Bus Services Årnes – Gardermoen 2016 Versjon 1 30.09.2015 Specification for installation of ticketing systemes for RuterRegion Bilag 1 til vedlegg 9 Busstjenester Årnes – Gardermoen 2016 Bilag 1 til vedlegg 9 Specification for installation of ticketing systemes for RuterRegion Innhold 1 INNLEDNING ..................................................................................................................................... 2 1.1 2 REQUIREMENTS FOR THE BUS PRODUCER .............................................................................................. 2 INSTALLATION ................................................................................................................................. 2 2.1 2.2 INSTALLATION OF THE TICKET ISSUE MACHINE (TP) AND THE TP’S CRADLE .............................................. 3 INSTALLATION OF THE CABLES FOR VALIDATORS (CP) ............................................................................. 3 30.09.2015 / Specification for installation of ticketing systemes for RuterRegion Side 1 av 5 Busstjenester Årnes – Gardermoen 2016 Bilag 1 til vedlegg 9 Specification for installation of ticketing systemes for RuterRegion 1 INNLEDNING General information This document specifies the necessary details for the mounting of the cradles for the (TP5800 (TP) ticket issue machines in buses for traffic in Akershus County. This document is a general description except for the responsibility for each part of the work. This document completes the installation guides for the VIX ticketing systems, the “R-001 TP5700 TP5800 with 4G 3G GPRS and GPS Bus Installation Guide v 1.3”. The document from VIX technology contain general information for the installation, independent of bus operator, type of bus and the responsibility for each part of the work. Responsibility for the work To complete the document mentioned above, you will find a responsibility matrix in figure 2 in the “Main document for the specification RuterRegion” document showing the responsibility of the different work, which is necessary for the installation for this specific bus delivery to Bus Operator. When the busses are delivered to the Bus Operator, the only remaining work is mounting of the TP 5800 cradle and TP5800 on the money board, and testing the functionality of the ticketing system. 1.1 Requirements for the bus producer Requirements for installation are as follows: • • • • • • • • • 2 Agreed equipment locations with Bus Operator and Ruter AS, who is the owner of the ticketing system Drill all mounting, cable access holes and mount the equipment as described in the documents and as shown on the provided drawings Establish cable routes and provide all cable protection/fixings Supply and run all cables plus provide power supplies to the system as requested and detailed on electrical schematic diagrams Supply all electrical distribution and control equipment shown on the schematic diagrams provided (housings, fixings, GPS antenna etc.). Terminate all wiring shown on the schematic diagrams Incorporate schematic diagrams and equipment locations into bus operations and maintenance manuals Check and approve the installation Hand over installation INSTALLATION Any changes of the agreed locations or changes of locations described in this document must be discussed with Bus Operator and Ruter before mounting. 30.09.2015 / Specification for installation of ticketing systemes for RuterRegion Side 2 av 5 Busstjenester Årnes – Gardermoen 2016 Bilag 1 til vedlegg 9 Specification for installation of ticketing systemes for RuterRegion The following sections describe the required installation. 2.1 Installation of the Ticket issue machine (TP) and the TP’s cradle Installation of the TP cradle and the TP will be done after the buses arrive to Oslo area. The busses must be prepared with cable from the dashboard according following terms: • The TP cradle should be installed at the left end of the money board with the driver’s console toward the driver and the customer’s interface towards the passengers’ passage. • The cable for the TP from the dashboard should be located as close to the money board as possible. • The cable should be easily accessible for maintenance. 2.2 Installation of the cables for validators (CP) For buses uses in RuterRegion(green buses) should it be prepared with cabling for validators to the pole near the doors and to the area where there is room for necessary network equipment. For the cable end at the door it should be placed in the roof above the pole with extra length of ca. 3m. The number of validators in a bus is dependent on the bus type and the number of doors. The main installation criteria are as follows: • The pole for mounting a validator must be between 32 and 38 mm in diameter. The pole must also be straight and not bent in any way. • Both articulated busses and single busses shall be prepared for one or two validators on each door. • Where possible, one validator shall be installed on the first vertical pole on the left side as a passenger boards the bus by the front door. If this is not possible the validator should be placed on the first available pole, preferably on the left side. Figur 1: Validator on the first pole. 30.09.2015 / Specification for installation of ticketing systemes for RuterRegion Side 3 av 5 Busstjenester Årnes – Gardermoen 2016 Bilag 1 til vedlegg 9 Specification for installation of ticketing systemes for RuterRegion Figur 2: Validator on the first available pole. • For double-doors with space for strollers, standing passengers or/and wheel chairs, there shall be installed a validator on each side of the doors. Figur 3: Validator on both poles with double-door entrance • For single-doors without such space, there will be placed one validator. 30.09.2015 / Specification for installation of ticketing systemes for RuterRegion Side 4 av 5 Busstjenester Årnes – Gardermoen 2016 Bilag 1 til vedlegg 9 Specification for installation of ticketing systemes for RuterRegion • For single-doors back entrance of the bus, the validator will be placed on the right side. Figur 4: Validator on the right pole for single-door back entrance • Normally this will be on the side with most passenger seats. 30.09.2015 / Specification for installation of ticketing systemes for RuterRegion Side 5 av 5
© Copyright 2024