THE CORPORATION OF THE TOWNSHIP OF CENTRE WELLINGTON COMMITTEE OF THE WHOLE AGENDA Tuesday, January 20, 2015 (9:00 a.m. to 4:00 p.m.) Friday, January 23, 2015 (9:00 a.m. to 4:00 p.m., if required) Monday, January 26, 2015 (9:00 a.m. to 4:00 p.m., if required) COUNCIL CHAMBER 1. CALL TO ORDER 2. DISCLOSURE OF PECUNIARY INTEREST UNDER THE MUNICIPAL CONFLICT OF INTEREST ACT 3. MAYOR’S REMARKS – Mayor Kelly Linton 4. OPENING REMARKS – Andrew Goldie, Chief Administrative Officer 5. DELEGATIONS Staci Barron re Parks & Recreation Budget Representative from the Elora Lions Club Call for additional delegations 6. BUDGET PRESENTATION - Mark Bradey, Financial Manager/Deputy Treasurer 7. TAX SUPPORTED & USER PAY CAPITAL BUDGETS (Appendix A) a) Comments regarding the 2015 Draft Budget – Management Team b) Questions from Council 8. 10-YEAR CAPITAL FORECAST (Appendix B) a) Comments regarding the forecast – Management Team b) Questions from Council 9. FINAL DECISIONS & COMMENTS regarding the 2015 Draft Capital Budget 10. ADJOURN Report No. COR2015-05 THE TOWNSHIP OF CENTRE WELLINGTON REPORT TO THE COMMITTEE OF THE WHOLE TO: Mayor Kelly Linton and Members of Council DATE: January 20, 2015 SUBJECT: 2015 DRAFT CAPITAL BUDGET RECOMMENDATION: THAT the Council of the Township of Centre Wellington adopt items 1 to 77 of the 2015 capital budget (Appendix A). SUMMARY: The 2015 draft capital budget has been developed through a process described more fully in this report. Background The capital budget typically involves significant expenditures to acquire, construct or improve land, buildings, engineering structures, or machinery and equipment used to provide municipal services with a benefit lasting beyond one year. It also includes onetime project costs in excess of $5,000 that may be operating in nature, such as maintenance items or studies, which would cause significant fluctuations in the tax rate if they were included in the operating budget. The capital budget represents a significant portion of the total dollars spent by the Township in any given year. In 2014, the capital budget, before vehicle and equipment replacement, represented approximately $5.5 million of internal sources of financing. This includes both tax supported and user pay sources of funding, and excludes debt. By comparison, the 2015 draft capital budget proposes a funding amount of approximately $6.7 million. This increase is the result of an additional $1.5 million proposed for water and wastewater projects in 2015 over 2014. The draft capital budget also includes projects funded by external sources such as grants, development charges, and developer and partner contributions totaling approximately $1.3 million. This brings the total 2015 draft capital budget, before vehicle and equipment replacement, to just over $8 million. The Budget Process Prior to the 2013 budget, the annual capital and operating budgets were discussed together during the annual budget deliberations, typically beginning in late February. The timing of the budget meetings was mainly dictated by the release of material information that had a significant impact on the operating budget (i.e. OMPF funding). This meant that tenders and proposal calls would be issued beginning in the spring of each year. Earlier tender calls usually result in favorable pricing for road, bridge and water/wastewater capital projects. In an effort to take advantage of favorable capital pricing, deliberations and approval of the capital and operating budgets were separated in 2013. Thus far, the Township has experienced positive pricing variances since the implementation of this budget process change. If additional information or funding becomes available before the operating budget is discussed, we are able to make an amendment to the capital budget. 2015 Capital Budget Process Discussions concerning the 2015 capital budget began in July for infrastructure related projects. The two main operational departments (Infrastructure and Community Services) were provided with tax supported funding and development charge allocations to be used, as a guideline only, when determining their 2015 capital priorities. The allocations were based on historical amounts allocated to Public Works and Parks and Recreation over the past five budget years. The Township’s Managing Directors met in August to specifically deal with development related capital projects. The focus of this meeting was to ensure all Managing Directors were in agreement with the anticipated timing of development related infrastructure. These projects have been positioned accordingly in the ten year capital forecast, and their descriptions in the capital budget (Appendices A & B) are followed by “{SFA}”. Given the substantial cost required to fund the non-growth portion of development related projects it has again been assumed, as it has in prior years, that these types of projects will be 100% front-end funded through a service financing agreement (SFA) with the developer. Capital budget requests were submitted to the Corporate Services (Financial Services) department and discussed with each department head throughout the months of August to October. In mid-November, the Interdepartmental Team met to discuss the capital budget. Based on available funding, approximately $850,000 of tax supported projects were eliminated from the draft 2015 capital budget. The projects were removed through a combination of deferring certain projects (or a portion of a project) to a later year, or eliminating projects entirely from the ten year capital forecast. Three additional half-days of discussions with only the Managing Directors and CAO in attendance were devoted to reviewing the ten year capital forecast. The focus was on setting a more realistic capital budget for the 2015-17 period given the likely tax supported reserves and development charge reserve fund financial constraints of the Township. During these meetings, discussion of individual project relevance and priority typically centered around four questions: 1. Is the project mandatory? 2. Is it critical that the project be completed in the 2015 – 2017 period – for safety or potential service disruption reasons? 3. Will the project lead to future efficiencies or cost savings? 4. Is the project part of normal lifecycle replacement? Information from numerous studies undertaken in 2013/14, including asset management, played an integral part in determining project priority. 2015 Draft Capital Budget The 2015 draft capital budget is attached as Appendix A. Highlights of the 2015 draft capital budget are: 1. 2. 3. 4. 5. 6. 7. Reconstruction of Water Street – High Street to Bridge Street Completion of the expansion at the Victoria Park Senior Centre First Line (WG) – Municipal #6687 to Side Road 15 Reconstruction of Queen Street East – Hillside Drive to River Street Renovations at 10 Mill St. for the relocation of the Tourism office in late 2015 Reconstruction of Chalmers Street – Church Street to Colborne Street Replacement of the propane fueled ice resurfacer at the Elora Community Centre with an electrically powered resurfacer to improve air quality in the facility 8. Reconstruction of Price Street – Mill Street to Church Street 9. Implementation of a multi-year pavement management program to replace small sections of pavement (Appendix J) 10. Proactive remediation on Township bridges to extend their useful life 11. Replacement of the roof at the Belwood Community Hall 12. Installation of water and wastewater infrastructure on Highway 6 between Side Road 18 and Side Road 19 13. Upgrading the Fergus Grand Theatre for accessibility including the front lobby and washroom 14. Pre-engineering for the reconstruction of Middlebrook Road – Third Line to Wellington Road 7 The 2015 draft capital budget will be revisited in February during the draft operating budget discussions once the remainder of the Township budget has been compiled. As Council is aware, the Township will receive approximately $293,000 in 2015 under the Ontario Community Investment Fund – formula based funding component (OCIF). Staff are currently assessing projects that meet the criteria for funding under the program and intend to bring forward a recommendation in February. 2015 Draft Capital Budget Funding Challenges The 2015 draft capital budget includes approximately $1.8 million dollars in growth related projects. These growth related projects are eligible for approximately $1.1 million of funding from the Township’s development charge (DC) reserve funds. It is anticipated that the Township will have approximately $750,000 of DC’s available for growth related projects for the foreseeable future. This assumes that development continues at the pace the Township has experienced over the past few years. Ten Year Capital Forecast The ten year capital forecast is attached as Appendix B. Consistent with prior year budgets, there are two key assumptions built into the 2015 draft ten year capital forecast. They are: 1. Bridges and culverts with estimated total capital expenditures in excess of $500,000 are assumed to be financed as 1/3 Township, 1/3 Federal subsidy, and 1/3 Provincial subsidy; and 2. Development specific capital projects are assumed to be 100% front-end funded through a service financing agreement with the developer. A significant amount of time was invested by the Managing Directors prioritizing capital projects in the ten year forecast; with particular attention paid to 2016 and 2017. It is anticipated that sufficient reserve funds and development charges will exist to fund all the projects listed in 2016 and 2017 years assuming unforeseen circumstances do not arise over the next year. For the 2016 budget, staff intends to bring forward a three year capital budget for approval that integrates information identified in all recent studies, is in line with the strategic direction set by this Council, and meets the financial restrictions projected for the Township. This information will lay the foundation for the future development, and approval, of a multi-year operating budget. Other Information The vehicle and equipment replacement capital items included in the ten year capital forecast and the 2015 draft capital budget (items 78 to 90 in Appendix A) have not been finalized. Funding for these reserves comes from the operating budget and therefore are not yet available. This information will be forthcoming in February and reviewed during the 2015 draft budget deliberations. It is therefore items 1 to 77 that are recommended for adoption by Council (see “Recommendation” on the first page of this report). BUDGET/FINANCIAL IMPLICATIONS: The Council approved capital budget document is a key policy and planning tool that sets out the Township’s capital program for the upcoming fiscal year, and forecast for the next ten years. CONSULTATION: The preparation of this report was done in consultation with the Township’s Managing Directors, Chief Administrative Officer, other senior managers, and Triton Engineering Services Limited. Residents were notified that Council would receive submissions from registered delegates by advertising in the Wellington Advertiser and on the Township’s web site. ATTACHMENTS: Appendix A – Draft 2015 Capital Budget Appendix B – Draft 10 Year Capital Forecast: 2015 - 2024 Appendix C – Summary of Capital Project Financing Appendix D – Graph – Gross Expenditures Appendix E – Graph – Sources of Financing Appendix F – Graph – Tax Supported Capital Budget – Historical Funding Allocation Appendix G – Existing Projects Requiring Additional Funding in the 2015 Capital Budget Appendix H – Map – 2015 Urban Capital Projects Appendix I – Map – 2015 Rural Capital Projects Appendix J – 2015 Pavement Management Plan and Map PREPARED BY: APPROVED BY: Mark Bradey, Financial Manager/Deputy-Treasurer Andrew Goldie, Chief Administrative Officer Appendix A TOWNSHIP OF CENTRE WELLINGTON 2015 CAPITAL BUDGET (in '000s) T TAX SUPPORTED INTERNAL SOURCES OF FUNDING EXTERNAL FINANCING REF # PROJECT # PROJECT TITLE 2015 BUDGET SUBSIDY DEV CHGS NET COST TO OTHER TOWNSHIP RESERVES DEV CONTR STUDIES OTHER USER PAY SUPPORTED INTERNAL SOURCES OF FUNDING SEWER WATER WATER/SEWER RESERVE RESERVE DEBT DEBT Studies 105-0405 2 3 4 25.0 2010-088 Update Corporate Strategic Action Plan 2014 Fire Master Plan 2014-071 Water and Wastewater Rate Study - 2015 60.0 755-0286 Downtown Facade Improvements Guidelines 15.0 Total Studies 25.0 20.0 20.0 25.0 F 1 60.0 120.0 - 20.0 120.0 - 20.0 15.0 15.0 30.0 30.0 - - 100.0 40.0 - - 30.0 30.0 - - - 100.0 40.0 - - 30.0 30.0 - 10.0 10.0 10.0 15.0 15.0 15.0 30.0 30.0 30.0 40.0 40.0 40.0 10.0 10.0 5.0 2.5 2.5 105.0 100.0 Corporate - IT&S 5 2015-025 Worktech Upgrade 6 2015-026 Class Software Upgrade 7 2015-027 Paperless Agenda Meeting Software 8 2015-029 Cemetery Management System 9 2015-058 Municpal Consent and Road Occupancy Permit Management System Total Corporate - IT&S A CORPORATE 105.0 - - - - - - 2.5 2.5 - 2015-036 R Corporate - Other 10 Wayfinding Signage Program - 2015 Total Corporate - Other MUNICIPAL BUILDINGS Municipal Buildings 105-0414 Civic Centre - Lamp Post Replacement 12 105-0415 Tourism Office Rennovations 13 2015-007 Civic Centre - Veterans' Hall Renovation 14 2015-008 Civic Centre - Building Signage 15 2015-009 Civic Centre - HVAC Upgrade - Phase I D 11 Total Municipal Buildings December 24, 2014 12:10 PM 20.0 20.0 20.0 20.0 - - - - 20.0 20.0 - - - - - 125.0 - - - - 125.0 120.0 - - 2.5 2.5 - 30.0 30.0 30.0 165.0 165.0 165.0 25.0 25.0 25.0 10.0 10.0 10.0 100.0 100.0 100.0 330.0 - - - - 330.0 330.0 - - - - - 330.0 - - - - 330.0 330.0 - - - - - Page 1 of 6 TOWNSHIP OF CENTRE WELLINGTON 2015 CAPITAL BUDGET (in '000s) T TAX SUPPORTED INTERNAL SOURCES OF FUNDING EXTERNAL FINANCING REF # PROJECT # PROJECT TITLE 2015 BUDGET SUBSIDY DEV CHGS NET COST TO OTHER TOWNSHIP RESERVES DEV CONTR FIRE SERVICES OTHER USER PAY SUPPORTED INTERNAL SOURCES OF FUNDING SEWER WATER WATER/SEWER RESERVE RESERVE DEBT DEBT Fire Services 2015-033 17 F0020 Elora Volunteer Firefighter Recruit Personal Protective Equipment Fire Extinguisher Training Unit Total Fire Services 20.0 20.0 15.0 35.0 - - 35.0 - - HEALTH SERVICES Cemeteries 20.0 F 16 15.0 15.0 - - 35.0 35.0 - - - - - - - 35.0 35.0 - - - - - 2009-052 Belsyde Cemetery - Columbarium "B" 65.0 65.0 65.0 19 2015-045 Elora Cemetery - Chapel Repointing 30.0 30.0 30.0 20 405-0354 30.0 30.0 30.0 Belsyde Cemetery Cremation Burial Area Expansion Total Cemeteries TRANSPORTATION & PUBLIC WORKS Public Works - Other A 18 125.0 - - - - 125.0 125.0 - - - - - 125.0 - - - - 125.0 125.0 - - - - - 20.0 2015-001 New Packer for Grader 20.0 20.0 22 2015-041 Facility Fire Protection 16.5 16.5 11.5 2.5 2.5 23 2015-057 Portable Heated Asphalt Hopper 30.0 30.0 10.0 10.0 10.0 24 330-0398 Queen St. Office Renovations 30.0 Total Public Works - Other Roadways - Rural 25 2012-064 26 2013-009 28 Middlebrook Rd. ±Third Line to WR 7 First Line (WG) - Municipal #6687 to Side Road 15 2015-023 Road Rebuild - Section of Jones Base Line South 2015-068 Asphalt Resurfacing - J.M. Quarrie Dr, Inverhaugh Total Roadways - Rural D 27 R 21 96.5 - 30.0 - - - 96.5 41.5 75.0 75.0 75.0 200.0 200.0 200.0 25.0 25.0 25.0 300.0 300.0 360.0 360.0 60.0 360.0 15.0 15.0 - - 27.5 27.5 - - - - - - 60.0 - - 60.0 - Roadways - Urban 29 2012-013 Queen St. E. - Hillside Dr. to River St. December 24, 2014 12:10 PM 360.0 Page 2 of 6 TOWNSHIP OF CENTRE WELLINGTON 2015 CAPITAL BUDGET (in '000s) T TAX SUPPORTED INTERNAL SOURCES OF FUNDING EXTERNAL FINANCING REF PROJECT # # 30 2012-019 31 2012-111 32 33 PROJECT TITLE Chalmers St. - Church St. to Colborne St. 2015 BUDGET SUBSIDY 380.0 DEV CHGS NET COST TO OTHER TOWNSHIP RESERVES 380.0 380.0 DEV CONTR 176.0 176.0 125.0 125.0 125.0 301-0037 Gregson Court Storm Water Management 200.0 200.0 200.0 34 301-0045 Hill St. Drainage Outlet, Elora 40.0 40.0 35 301-0428 Hill St W - Maple St to Beatty Line 120.0 48.0 48.0 36 301-0429 Price St - Mill St to Church St 500.0 500.0 500.0 37 301-0444 Water Street - High St to Bridge St 986.0 394.4 252.6 38 301-0463 2,223.4 2,081.6 Structures 39 301-0104 Bridge Repairs and Remediation Total Structures SANITARY SEWER 72.0 591.6 162.8 3,049.8 68.1 73.7 162.8 - 663.6 162.8 - 100.0 100.0 100.0 - - - - 100.0 3,606.3 - 663.6 222.8 - 2,719.9 A Sideroad 18 - Steele St to Vincent St Surface Asphalt {SFA} Total Roadways - Urban 40.0 SEWER WATER WATER/SEWER RESERVE RESERVE DEBT DEBT F 176.0 2015-050 Extension of McQueen Blvd from Tower St to Westerly Limit {SFA} Pavement Management - 2015 OTHER USER PAY SUPPORTED INTERNAL SOURCES OF FUNDING 100.0 - - 68.1 73.7 - 100.0 - - - - - 2,523.1 - - 95.6 101.2 - Sanitary Sewer System 40 2012-014 Queen St. E. - Hillside Dr. to River St. 41 2012-020 Chalmers St. - Church St. to Colborne St. 42 2015-015 Wastewater Snowplow 43 2015-018 44 45 110.0 110.0 20.0 20.0 20.0 7.0 7.0 7.0 Fergus WWTP - Digester Building Roof 40.0 40.0 40.0 360-0356 Highway 6 - Sideroad 19 to Sideroad 18 359.0 359.0 359.0 360-0429 Price St - Mill St to Church St 55.0 55.0 55.0 46 360-0436 26.0 26.0 26.0 47 360-0444 Fergus WWTP - Mechanical Bar Screen (Headworks Building) Water Street - High St to Bridge St 200.0 44.0 44.0 48 360-0456 Mill Street Sewage Pumping Station 100.0 100.0 100.0 49 360-9650 LPS Grinder Pumps 15.0 15.0 D R 110.0 Total Sanitary Sewer System December 24, 2014 12:10 PM 156.0 15.0 932.0 - 156.0 - - 776.0 - - - 776.0 - - 932.0 - 156.0 - - 776.0 - - - 776.0 - - Page 3 of 6 TOWNSHIP OF CENTRE WELLINGTON 2015 CAPITAL BUDGET (in '000s) T TAX SUPPORTED INTERNAL SOURCES OF FUNDING EXTERNAL FINANCING REF # PROJECT # PROJECT TITLE 2015 BUDGET SUBSIDY DEV CHGS NET COST TO OTHER TOWNSHIP RESERVES DEV CONTR WATERWORKS OTHER USER PAY SUPPORTED INTERNAL SOURCES OF FUNDING SEWER WATER WATER/SEWER RESERVE RESERVE DEBT DEBT Waterworks System 2012-015 Queen St. E. - Hillside Dr. to River St. 150.0 51 2012-021 Chalmers St. - Church St. to Colborne St. 100.0 52 2015-013 Hydrant Transmitters 20.0 53 2015-014 20.0 54 2015-019 Well Highlift Pumps - Variable Frequency Drive Controllers Hydrant - Snow Removal Equipment 55 2015-020 Elora Well #1 - Highlift Pump 15.0 56 2015-038 Daniel Cres. Elevated Tower - Recoating 57 2015-039 Fergus Well House #5 Roof Repair 58 2015-040 Fergus Well #1 - Window Replacement 59 2015-043 Source Protection Assessments 60 330-0356 61 330-0429 Highway 6 Trunk Water Main Extension to Sideroad 18 Oversizing Price St - Mill St to Church St 62 330-0444 Water Street - High St to Bridge St PARKS & RECREATION Facilities - Belwood Hall 63 2015-012 14.0 Belwood Community Hall - Roof Replacement Total Facilities - Belwood Hall 150.0 100.0 100.0 20.0 20.0 20.0 20.0 14.0 14.0 15.0 200.0 200.0 200.0 12.0 12.0 12.0 A 15.0 7.0 7.0 7.0 20.0 20.0 20.0 270.0 270.0 270.0 150.0 150.0 150.0 314.0 188.4 125.6 125.6 1,292.0 - 188.4 - - 1,103.6 - - - - 1,103.6 - 1,292.0 - 188.4 - - 1,103.6 - - - - 1,103.6 - 100.0 100.0 100.0 100.0 - - - - - 25.0 - - - - - R Total Waterworks System 150.0 F 50 100.0 100.0 - - - - Facilities - CW Community Sportsplex 64 2011-067 Announcement System - CWCS 25.0 25.0 65 2014-059 CWCS - Parking Lot Partial Replacement 80.0 80.0 80.0 66 510-0447 325.0 325.0 325.0 430.0 430.0 50.0 50.0 D CWCS Sportsplex Building - Aquatics Facade Total Facilities - CW Community Sportsplex 430.0 - - - - Facilities - Elora Community Centre 67 2014-021 Elora Community Centre - Chiller Replacement December 24, 2014 12:10 PM 50.0 Page 4 of 6 TOWNSHIP OF CENTRE WELLINGTON 2015 CAPITAL BUDGET (in '000s) T TAX SUPPORTED INTERNAL SOURCES OF FUNDING EXTERNAL FINANCING REF PROJECT # # 68 2015-004 PROJECT TITLE Olympia Electrical Upgrade Total Facilities - Elora Community Centre 2015 BUDGET SUBSIDY 50.0 100.0 - DEV CHGS NET COST TO OTHER TOWNSHIP RESERVES 50.0 50.0 DEV CONTR - - - 100.0 100.0 OTHER USER PAY SUPPORTED INTERNAL SOURCES OF FUNDING SEWER WATER WATER/SEWER RESERVE RESERVE DEBT DEBT - - - - - - - - - - - - - - - - - - - - 69 2011-013 Fergus Grand Theatre - Front Lobby Washroom & Accessibility Total Facilities - Fergus Grand Theatre 50.0 50.0 - - Facilities - Victoria Park Senior's Centre 2015-030 Victoria Park (Fergus) Parking Lot Expansion 71 760-0318 Victoria Park Senior Centre Expansion Total Facilities - Victoria Park Senior's Centre Parks 72 2015-016 Gerrie Road to Foote Park Trail Upgrade 73 550-0014 Bissell Park Accessible Washrooms 74 550-0450 Park Identification - All Parks 75 550-0451 76 550-0461 Westminster Highlands Park - Play Equipment & Basketball Court (Fergus) Strathlea Subdivision Park (Fergus) Total Parks 75.0 - - 50.0 50.0 50.0 50.0 75.0 75.0 555.0 555.0 630.0 630.0 10.0 10.0 10.0 15.0 15.0 15.0 10.0 10.0 10.0 7.5 7.5 455.0 530.0 -100.0 - - -100.0 - A 70 F Facilities - Fergus Grand Theatre 75.0 67.5 75.0 185.0 67.5 - 135.0 - - 7.5 7.5 50.0 50.0 505-0453 R Parks and Recreation - Other 77 Emerald Ash Borer Program Total Parks and Recreation - Other VEHICLE REPLACEMENT 50.0 50.0 50.0 50.0 - - - - 50.0 50.0 - - - - - 1,445.0 - 135.0 -100.0 - 1,410.0 1,410.0 - - - - - 210-9500 Building - Vehicle Replacement 26.0 26.0 26.0 79 205-9500 Fire - Vehicle Replacement 30.0 30.0 30.0 80 505-9500 P&R Vehicle Replacement 90.0 90.0 90.0 81 303-9500 Public Works Vehicle Replacement 330.0 330.0 330.0 82 330-9500 35.0 35.0 D 78 Water Vehicle Replacement 511.0 - - - - 35.0 511.0 476.0 188.6 188.6 - - - 35.0 - EQUIPMENT REPLACEMENT 83 205-9600 Fire Equipment Replacement December 24, 2014 12:10 PM 188.6 Page 5 of 6 TOWNSHIP OF CENTRE WELLINGTON 2015 CAPITAL BUDGET (in '000s) T TAX SUPPORTED INTERNAL SOURCES OF FUNDING EXTERNAL FINANCING PROJECT TITLE IT&S Hardware Equipment Replacement 2015 BUDGET SUBSIDY 43.0 85 105-9600 IT&S Software Replacement 86 505-9600 P&R Facilities Equipment Replacement 87 505-9700 P&R Parks Equipment Replacement 66.3 88 303-9600 Public Works Equipment Replacement 35.3 89 360-9600 Sanitary Sewer Equipment Replacement 30.5 90 330-9600 Water Equipment Replacement NET COST TO OTHER TOWNSHIP RESERVES 43.0 43.0 DEV CONTR 14.0 14.0 14.0 213.7 213.7 213.7 66.3 35.3 35.3 SEWER WATER WATER/SEWER RESERVE RESERVE DEBT DEBT 30.5 9.0 - - 0.0 1,163.0 9.0 - - 600.4 560.9 - - 30.5 9.0 - 122.8 - 7,835.9 5,620.0 0.0 0.0 934.6 1,281.3 0.0 D R A 9,121.6 66.3 OTHER 30.5 9.0 600.4 GRAND TOTAL DEV CHGS F REF PROJECT # # 84 105-9601 USER PAY SUPPORTED INTERNAL SOURCES OF FUNDING December 24, 2014 12:10 PM Page 6 of 6 Appendix B 2015 2016 2017 2018 2019 105-0009 - Municipal Servicing Standards Update 0 0 5,000 0 105-0010 - Long-Term Water Strategy Master Plan 0 170,000 170,000 2020 2021 2022 2023 2024 Total 5,000 0 5,000 0 5,000 0 20,000 0 0 0 0 0 0 0 340,000 25,000 0 0 0 0 0 0 0 0 0 25,000 2010-082 - Development Charges Study 2016 0 60,000 0 0 0 0 0 0 0 0 60,000 2010-083 - Official Plan Review - 2021 0 0 0 2010-084 - Zoning By-Law Review - 2017 0 0 10,500 0 0 0 70,000 0 0 0 70,000 0 0 0 0 0 0 0 10,500 2010-085 - Zoning By-Law Review - 2022 0 2010-086 - Update Parks, Recreation & Culture Master Plan 0 2010-087 - Indoor Turf Training Facility Feasibility Study 0 STUDIES 20,000 0 0 0 0 0 0 10,500 0 0 10,500 70,000 0 0 0 0 0 0 0 0 70,000 0 0 0 0 43,000 0 0 0 0 43,000 34,000 0 0 0 0 0 0 0 0 54,000 0 0 35,000 0 0 0 0 0 0 35,000 5,000 5,000 0 0 0 0 0 0 0 10,000 A 2010-088 - Fire Master Plan F Studies 105-0405 - Update Corporate Strategic Action Plan - 2014 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 0 2011-011 - Review of the 2015 - 2018 Corporate Strategic Action Plan 0 2011-012 - Review of the 2019 - 2022 Corporate Strategic Action Plan 0 0 0 0 5,000 5,000 5,000 0 0 0 15,000 2012-006 - Township Wide Job Evaluation Study 0 0 0 30,000 0 0 0 0 0 0 30,000 2013-019 - Update to Growth Strategy 2020 0 0 0 0 0 186,000 0 0 0 0 186,000 2014-004 - Tier 3 Water Quantity Risk Assessment 0 0 0 250,000 250,000 0 0 0 0 0 500,000 2014-005 - Heritage Master Plan 0 10,000 90,000 0 0 0 0 0 0 0 100,000 2014-006 - Stormwater Master Plan 0 75,000 75,000 0 0 0 0 0 0 0 150,000 2014-038 - Update Corporate Strategic Action Plan - 2022 0 0 0 0 0 0 0 40,000 0 0 40,000 D R 2011-009 - Update Corporate Strategic Action Plan - 2018 12/24/2014 12:11:59 PM Page 1 of 24 2016 2017 2018 2019 0 0 0 0 0 2014-071 - Water and Wastewater Rate Study - 2015 60,000 0 0 0 0 2014-072 - Water and Wastewater Rate Study - 2020 0 0 0 0 0 2015-054 - Development Charges Study 2021 0 0 0 15,000 0 0 0 0 0 120,000 424,000 355,500 120,000 424,000 355,500 2014-039 - Review of the 2023 - 2026 Corporate Strategic Action Plan 755-0286 - Downtown Facade Improvements Guidelines F0004 - Transportation Plan Total for Studies Total STUDIES 2020 2021 2022 2023 2024 Total 0 0 0 5,000 5,000 10,000 0 0 0 0 0 60,000 60,000 0 0 0 0 60,000 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 0 0 0 60,000 0 0 0 60,000 0 0 0 0 0 0 0 15,000 250,000 0 0 0 0 0 0 250,000 565,000 260,000 294,000 140,000 50,500 10,000 5,000 2,224,000 565,000 260,000 294,000 140,000 50,500 10,000 5,000 2,224,000 Corporate - IT&S 2014-054 - Business Continuity/Disaster Recovery Assessment 0 A CORPORATE 20,000 0 0 0 0 0 0 0 0 20,000 0 0 0 0 0 0 0 0 0 10,000 0 0 0 0 0 0 0 0 0 15,000 2015-025 - Worktech Upgrade 10,000 2015-026 - Class Software Upgrade 15,000 2015-027 - Paperless Agenda Meeting Software 30,000 0 0 0 0 0 0 0 0 0 30,000 0 10,000 0 0 0 0 0 0 0 0 10,000 2015-029 - Cemetery Management System 40,000 0 0 0 0 0 0 0 0 0 40,000 2015-058 - Municpal Consent and Road Occupancy Permit Management System 10,000 0 0 0 0 0 0 0 0 0 10,000 105,000 30,000 0 0 0 0 0 0 0 0 135,000 20,000 0 0 0 0 0 0 0 0 0 20,000 20,000 0 0 0 0 0 0 0 0 0 20,000 125,000 30,000 0 0 0 0 0 0 0 0 155,000 Total for Corporate - IT&S Corporate - Other R 2015-028 - Information Technology Security Audit 2015-036 - Wayfinding Signage Program 2015 D Total for Corporate - Other Total CORPORATE 12/24/2014 12:11:59 PM Page 2 of 24 2015 2016 2017 2018 2019 30,000 0 0 0 0 0 0 MUNICIPAL BUILDINGS Municipal Buildings 165,000 0 0 2011-020 - LCBO Roof Replacement 0 75,000 0 2015-005 - West Garafraxa Office - HVAC Furnace Replacement 0 5,000 0 2015-006 - Civic Centre - Lunch Room Renovation 0 0 0 25,000 0 0 2015-008 - Civic Centre - Building Signage 10,000 0 0 2015-009 - Civic Centre - HVAC Upgrade Phase I 100,000 2015-010 - Civic Centre - HVAC Upgrade Phase II 0 2015-051 - Civic Centre - IT&S Renovation 0 2015-007 - Civic Centre - Veterans' Hall Renovation Total for Municipal Buildings 330,000 Total MUNICIPAL BUILDINGS 330,000 2021 2022 2023 2024 Total 0 0 0 0 0 30,000 0 0 0 0 0 165,000 0 0 0 0 0 0 0 75,000 0 0 0 0 0 0 0 5,000 35,000 0 0 0 0 0 0 35,000 0 0 0 0 0 0 0 25,000 0 0 0 0 0 0 0 10,000 0 0 0 0 0 0 0 0 0 100,000 75,000 0 0 0 0 0 0 0 0 75,000 25,000 0 0 0 0 0 0 0 0 25,000 180,000 0 35,000 0 0 0 0 0 0 545,000 180,000 0 35,000 0 0 0 0 0 0 545,000 A 105-0415 - Tourism Office Rennovations 2020 F 105-0414 - Civic Centre - Lamp Post Replacement T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 Fire Services R FIRE SERVICES 2010-002 - Equipment for Additional Full Time Firefighters 0 0 0 0 0 0 0 0 0 34,900 34,900 2010-078 - Tanker 0 0 0 0 0 0 0 0 0 376,000 376,000 0 0 0 0 0 0 0 0 0 590,000 590,000 0 0 0 0 0 0 0 0 2,250,000 0 2,250,000 2010-081 - Equipment for Additional Volunteer Firefighters 0 0 0 0 0 0 0 0 0 174,500 174,500 2012-003 - Traffic Signals - Opticom - 2016 0 20,000 0 0 0 0 0 0 0 0 20,000 20,000 0 0 0 0 0 0 0 0 0 20,000 0 0 0 0 0 0 0 0 0 376,000 376,000 2010-079 - Pumper D 2010-080 - New Fire Hall 2015-033 - Elora Volunteer Firefighter Recruit Personal Protective Equipment F0017 - Fire/EMS Unit 12/24/2014 12:11:59 PM Page 3 of 24 2015 2016 2017 2018 2019 15,000 0 0 0 0 35,000 20,000 0 0 0 35,000 20,000 0 0 0 65,000 0 0 0 0 0 2015-045 - Elora Cemetery - Chapel Repointing 30,000 0 0 405-0189 - Elora Cemetery ±Chapel Repairs 0 14,000 30,000 F0020 - Fire Extinguisher Training Unit Total for Fire Services Total FIRE SERVICES T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 2020 2021 2022 2023 2024 Total 0 0 0 0 0 15,000 0 0 0 2,250,000 1,551,400 3,856,400 0 0 0 2,250,000 1,551,400 3,856,400 HEALTH SERVICES 2015-003 - Belsyde Cemetery Expansion 405-0354 - Belsyde Cemetery Cremation Burial Area Expansion Total for Cemeteries 125,000 Total HEALTH SERVICES 125,000 TRANSPORTATION & PUBLIC WORKS Public Works - Other 0 0 0 0 0 0 0 65,000 0 190,000 0 0 0 0 0 190,000 0 0 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 14,000 0 0 0 0 0 0 0 0 0 30,000 14,000 0 0 190,000 0 0 0 0 0 329,000 14,000 0 0 190,000 0 0 0 0 0 329,000 A 2009-052 - Belsyde Cemetery Columbarium "B" F Cemeteries 0 0 0 0 200,000 0 0 0 0 0 200,000 2010-031 - Single Axle Truck (with dump/plow/sander/wing) 0 0 200,000 0 0 0 0 0 0 0 200,000 2014-010 - Sidewalk Machine Snowblower& Blade 0 0 0 135,000 0 0 0 0 0 0 135,000 2014-011 - Chipper 0 50,000 0 0 0 0 0 0 0 0 50,000 2014-012 - Rubber Tire Excavator 0 0 0 0 250,000 0 0 0 0 0 250,000 2014-013 - New Pick-up Truck 0 38,000 0 0 0 0 0 0 0 0 38,000 2014-077 - Road Condition Assessment 0 0 30,000 0 30,000 0 30,000 0 30,000 0 120,000 20,000 0 0 0 0 0 0 0 0 0 20,000 16,500 0 0 0 0 0 0 0 0 0 16,500 R 2010-030 - Single Axle Truck (with dump/plow/sander/wing) D 2015-001 - New Packer for Grader 2015-041 - Facility Fire Protection 12/24/2014 12:11:59 PM Page 4 of 24 2016 2017 2018 2019 2020 2021 2022 2023 2024 Total 0 0 0 0 0 20,000 0 0 0 0 0 30,000 0 20,000 0 0 0 30,000 0 0 0 0 0 0 0 500,000 3,451,000 0 0 0 0 0 3,951,000 30,000 0 0 0 0 0 0 0 0 0 30,000 F0120 - Stumper Machine 0 0 0 54,000 0 0 0 0 0 0 54,000 F0122 - New Pick-up Truck 0 0 0 38,000 0 0 0 0 0 0 38,000 F0123 - New Utility Truck 0 0 0 43,000 0 0 0 0 0 0 43,000 F0124 - Additional Vehicle/Equipment Needs 0 0 0 0 0 0 0 0 978,000 0 978,000 96,500 108,000 230,000 770,000 3,931,000 0 30,000 0 1,008,000 0 6,173,500 2015-057 - Portable Heated Asphalt Hopper 303-0299 - New Centralized Operations Facility 330-0398 - Queen St. Office Renovations Total for Public Works - Other F 2015-042 - Tractor Snow Blower 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 2009-047 - Second Line East ±Side Rd 10 to Side Rd14 Phase 2 0 2010-074 - Eramosa/WG Townline - WR 29 to Third Line WG - Paving 0 2010-091 - Eighth Line Reconstruction Wellington Rd 18 to Sideroad 5 0 2010-092 - Third Line - Caroll Creek to WR 17 2012-064 - Middlebrook Rd. ±Third Line to WR 7 A Roadways - Rural 0 0 0 0 0 0 0 250,000 250,000 0 0 0 485,000 0 0 0 0 0 485,000 0 0 0 775,000 0 0 0 0 0 775,000 0 0 0 0 0 0 250,000 0 0 0 250,000 75,000 1,000,000 1,250,000 250,000 0 0 0 0 0 0 2,575,000 2012-065 - Eighth Line W. ±SR 5 to WR 17 0 0 0 0 0 0 0 0 0 370,000 370,000 2012-066 - Eight Line W. ±Middlebrook Rd. to WR 18 0 0 0 0 370,000 0 0 0 0 0 370,000 2012-067 - Eighth Line W. ±Grand River to Middlebrook Rd. 0 0 0 0 0 0 0 0 0 660,000 660,000 2012-069 - Eighth Line E. ±WR 21 to SR 10 0 0 0 0 0 0 0 0 0 430,000 430,000 2012-070 - Eighth Line E. ±SR 14 to SR 10 0 0 0 0 0 0 0 0 0 480,000 480,000 2012-072 - Fourth Line E. ±SR 10 to SR 4 0 0 0 0 0 0 0 0 0 660,000 660,000 2012-073 - Sixth Line E. ±Cnty R. 21 (Inverhaugh) to Side Rd.10 0 0 0 0 0 0 0 570,000 0 0 570,000 D R 0 12/24/2014 12:11:59 PM Page 5 of 24 2016 2017 2018 2019 2020 2021 2022 2023 2024 Total 2012-074 - SR 4 - WR 21 to Second Line 0 0 0 0 0 2012-077 - Guelph St. ±Second Line to Elora St. 0 0 0 0 0 550,000 0 0 0 0 0 0 550,000 0 290,000 0 290,000 2012-078 - Gerrie Rd. ±Side Rd 10 (south) to SR 15 0 0 0 0 0 0 0 0 400,000 0 400,000 2012-079 - SR 15 ±Gerrie Rd. to Hwy.#6 (Phase 1) 0 0 0 0 0 0 0 0 550,000 0 550,000 2012-080 - SR 15 ±James St. (Salem) to Gerrie Rd. (Phase 2) 0 0 0 0 0 0 400,000 0 0 0 400,000 2012-081 - Jones Base Line South ± Scotland St. to 4th Line (Nichol) 0 0 0 0 0 0 0 0 0 360,000 360,000 2012-082 - Jones Base Line South ±4th Line to 6th Line (Nichol) 0 0 0 0 0 0 0 0 520,000 0 520,000 2012-083 - Gerrie Rd. ±Side Rd 10 (south) to SR 5 0 0 0 0 0 0 0 0 370,000 0 370,000 2012-084 - Gerrie Rd. ±SR 5 - Cnty Rd.17 0 2012-085 - Irvine St. ±Bricker Ave to SR 15 {SFA} 0 2012-091 - Eramosa/WG Townline ±Third Line WG to Fifth Line WG - Paving 0 2012-093 - 4th Line (WG) : EramosaGarafraxa Townline to Cnty Rd. 18 0 2013-001 - Side Road 20 - Fifth Line to Sixth Line Reconstruction 0 2013-002 - Side Road 20 - First Line to Second Line Paving 0 200,000 2013-003 - Side Road 20 - Second Line to Third Line Paving 0 2013-004 - Side Road 20 - Third Line to Fourth Line Paving A F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 0 0 0 0 0 370,000 0 0 370,000 0 0 0 0 0 0 0 0 423,000 423,000 0 0 0 460,000 0 0 0 0 0 460,000 0 0 0 0 0 0 0 0 440,000 440,000 0 200,000 0 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 200,000 0 0 0 0 200,000 0 0 0 0 200,000 0 0 0 0 0 0 200,000 0 0 0 200,000 2013-005 - Side Road 20 - Fourth Line to Fifth Line Paving 0 0 0 0 0 0 0 200,000 0 0 200,000 2013-006 - Side Road 20 - Fifth Line to Sixth Line Paving 0 0 0 0 0 0 0 0 200,000 0 200,000 2013-007 - First Line (WG) - Side Road 10 to Municipal #6641 0 0 200,000 0 0 0 0 0 0 0 200,000 200,000 0 0 0 0 0 0 0 0 0 200,000 D R 0 2013-009 - First Line (WG) - Municipal #6687 to Side Road 15 12/24/2014 12:11:59 PM Page 6 of 24 2016 2017 2018 2019 2013-014 - Sideroad 18 Reconstruction Mid Section 0 0 0 0 0 2013-027 - Eramosa/WG Townline - Sixth Line to WR26 - Rebuild to 'A' Gravel 0 0 0 570,000 0 25,000 0 0 0 0 0 0 0 60,000 0 0 F0083 - Second Line - Highway 6 to Jones Baseline 0 0 0 F0086 - Second Line - Highway 6 to Guelph St 0 0 F0101 - Sideroad 10 (Queen Mary) Highway 6 to Jones Baseline 0 F0102 - Fourth Line - Jones Baseline to Highway 6 0 F0103 - Sixth Line - Highway 6 to WR 7 0 F0104 - Stephen Court - Guelph Line West 0 F0108 - Sideroad 25 - WR 16 to Eighth Line 0 2015-059 - Gerrie Rd. - Colborne St to SR 15 2015-068 - Asphalt Resurfacing - J.M. Quarrie Dr, Inverhaugh F0109 - Fourth Line E. ±SR 14 to SR 10 2022 2023 2024 Total 0 0 0 0 1,350,000 1,350,000 0 0 0 0 0 570,000 0 0 0 0 0 25,000 0 0 0 500,000 0 0 500,000 0 0 0 0 0 0 0 60,000 0 0 0 0 0 0 1,252,000 1,252,000 0 0 0 0 0 0 0 1,109,000 1,109,000 0 0 0 0 0 0 0 0 214,000 214,000 0 0 0 0 0 0 0 327,000 0 327,000 0 0 0 0 0 0 300,000 0 0 300,000 0 0 0 0 0 0 200,000 0 0 200,000 0 0 0 0 0 0 0 0 669,000 669,000 0 0 0 0 0 0 620,000 620,000 1,200,000 1,650,000 820,000 2,090,000 750,000 850,000 2,140,000 2,657,000 9,287,000 21,804,000 2010-052 - Colborne St Phase II - Geddes St to North Queen St 0 0 415,000 0 0 0 0 0 0 0 415,000 2010-053 - Colborne St Phase III - John St to Wilson Cres 0 0 0 0 445,000 0 0 0 0 0 445,000 2010-054 - York St - Waterloo St to Cnty Rd 7 {SFA} 0 0 0 0 820,000 0 0 0 0 0 820,000 2010-055 - David St - Irvine St to Geddes St 0 0 0 0 0 894,000 0 0 0 0 894,000 2010-056 - Henderson St - Smith St to James St 0 0 0 0 220,000 0 0 0 0 0 220,000 2010-058 - Gerrie Road (reconstruction from rural to urban standard) {SFA} 0 0 0 0 1,368,000 0 0 0 0 0 1,368,000 D Roadways - Urban 12/24/2014 12:11:59 PM 0 R 0 360,000 Total for Roadways - Rural 0 2021 0 A 2015-023 - Road Rebuild - Section of Jones Base Line South 2020 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 Page 7 of 24 2016 2017 2018 2019 2010-059 - County Road 7 and York Street (Traffic Signalization) {SFA} 0 0 0 0 200,000 2010-061 - McQueen Blvd - Millburn Blvd to McTavish St {SFA} 0 0 0 0 0 2010-062 - McQueen Blvd - Fergus/Nichol Boundary to Guelph St {SFA} 0 0 0 0 0 2010-063 - Guelph St. - Elora St. to Second Line {SFA} 0 0 0 2010-065 - Intersection/Signalization McQueen Blvd and Scotland St 0 0 0 2010-066 - St Andrew St - Gartshore St to Tom St {SFA} 0 850,000 0 2010-067 - Township Bypass/Ring Road Development 0 0 2010-070 - Reconstruction of Colborne St from Gerrie Rd to Beatty Line - Internal to Nigus Holdings {SFA} 0 2010-071 - Reconstruction of Colborne St from Gerrie Rd to Beatty Line - External to Nigus Holdings {SFA} 0 2010-072 - Reconstruction of Beatty Line from South of Garafraxa St to Millage Lane {SFA} 0 2010-189 - Mill St. W. Sidewalk ±Metcalfe St. to Price St. (south side) 0 2011-014 - St David Street N - Woodhill Dr to Side Road 19 0 2012-008 - Elora St. - Tower St. to Perth St. 2012-012 - John St. - Provost Lane to Tower St. 2020 2021 2022 2023 2024 Total 0 0 0 0 0 200,000 0 0 0 0 946,000 946,000 0 0 0 0 1,283,000 1,283,000 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 0 0 0 0 0 2,565,000 2,565,000 0 0 0 0 0 0 200,000 200,000 0 0 0 0 0 0 0 850,000 0 0 0 0 0 0 0 4,049,000 4,049,000 0 0 1,970,000 0 0 0 0 0 0 1,970,000 0 0 544,000 0 0 0 0 0 0 544,000 0 0 1,670,000 0 0 0 0 0 0 1,670,000 0 0 0 0 0 0 0 0 110,000 110,000 0 0 0 0 0 0 0 0 200,000 200,000 0 0 0 0 0 560,000 0 0 0 0 560,000 0 0 0 0 0 230,000 0 0 0 0 230,000 360,000 0 0 0 0 0 0 0 0 0 360,000 2012-016 - Ashphalt Resurfacing Woodhill Dr. - Black to St. David St. N. 0 0 0 0 0 0 0 0 0 230,000 230,000 2012-017 - Ashphalt Resurfacing Parkside Dr. - Black to St. David St. N. 0 0 0 0 0 0 0 0 0 150,000 150,000 380,000 0 0 0 0 0 0 0 0 0 380,000 R A 0 D 2012-013 - Queen St. E. - Hillside Dr. to River St. 2012-019 - Chalmers St. - Church St. to Colborne St. 12/24/2014 12:11:59 PM Page 8 of 24 2016 2017 2018 2019 2012-022 - Church St. - Metcalfe St. to Price St. 0 0 0 0 260,000 2012-028 - Ashphalt Resurfacing Campbell Ave. - Woodhill Dr. to Elizabeth Cres. 0 0 0 0 0 2012-029 - Ashphalt Resurfacing - Philip Crt. 0 0 0 0 0 2012-032 - Glengarry Cres. - Gartshore St. to Dickson Dr. 0 185,000 0 2012-033 - Dickson Dr. - Glengarry Cres. to cul-de-sac 0 0 80,000 2012-039 - James St - Metcalfe St to Price St 0 0 0 2012-042 - McNab St - High St. to Bridge St. 0 0 0 2012-055 - Victoria St - McNab Roundabout to York St 0 2012-060 - Moir St. - Geddes St. to Princess St. {SFA} 0 2012-075 - Beatty Line N. ±SR 18 to SR 15 0 176,000 2021 2022 2023 2024 Total 0 0 0 0 0 260,000 0 0 0 0 95,000 95,000 0 0 0 0 60,000 60,000 0 0 0 0 0 0 0 185,000 0 0 0 0 0 0 0 80,000 0 0 0 300,000 0 0 0 300,000 0 0 0 1,600,000 0 0 0 1,600,000 A 2012-111 - Extension of McQueen Blvd from Tower St to Westerly Limit {SFA} 2020 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 380,000 0 0 0 0 0 0 0 0 380,000 0 100,000 0 0 0 0 0 0 0 100,000 0 200,000 0 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 176,000 0 0 575,000 0 0 0 0 0 0 575,000 0 2015-002 - 2016-2024 Sidewalk Replacement and Condition Survey 0 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 810,000 2015-034 - Princess St - Church St to Grand River 0 0 370,000 0 0 0 0 0 0 0 370,000 2015-037 - John St., Salem - Geddes to Salem St. 0 140,000 0 0 0 0 0 0 0 0 140,000 2015-044 - Nelson St. - WR 19 to George St - Paving 0 0 0 0 90,000 0 0 0 0 0 90,000 2015-046 - Bridge St - Tower St S to St David St S 0 0 0 0 0 370,000 0 0 0 0 370,000 2015-049 - Asphalt Resurfacing - Bon Acord/Omar Subdivision 0 0 0 0 0 150,000 0 0 0 0 150,000 125,000 0 0 0 0 0 0 0 0 0 125,000 D R 2013-021 - Hill St. Drainage Within Subdivision, Elora 2015-050 - Pavement Management - 2015 12/24/2014 12:11:59 PM Page 9 of 24 2016 2017 2018 2019 2015-062 - Hill St E - Herrick St to Gartshore St 0 0 0 0 0 2015-063 - Asphalt Resurfacing - Barnett Cres 0 0 0 0 0 2015-064 - Asphalt Resurfacing Chambers Cres and Cummings Cres 0 0 0 0 0 2015-069 - Pavement Management - 20162024 0 125,000 125,000 200,000 0 0 40,000 0 0 301-0254 - St David Street N - Menzies Ln. to Garafraxa St - Preliminary 0 50,000 360,000 301-0367 - Tower St. S. ±Right Hand Turn Lane Improvements at Bridge St. 0 140,000 0 301-0045 - Hill St. Drainage Outlet, Elora 120,000 301-0429 - Price St - Mill St to Church St 500,000 301-0444 - Water Street - High St to Bridge St 986,000 301-0463 - Sideroad 18 - Steele St to Vincent St - Surface Asphalt {SFA} 162,750 F0024 - Union Street W - Tower St to Guelph Rd 0 F0027 - Gerrie Rd/Colborne Intersection Signalization {SFA} 0 F0037 - Garafraxa St - Maiden Lane to Beatty Line {SFA} 2022 2023 2024 Total 0 0 620,000 0 0 620,000 0 0 250,000 0 0 250,000 0 0 0 500,000 0 500,000 125,000 125,000 125,000 125,000 125,000 125,000 1,125,000 0 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 40,000 0 0 0 0 0 0 0 410,000 0 0 0 0 0 0 0 140,000 0 0 0 0 0 0 0 0 0 120,000 0 0 0 0 0 0 0 0 0 500,000 400,000 0 0 0 0 0 0 0 0 1,386,000 0 0 0 0 0 0 0 0 0 162,750 0 0 0 0 0 1,270,000 0 0 0 1,270,000 0 0 0 200,000 0 0 0 0 0 200,000 0 0 676,000 0 0 0 0 0 0 0 676,000 F0040 - Forfar Street E - St David to James St 0 0 0 0 0 0 0 0 261,000 0 261,000 F0046 - Churchill Crescent 0 0 0 582,000 629,000 0 0 0 0 0 1,211,000 F0056 - St George St E - Herrick St to Gartshore St 0 0 0 0 0 620,000 0 0 0 0 620,000 F0059 - St George St W - Maple St to Beatty Line 0 0 0 0 0 0 0 0 0 335,000 335,000 F0072 - Graham Street - Colborne St to Gerrie Road {SFA} 0 0 0 0 183,000 0 0 0 0 0 183,000 D R 301-0428 - Hill St W - Maple St to Beatty Line 2021 125,000 A 301-0037 - Gregson Court Storm Water Management 2020 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 12/24/2014 12:11:59 PM Page 10 of 24 2015 2016 2017 2018 2019 0 0 180,000 0 0 3,049,750 2,360,000 2,596,000 5,556,000 4,630,000 2012-054 - Trunk Storm - Moir St. to the Gorge 0 0 270,000 0 0 F0118 - Nichol Drain #2 - Trunk Storm Outlet 0 0 0 0 0 270,000 2010-076 - Sideroad 15 - Queen Mary Bridge - 30-WG 0 0 0 2011-043 - Sideroad 11 Bridge - 28-P 0 0 0 2012-096 - Second Line Bridge Deck (31WG) 0 2012-097 - Irvine St. (9-N) Portage Bridge Repairs 0 2014-040 - Fifth Line Bridge (16-WG) 0 2014-041 - Seventh Line Bridge - 9-WG 0 2014-043 - Washington St. Bridge (12-N) 2014-073 - Fourth Line - 5-E F0100 - St David Street N - Garafraxa St to Edinburgh Ave Total for Roadways - Urban T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 2020 2021 2022 2023 2024 Total 0 0 0 0 0 180,000 3,039,000 3,385,000 1,085,000 976,000 10,438,000 37,114,750 0 0 0 0 0 270,000 Total for Storm Drainage 0 0 0 0 0 0 760,000 760,000 0 0 0 0 0 0 760,000 1,030,000 985,000 0 0 0 0 0 0 985,000 0 0 0 0 0 0 1,100,000 1,100,000 A Structures F Storm Drainage 0 0 0 0 0 0 0 2,000,000 2,000,000 0 0 0 660,000 0 0 0 0 0 660,000 0 0 0 0 0 1,600,000 0 0 0 1,600,000 0 0 0 0 0 0 0 1,200,000 0 1,200,000 0 0 0 250,000 0 0 0 0 0 0 250,000 0 0 0 0 0 0 0 0 0 1,700,000 1,700,000 R 0 2015-031 - Eighth Line Bridge - 21-P 0 550,000 0 0 0 0 0 0 0 0 550,000 2015-056 - Gerrie Road Bridge Repairs - 3 -N 0 110,000 0 0 0 0 0 0 0 0 110,000 301-0030 - Sideroad 20 Bridge: 27-WG 0 0 0 1,830,000 0 0 0 0 0 0 1,830,000 301-0085 - Third Line - Carroll Creek Bridge - 24-P 0 0 0 0 1,700,000 0 0 0 0 0 1,700,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 1,000,000 301-0431 - Bridge and Culvert Structure Inspection 0 90,000 0 90,000 0 90,000 0 90,000 0 90,000 450,000 F0111 - First Line Bridge (24-WG) 0 0 0 0 0 0 0 626,000 0 0 626,000 F0112 - St David St Bridge (Highway #6) 0 0 0 2,600,000 0 0 0 0 0 0 2,600,000 D 301-0104 - Bridge Repairs and Remediation 12/24/2014 12:11:59 PM Page 11 of 24 2015 F0116 - Weisenberg Road Bridge (5-P) 2016 2017 2018 2019 0 0 0 0 0 100,000 850,000 100,000 5,855,000 2,460,000 3,606,250 4,518,000 4,846,000 13,001,000 13,111,000 2010-024 - St Andrew St W - Breadalbane St to Provost Lane 0 0 0 2010-042 - David St SPS Upgrade 0 0 0 2010-043 - Colborne Street - Phase III John St to Wilson Cres {SFA} 0 0 0 2010-044 - Sanitary Force Main - David St SPS to Cty Rd 7 Bridge 0 0 0 2010-045 - First Line SPS & Force Main to existing system (Waterloo St or Park Rd) {SFA} 0 2010-046 - Colborne St - Gerrie Rd Easterly {SFA) 0 2010-048 - McQueen Blvd - Milburn Blvd to McTavish St {SFA} 0 2010-049 - St Andrew St E - Gartshore St to Tom St {SFA} Total for Structures Total TRANSPORTATION & PUBLIC WORKS T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 2020 2021 2022 2023 2024 Total 0 543,000 0 0 0 543,000 190,000 2,243,000 816,000 1,300,000 4,990,000 18,904,000 3,979,000 6,508,000 4,041,000 5,941,000 25,475,000 85,026,250 388,000 0 0 0 0 0 0 388,000 0 0 872,600 0 0 0 0 872,600 0 130,000 0 0 0 0 0 130,000 0 0 215,000 0 0 0 0 215,000 A Sanitary Sewer System F SANITARY SEWER 0 0 0 0 0 946,200 0 0 946,200 0 0 94,600 0 0 0 0 0 0 94,600 0 0 0 0 0 0 0 0 42,100 42,100 0 980,000 0 0 0 0 0 0 0 0 980,000 2010-050 - Trunk Sanitary Sewer on Tom St from St Andrew St to Garafraxa St {SFA} 0 1,001,600 0 0 0 0 0 0 0 0 1,001,600 2010-051 - Extension of Beatty Line Sanitary Sewer from Garafraxa St to Colborne St {SFA} 0 0 0 0 178,700 0 0 0 0 0 178,700 2012-009 - Elora St. - Tower St. to Perth St. 0 0 0 0 0 130,000 0 0 0 0 130,000 2012-014 - Queen St. E. - Hillside Dr. to River St. 110,000 0 0 0 0 0 0 0 0 0 110,000 2012-020 - Chalmers St. - Church St. to Colborne St. 20,000 0 0 0 0 0 0 0 0 0 20,000 0 0 0 0 15,000 0 0 0 0 0 15,000 D R 0 2012-023 - Church St. - Metcalfe St. to Price St. 12/24/2014 12:11:59 PM Page 12 of 24 2016 2017 2018 2019 2012-031 - St. Andrew St. W. & Menzies Lane - Tower St to St. David St. 0 0 0 0 0 2012-035 - Colborne St - Phase II Geddes St to North Queen St 0 15,000 0 0 0 2012-036 - Henderson St - Smith St to James St 0 0 0 0 15,000 2012-040 - James St - Metcalfe St to Price St 0 0 0 2012-043 - McNab St - High St. to Bridge St. 0 0 0 2012-056 - Victoria St - McNab Roundabout to York St 0 15,000 0 2012-058 - David St - Irvine St to Geddes St 0 0 2013-015 - Sideroad 18 Reconstruction Mid Section 0 2013-028 - Grand River Crossing of Beatty Line Trunk Sanitary Sewer to Union St. SPS {SFA} 0 2014-014 - John St. - Provost Lane to Tower St. 0 2014-018 - St David Street N - Garafraxa St to Edinburgh Ave 0 2014-062 - Union Street W - Tower St to Guelph Rd 0 2021 2022 2023 2024 Total 0 620,000 0 0 0 620,000 0 0 0 0 0 15,000 0 0 0 0 0 15,000 0 0 15,000 0 0 0 15,000 0 0 0 425,000 0 0 0 425,000 0 0 0 0 0 0 0 15,000 0 0 0 25,000 0 0 0 0 25,000 0 0 0 0 0 0 0 530,000 0 530,000 0 0 0 0 0 0 0 0 3,500,000 3,500,000 0 0 0 0 25,000 0 0 0 0 25,000 0 560,000 0 0 0 0 0 0 0 560,000 0 0 0 0 0 315,000 0 0 0 315,000 A 0 R 2015-015 - Wastewater Snowplow 2020 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 7,000 0 0 0 0 0 0 0 0 0 7,000 40,000 0 0 0 0 0 0 0 0 0 40,000 2015-048 - Bridge St - Tower St S to St David St S 0 0 0 0 0 15,000 0 0 0 0 15,000 2015-061 - Princess St - Church St to Grand River 0 0 15,000 0 0 0 0 0 0 0 15,000 2015-066 - Hill St E - Herrick St to Gartshore St 0 0 0 0 0 0 0 250,000 0 0 250,000 360-0254 - St David Street N - Menzies Ln. to Garafraxa St. 0 50,000 500,000 0 0 0 0 0 0 0 550,000 359,000 0 0 0 0 0 0 0 0 0 359,000 D 2015-018 - Fergus WWTP - Digester Building Roof 360-0356 - Highway 6 - Sideroad 19 to Sideroad 18 12/24/2014 12:11:59 PM Page 13 of 24 2016 2017 2018 2019 360-0429 - Price St - Mill St to Church St 55,000 0 0 0 0 360-0436 - Fergus WWTP - Mechanical Bar Screen (Headworks Building) 26,000 0 0 0 0 360-0444 - Water Street - High St to Bridge St 200,000 60,000 0 0 360-0456 - Mill Street Sewage Pumping Station 100,000 1,000,000 0 360-9650 - LPS Grinder Pumps 15,000 15,000 15,000 F0039 - Garafraxa St Sanitary Sewer Extension from Maiden Lane to Beatty Line {SFA} 0 0 285,000 F0042 - Forfar Street E - St David St to James St 0 0 0 F0048 - Churchill Crescent 0 0 375,000 F0058 - St George St E - Herrick St to Gartshore St 0 F0061 - St George St W - Maple St to Beatty Line 0 F0074 - Graham Street - Colborne St to Gerrie Road {SFA} 0 F0078 - Mill Street - Irvine St to Chalmers St {SFA} 0 F0085 - Second Line - Highway 6 to Jones Baseline (Scotland St) {SFA} 0 F0097 - Union St Force Main - Union St SPS to Fergus WPCP {SFA} 0 F0098 - Union Street - SPS Upgrade {SFA} 2020 2021 2022 2023 2024 Total 0 0 0 0 0 55,000 0 0 0 0 0 26,000 0 0 0 0 0 0 260,000 0 0 0 0 0 0 0 1,100,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 150,000 0 0 0 0 0 0 0 285,000 0 0 0 0 0 85,000 0 85,000 404,000 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 0 0 0 0 0 779,000 0 0 0 250,000 0 0 0 0 250,000 0 0 0 0 0 0 0 0 90,000 90,000 0 0 0 50,000 0 0 0 0 0 50,000 0 0 0 320,600 0 0 0 0 0 320,600 0 0 0 0 0 0 0 0 810,600 810,600 0 0 0 0 0 0 0 0 284,600 284,600 0 0 0 0 0 0 0 0 0 2,500,000 2,500,000 F0099 - Southwest Trunk - Union St to Highway 6 {SFA} 0 0 0 0 0 0 0 0 0 2,029,000 2,029,000 F0171 - Future Expansion of Fergus WWTP 0 0 0 0 15,000,000 0 0 0 0 0 15,000,000 932,000 3,136,600 1,750,000 901,600 15,724,300 1,547,600 1,390,000 1,211,200 630,000 9,271,300 36,494,600 932,000 3,136,600 1,750,000 901,600 15,724,300 1,547,600 1,390,000 1,211,200 630,000 9,271,300 36,494,600 R A 0 0 D Total for Sanitary Sewer System Total SANITARY SEWER 12/24/2014 12:11:59 PM Page 14 of 24 2015 2016 2017 2018 2019 2010-014 - Tower St S - Union St to Albert St 0 88,000 0 0 0 2010-015 - Tower St S - Albert St to Prince's St 0 119,000 0 0 0 2010-018 - St Andrew St W - Provost Lane to St David St. 0 122,000 0 2010-019 - Colquhoun St - Beatty Line to Johnston St 0 215,000 0 2010-020 - St Andrew St W - Breadalbane St to Colquhoun St 0 96,000 0 2010-021 - Colquhoun St - Breadalbane St to Johnston St S 0 226,000 0 2010-022 - Johnston St - Colquhoun St to 37 metres North 0 2010-023 - St Andrew St W - Breadalbane St to Provost Lane 0 2010-032 - Colborne St - Phase II Geddes St to North Queen St 0 2010-033 - Colborne St - Phase III - John St to Wilson Cres 0 2010-034 - Gerrie Road Water Main Extension {SFA} 0 2010-036 - York St - Waterloo St to WR 7 {SFA} 0 2010-037 - Trunk Water Main on St Andrew St E from Gartshore St to Tom St WATERWORKS 2020 2021 2022 2023 2024 Total 0 0 0 0 0 88,000 0 0 0 0 0 119,000 F Waterworks System T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 0 0 0 0 0 0 122,000 0 0 0 0 0 0 0 215,000 0 0 0 0 0 0 0 96,000 0 0 0 0 0 0 0 226,000 A 0 0 0 0 0 0 0 0 0 33,000 0 0 355,000 0 0 0 0 0 0 355,000 0 150,000 0 0 0 0 0 0 0 150,000 0 0 0 155,000 0 0 0 0 0 155,000 0 0 0 341,700 0 0 0 0 0 341,700 0 0 0 194,500 0 0 0 0 0 194,500 0 0 0 290,000 0 0 0 0 0 0 290,000 2010-041 - Colborne St - Gerrie Rd Easterly {SFA} 0 0 0 126,200 0 0 0 0 0 0 126,200 2012-010 - Elora St. - Tower St. to Perth St. 0 0 0 0 0 140,000 0 0 0 0 140,000 2012-015 - Queen St. E. - Hillside Dr. to River St. 150,000 0 0 0 0 0 0 0 0 0 150,000 2012-021 - Chalmers St. - Church St. to Colborne St. 100,000 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 95,000 0 0 0 0 0 95,000 D R 33,000 2012-024 - Church St. - Metcalfe St. to Price St. 12/24/2014 12:11:59 PM Page 15 of 24 2016 2017 2018 2019 2012-038 - Henderson St - Smith St to James St 0 0 0 0 70,000 2012-041 - James St - Metcalfe St to Price St 0 0 0 0 0 2012-044 - McNab St - High St. to Bridge St. 0 0 0 0 0 2012-057 - Victoria St - McNab Roundabout to York St 0 95,000 0 2012-059 - David St - Irvine St to Geddes St 0 0 0 2013-016 - Sideroad 18 Reconstruction Mid Section 0 0 0 2013-029 - High St - Trunk Watermain McNab - York {SFA} 0 0 2014-015 - John St. - Provost Lane to Tower St. 0 0 20,000 2015-019 - Hydrant - Snow Removal Equipment 14,000 2015-020 - Elora Well #1 - Highlift Pump 2015-038 - Daniel Cres. Elevated Tower Recoating 2015-039 - Fergus Well House #5 Roof Repair 2021 2022 2023 2024 Total 0 0 0 0 0 70,000 0 75,000 0 0 0 75,000 0 390,000 0 0 0 390,000 0 0 0 0 0 0 0 95,000 0 0 385,000 0 0 0 0 385,000 0 0 0 0 0 0 610,000 610,000 0 0 199,700 0 0 0 0 0 199,700 0 0 0 10,000 0 0 0 0 10,000 A 20,000 2015-014 - Well Highlift Pumps - Variable Frequency Drive Controllers 0 0 0 0 0 0 0 0 0 20,000 20,000 20,000 20,000 20,000 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 14,000 15,000 0 0 0 0 0 0 0 0 0 15,000 200,000 200,000 0 0 0 0 0 0 0 0 400,000 R 2015-013 - Hydrant Transmitters 2020 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 12,000 0 0 0 0 0 0 0 0 0 12,000 7,000 0 0 0 0 0 0 0 0 0 7,000 20,000 0 0 0 0 0 0 0 0 0 20,000 2015-047 - Bridge St - Tower St S to St David St S 0 0 0 0 0 115,000 0 0 0 0 115,000 2015-060 - Princess St - Church St to Grand River 0 0 115,000 0 0 0 0 0 0 0 115,000 2015-065 - Hill St E - Herrick St to Gartshore St 0 0 0 0 0 0 0 230,000 0 0 230,000 2015-067 - St David Street N - Garafraxa St to Edinburgh Ave 0 0 400,000 0 0 0 0 0 0 0 400,000 2015-040 - Fergus Well #1 - Window Replacement D 2015-043 - Source Protection Assessments 12/24/2014 12:11:59 PM Page 16 of 24 2016 2017 2018 2019 0 50,000 620,000 0 0 330-0356 - Highway 6 Trunk Water Main Extension to Sideroad 18 Oversizing 270,000 0 0 0 0 330-0429 - Price St - Mill St to Church St 150,000 0 0 0 330-0444 - Water Street - High St to Bridge St 314,000 140,000 0 0 F0025 - Union Street W - Tower St to Guelph Rd 0 0 0 F0038 - Garafraxa St - Beatty Line to Maiden Lane {SFA} 0 0 247,100 F0041 - Forfar Street E - St David St to James St 0 0 0 F0047 - Churchill Crescent 0 0 167,000 F0057 - St George St E - Herrick St to Gartshore St 0 F0060 - St George St W - Maple St to Beatty Line 0 F0073 - Graham Street - Colborne St to Gerrie Road {SFA} 0 F0080 - New Municipal Wells Combined Water Systems Including Well Head Protection 0 F0084 - Second Line - Highway 6 to Jones Baseline (Scotland St) {SFA} 2021 2022 2023 2024 Total 0 0 0 0 0 670,000 0 0 0 0 0 270,000 0 0 0 0 0 0 150,000 0 0 0 0 0 0 454,000 0 0 0 260,000 0 0 0 260,000 0 0 0 0 0 0 0 247,100 0 0 0 0 0 115,000 0 115,000 182,000 0 0 0 0 0 0 349,000 A 0 0 0 230,000 0 0 0 0 230,000 0 0 0 0 0 0 0 0 100,000 100,000 0 0 0 55,000 0 0 0 0 0 55,000 0 0 0 0 0 0 2,102,600 0 0 2,102,600 0 0 0 0 0 0 0 0 0 460,000 460,000 F0087 - Second Line - Highway 6 to Guelph St {SFA} 0 0 0 0 0 0 0 0 0 674,900 674,900 F0093 - Trunk Water Main Extension on Scotland St to Second Line {SFA} 0 0 0 0 0 0 0 0 0 405,800 405,800 F0094 - Highway 6 South to Second Line {SFA} 0 0 0 0 0 0 0 0 0 357,400 357,400 F0095 - McQueen Blvd - Millburn Blvd to McTavish St {SFA} 0 0 0 0 0 0 0 0 0 178,700 178,700 0 0 0 0 0 0 0 0 0 810,600 810,600 1,292,000 1,404,000 1,719,100 973,200 1,130,900 880,000 725,000 2,332,600 115,000 3,597,400 14,169,200 1,292,000 1,404,000 1,719,100 973,200 1,130,900 880,000 725,000 2,332,600 115,000 3,597,400 14,169,200 R 0 D 330-0254 - St David Street N - Menzies Ln. to Garafraxa St. 2020 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 F0096 - Guelph St. - Second Line to McQueen Blvd. {SFA} Total for Waterworks System Total WATERWORKS 12/24/2014 12:11:59 PM Page 17 of 24 2015 2016 2017 2018 2019 100,000 0 0 0 0 100,000 0 0 0 0 2011-067 - Announcement System CWCS 25,000 0 0 2014-059 - CWCS - Parking Lot Partial Replacement 80,000 0 0 2015-053 - Centre Wellington Sportsplex Hall retro fit to multi-use 0 0 0 510-0375 - Emergency Plan Generator Sportsplex 0 600,000 0 510-0447 - CWCS Sportsplex Building Aquatics Facade 325,000 PARKS & RECREATION 2015-012 - Belwood Community Hall Roof Replacement Total for Facilities - Belwood Hall F0128 - Pad B - New Seating Area Heating Total for Facilities - CW Community Sportsplex 0 430,000 2022 2023 2024 Total 0 0 0 0 0 100,000 0 0 0 0 0 100,000 0 0 0 0 0 0 25,000 0 0 0 0 0 0 0 80,000 0 0 0 0 2,500,000 0 0 2,500,000 0 0 0 0 0 0 0 600,000 0 0 0 325,000 0 0 0 0 0 0 20,000 0 0 0 0 0 0 0 0 20,000 620,000 0 0 0 0 0 2,500,000 0 0 3,550,000 0 20,000 0 0 0 0 0 0 0 0 20,000 2011-074 - Elora Community Centre Skateboard Area 0 150,000 0 0 0 0 0 0 0 0 150,000 2011-079 - Elora Community Centre Replace Hall Roof 0 0 195,000 0 0 0 0 0 0 0 195,000 2014-021 - Elora Community Centre Chiller Replacement 50,000 0 0 0 0 0 0 0 0 0 50,000 2014-058 - Elora Community Centre Surveillance Cameras 0 15,000 0 0 0 0 0 0 0 0 15,000 2014-064 - Elora Community Centre Ice Pad Replacement 0 0 0 0 0 0 1,200,000 0 0 0 1,200,000 0 0 0 0 350,000 0 0 0 0 0 350,000 50,000 0 0 0 0 0 0 0 0 0 50,000 R 2011-068 - Announcement System - ECC D Facilities - Elora Community Centre 2021 0 A Facilities - CW Community Sportsplex 2020 F Facilities - Belwood Hall T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 2014-065 - Emergency Plan Generator Elora Community Centre 2015-004 - Olympia Electrical Upgrade 12/24/2014 12:11:59 PM Page 18 of 24 2015-052 - Elora Community Centre Hall retro fit to multi-use Total for Facilities - Elora Community Centre 2015 2016 2017 2018 2019 0 0 0 0 0 100,000 185,000 195,000 0 350,000 50,000 50,000 0 0 0 0 0 50,000 50,000 0 75,000 0 0 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 2020 2021 2022 2023 2024 Total 1,000,000 0 0 0 0 1,000,000 1,000,000 1,200,000 0 0 0 3,030,000 0 0 0 0 0 0 100,000 0 0 0 75,000 0 0 0 75,000 0 0 0 75,000 0 0 0 175,000 0 0 0 0 0 0 0 75,000 2011-013 - Fergus Grand Theatre - Front Lobby Washroom & Accessibility 2014-057 - Fergus Grand Theatre Sprinkler System Total for Facilities - Fergus Grand Theatre 2015-030 - Victoria Park (Fergus) Parking Lot Expansion 760-0318 - Victoria Park Senior Centre Expansion Total for Facilities - Victoria Park Senior's Centre 455,000 530,000 Grounds - CW Community Sportsplex 0 2011-064 - CWCS Grounds Site Master Plan - Phase I 0 0 0 0 0 0 0 0 0 0 455,000 0 0 0 0 0 0 0 0 0 530,000 0 25,000 0 0 0 0 0 0 0 25,000 0 0 0 100,000 0 0 0 0 0 100,000 R 2009-077 - CWCS Grounds Site Master Plan A Facilities - Victoria Park Senior's Centre F Facilities - Fergus Grand Theatre 2011-065 - CWCS Grounds Site Master Plan - Phase II 0 0 0 0 0 150,000 0 0 0 0 150,000 2011-066 - CWCS Grounds Site Master Plan - Phase III 0 0 0 0 0 0 250,000 0 0 0 250,000 F0141 - Woodlot Management Plan 0 0 0 0 15,000 0 0 0 0 0 15,000 Total for Grounds - CW Community Sportsplex 0 0 25,000 0 115,000 150,000 250,000 0 0 0 540,000 2009-072 - Victoria Park - Asphalt Stone Dust Track Surface 0 70,000 0 0 0 0 0 0 0 0 70,000 2009-078 - Confederation Park - Upgrades to Park Trail for Accessibility 0 15,000 0 0 0 0 0 0 0 0 15,000 D Parks 12/24/2014 12:11:59 PM Page 19 of 24 2016 2017 2018 2019 2010-003 - Milligan Park - Plan Implementation Phase I (Design) 0 0 0 0 15,000 2010-145 - Victoria Park (Elora) - Phase III Implementation 0 0 300,000 0 0 2010-147 - Milligan Park - Plan Implementation Phase II 0 0 0 0 0 2010-148 - Tait Park - Landscaping and Trail (Fergus) - Phase II 0 0 0 2010-164 - Dog Leash Free Park Area 0 0 0 2010-166 - Introductory Skateboard Zones 0 0 0 2010-168 - Minor Children's Splash Pad - # 1 0 0 0 2010-169 - Minor Children's Splash Pad - # 2 0 0 0 2010-170 - Community Allotment Gardens - Two Gardens 0 2010-171 - Barrier Free Children's Play Structures - # 1 0 2010-172 - Barrier Free Children's Play Structures - # 2 (Sorbara Development Phase III) 0 2010-173 - Multi-use Courts - Two Courts #1 2020 2021 2022 2023 2024 Total 0 0 0 0 0 15,000 0 0 0 0 0 300,000 80,000 0 0 0 0 80,000 0 0 0 42,000 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 42,000 0 0 0 0 26,800 0 0 0 0 26,800 0 0 0 0 26,800 0 0 26,800 0 0 0 141,700 0 0 0 141,700 0 0 0 0 0 0 141,700 141,700 A 0 0 0 0 0 0 0 0 10,700 10,700 0 0 0 0 0 225,500 0 0 0 225,500 0 0 0 225,500 0 0 0 0 0 225,500 0 0 73,400 0 0 0 0 0 0 0 73,400 2010-174 - Multi-use Courts - Two Courts #2 0 0 0 0 0 0 0 73,400 0 0 73,400 2010-176 - Elora Meadows Development Park - Neighbourhood Play Equipment 0 90,000 0 0 0 0 0 0 0 0 90,000 2010-177 - Future Parkland (35.1 acres) 0 0 0 0 0 1,733,000 0 0 0 0 1,733,000 2010-194 - Southridge Development Park Washroom Building 0 0 0 150,000 50,000 0 0 0 0 0 200,000 2010-195 - Irrigated & Lit Soccer Fields (2 Full) - Sorbara Development - Phase I 0 0 0 440,200 0 0 0 0 0 0 440,200 2010-196 - Sorbara Development - Phase II 0 0 0 150,000 0 0 0 0 0 0 150,000 2010-197 - Sorbara Development - Phase IV 0 0 0 0 0 150,000 0 0 0 0 150,000 2010-199 - Irrigated & Lit Soccer Field - (1 Full) 0 0 0 0 0 0 220,100 0 0 0 220,100 D R 0 12/24/2014 12:11:59 PM Page 20 of 24 2015 2016 2017 2018 2019 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 2020 2021 2022 2023 2024 Total 0 0 72,500 0 0 72,500 0 0 0 0 0 75,000 0 0 0 0 0 2011-058 - Gibbons Drive Park Trail and Play Structure 0 75,000 0 0 0 2011-061 - West Garafraxa Sports Fields Develop Master Plan 0 0 35,000 75,000 10,000 0 0 0 0 0 120,000 2011-070 - Forfar Park - Washroom Building 0 0 0 0 0 165,000 0 0 0 0 165,000 2011-071 - Strathallan Park - Soccer Field and Parking Lot 0 55,000 105,000 0 0 0 0 0 0 0 160,000 2011-073 - Revell Park - Play Equipment 0 0 0 0 100,000 0 0 0 0 0 100,000 2011-075 - Parks - Trails and Landscaping - 5 Elora Parks 0 35,000 0 0 0 0 0 0 0 0 35,000 2011-076 - Douglas Park - Trail Development 0 0 0 0 50,000 0 0 0 0 0 50,000 2014-016 - Beatty Hollow Neighbourhood Park 0 2014-024 - Bissell Park - Refrigerated Outdoor Rink and Change House 0 0 10,000 550-0014 - Bissell Park Accessible Washrooms 15,000 0 150,000 0 0 0 0 0 0 0 150,000 0 0 0 100,000 900,000 0 0 0 0 1,000,000 0 0 300,000 0 0 0 0 0 0 300,000 0 0 0 0 0 0 0 0 0 10,000 0 0 0 0 0 0 0 0 0 15,000 R 2015-016 - Gerrie Road to Foote Park Trail Upgrade A 2014-026 - Bissell Park - Parking Lot F 2010-200 - Irrigated Soccer Field - (1 Full) 0 0 0 0 0 150,000 145,200 0 0 0 295,200 550-0448 - Victoria Park (Elora) - Phase II Implementation 0 237,000 0 0 0 0 0 0 0 0 237,000 550-0450 - Park Identification - All Parks 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 100,000 550-0451 - Westminster Highlands Park Play Equipment & Basketball Court (Fergus) 75,000 80,000 0 0 0 0 0 0 0 0 155,000 550-0461 - Strathlea Subdivision Park (Fergus) 75,000 0 0 0 0 0 0 0 0 0 75,000 F0146 - Major Children's Splash Pad 0 0 0 0 0 0 300,000 0 0 0 300,000 F0147 - Tait Park - Landscaping and Trail (Fergus) - Phase I 0 0 9,500 0 0 0 0 0 0 0 9,500 F0150 - Veteran's Park (Salem) 0 0 15,000 0 0 0 0 0 0 0 15,000 D 550-0323 - Irrigated Soccer Fields - (5 Full) 12/24/2014 12:11:59 PM Page 21 of 24 2016 2017 2018 2019 F0151 - Acquisition of Green Space (between Fergus/Elora) 0 0 400,000 0 0 F0152 - Forfar Park - Convert to Soccer Fields and Parking Lot Expansion (Fergus) 0 0 0 0 0 F0157 - Granwood Gate Park - Play Equipment and Landscaping (Elora) 0 0 0 0 50,000 F0160 - Harper Street Park - Park Plan and Implementation (Fergus) 0 10,000 15,000 185,000 677,000 2010-152 - Dedicated Youth Space 0 2010-153 - Indoor Turf Training Facility 0 2010-154 - Multipurpose Park Vehicle 0 2010-155 - Landscape Truck 0 2010-157 - Backhoe Tractor 0 2010-158 - Turf Comb 0 2010-159 - Disc Seeder 0 2010-160 - Top Dresser 0 2010-161 - Water Trailer 2010-162 - Lawn Sweeper Total for Parks 2021 2022 2023 2024 Total 0 0 0 0 0 400,000 105,000 0 0 0 0 105,000 50,000 0 0 0 0 100,000 0 0 0 0 0 0 0 25,000 1,112,900 1,125,200 652,500 3,369,800 1,042,500 182,700 10,000 162,400 8,520,000 0 0 0 0 0 640,000 0 0 0 640,000 0 0 0 0 0 0 0 1,720,000 0 1,720,000 134,000 0 0 0 0 0 0 0 0 134,000 A Parks and Recreation - Other 0 0 0 0 0 70,000 0 0 0 70,000 0 0 0 0 0 64,000 0 0 0 64,000 0 6,000 0 0 0 0 0 0 0 6,000 0 0 0 0 0 23,000 0 0 0 23,000 21,000 0 0 0 0 0 0 0 0 21,000 0 0 0 0 0 0 8,000 0 0 0 8,000 0 14,000 0 0 0 0 0 0 0 0 14,000 R 2014-008 - 60" Mower 2020 F 2015 T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 0 0 0 0 35,000 0 0 0 0 0 35,000 505-0453 - Emerald Ash Borer Program 50,000 100,000 200,000 0 0 0 0 0 0 0 350,000 Total for Parks and Recreation - Other 50,000 269,000 206,000 0 35,000 0 805,000 0 1,720,000 0 3,085,000 1,445,000 1,801,000 1,538,900 1,125,200 1,152,500 4,519,800 3,372,500 2,682,700 1,730,000 162,400 19,530,000 205-9600 - Fire Equipment Replacement 188,640 149,880 106,567 53,484 335,796 147,900 101,196 69,685 65,783 111,206 1,330,137 Total for Fire - Equipment Replacement 188,640 149,880 106,567 53,484 335,796 147,900 101,196 69,685 65,783 111,206 1,330,137 Total PARKS & RECREATION EQUIPMENT REPLACEMENT D Fire - Equipment Replacement 12/24/2014 12:11:59 PM Page 22 of 24 2015 2016 2017 2018 2019 43,000 128,000 91,000 95,500 147,500 43,000 128,000 91,000 95,500 147,500 14,000 14,000 46,950 14,000 14,000 46,950 505-9600 - P&R Facilities Equipment Replacement 213,650 141,850 163,450 Total for P&R Facilities - Equipment Replacement 213,650 141,850 163,450 105-9601 - IT&S Hardware Equipment Replacement Total for IT Hardware - Equipment Replacement IT Software - Equipment Replacement 105-9600 - IT&S Software Replacement Total for IT Software - Equipment Replacement P&R Parks - Equipment Replacement 505-9700 - P&R Parks Equipment Replacement 66,300 Total for P&R Parks - Equipment Replacement 66,300 Public Works - Equipment Replacement 35,300 Total for Public Works - Equipment Replacement 2022 2023 2024 Total 114,500 136,000 49,000 89,500 89,500 983,500 114,500 136,000 49,000 89,500 89,500 983,500 48,000 2,000 54,950 0 18,000 0 197,900 0 48,000 2,000 54,950 0 18,000 0 197,900 194,500 233,350 286,050 363,300 290,750 267,000 264,000 2,417,900 194,500 233,350 286,050 363,300 290,750 267,000 264,000 2,417,900 60,300 220,200 184,200 289,000 316,700 273,500 379,600 316,600 320,900 2,427,300 60,300 220,200 184,200 289,000 316,700 273,500 379,600 316,600 320,900 2,427,300 71,800 28,700 17,300 24,400 19,900 49,800 45,900 46,900 21,500 361,500 R 303-9600 - Public Works Equipment Replacement 2021 0 A P&R Facilities - Equipment Replacement 2020 F IT Hardware - Equipment Replacement T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 35,300 71,800 28,700 17,300 24,400 19,900 49,800 45,900 46,900 21,500 361,500 30,500 94,600 13,600 14,700 22,200 90,600 13,500 15,900 130,300 128,500 554,400 30,500 94,600 13,600 14,700 22,200 90,600 13,500 15,900 130,300 128,500 554,400 9,000 4,500 13,400 5,000 35,900 103,300 9,100 98,200 47,700 20,500 346,600 Sewer - Equipment Replacement 360-9600 - Sanitary Sewer Equipment Replacement Total for Sewer - Equipment Replacement Water - Equipment Replacement 330-9600 - Water Equipment Replacement D Total for Water - Equipment Replacement Total EQUIPMENT REPLACEMENT 12/24/2014 12:11:59 PM 9,000 4,500 13,400 5,000 35,900 103,300 9,100 98,200 47,700 20,500 346,600 600,390 664,930 683,867 564,684 1,136,146 1,080,950 1,001,346 949,035 981,783 956,106 8,619,237 Page 23 of 24 2015 2016 2017 2018 2019 26,000 26,800 0 28,400 0 26,000 26,800 0 28,400 0 0 0 0 30,000 432,600 445,600 30,000 432,600 445,600 505-9500 - P&R Vehicle Replacement 90,000 41,200 Total for Parks & Recreation - Vehicle Replacement 90,000 VEHICLE REPLACEMENT 210-9500 - Building - Vehicle Replacement Total for Building - Vehicle Replacement Fire - Vehicle Replacement 2012-037 - Municipal FD Training Officer Vehicle Replacement 205-9500 - Fire - Vehicle Replacement Total for Fire - Vehicle Replacement 330,000 Total for Public Works - Vehicle Replacement 330,000 0 2022 2023 2024 Total 0 31,000 32,000 32,900 0 177,100 0 31,000 32,000 32,900 0 177,100 0 0 0 0 0 45,000 437,100 78,800 0 150,000 141,400 633,400 0 2,348,900 437,100 123,800 0 150,000 141,400 633,400 0 2,393,900 53,000 54,600 61,900 70,700 65,700 0 183,700 97,800 718,600 41,200 53,000 54,600 61,900 70,700 65,700 0 183,700 97,800 718,600 922,000 567,500 584,600 630,300 440,600 644,800 301,300 817,000 554,500 5,792,600 922,000 567,500 584,600 630,300 440,600 644,800 301,300 817,000 554,500 5,792,600 36,100 13,250 218,500 0 257,950 0 43,000 237,500 39,100 845,400 A 303-9500 - Public Works Vehicle Replacement 2021 45,000 Parks & Recreation - Vehicle Replacement Public Works - Vehicle Replacement 2020 F Building - Vehicle Replacement T TOWNSHIP OF CENTRE WELLINGTON 10-Year Capital Forecast: 2015 - 2024 Sewer - Vehicle Replacement 0 R 360-9500 - Sanitary Sewer Vehicle Replacement Total for Sewer - Vehicle Replacement 0 36,100 13,250 218,500 0 257,950 0 43,000 237,500 39,100 845,400 2014-404 - Municipal Risk Management Officer - Vehicle Replacement 0 0 0 0 0 0 35,800 0 0 0 35,800 330-9500 - Water Vehicle Replacement 35,000 77,300 108,650 0 39,400 217,350 35,800 43,000 376,800 84,800 1,018,100 Water - Vehicle Replacement Total for Water - Vehicle Replacement 35,000 77,300 108,650 0 39,400 217,350 71,600 43,000 376,800 84,800 1,053,900 511,000 1,536,000 1,188,000 1,323,200 855,400 986,600 963,100 560,700 2,281,300 776,200 10,981,500 9,121,640 13,728,530 12,081,367 18,488,884 33,560,246 13,287,950 14,099,946 11,827,735 13,939,083 D Total VEHICLE REPLACEMENT Grand Total: 12/24/2014 12:11:59 PM 41,794,806 181,930,187 Page 24 of 24 2015 2016 2017 2018 2019 2020 T Township of Centre Wellington 10-Year Capital Forecast - Financing 2021 2022 2023 2024 Total 9,121,640 13,728,530 12,081,367 18,488,884 33,560,246 13,287,950 14,099,946 11,827,735 13,939,083 41,794,806 181,930,187 External Sources of Financing Subsidies Development Charges Developer/Partner Contributions Other 1,163,000 122,750 - 947,300 2,831,600 - 879,910 1,308,100 - 3,610,000 1,751,923 4,404,800 - 1,460,000 2,868,000 4,241,200 - 1,944,570 - 1,428,667 2,257,040 - 375,600 2,295,105 946,200 - 800,000 4,780,500 - 3,199,999 7,418,360 17,270,700 - 10,874,266 26,305,708 31,125,350 - Total External Sources of Financing 1,285,750 3,778,900 2,188,010 9,766,723 8,569,200 1,944,570 3,685,707 3,616,905 5,580,500 27,889,059 68,305,324 Internal Sources of Financing Debentures Water Capital Reserve Sanitary Sewer Capital Reserve Vehicle Replacement Reserves Equipment Replacement Reserves Other Reserves and Reserve Funds 1,237,340 904,090 511,000 600,390 4,583,070 1,519,920 1,143,620 1,536,000 664,930 5,085,160 1,567,000 1,465,000 1,188,000 683,867 4,989,490 658,800 908,800 1,323,200 564,684 5,266,677 15,000,000 950,900 733,400 855,400 1,136,146 6,315,200 1,559,700 910,000 629,750 986,600 1,080,950 6,176,380 595,000 1,390,000 963,100 1,001,346 6,464,793 230,000 265,000 560,700 949,035 6,206,095 115,000 630,000 2,281,300 981,783 4,350,500 640,000 105,000 776,200 956,106 11,428,441 16,559,700 8,423,960 8,174,660 10,981,500 8,619,237 60,865,806 Total Internal Sources of Financing 7,835,890 9,949,630 9,893,357 8,722,161 24,991,046 11,343,380 10,414,239 8,210,830 8,358,583 13,905,747 113,624,863 Total Sources of Financing 9,121,640 13,728,530 12,081,367 18,488,884 33,560,246 13,287,950 14,099,946 11,827,735 13,939,083 41,794,806 181,930,187 A Assumptions F Total Capital Expenditures D R 1. Bridges and culverts with estimated total capital expenditures in excess of $500,000 are assumed to be financed as 1/3 Township funded, 1/3 Federal subsidy, and 1/3 Provincial subsidy. 2. Development specific capital projects are assumed to be 100% front-end funded through a service financing agreement by the developer/partner. Appendix C TOWNSHIP OF CENTRE WELLINGTON SUMMARY OF CAPITAL PROJECT FINANCING 2015 CAPITAL BUDGET Financing Method Corporate Fire Services Health Services Municipal Buildings Parks & Recreation Studies Transportation & Public Works Total Debenture - - - - - - - - Developer/Partner Contribution - - - - -100,000 - 222,750 122,750 Development Charges (DC's) - - - - 135,000 20,000 663,600 818,600 Other - - - - - - - - Reserves 177,000 253,640 125,000 356,000 1,779,950 40,000 2,888,370 5,619,960 Subsidies - - - - - - - - 177,000 253,640 125,000 356,000 1,814,950 60,000 3,774,720 6,561,310 TOTAL Financing Method Sanitary Sewer Waterworks Total Debenture - - - Developer/Partner Contribution - - - 156,000 188,400 344,400 - - - Reserves 934,590 1,281,340 2,215,930 Subsidies - - - 1,090,590 1,469,740 2,560,330 Development Charges (DC's) Other TOTAL January 07, 2015 11:17 AM Page 1 of 1 Township of Centre Wellington 2015 Capital Budget Gross Expenditures ($9,121,640) January 07, 2015 11:15 AM Appendix D Page 1 of 1 Appendix E Township of Centre Wellington 2015 Capital Budget Sources of Financing ($9,121,640) January 07, 2015 11:13 AM Page 1 of 1 Appendix F 2015 Tax Supported Capital Budget Historical Funding Allocation 80% 70% 60% 50% 5 Year Average 40% 2015 Draft Budget 30% 20% 10% 0% Corporate Fire Health Mun Buildings P&R Studies PW Appendix G Existing Projects Requiring Additional Funding in the 2015 Capital Budget Ref # 1 11 Project Description Update Corporate Strategic Action Plan ‐ 2014 Downtown Façade Improvement Guidelines Lamp Post Replacement 12 Tourism Office Renovations 20 Belsyde Cemetery Cremation Burial Area Expansion 24 Queen St. Office Renovations 33 Gregson Court Storm Water Management 34 Hill St. Drainage Outlet, Elora 4 35 Hill St W – Maple St to Beatty Line 36/45/61 Price St – Mill St to Church St 37/47/62 Water Street – High St to Bridge St 38 Sideroad 18 – Steele St to Vincent St – Surface Asphalt 39 Bridge Repairs and Remediation 44/60 Highway 6 – Sideroad 19 to Sideroad 18 46 Fergus WWTP – Mechanical Bar Screen (Headworks Building) Mill Street Sewage Pumping Station 48 Comments Additional funds for the development of a strategic plan ($31,500 available) Additional funding required in 2015 for more public engagement ($23,000 available) Actual cost exceeded estimate in 2014 budget. Additional funds required for project ($50,000 available) 2014 budget allocation was for design. 2015 amount is for construction ($200,000 available) All funds approved for this project in 2013 were used to fund the Belsyde Cemetery Master Plan project initiated in 2014 Additional funds required to renovate the lunchroom, change room, and washroom Partially funded in prior year budgets. 2015 funding required to have sufficient funding to construct the storm water management facility ($300,000 available) Additional funding required to complete the project as per Tender T‐15‐14 and COR2014‐59 ($255,000 available) Additional funding required for the removal of contaminated soil 2014 budget amount was for design, approvals, testing, etc. 2015 amount is for construction 2014 budget amount was for design, approvals, testing, etc. 2015 amount is for construction. Further funding in 2016 required for landscaping and final asphalt. Total project cost estimated to be $3,000,000 This was a requirement of the Service Financing Agreement with Bonaire Highlands – recognizes the developer funds received in 2014 with construction in 2015 Funds will be used to complete proactive repairs to a number of Township bridges to extend their useful life ($160,000 available) This was a requirement of the Service Financing Agreement with Bonaire Highlands – recognizes the Township’s portion of the cost of the project. Total project cost estimated to be $1,100,000 Insufficient funding estimated in 2014 budget, additional funds required to complete project ($48,000 available) Project initiated in 2014 with funding for Class EA. 2015 funding for design and approvals. 2016 amount required for construction. Total project cost estimated to be $1,130,000 66 72 73 74 75 76 77 CWCS Sportsplex Building – Aquatics Façade Victoria Park Senior Centre Expansion Bissell Park Accessible Washrooms Park Identification – All Parks Additional funding required per consultant’s estimate to correct the deficiency ($500,000 available) 2015 funding recognizes the additional cost of the project as per COR2014‐35 and Tender T‐10‐14 Additional funding required for an accessible washroom and ramping at Bissell Park ($150,000 available) Ongoing project initiated in 2014 that continues for a number of years ($19,500 available) Westminster Highlands Park – Project approved during 2014. Recognition of Play Equipment & Basketball Township’s 2015 funding commitment to the project per Court (Fergus) the agreement Strathlea Subdivision Park Project approved during 2014. Recognition of the (Fergus) Township’s 2015 funding commitment to the project per the agreement Emerald Ash Borer Program Initially funded in 2014 budget. Additional funding to develop and begin implementation of strategy ($60,000 available) Highway Gartshore N Storm Structure St g arry Scotland Wa ar v ey Walke r Av e F lannery t c hison Lane ge vil le E Wellington Rd 18 2014-059, 2011-067, 510-0447 2015-039 Scotland McQuee n Or an E Gow Herrick Thistle Hillside E Alice Tait a viso n Tom James Cameron Gowrie Gowrie S St Athol Tower M George Barker Gartshore Gzowski m y Victoria St Woodside Perry Athol Perth St Riley Aberdeen Guelph tt Millbu r n St St St St David ill dh W oo Rev N 6 McTavish can Crt Gilkison Finnie Healey McGowan Steele St Gerrie Ronald Bridge Hill 7 Sideroad D Andrew Belsyde Cherr E Dianne tt Argyll illiga McQueen Highland Sc o Elkin St St in Cres E Patrick 2015-013 Sideroad 4 Project Type George E d 2009-052, 405-0354 r Hill H Prince's 2012-111 St E St on Albert y Hill Barnett 550-0451 St las m La W Wellington Elora Dou 2015-040 330-0398 2015-030, 760-0318 side E Glen A en Que Union Dickson Elg ae W St McAlist e Blair st St Forfar Hill r Towe Rd F ergus 2015-018, 360-0436 k Bella Garafraxa 2011-013 ir ill o Prov Acord a Bl Br Ri ver Bon Patric St ne Omar C hou n olqu W e alba h ut Rd Parkside John r Towe en Line Georg d Brea St So Wellington Kelsow Strathallan Glengarry Gordon Gordon Gordon E dinburgh Black Maid First W 301-0428 Hill n Joh n sto fford S ta ck Bla ell Garafraxa 18 lls 301-0045 Hill kis Peglar 19 ia Elizabeth Beatty Kertland Cuttin g S Spencer MIllage We lling ton G il Gibbons 301-0037 Gregson g York Clarke Patrick 2015-016 r ve Ri Ha Par k Wellesley John Mary 301-0444 Grah John Mary Chalmers Melville Princess Melville St Colborne on York 360-0356 Churc h 550-0014 St Mi ll am SR l lie Holman McNa b W ilson Co Gerrie Irvine Stanle Erb North South Victo ria East St G ourlay 301-0463 Du n ood Church Colborne o Ann Cre St l High Moir 2012-019 Water Nichol Wellington 18 Camp b e l s Thomas 2015-038 SR 10 Sideroad Harper David Ryan Rd ley Far Victo r Smith 2015-020 Rea 550-0461 Rd Victori a Sophia 105-0415 Water y Dr Ross Walser St 360-0456 Mathieson s 105-0414, 2015-007, 2015-008, 2015-009 301-0429 Jame Rd Marr Cuthbert Ste v en J Stumpf Clegg Marr Bricker Emily 2014-021, 2015-004 Beatty Line N St G eddes Gold 2015-045 John n Avruskin 6 Appendix H Sewer Road Road, Sewer, Water Water Trail Sewer, Water Author: gwolowich Date: 2015-01-07 Time: 1:33:41 PM Capital Projects Based on 2015 Draft Budget Appendix H (Urban Projects) 0 100200 400 1:30,000 Path: O:\PLANNING_DATA\Public_Works_Projects\Capital_Projects\2015\MXD\Captial_Projects_Urban_2015.mxd 600 800 m Sources: Parcel Fabric: Wellington County, 2009. Teranet, 2002. Orthophotography: First Base Solutions, Wellington County, 2006. Information on this map was produced with permission from the County of Wellington. Data provided herein is derived from sources with varying levels of accuracy and currency. This is not a survey product. The Township of Centre Wellington disclaims all responsibility for the accuracy or completeness of information contained herein. The Township of Centre Wellington assumes no responsibility for errors arising from use of these mapping products. All rights reserved. May not be reproduced without permission. © The Township of Centre Wellington, County of Wellington. Line Rd George 15 St Broadway Line North Seventh St Line Nelson Sixth Queen Fifth St deroad 9 Belwood Si Wellington Smith Line Rd St St 16 Third Line Third Rd 26 Rd Wellington Line Sixth Seventh Line Fifth Wellingt on Line Line Townline Lin e Line Third Fifth Line 18 Sixth Second Line 30 Rd RdSidero19 ad Maple Leaf Acres Fourth 29 Wellington Wellington Line Line Line First lling 29 Rd 2015-023 Rd Jones Line H i gh way 14 Eighth Wellington Baseline Guelph 6 Sixth Sideroad 2015-012 19 Lake Belwood xa Eramosa-Garafr a 6 Line Sideroad E Line Fourth Sideroad Fourth Second Sixth 10 Wellington E Line N E Line E Line Eighth Weisenberg Rd St Line Tower 7 Second Rd 4 Wellington Rd 18 Wellington Rd Well i n gt o n St W ell ing Eighth Sideroad 12 Baseline 6 18 Rd Lin e Sideroad Highway Line Line 19 Wellington Fourth 2015-068 Sideroad Jones N Rd Gerrie St ton S to n First 2013-009 Third Rd W East Mi ll St 10 We 21 Colborn Wel lin 15 Rd Line Sideroad e Rd Sideroad Gartshore St 2012-064 10 Beatty 18 Gedde s St Rd Sideroad on gt brook dle 10 Irvine First W Third Wellington Mid Sideroad Line Noah Rd 11 St Sideroad Line W Appendix I 22 22 Capital Projects Based on 2015 Draft Budget Project Type Structure Road Design Work Author: gwolowich Date: 2015-01-07 Appendix I (Rural Projects) Road 0 Time: 1:34:10 PM Path: O:\PLANNING_DATA\Public_Works_Projects\Capital_Projects\2015\MXD\Captial_Projects_Rural_2015.mxd 700 1,400 1:100,000 2,800 m Sources: Parcel Fabric: Wellington County, 2009. Teranet, 2002. Orthophotography: First Base Solutions, Wellington County, 2006. Information on this map was produced with permission from the County of Wellington. Data provided herein is derived from sources with varying levels of accuracy and currency. This is not a survey product. The Township of Centre Wellington disclaims all responsibility for the accuracy or completeness of information contained herein. The Township of Centre Wellington assumes no responsibility for errors arising from use of these mapping products. All rights reserved. May not be reproduced without permission. © The Township of Centre Wellington, County of Wellington. Appendix J 2015 Pavement Management Plan Proposed Year 2015 2015 2015 2015 2015 2015 2015 2015 Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Full Depth No No No Yes No No No No Resurfacing Patches Yes Yes Yes No Yes Yes Yes Yes Street Town Between Colborne Chalmers McNab St Margaret St (Civic Centre) St David St N - HWY 6 Provost Bon Accord St David St Elora Elora Elora Elora Fergus Fergus Fergus Elora John St and Cuthbert St Intersection at Moir St High St and Bridge St James and Victoria Cres Edinburgh and St Andrew John St and Hill St W Raglan and Cul de Sac Geddes St and N Queen St No No Yes No No No No No No No No No No No No No No No No No Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Conservation Trail Erb St Erb St Waterloo Wellington St Foote Cres Cuthbert St Princess St Victoria St Water St Tom St Hill St E Raglan Fergus St Beatty Line S Stephen's Crt. Union St E Victoria Terrace Woodhill Dr John St Emily St Belwood Elora Elora Elora Elora Elora Elora Elora Elora Elora Fergus Fergus Fergus Fergus Fergus Fergus Fergus Fergus Fergus Salem Salem Green Valley Rd and SR9 Emily St and Mathieson St Sophia St and Dead End Nichol St and York St Cuthbert St and Cuthbert St Wellington Dr and Cul De Sac Wellington Dr and Colborne St East Mill and Church Carlton St and McNab St WR7 and Victoria St St Patrick St and St Andrew St Gartshore St and Tom St WR18 and Bon Accord St WR18 and Beatty Line S Fergus St and Colquhoun Guelph St Bridge St and Hillside Dr Forfar St and Parkside Dr Black St and Campbell Ave Geddes and Dead End Geddes St and Erb St Notes: 1. The majority of the locations are limited to resurfacing specific patching areas (hot mix asphalt). This process involves milling 50mm existing and repaving. 2. Full depth restoration involves pulverizing the entire surface, regrading the base and repaving with hot mix asphalt. McQue e n First ge v ille 19 Gow Lane Lamo nd Wellingt on Rd 18 29 E Rd F lannery Or an t c hison Anderson St Scotland Scotland McTavish M E E Wellington D Wa lke r Tait n tt Millbu r n George St Wa tt ar v ey Av e Belsyde Cherr a viso n M cQ uee Thistle Gowrie S St David St Elkin r St Alice Highland Arg yll E E Andrew Rd Dianne Barker St St Wellington Tom Cameron Herrick Hill Hillside s S St Tower Albert g arry St Gartshore Gzowski y Victoria James in St Woodside Perry Athol Perth Riley Aberdeen e rs W illiga Guelph Conservati Gartshore N St David dh ill W oo Rev Gilkison 6 Patrick Sc o Sideroad E St E Queen y Hill Cham b St Line Highway can Crt Beatty Gerrie Finnie N Prince's St Athol Grah Jo Ronald Healey Steele St Rd Stanle en Stev Cuthbert Kertland Wellesley Mary Mary John Bridge McGowan ee n Qu Cres Barnett las A e n zi e Wellington Elora W St E Gle n H B raeside Dou Cre s Belwood Dic kson in Elg Rd Site 4 McAlist e Blair Hill M Un io n St Forfar r R i v er Al ir Bella m Garafraxa Towe n Ber g st Wellington Parkside E din burgh o Pro v Rd uho u a Bl Gordon Strathallan Joh n k Patric St ane Acord Colq ge d alb h ut Riv er Bon F ergus W Brea So Om ar n Line G e or Jo h nsto St Stafford First W Hill Gordon Kelsow 9 Sideroad Glengarry Peglar Allan Dr G re en Valley Rd Amalia Gr egson g Garafraxa r Towe en Clarke Melville Gerrie Irvine John Aqua Melville Chalmers Princess St Geddes Pri ce M Victoria etc alf e a Hig h kis Gibbons Black Maid Park S ck ell ton 18 7 Hill B la MIllage Trail on 19 ri a Elizabeth 10 Sideroad Harper G il Sp encer Hill We lling r ve Ri lls Speers SR l lie Colborne Patrick rge St Lake Belwood ood Y ork Co am St Mill St Ha W ilson Du n on Yo rk Colborne 18 Victo b East G ourlay SR Holman Water McN a St Ann Cre Rd y Rd Nic ho l Church le Far St Camp b e ll Water Wellington Site 3 Ryan St W Ross M Carlton i l l es Site 2 Rea Thomas s Jam n iel Cuttin g Er b No rth South Sophia y Da Site 1 Walser Dr Mathieson David Beatty Marr Clegg M ar r eo 6 Line St G eddes Gold Bricker Stumpf 19 Rd Wel lington N James Water Ann Mill John Emily Victo ri 15 G Elizabeth f ord Avruskin Sideroad Woolwich n Mill 2015 Pavement Management Sites - Urban Repair Type 2015 Full Depth Restoration Future Full Depth Restoration Author: aflanagan O Date: 2015-01-14 2015-050 2015 Pavement Resurfacing Patches Future Pavement Resurfacing Patches 0 250 Time: 2:51:45 PM Path: C:\Alex\Adam\2015_Pavement_Management\2015_Pavement_Management_Urban_Update.pdf.mxd 500 1:30,000 1,000 Meters Sources: Parcel Fabric: Wellington County, 2009. Teranet, 2002. Orthophotography: First Base Solutions, Wellington County, 2006. Information on this map was produced with permission from the County of Wellington. Data provided herein is derived from sources with varying levels of accuracy and currency. This is not a survey product. The Township of Centre Wellington disclaims all responsibility for the accuracy or completeness of information contained herein. The Township of Centre Wellington assumes no responsibility for errors arising from use of these mapping products. All rights reserved. May not be reproduced without permission. © The Township of Centre Wellington, County of Wellington. Site 1 - Margaret Ave, Elora (Civic Centre Parking) – Full Depth Restoration and increased parking. Site 2 – Chalmers and Moir St., Elora – Looking west on Moir St. Site 3 – Colborne St., Elora – typical patch Site 4 – St. David St. N. (HWY#6) – typical patch
© Copyright 2024