Keith Mitchinson Head of Carrier Contracts www.btwholesale.com Wednesday 9

Keith Mitchinson
Head of Carrier Contracts
Wednesday 9th June 2010
www.btwholesale.com
Standard Contract Forum Session
SIA Contract Documentation update
•
Interconnect Briefing 018-10 (SCF Contract Information Note 62) on 24
February 2010 announced revisions to the following SIA Contract
Documentation:
 Main Body
 Annex D (Definitions)
 Schedule 112 BT Premium Rate Service Calls
 Schedule 218 BT 118 Directory Enquiry (DQ) Service Calls
 Schedule 313 Operator Premium Rate Service Calls
 Schedule 314 Operator Personal Numbering Service Calls
 Schedule 418 Operator118 Directory Enquiry (DQ) Service Calls
in respect of AIT and 2008 Contract Review Clear-the-Decks (see next slide)
Wednesday 9th June 2010
www.btwholesale.com
Standard Contract Forum Session - continued
2008 SIA Contract Review Clear-the-Decks
•
Further to: BT email proposal of 14 December 2009; discussion at IPF 2 February
2010; BT email of 23 February 2010 and Interconnect Briefing 018-10 dated 24
February 2010, Main Body revised as follows:
•
warranties (6.2)
•
Conduct of indemnified events (new 23A)
•
IPR indemnities (24.2/3)
•
BT right of termination (no links) (27.5A)
•
Service of notices (28.3)
•
Signature of variations (30.2)
•
Clarification of: Changes to Manuals (1.4); System Alterations (4.6/7); Transfer
Charge Calls (7.1/7.2); indemnity re Information (10.7); System protection (16.1/2);
review (19.1.7); determination (deletion of 20.2); disputes (new 26.1.1/2)
Wednesday 9th June 2010
www.btwholesale.com
Standard Contract Forum Session - continued
SIA Contract Documentation update
•
Interconnect Briefing 022-10 (SCF Contract Information Note 63) on 17
March 2010 announced the following new SIA Schedule
 Schedule 250 BT 116 European Helpline Service Calls
and associated revisions to the following SIA Contract Annex:
 Annex A (Planning and Operations)
in respect of the launch of 116 services
Wednesday 9th June 2010
www.btwholesale.com
Standard Contract Forum Session - continued
SIA Contract Documentation update
•
Interconnect Briefing 029-10 (SCF Contract Information Note 64) on
21 April 2010 announced revisions to the following SIA Contract
Documentation:
•
Schedule 11 Directory Information Supply
 to clarify charging for special phone book entries
•
Schedule 143 Carrier Pre-Selection
 Sunday access to CPS Gateway
•
Schedule 210 BT Special Services (higher rate) NTS Calls
 to include new 0872 and 0873 number ranges
•
Schedule 211 BT Special Services (basic rate) NTS Calls
 to include new 0843 number range
Wednesday 9th June 2010
www.btwholesale.com
Standard Contract Forum Session - continued
Updated AIT
•
•
•
•
1 March 2010 notified as Effective Date for new process by
Interconnect Briefing 331–09 on 28 August 2009
Reminders at October 2009 and February 2010 IPF/SCF sessions
Reminder via Interconnect Briefing 008–10 on 01 February 2010…..
…also made available BT draft of AIT Guidance document as
proposed by Ofcom
http://www.btwholesale.com/pages/static/Pricing_and_Contracts/Contract_Revi
ews/Artificial_Inflation_of_Traffic_AIT_Review.html
•
Further reminder via Interconnect Briefing 019–10 on 24 February
2010
• 1 March 2010 launch
•
March “interim regime” - February 2010 call traffic dealt with under
the old definition of AIT, but notices issued in March before 14th AIT
calendar day dealt with under new process
Wednesday 9th June 2010
www.btwholesale.com
Standard Contract Forum Session - continued
2010 SIA Contract Review opportunity
•
2008 Contract Review process not completed…
•
… though “Clear-the-Decks” text (see earlier slide) was added to Reference
Offer and is available from February 2010
•
discussions on a number of areas stalled – if still seen as critical by CPs
would need refocus and relaunch…
•
…Contract provides for a 2010 Contract Review initiation window April-June
•
If review to proceed, BT proposed following a process more like recently
agreed MSA/PPC processes…
•
…hence Interconnect Briefing 030-10 dated 28 April 2010, and draft process
at
http://www.btwholesale.com/pages/static/Pricing_and_Contracts/Contract_Revie
ws.html
•
and Interconnect Briefings 038-10 (5 May 2010) and 042-10 (28 May 2010),
inviting CP review issues to be sent to BT by 4 June 2010 at
[email protected] with “2010 SIA Contract Review” in the subject line
•
…present situation…
Wednesday 9th June 2010
www.btwholesale.com
Standard Contract Forum Session - continued
BTW Credit Vet Review
•
•
•
•
•
BTW Credit Vet Policy review launched August 2009
BT circulated consolidated list of CP issues 25 September
BT initial responses 13 October
Meeting with interested CPs 15 October
9 November notes and initial comments to active CPs (and copied to
msa@ukcta)
•
BT Policy redraft to active CPs (and copied to msa@ukcta) on 12 January
•
Late April BT decided that it ought to make improved text available to CPs,
so…
•
….Interconnect Briefing 039-10 dated 5 May 2009 notified that, per process,
updated Draft 7.4 of the BTW Credit Vetting Policy would take effect as
Issue 8.00 from 30 July 2010
•
[Meanwhile Interconnect Briefing 044-10 dated 2 June 2010 notifies new
issue 7A with Appendix 14 for IVPS and several corrected cross-references
in Appendices]
•
Any CP comments on 7.4 (or 7A changes) to [email protected] and
[email protected] as soon as possible before the effective date.
Wednesday 9th June 2010
www.btwholesale.com