PLTP Ulumbu is a power plant utilizing geothermal energy located in the village Wewo, District Satar
Mese, Manggarai Central, East Nusa Tenggara, about 22 miles south of Ruteng.
Trial operation of the electricity that utilize geothermal resources Ulumbu begins with drilling the
first well in 2003. Drilling resumed later in 2006 the second and third drilling wells.
In Dec 2008, GDA signed a contract with PT PAL Indonesia for the design, manufacture, and supply of
equipment for the Ulumbu geothermal project on Flores Island.
First electricity was generated in Nov 2011. Later in the year 2012, second unit of Ulumbu began to
supply the electricity to other districts on the island of Flores. Ulumbu was lit electricity to four
villages. Late in November of 2 x 2.5 MW will be spliced into the city Ruteng. Year 2012 will also go
to neighboring districts and starting in 2013 across mainland Flores electricity supplied from
Ulumbu.
In September 2014, Second Phase of 2 × 2.5 MW capacity has been successfully commissioned and
start producing electricity.
INDONESIA POWER GENERATION
http://repit.wordpress.com/
PHASE I of 2 X 2.5 MW
[email protected]
INDONESIA POWER GENERATION
http://repit.wordpress.com/
PHASE II of 2 X 2.5 MW
[email protected]
INDONESIA POWER GENERATION
Type
Area
Kind of Fuel
Power Capacity
Owner
Shareholders
Activity Since
Contact
Address
Email
Phone & Fax
Web
EPC
http://repit.wordpress.com/
[email protected]
Geothermal Power Plant
village Wewo – Ulumbu , District Satar Mese, Central Manggarai, East Nusa
Tenggara,
Geothermal
Phase I = 2 x 2.5 MW + Phase II = 2 x 2.5 MW
PT. PLN
PT. PLN
Phase I : 2011, Phase II : 2014
General Manager PLN NTT Area, Richard Syafkaur
PT PLN (PERSERO) WILAYAH NUSA TENGGARA TIMUR
Jl. Cak Doko No. 50B, KUPANG
Telp. +62380 833971, 833969 (Mnj), Fax. +62380 822100
www.pln.co.id
PT Rekadaya Elektrika (incl : PAL Indonesia, Geothermal Development
Associates)