J/U WIND PIONEER - DBB Jack-Up

J/U WIND PIONEER
CLASSIFICATION & RULES
Type
HI1200
CARGO CAPACITY
Built
2010 – rebuilt in 2014-2015
Yard
Originally Hyundai HI, South Korea,
Rebuilt at Oerskov Yard, Denmark
Max payload incl. of
650 t
bunkers and consumables
Class
Flag
Main deck area
Approx. 530 m2
1A1 R2 Self-Elevating Wind
Turbine Installation and Crane Unit
DYNPOS-AUT
Main deck load capacity
7.5 t/m2 with strong points
Danish
Number/type
4/tubular
Diameter
2.3 m
Length
56 m
Spudcan area
27 m2
MAIN DIMENSIONS
HULL
LEGS & SPUDCANS
Length, waterline
50 m
JACKING SYSTEM
Length, overall
56/92 m
Type
Rack and pinion
Width, overall
28 m
Drive
Electro-hydraulic
Hull depth
4.5 m
Elevating speed
0.5 m/min
Draught (hull)
3.0 m
Pre-load capacity, active
1,200 t/leg
Distance between legs
Longitudinal 38.5 m
Jacking capacity, passive 1,200 t/leg
Transverse 23 m
SPECIFICATIONS | J/U WIND PIONEER
OPERATIONAL LIMITATIONS
TANK CAPACITIES
Available leg length 1
41 m
Fuel
150 m3
Jacking
Up to 1.35 m Hs
Fresh water
173 m3
Sewage
30 m3
CRANES
FUEL CONSUMPTION
MAIN CRANE
Type
Liebherr BOS 7500
Boom length
78 m
Capacities
150 t (232 t) @ at 19 m radius @ 78
m height above deck
50 t @ 18 m radius @ 74 m height
above deck
22 persons
Day rooms, changing rooms for men and women, office, coffee
shop, deck room, mess room, laundry and gymnasium
PROPULSION UNITS
Approx. 5 knots (towed)
1.5 t/24h
FACILITIES
Aux. hoist approved for man riding. SWL max 2 t
Speed
1 t/24h
Elevated, crane work
Additional accommodation in TLQ’s can be added 2
40 t @ 69.8 m radius @ 48 m height
above deck
4 x 744 kW azimuth thrusters
Elevated, standby
Charterer’s fixed
accommodation in
single cabins
AUXILIARY HOIST
Thrusters
1 t/24h
ACCOMMODATION & FACILITIES
44 t @ 65 m radius @ 42 m height
above deck
Capacities
Transit (towed)
1
Operational water depth is dependent on soil conditions and site-specific assessment.
2
Dependent on project-specific layout.
Vessel specifications set out are approximate and the owner offers no warranty
or representation in relation to the same.
POWER
Diesel-electric engines. 3 generator sets with a total capacity
of 1,320 kW
POSITIONING
The propulsion system is arranged for dynamic positioning
with DP1 notation
55375
19369
BRIDGE DECK
10800
C-DECK
B-DECK
POWERPACKS
FOR THRUSTERS
A-DECK
A
COFF.
VOID
F.W.
NO.3 W.B.
NO.2 W.B
BASE LINE
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
FP
T. +45 87 30 84 00
F. +45 87 30 84 10
M. [email protected]
www.dbbjackup.dk
80
85
90
95
10
0
AP
10
5
Rev.4 (2.2015)
Borneovej 28
DK-8000 Aarhus C
Denmark
AFT
.
F.O
NO.4 W.B.
J/U WIND PIONEER
VOID
PUMP ROOM
FORWARD