INSTALLATION INSTRUCTIONS FOR SL580 HEATER KITS 65-18508 & 65-19085 APPLICATION REQUIREMENTS: This instruction is available for SL580 operators. PARTS LIST: Unpack kit to verify the parts listed below are included. PART NUMBER QUANTITY DESCRIPTION 01-18509 INSTRUCTION SHEET, SL580 HEATER KIT 1 21-15453-1 TRANFORMER 100VA (USED ON KIT #65-19085 ONLY) 27-18510-1 BAND HEATER W/ LEADS AND CLAMP (REWORKED) 1 1 75-18638 THERMOSTAT W/ PLATE ASSEMBLY 1 77-19087 HARDWARE PACKAGE (USED ON KIT #65-18508 ONLY) 1 77-19089 HARDWARE PACKAGE (USED ON KIT #65-19085 ONLY) 1 INSTALLATION INSTRUCTIONS FOR SL580 HEATER KIT Installation of Heater Kit for SL580: 1. Remove brake from reducer. Note: To remove bolts connecting brake to reducer, heat loctite to required temperature. 2. Wrap reworked heater band around reducer and tighten. 3. Attach thermostat and plate assembly to reducer. Remove lower motor mounting bolt and insert through the plate assembly. Reinstall lower motor mounting bolt. Refer to isometric drawing. 4. Attach the 9” wire lead from the heater to thermostat Q.C. terminal post. 5. Attach the 17” lead supplied separately to the other Q.C. terminal post. WARNING TO AVOID SERIOUS PERSONAL INJURY OR DEATH FROM ELECTROCUTION, DISCONNECT ELECTRIC POWER TO OPERATOR BEFORE INSTALLING. 6. Make wire connections, Refer to diagrams supplied. Note: Make certain all wires are secured inside sleeving and away from all moving parts. CAUTION 7. Put brake back on reducer. 8. Make wire connections (See pages 2 thru 4 for wiring diagrams). INSTALLATION ISOMETRIC DRAWING THERMOSTAT AND PLATE ASSEMBLY CONNECT TO THERMOSTAT TERMINALS BRAKE ASSEMBLY HEATER BAND W/ CLAMP (REWORKED) LOCATE THERMOSTAT HERE ON OPPOSITE SIDE OF REDUCER HEATER WIRING DIAGRAM FOR 115, 208 & 230V 1-PHASE GATE OPERATORS Operator Effected: SL580 Instructions: Route heater wires through a knockout hole on the operator switch box and connect to incoming power line. Use bushing to protect the wires at the box. Note: Do not use the knockout hole which is used by installers during operator installation. 2 HEATER WIRING DIAGRAM FOR 208 & 230V 3-PHASE GATE OPERATORS Operator Effected: SL580 Instructions: Route heater wires through a knockout hole on the operator switch box and connect to incoming power line. Use bushing to protect the wires at the box. Note: Do not use the knockout hole which is used by installers during operator installation. HEATER WIRING DIAGRAM FOR 460V 3-PHASE GATE OPERATORS Operator Effected: SL580 Instructions: Replace the existing 60VA transformer inside the operator E-box with the 100VA transformer (21-15453-1). Route heater wires through a knockout hole on the operator E-box and connect to the transformer. Terminate unused transformer input wires. Use bushing to protect the wires at the box. 3 HEATER WIRING DIAGRAM FOR 575V 3-PHASE GATE OPERATORS Operator Effected: SL580 Instructions: Route heater wires through a knockout hole on the operator E-box and connect to the transformer. Use bushing to protect the wires at the box. 01-18509C ©2002, The Chamberlain Group, Inc All Rights Reserved.
© Copyright 2024