MV REVELATION - Trinity Offshore

T RINITY O FFSHORE P TE L TD
Tel : (65) 65431000
4 Loyang Crescent, Singapore 508979
Fax : (65) 65451000 Email : [email protected]
Co. Reg. No. 199102555 K
Website : www.trinityoffshore.com
138 MEN MULTI-ROLE/ACCOMMODATION VESSEL
MV REVELATION
Vessel Specification
Re-Built /
Conversion
Port of Registry
Classification
Shipyard
:
1984 / 2002
:
:
:
Belize
IRS
Sønderborg Skibsværft A/S, Denmark
Principal Dimensions
Overall Length
BP Length
Beam
Draft
GRT / NRT (MT)
:
:
:
:
:
80 m
75 m
13.25 m
5.1 m
2,311 / 693
Navigation & Communication
Weather Facsimile
Radar
:
:
Autopilot
Gyro Compass
Standard
Compass
Echo Sounder
GPS
:
:
Furuno Fax 108
Furuno ARPA FAR 2815
Furuno ARPA FAR 1945
Simrad AP 50
Anschutz STD 22
:
Cassens and Plath 21
:
:
Radio
:
Furuno F 861-A MK2
Furuno GP 30
Furuno GP 32
GMDSS Requirement A1+A2+A3
Life Saving Equipment
Life Raft
Rescue Boat
:
:
12 x 25 man life rafts
R6 Inboard MK-II
(capacity:15 Men)
Accommodation & Survey / Utility Room (optional)
82 berths + 1 clinic
bed
6 cabin x 1 man
11 cabins x 2 men
12 cabins x 4 men
1 cabin x 6 men
Attached Toilets
56 berths
2 cabins x 2 men
13 cabins x 4 men
Common Toilets
Total: 138 berths
(Number of berths for Charterers’ usa ge as per charter
NOTICE: Particulars are believed to be correct and subject to revision without prior notice. Interested parties must inspect vessel to check on suitability of the Company’s equipment. Company has
exercised due diligence to ensure that the data contained herein is reasonably accurate. However, the Company does not warrant the accuracy or completeness of the data. In no event shall the Company
be liable for any damages whatsoever arising out of the use or inability to use the data contained herein. All optional equipment for Charterers’ usage shall be agreed by the Company. Updated as at 15
December 2014.
-----------------------------------------------------------------------------– Page 1 of 2 –
MV REVELATION
Survey
(ROV Tracking)
:
party a greement)
2 x12” & 1 x 14” in Gate Valves
Simrad HPR 410 Pole (optional)
Multi Purpose Room size 26 ft by 19 ft - for safety briefing,
meeting or recreation purposes. Two office Room 3.5x3.5m
(Co mmunica tio ns equip ment are for sa fety co mp liance
and Owner’s usage o nly)
Capacity(s)
Clear Deck Space
Fresh Water
Fuel
Freezer / Chiller
Dry Store
:
:
:
:
:
Propulsion
330 m² approx.
330MT + 4 x 5MT/day
380 m³
45 m³ approx.
65 m³ approx.
Main Engine
:
Azimuth Stern
Thrusters cum
Back-up Propulsion
Bow Thruster
:
Performance
Cruising Speed
Cruising
Endurance
:
8 knots
:
40 days
Fuel Consumption
:
:
B + W Alpha Diesel 8L-28-32,
2,400 HP, CPP 4 blades
2 Aquamaster ALT 911 fixed pitch
Coupled to GM 12V-149TI, 980HP
1 x Brunvoll SPT-VP, 450 HP
1 x Brunvoll FU-63-LTC-1100 HP
CPP
Generators & Alternators
6 x Detroit Diesel Engine 149; driving 6 x Reliance
Alternators giving 6 x 600 KVA 440V 3 phase 60 Hz
8.5MT/day approx. (Main
Engines)
2.0MT/day approx. (Generators)
1 x Scania model D11 R81NV, 130 HP at 1500 RPM driving
1 x EEC BRF 315 alternators giving
1 x 110 KVA, 380V, 3 phase, 50 Hz
Crane (optional)
Mooring System
American Hoist 5750,
Crane Cab position about 40ft above sea level
Max Rated – 25T SWL, Boom Length: 100ft
Utility Crane – EH30/10 3T @ 10 m fixed boom and Atlas 3T
Knuckle Boom
4 x 25T Single Drum Capacity 1,000 m x 42 mm with 1 spare
Coil 1,000 m x 40mm
4 x Delta Flipper Anchors – Fwd: 3T, Aft: 4T
Fitted with tension & pay-out meter
10T Capstan at port & starboard aft quarter
NOTICE: Particulars are believed to be correct and subject to revision without prior notice. Interested parties must inspect vessel to check on suitability of the Company’s equipment. Company has
exercised due diligence to ensure that the data contained herein is reasonably accurate. However, the Company does not warrant the accuracy or completeness of the data. In no event shall the Company
be liable for any damages whatsoever arising out of the use or inability to use the data contained herein. All optional equipment for Charterers’ usage shall be agreed by the Company. Updated as at 15
December 2014.
-----------------------------------------------------------------------------– Page 2 of 2 –
MV REVELATION