Energy, power and heating plants

Power and heating plants, environment studies
Reference list
7.11.2015
1(8)
Energy, power and heating plants
Year
Customer
2014 –
Turku Energia Oy
2015
Subject
Service
40 MW pulverized pellet fired district
heating plant
Procurement planning and
project management,
preparation of an
environmental permit
2014 – Hyvinkään Lämpövoima 10 MW pulverized pellet fired district
2015
heating plant
Oy
Procurement planning, project
management
2014
Flue gas condenser
Process specialist services
District heating plant, several heavy
fuel oil boilers
Feasibility study
Nakkila Boilers Oy
2013 –
Turku Energia Oy
2014
2013
Biofuels, peat and waste combustion
Nivalan Kaukolämpö Oy (co-incineration)
CHP power plant (5 MWe / 15 MWth)
2013
Confidential
The value of district heating company
Preparation of an
environmental permit
Evaluation of income value
and net asset value
2012 – Hyvinkään Lämpövoima 10 – 30 MW Pellets and 20 MW
2013
biofuels boiler plants
Oy
Feasibility study, procurement
planning, preparation of an
environmental permit
Fortum
2012 –
Power and Heat Oy,
2013
Espoo, Finland
Large sewage water heat pump
Pre-engineering
2012
Nakkila Boilers Oy
Flue gas condenser
Process development and
balance calculation
2012
ABB Oy, Marine
WHRS project
Process specialist services
Combined district cooling and heating
by heat pumps (10-15 MWcool / 15-20
MWheat) with accumulator, sewage
water as heat source
Concept design, procurement
planning, implementation
design
2012 –
Turku Energia Oy
2013
Power and heating plants, environment studies
Reference list
7.11.2015
2(8)
Year
Customer
Subject
Service
2011
Turku Energia Oy
Combined district cooling and heating,
Feasibility study
enlargement of existing plant
Application for environmental
permit and financing, basicengineering, procurement
planning, project management
Application for environmental
permit and financing, concept
design, basic-engineering,
procurement planning
2011 –
Valio Oy, Lapinlahti
2013
20 MW biofuels and peat combustion
steam boiler plant, 2 x 12,4 MW oil
steam boiler
2010 –
Jalasjärven Lämpö Oy
2012
6 MW biofuels heat only boiler and
flue gas condensing and heat recovery
plant
2010 –
Vatajakosken Sähkö Oy
2011
Biofuels CHP power plant and steam
boiler plant
Feasibility study
30 MW Steam boiler plant
Evaluation of tenders, expert
services
2010
FC Energia Oy,
Äetsä
2010 –
Keitele Energy Oy
2011
Biofuels combustion CHP power plant
Feasibility study
(5 MWe / 15 MWth)
2010
Turku Energia Oy
40 MW biofuels heat only boiler and
combined district cooling and heating
by heat pumps
Feasibility study
2009
Hyvinkään Lämpövoima
Combined district cooling and heating
Oy/Ekokem Oy Ab
Feasibility study
2008 –
Biofuels and peat combustion CHP
Nivalan Kaukolämpö Oy
2010
power plant (5 MWe / 15 MWth)
Feasibility study, application
for environmental permit and
financing, concept design,
basic-engineering,
procurement planning, project
management
2008 – Raisio district heating
2009
plant
Concept design, investment
cost estimates and feasibility
study
Biofuels CHP power plant
Feasibility study, application
for environmental permit and
Biofuels and peat combustion CHP
financing, concept design,
2007 –
power plant (5 MWe / 15 MWth). 2 - 4
basic-engineering,
Keuruu Lämpövoima Oy
2010
MW flue gas condensing and heat
procurement planning,
recovery plant
implementation engineering,
project management
Power and heating plants, environment studies
Reference list
7.11.2015
3(8)
Year
Customer
Subject
Service
2007
Vaasan Sähkö Oy
12/30 MW biofuels and peat power
plant
Concept design, investment
cost estimates and feasibility
study
2007
VTT Technical Research
Feasibility calculation of power plants
Centre of Finland
Tailored calculation tool for
energy process investment
evaluations
2006 –
Kemijärven Lämpö Oy
2010
Peat and biofuels combustion CHP
power plant (5 MWe / 15 MWth)
Feasibility study, application
for environmental permit and
financing, concept design,
basic-engineering,
procurement planning,
implementation engineering,
project management
2006 –
Turku Energia Oy
2009
Combined district cooling and heating
by heat pumps (10-15 MWcool / 15-20
MWheat) with accumulator, sewage
water as heat source
Concept design, procurement
planning, implementation
design
2006 –
Parkanon Voima Oy
2007
3 MWe / 8 MWth CCA-treated wood
power plant, Flue gas cleaning
Concept design, procurement
planning, evaluation of
tenders, expert services
2006 – Technical Research
2007
Centre of Finland
5 – 20 MWe condensing biofuels
power plant
Concept design, investment
cost estimates and feasibility
study
2006 – Fortum Power and Heat
2007
Nynäshamn, Sweden
A 5 MW flue gas condensing and heat
recovery plant for 28 MWth recycled
fuels burning boiler
Concept design, investment
cost estimates, procurement
planning, evaluation of
tenders, project services
A 1,5 MW flue gas condensing and
heat recovery plant for 12 MWth
natural gas burning boiler
Process and detail design of
plate and heat exchanger,
investment cost estimates
Biofuels burning power plant (66
MWth). Study of flue-gas condensing
and heat recovery plant and heat
accumulator
Concept design, investment
cost estimates, energy balance
calculations and feasibility
study
2006
Fortum Heat and
Vahterus Oy
2006
Vapo Voima Oy, Forssa
power plant
2006
Confidential
3,5 MWe / 13 MWt CHP-plant and 12
MW district heating plant
Investment cost estimates,
energy balance calculations
and feasibility study
2006
Alajärven Lämpö Oy
and Myllyvoima Oy
1,7 MWe / 8,5 MWt power plant
Peat and biofuels
Concept design,
investment cost estimates,
feasibility study
Power and heating plants, environment studies
Reference list
7.11.2015
4(8)
Year
2006
Customer
Pölkky Oy
Subject
Heating plant
2005 – Lapuan Energia Oy
2008
(Kiviristin Lämpö Oy)
Peat and biofuels combustion power
plant (4 MWe / 14MWth)
2005 –
Confidential
2008
20 – 50 MWe CHP- and condensing
power plant. Peat, wood, municipal
solid waste
2005 –
District heating plant + 4,9 MW
Junnikkala Oy, Kalajoki
2006
cutter chip burning boiler plant
Service
CO2 and emission trade
calculations,
document preparation,
emission control planning,
consultancy services
Feasibility study, application
for environmental permit and
financing, concept design,
basic-engineering,
procurement planning,
implementation engineering,
project management
Concept design, investment
cost estimates, feasibility
study
CO2 and emission trade
calculations,
document preparation,
emission control planning,
consultancy services
Concept design, investment
cost estimates, feasibility
study, procurement planning,
application for environmental
permit
2005 – Saarijärven
2006
Kaukolämpö Oy
Peat and biofuel combustion 3 MW
district heating plant + 0,5 MW flue
gas
Concept design, investment
cost estimates, feasibility
study, procurement planning
2005 –
Taivalkosken Voima Oy
2006
2,5 MW flue gas condensing and
district heating plant for 2 x 7,1 MW
biofuels burning boilers
Concept design, procurement
planning, evaluation of
tenders, expert services
2005
Kuusiston Saha Oy
Heating plant
2005
Isojoen Lämpö Oy
District heating plant
2005
Taivalkosken Voima Oy
District heating plant
CO2 and emission trade
calculations,
document preparation,
emission control planning,
consultancy services
CO2 and emission trade
calculations,
document preparation,
emission control planning,
consultancy services
CO2 and emission trade
calculations,
document preparation,
emission control planning,
consultancy services
Power and heating plants, environment studies
Reference list
7.11.2015
5(8)
Year
Customer
Subject
Service
CO2 and emission trade
calculations,
document preparation,
emission control planning,
consultancy services
CO2 and emission trade
calculations, document
preparation, emission control
planning, consultancy services
CO2 and emission trade
calculations, document
preparation, emission control
planning, consultancy services
CO2 and emission trade
calculations, document
preparation, emission control
planning, consultancy services
2005
Haapajärven Lämpö Oy District heating plant
2005
Liedon Lämpö Oy
2005
Kannuksen Kaukolämpö
District heating plant
Oy
2005
JK Juusto Kaira Oy
Heating and steam producing plant
2005
Foster Wheeler Energia
Oy
Jyväskylä CHP project (440 MWth)
Procurement planning,
Flue gas condensing and heat recovery evaluation of tenders,
unit
expert services
2005
Pirken Oy
Peat and biofuel combustion 7 MW
heat only boiler and power plant
(2 MWe / 8.5MWth)
2005
Kiviristin Lämpö Oy
2005
Demolite Oy
District heating plant
Concept design, investment
cost estimates, CO2 trade and
energy balance calculations,
feasibility study, procurement
planning
Concept design, investment
Peat and biofuel combustion power
cost estimates, CO2 trade and
plant (3 MWe / 13MWth) or 12-15 MW
energy balance calculations
heat only boiler
and feasibility study
8 MW CCA-wood burning district
heating plant
Concept design, procurement
planning, evaluation of
tenders, expert services
2004 –
Several customers
2005
Studies of emission regulations,
calculation of CO2-emission permits,
mass and energy balances of boilers
according to DIN 1942.
Expert services
2004 –
Wärtsilä Biopower Oy
2005
0,6 MW flue gas condensing and
Concept design, expert
district heating plant for 4 MW biofuel
services
burning boiler
2004 – Fortum Lämpö Oy,
2005
Vammala
4,0 MW flue gas condensing and
district heating plant for 15 MW
biofuel burning boiler
Concept design, procurement
planning, evaluation of
tenders, expert services
Power and heating plants, environment studies
Reference list
7.11.2015
6(8)
Year
Customer
Subject
Service
2004 –
Viitasaaren Lämpö Oy
2005
3,5 MW flue gas condensing and
district heating plant for 16 MW
biofuel burning boiler
Concept design, procurement
planning, evaluation of
tenders, expert services
2004 – Kauhavan Kaukolämpö
2005
Oy
6,5 MW biofuel + 16,2 MW heavy
fuel oil burning district heating plants
Feasibility study, CO2 and
emission trade calculations
2004 –
Viitasaaren Lämpö Oy
2005
16 MW biofuel + 18 MW heavy fuel
oil burning district heating plants
Feasibility study, CO2 and
emission trade calculations
2004 –
Myllyahon Saha Oy
2005
10,5 MW biofuel + 22,2 MW heavy
fuel oil burning district heating plants
Feasibility study, CO2 and
emission trade calculations
2004 –
Porin Lämpövoima Oy
2005
Aittaluoto 37/75 MW CHP biofuel
power plant (206 MWth). Study of
Flue-gas condensing and heat recovery
and heat accumulator
Concept design, investment
cost estimates, energy balance
calculations and feasibility
study
2004 –
Turku Energia Oy
2005
Combined district cooling and heating
by heat pumps (25 MWcool /
37 MWheat) with accumulator
Feasibility study and
preliminary lay-out
2004 –
Kemin Energia Oy
2005
Biofuel boiler (26 MW + 8 MW)
Procurement planning,
Flue gas condensing and heat recovery evaluation of tenders, contract,
unit, DH-accumulator study
expert services
2004 2005
Ähtärin Lämpökeskus
Oy
4 MW biofuel burning district heating
boiler plant
2004
Noviant CMC Oy (Metsa
CMC Mill, Äänekoski Finland
Specialty Chemicals Oy)
2004
Confidential
2004
Suomussalmen kunta
2004
Jyväskylän
Energiantuotanto Oy
The value of district heating plant
13 MW biofuel + 25,7 MW heavy fuel
oil burning district heating plants
Emission trade documents, emission
control, phase 1
Rauhalahti biofuel power plant
(295 MWfuel)
Flue gas condensing and heat recovery
unit (60 MWth)
Concept design, procurement
planning, evaluation of
tenders, expert services
Total energy consumption
survey
Evaluation of the company
and feasibility study
Document preparation,
emission control planning,
consultancy services
Procurement planning,
evaluation of tenders, expert
services
Power and heating plants, environment studies
Reference list
7.11.2015
7(8)
Year
Customer
Subject
Service
2004
Demolite Oy
Incineration of chromated copper
arsenate (CCA) treated waste wood
Evaluation of gate fee,
process expert services
2003 – Tartu Energia AS
2004
Tartu, Estonia
Simulation and engineering
Biofuel boilers (2 X 18 MW): Flue-gas
services, evaluation of tenders,
condensing and heat recovery
project expert services
2003
Turku Energia Oy
Waste to energy boiler (7 MWth)
Feasibility study
2003
Vapo Oy Energia
Biofuel district heating market and
power plants in Sweden
Evaluation study
2003
Kiviristin Lämpö Oy and Biofuel combustion power plant
(3 MWe / 13MWth)
Vapo Oy
2003
Kauhavan Kaukolämpö
Oy
Biofuel district heating plant (5 MWe /
Process expert services
6 MWth)
2003
Ähtärin Lämpökeskus
Oy
Biofuel boiler plant (4 MWth)
Feasibility study, procurement
Flue gas condensing and heat recovery
and engineering services
unit (2 MWth)
2003
Virtain kaupunki
Heating of sidewalk and bicycle track
by DH return water
Feasibility study
2003
Lapuan Nahka Oy
Energy systems
Energy consumption study
2002
Kvaerner Pulping Oy
Flue gas condensing and heat recovery
Simulation and process
design/engineering services
2002
Noviant CMC Oy (Metsa CMC Mill, Äänekoski Finland
Specialty Chemicals Oy) Energy systems
2000
Powertechnics Oy/
Empower Oy
Power plant, Sines, Portugal
Utility systems, outsourcing
Simulation, feasibility study
Feasibility study: “Energy
consumption”
Technical evaluation, “Due
Diligence” -report
Power and heating plants, environment studies
Reference list
7.11.2015
8(8)
Year
Customer
Subject
Service
2000
Sallan Aluelämpö Oy
Flue gas condensing and heat recovery Simulation
1999
Kvaerner Pulping
Oy/Sydkraft Malmö
Flue gas condensing and heat recovery
Simulation
unit (17 MWth)