.3%
$
17,664
Project Subtotal
$
130,297,204
$
37,545,289 $
3,779,988
29.3%
$ 6,321,243
Totals
$ 130,297,204
$
37,545,289 $
3,779,988
29%
$ 6,321,243
$
1,717,110
$
15,740
$
1,701,370
$
2,500,000
$
2,500,000
$
4,217,110
$
4,201,370
City of Pasadena
Department of Finance, Purchasing Division
Pasadena First Buy Local
Local Participation Plan Update
For the Glenarm Repowering Project (Project)
As of October, 2014
1) Staff has participated in weekly meetings with the contractors and the Project
Team to maintain focus on the Local Participation Plan (Plan). The Plan calls
for 15% local subcontracting and procurement. As of October 23, 2014, the
Project is reporting $462,272.85 or 27.7% of its subcontracting and
procurement has been spent with Pasadena businesses.
2) The Project Labor Agreement calls for 25% of the payroll to be satisfied by
Pasadena residents. Staff has been monitoring the onsite certified payroll on
an ongoing basis since the start of the Project, and advising the Prime and
Project Team on strategies that will enable the Project to meet or exceed the
local hiring goal. As of October 23, 2014, ARB and their subcontractors are
reporting $67,778.60 in payroll to Pasadena residents, which represents
36.1% of the total payroll for the project. A labor wage summary report is
attached for review.
3) Staff provided a “late certified payroll” report to the Project Team, the Prime
and subcontractors. The purpose of this report was to inform the team of the
contractor’s certified payroll submittals that were more than 14 days late.
Staff has recommended that contractors be required to be current with their
payroll reports prior to processing their Pay Applications.
4) Staff is facilitating ongoing follow up on various requests made from ARB and
their subcontractors to the Union halls. Current feedback from the Unions
regarding the contractors’ requests for Pasadena residents is functional, and
there is currently an adequate Pasadena workforce for meeting the 25% goal.
However, staff will begin to focus its efforts on preparing for the peak areas of
the project in the next calendar year.
5) Recently, staff has been informed by the Project Team that Pipefitters may be
the most utilized trade on the site. Staff has begun to shift its focus to this
trade.
6) Staff is facilitating a “Special Recruitment” for Pasadena residents with the
Carpenters, Cement Masons, and Pipefitters. The recruitment is scheduled
for November 4, 2014 at 8:30AM at the Jackie Robinson Community Center
(JRCC). These trades were estimated by the Project Team to be three of the
top six trades for the Project. The trade unions will provide detailed
presentations of their apprenticeship programs and unique application
processes. The purpose of this effort is to expand the Pasadena workforce
with the unions. In addition, the Prime will provide an overview of the project
and its workforce needs. The outreach for this effort includes direct briefing to
various community stakeholders, a posting on the Project’s web page
(http://cityofpasadena.net/waterandpower/gt5/), a mailer to over 800
Pasadena residents in our database, distribution to neighborhood
associations, community centers and the Central Library, and a posting on
the City’s Facebook, Twitter accounts and KPAS.
7) Staff continued its outreach to local organizations to request contact
information for potential Pasadena apprentices to be included in the City’s
local hiring database. The purpose of this effort was to ensure that Pasadena
residents seeking apprenticeship and employment opportunities were
included in the recruitment and referral process during the course of the
Project.
8) Staff continued its monthly meeting with community stakeholders to discuss
Local Participation. The purpose of these meetings is to provide information
on strategies the City uses to maximize local participation. The benefit of
these meetings are information sharing, and overall communication with
community members interested in the results of the City’s local hiring and
procurement efforts.