TT250 Trade Tower Instruction Manual DESIGNATION: TT250 TRADE TOWER EN 1004 — 3 — 7.1/7.1 — XXXD CEN designation of this instruction manual EN 1298 — IM — en Rev-01 This assembly instruction is designed to provide a step by step guide to ensure easy and safe erection using This assembly instruction is designed to provide a step by step guide to ensure easy and safe erection using the theThis 3T (Through The Trap) build method. This assembly assembly instruction instruction isisdesigned designed to toprovide provide aastep step by bystep step guide guide to toensure ensure easy easy and and safe erection usingthe the the This assembly instruction is designed to provide a step by step guide to ensure easy andsafe safeerection erection using using 3T (Through The Trap) build method. 3T (Through Thebuild Trap) build method. 3T 3T(Through (Through The TheTrap) Trap) build method. method. This assembly instruction is designed to provide a step by step guide to ensure easy and safe erection using the Read this guide and ensure understanding before starting assembly. 3T (Through Trap) build method. Read this guide and ensureThe understanding before starting assembly. Read this guide and ensure understanding before starting assembly. Read Readthis thisguide guideand andensure ensureunderstanding understandingbefore beforestarting starting assembly. assembly. Read this guide and ensure understanding before starting assembly. The guide shows construction a spigot-down HEIGHTS system. A spigot-up system follows the same steps. SAFE WORKING LOADS ANDof The guide shows construction ofWORKING a spigot-down system. A spigot-up system follows the same steps. The guideof shows construction ofsystem. a spigot-down system. A spigot-up follows samesteps. steps. The Theguide guideshows showsconstruction construction of aaspigot-down spigot-down system. AAspigot-up spigot-up system systemsystem follows follows the thethe same same steps. SAFE WORKING LOADS AND WORKING HEIGHTS The safe working load on SAFE the working platform isAND 180kg evenly distributed WORKING LOADS WORKING HEIGHTS SAFE WORKING LOADS AND WORKING HEIGHTS SAFE SAFE WORKING WORKING LOADS LOADS AND AND WORKING WORKING HEIGHTS HEIGHTS The load on the working platform is 180kg evenly distributed. Doensure not extend the build height above that The safe working loadsafe onworking the working 180kg evenly Do not extend the build height above thatthe This tower assembly instruction isplatform designed to provide a stepdistributed. by step guide to easy and safe erection using The total loading the structure should notis 400kg. The safeon working load on the working platform isexceed 180kg evenly distributed. Do not extend the build height above that 3T on (Through The Trap) build method. The The safe safe working working load load on the the working working platform platform is is 180kg 180kg evenly evenly distributed. distributed. Do Do not not extend extend the the build build height height above above that that shown in thisfor guide. Maximum platform height is 7.1m indoor and outdoor use. shown in this guide. shown in this guide. Read this guide and ensure understanding before starting assembly. shown shownininthis thisguide. guide. WARNING WARNING The guide shows construction of a spigot-down system. A spigot-up system follows the same steps. ON AN NEVER STAND WARNING WARNING NEVER STANDPLATFORM ON AN UNGUARDED SAFE ASSEMBLY WORKING PROCESS LOADS AND WORKING HEIGHTS UNGUARDED NEVER NEVER STAND STANDPLATFORM ON ONAN AN UNGUARDED UNGUARDEDPLATFORM PLATFORM ASSEMBLY PROCESS The safe load on the working platform is 180kg evenly distributed. Do not extend the build height above that 1.working Preparation ASSEMBLY PROCESS ASSEMBLY PROCESS • Locate the tower, ensuring ground is level. shown in this guide. 1. Preparation ASSEMBLY ASSEMBLY PROCESS PROCESS 1. Preparation • Unlock the interlock pins on all frames. 1. Preparation • Locate the tower, ensuring ground is level. • When installed, always move the interlock pin to the “locked” •1.Preparation Locate the tower, ensuring ground • Locate the tower, ensuring groundisislevel. level. position. 1. Preparation • Unlock the interlock pins on all frames. • Unlock the the interlock pins frames. interlock pins on all all into frames. • Unlock • Sort the on braces horizontal and diagonal braces ••Locate Locate•the the tower, tower, ensuring ensuring ground ground isisinterlock level. level. When installed, always move the pinpin to the the diagonals are longer. • When installed, always move theslightly interlock to “locked” • When installed, always move the interlock pin to the “locked” position. Unlockthe the interlock interlock pins pins on on all all frames. frames. ••Unlock • Unlock the brace locks. position. position. the “locked” ASSEMBLY PROCESS • Sort thealways bracesmove into horizontal andpin diagonal •••When When installed, installed, move the theinterlock interlock pin to tothe thebraces “locked” “locked” Sort into horizontal and • the Sortbraces thealways braces into horizontal anddiagonal diagonal braces diagonals are slightly longer. 1. Preparation position. position.the the diagonals are slightly longer. braces - the diagonals are slightly longer. (attaching castors) 2. Base • Unlock the• Locate brace locks. the tower, ensuring ground is level. •••Sort Sort the the braces braces into into horizontal horizontal and and diagonal diagonal braces braces-• Unlock the brace locks. Unlock the brace locks. Step 1: Ensure interlock pins are removed from the base frame Unlock the interlock pins on all frames. • the thediagonals diagonalsare areslightly slightlylonger. longer. WARNING NEVER STAND ON AN UNGUARDED PLATFORM Note the locking and unlocking position for the castors • When installed, always move the interlock pin to the “locked” Step 2: Install castor into the leg by pushing with manual ••Unlock Unlockthe thebrace bracelocks. locks. position. force only, (without tool use). 2. Base (attaching castors) • SortStep thecastors) braces horizontal and diagonal braces 3: Insert into the interlock pin as shown 2. Base (attaching the diagonals areare slightly longer. Step 1: Ensure interlock pins removed from the base frame 2. Base (attaching castors) Step 4: Lock before ascending any part of Step 1: Ensure interlock pinscastors are removed from the base frame • Unlock pins the brace locks. the tower. Step 1: Ensure interlock are removed from the Step 2: Install castor into the leg by pushing with manual Base Base (attaching (attaching castors) castors) 2. 2. frame base Step 2: Install castor into the leg by pushing with manual force only, (without tool use). force only, (without tool use).from Step Step1: 1:Ensure Ensureinterlock interlock pins pins are areremoved removed fromthe thebase baseframe frame 3: castor Insert the pin asthe shown 3.interlock Locking down platformwith (Windlock) Step 2: Step Install into the leg by pushing Base (attaching 2. the Step 3: Insert interlock pincastors) as shown manual forcecastor only,into (without tool use). windlock clip is installed onmanual the platform at the hook. Step Step2: 2:Install Install castor intoA the the leg leg by by pushing pushing with with manual Step force only, (without tool use). Step 4:Lock Lockcastors castors before ascending any part Step 3: Insert the interlock pin as shown Step Step4: 4: Lock castors before before ascending ascending any any part part of of of 3. Locking down the platform (Windlock) the tower. the the tower. tower. down the platform (Windlock) 3. Locking Step 4: Lock castors before ascending any part of A windlock clip is installed the tower.on the platform at the hook. A windlock clip is installed on the platform at the hook. This is locked as shown here. This is locked as shown here. 01 3. 3.Locking Lockingdown downthe theplatform platform(Windlock) (Windlock) 3. Locking down the platform (Windlock) 3. Locking down the platform (Windlock) AAwindlock windlockclip clipisisinstalled installed on the the platform platform at the hook. hook. A windlockon clip is installed onat thethe platform at the hook. AThis windlock clip installed on the platform at the hook. This isislocked locked as asisshown shown here. here. This is locked as shown here. This is locked as shown here. 01 01 01 01 01 Noteunlocking the thelocking locking and and for Note the locking Note and position unlocking unlockingposition positionfor forthe the the castors castors castors Step 4: LockStep castors before ascending any part offrom the base frame is locked as shown here. 1:This Ensure interlock pins are removed Steponly, 4: Lock castors before ascending any part of force force only, (without (without tool use). use). the tower. tool 3: Insert the interlock pin as shown theStep tower. 2: Install castor into the leg by pushing with manual Step Step3: 3: Insert Insertthe theinterlock interlockpin pinas asshown shown 2 Note the locking and Note the locking and unlocking position for the unlocking castors position for the castors Note the locking and unlocking position for the castors WARNING USAGE ADVICE • • • • • • • • • • • • • • • • NEVER STAND ON AN UNGUARDED PLATFORM We recommend a minimum of two people to assemble, dismantle and move the platform tower. Check that all components are on site and in good working order. Ensure that the assembly location is checked to prevent hazards during assembly, dismantling or moving and while working on the tower. Particular attention should be given to the ground condition, whether level or sloping, obstructions and wind conditions. The ground condition must be capable of supporting the tower structure. Towers must always be climbed from the inside of the assembly using the ladder. Lifting of components must be done inside the effective base area of the tower; components are normally hoisted using a rope. Moving the tower must only be done by manual effect from the base of the tower. When moving tower be aware of overhead hazards (e.g. electric cables). No personnel or material to be on the platform whilst the tower is being moved. Beware of horizontal loads which can lead to instability of the tower. The maximum side force is 20kg. Do not use boxes or steps to gain additional height. If extra height required, contact your distributor to get extra components. Do not lift or suspend an assembled mobile tower. Damaged components or components from other tower systems must never be used. Stabilisers should always be fitted when specified. Use the stabiliser shown on the component list according to the tower height. When wind exceeds Beaufort force 4, cease using the tower. If wind is expected to reach Beaufort force 6, tie tower to a rigid structure. If winds of Force 8 are forecast, dismantle the tower or remove to shelter. Wind speeds Force Peak mph Peak km/h Peak m/s Guidance 4 18 29 8.1 Moderate breeze - raises dust & loose paper 6 31 50 13.9 Strong breeze - difficult to use umbrella 8 48 74 20.8 Gale force - walking is difficult CARE AND MAINTENANCE • • • • • • 3 Keep all equipment clean, especially spigots and sockets where frames join. Spigots should fit easily into sockets. Lubricate with light oil. Remove dirt or paint from adjustable legs with a light brush, lightly oil the leg locks. Do not strike or hammer components. Do not throw or drop onto hard surfaces. Lightly oil spring mechanism of the hooks. For transport and storage, components are best stored vertically. Damaged parts must be repaired or replaced; refer to the Instant Upright website for further advice or contact your equipment supplier for advice. STABILISERS STABILISERS STABILISERS Outriggers Outriggers Outriggersare are areto totobe be beused, used, used,when when whenspecified, specified, specified,to totoguarantee guarantee guaranteethe the thestructural structural structuralstability stability stabilityof ofofthe the thetower. tower. tower. Outriggers are to be used, when specified, to guarantee the structural stability of the tower. STABILISERS Stabilisersaretobeused,whenspecified,toguaranteethestructuralstabilityofthetower. Fig.2 Fig Fig Fig222 Fig 2 Fig.3 Fig Fig Fig333 Fig 3 Fig.4 Fig Fig Fig444 Fig 4 For working platform heights< 5.3m Standard stabiliser: x = 3053mm ALWAYS ALWAYSENSURE ENSURESTABILISER STABILISERSIZE SIZEISISCORRECT CORRECTAND ANDABLE ABLETO TO ALWAYS ENSUREplatform STABILISER SIZE IS CORRECT AND ABLE TO For working heights > 5.3m Large stabiliser: x = 4780mm SUPPORT SUPPORTTOWER TOWER SUPPORT TOWER STABILISERS Lightly Lightly Lightly tighten tighten tightenthe the theupper upper upperclamps clamps clampsabove above abovethe the thesixth sixth sixthrung rung rungon on oneach each eachcorner corner cornerpost. post. post.Position Position Positionthe the thelower lower lowerclamp clamp clamp Lightly tighten the upper clamps above the sixth rung on each corner post. Position the lower clamp above above abovethe the thebottom bottom bottomrung. rung. rung.Ensure Ensure Ensurethe the thelower lower lowerarm arm armis isisas as ashorizontal horizontal horizontalas as aspossible. possible. possible.Position Position Positionthe the thestabilisers stabilisers stabilisersso so sothat that that Lightly tighten rung. the upper clamps above sixth rung onaseach corner post. Position the lower clamp above the bottom Ensure the lower armthe is as horizontal possible. Position the stabilisers so that the the thefootpads footpads footpadsare are areapproximately approximately approximatelyequidistant equidistant equidistantfrom from fromeach each eachother, other, other,as as asshown shown shownin ininFig.2. Fig.2. Fig.2.Adjust Adjust Adjustthe the theoutrigger outrigger outriggerand and and the above footpads are approximately equidistant fromarm each as shown Fig.2. Adjust the outrigger and the bottom rung. Ensure lower is other, as horizontal asinpossible. Position the locking stabilisers reposition reposition repositionthe the theclamps clamps clampsas as asrequired required required to totothe make make make firm firm firmcontact contact contact with with with the the theground. ground. ground. Ensure Ensure Ensurethe the the clips clips clipswith with with locking lockingpin pin pinare are are reposition the clamps as required to make firm contact with the ground. Ensure the clips with locking pin are in ininplace. place. place. When When When in ininthe the thecorrect correct correct position, position, position,tighten tighten tighten the the theclamps clamps clamps firmly. firmly. firmly. so that the footpads are approximately equidistant from each other, as shown in Fig.2. Adjust the in place. When in the correct position, tighten the clamps firmly. outrigger and reposition the clamps as required to make firm contact with the ground. Ensure the To To Toposition position position the the the tower tower toweragainst against against aawall, wall, wall,do do do not not notremove remove remove the thestabiliser; stabiliser; stabiliser; move move move parallel parallel parallel with with with the the thewall. wall. wall. (Fig.3) (Fig.3) (Fig.3) clips with locking pin are ain place. When in thethe correct position, tighten the clamps firmly. To position the tower against a wall, do not remove the stabiliser; move parallel with the wall. (Fig.3) To To Toposition position position the the thetower tower tower in ininaaaagainst corner, corner, corner,remove remove the thenot inside inside inside stabiliser stabiliser stabiliser and and andplace place placethe the theoutside outside outside two two two parallel parallel parallel with with withthe the thewall. wall. wall. To position the tower aremove wall, the do remove the stabiliser; move parallel with the wall. (Fig.3) To position the tower in a corner, remove the inside stabiliser and place the outside two parallel with the wall. (Fig.4) (Fig.4) (Fig.4) (Fig.4) To position the tower in a corner, remove the inside stabiliser and place the outside two parallel with Ballast Ballast Ballastweight weight weightmaybe maybe maybeused used usedto totostabilise stabilise stabilisethe the thetower, tower, tower,please please pleasecontact contact contactyour your yoursupplier supplier supplierfor for forthe the thecorrect correct correctamount amount amountof ofof the wall. (Fig.4) Ballast weight maybe used to stabilise the tower, please contact your supplier for the correct amount of ballast ballast ballastweight weight weightrequired. required. required. ballast weight required. 03 03 03 03 4 SPECIFIC PRODUCT INFORMATION Table of parts and quantities TT250 - 0.8m, 1.8m, 3.5m, 5.3m and 7.1m to EN1004 and WAHR Platform Height 0.8m 1.8m 3.5m 5.3m 7.1m Work Height (m) 2.8m 3.8m 5.5m 7.3m 9.1m Tower Height (m) 1.8m 2.8m 4.5m 6.3m 8.1m Tower Weight in kg 29.5 42.0 81.5 91.5 123.0 Description Weight (kg) 0.8m 1.8m 3.5m 5.3m 7.1m 1 1 1 1 1 5 9 9 13 Trade tower base frame 11.5 Horizontal brace 1.7 Diagonal brace 1.2 1 2 4 8 10 Trapdoor platform 9.8 1 1 2 2 3 4 rung extension frame 2.0 2 2 2 2 Stabiliser 2.8 4 4 4 Castor 2.0 4 4 4 Toe-board set 6.0 1 1 1 7 rung extension frame 3.5 2 4 6 Stabiliser extension kit 2.0 4 4 4 MOVING TOWER To move the tower to a new position, first prepare the tower. • • • • • • • • • • • 5 Check that the wind speed does not exceed 29km/h (8.1m/s). Ensure the tower is empty (material and personnel) Check for overhead obstructions including electrical cables. Raise and stabiliser feet (only enough to clear obstructions). Taking care to ensure tower stability is maintained. Release the castor brakes. Carefully move the tower by manually applying force at the base. Do not use mechanical means to move the tower. Once positioned prepare the tower for use. Check and adjust as necessary to ensure all castors and stabilisers are in firm contact with the ground. Check that the tower is vertical using a spirit level. Reapply the castor brakes. TRADE TOWER - 0.8m 6 1 2 3 4 5 6 TRADE TOWER - 1.8m 7 1 2 3 4 5 6 7 8 TRADE TOWER - 1.8m 8 9 10 11 12 TRADE TOWER - 3.5m 9 1 2 3 4 5 6 7 8 TRADE TOWER - 3.5m 10 9 10 11 12 13 14 15 16 TRADE TOWER - 3.5m 11 17 18 19 20 TRADE TOWER - 5.3m 12 1 2 3 4 5 6 7 8 TRADE TOWER - 5.3m 13 9 10 11 12 13 14 15 16 TRADE TOWER - 5.3m 17 18 19 20 21 22 23 14 TRADE TOWER - 7.1m 15 1 2 3 4 5 6 7 8 TRADE TOWER - 7.1m 16 9 10 11 12 13 14 15 16 TRADE TOWER - 7.1m 17 17 18 19 20 21 22 23 24 TRADE TOWER - 7.1m 25 26 27 28 29 18 TT250 - Large stabiliser assembly using Stabiliser + Stabiliser extension kit 19 1 2 3 4
© Copyright 2024