SBP Supplemental Bearing Plate Use the SBP instead of extra truss plies or nail-on scabs to distribute concentrated truss reactions and avoid top plate crushing. The two-piece design accommodates any number of girder plies. A wraparound design gives superior uplift resistance, and reinforcement ribs effectively distribute bearing loads. Works with both single and double 2x4 or 2x6 top plates. H DF-L 1015 S-P-F 769 Hem Fir 667 DF-L 1015 S-P-F 769 Hem Fir 667 1 2 3 4 1 2 3 4 5035 5035 5035 5035 3575 3575 3575 3575 9300 13565 17825 22090 6805 10030 13260 16490 7.63 5.57 4.88 4.53 7.38 5.44 4.79 4.47 22.40 22.40 22.40 22.40 15.90 15.90 15.90 15.90 41.37 60.33 79.30 98.27 30.26 44.63 58.99 73.35 193.88 141.39 123.89 115.14 187.34 138.12 121.71 113.51 1 3930 6730 8.41 17.48 29.95 213.59 42.41 54.88 67.34 151.24 130.46 120.07 62.35 92.15 121.96 151.77 45.68 68.24 90.81 113.38 44.97 64.55 84.14 103.73 292.21 215.96 190.54 177.83 282.75 211.23 187.38 175.46 320.70 230.20 200.03 184.95 1 2 3 4 1 2 3 4 1 2 3 4 3930 9535 5.95 17.48 3930 12335 5.14 17.48 3930 15140 4.73 17.48 SBP6 on 2x6 / 2x8 Top Plate and Alternate Installation 7315 7315 7315 7315 5195 5195 5195 5195 5705 5705 5705 5705 F1 Typical SBP standard installation H D No. of Factored Resistance (Lbs) Factored Resistance (kN) Truss SBP's Alone SBP + Truss Bearing SBP's Alone SBP + Truss Bearing Plies 100% 100% EBL 100% 100% EBL SBP4 on 2x4 / 2x6 Top Plate and Alternate Installation 2 3 4 L W SBP Installation: • Use all specified fasteners. • The SBP shall be installed in pairs. fcp (psi) F2 D Materials: 16 gauge Finish: G90 galvanizing Wood Species Uplift 14015 20715 27415 34115 10270 15340 20415 25490 10110 14510 18915 23320 11.50 8.50 7.50 7.00 11.13 8.31 7.38 6.91 12.63 9.06 7.88 7.28 32.54 32.54 32.54 32.54 23.11 23.11 23.11 23.11 25.38 25.38 25.38 25.38 L W Typical SBP6 one tab up on a 2x8 top plate installation (SBP4 similar) SBP one tab up Typical SBP one tab up alternate installation 1) Factored resistance is for a pair of SBP devices. SBP's shall be installed in pairs. 2) Multiple ply trusses shall be fastened together to act as a single unit. 3) EBL denotes effective bearing length and includes the actual bearing length plus the contribution of the SBP device. 4) Assumes full seating of truss on top plate. Dimensions (in) USP Stock No. Ref. No. SBP4 SBP6 Jan. 8, 2015 This technical document expires on Dec. 31, 2016. TBE4 TBE6 Truss/Joist W H Thickness 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3-1/2 3-1/4 3˝ or more 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3˝ or more 5-1/2 3-1/4 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3˝ or more Fastener Schedule2,6 Plate Truss 5 Sides Top Qty Type Qty Type Qty Type Application Standard 20 10dx1-1/2 4 10d 8 10d Installation 20 10d 20 10dx1-1/2 One Tab Up 4 10d 8 10d (2x6 Top Plate) 20 10d 20 10dx1-1/2 One Tab Up 4 10d 8 10d (Alternate) 20 10d Standard 28 10dx1-1/2 4 10d 8 10d Installation 28 10d 4 4 10d 10d 8 8 10d 10d 28 10dx1-1/2 28 28 28 10d 10dx1-1/2 10d DF-L (Lbs) F1 F2 Factored Resistance (115%)1,3 DF-L (kN) S-P-F (Lbs) Uplift F1 F2 F1 F2 Uplift F1 F2 Uplift 2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70 2880 2230 1435 12.81 9.92 6.38 2045 1965 805 9.10 8.74 3.58 1880 1315 1435 8.36 6.38 1120 1125 805 4.98 5.00 3.58 5.85 2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70 One Tab Up 2880 2230 1435 12.81 9.92 (2x8 Top Plate) One Tab Up (Alternate) Uplift S-P-F (kN) 1880 1315 1435 8.36 5.85 6.38 2045 1965 805 9.10 8.74 3.58 6.38 1120 1125 805 4.98 5.00 3.58 1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed. For standard term loads divide the values by 1.15. 2) Fastener schedule is for a pair of SBP devices. 3) Factored resistances are for a pair of SBP devices. 4) Multiple ply trusses shall be fastened together to act as a single unit. 5) Where truss sits on a single top plate, 10d x 1-1/2 nails may be used on the top side of the top plate. 6) NAILS: 10d x 1-1/2 nails are 0.148" dia. x 1-1/2" long, 10d nails are 0.148" dia. x 3" long. Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information. USP supplies quality products to build Stronger Safer Structures www.USPconnectors.com USP2320-SBP Revised January 2015 ©2015 MiTek Industries, Inc. All Rights Reserved. SBP Supplemental Bearing Plate Jan. 8, 2015 Use the SBP instead of extra truss plies or nail-on scabs to distribute concentrated truss reactions and avoid top plate crushing. The two-piece design accommodates any number of girder plies. A wraparound design gives superior uplift resistance, and reinforcement ribs effectively distribute bearing loads. Works with both single and double 2x4 or 2x6 top plates. H DF-L 1015 S-P-F 769 Hem Fir 667 DF-L 1015 S-P-F 769 Hem Fir 667 Jan. 8, 2015 1 2 3 4 1 2 3 4 5035 5035 5035 5035 3575 3575 3575 3575 9300 13565 17825 22090 6805 10030 13260 16490 7.63 5.57 4.88 4.53 7.38 5.44 4.79 4.47 22.40 22.40 22.40 22.40 15.90 15.90 15.90 15.90 41.37 60.33 79.30 98.27 30.26 44.63 58.99 73.35 193.88 141.39 123.89 115.14 187.34 138.12 121.71 113.51 1 3930 6730 8.41 17.48 29.95 213.59 42.41 54.88 67.34 151.24 130.46 120.07 62.35 92.15 121.96 151.77 45.68 68.24 90.81 113.38 44.97 64.55 84.14 103.73 292.21 215.96 190.54 177.83 282.75 211.23 187.38 175.46 320.70 230.20 200.03 184.95 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 3930 9535 5.95 17.48 3930 12335 5.14 17.48 3930 15140 4.73 17.48 SBP6 on 2x6 / 2x8 Top Plate and Alternate Installation 7315 7315 7315 7315 5195 5195 5195 5195 5705 5705 5705 5705 14015 20715 27415 34115 10270 15340 20415 25490 10110 14510 18915 23320 USP Stock No. Ref. No. SBP4 SBP6 This technical document expires on Dec. 31, 2016. Typical SBP standard installation D 11.50 8.50 7.50 7.00 11.13 8.31 7.38 6.91 12.63 9.06 7.88 7.28 32.54 32.54 32.54 32.54 23.11 23.11 23.11 23.11 25.38 25.38 25.38 25.38 L W Typical SBP6 one tab up on a 2x8 top plate installation (SBP4 similar) SBP one tab up Typical SBP one tab up alternate installation 1) Factored resistance is for a pair of SBP devices. SBP's shall be installed in pairs. 2) Multiple ply trusses shall be fastened together to act as a single unit. 3) EBL denotes effective bearing length and includes the actual bearing length plus the contribution of the SBP device. 4) Assumes full seating of truss on top plate. Dimensions (in) Jan. 8, 2015 F1 H No. of Factored Resistance (Lbs) Factored Resistance (kN) Truss SBP's Alone SBP + Truss Bearing SBP's Alone SBP + Truss Bearing Plies 100% 100% EBL 100% 100% EBL SBP4 on 2x4 / 2x6 Top Plate and Alternate Installation Jan. 8, 2015 L W SBP Installation: • Use all specified fasteners. • The SBP shall be installed in pairs. fcp (psi) F2 D Materials: 16 gauge Finish: G90 galvanizing Wood Species Uplift TBE4 TBE6 Truss/Joist W H Thickness 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3-1/2 3-1/4 3˝ or more 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3˝ or more 5-1/2 3-1/4 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3˝ or more Fastener Schedule2,6 Plate Truss 5 Sides Top Qty Type Qty Type Qty Type Application Standard 20 10dx1-1/2 4 10d 8 10d Installation 20 10d 20 10dx1-1/2 One Tab Up 4 10d 8 10d (2x6 Top Plate) 20 10d 20 10dx1-1/2 One Tab Up 4 10d 8 10d (Alternate) 20 10d Standard 28 10dx1-1/2 4 10d 8 10d Installation 28 10d 4 4 10d 10d 8 8 10d 10d 28 10dx1-1/2 28 28 28 10d 10dx1-1/2 10d DF-L (Lbs) F1 F2 Factored Resistance (115%)1,3 DF-L (kN) S-P-F (Lbs) Uplift F1 F2 F1 F2 Uplift F1 F2 Uplift 2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70 2880 2230 1435 12.81 9.92 6.38 2045 1965 805 9.10 8.74 3.58 1880 1315 1435 8.36 6.38 1120 1125 805 4.98 5.00 3.58 5.85 2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70 One Tab Up 2880 2230 1435 12.81 9.92 (2x8 Top Plate) One Tab Up (Alternate) Uplift S-P-F (kN) 1880 1315 1435 8.36 5.85 6.38 2045 1965 805 9.10 8.74 3.58 6.38 1120 1125 805 4.98 5.00 3.58 1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed. For standard term loads divide the values by 1.15. 2) Fastener schedule is for a pair of SBP devices. 3) Factored resistances are for a pair of SBP devices. 4) Multiple ply trusses shall be fastened together to act as a single unit. 5) Where truss sits on a single top plate, 10d x 1-1/2 nails may be used on the top side of the top plate. 6) NAILS: 10d x 1-1/2 nails are 0.148" dia. x 1-1/2" long, 10d nails are 0.148" dia. x 3" long. Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information. USP supplies quality products to build Stronger Safer Structures www.USPconnectors.com USP2320-SBP Revised January 2015 ©2015 MiTek Industries, Inc. All Rights Reserved. SBP Supplemental Bearing Plate Jan. 8, 2015 Use the SBP instead of extra truss plies or nail-on scabs to distribute concentrated truss reactions and avoid top plate crushing. The two-piece design accommodates any number of girder plies. A wraparound design gives superior uplift resistance, and reinforcement ribs effectively distribute bearing loads. Works with both single and double 2x4 or 2x6 top plates. H Jan. 8, 2015 DF-L 1015 S-P-F 769 Hem Fir 667 DF-L 1015 S-P-F 769 Hem Fir 667 Jan. 8, 2015 1 2 3 4 1 2 3 4 5035 5035 5035 5035 3575 3575 3575 3575 9300 13565 17825 22090 6805 10030 13260 16490 7.63 5.57 4.88 4.53 7.38 5.44 4.79 4.47 22.40 22.40 22.40 22.40 15.90 15.90 15.90 15.90 41.37 60.33 79.30 98.27 30.26 44.63 58.99 73.35 193.88 141.39 123.89 115.14 187.34 138.12 121.71 113.51 1 3930 6730 8.41 17.48 29.95 213.59 42.41 54.88 67.34 151.24 130.46 120.07 62.35 92.15 121.96 151.77 45.68 68.24 90.81 113.38 44.97 64.55 84.14 103.73 292.21 215.96 190.54 177.83 282.75 211.23 187.38 175.46 320.70 230.20 200.03 184.95 1 2 3 4 1 2 3 4 1 2 3 4 3930 9535 5.95 17.48 3930 12335 5.14 17.48 3930 15140 4.73 17.48 SBP6 on 2x6 / 2x8 Top Plate and Alternate Installation 7315 7315 7315 7315 5195 5195 5195 5195 5705 5705 5705 5705 F1 Typical SBP standard installation H D No. of Factored Resistance (Lbs) Factored Resistance (kN) Truss SBP's Alone SBP + Truss Bearing SBP's Alone SBP + Truss Bearing Plies 100% 100% EBL 100% 100% EBL SBP4 on 2x4 / 2x6 Top Plate and Alternate Installation 2 3 4 L W SBP Installation: • Use all specified fasteners. • The SBP shall be installed in pairs. fcp (psi) F2 D Materials: 16 gauge Finish: G90 galvanizing Wood Species Uplift 14015 20715 27415 34115 10270 15340 20415 25490 10110 14510 18915 23320 11.50 8.50 7.50 7.00 11.13 8.31 7.38 6.91 12.63 9.06 7.88 7.28 32.54 32.54 32.54 32.54 23.11 23.11 23.11 23.11 25.38 25.38 25.38 25.38 L W Typical SBP6 one tab up on a 2x8 top plate installation (SBP4 similar) SBP one tab up Typical SBP one tab up alternate installation 1) Factored resistance is for a pair of SBP devices. SBP's shall be installed in pairs. 2) Multiple ply trusses shall be fastened together to act as a single unit. 3) EBL denotes effective bearing length and includes the actual bearing length plus the contribution of the SBP device. 4) Assumes full seating of truss on top plate. Dimensions (in) USP Stock No. Ref. No. SBP4 Jan. 8, 2015 This technical document expires on Dec. 31, 2016. SBP6 TBE4 TBE6 Truss/Joist W H Thickness 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3-1/2 3-1/4 3˝ or more 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3˝ or more 5-1/2 3-1/4 2-7/8˝ or less 3˝ or more 2-7/8˝ or less 3˝ or more Fastener Schedule2,6 Plate Truss 5 Sides Top Qty Type Qty Type Qty Type Application Standard 20 10dx1-1/2 4 10d 8 10d Installation 20 10d 20 10dx1-1/2 One Tab Up 4 10d 8 10d (2x6 Top Plate) 20 10d 20 10dx1-1/2 One Tab Up 4 10d 8 10d (Alternate) 20 10d Standard 28 10dx1-1/2 4 10d 8 10d Installation 28 10d 4 4 10d 10d 8 8 10d 10d 28 10dx1-1/2 28 28 28 10d 10dx1-1/2 10d DF-L (Lbs) F1 F2 Factored Resistance (115%)1,3 DF-L (kN) S-P-F (Lbs) Uplift F1 F2 F1 F2 Uplift F1 F2 Uplift 2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70 2880 2230 1435 12.81 9.92 6.38 2045 1965 805 9.10 8.74 3.58 1880 1315 1435 8.36 6.38 1120 1125 805 4.98 5.00 3.58 5.85 2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70 One Tab Up 2880 2230 1435 12.81 9.92 (2x8 Top Plate) One Tab Up (Alternate) Uplift S-P-F (kN) 1880 1315 1435 8.36 5.85 6.38 2045 1965 805 9.10 8.74 3.58 6.38 1120 1125 805 4.98 5.00 3.58 1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed. For standard term loads divide the values by 1.15. 2) Fastener schedule is for a pair of SBP devices. 3) Factored resistances are for a pair of SBP devices. 4) Multiple ply trusses shall be fastened together to act as a single unit. 5) Where truss sits on a single top plate, 10d x 1-1/2 nails may be used on the top side of the top plate. 6) NAILS: 10d x 1-1/2 nails are 0.148" dia. x 1-1/2" long, 10d nails are 0.148" dia. x 3" long. Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information. USP supplies quality products to build Stronger Safer Structures www.USPconnectors.com USP2320-SBP Revised January 2015 ©2015 MiTek Industries, Inc. All Rights Reserved.
© Copyright 2024