POWER CABLE SYSTEMS

POWER CABLE SYSTEMS
No
Area
Europe
System
Western Link
HVDC
From/To
West Kilbride Birkenhead
Owner/Operator
National Grid
Contract
Yes
Supplier /
Installer
Prysmian &
Siemens
km
approx.
350 km
Europe
East Coast
Electricity grid
Along East Coast of
Scotland
Crown Estate
No
?
960 km
Europe
Western Isle
power link
Grabhair on the Isle
of Lewis across to
Dundonnell on Little
Loch Broom
Scottish and Southern
Energy
No
?
80 km
No/planned Out for tender
Scottish Government,
the Department of
Enterprise, Trade and
Investment in Northern
Ireland and the
Department of
Communications,
Energy and Natural
Resources in Ireland
Statoil
No
?
?
No/concept
Yes
Nexans
46 km
No/planned
ESB
Yes
Prysmian
7 x 3 km
No/planned
Scottish and Southern
Energy
Yes
Nexans
2 x 41 km
No/planned
1
Installed
No/planned Installation
ongoing
No/planned
2
3
Europe
Scotland - Ireland - Scotland - Ireland Northern Ireland
Northern Ireland
4
Europe
Tyrihans field
Tyrihans field Infield connections
Europe
Shannon River
Crossing
Kintyre Southwest
Scotland
Kilpaddoge Moneypoint
Kintyre peninsula
and mainland coast
in Southwest
Scotland.
Europe
Hinkley to
Avonmouth
Hinkley to
Avonmouth
National Grid
No
?
?
No/Concept
Europe
Scotland Northern Ireland
Scotland - Northern
Ireland
Moyle Interconnector
Limited
No
?
106 km
No/planned Out for tender
Europe
Ireland - France
Ireland - France
Eirgrid
No
?
?
No/planned Route Survey
completed
Europe
Norway Trondheim
Norway
Norway (Utsira
High
Electrification)
Trondheim Fjord
Statnett
?
?
8 km
No/Rumours
Norway
From shore to
Platforms and
Interplatforms
Austevoll Kraftlag
Statoil
Yes
No
Prysmian
?
?
200 km +
No/planned
No/planned Feasibility
study ongoing
Europe
Norway (Troll A to
shore)
Statoil
Yes
ABB
350 km
No/planned
Europe
Norway (Martin
Linge/Hild field)
Troll A platform to
shore and
Interplatforms
Martin Linge
platform to Kollsnes
Total E&P Norge AS
Yes
Subsea 7 &
ABB
160 km
No/planned
Europe
UK (Bittern field)
Bittern field
Shell U.K. Ltd.
Yes
Ocean
Installer
No/planned
Europe
UK Caithness Blackhillock
UK Caithness Blackhillock
Scottish and Southern
Energy
Yes
ABB
1 x 20.7
km + 1 x
1.8 km
160 km
5
6
Europe
7
8
9
10
11
12
Europe
Europe
13
14
15
16
17
No/planned
POWER CABLE SYSTEMS
No
Area
Europe
18
Europe
System
Sweden Denmark
Sweden
From/To
Across the Öresund
Edsviken Submarine
Cable Project Danderyd –
Järva/Ålkistan
Contract
No
Supplier /
Installer
?
km
?
Installed
No/planned
No
?
?
No/planned
No
?
?
No/Rumours
No
?
?
No/planned
RTE & RED
AMEC
No
No
?
?
?
?
No/concept
No/concept
Research Institutes in
Iceland and UK
No
?
1200 1900 km
No/concept Feasibility
study ongoing
Owner/Operator
Svenska kraftnät;
Energinet.dk
Svenska Kraftnät
19
Europe
20
Europe
21
22
Europe
Europe
Spain (Island of Mainland - Island of Red Electrica de Espana
Ons)
Ons
Ceuta and the
Ceuta and the
Red Electrica de Espana
Iberian Peninsula Iberian Peninsula
Spain - France
West Coast UK
Bilbao - Bordeaux
Stornoway, in the
Western Isles, to
Hunterston, in
Ayrshire, UK
23
Europe
Iceland Iceland Scotland; Iceland - Scotland,Norway,
Norway
The Netherlands or
Germany
Europe
Iceland - UK;
Iceland - Germany
Iceland - UK or
Germany
EnBW from Germany
and Iceland Government
No
?
1200 nm
No/concept
Europe
Power from Shore
Goliat oilfield to
Hammerfest
ENI; Hammerfest Energi
Nett
Yes
ABB & Aker
Solutions for
Installation
85 km
No/planned
Northern Sweden - Fingrid Oyj and Svenska
Finland
Kraftnät
Pembroke and Wylfa
National Grid
on Anglesey
No
?
?
No/Rumours
No
?
63 km
No/concept Feasibility
study ongoing
National Grid
No
?
330 km
NorthConnect: Adger
Energi, E-Co Energi,
Lyse and Sweden’s
Vattenfall
Statnett; National Grid
No
?
570 km
No/planned Consultations
ongoing possible
interconnectio
n with other
Offshore Wind
Farms
No/planned
No
?
711 km
ABB
350 km
24
25
26
Europe
Fenno-Skan 3
Europe
Pembroke and
Wylfa on
Anglesey
27
28
Europe
Scotland Weisdale, Shetland Shetland (Viking
Portgordon,
Interconnector)
Scotland
29
Europe
UK- Norway
UK - Norway
Europe
UK - Norway
UK - Norway
Europe
Nordbalt (ex
SwindLit)
Lithuania - Sweden
Lietuvos Energija and
Svenska Kraftnat
Yes
Europe
Europe
UK - France
The Netherlands
UK - France
Ellewoutsdijk Terneuzen
FAB Link Limited
Delta Infra BV
No
Yes
Europe
The Netherlands
Luchterduinen
Offshore Wind Farm
- Export Cable
VSMC
Yes
30
31
32
33
34
35
?
?
Van Oord &
?
Visser & Smit
Hanab
LS Cable
25.7 km
No/planned Out for tender
No/planned Installation
ongoing
No/planned
No/planned
Installation
completed
POWER CABLE SYSTEMS
No
36
37
From/To
Gemini OWF Export Cable
Russia - Sweden
Vyborg to
Greifswald
Owner/Operator
Typhoon Offshore B.V.
Contract
Yes
Supplier /
Installer
Nkt cables
km
200 km
Installed
No/planned
Rosenergoatom
Inter RAO UES
No
No
?
?
?
1220 km
No/concept
No/planned
Spanish Islands
Red Electrica de Espana
Yes
1 x Nexans; 1
x Prysmian
2 x 115
km
No
?
100 km
Europe
Benejana - Cabo de Red Electrica de Espana
la Nao, Ibiza
Ibiza -Formentera Ibiza -Formentera Red Electrica de Espana
No/planned Installation
ongoing
No/planned
No
?
?
No/planned
Europe
Majorca - Menorca
No
?
2 x 11 km
No/planned
Europe
Turkey
Yes
Prysmain
2 x 4 km
No/planned
Europe
Turkey - Cyprus
No
?
< 100 km
No/concept
Europe
No
?
400 km
No/planned
Europe
Black Sea High
Voltage Direct
Current (HVDC)
project
NorNed 2
Europe
No/planned Application
filed
No/planned
Europe
Area
Europe
System
The Netherlands
Europe
Europe
Russia - Sweden
Russia - Germany
Europe
Majorca - Ibiza
Europe
Ibiza - Spain
38
39
40
41
Majorca - Minorca
?
42
43
44
45
Crossing the
TEIAS
Dardanelles Strait
Turkey - Turkey
Turkish Government
Republic of
Northern Cyprus
Constanta, Romania Transelectrica & TEIAS
- Pasakoy, Turkey
Norway Netherlands
Tennet & Statnett
No
?
approx.
580 km
Nemo
UK - Belgium
Elia/National Grid
No
?
North Sea Super
Grid
UK - Denmark
UK - Netherlands Germany
UK - Denmark
Scottish and Southern
Energy
Dong Energy A/S &
National Grid
No
?
approx.
250 km
1000 km
No
?
?
No/planned Feasibility
study ongoing
Denmark - The
Netherlands
(COBRA)
Guernsey - Jersey
Denmark - The
Netherlands
Tennet & Energinet.dk
No
?
?
No/planned
Guernsey - Jersey
Guernsey Electricity
No
?
?
Europe
Denmark - Agersø
and Omø
Denmark - Agersø
and Omø
SEAS-NVE
No
?
6 km
No/planned Survey
completed
No/planned
Europe
Denmark - Jutland Denmark - Jutland
and Laesoe Island and Laesoe Island
Energinet.dk
Yes
LS Cable
24.5 km
No/planned
Europe
Denmark - Anholt Denmark - Anholt
Island - Anholt Island - Anholt Wind
Wind Farm
Farm
Energinet.dk
No
?
28 km
No/planned
Europe
Denmark - Lolland- Denmark - LollandAsko
Asko
Denmark - LilleøDenmark - LilleøFemø
Femø
SEAS-NVE
Yes
No/planned
Yes
JD
Contractors
JD
Contractors
?
SEAS-NVE
?
No/planned
46
47
48
Europe
No/concept
49
Europe
50
Europe
51
52
53
54
55
Europe
56
POWER CABLE SYSTEMS
No
Supplier /
Installer
Area
Europe
System
Kriegersflak
From/To
Denmark Kriegersflak OWF
Owner/Operator
Energinet.dk
Contract
No
km
45 km
Europe
Horns Rev 3
Energinet.dk
Yes
ABB
32 km
Europe
NorGer
Horns Rev 3 Export
Cable
Feda, Norway Wilhelmshaven,
Germany
Statnett, KfW, TenneT
No
?
620 km
No/planned Planning
procedures
ongoing
Europe
Norway Germany (Nord
Link)
Statnett & TenneT
No
?
approx.
600 km
No/planned Out for tender
Europe
Italy - Capri
Terna Rete Italia S.p.A.
Yes
Prysmian
30 km
No/planned
Europe
Marulk gas field
Yes
Nexans
13.5 km
No/planned
Europe
Baltic 2
Statoil ASA, ENI Norge
AS and Dong E&P
Norge AS
Bentwisch - Baltic 2 50Hertz Offshore GmbH
Offshore Platform
Yes
NSW
2 x 60 km
Europe
Sylwin 1
Buesum, Germany Offshore Platform
TenneT
Yes
160 km
Europe
DolWin 2
Norderney, Germany
- Offshore Platform
TenneT
Yes
Prysmian
Cables &
Systems &
Siemens
ABB
No/planned Installation
ongoing
No/planned Installation
ongoing
165 km
No/planned
Europe
Helwin 2
Buesum, Germany Offshore Platform
TenneT
Yes
85 km
No/planned Installation
ongoing
Europe
Sylwin 2
Buesum, Germany Offshore Platform
TenneT
No
Prysmian
Cables &
Systems &
Siemens
?
?
No/planned
Europe
BorWin 3
TenneT
Yes
No/planned
Dolwin 3
TenneT
Yes
Prysmian
Cables
Prysmian
Cables &
Alstom Grid
?
Europe
Diele, Germany Offshore Platform
Diele, Germany Offshore Platform
80 km
No/planned
57
58
59
60
Øksendal in Sirdal
municipality,
Norway to
Diele/Brunsbüttel,
Germany
Island of Capri Torre Annunziata
(Naples)
Installed
No/planned Out for tender
(AC cable)
No/planned
61
62
Control Umbilical
Alve template
63
64
65
66
67
68
69
POWER CABLE SYSTEMS
No
Area
Europe
System
BorWin 4
From/To
BorWin Beta Offshore Wind Farm
Owner/Operator
TenneT
Contract
No
Europe
Innogy Nordsee 1
OWF Export Cable
Innogy Nordsee 1
platform - Dolwin
beta
TenneT
Yes
Europe
BorWin 5
TenneT
No
TenneT
Yes
Supplier /
Installer
?
km
?
Installed
No/planned out for tender
70
71
72
Europe
73
Europe
74
Europe
75
Europe
76
Europe
Diele, Germany Offshore Platform
Gode Wind 1
DolWin Beta
Export Cable
Platform - Gode
Wind 1 platform
Dolwin 4
Diele, Germany Offshore Platform
Deutsche Bucht
Borwin Beta Connection
Deutsche Bucht
Sandbank OWF Sandbank OWF Sylwin Alpha
Sylwin Alpha
Borkum Riffgrund Borkum, Germany 1
Offshore Platform
Siem
2 x 11 km
Offshore
Contractor &
J-Power
?
?
NSW
Elba - Italy
Europe
Europe
No/planned
2 x 8.5 km
No/planned
TenneT
No
?
?
No/planned
TenneT
Yes
31 km
No/planned
TenneT
Yes
Prysmian
Cables
ABB
2 x 36 km
No/planned
Tennet
Yes
NSW
2 x 26 km
No/planned Installation
ongoing
No/planned
77
Europe
No/planned
Terna SpA
No
?
35 km
Italy - Montenegro
Island Elba Mainland Italy
Italy - Montenegro
EPCG & Terna Spa
Yes
No/planned
Italy - Croatia
Terna SpA & HEP-OPS
No
Pyrsmian/Ne
xans
?
400 km
Italy - Croatia
?
No/planned Feasibility
study ongoing
Europe
Albania - Italy
Albania - Italy
Albanian Government &
Terna SpA
Yes
ASG
340 km
Europe
Cyclades Ring
Network
Lavrion-Syros
Independent Power
Transmission Operator
Yes
Prysmian
108 km
No/planned Approved by
both
Governments
No/planned
Europe
Europe
Europe
Libya - Greece
Italy - Libya
Greece - Italy
Libya - Greece
Sicily - Libya
Greece - Italy
?
?
Greek Government
No
No
No
?
?
?
?
?
?
Europe
Lanzarote Fuerteventura
Greece Domestic
REE
No
?
?
Rumours
No/planned
No/concept cancelled?
No/planned
Public Power
Corporation S.A.
REE
Yes
Nexans
3 x 21 km
No/planned
No
?
?
No/planned
REE
No
?
?
No/planned
78
79
80
81
82
83
84
85
Europe
Gran Canary and
Fuerteventura
Lanzarote Fuerteventura
Polypotamos - Nea
Makri
Gran Canary and
Fuerteventura
Europe
Europe
Teneriffe - La
Gomera
Norway
Teneriffe - La
Gomera
Gygrid Field
Europe
Norway
Europe
Norway
Europe
Norway
Europe
Norway
Europe
Norway
Ormen Lange North
Field
Fossekall Dompap
oil and gas field
Statoil’s Gudrun
North Sea oil and
gas field
Statoil's Åsgard oil
and gas field
Statoil's Troll A
86
Europe
87
88
89
Statoil
Yes
Nexans
1 x 20 km
No/planned
Norske Shell
Yes
Nexans
6.5 km
No/planned
Statoil
Yes
Nexans
25 km
No/planned
Statoil
Yes
ABB/EMAS
AMC
55 km
No/planned
Statoil
Yes
Nexans
165 km
No/planned
Statoil
Yes
ABB
69 km
No/planned
90
91
92
93
94
95
POWER CABLE SYSTEMS
No
96
97
98
Area
Europe
System
Norway
From/To
Oseberg Delta field
Owner/Operator
Statoil
Contract
Yes
Supplier /
Installer
Nexans
km
?
Europe
Europe
Europe
Norway
Norway
Norway
Statoil
Staoil
Statoil
Yes
Yes
No
Nexans
Nexans
?
?
?
?
Europe
Norway
Statoil
Yes
Nexans
9 km
No/planned
Europe
Norway
BKK Nett AS
Yes
Nexans
90 km
No/planned
Europe
Finland
Kraftnät Åland AB
Yes
ABB
158 km
No/planned
Europe
Africa
Israel - Cyprus Greece
Tunisia - Italy
Snøhvit gas field
Smørbukk Sør
Johan Sverdrup to
shore
Gullfaks
Rimfaksdalen Gas
Project
Hjeltefjorden and
Lurefjorden
Finnish mainland
and Åland
Israel - Cyprus Greece
El Hawaria in
Tunisia and
Partanna in Sicily
Installed
No/planned Installation
ongoing
No/planned
No/planned
No/concept
Africa
Angola
Dalia and the
Girassol floating
production storage
and offloading units
Africa
Algeria - Morocco
Africa
Algeria - Italy
Africa
Algeria - Spain
Algeria - Spain
Africa
Africa
Africa
Algeria - Spain
Morocco - Spain
Libya - Italy
Algeria - Spain
Morocco - Spain
Libya - Italy
Africa
Egypt
AGIBA's West
Ashrafi hydrocarbon
facility to shore
Africa
Tanzania
Electrification
Africa
Mozambique
Africa
Nigeria
Africa
Nigeria
Kisorya Bay to
Rugezi Bay,
Crossing Lake
Victoria
Quirimbas National
Park
Total Ofon Phase 2
project
Egina field
Middle East
Offshore Saudi
Arabia
Middle East
Ras Laffan
Industrial City Halul Island
Qatar’s Power
Transmission
Expansion
99
100
101
102
103
Quantum Energy Ltd
No
?
540 miles
No/planned
Italian electricity grid
Terna SpA &Tunisia's
electricity and gas
company Steg
Total E&P Angola
No
?
170 km
No/planned MOU signed
Yes
Technip
34 km
No/planned
Algeria - Morocco
?
No
?
?
No/Rumours
Algeria - Italy
Algerian Energy
Company (AEC)
Algerian Energy
Company (AEC)
Algerian Government
Morocco Government
Libya & Italian Energy
Companies
AGIBA Petroleum
Company
No
?
?
No/concept
No
?
?
Rumours
No
No
No
?
?
?
1
1
?
Rumours
No Rumours
No/Rumours
Yes
CTC Marine
Projects
10 km
No/planned
No
?
< 350 km
No/concept
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
Middle East
119
Offshore Saudi
Arabia - Platform
connections
Ras Laffan
Industrial City Halul Island
Qatar’s Power
Transmission
Expansion
Tanesco
?
No
?
10 km
No/Rumours
Subsea 7
Yes
JDR
2 x 5 km
No/planned
Total Upstream Nigeria
Ltd
PMS, Egypt
Yes
Duco Ltd.
No/planned
No
?
76 km
(Umb.)
Several
Qatar Petroleum
Yes
LS Cable
2 x 100
km
Qatar General Electricity
& Water Corporation
Yes
Prysmian
Cables &
Systems
63 km
No/planned
No/planned Installation
ongoing
No/planned
POWER CABLE SYSTEMS
No
Supplier /
Contract
Installer
km
Yes
ZTT; Subtech 99 Km for
phase 1;
91 km for
phase 2
Area
Middle East
System
Wasit gas
development
programme
From/To
Wasit gas
development
programme
Owner/Operator
Saudi Aramco
Middle East
Saudi Arabia Egypt
Saudi Arabia - Egypt
No
?
20 km
No/planned
Middle East
Egypt - Jordan
Egypt - Jordan
Egyptian Electricity
holding Company
(EEHC) and the Saudi
Electricity Company
(SEC)
Ministry of Electricity
No
?
20 km
No/planned
Middle East
Iran - UAE
Iran - Dubai, UAE
?
?
?
110 miles
No/planned
Middle East
Replacement of
power feeding
systems to Zakum
offshore oil field
UAE
ADMA-OPCO
Yes
Prysmian
Cables &
Systems
200 km
No/planned
Middle East
Nasr Full Field
Development
Project
UAE
ADMA-OPCO
Yes
144 km +
55 km
No/planned
Middle East
Saudi Arabia
Abu Ali and
Khursaniyah fields
Saudi Aramco
Yes
Hyundai
Heavy
Industries
Co., Ltd.
McDermott
2 x 20 km
No/planned
Middle East
Iraq Crude Oil
Export Expansion
Project
Iraq
Leighton International
Yes
Parker
Hannifin
Corporation
60 km
No/Planned
Middle East Satah Al Razboot
(SARB) package 3
project
UAE
ADMA OPCO
Yes
JDR
55 km
No/planned
Flinders Island Tasmania
Cook Strait
Crossing
Hydro Tasmania
No
?
< 50 km
No/planned
Transpower
No
?
2 cables
No/planned
ETSA
No
?
15 km
No/planned
PNG Energy
Developments & Origin
Energy
No
?
?
No/concept
Santos Ltd.
Yes
JDR
85 km
No/planned
?
Yes
ABB
74 km
No/planned
Russian Electricity
Company
Federal Grid Company
from Georgia
No
?
2 x 30 km
No/planned
No
?
?
No/planned
120
121
Installed
No/planned Installation
ongoing
122
123
124
125
126
127
128
Australia
129
Australia
130
Australia
131
Australia
132
Australia
Flinders Island
connector
Cook Strait
Interconnector
(New Zealand)
Kangaroo Island
Cape Jarvis Penneshaw
Papua New
Wabo in the Gulf
Guinea - North
Province of PNG to
Queensland
Weipa, North
Queensland
Fletcher Finucane Western Australia
133
Australia
134
Asia
Yorke Peninsula
to Adelaide
Lake Ladoga
135
Asia
Asia
Greater Sochi
development
project
Azerbaijan Turkmenistan
India - Iran/Qatar
Asia
India - Sri Lanka
Asia
Subic Bay
Philippines
136
Asia
137
CERES wind farm
project
Lake Ladoga Island Valaam
Dzhubga to Psou
?
?
No
?
?
No/Rumours
India - Iran/Qatar
Indian Government
No
?
< 2000 km
No/concept
Madurai in Tamil
Nadu with
Thalaimannar,
Mannar and
Anuradhapuara
Camayan Point to
nearby Grande
Island
PTC
No
?
200 km
No/planned Approved by
both
Governments
Mirant Philippines
No
?
2.5 km
No/planned
138
139
140
POWER CABLE SYSTEMS
No
Supplier /
Installer
KEPCO
Area
Asia
System
Leyte - Mindanao,
Philippines
From/To
Leyte - Mindanao
Owner/Operator
Transco Philippines
Contract
Yes
km
23 km
Installed
No/planned Kepco is
providing
financing
Asia
Singapore's
mainland to a
southern island
Singapore's
mainland to a
southern island
Singaporean power
company
Yes
National Grid Corp. of
the Philippines
National Grid Corp. of
the Philippines
Yes
No
Sumitomo
Corp & JPower
Systems
Corp.
Kanematsu
Corp.
?
50 km
No/planned
18.8 km
No/planned
?
No/planned
Cebu and Bantayan
Island
National Grid Corp. of
the Philippines
No
?
?
No/planned Feasibility
study ongoing
Davao Light and Power
Corp.
Tenaga Nasional Bhd &
Indonesia's PT
Perusahaan Listrik
Negara (PLN)
Camiguin Electric
Cooperative
PT PLN
No
No
?
1 km
No/planned
?
56 km
No/planned
No
?
13 km
No/planned
No
?
700 km
No/planned
Electrical Services
Department of Brunei
Thailand Energy
company
Perusahaan Listrik
Negara
No
?
?
No/planned
No
?
?
No/planned
No
?
5.5 km
No/planned
No
?
< 200 km
No/planned
Yes
Nexans
33 km
No/planned
Yes
2 x 59 km
No/planned
141
142
Asia
143
Asia
Negros - Panay
Negros - Panay
Power Link
Guihulngan City Guihulngan City to
to San Carlos City
San Carlos City
144
Asia
Cebu and
Bantayan Island
Asia
Davao City
Davao City
Asia
Malaysia Indonesia
Malaysia - Sumatra
Asia
Camiguin Mindanao
Sumatra - West
Java
Camiguin Mindanao
Bangko in South
Sumatra and Bogor
in West Java
Temburong Mentiri
Phangan Island
Brunei
Thailand
Asia
North Jakarta and
Panjang island
North Jakarta and
Panjang island
Asia
Russia - Japan
145
146
147
148
Asia
149
Asia
150
Asia
151
152
Sakhalin - Hokkaido UES & Sumitomo Corp.
& Honshu
153
Asia
Krabi main land to Krabi main land to
Sri Borya, Pu (or
Sri Borya, Pu (or
Crab) and Phi Phi Crab) and Phi Phi
Don Islands
Don Islands
Thailand Energy
company
154
Asia
TPC Taiwan –
Peng Hu
Tai Tzu Tsun on the Taiwan Power Company
Taiwan mainland to
Li Cheng Chiao on
Peng Hu Island.
CLP Power
Yes
Sumitomo
Corp & JPower
Systems
Corp.
?
1.3 km
No/planned
CLP Power
Yes
?
2 x 880 m
No/planned
Electricity of Viet Nam
No
?
115 km
No/planned
155
Asia
156
Asia
Tolo Harbour,
Ma On Shan to Pak
China
Shek Kok
Liu Ko Ngam to Liu Ko Ngam to Pak
Pak Sha Tau Tsui - Sha Tau Tsui - Hong
Hong Kong
Kong
157
Asia
158
Vietnam
Mainland to Phu
Quoc Island
POWER CABLE SYSTEMS
No
Area
Asia
159
Asia
160
Asia
System
Vietnam
From/To
Owner/Operator
Contract
Mainland to Ly Son Electricity of Viet Nam
No
Island
Northern Mariana
Tinian - Saipan
Commonwealth Utilities
No
Islands
Corp
Indonesia
Seribu archipelago
PT PLN
No
Supplier /
Installer
?
km
?
Installed
No/planned
?
?
No/concept
?
?
No/planned
161
162
163
Asia
Indonesia
No
?
10 km
No/planned
South Korea
South Korea Japan
Batam - Bintan
Island
Jeju Island
Busan via Tsushima
(Daemado Island) to
Japan’s Kyushu
Island
PT PLN
Asia
Asia
KEPCO
KEPCO
No
No
?
?
100 km
200 km
No/Rumours
No/Planned
North
America
North
America
Alaska
Snettisham
No
?
?
No/concept
Bay of Fundy
Bay of Fundy
Alaska Electric Light &
Power Co.
Fundy Ocean Research
Centre for Energy
Yes
Prysmian
11 km
Lake Erie
CleanPower
Connector
AWC Backbone
Nantikoke, Ontario Springfield,
Pennsylvania
Virginia - New York
No
?
100 km
No/planned Cable
delivered - to
be installed
No/concept
No
?
?
No/planned
Yes
Nexans
15 km
No/planned
No
?
?
No/concept
Yes
ABB
?
No/planned Received
Presidential
Permit Received
Approval of US
Army Corps of
Engineers
No
?
?
No/planned CPCN
Application
withdrawn
No
?
650 miles
No/concept
164
165
166
North
America
167
North
America
168
169
North
America
North
America
Intertie Project
(Alaska)
Cook Inlet
Crossing
North
America
JDF Project
170
Lake Erie Power Corp
Trans-Elect, Google,
Good Energies and
Marubeni Corporation
North Douglas to
Alaska Electric Light &
Young Bay
Power Co.
Cook Inlet crossing
Northern Dynasty
from Homer
Minerals & Homer
Electric Association
Vancouver Island
Sea Breeze Pacific
across the Strait of Regional Transmission
Juan de Fuca to the
System, Inc.
City of Port Angeles
on the Olympic
Peninsula,
Washington
171
North
America
172
North
America
Vancouver Island Vancouver Island
Sea Breeze Pacific
(British Colombia) across the Strait of Regional Transmission
Georgia to
System, Inc.
Vancouver, British
Columbia
Oregon Portland, Oregon, to
Sea Breeze Pacific
California
the San Francisco Regional Transmission
Bay Area
System Inc. & Pacific
Gas & Electric Company
173
174
North
America
North
America
California
North
America
New York
North
America
Haidalink
New York
Los Angeles to
?
Catalina Island
PJM Interconnection Poseidon Transmission
- Long Island
?
?
?
No/Rumours
No
?
?
No/planned
National Grid
Yes
LS Cable
?
No/planned
NaiKun Wind Energy
Group Inc.
No
?
50 km
No/concept
175
176
177
West Islip, N.Y. with
nearby Captree
Island
Offshore substation
to a substation at
Tlell, Canada
POWER CABLE SYSTEMS
No
Area
North
America
System
Lower Churchill
project
From/To
Quebec - Ontario
Owner/Operator
Contract
Newfoundland and
No
Labrador Hydro-Electric
Corp.
Supplier /
Installer
?
km
180 km
Installed
No/planned Feasibility
study ongoing
178
North
America
Green line project Wiscasset to Boston
New England
Independent
Transmission Company
No
?
140 miles
No/concept
Lanai to Oahu;
Lanai to Molokai;
Lanai to Maui
crossing the Strait
of Belle Isle, Cabot
Strait and Bay of
Fundy
Lake Winnipeg
crossing (Bipole 3)
Hawaiian Electric Co
No
?
several
Nalcor Energy
Yes
Nexans
2 x 170
km
No/planned EIA awarded ongoing
No/planned
Manitoba Hydro
No
?
?
179
North
America
Hawaii
North
America
New Brunswick Massachusetts
(Maritime Link)
North
America
Canada
North
America
Canada
Prince Edward
Island - Mainland
Summerside Electric
No
?
20 km
North
America
Canada - New
York (CHPE:
ChamplainHudson Power
Cable)
Bermuda
Lake Champlain,
down the bed of the
Hudson all the way
to New York City
Transmission
Developers
No
?
370 miles
Cut Wharf, Dockyard
- Admiralty House
dock in Pembroke &
Tucker’s Town
public dock Cooper’s Island, St
George’s.
Belco
No
?
?
No/planned
New Jersey Virginia
Trans-Elect
No
?
600+ km
No/concept
Feasibility
study ongoing
Chevron USA Inc.
Yes
Nexans
42 km
No/planned
180
181
182
183
184
North
America
185
North
America
Atlantic Wind
Connection
No/concept Feasibility
discussion
held
No/planned Application
filed
No/concept Feasibility
discussion
held
186
187
188
North
Gulf of Mexico
Jack and St. Malo
America
fields
North
Gulf of Mexico
Gulf of Mexico
America
Caribbean Grenada - Tobago Grenada to Tobago
ExxonMobil
Yes
Prysmian
50 km
No/planned
Grenada Government
No
?
?
No/planned
Petrobras
Yes
70 km
No/planned
Trinidad/Tobago
Government
Pemex
No
Aker
Kvaerner
?
?
No/planned
Demar S.A.
de C.V.
?
?
No/planned
No
?
No/planned
No
?
?
No
?
?
No/planned Consultancy
out for tender
No/concept
189
Caribbean
Gulf of Mexico
190
Caribbean Trinidad - Tobago
191
Caribbean
Gulf of Mexico
Caribbean
St. Kitts - Nevis
Caribbean
Dominica Martinique Guadeloupe
Santa Lucia Martinique
192
193
194
Caribbean
195
Cascade and
Chinook fields
Trinidad - Tobago
Ku-Maloob-Zaap oil
field
St. Kitts - Nevis
West Indies Power (WIP)
Nevis Ltd
Dominica West Indies Power
Martinique (Dominica) Ltd
Guadeloupe
Santa Lucia Qualibou Energy
Martinique
Yes
POWER CABLE SYSTEMS
No
Area
Caribbean
System
St. Thomas – St.
Croix – British
Virgin Islands –
Puerto Rico
From/To
St. Thomas – St.
Croix – British
Virgin Islands –
Puerto Rico
Caribbean
Curacao Venezuela
Caribbean
St. Thomas - St.
John
Willemstad, Curacao
and Puerto
Cumarebo,
St. Venezuela
Thomas - St.
John
Caribbean
Island of
Margarita Mainland
South
America
South
America
Baja California
Mexico
Guyana
South
America
South
America
South
America
196
Owner/Operator
Contract
Puerto Rico Electrical
No
Energy Authority &
Virgin Island’s Water
and Power Authority &
Florida Power and Light
Supplier /
Installer
?
km
?
Installed
No/concept Feasibility
study
complete feasible
?
No
?
90 km
No/concept
WAPA
No
?
6 km
No/planned
Yes
LS Cable
(Installer:
SBSS)
3 x 40 km
No/planned
CFE
No
?
250 km
No/concept
West Demerara
Guyana Power and
Light
Yes
?
No/planned
Guyana - Brazil
Guyana - Brazil
No
?
No/concept
Brazil
Yes
Nexans
65 km
No/planned
Petrobras
Yes
Nexans
59 km
No/planned
Brazil - Marlim
Leste field
Development
Brazil - Peregrino
development
FPSO Cidade de
Santos MV20
Brazil - Mexilhão
gas field in the
Santos Basin
P-53 floating
production to
Marlim Leste field
Brazil - Peregrino
development
ENMAN Services
Limited
Petrobras
China
National
Machinery
Import and
Export
Corporation
?
Petrobras
Yes
Marine
Systems
175 km
No/planned
Yes
No/planned
Galapagos Islands
No
Prysmian
Cable &
Systems
?
20 km
Ecuador
Norsk Hydro and
Anadarko Petroleum
Corporation
Celec EC
1 km
No/planned
Chile domestic
Chaiten - Puerto
Montt
Aysen - Puerto
Montt
Transelec
No
?
160 km
No/planned
Chile Government
No
?
800 - 900
km
No/planned Feasibility
study ongoing
No
?
?
No/Rumours
No
?
1000 km
No/planned Feasibility
study ongoing
197
198
199
200
Island of Margarita National Electricity
Mainland, Venezuela Corporation (Corpoelec)
201
202
203
Brazil - Mexilhão
project
204
South
America
205
South
America
206
207
208
South
America
South
America
South
America
Chile domestic
209
210
211
South
America
South
America
Chile domestic
Isle Santa Maria Transelec
shore
Colombia Colombia Colombian Government
Dominican
Dominican Republic
Republic - Puerto
- Puerto Rico
Rico
POWER CABLE SYSTEMS
No
212
213
Area
South
America
South
America
System
Colombia Panama
Colombia Panama
From/To
Colombia - Panama
Owner/Operator
Etesa & ISA
Contract
No
Supplier /
Installer
?
km
400 km
Installed
No/planned
Colombia - Panama
Etesa & ISA
No
?
55 km
No/planned
DISCLAIMER
The information contained in www.SubCableNews.com is derived from sources, which we believe to be accurate but is not guaranteed.
www.SubCableNews.com is not responsible for any errors or omissions and disclaims any liability incurred as a consequence of any of the contents of this
resource. No part of this publication may be reproduced, duplicated, published or transmitted in any form by any means without prior written permission from
the publisher.