PROJECT CAMEO MTU AMERICA DEVELOPMENT PROJEC T/ MTU AMERICA / AIKEN, SC Project Value: $24,600,000 Key Project Features: • Precision Fuel Conditioning and Measurement Project Overview: Panel, controlling fuel pressure, temperature ACS provided turnkey delivery, including the and measurement. design, construction, equipment fabrication and • integration and commissioning services for a new equipment, test articles and support engine research and development test center in Aiken, South Carolina. The project consisted of equipment. • a Development Building with two R&D test cells as well as a new Mechanical/Electrical building Driveline including high speed shafting and a tandem (water brake & AC) dynamometer. • providing all new facility systems required to support the test cells. The project will support the 3D CAD Model of entire test cell, test Isolated Inertia Mass with dampening spring system for vibration control. • research and development for MTU America’s S2000 Engine adapter system that accommodates over 20 different engine types/models. and S4000 series of diesel engines. The output range • Engine water cooling system skid. of these engines is 550 kW up to a maximum of 4500 • Combustion Air intake and Exhaust after kW. ACS Services: ACS held a single-source contract for test facility treatment systems with quick disconnects. • Data Acquisition and Control system. • Test Cell acoustics engineered to meet client requirements design and construction management; equipment design and component specification, equipment build, procurement, and contractor installation; Project Duration: 18 months integration of equipment, facility, and control systems; and commissioning. Completion Date: Spring 2013 Headquarters - Madison, WI - USA / Greenville, SC - USA / Troy, MI - USA / TEDA Tianjin, China / Leicester, UK / www.acscm.com / [email protected]
© Copyright 2024