SBP Supplemental Bearing Plate

SBP Supplemental Bearing Plate
Use the SBP instead of extra truss plies or nail-on scabs
to distribute concentrated truss reactions and avoid top
plate crushing. The two-piece design accommodates
any number of girder plies. A wraparound design gives
superior uplift resistance, and reinforcement ribs effectively distribute bearing loads. Works with both single
and double 2x4 or 2x6 top plates.
H
DF-L
1015
S-P-F
769
Hem Fir
667
DF-L
1015
S-P-F
769
Hem Fir
667
1
2
3
4
1
2
3
4
5035
5035
5035
5035
3575
3575
3575
3575
9300
13565
17825
22090
6805
10030
13260
16490
7.63
5.57
4.88
4.53
7.38
5.44
4.79
4.47
22.40
22.40
22.40
22.40
15.90
15.90
15.90
15.90
41.37
60.33
79.30
98.27
30.26
44.63
58.99
73.35
193.88
141.39
123.89
115.14
187.34
138.12
121.71
113.51
1
3930
6730
8.41
17.48
29.95
213.59
42.41
54.88
67.34
151.24
130.46
120.07
62.35
92.15
121.96
151.77
45.68
68.24
90.81
113.38
44.97
64.55
84.14
103.73
292.21
215.96
190.54
177.83
282.75
211.23
187.38
175.46
320.70
230.20
200.03
184.95
1
2
3
4
1
2
3
4
1
2
3
4
3930
9535
5.95
17.48
3930
12335
5.14
17.48
3930
15140
4.73
17.48
SBP6 on 2x6 / 2x8 Top Plate and Alternate Installation
7315
7315
7315
7315
5195
5195
5195
5195
5705
5705
5705
5705
F1
Typical SBP
standard installation
H
D
No. of
Factored Resistance (Lbs)
Factored Resistance (kN)
Truss SBP's Alone SBP + Truss Bearing SBP's Alone SBP + Truss Bearing
Plies
100%
100%
EBL
100%
100%
EBL
SBP4 on 2x4 / 2x6 Top Plate and Alternate Installation
2
3
4
L
W
SBP
Installation:
• Use all specified fasteners.
• The SBP shall be installed in pairs.
fcp
(psi)
F2
D
Materials: 16 gauge
Finish: G90 galvanizing
Wood
Species
Uplift
14015
20715
27415
34115
10270
15340
20415
25490
10110
14510
18915
23320
11.50
8.50
7.50
7.00
11.13
8.31
7.38
6.91
12.63
9.06
7.88
7.28
32.54
32.54
32.54
32.54
23.11
23.11
23.11
23.11
25.38
25.38
25.38
25.38
L
W
Typical SBP6 one tab up on
a 2x8 top plate installation
(SBP4 similar)
SBP one tab up
Typical SBP one tab up
alternate installation
1) Factored resistance is for a pair of SBP devices. SBP's shall be installed in pairs.
2) Multiple ply trusses shall be fastened together to act as a single unit.
3) EBL denotes effective bearing length and includes the actual bearing length plus the contribution
of the SBP device.
4) Assumes full seating of truss on top plate.
Dimensions
(in)
USP
Stock No. Ref. No.
SBP4
SBP6
Jan. 8, 2015
This technical document expires on Dec. 31, 2016.
TBE4
TBE6
Truss/Joist
W
H
Thickness
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3-1/2 3-1/4
3˝ or more
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3˝ or more
5-1/2 3-1/4
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3˝ or more
Fastener Schedule2,6
Plate
Truss
5
Sides
Top
Qty Type Qty Type Qty
Type
Application
Standard
20 10dx1-1/2
4 10d 8 10d
Installation
20
10d
20 10dx1-1/2 One Tab Up
4 10d 8 10d
(2x6 Top Plate)
20
10d
20 10dx1-1/2 One Tab Up
4 10d 8 10d
(Alternate)
20
10d
Standard
28 10dx1-1/2
4 10d 8 10d
Installation
28
10d
4
4
10d
10d
8
8
10d
10d
28
10dx1-1/2
28
28
28
10d
10dx1-1/2
10d
DF-L (Lbs)
F1
F2
Factored Resistance (115%)1,3
DF-L (kN)
S-P-F (Lbs)
Uplift
F1
F2
F1
F2
Uplift
F1
F2
Uplift
2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70
2880 2230 1435 12.81 9.92
6.38 2045 1965 805
9.10 8.74 3.58
1880 1315 1435 8.36
6.38 1120 1125 805
4.98 5.00 3.58
5.85
2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70
One Tab Up
2880 2230 1435 12.81 9.92
(2x8 Top Plate)
One Tab Up
(Alternate)
Uplift
S-P-F (kN)
1880 1315 1435 8.36
5.85
6.38 2045 1965 805
9.10 8.74 3.58
6.38 1120 1125 805
4.98 5.00 3.58
1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed. For standard term loads divide the values by 1.15.
2) Fastener schedule is for a pair of SBP devices.
3) Factored resistances are for a pair of SBP devices.
4) Multiple ply trusses shall be fastened together to act as a single unit.
5) Where truss sits on a single top plate, 10d x 1-1/2 nails may be used on the top side of the top plate.
6) NAILS: 10d x 1-1/2 nails are 0.148" dia. x 1-1/2" long, 10d nails are 0.148" dia. x 3" long.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
USP2320-SBP
Revised January 2015
©2015 MiTek Industries, Inc. All Rights Reserved.
SBP Supplemental Bearing Plate
Jan. 8, 2015
Use the SBP instead of extra truss plies or nail-on scabs
to distribute concentrated truss reactions and avoid top
plate crushing. The two-piece design accommodates
any number of girder plies. A wraparound design gives
superior uplift resistance, and reinforcement ribs effectively distribute bearing loads. Works with both single
and double 2x4 or 2x6 top plates.
H
DF-L
1015
S-P-F
769
Hem Fir
667
DF-L
1015
S-P-F
769
Hem Fir
667
Jan. 8, 2015
1
2
3
4
1
2
3
4
5035
5035
5035
5035
3575
3575
3575
3575
9300
13565
17825
22090
6805
10030
13260
16490
7.63
5.57
4.88
4.53
7.38
5.44
4.79
4.47
22.40
22.40
22.40
22.40
15.90
15.90
15.90
15.90
41.37
60.33
79.30
98.27
30.26
44.63
58.99
73.35
193.88
141.39
123.89
115.14
187.34
138.12
121.71
113.51
1
3930
6730
8.41
17.48
29.95
213.59
42.41
54.88
67.34
151.24
130.46
120.07
62.35
92.15
121.96
151.77
45.68
68.24
90.81
113.38
44.97
64.55
84.14
103.73
292.21
215.96
190.54
177.83
282.75
211.23
187.38
175.46
320.70
230.20
200.03
184.95
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
3930
9535
5.95
17.48
3930
12335
5.14
17.48
3930
15140
4.73
17.48
SBP6 on 2x6 / 2x8 Top Plate and Alternate Installation
7315
7315
7315
7315
5195
5195
5195
5195
5705
5705
5705
5705
14015
20715
27415
34115
10270
15340
20415
25490
10110
14510
18915
23320
USP
Stock No. Ref. No.
SBP4
SBP6
This technical document expires on Dec. 31, 2016.
Typical SBP
standard installation
D
11.50
8.50
7.50
7.00
11.13
8.31
7.38
6.91
12.63
9.06
7.88
7.28
32.54
32.54
32.54
32.54
23.11
23.11
23.11
23.11
25.38
25.38
25.38
25.38
L
W
Typical SBP6 one tab up on
a 2x8 top plate installation
(SBP4 similar)
SBP one tab up
Typical SBP one tab up
alternate installation
1) Factored resistance is for a pair of SBP devices. SBP's shall be installed in pairs.
2) Multiple ply trusses shall be fastened together to act as a single unit.
3) EBL denotes effective bearing length and includes the actual bearing length plus the contribution
of the SBP device.
4) Assumes full seating of truss on top plate.
Dimensions
(in)
Jan. 8, 2015
F1
H
No. of
Factored Resistance (Lbs)
Factored Resistance (kN)
Truss SBP's Alone SBP + Truss Bearing SBP's Alone SBP + Truss Bearing
Plies
100%
100%
EBL
100%
100%
EBL
SBP4 on 2x4 / 2x6 Top Plate and Alternate Installation
Jan. 8, 2015
L
W
SBP
Installation:
• Use all specified fasteners.
• The SBP shall be installed in pairs.
fcp
(psi)
F2
D
Materials: 16 gauge
Finish: G90 galvanizing
Wood
Species
Uplift
TBE4
TBE6
Truss/Joist
W
H
Thickness
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3-1/2 3-1/4
3˝ or more
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3˝ or more
5-1/2 3-1/4
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3˝ or more
Fastener Schedule2,6
Plate
Truss
5
Sides
Top
Qty Type Qty Type Qty
Type
Application
Standard
20 10dx1-1/2
4 10d 8 10d
Installation
20
10d
20 10dx1-1/2 One Tab Up
4 10d 8 10d
(2x6 Top Plate)
20
10d
20 10dx1-1/2 One Tab Up
4 10d 8 10d
(Alternate)
20
10d
Standard
28 10dx1-1/2
4 10d 8 10d
Installation
28
10d
4
4
10d
10d
8
8
10d
10d
28
10dx1-1/2
28
28
28
10d
10dx1-1/2
10d
DF-L (Lbs)
F1
F2
Factored Resistance (115%)1,3
DF-L (kN)
S-P-F (Lbs)
Uplift
F1
F2
F1
F2
Uplift
F1
F2
Uplift
2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70
2880 2230 1435 12.81 9.92
6.38 2045 1965 805
9.10 8.74 3.58
1880 1315 1435 8.36
6.38 1120 1125 805
4.98 5.00 3.58
5.85
2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70
One Tab Up
2880 2230 1435 12.81 9.92
(2x8 Top Plate)
One Tab Up
(Alternate)
Uplift
S-P-F (kN)
1880 1315 1435 8.36
5.85
6.38 2045 1965 805
9.10 8.74 3.58
6.38 1120 1125 805
4.98 5.00 3.58
1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed. For standard term loads divide the values by 1.15.
2) Fastener schedule is for a pair of SBP devices.
3) Factored resistances are for a pair of SBP devices.
4) Multiple ply trusses shall be fastened together to act as a single unit.
5) Where truss sits on a single top plate, 10d x 1-1/2 nails may be used on the top side of the top plate.
6) NAILS: 10d x 1-1/2 nails are 0.148" dia. x 1-1/2" long, 10d nails are 0.148" dia. x 3" long.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
USP2320-SBP
Revised January 2015
©2015 MiTek Industries, Inc. All Rights Reserved.
SBP Supplemental Bearing Plate
Jan. 8, 2015
Use the SBP instead of extra truss plies or nail-on scabs
to distribute concentrated truss reactions and avoid top
plate crushing. The two-piece design accommodates
any number of girder plies. A wraparound design gives
superior uplift resistance, and reinforcement ribs effectively distribute bearing loads. Works with both single
and double 2x4 or 2x6 top plates.
H
Jan. 8, 2015
DF-L
1015
S-P-F
769
Hem Fir
667
DF-L
1015
S-P-F
769
Hem Fir
667
Jan. 8, 2015
1
2
3
4
1
2
3
4
5035
5035
5035
5035
3575
3575
3575
3575
9300
13565
17825
22090
6805
10030
13260
16490
7.63
5.57
4.88
4.53
7.38
5.44
4.79
4.47
22.40
22.40
22.40
22.40
15.90
15.90
15.90
15.90
41.37
60.33
79.30
98.27
30.26
44.63
58.99
73.35
193.88
141.39
123.89
115.14
187.34
138.12
121.71
113.51
1
3930
6730
8.41
17.48
29.95
213.59
42.41
54.88
67.34
151.24
130.46
120.07
62.35
92.15
121.96
151.77
45.68
68.24
90.81
113.38
44.97
64.55
84.14
103.73
292.21
215.96
190.54
177.83
282.75
211.23
187.38
175.46
320.70
230.20
200.03
184.95
1
2
3
4
1
2
3
4
1
2
3
4
3930
9535
5.95
17.48
3930
12335
5.14
17.48
3930
15140
4.73
17.48
SBP6 on 2x6 / 2x8 Top Plate and Alternate Installation
7315
7315
7315
7315
5195
5195
5195
5195
5705
5705
5705
5705
F1
Typical SBP
standard installation
H
D
No. of
Factored Resistance (Lbs)
Factored Resistance (kN)
Truss SBP's Alone SBP + Truss Bearing SBP's Alone SBP + Truss Bearing
Plies
100%
100%
EBL
100%
100%
EBL
SBP4 on 2x4 / 2x6 Top Plate and Alternate Installation
2
3
4
L
W
SBP
Installation:
• Use all specified fasteners.
• The SBP shall be installed in pairs.
fcp
(psi)
F2
D
Materials: 16 gauge
Finish: G90 galvanizing
Wood
Species
Uplift
14015
20715
27415
34115
10270
15340
20415
25490
10110
14510
18915
23320
11.50
8.50
7.50
7.00
11.13
8.31
7.38
6.91
12.63
9.06
7.88
7.28
32.54
32.54
32.54
32.54
23.11
23.11
23.11
23.11
25.38
25.38
25.38
25.38
L
W
Typical SBP6 one tab up on
a 2x8 top plate installation
(SBP4 similar)
SBP one tab up
Typical SBP one tab up
alternate installation
1) Factored resistance is for a pair of SBP devices. SBP's shall be installed in pairs.
2) Multiple ply trusses shall be fastened together to act as a single unit.
3) EBL denotes effective bearing length and includes the actual bearing length plus the contribution
of the SBP device.
4) Assumes full seating of truss on top plate.
Dimensions
(in)
USP
Stock No. Ref. No.
SBP4
Jan. 8, 2015
This technical document expires on Dec. 31, 2016.
SBP6
TBE4
TBE6
Truss/Joist
W
H
Thickness
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3-1/2 3-1/4
3˝ or more
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3˝ or more
5-1/2 3-1/4
2-7/8˝ or less
3˝ or more
2-7/8˝ or less
3˝ or more
Fastener Schedule2,6
Plate
Truss
5
Sides
Top
Qty Type Qty Type Qty
Type
Application
Standard
20 10dx1-1/2
4 10d 8 10d
Installation
20
10d
20 10dx1-1/2 One Tab Up
4 10d 8 10d
(2x6 Top Plate)
20
10d
20 10dx1-1/2 One Tab Up
4 10d 8 10d
(Alternate)
20
10d
Standard
28 10dx1-1/2
4 10d 8 10d
Installation
28
10d
4
4
10d
10d
8
8
10d
10d
28
10dx1-1/2
28
28
28
10d
10dx1-1/2
10d
DF-L (Lbs)
F1
F2
Factored Resistance (115%)1,3
DF-L (kN)
S-P-F (Lbs)
Uplift
F1
F2
F1
F2
Uplift
F1
F2
Uplift
2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70
2880 2230 1435 12.81 9.92
6.38 2045 1965 805
9.10 8.74 3.58
1880 1315 1435 8.36
6.38 1120 1125 805
4.98 5.00 3.58
5.85
2880 3065 2435 12.81 13.63 10.83 2045 2175 1730 9.10 9.68 7.70
One Tab Up
2880 2230 1435 12.81 9.92
(2x8 Top Plate)
One Tab Up
(Alternate)
Uplift
S-P-F (kN)
1880 1315 1435 8.36
5.85
6.38 2045 1965 805
9.10 8.74 3.58
6.38 1120 1125 805
4.98 5.00 3.58
1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed. For standard term loads divide the values by 1.15.
2) Fastener schedule is for a pair of SBP devices.
3) Factored resistances are for a pair of SBP devices.
4) Multiple ply trusses shall be fastened together to act as a single unit.
5) Where truss sits on a single top plate, 10d x 1-1/2 nails may be used on the top side of the top plate.
6) NAILS: 10d x 1-1/2 nails are 0.148" dia. x 1-1/2" long, 10d nails are 0.148" dia. x 3" long.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
USP2320-SBP
Revised January 2015
©2015 MiTek Industries, Inc. All Rights Reserved.