Showerlux Legacy Pivot Door Installation Instructions

Showerlux Legacy Pivot Door
Installation Instructions
IMPORTANT - PLEASE READ
● Please read these instructions carefully before assembly and installation.
● Please inspect immediately upon receipt for damage that may have been caused in
transit. Please examine all exposed glass edges and corners prior to assembly,
damaged edges can cause spontaneous breakage during product life time.
● Damage reported later cannot be accepted.
● Please assess the weight of this product prior to assembly and installation. Seek
assistance should you require it.
● Before installation, you must ensure that the shower tray is level in all directions and
completely sealed to the tiles.
● This product must only be fitted onto tiled or waterproof surfaces.
● The wall plugs and screws supplied are for use on solid walls and floors only. Any
other surface will require alternative fixings.
● The enclosure when fitted, must not overhang the front of the tray.
● Please leave this instruction leaflet with the customer.
HINTS & TIPS
● Surfaces to be siliconed should be de-greased in accordance with
silicone suppliers instructions, observing any safety instructions.
● Ensure there are no hidden pipes or cables in the wall before
drilling.
● If using power tools (e.g. to drill holes) wear safety glasses and
always disconnect tools from the power supply after use.
● If drilling holes in ceramic tiles use a piece of masking tape on the
tile to stop the drill bit from slipping.
● DO NOT use your drill on hammer action when drilling holes in
ceramic tiles.
● Use the opened out enclosure packaging to protect your floor and
wall while assembling.
● To check spirit level accuracy place on a horizontal surface. Note
the bubble position between markers. Rotate the spirit level through
180 Degrees horizontally then note the bubble position. Check both
noted positions match each other. If they do not match recalibrate
or renew the spirit level. Repeat the test also in the vertical plane.
CARE & MAINTENANCE
● To prevent the formation of water spots on the glass, use the
squeegee supplied in the installation fixing pack to wipe down the
glass after every shower.
● Always use plenty of water and a soft cloth or sponge to wipe down
all aluminium sections and plastic parts.
● Aggressive proprietary cleaning agents may seriously damage your
product. Do not use any solvent or abrasive chemicals to clean this
product.
● We recommend that this product is cleaned with Showerlux
'Showerclean' once a week. This will help to reduce the build up of
lime scale.
● Showerlux enclosures and screens are generally maintenance free.
However, it may be necessary to lubricate roller assemblies or other
moving hinge parts occasionally. Use a high quality silicone spray
on the moving parts as required.
(1)
Please Read Carefully
Showerlux 'LEGACY' shower enclosures can be installed
without the need to step inside the Shower tray area.
Please follow the instructions carefully
TOOLS REQUIRED
3.2
6
LIST OF SPARE PARTS
A
X2
B
X2
C
X1
D
X2
ST4*30
Long
(R)(L)
E
X2
F
X8
G
X8
H
X8
ST4*12
short
I
X8
J
X1
K
X1
(2)
L
X1
M
X1
ST E P 1
Please ensure the shower tray is level
in all directions as shown above
S TE P 3
ST E P 2
1.Push fit the top covers (D) as shown above.
2.push fit the vertical compensators (A) please
ensure the visible punch holes are on the outside
of the enclosure to allow external fixing.
STEP 4
G
6
Position the enclosure 11mm in from the ledge of the tray to the face shown above ensure the vertical
wall compensator is positioned to the outside of the tray with the holes visible for external fixing.
Ensure the frame is level and mark the points for drilling. Remove the enclosure from tray, position safely
to one side and drill the marked positions and fit plugs as shown (G).
(3)
STEP 5
H
Reposition the frame and attach the wall compensator with the screws (H).
STEP 6
K
C
J
Fit the handle (C ) first, then push fit the vertical magnet (K) to the handle side
of the door & the vertical flipper seal (J) to the rear side as shown above.
(4)
STEP 7
Secure the frame to the wall comp with parts (F) & (I) ensuring that the glass is parallel to
the frame as shown above then apply cover (B) as shown in the diagrams above.
STEP 8
STEP 9
Push-fit the lower seal to glass, as shown above.
Push fit the top covers (E)
as shown above.
Ensure the seal is cut flush at the hinge end (1) and fit
tightly against the hinge. Cut & shape the seal around
vertical magnet (2) and silicone into position (3).
Failure to do so, can significantly affect the product's performance.
(5)
STEP 10
From the outside apply sealant down the full length of the vertical wall compensators
and across the base of the lower rail as illustrated. Ensure to seal 50mm up the external
rail joints as shown in the diagram below.
SHOWERLUX HELPLINE:02476 882518
SHOWERLUX(UK) Ltd.
Fax:02476 882539
Sibree Road,Coventry,West Midlands CV3 4FD
Email:[email protected]
Tel:02476 639400
Email:[email protected]
Fax:02476 305457
Due to a policy of continuous improvenment and product development, Showerlux UK
Limited reserves the right to amend specification without notice
(6)
PRODUCT SCHEMATIC DIAGRAM
E
F
K
D
J
G
C
A
S-61 8
I
M
(7)
L
H
B