Solcelleanlegg og energilagring Birger Hestnes – NEK Elsikkerhetskonferansen 2015 Nøkkeltall - NEK • • • Ca. 500 eksperter fra norsk næringsliv i 100 komitéer Netto vekst i medlemmer 8% (2014) Forvalter rundt 6.000 standarder – – – Prosessorienterte (10%) Systemorienterte (30% Produktorienterte (60%) 2 Kjernevirksomhet • • • «Drifter» norsk internasjonal el- og ekom standardisering Fremmer norsk innflytelse Fremmer bruk av internasjonale standarder i Norge 3 Medlemsorganisasjonen 11 medlemsparter – «eiere» NVE DSB Nkom Myndigheter Energi Norge NELFO Norsk Industri Bransjeorganisasjoner Nemko DNV GL Sertifisering - industri Statkraft Statnett Statoil Toneangivende norske industrivirksomheter 4 Det globale perspektiv «De tre søyler» 5 SPEILKOMITÉ NEK Norsk Elektroteknisk Komite NK Nasjonal Komite IEC/CENELEC TC / SC Technical Committee WG Working group Internasjonalt perspektiv «BEHOVET FOR STANDARDISERING OG CONFORMITY ASSESSMENT ER STØRRE ENN NOENSINNE» (Sitat; Jim Shannon, IEC president elect – 2015) 7 Hvorfor standardisering? Uten standardisering – ingenting annet enn ‘morsomme’ eksempler. VERDEN ER FULL AV ‘GODE’ EKSEMPLER – PETTER SMART + REODOR FELGEN. De laget perfekte løsninger som ingen kopierte. De var faktisk stolte av at de klarte dette alene! Og de fikk selvsagt rett Standardisering = stort marked Samarbeid mellom IEC og CENELEC • Dresden agreement • Rasjonalisering av ressurser – teknisk arbeid skal i størst mulig grad finne sted i IEC. IEC-publikasjoner blir i størst mulig grad adoptert til CENELEC uten tekniske endringer. • Unngår dobbelt arbeid. Felles arbeidsgrupper i IEC og CENELEC settes ikke opp. Arbeid skjer i IEC. (CENELECs medlemmer er også medlemmer i IEC.) • Rasjonalisering av prosessene for å møte markedets behov. Parallelle voteringer på felles arbeid. • Nytt arbeid i CENELEC blir kun startet dersom dette ikke er aktuelt for IEC. (Tilsvarende på nasjonalt nivå.) • Mulighet for IEC å benytte materiale fra CENELEC til å utvikle internasjonale standarder. Agreement on common planning of new work and parallell voting IEC - Systems work in Standards development At the end of June 2015, the IEC had four System Evaluation Groups (SEGs): • SEG 1: Smart Cities; • SEG 4: Low Voltage Direct Current (LVDC) Applications, Distribution and Safety for use in Developed and Developing Economies; • SEG 5: Electrotechnology for mobility; • SEG 6: Non-traditional Distribution Networks / Microgrids. And two Systems Committees (SyCs): • SyC AAL – Active Assisted Living • SyC Smart Energy IEC - Systems work in Standards development SyC Smart Energy The SyC Smart Energy will engage with IEC TCs to continue the development of interoperable Standards for transmission, distribution, metering, connecting consumers and cybersecurity. Its primary activities include: • Advance metering and substation & distribution automation; • Connecting the consumer, smart appliances; • Smart Energy, microgrids and active distribution networks; • Interactions with heat/cold and gas; • Cybersecurity; • Privacy; • Infrastructure modernization or new deployments; • Plugin hybrid electric vehicles. In the coming months, it will work to provide systems-level standardization, coordination and guidance in the areas of Smart Grid and Smart Energy, including interaction/integration in the areas of heat and gas. IEC - Systems work in Standards development SyC AAL, Active Assisted Living SyC Active Assisted Living (AAL) had its first meeting in March 2015 in Frankfurt, Germany, and agreed a comprehensive work programme. The internal structure of the SyC was approved as well as a list of TCs and consortia to be part of the platform. The operation is now effective and a first project for a new AAL chapter of the IEV is ongoing. SyC AAL set up four working groups: • WG 1: AAL user focus; • WG 2: AAL architecture and interoperability; • WG 3: AAL quality and conformity assessment; • WG 4: AAL regulatory matters. IEC - Systems work in Standards development SyC Smart Cities Blir trolig opprettet 2016 etter forslag fra Standard Management Board. Scope: To foster the development of standards in the field of electrotechnology to help with the integration interoperability and effectiveness of city systems. IEC - Systems work in Standards development Strategic Groups At the end of June 2015, IEC had three operational Strategic Groups (SGs): • SG 8: Industry 4.0 – Smart Manufacturing • SG 9: Communication Technologies • SG 10: Wearable Smart Devices In addition to SG 8, created in early 2014, the SMB has established two new SGs: SG 9 was set up by the SMB to coordinate activities in the telecommunications sector in IEC. It will create an inventory of work and activities, provide directions on future trends, interact with other organizations, identify cross-cutting technologies and promote interoperability. SG 10 was set up by SMB with the task of reviewing existing activities in a number of technical committees and ensuring coordination of activities. eMobility Europa 15 CENELEC Background – Interactions between automotive industry and electricity networks (connectors, wiring rules, electromagnetic compatibility aspects, safety issues) interoperability issues – Different needs for home charging, fast charging, types of vehicle, etc.. technical details – Automotive sector: large market and large producers no need to re-invent the wheel – Lack of standards may deter roll-out, implementation may be needed to standardize “chicken and egg” situation © CEN-CENELEC 2015 17 Mandate M/468 Mandate M/468 ‘Charging of electric vehicles’ asks the European Standards Organisations to develop and/or review existing standards in order to: • – Ensure interoperability and connectivity between the electricity supply and on-board chargers of electric vehicles – Ensure interoperability and connectivity between ‘off-board’ chargers and the electric vehicle and removable batteries – Consider any smart-charging issues – Consider safety risks and electromagnetic compatibility of the charger of electric vehicles © CEN-CENELEC 2015 18 Major challenges – – – – Domestic installations may not be adequate for charging Need to reduce options in charger/connector standards Smart charging – potential needs to be fulfilled; work on smart charging and on vehicle-to-grid communication is not yet mature New standards needed - detailed adjustments needed for EMC © CEN-CENELEC 2015 19 CEN-CLC eMobility Coordination Group – Establishing a coordination mechanism to carry forward main recommendations, monitor and steer their implementation CEN-CENELEC eMobility Coordination Group • CEN and CENELEC Technical Committees are already actively working: − CEN/TC 301 ‘Road vehicles’ − CLC/TC 69X ‘Electric systems for electric road vehicles’ − CLC/TC 23BX ‘Switches, boxes and enclosures for household and similar purposes, plugs and socket outlets for d.c. and for the charging of electrical vehicles including their connectors’ − CLC/TC 64 ‘Electrical installations and protection against electric shock’ © CEN-CENELEC 2015 20 Outcome CEN-CLC eMobility Coordination Group is determined to reply to M/468 A work programme and a set of available standards available on CEN-CLC website – Covering the following aspects: charging systems, connection to the grid and electrical safety – No single solution for couplers options – Report on Smart Charging available on CEN-CLC website – © CEN-CENELEC 2015 21 Latest developments European Commission ‘Clean Power for Transport’ Package issued in January 2013 Package includes a directive on the deployment of alternative fuels infrastructure (2014/94/EU) Alternative fuels considered: electricity, hydrogen, natural gas Standardization request (M/533) to CEN and CENELEC asking to develop ENs on the following aspects: wireless recharging of passenger cars, light duty vehicles and electric busses; battery swapping for passenger cars; electric buses connectors and socket outlet, AC normal recharging points for L-category vehicles, etc… CEN-CENELEC work programme sent to EC in September 2015 Part on electricity is coordinated by the CEN-CLC eMobility Coordination Group © CEN-CENELEC 2015 22 Link with international ISO/IEC • – Standards in this domain are – and have to be – international – Most of the work of Technical Committees is based on ISO and IEC, where work is already well under way Strengthening transatlantic cooperation Regular exchange of information with the US-EC Transatlantic Economic Council (TEC) - Cooperation on Standardization Constructive dialogue with ANSI CEN-CENELEC-ANSI eMobility Roundtable in November 2012 Link with JRC and EU US interoperability Centres: participation of CEN-CLC to the opening of the second interoperability Centre in Ispra - Italy (28 & 29 October 2015) © CEN-CENELEC 2015 23 Solkraft - hva skjer? Trend Europa • • • • Økende interesse for produksjon av solkraft Tyskland med politikken «energiwende» har vært ledende Fallende priser på utstyr Gradvis økende effektivitet Gruppering av produsenter • Storskala produksjon – – • Profesjonelle kraftprodusenter Konkurransedyktig i Norge? Prosumenter – – – Både produsent og konsument Alternativ pris = kraftpris+transport+avgifter Kan være interessant for mange Utgangspunkt - Norge • Norge er i en særstilling med et meget høyt innslag av fornybar energi i kraftforsyningen, men… • Energipris, forventet aggressiv dynamisk nettleie og høye avgifter kan gjøre lokal produksjon attraktivt også her. PROSUMENT En verden av småprodusenter 09-09-2014 Norsk Elektroteknisk Komite 28 Prosument • • Innebærer normalt egenproduksjon ved hjelp av vind- eller solenergi, kombinert med elektrisk energilagringssystem Trend: Solenergiproduksjon integreres i bygningsmaterialer Hva er dette? Norsk Elektroteknisk Komite 30 Hva er budskapet? • • • • Investeringsbeslutninger tatt av privatperson baseres ikke bare på økonomisk rasjonale «Et knippe av motiv» kan påvirke beslutningen Trender kan påvirke beslutningstaker Energipolitikken kan påvirke ulike energibæreres vilkår Norsk Elektroteknisk Komite 31 Estetikk og annet • Solpanel behøver ikke å være skjemmende – • Integreres mot lokal energilagring – • • Integreres som en del av bygningmateriale For å oppnå jevnt og lavt effektuttak «Plugg and play» gjør installasjon enkel Energipris (kr/kWh) er fallende, nå ca. 60.000,- for 3,5 kW i en installasjon. Norsk Elektroteknisk Komite 32 Eksempler Norsk Elektroteknisk Komite 33 Hva er trenden internasjonalt? • «Smart Grid» er på alles lepper – – – – – • Bygge inn prosessorkraft og kommunikasjon i elnettet Effekt-topper skal «jevnes ut» Høyrere prising av effekt Lokal produksjon og energilagring fremelskes Jfr. IEC SyC – Smart Energy «Internet of things» gir fleksibilitet lokalt Norsk Elektroteknisk Komite 34 Hovedprinsipp Norsk Elektroteknisk Komite 35 Regelverksperspektiv • Kan være krevende – – – – – – – Hvilke forskrifter sorterer slike anlegg under? Hvem er produsent når anlegg er sammensatt? Hvilke krav stilles til prosjektering? Hvem har tillatelse til å utføre slike anlegg? Hvilke krav stilles til ettersyn og vedlikehold? Energilagring basert på Litiumbatteri…? Krav til dokumentasjon og samsvarserklæring? Norsk Elektroteknisk Komite 36 Sikkerhetsaspekt - I Grensesnitt mot installasjon – plugg and play • Når er anlegget spenningsløst? • – – – • «Kontinuerlig» produksjon Energilagringssystem (10-15 kWh) Enhetlig system = kontroll, men hva med plassbygde satt sammen av komponenter fra ulike kilder? Potensialutjevning mellom systemene Norsk Elektroteknisk Komite 37 Sikkerhetsaspekt II • • • • • Vil vern løse ut i «off-grid» drift? DC-kortslutning og -lysbue (pluggsystem) Levetid og service – hvilke behov foreligger? Er delsystemene egnet for sammenkobling? Er boligeier kvalifisert til drift av slike anlegg? Norsk Elektroteknisk Komite 38 NEK/NK 82 Fotovoltaiske Solenergisystemer NK 82 er en norsk komite som speiler den korresponderende komiteen i IEC for internasjonal standardisering og CENELEC for europeisk standardisering. Arbeidet i den norske komiteen er derfor identisk med IEC og CENELEC. Scope IEC TC 82: "To prepare international standards for systems of photovoltaic conversion of solar energy into electrical energy and for all the elements in the entire photovoltaic energy system. In this context, the concept "photovoltaic energy system" includes the entire field from light input to a photovoltaic cell to and including the interface with the electrical system(s) to which energy is supplied. NOTE: It is recognized that there is some common interest between TC 47 and TC 82, therefore these two Committees shall maintain liaison." Energilagring - IEC White Paper NEK/NK 120 Elektriske energilagringssystemer Scope IEC TC 120:"Standardization in the field of grid integrated EES systems implementing system approaches to understand their complex constructions.« Foreløpig ikke etablert norsk speilkomité. NEK vil etter hvert aktivt oppsøke norske fagmiljøer for å sjekke norsk grunnlag og interesse. Energilagring? Kilde: Teknisk Ukeblad 21.11.2015 «Her bor de helt avkoblet fra både strømnett, vann og avløp Hvorfor kjøpe strøm og vann når naturen leverer vann og solenergi gratis? Hvorfor kaste bort verdifull kloakk du kan bruke selv? Installasjonene leverer likestrøm som lagres i to truckbatterier à 500 kilo, plassert i en naustlignende bod. Batteriene er seriekoblet og lagrer strøm med 48 volts spenning.» http://www.tu.no/bygg/2015/11/21/her-bor-de-helt-avkoblet-frabade-stromnett-vann-og-avlop#cxrecs_s TAKK FOR OPPMERKSOMHETEN!
© Copyright 2024