ESSEX REGION CONSERVATION AUTHORITY NOTICE OF PUBLIC INFORMATION CENTRE No. 1

ESSEX REGION CONSERVATION AUTHORITY
NOTICE OF PUBLIC INFORMATION CENTRE No. 1
UPPER LITTLE RIVER WATERSHED MASTER DRAINAGE PLAN & STORMWATER
MANAGEMENT PLAN
The Essex Region Conservation Authority in conjunction with the City of Windsor and the Town of Tecumseh
has initiated a Master Plan Study in accordance with Phases 1 & 2 of the Municipal Class Environmental
Assessment (EA) process. This Study will determine the storm water management infrastructure requirements for
the Upper Little River Watershed area to service existing and future development.
A Public Information Centre (P.I.C.) will take place to provide further information to the public regarding the
project and to receive input and comments. Displays of study information will be available for review
introducing the project and outlining the Environmental Assessment requirements. Representatives from the
Essex Region Conservation Authority, the City of Windsor, the Town of Tecumseh, and Stantec Consulting will
be present to discuss issues and concerns.
The Public Information Centre (P.I.C.) No.1 is scheduled for Tuesday, May 29, 2012 at the Forest Glade
Community Centre – 3215 Forest Glade Drive from 3:00p.m. – 5:00p.m. & 6:00p.m. – 8:00p.m.
If you have any questions or wish to be added to the study mailing list, please contact:
Jeremy Wychreschuk, M.A.Sc., P. Eng.
Director of Watershed Engineering
Essex Region Conservation Authority
360 Fairview Avenue West
Essex, Ontario, N8M 1Y8
Tel: (519) 776-5209
Fax: (519) 776-8688
[email protected]
Jayson Innes, M.A.Sc., P. Eng.
Project Manager
Stantec Consulting Ltd.
49 Frederick Street
Kitchener, Ontario, N2H 6M7
Tel: (519) 585-7282
Fax: (519) 579-8664
[email protected]