POWER CABLE SYSTEMS No Area Europe System Western Link HVDC From/To West Kilbride Birkenhead Owner/Operator National Grid Contract Yes Supplier / Installer Prysmian & Siemens km approx. 350 km Europe East Coast Electricity grid Along East Coast of Scotland Crown Estate No ? 960 km Europe Western Isle power link Grabhair on the Isle of Lewis across to Dundonnell on Little Loch Broom Scottish and Southern Energy No ? 80 km No/planned Out for tender Scottish Government, the Department of Enterprise, Trade and Investment in Northern Ireland and the Department of Communications, Energy and Natural Resources in Ireland Statoil No ? ? No/concept Yes Nexans 46 km No/planned ESB Yes Prysmian 7 x 3 km No/planned Scottish and Southern Energy Yes Nexans 2 x 41 km No/planned 1 Installed No/planned Installation ongoing No/planned 2 3 Europe Scotland - Ireland - Scotland - Ireland Northern Ireland Northern Ireland 4 Europe Tyrihans field Tyrihans field Infield connections Europe Shannon River Crossing Kintyre Southwest Scotland Kilpaddoge Moneypoint Kintyre peninsula and mainland coast in Southwest Scotland. Europe Hinkley to Avonmouth Hinkley to Avonmouth National Grid No ? ? No/Concept Europe Scotland Northern Ireland Scotland - Northern Ireland Moyle Interconnector Limited No ? 106 km No/planned Out for tender Europe Ireland - France Ireland - France Eirgrid No ? ? No/planned Route Survey completed Europe Norway Trondheim Norway Norway (Utsira High Electrification) Trondheim Fjord Statnett ? ? 8 km No/Rumours Norway From shore to Platforms and Interplatforms Austevoll Kraftlag Statoil Yes No Prysmian ? ? 200 km + No/planned No/planned Feasibility study ongoing Europe Norway (Troll A to shore) Statoil Yes ABB 350 km No/planned Europe Norway (Martin Linge/Hild field) Troll A platform to shore and Interplatforms Martin Linge platform to Kollsnes Total E&P Norge AS Yes Subsea 7 & ABB 160 km No/planned Europe UK (Bittern field) Bittern field Shell U.K. Ltd. Yes Ocean Installer No/planned Europe UK Caithness Blackhillock UK Caithness Blackhillock Scottish and Southern Energy Yes ABB 1 x 20.7 km + 1 x 1.8 km 160 km 5 6 Europe 7 8 9 10 11 12 Europe Europe 13 14 15 16 17 No/planned POWER CABLE SYSTEMS No Area Europe 18 Europe System Sweden Denmark Sweden From/To Across the Öresund Edsviken Submarine Cable Project Danderyd – Järva/Ålkistan Contract No Supplier / Installer ? km ? Installed No/planned No ? ? No/planned No ? ? No/Rumours No ? ? No/planned RTE & RED AMEC No No ? ? ? ? No/concept No/concept Research Institutes in Iceland and UK No ? 1200 1900 km No/concept Feasibility study ongoing Owner/Operator Svenska kraftnät; Energinet.dk Svenska Kraftnät 19 Europe 20 Europe 21 22 Europe Europe Spain (Island of Mainland - Island of Red Electrica de Espana Ons) Ons Ceuta and the Ceuta and the Red Electrica de Espana Iberian Peninsula Iberian Peninsula Spain - France West Coast UK Bilbao - Bordeaux Stornoway, in the Western Isles, to Hunterston, in Ayrshire, UK 23 Europe Iceland Iceland Scotland; Iceland - Scotland,Norway, Norway The Netherlands or Germany Europe Iceland - UK; Iceland - Germany Iceland - UK or Germany EnBW from Germany and Iceland Government No ? 1200 nm No/concept Europe Power from Shore Goliat oilfield to Hammerfest ENI; Hammerfest Energi Nett Yes ABB & Aker Solutions for Installation 85 km No/planned Northern Sweden - Fingrid Oyj and Svenska Finland Kraftnät Pembroke and Wylfa National Grid on Anglesey No ? ? No/Rumours No ? 63 km No/concept Feasibility study ongoing National Grid No ? 330 km NorthConnect: Adger Energi, E-Co Energi, Lyse and Sweden’s Vattenfall Statnett; National Grid No ? 570 km No/planned Consultations ongoing possible interconnectio n with other Offshore Wind Farms No/planned No ? 711 km ABB 350 km 24 25 26 Europe Fenno-Skan 3 Europe Pembroke and Wylfa on Anglesey 27 28 Europe Scotland Weisdale, Shetland Shetland (Viking Portgordon, Interconnector) Scotland 29 Europe UK- Norway UK - Norway Europe UK - Norway UK - Norway Europe Nordbalt (ex SwindLit) Lithuania - Sweden Lietuvos Energija and Svenska Kraftnat Yes Europe Europe UK - France The Netherlands UK - France Ellewoutsdijk Terneuzen FAB Link Limited Delta Infra BV No Yes Europe The Netherlands Luchterduinen Offshore Wind Farm - Export Cable VSMC Yes 30 31 32 33 34 35 ? ? Van Oord & ? Visser & Smit Hanab LS Cable 25.7 km No/planned Out for tender No/planned Installation ongoing No/planned No/planned Installation completed POWER CABLE SYSTEMS No 36 37 From/To Gemini OWF Export Cable Russia - Sweden Vyborg to Greifswald Owner/Operator Typhoon Offshore B.V. Contract Yes Supplier / Installer Nkt cables km 200 km Installed No/planned Rosenergoatom Inter RAO UES No No ? ? ? 1220 km No/concept No/planned Spanish Islands Red Electrica de Espana Yes 1 x Nexans; 1 x Prysmian 2 x 115 km No ? 100 km Europe Benejana - Cabo de Red Electrica de Espana la Nao, Ibiza Ibiza -Formentera Ibiza -Formentera Red Electrica de Espana No/planned Installation ongoing No/planned No ? ? No/planned Europe Majorca - Menorca No ? 2 x 11 km No/planned Europe Turkey Yes Prysmain 2 x 4 km No/planned Europe Turkey - Cyprus No ? < 100 km No/concept Europe No ? 400 km No/planned Europe Black Sea High Voltage Direct Current (HVDC) project NorNed 2 Europe No/planned Application filed No/planned Europe Area Europe System The Netherlands Europe Europe Russia - Sweden Russia - Germany Europe Majorca - Ibiza Europe Ibiza - Spain 38 39 40 41 Majorca - Minorca ? 42 43 44 45 Crossing the TEIAS Dardanelles Strait Turkey - Turkey Turkish Government Republic of Northern Cyprus Constanta, Romania Transelectrica & TEIAS - Pasakoy, Turkey Norway Netherlands Tennet & Statnett No ? approx. 580 km Nemo UK - Belgium Elia/National Grid No ? North Sea Super Grid UK - Denmark UK - Netherlands Germany UK - Denmark Scottish and Southern Energy Dong Energy A/S & National Grid No ? approx. 250 km 1000 km No ? ? No/planned Feasibility study ongoing Denmark - The Netherlands (COBRA) Guernsey - Jersey Denmark - The Netherlands Tennet & Energinet.dk No ? ? No/planned Guernsey - Jersey Guernsey Electricity No ? ? Europe Denmark - Agersø and Omø Denmark - Agersø and Omø SEAS-NVE No ? 6 km No/planned Survey completed No/planned Europe Denmark - Jutland Denmark - Jutland and Laesoe Island and Laesoe Island Energinet.dk Yes LS Cable 24.5 km No/planned Europe Denmark - Anholt Denmark - Anholt Island - Anholt Island - Anholt Wind Wind Farm Farm Energinet.dk No ? 28 km No/planned Europe Denmark - Lolland- Denmark - LollandAsko Asko Denmark - LilleøDenmark - LilleøFemø Femø SEAS-NVE Yes No/planned Yes JD Contractors JD Contractors ? SEAS-NVE ? No/planned 46 47 48 Europe No/concept 49 Europe 50 Europe 51 52 53 54 55 Europe 56 POWER CABLE SYSTEMS No Supplier / Installer Area Europe System Kriegersflak From/To Denmark Kriegersflak OWF Owner/Operator Energinet.dk Contract No km 45 km Europe Horns Rev 3 Energinet.dk Yes ABB 32 km Europe NorGer Horns Rev 3 Export Cable Feda, Norway Wilhelmshaven, Germany Statnett, KfW, TenneT No ? 620 km No/planned Planning procedures ongoing Europe Norway Germany (Nord Link) Statnett & TenneT No ? approx. 600 km No/planned Out for tender Europe Italy - Capri Terna Rete Italia S.p.A. Yes Prysmian 30 km No/planned Europe Marulk gas field Yes Nexans 13.5 km No/planned Europe Baltic 2 Statoil ASA, ENI Norge AS and Dong E&P Norge AS Bentwisch - Baltic 2 50Hertz Offshore GmbH Offshore Platform Yes NSW 2 x 60 km Europe Sylwin 1 Buesum, Germany Offshore Platform TenneT Yes 160 km Europe DolWin 2 Norderney, Germany - Offshore Platform TenneT Yes Prysmian Cables & Systems & Siemens ABB No/planned Installation ongoing No/planned Installation ongoing 165 km No/planned Europe Helwin 2 Buesum, Germany Offshore Platform TenneT Yes 85 km No/planned Installation ongoing Europe Sylwin 2 Buesum, Germany Offshore Platform TenneT No Prysmian Cables & Systems & Siemens ? ? No/planned Europe BorWin 3 TenneT Yes No/planned Dolwin 3 TenneT Yes Prysmian Cables Prysmian Cables & Alstom Grid ? Europe Diele, Germany Offshore Platform Diele, Germany Offshore Platform 80 km No/planned 57 58 59 60 Øksendal in Sirdal municipality, Norway to Diele/Brunsbüttel, Germany Island of Capri Torre Annunziata (Naples) Installed No/planned Out for tender (AC cable) No/planned 61 62 Control Umbilical Alve template 63 64 65 66 67 68 69 POWER CABLE SYSTEMS No Area Europe System BorWin 4 From/To BorWin Beta Offshore Wind Farm Owner/Operator TenneT Contract No Europe Innogy Nordsee 1 OWF Export Cable Innogy Nordsee 1 platform - Dolwin beta TenneT Yes Europe BorWin 5 TenneT No TenneT Yes Supplier / Installer ? km ? Installed No/planned out for tender 70 71 72 Europe 73 Europe 74 Europe 75 Europe 76 Europe Diele, Germany Offshore Platform Gode Wind 1 DolWin Beta Export Cable Platform - Gode Wind 1 platform Dolwin 4 Diele, Germany Offshore Platform Deutsche Bucht Borwin Beta Connection Deutsche Bucht Sandbank OWF Sandbank OWF Sylwin Alpha Sylwin Alpha Borkum Riffgrund Borkum, Germany 1 Offshore Platform Siem 2 x 11 km Offshore Contractor & J-Power ? ? NSW Elba - Italy Europe Europe No/planned 2 x 8.5 km No/planned TenneT No ? ? No/planned TenneT Yes 31 km No/planned TenneT Yes Prysmian Cables ABB 2 x 36 km No/planned Tennet Yes NSW 2 x 26 km No/planned Installation ongoing No/planned 77 Europe No/planned Terna SpA No ? 35 km Italy - Montenegro Island Elba Mainland Italy Italy - Montenegro EPCG & Terna Spa Yes No/planned Italy - Croatia Terna SpA & HEP-OPS No Pyrsmian/Ne xans ? 400 km Italy - Croatia ? No/planned Feasibility study ongoing Europe Albania - Italy Albania - Italy Albanian Government & Terna SpA Yes ASG 340 km Europe Cyclades Ring Network Lavrion-Syros Independent Power Transmission Operator Yes Prysmian 108 km No/planned Approved by both Governments No/planned Europe Europe Europe Libya - Greece Italy - Libya Greece - Italy Libya - Greece Sicily - Libya Greece - Italy ? ? Greek Government No No No ? ? ? ? ? ? Europe Lanzarote Fuerteventura Greece Domestic REE No ? ? Rumours No/planned No/concept cancelled? No/planned Public Power Corporation S.A. REE Yes Nexans 3 x 21 km No/planned No ? ? No/planned REE No ? ? No/planned 78 79 80 81 82 83 84 85 Europe Gran Canary and Fuerteventura Lanzarote Fuerteventura Polypotamos - Nea Makri Gran Canary and Fuerteventura Europe Europe Teneriffe - La Gomera Norway Teneriffe - La Gomera Gygrid Field Europe Norway Europe Norway Europe Norway Europe Norway Europe Norway Ormen Lange North Field Fossekall Dompap oil and gas field Statoil’s Gudrun North Sea oil and gas field Statoil's Åsgard oil and gas field Statoil's Troll A 86 Europe 87 88 89 Statoil Yes Nexans 1 x 20 km No/planned Norske Shell Yes Nexans 6.5 km No/planned Statoil Yes Nexans 25 km No/planned Statoil Yes ABB/EMAS AMC 55 km No/planned Statoil Yes Nexans 165 km No/planned Statoil Yes ABB 69 km No/planned 90 91 92 93 94 95 POWER CABLE SYSTEMS No 96 97 98 Area Europe System Norway From/To Oseberg Delta field Owner/Operator Statoil Contract Yes Supplier / Installer Nexans km ? Europe Europe Europe Norway Norway Norway Statoil Staoil Statoil Yes Yes No Nexans Nexans ? ? ? ? Europe Norway Statoil Yes Nexans 9 km No/planned Europe Norway BKK Nett AS Yes Nexans 90 km No/planned Europe Finland Kraftnät Åland AB Yes ABB 158 km No/planned Europe Africa Israel - Cyprus Greece Tunisia - Italy Snøhvit gas field Smørbukk Sør Johan Sverdrup to shore Gullfaks Rimfaksdalen Gas Project Hjeltefjorden and Lurefjorden Finnish mainland and Åland Israel - Cyprus Greece El Hawaria in Tunisia and Partanna in Sicily Installed No/planned Installation ongoing No/planned No/planned No/concept Africa Angola Dalia and the Girassol floating production storage and offloading units Africa Algeria - Morocco Africa Algeria - Italy Africa Algeria - Spain Algeria - Spain Africa Africa Africa Algeria - Spain Morocco - Spain Libya - Italy Algeria - Spain Morocco - Spain Libya - Italy Africa Egypt AGIBA's West Ashrafi hydrocarbon facility to shore Africa Tanzania Electrification Africa Mozambique Africa Nigeria Africa Nigeria Kisorya Bay to Rugezi Bay, Crossing Lake Victoria Quirimbas National Park Total Ofon Phase 2 project Egina field Middle East Offshore Saudi Arabia Middle East Ras Laffan Industrial City Halul Island Qatar’s Power Transmission Expansion 99 100 101 102 103 Quantum Energy Ltd No ? 540 miles No/planned Italian electricity grid Terna SpA &Tunisia's electricity and gas company Steg Total E&P Angola No ? 170 km No/planned MOU signed Yes Technip 34 km No/planned Algeria - Morocco ? No ? ? No/Rumours Algeria - Italy Algerian Energy Company (AEC) Algerian Energy Company (AEC) Algerian Government Morocco Government Libya & Italian Energy Companies AGIBA Petroleum Company No ? ? No/concept No ? ? Rumours No No No ? ? ? 1 1 ? Rumours No Rumours No/Rumours Yes CTC Marine Projects 10 km No/planned No ? < 350 km No/concept 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 Middle East 119 Offshore Saudi Arabia - Platform connections Ras Laffan Industrial City Halul Island Qatar’s Power Transmission Expansion Tanesco ? No ? 10 km No/Rumours Subsea 7 Yes JDR 2 x 5 km No/planned Total Upstream Nigeria Ltd PMS, Egypt Yes Duco Ltd. No/planned No ? 76 km (Umb.) Several Qatar Petroleum Yes LS Cable 2 x 100 km Qatar General Electricity & Water Corporation Yes Prysmian Cables & Systems 63 km No/planned No/planned Installation ongoing No/planned POWER CABLE SYSTEMS No Supplier / Contract Installer km Yes ZTT; Subtech 99 Km for phase 1; 91 km for phase 2 Area Middle East System Wasit gas development programme From/To Wasit gas development programme Owner/Operator Saudi Aramco Middle East Saudi Arabia Egypt Saudi Arabia - Egypt No ? 20 km No/planned Middle East Egypt - Jordan Egypt - Jordan Egyptian Electricity holding Company (EEHC) and the Saudi Electricity Company (SEC) Ministry of Electricity No ? 20 km No/planned Middle East Iran - UAE Iran - Dubai, UAE ? ? ? 110 miles No/planned Middle East Replacement of power feeding systems to Zakum offshore oil field UAE ADMA-OPCO Yes Prysmian Cables & Systems 200 km No/planned Middle East Nasr Full Field Development Project UAE ADMA-OPCO Yes 144 km + 55 km No/planned Middle East Saudi Arabia Abu Ali and Khursaniyah fields Saudi Aramco Yes Hyundai Heavy Industries Co., Ltd. McDermott 2 x 20 km No/planned Middle East Iraq Crude Oil Export Expansion Project Iraq Leighton International Yes Parker Hannifin Corporation 60 km No/Planned Middle East Satah Al Razboot (SARB) package 3 project UAE ADMA OPCO Yes JDR 55 km No/planned Flinders Island Tasmania Cook Strait Crossing Hydro Tasmania No ? < 50 km No/planned Transpower No ? 2 cables No/planned ETSA No ? 15 km No/planned PNG Energy Developments & Origin Energy No ? ? No/concept Santos Ltd. Yes JDR 85 km No/planned ? Yes ABB 74 km No/planned Russian Electricity Company Federal Grid Company from Georgia No ? 2 x 30 km No/planned No ? ? No/planned 120 121 Installed No/planned Installation ongoing 122 123 124 125 126 127 128 Australia 129 Australia 130 Australia 131 Australia 132 Australia Flinders Island connector Cook Strait Interconnector (New Zealand) Kangaroo Island Cape Jarvis Penneshaw Papua New Wabo in the Gulf Guinea - North Province of PNG to Queensland Weipa, North Queensland Fletcher Finucane Western Australia 133 Australia 134 Asia Yorke Peninsula to Adelaide Lake Ladoga 135 Asia Asia Greater Sochi development project Azerbaijan Turkmenistan India - Iran/Qatar Asia India - Sri Lanka Asia Subic Bay Philippines 136 Asia 137 CERES wind farm project Lake Ladoga Island Valaam Dzhubga to Psou ? ? No ? ? No/Rumours India - Iran/Qatar Indian Government No ? < 2000 km No/concept Madurai in Tamil Nadu with Thalaimannar, Mannar and Anuradhapuara Camayan Point to nearby Grande Island PTC No ? 200 km No/planned Approved by both Governments Mirant Philippines No ? 2.5 km No/planned 138 139 140 POWER CABLE SYSTEMS No Supplier / Installer KEPCO Area Asia System Leyte - Mindanao, Philippines From/To Leyte - Mindanao Owner/Operator Transco Philippines Contract Yes km 23 km Installed No/planned Kepco is providing financing Asia Singapore's mainland to a southern island Singapore's mainland to a southern island Singaporean power company Yes National Grid Corp. of the Philippines National Grid Corp. of the Philippines Yes No Sumitomo Corp & JPower Systems Corp. Kanematsu Corp. ? 50 km No/planned 18.8 km No/planned ? No/planned Cebu and Bantayan Island National Grid Corp. of the Philippines No ? ? No/planned Feasibility study ongoing Davao Light and Power Corp. Tenaga Nasional Bhd & Indonesia's PT Perusahaan Listrik Negara (PLN) Camiguin Electric Cooperative PT PLN No No ? 1 km No/planned ? 56 km No/planned No ? 13 km No/planned No ? 700 km No/planned Electrical Services Department of Brunei Thailand Energy company Perusahaan Listrik Negara No ? ? No/planned No ? ? No/planned No ? 5.5 km No/planned No ? < 200 km No/planned Yes Nexans 33 km No/planned Yes 2 x 59 km No/planned 141 142 Asia 143 Asia Negros - Panay Negros - Panay Power Link Guihulngan City Guihulngan City to to San Carlos City San Carlos City 144 Asia Cebu and Bantayan Island Asia Davao City Davao City Asia Malaysia Indonesia Malaysia - Sumatra Asia Camiguin Mindanao Sumatra - West Java Camiguin Mindanao Bangko in South Sumatra and Bogor in West Java Temburong Mentiri Phangan Island Brunei Thailand Asia North Jakarta and Panjang island North Jakarta and Panjang island Asia Russia - Japan 145 146 147 148 Asia 149 Asia 150 Asia 151 152 Sakhalin - Hokkaido UES & Sumitomo Corp. & Honshu 153 Asia Krabi main land to Krabi main land to Sri Borya, Pu (or Sri Borya, Pu (or Crab) and Phi Phi Crab) and Phi Phi Don Islands Don Islands Thailand Energy company 154 Asia TPC Taiwan – Peng Hu Tai Tzu Tsun on the Taiwan Power Company Taiwan mainland to Li Cheng Chiao on Peng Hu Island. CLP Power Yes Sumitomo Corp & JPower Systems Corp. ? 1.3 km No/planned CLP Power Yes ? 2 x 880 m No/planned Electricity of Viet Nam No ? 115 km No/planned 155 Asia 156 Asia Tolo Harbour, Ma On Shan to Pak China Shek Kok Liu Ko Ngam to Liu Ko Ngam to Pak Pak Sha Tau Tsui - Sha Tau Tsui - Hong Hong Kong Kong 157 Asia 158 Vietnam Mainland to Phu Quoc Island POWER CABLE SYSTEMS No Area Asia 159 Asia 160 Asia System Vietnam From/To Owner/Operator Contract Mainland to Ly Son Electricity of Viet Nam No Island Northern Mariana Tinian - Saipan Commonwealth Utilities No Islands Corp Indonesia Seribu archipelago PT PLN No Supplier / Installer ? km ? Installed No/planned ? ? No/concept ? ? No/planned 161 162 163 Asia Indonesia No ? 10 km No/planned South Korea South Korea Japan Batam - Bintan Island Jeju Island Busan via Tsushima (Daemado Island) to Japan’s Kyushu Island PT PLN Asia Asia KEPCO KEPCO No No ? ? 100 km 200 km No/Rumours No/Planned North America North America Alaska Snettisham No ? ? No/concept Bay of Fundy Bay of Fundy Alaska Electric Light & Power Co. Fundy Ocean Research Centre for Energy Yes Prysmian 11 km Lake Erie CleanPower Connector AWC Backbone Nantikoke, Ontario Springfield, Pennsylvania Virginia - New York No ? 100 km No/planned Cable delivered - to be installed No/concept No ? ? No/planned Yes Nexans 15 km No/planned No ? ? No/concept Yes ABB ? No/planned Received Presidential Permit Received Approval of US Army Corps of Engineers No ? ? No/planned CPCN Application withdrawn No ? 650 miles No/concept 164 165 166 North America 167 North America 168 169 North America North America Intertie Project (Alaska) Cook Inlet Crossing North America JDF Project 170 Lake Erie Power Corp Trans-Elect, Google, Good Energies and Marubeni Corporation North Douglas to Alaska Electric Light & Young Bay Power Co. Cook Inlet crossing Northern Dynasty from Homer Minerals & Homer Electric Association Vancouver Island Sea Breeze Pacific across the Strait of Regional Transmission Juan de Fuca to the System, Inc. City of Port Angeles on the Olympic Peninsula, Washington 171 North America 172 North America Vancouver Island Vancouver Island Sea Breeze Pacific (British Colombia) across the Strait of Regional Transmission Georgia to System, Inc. Vancouver, British Columbia Oregon Portland, Oregon, to Sea Breeze Pacific California the San Francisco Regional Transmission Bay Area System Inc. & Pacific Gas & Electric Company 173 174 North America North America California North America New York North America Haidalink New York Los Angeles to ? Catalina Island PJM Interconnection Poseidon Transmission - Long Island ? ? ? No/Rumours No ? ? No/planned National Grid Yes LS Cable ? No/planned NaiKun Wind Energy Group Inc. No ? 50 km No/concept 175 176 177 West Islip, N.Y. with nearby Captree Island Offshore substation to a substation at Tlell, Canada POWER CABLE SYSTEMS No Area North America System Lower Churchill project From/To Quebec - Ontario Owner/Operator Contract Newfoundland and No Labrador Hydro-Electric Corp. Supplier / Installer ? km 180 km Installed No/planned Feasibility study ongoing 178 North America Green line project Wiscasset to Boston New England Independent Transmission Company No ? 140 miles No/concept Lanai to Oahu; Lanai to Molokai; Lanai to Maui crossing the Strait of Belle Isle, Cabot Strait and Bay of Fundy Lake Winnipeg crossing (Bipole 3) Hawaiian Electric Co No ? several Nalcor Energy Yes Nexans 2 x 170 km No/planned EIA awarded ongoing No/planned Manitoba Hydro No ? ? 179 North America Hawaii North America New Brunswick Massachusetts (Maritime Link) North America Canada North America Canada Prince Edward Island - Mainland Summerside Electric No ? 20 km North America Canada - New York (CHPE: ChamplainHudson Power Cable) Bermuda Lake Champlain, down the bed of the Hudson all the way to New York City Transmission Developers No ? 370 miles Cut Wharf, Dockyard - Admiralty House dock in Pembroke & Tucker’s Town public dock Cooper’s Island, St George’s. Belco No ? ? No/planned New Jersey Virginia Trans-Elect No ? 600+ km No/concept Feasibility study ongoing Chevron USA Inc. Yes Nexans 42 km No/planned 180 181 182 183 184 North America 185 North America Atlantic Wind Connection No/concept Feasibility discussion held No/planned Application filed No/concept Feasibility discussion held 186 187 188 North Gulf of Mexico Jack and St. Malo America fields North Gulf of Mexico Gulf of Mexico America Caribbean Grenada - Tobago Grenada to Tobago ExxonMobil Yes Prysmian 50 km No/planned Grenada Government No ? ? No/planned Petrobras Yes 70 km No/planned Trinidad/Tobago Government Pemex No Aker Kvaerner ? ? No/planned Demar S.A. de C.V. ? ? No/planned No ? No/planned No ? ? No ? ? No/planned Consultancy out for tender No/concept 189 Caribbean Gulf of Mexico 190 Caribbean Trinidad - Tobago 191 Caribbean Gulf of Mexico Caribbean St. Kitts - Nevis Caribbean Dominica Martinique Guadeloupe Santa Lucia Martinique 192 193 194 Caribbean 195 Cascade and Chinook fields Trinidad - Tobago Ku-Maloob-Zaap oil field St. Kitts - Nevis West Indies Power (WIP) Nevis Ltd Dominica West Indies Power Martinique (Dominica) Ltd Guadeloupe Santa Lucia Qualibou Energy Martinique Yes POWER CABLE SYSTEMS No Area Caribbean System St. Thomas – St. Croix – British Virgin Islands – Puerto Rico From/To St. Thomas – St. Croix – British Virgin Islands – Puerto Rico Caribbean Curacao Venezuela Caribbean St. Thomas - St. John Willemstad, Curacao and Puerto Cumarebo, St. Venezuela Thomas - St. John Caribbean Island of Margarita Mainland South America South America Baja California Mexico Guyana South America South America South America 196 Owner/Operator Contract Puerto Rico Electrical No Energy Authority & Virgin Island’s Water and Power Authority & Florida Power and Light Supplier / Installer ? km ? Installed No/concept Feasibility study complete feasible ? No ? 90 km No/concept WAPA No ? 6 km No/planned Yes LS Cable (Installer: SBSS) 3 x 40 km No/planned CFE No ? 250 km No/concept West Demerara Guyana Power and Light Yes ? No/planned Guyana - Brazil Guyana - Brazil No ? No/concept Brazil Yes Nexans 65 km No/planned Petrobras Yes Nexans 59 km No/planned Brazil - Marlim Leste field Development Brazil - Peregrino development FPSO Cidade de Santos MV20 Brazil - Mexilhão gas field in the Santos Basin P-53 floating production to Marlim Leste field Brazil - Peregrino development ENMAN Services Limited Petrobras China National Machinery Import and Export Corporation ? Petrobras Yes Marine Systems 175 km No/planned Yes No/planned Galapagos Islands No Prysmian Cable & Systems ? 20 km Ecuador Norsk Hydro and Anadarko Petroleum Corporation Celec EC 1 km No/planned Chile domestic Chaiten - Puerto Montt Aysen - Puerto Montt Transelec No ? 160 km No/planned Chile Government No ? 800 - 900 km No/planned Feasibility study ongoing No ? ? No/Rumours No ? 1000 km No/planned Feasibility study ongoing 197 198 199 200 Island of Margarita National Electricity Mainland, Venezuela Corporation (Corpoelec) 201 202 203 Brazil - Mexilhão project 204 South America 205 South America 206 207 208 South America South America South America Chile domestic 209 210 211 South America South America Chile domestic Isle Santa Maria Transelec shore Colombia Colombia Colombian Government Dominican Dominican Republic Republic - Puerto - Puerto Rico Rico POWER CABLE SYSTEMS No 212 213 Area South America South America System Colombia Panama Colombia Panama From/To Colombia - Panama Owner/Operator Etesa & ISA Contract No Supplier / Installer ? km 400 km Installed No/planned Colombia - Panama Etesa & ISA No ? 55 km No/planned DISCLAIMER The information contained in www.SubCableNews.com is derived from sources, which we believe to be accurate but is not guaranteed. www.SubCableNews.com is not responsible for any errors or omissions and disclaims any liability incurred as a consequence of any of the contents of this resource. No part of this publication may be reproduced, duplicated, published or transmitted in any form by any means without prior written permission from the publisher.
© Copyright 2024