Newport City Council Road Works Report for the period – Saturday

Newport City Council
Road Works Report for the period –
Saturday 17th January – Friday 23rd January 2015
Signing and
Guarding
Stop and Go
LOCATION
Temporary
Traffic
Lights
Temporary
lane closure
Road
Closure
Diversion
route in
place
Give and Take
DESCRIPTION OF WORKS
START
DATE
14.02.14
END
DATE
14.02.15
Temporary road closure
TRAFFIC MANAGEMENT
Aberthaw Rise
Development Works
Alicia Crescent opposite number 6
Installation of poly duct in the footway
and new cabinet and base
22.01.15
30.01.15
Signing and Guarding
Allt-yr-yn Avenue outside number 4
Welsh Water Contractors renewing a
communication pipe
13.01.15
19.01.15
Give and take
1
LOCATION
DESCRIPTION OF WORKS
START
DATE
13.01.15
END
DATE
26.01.15
Give and take
TRAFFIC MANAGEMENT
Bideford Road side of number 1 Buxton
Close
Welsh Water Contractors installing a
new service
Broadstreet Common outside Fairwater
Welsh Water Contractors renewing
leaking stop tap
20.01.15
22.01.15
Give and take
Brynglas Road outside number 2-3
Welsh Water Contractors excavating to
locate a stop tap
20.01.15
22.01.15
Give and take
Caerleon Road outside number 486
Welsh Water Contractors carrying out
trial hole investigations
19.01.15
21.01.15
Give and take
Caerleon Road outside number 529
Welsh Water Contractors renewing
existing stop tap
13.01.15
19.01.15
Give and take
Caerphilly Road outside Smithy
BT contractors installing 5mts of
ducting in the verge and a cabinet
22.01.15
30.01.15
Signing and Guarding
Caerphilly Road junction with Old Road /
junction Caerphilly Close
Wales and West Contractors replacing
gas main
03.11.14
27.01.15
Temporary Traffic Lights
2
LOCATION
DESCRIPTION OF WORKS
START
DATE
15.01.15
END
DATE
19.01.15
Give and take
TRAFFIC MANAGEMENT
Cae Brynton Road outside number 1
Welsh Water Contractors carrying out
trial hole investigations
Cambrian Road from junction with Bridge
Street to junction with Queensway
Installation of telecommunications
ducting
19.01.15
31.01.15
Signing and Guarding
Cardiff Road outside number 65 & 67
Welsh Water contractors carrying out a
meter change
21.01.15
23.01.15
Signing and Guarding
Channel View outside Hazeldene
Western Power Distribution contractors
carrying out excavations in the highway
to locate and repair fault
15.01.15
26.01.15
Give and take
Chepstow Road outside number 203
Welsh Water contractors carrying out a
meter change
21.01.15
23.01.15
Signing and Guarding
Christchurch Hill Outside Tudor House
Welsh Water Contractors renewing a
leaking communication
18.01.15
20.01.15
Give and take
Christchurch Road from numbers 303 to
329
Welsh Water contractors carrying out
manhole survey and CCTV work
Sunday 18th January
2015
3
Stop and go
LOCATION
DESCRIPTION OF WORKS
START
DATE
15.01.15
END
DATE
19.01.15
Signing and Guarding
TRAFFIC MANAGEMENT
Clifton Common in verge opposite the
junction of Goldcliff Road
BT contractors carrying out emergency
works on a damaged cable
Coast Road outside Rehoboth cottage
Welsh Water Contractors renewing a
leaking communication pipe
15.01.15
19.01.15
Temporary Traffic Lights
Commercial Road outside number 10a
Western Power Distribution contractors
carrying out a joint hole for a new
supply
19.01.15
23.01.15
Signing and Guarding
Commercial Road outside number 44-45
Welsh Water Contractors installing a
new service
17.01.15
20.01.15
Give and take
Constance Street outside number 60
Wales and West Contractors cutting off
a service
20.01.15
22.01.15
Give and take
Corn Street junction of Skinner Street on
the footway
Contractors undertaking a trial
excavation for the existing sewer
05.01.15
13.02.15
Temporary Traffic Lights
Corporation Road outside numbers 264272
Welsh Water contractors carrying out a
meter change
21.01.15
23.01.15
Signing and Guarding
4
LOCATION
DESCRIPTION OF WORKS
START
DATE
15.01.15
END
DATE
19.01.15
Give and take
TRAFFIC MANAGEMENT
Court Gardens outside number 23
Welsh Water Contractors undertaking
trial holes
Cunningham Road outside number 19
Virgin Media contractors installing a
new tee in the footway
21.01.15
22.01.15
Signing and Guarding
Cyril Street outside number 14
Welsh Water contractors installing a
meter
19.01.15
21.01.15
Give and take
Dewsland Park Road outside number 66
and 68
Welsh Water contractors renewing a
leaking communication pipe
20.01.15
22.01.15
Give and take
Drinkwater Gardens outside number 2
Virgin Media contractors rebuilding a
chamber in the footway
12.01.15
19.01.15
Signing and Guarding
Drovers Mews outside number 15
Welsh Water contractors installing a
meter
21.01.15
23.01.15
Signing and Guarding
East Way Road outside number 28
BT contractors installing 12mts of
ducting in the footway
17.01.15
21.01.15
Signing and Guarding
5
LOCATION
DESCRIPTION OF WORKS
Fields Park Crescent side of Fields Park
Court
Virgin Media contractors rebuilding a
chamber in the footway
Flint Close on junction
Welsh Water contractors repairing
leaking sluice valve
Friars Walk Development
START
DATE
12.01.15
END
DATE
19.01.15
Signing and Guarding
19.01.15
21.01.15
Give and take
28.10.13
on-going
Signing and Guarding
TRAFFIC MANAGEMENT
Gaer Park Drive outside number 72
Virgin Media contractors rebuilding a
chamber in the footway
12.01.15
19.01.15
Signing and Guarding
George Street junction of Lower Dock
Street
Contractors working for NCC carrying
out Junction improvement works
29.09.14
31.01.15
Signing and guarding and
temporary lane closures in
place
Glanwern Avenue outside number 33
Welsh Water contractors renewing an
existing meter
13.01.15
19.01.15
Signing and Guarding
6
LOCATION
DESCRIPTION OF WORKS
START
DATE
21.01.15
END
DATE
23.01.15
Signing and Guarding
TRAFFIC MANAGEMENT
Glasllwch Lane junction with Western
Avenue
T-Mobile contractors carrying out trial
hole to expose bas and holding down
bolts of existing telecommunications
mast
Goldcliff Road at the junction of Clifton
Common
BT contractors carrying out emergency
works on a damaged cable
15.01.15
19.01.15
Signing and Guarding
Hargreaves Drive outside number 26
Wales and West Contractors laying a
new gas services
15.01.15
20.01.15
Give and take
Hendre Farm Drive rear of number 1 to 5
Hendre Farm Court
Western Power Distribution contractors
carrying remedial works to a
reinstatement
21.01.15
23.01.15
Signing and Guarding
High Street junction of Bridge Street –
Natwest Bank
Cherry picker on the road to carry out
building survey
Sunday 18th January
2015
Signing and Guarding: Give
and take
Imperial Way on roundabout junction with
Pencarn Way
O2 contractors installing a new cabinet
and base and ducting work
21.01.15
Signing and Guarding; Lane
closure
7
23.01.15
LOCATION
DESCRIPTION OF WORKS
START
DATE
19.01.15
END
DATE
21.01.15
Give and take
TRAFFIC MANAGEMENT
Jeans Close outside number 2
Welsh Water contractors installing a
meter
Kestrel Way outside number 45
Welsh Water contractors installing a
meter
20.01.15
22.01.15
Give and take
Kingfisher Place outside 13
Wales and West Contractors cutting off
gas service
16.01.15
20.01.15
Give and take
Lansdowne Road outside 1
Virgin Media Contractors rebuilding
chamber in the footway
12.01.15
19.01.15
Signing and Guarding
Laurel Road outside number 96
Welsh Water contractors renewing a
leaking supply pipe
15.01.15
23.01.15
Give and take
Long Meadow Court outside number 33
Welsh Water contractors installing a
meter
19.01.15
21.01.15
Signing and Guarding
Maesglas Avenue outside number 101
Virgin Media Contractors installing a
tee in the footway
20.01.15
21.01.15
Signing and Guarding
8
LOCATION
DESCRIPTION OF WORKS
START
DATE
19.01.15
END
DATE
26.01.15
TRAFFIC MANAGEMENT
Magor Road outside Silverdale
Wales and West Contractors laying new
gas service
Malpas Road opposite number 585
O2 contractors installing a new cabinet
and base and ducting work
21.01.15
22.01.15
Signing and Guarding; Lane
closure
Mallard Way outside number 30
Welsh Water contractors installing a
meter
20.01.15
22.01.15
Signing and Guarding
Marlborough Road outside 9-31
Pendragon Construction constructing a
new boundary wall
01.12.14
29.05.15
Signing and Guarding
Mill Parade outside substation
Welsh Water Contractors installing new
service
12.01.15
16.01.15
Give and take
Old Barn Estate outside number 18
Welsh Water Contractors renewing
leaking stop tap
19.01.15
21.01.15
Signing and Guarding
Old Hill outside Ashgrove
Welsh Water Contractors renewing
leaking stop tap
14.01.15
16.01.15
Temporary road closure
9
Give and take
LOCATION
DESCRIPTION OF WORKS
START
DATE
20.01.15
END
DATE
22.01.15
Signing and Guarding
TRAFFIC MANAGEMENT
Partridge Way outside number 41
Welsh Water Contractors installing a
new meter
Powells Place whole road
Welsh Water Contractors installing new
sewer
12.01.15
20.03.15
Temporary road closure
Ruskin Rise junction with Bronte Grove
Virgin Media Contractors rebuilding
chamber in the footway
12.01.15
19.01.15
Signing and Guarding
Somerton Lane outside number 7
Wales and West Contractors repairing a
gas escape
15.01.15
21.01.15
Give and take
Springfield Lane outside number 8
Welsh Water Contractors installing a
new meter
20.01.15
22.01.15
Signing and Guarding
Spytty Road left turn before Newport
Retail Park
O2 contractors installing a new cabinet
and base and ducting work
19.01.15
21.01.15
Signing and Guarding; Lane
closure
St Davids Crescent adjacent to 1
Wales and West Contractors laying new
gas service
14.01.15
20.01.15
Give and take
10
LOCATION
DESCRIPTION OF WORKS
START
DATE
17.01.15
END
DATE
20.01.15
Signing and Guarding
TRAFFIC MANAGEMENT
Stow Park Circle outside number 3a
Virgin Media Contractors clearing
blockage in the footway
Tennyson Road outside 10
Welsh Water Contractors installing new
customer connection
05.01.15
16.01.15
Give and take
Tredegar Street outside number 1
Wales and West Contractors cutting off
service
21.01.15
26.01.15
Give and take
Ty Mawr Lane outside Ty Mawr Stables
Western Power Distribution Contractors 15.01.15
laying new electricity supply
19.01.15
Signing and Guarding
Usk Way side of number 28 East Usk Way
BT contractors installing 5mts of
ducting and cabinet
17.01.15
21.01.15
Signing and Guarding
Warwick Road rear of 418 Chepstow Road
Wales and West Contractors laying new
gas service
15.01.15
20.01.15
Give and take
Westfield Close outside number 7-8
Cambridge Court
Welsh Water Contractors replacing
marker post
19.01.15
21.01.15
Signing and Guarding
11
Yewberry Lane outside number 35
Welsh Water Contractors renewing
existing stop tap
START
DATE
13.01.15
END
DATE
19.01.15
Give and take
York Place outside number 32
Western Power Distribution Contractors 20.01.15
carrying out a joint hole for new supply
26.01.15
Signing and Guarding
LOCATION
DESCRIPTION OF WORKS
.
12
TRAFFIC MANAGEMENT