ibo r ILP ARUMUGAM PILLAI NIBONG TEBAL t Bunta JANGKA PENDEK Ke Pari Taman Ilmu ILPAP NT Klinik Kesihatan Bukit Panchor Kolej Vokasional Nibong Tebal Taman Seri Panchur Taman Bersatu Masjid Bkt. Panchur Tol JAWI USM Jaya KURSUS Ke N ng i aw Ke J Ke ndar Baharu Ba www.ilpapnt.gov.my Te ba l rang Direkabentuk oleh Mohd Alias Ismail Dihasilkan oleh Bahagian Teknologi Percetakan ILP Arumugam Pillai, Nibong Tebal, Pulau Pinang Jabatan Tenaga Manusia Kementerian Sumber Manusia Sebe Untuk maklumat lanjut sila hubungi : oh ian A.P an Perindustr Institut Latih nchor, 14300 Jalan Bukit Pa S l, SP Nibong Teba g Pulau Pinan illai Nibong Te ELEK TRIK I bal T E K N O LO G Jabatan Tenaga Manusia Communitty & Employment Support Service (CESS) Tel : 04-5956000/6020/6088 Faks : 04-5956006 Emel : [email protected] Web : www.ilpapnt.gov.my Ke Ip 16 2 Days 18 1 Day 18 1 Day 8 1 Day 8 1 Day 16 2 Days 16 2 Days 8 1 Day 8 1 Day 240 4~6 Moths 240 4~6 Moths The participant should be able to install electrical circuit for industrial use that meets requirement of ST using GI conduit and metal trunking. They also should know to choose correct cable size, loads, and circuit breaker The participant should be able to read schematic diagram, and do wiring connection on DC motor. The participant should be able to draw the plan of three phase electrical circuit for domestic and industrial use that meets requirement of ST. They also should know to choose correct cable size, loads, and circuit breaker The participant should be able to read schematic diagram, load calculation and balancing load, do wiring connection on star-delta connection. The participant should be able to install three phase electrical circuit for domestic use that meets requirement of ST using PVC conduit and PVC trunking. They also should know to choose correct cable size, loads, and circuit breaker The participant should be able to install three phase electrical circuit for industrial use that meets requirement of ST using GI conduit and metal trunking. They also should know to choose correct cable size, loads, and circuit breaker The participant should be able to use voltmeter, ammeter,multimeter and clamp meter to do trobleshoot wiring problems. They also can apply it to electrical appliances. The participant should be able to do wirin on Capacitor start motor, Capacitor run motor, Capacitor start & run motor and Universal motor. They also should know to choose correct cable size, loads, and circuit breaker. The participant should be able to do wiring on DOL, Star-Delta, Auto Trans, Auto resistor and Jogging. They also should know to choose correct cable size, loads, and circuit breaker. The participant should be able to do wiring,trobleshooting and servicing on fire alarm system includes sensor, siren, and control system. The participant should be able to install,troubleshooting and servicing domestic air-cond system. They also should know to calculate the horse power requirement. The participant should be able to know solar PV ON-GRID and OFF-GRID system, calculation power and load and wiring system. The participant should be able to do connection on parallel and series, use voltmeter, ammeter, clamp meter. They also should know the Ohm's Law to calculate volt, amp, and power. The participant should be able to use First Aid, do CPR, calculation on maximum load and circuit breaker, types and use of fire extinguisher, and introduction to HIRARC. Provide participants with the skills and knowledge to assemble, commission, maintain and basic troubleshoot electropneumatic control systems and equipment. To provide participants with a basic knowledge of the construction and principle operation of programmable logic controllers as well as to develop his ability to write simple programs and operate control system. It is also to acquaint the participants with the application possibilities of using PLC. The participant should be able to calculation on lagging and leading power factor, KVAR for capacitor bank. They also will know to calculate the real power to optimum and energy saver. The participant should be able to service Air Circuit Breaker, maintenance,testing and proper procedure to shut down and normalized ACB. The participant should be able to calculate the time and current fault. Should be able to set the relay of over current, earth fault and earth leakage current. The participant should be able to identify the parts in transformer, calculation on the load, and testing the transformer. The participant will receive the competency licenses from Suruhanjaya Tenaga (EC) for single phase wiring. The participant will receive the competency licenses from Suruhanjaya Tenaga (EC) for three phase wiring. 1. Distribution Board 2. Single Phase Industrial Wiring ( GI Conduit & GI Trunking ) 3. Installation and testing 1. Direct Current Motor 2. DC System 1. Three Phase Layout Drawing 2. Three Phase Single Line Drawing 3. Three Phase Wiring Drawing 1. Star Connection 2. Delta Connection 3. Three and Four Line System 1. Three Phase Wiring (PVC) 2. Testing and Commissioning 3. Maintain Electrical Installation 1. Three Phase Wiring (Galvanised Iron) 2. Testing and Commissioning 3. Maintain Electrical Installation 1. Troubleshoot Wiring 2. Troubleshoot Electrical Appliances 1. Motor Control Wiring 1. Motor Control Wiring, DOL, Star-Delta, Auto Trans, Auto resistor and Jogging. 1. Fire Alarm system. 2. Fire alarm electrical service. 3. Fire alarm electrical troubleshooting 1. Air Conditioning system. 2. Air Conditioning service. 3. Air Conditioning troubleshooting 1. PV Solar system. 2. PV solar services. 3. PV Solar troubleshooting 1. Series, Parallel and Series-Parallel Circuit 2. R-C-L Circuit 3. Metering Devices 1. First Aid Treatment 2. Personal Safety and PPE 3. Fire Fighting Equipment 4. HIRARC introduction 1. Ladder Diagram 2. Valve & Cylinder 3. Reading / Design Electrical Control System 4. Control Circuit 1. Ladder Diagram & Mneumonic Code 2. Logic Sequence 3. Connect input / output to PLC 4. Logic & sequence project 5. Timer & counter application 1. Power Factor Correction 1. Service ACB and troubleshooting 1. Primary and Secondary injection test. 1. The System Operation 2. Load Calculation 3. Testing on Transformer Pendawaian Kompeten Satu Fasa Pendawaian Kompeten Tiga Fasa Industrial Wiring (Single Phase) DC Motor Domestic Wiring (Three Phase) Industrial Wiring (Three Phase) Electrical Fault Finding PW 4 PW 2 Low Voltage Transformer Main Switch Board Main Switch Board Main Switch Board PLC Programming Basic Electro- Pneumatics Electrical Safety Basic Electricity Photo Voltaic Solar system Air Conditioning Electrical System Fire Alarm Electrical system Three Phase AC Motor Single Phase AC Motor Three Phase Electrical System Electrical Drawing (Three Phase) 16 2 Days 8 1 Day 8 1 Day 8 1 Day 8 1 Day 16 2 Days 16 2 Days 8 1 Day 24 3 Days 24 3 Days 16 2 Days 16 2 Days The participant should be able to install electrical circuit for domestic use that meets requirement of ST using PVC conduit and PVC trunking. They also should know to choose correct cable size, loads, and circuit breaker Domestic Wiring (Single Phase) Domestic Electrical Drawing (Single Phase) 1. Distribution Board 2. Single Phase Domestic Wiring ( PVC Conduit & PVC Trunking ) 3. Installation and testing DURATION (HRS) TEMPOH (JAM) 8 1 Day COURSE OUTLINE HASIL PEMBELAJARAN The participant should be able to draw the plan of electrical circuit for domestic use that meets requirement of ST. They also should know to choose correct cable size, loads, and circuit breaker COURSE CONTENT KANDUNGAN KURSUS 1. Single Phase Layout Drawing 2. Single Phase Single Line Drawing 3. Single Phase Wiring Drawing COURSE TITLE TAJUK KURSUS PEGAWAI UNTUK DIHUBUNGI : EN ALWARY SUHAIMY BIN JOHARI NO. TELEFON : 04 - 595 6063 EMAIL : [email protected] TEKNOLOGI ELEKTRIK 10 10 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 CAPACITY (PAX) JUM. PESERTA
© Copyright 2024